WO2024024177A1 - 缶の製造方法及び製造システム - Google Patents

缶の製造方法及び製造システム Download PDF

Info

Publication number
WO2024024177A1
WO2024024177A1 PCT/JP2023/014031 JP2023014031W WO2024024177A1 WO 2024024177 A1 WO2024024177 A1 WO 2024024177A1 JP 2023014031 W JP2023014031 W JP 2023014031W WO 2024024177 A1 WO2024024177 A1 WO 2024024177A1
Authority
WO
WIPO (PCT)
Prior art keywords
press machine
blank
process press
post
manufacturing
Prior art date
Application number
PCT/JP2023/014031
Other languages
English (en)
French (fr)
Inventor
圭 大堀
達矢 長船
高則 中川
Original Assignee
東洋製罐株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東洋製罐株式会社 filed Critical 東洋製罐株式会社
Publication of WO2024024177A1 publication Critical patent/WO2024024177A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D22/00Shaping without cutting, by stamping, spinning, or deep-drawing
    • B21D22/02Stamping using rigid devices or tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D22/00Shaping without cutting, by stamping, spinning, or deep-drawing
    • B21D22/20Deep-drawing
    • B21D22/28Deep-drawing of cylindrical articles using consecutive dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/02Advancing work in relation to the stroke of the die or tool
    • B21D43/04Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
    • B21D43/05Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work specially adapted for multi-stage presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • B21D51/26Making hollow objects characterised by the use of the objects cans or tins; Closing same in a permanent manner

Definitions

  • the present invention relates to a method for manufacturing cans by deep drawing and a manufacturing system for deep drawing cans.
  • an object of the present invention is to provide a can manufacturing method and manufacturing system that can be supplied at low cost and in a short delivery time.
  • the method of manufacturing cans by deep drawing using a press includes: A pre-process press machine, a post-process press machine, and a conveyance means for transporting a blank from the pre-process press machine to the post-process press machine, and the pre-process press machine blanks a metal plate and adjusts the thickness of the blank.
  • the method is characterized in that it includes a second pressing step for forming a can.
  • the can manufacturing system of the present invention by deep drawing using a press machine, It is equipped with a front-process press machine, a back-process press machine, and a conveyance means for transporting a blank from the front-process press machine to the post-process press machine, and the front-process press machine performs blank processing on a metal plate and adjusts the thickness of the blank.
  • the post-process press machine is configured to perform a coining process to reduce the size of the can, and the post-process press machine is configured to perform a drawing process and/or a drawing ironing process to form a square can.
  • the present invention can construct a manufacturing system that is optimal for the product to be processed, its size, and its processing process, and furthermore, can be provided at low cost and can be designed and manufactured in a short period of time. Furthermore, by using a general-purpose press machine, even when there is a change in the type or size of the product to be processed, it can be handled relatively easily.
  • FIG. 1 is an explanatory side view of the manufacturing system 1 of the present embodiment.
  • FIG. 1 is an explanatory top view of the manufacturing system 1 of the present embodiment.
  • an embodiment of the method of manufacturing a can for example, a square can such as a cell case of a battery such as a lithium ion battery, and the manufacturing system used in the manufacturing method according to the present invention by deep drawing using a press will be described with reference to the drawings. This will be explained with reference to.
  • An embodiment of the present invention (hereinafter referred to as "the present embodiment") is a manufacturing method and a manufacturing system for manufacturing a cell case for a lithium ion battery having a rectangular opening.
  • FIG. 1 is a diagram showing the process of molding a cell case of this embodiment.
  • the manufacturing process of the cell case in this embodiment will be explained with reference to FIG. (1)
  • the uncoiler is a device that unwinds the aluminum sheet S wound into a coil, and supplies the unwound aluminum sheet S to the pre-process press machine 2.
  • the pre-process press machine 2 performs a first press process.
  • the first pressing process is a process in which blanking is performed in the order of blanking process and coining process.
  • the blanking step is a step of punching out a flat blank B, such as an elliptical shape or a compound R shape, for manufacturing cans by deep drawing from the aluminum sheet S unwound from the uncoiler.
  • the coining process is a process of crushing a part of the blank B with a punch to reduce the thickness of the blank. In this embodiment, the coining process is performed on the part that will become the can bottom in the final shape of the can and/or its vicinity. In this process, the thickness of the board is reduced.
  • the coining process there is a step of finger conveying the blank B to the blank conveying device 4.
  • Post-process press machine 3 performs a second press process.
  • the second pressing step is a step in which the blank B is processed into the final cup shape through a plurality of forming steps.
  • the multi-step forming process includes the 1st forming process, which involves drawing a cup C in a flat shape such as an elliptical shape or compound R-shape, and the final forming process, which draws the cup C into the long and short sides of the final product. It has a processing process. After each processing step, there is a step of finger-transferring the cup C to the next processing step, the cup conveying device 5. Note that a necessary molding process may be added between the first molding process and the final molding process.
  • the blanking step, the coining step, and each molding step are performed using a press machine.
  • the presses used in the blanking process and coining process only require a short stroke, but a high pressure capacity is required.
  • the press used in each molding process requires a long stroke, but only needs to have a low pressurizing capacity.
  • a general-purpose press machine with a short stroke and high pressurizing capacity to use the pre-process press machine 2, and used the same press machine for each forming process.
  • the post-process press 3 is selected from general-purpose presses with a long stroke and low pressurizing capacity.
  • the pre-process press machine 2 and the post-process press machine 3 are connected via a blank transport device 4, and a cup transport device 5 for transporting the cup C from the post-process press machine 3 is further combined, as shown in FIGS. 2 and 3.
  • a series of manufacturing systems 1 are arranged as shown in FIG.
  • FIG. 2 is an explanatory side view of the manufacturing system 1 of this embodiment
  • FIG. 3 is an explanatory top view.
  • a manufacturing system 1 having a pre-process press machine 2, a post-process press machine 3, a blank transport device 4, and a cup transport device 5 according to this embodiment will be explained using FIGS. 2 and 3.
  • the pre-process press machine 2 and the post-process press machine 3 are so-called general-purpose press machines, but the pre-process press machine is selected from general-purpose press machines that have two processing stages, and the post-process press machine has multiple processing stages. Choose from a variety of versatile press machines.
  • the pre-process press machine 2 includes a blank processing stage 21a and a coining processing stage 21b arranged in a row as the pre-process processing stage 21.
  • the pre-processing stage 21 has a punch 221 and a die 231, and the blanking stage 21a and the coining stage 21b each have a punch 221 and a die 231 facing each other.
  • the two punches 221 are held in a punch holder provided with a slide 22 and lined up at a predetermined interval, and the two dies 231 are held in a die holder provided on a bolster 23 and lined up in a line at a predetermined interval. I'm here.
  • the pre-process press machine 2 includes a transfer device 24 that transports the blank B.
  • the transfer device 24 is arranged to transport the blank B from the blank processing stage 21a and the coining processing stage 21b to the next coining processing stage 21b and the blank transport device 4, respectively, and each time the punch 221 moves up and down, , the blank B is moved to the next coining processing stage 21b and the blank conveying device 4.
  • the post-process press machine 3 includes a receiving stage 31a, a first molding stage 31b, and a final molding stage 31c arranged in a line as the post-processing stages 31. Note that a necessary molding stage may be added between the first molding stage 31b and the final molding stage 31c.
  • the first molding stage 31b and the final molding stage 31c each include a punch 321 and a die 331 facing each other.
  • the three punches 321 are held in a punch holder provided on the slide 32 and lined up at predetermined intervals, and the three dies are held in a die holder provided on the bolster 33 and lined up in a line at predetermined intervals.
  • the terminal end portion of the blank conveying device 4 is disposed by removing the configuration of the first processing stage originally included in a general-purpose press machine.
  • the post-process press machine 3 includes a transfer device 34 that transports the blank B and the cup C.
  • the transfer device 34 transfers blanks B and cups C from the receiving stage 31a, 1st molding stage 31b, and final molding stage 31c to the next 1st molding stage 31b, final molding stage 31c, and cup conveyance device 5, respectively.
  • the punch 321 moves up and down, the blank B and the cup C are moved to the next 1st forming stage 31b, final forming stage 31c, and cup conveying device 5.
  • Transfer device As shown in FIG. 3, as the transfer device 24 provided in the pre-process press machine 2, a pair of fingers 241 are arranged facing each other on the blank processing stage 21a and the coining processing stage 21b. These two pairs of fingers 241 are integrally connected and are driven in synchronization with the lifting and lowering of the punch 221. The pair of fingers 241 grip the blank B and move it to the next coining processing stage 21b and the blank transport device 4.
  • a pair of fingers 341 are arranged facing each other on the receiving stage 31a, the first molding stage 31b, and the final molding stage 31c. These plural pairs of fingers 341 are integrally connected and are driven in synchronization with the lifting and lowering of the punch 321. This pair of fingers 341 grips the blank B and cup C and moves them to the next 1st molding stage 31b, final molding stage 31c, and cup conveying device 5.
  • the fingers 241 and 341 grip the flat blank B and cup C so as to sandwich them from both sides in the longitudinal direction. Thereby, the pitch of conveyance can be shortened, and deformation of the cup C due to the gripping force can be suppressed.
  • the contact parts 2411 and 3411 that come into contact with the blank B and the cup C are made of a material that does not easily scratch the aluminum blank B and the cup C, such as a resin material or a rubber material. There is. Since the blank B and cup C become hot during press working, the contact parts 2411 and 3411 need a certain level of heat resistance, and since the blank B and cup C are repeatedly held and released, durability such as wear resistance is required. Gender is also required.
  • the material is appropriately selected from polyamideimide, polyacetal, monomer cast nylon, fluororesin, polyetheretherketone, fluororubber, silicone rubber, ethylene propylene rubber, acrylic rubber, and the like.
  • the heat resistance temperature is preferably 100°C or higher, more preferably 150°C or higher.
  • the manufacturing system 1 of this embodiment has been described above, it is not limited to this example, and various modifications can be considered.
  • the manufacturing system 1 of this embodiment is composed of two general-purpose press machines, a pre-process press machine 2 and a post-process press machine 3, but is not limited to this, and three or more general-purpose press machines It may also be composed of a press machine.
  • the most suitable general-purpose press machine is selected from among those having different pressurizing capacities, strokes, number of processing stages, etc.
  • a manufacturing system can also be configured.
  • a pre-process press machine 2 with a high pressurizing capacity and a short stroke is combined with a post-process press machine 3 with a low pressurizing capacity and a long stroke, but other than this combination Any combination of these may be used.
  • the pre-process press machine 2 performs blanking and coining processes
  • the post-process press machine 3 performs multiple forming processes.
  • the order in which such processing is performed can be appropriately designed depending on the specific molding process, such as the type, shape, and size of the product to be manufactured.
  • the pre-process press machine 2 does not need to include the coining stage 21b, and the blanking stage 21a may only punch out the blank, or punch the blank and draw it by punching.
  • the post-process press machine 3 may arrange a necessary number of forming stages in the middle. It is also possible to add other necessary processing stages, such as a remodeling process, step machining process, and lubricant application process, to any position.
  • the manufacturing system 1 of this embodiment processes the cell case of an aluminum lithium-ion battery, it is not limited to the cell case, but may process any other type of aluminum can. . It may also be used to process any type of cases or cans made of other metals such as stainless steel, or any type of cases or cans with a laminated structure in which metal is coated with resin or the like. There may be.
  • the manufacturing system 1 of this embodiment manufactures cans with rectangular openings.
  • cans with square openings, and cans with other shapes such as not only rectangular cans but also circular cans and oval cans may be manufactured.
  • [Other embodiments of the invention] In a method for manufacturing cans by deep drawing using a press, A pre-process press machine, a post-process press machine, and a conveying means for transporting the blank from the pre-process press machine to the post-process press machine, a first press step in which the pre-process press machine performs a blanking process on the metal plate and a coining process to reduce the plate thickness of the blank; a conveyance step of conveying the blank from the pre-process press machine to the post-process press machine; A method for producing a can, comprising a second pressing step in which a square can is formed by drawing and/or drawing and ironing using the post-process press.
  • the post-process press machine includes fingers for conveying a molded product obtained by drawing and/or drawing and ironing the blank, According to any one of (1) to (4) above, the finger includes a contact portion made of a resin material or a rubber material, and the molded product is gripped and conveyed by the contact portion. Method of manufacturing the described can. (6) The method for manufacturing a can according to any one of (1) to (5) above, wherein the can is an aluminum can.
  • a pre-process press machine In a can manufacturing system using deep drawing using a press, A pre-process press machine, a post-process press machine, and a conveying means for transporting the blank from the pre-process press machine to the post-process press machine,
  • the pre-process press machine is configured to perform a blanking process on a metal plate and a coining process to reduce the thickness of the blank
  • a can manufacturing system characterized in that the post-process press machine is configured to perform drawing and/or drawing and ironing to form square cans.
  • the pre-process press machine is configured to perform the blank processing before the coining process, and has a finger for transporting the blank formed by the blank process within the pre-process press machine.
  • the post-process press machine includes fingers for conveying a molded product obtained by drawing and/or drawing and ironing the blank,

Abstract

本発明は、安価かつ短納期で供給できる缶製造方法及び製造システムを提供することを課題とする。 プレス機の深絞り加工による缶の製造方法において、前工程プレス機、後工程プレス機及び前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送手段を備え、前記前工程プレス機で金属板に対してブランク加工及びブランクの板厚を減少させるコイニング加工を行う第1プレス工程と、前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送工程と、後工程プレス機で絞り加工及び/又は絞りしごき加工を行い角型缶の成形を行う第2プレス工程とを含むことを特徴とする缶の製造方法。

Description

缶の製造方法及び製造システム
 本発明は、缶を深絞り加工により製造する方法及び缶を深絞り加工するための製造システムに関する。
 従来、缶の深絞り加工では、板金からブランクを打ち抜くブランク加工、有底の筒状カップを形成する絞り加工等の複数の加工を1台のプレス機を使用して行うことが普通である(特許文献1、2参照)。
 そして、その1台のプレス機は、製品の種類やサイズに対応した専用の1台のプレス機を使用することが一般的である。
特開2021-23942号公報 特開2003-275833号公報
 プレス機として、缶の種類やサイズ等に応じた複数種類の機種がラインアップされており、これらの機種を元に缶製造メーカーの工法等に合わせて、専用のプレス機を設計製造するが、必ずしも、缶製造メーカーの工法等に合わせて仕様を細かく設定できるとは限らないので、オーバースペックとなることがあった。さらに、専用のプレス機であるから、他の製品の製造への転用も難しく、缶製造において、高コスト化の要因となっていた。
 また、専用のプレス機を設計製造するには、かなりの期間を要するので、納期が長くなるという欠点もあった。
 そこで、本発明は、安価かつ短納期で供給できる缶製造方法及び製造システムを提供することを課題とする。
 本発明の、プレス機の深絞り加工による缶の製造方法は、
 前工程プレス機、後工程プレス機及び前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送手段を備え、前記前工程プレス機で金属板に対してブランク加工及びブランクの板厚を減少させるコイニング加工を行う第1プレス工程と、前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送工程と、前記後工程プレス機で絞り加工及び/又は絞りしごき加工を行い角型缶の成形を行う第2プレス工程とを含むことを特徴とする。
 また、本発明の、プレス機の深絞り加工による缶の製造システムは、
 前工程プレス機、後工程プレス機及び前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送手段を備え、前記前工程プレス機は金属板に対してブランク加工及びブランクの板厚を減少させるコイニング加工を行うよう構成されており、前記後工程プレス機は絞り加工及び/又は絞りしごき加工を行い角型缶を成形するよう構成されたことを特徴とする。
 本発明は、上述した構成により、加工する製品やサイズ、その加工工程に最適な製造システムを構築することができ、さらに、安価で提供できるとともに、短い期間で設計製造することができる。
 また、汎用プレス機を使用することにより、加工する製品の種類やサイズの変更があった時でも、比較的容易に対応することができる。
本実施形態のセルケースの成形工程を示した図である。 本実施形態の製造システム1の側面説明図である。 本実施形態の製造システム1の上面説明図である。
 以下、図面を参照して本発明の実施形態を説明する。以下の説明で、異なる図における同一符号は同一機能の部位を示しており、各図における重複説明は適宜省略する。
 以下、図面を参照して本発明の実施形態を説明する。
[実施形態]
 以下、本発明の、プレス機の深絞り加工による缶、例えば、リチウムイオン電池などの電池のセルケースのような角型缶の製造方法及び該製造方法に使用する製造システムの実施形態を、図面を参照しながら説明する。
 本発明の実施形態(以下、「本実施形態」という。)は、開口部が長方形状のリチウムイオン電池のセルケースを製造する製造方法及び製造システムである。
[製造工程]
 図1は、本実施形態のセルケースの成形工程を示した図である。
 本実施形態でのセルケースの製造工程を、図1を参照して、説明する。
(1)アンコイラーは、コイル状に巻かれたアルミニウムシートSを巻き出す装置であり、巻き出したアルミニウムシートSを前工程プレス機2に供給する。
(2)前工程プレス機2では、第1プレス工程を行う。第1プレス工程は、ブランク加工工程、コイニング加工工程の順にブランク加工を行う工程である。
(3)ブランク加工工程は、アンコイラーから巻き出されたアルミニウムシートSから、深絞り加工により缶を製造するための楕円形状や複合R形状などの扁平形状のブランクBを打ち抜く工程である。ブランク加工工程後、ブランクBを次のコイニング加工工程にフィンガー搬送する工程を有する。
(4)コイニング加工工程は、ブランクBの一部分をパンチにより押しつぶして板厚を薄くする工程であり、本実施形態では、缶の最終形状において缶底となる部分及び/又はその近傍にコイニング加工を施して、板厚を薄くする工程である。コイニング加工工程後、ブランクBをブランク搬送装置4にフィンガー搬送する工程を有する。
(5)前工程プレス機2でブランク加工とコイニング加工を行い、続いて、後工程プレス機3で加工するために、ブランク搬送装置4で、ブランクBを後工程プレス機3に搬送する搬送工程を有する。
(6)後工程プレス機3では、第2プレス工程を行う。第2プレス工程は、複数工程の成形加工により、ブランクBを最終的なカップ形状に加工していく工程である。
(7)複数工程の成形加工工程は、楕円形状や複合R形状などの扁平形状のカップCに絞り加工する1st成形加工、カップCを最終製品の長辺・短辺寸法に絞り加工する最終成形加工工程を有する。各加工工程後には、カップCを次の加工工程、カップ搬送装置5にフィンガー搬送する工程を有する。
 なお、1st成形加工工程と最終成形加工工程の間に、必要な成形加工工程を追加してもよい。また、各成形加工工程では絞り加工または絞りしごき加工を適宜選択できる。
(8)後工程プレス機3で、他の成形加工工程を行い、続いて、プレス加工後工程へ、カップ搬送装置5で、カップC(角型缶)を搬送する搬送工程を有する。
(9)プレス加工後工程では、必要に応じて、角型缶に付着した潤滑油や異物を除去する洗浄工程や、完成した角型缶をカメラ等を用いて外観検査を行い、検査に合格した良品を梱包する検査・梱包工程を有する。
 上記工程のうち、ブランク加工工程、コイニング加工工程、各成形加工工程がプレス機で行われる工程である。
 プレス機で行う工程のうち、ブランク加工工程及びコイニング加工工程で使用するプレス機は、ストロークは短いものでよいが、高い加圧能力が必要であるのに対して、絞り加工又は絞りしごき加工を行う各成形加工工程で使用するプレス機は、長いストロークを必要とするが、加圧能力は低いものでよい。
 そこで、ブランク加工工程及びコイニング加工工程を同じプレス機で行うこととして、短ストロークで、高い加圧能力を有する汎用プレス機から選択して、前工程プレス機2とし、各成形加工工程を同じプレス機で行うこととして、長ストロークで、低い加圧能力を有する汎用プレス機から選択して、後工程プレス機3とする。
 これら前工程プレス機2と後工程プレス機3を、ブランク搬送装置4を介して接続し、さらに、後工程プレス機3からカップCを搬出するカップ搬送装置5を組み合わせて、図2及び図3に示すように一連の製造システム1として配置する。
[製造システム]
 図2は本実施形態の製造システム1の側面説明図、図3は上面説明図である。
 本実施形態の前工程プレス機2、後工程プレス機3、ブランク搬送装置4及びカップ搬送装置5を有する製造システム1を、図2及び図3を用いて説明する。
 前工程プレス機2、後工程プレス機3は、いわゆる、汎用プレス機であるが、前工程プレス機は2つの加工ステージを有する汎用プレス機から選択し、後工程プレス機は複数の加工ステージを有する汎用プレス機から選択する。
 前工程プレス機2は、前工程加工ステージ21として、ブランク加工ステージ21a、コイニング加工ステージ21bを一列に並べて備えている。
 前工程加工ステージ21はパンチ221とダイ231を有し、ブランク加工ステージ21a、コイニング加工ステージ21bは、それぞれ、互いに対向するパンチ221とダイ231を備えている。2つのパンチ221は、スライド22の設けられたパンチホルダに保持されて所定の間隔で一列に並び、2つのダイ231は、ボルスター23に設けられたダイホルダに保持されて所定の間隔で一列に並んでいる。
 また、前工程プレス機2は、ブランクBを搬送するトランスファー装置24を有する。トランスファー装置24は、ブランク加工ステージ21a、コイニング加工ステージ21bから、それぞれ、次のコイニング加工ステージ21b、ブランク搬送装置4に、ブランクBを搬送するように配置されており、パンチ221が昇降する毎に、ブランクBを次のコイニング加工ステージ21b、ブランク搬送装置4に移動させる。
 後工程プレス機3は、後工程加工ステージ31として、受取ステージ31a、1st成形加工ステージ31b、最終成形加工ステージ31cを一列に並べて備えている。なお、1st成形加工ステージ31bと最終成形加工ステージ31cの間に、必要な成形加工ステージを追加してもよい。
 後工程加工ステージ31のうち、1st成形加工ステージ31b、最終成形加工ステージ31cは、それぞれ、互いに対向するパンチ321とダイ331を備えている。3つのパンチ321は、スライド32の設けられたパンチホルダに保持されて所定の間隔で一列に並び、3つのダイは、ボルスター33に設けられたダイホルダに保持されて所定の間隔で一列に並んでいる。
 受取ステージ31aには、汎用プレス機が本来有する最初の加工ステージの構成を取り除いて、ブランク搬送装置4の終端部が配置されている。
 また、後工程プレス機3は、ブランクBやカップCを搬送するトランスファー装置34を有する。トランスファー装置34は、受取ステージ31a、1st成形加工ステージ31b、最終成形加工ステージ31cから、それぞれ、次の、1st成形加工ステージ31b、最終成形加工ステージ31c、カップ搬送装置5に、ブランクBやカップCを搬送するように配置されており、パンチ321が昇降する毎に、ブランクBやカップCを、次の1st成形加工ステージ31b、最終成形加工ステージ31c、カップ搬送装置5に移動させる。
[トランスファー装置]
 図3に示すように、前工程プレス機2に設けられたトランスファー装置24として、ブランク加工ステージ21a、コイニング加工ステージ21bに、それぞれ、一対のフィンガー241が対向配置されている。これら二対のフィンガー241は、一体的に連結されていて、パンチ221の昇降と同期して駆動される。この一対のフィンガー241が、ブランクBを把持して、次のコイニング加工ステージ21b、ブランク搬送装置4に移動させる。
 また、後工程プレス機3に設けられたトランスファー装置34として、受取ステージ31a、1st成形加工ステージ31b、最終成形加工ステージ31cに、それぞれ、一対のフィンガー341が対向配置されている。これら複数対のフィンガー341は、一体的に連結されていて、パンチ321の昇降と同期して駆動される。この一対のフィンガー341が、ブランクB、カップCを把持して、次の1st成形加工ステージ31b、最終成形加工ステージ31c、カップ搬送装置5に移動させる。
 フィンガー241、フィンガー341は、扁平形状のブランクBやカップCを、長軸方向の両側から挟み込むように把持する。これにより、搬送のピッチを短くすることができ、また、カップCが把持力で変形することを抑制できる。
 フィンガー241、フィンガー341のうち、ブランクBやカップCと接触する接触部2411,3411は、アルミニウム製のブランクBやカップCに傷がつきにくい材料、例えば、樹脂材やゴム材などで構成されている。プレス加工により、ブランクBやカップCは熱くなるので、接触部2411,3411は、所定の耐熱性を必要とし、また、ブランクBやカップCの挟持と解放を繰り返し行うので耐摩耗性などの耐久性も必要とされる。この点も考慮して、ポリアミドイミド、ポリアセタール、モノマーキャストナイロン、フッ素樹脂、ポリエーテルエーテルケトン、フッ素ゴム、シリコンゴム、エチレンプロピレンゴム、アクリルゴムなどから適宜選択する。また、耐熱温度としては100℃以上、より好ましくは150℃以上が好ましい。
[変形例]
 上記では、本実施形態の製造システム1について説明したが、この例に限らず、様々な変形例が考えられる。
(1)本実施形態の製造システム1は、前工程プレス機2と後工程プレス機3の2台の汎用プレス機で構成されるものであるが、これには限られず、3台以上の汎用プレス機で構成されるものとしてもよい。このとき、それぞれの汎用プレス機は、加圧能力、ストローク、加工ステージ数などが異なるものから、最適なものが選択される。
 また、各加工工程に要する加圧能力、ストロークが同程度のものであっても、加工ステージ数が多い場合、専用プレス機1台を使用する代りに、汎用プレス機を複数台接続して、製造システムを構成することもできる。
(2)本実施形態の製造システム1では、加圧能力が高く、ストロークが短い前工程プレス機2と、加圧能力が低く、ストロークが長い後工程プレス機3を組み合わせたが、この組み合わせ以外のどのような組み合わせであってもよい。
(3)本実施形態の製造システム1では、前工程プレス機2ではブランク加工とコイニング加工を、後工程プレス機3で複数の成形加工を行うものであったが、それぞれのプレス機で、どのような加工をどのような順序で行うかは、製造する製品の種類、形状、大きさ等、具体的な成形加工プロセスに応じて、適宜設計し得るものである。
 例えば、前工程プレス機2は、コイニング加工ステージ21bを備える必要はなく、ブランク加工ステージ21aは、ブランクを打ち抜くのみ、または、ブランクの打ち抜き及びパンチにより絞り加工を行うものであってもよい。
 また、後工程プレス機3は、絞り加工を行う1st成形加工ステージ31b、最終成形加工ステージ31cに加えて、必要な数の成形加工ステージを中間に配置してもよい。また、リフォーム工程や段差加工工程、潤滑油塗布工程など、他に必要な加工ステージを任意の位置に追加することも可能である。
(4)本実施形態の製造システム1は、アルミニウム製のリチウムイオン電池のセルケースを加工するものであったが、セルケースに限らず、他の任意の種類のアルミ缶を加工するものでもよい。また、ステンレスなどの他の金属製の任意の種類のケースや缶を加工するものであってもよいし、金属に樹脂等を被覆した積層構造の任意の種類のケースや缶を加工するものであってもよい。
 (5)本実施形態の製造システム1は、開口部が長方形状の缶を製造するものであった。このほかに、開口部が正方形の缶、さらには、四角形に限らず、円形の缶、楕円形の缶などの他の形状の缶を製造するものであってもよい。
[発明の他の実施形態]
(1)プレス機の深絞り加工による缶の製造方法において、
 前工程プレス機、後工程プレス機及び前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送手段を備え、
 前記前工程プレス機で金属板に対してブランク加工及びブランクの板厚を減少させるコイニング加工を行う第1プレス工程と、
 前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送工程と、
 前記後工程プレス機で絞り加工及び/又は絞りしごき加工を行い角型缶の成形を行う第2プレス工程とを含むことを特徴とする缶の製造方法。
(2)前記前工程プレス機のストロークは前記後工程プレス機のストロークよりも短いことを特徴とする前記(1)に記載の缶の製造方法。
(3)前記前工程プレス機の加圧能力は前記後工程プレス機の加圧能力よりも高いことを特徴とする前記(1)又は(2)に記載の缶の製造方法。
(4)前記前工程プレス機は前記ブランク加工により形成された前記ブランクを搬送するフィンガーを備え、
 前記第1プレス工程では、前記ブランク加工を前記コイニング加工より先に行い、前記ブランク加工により形成された前記ブランクを前記前工程プレス機内でフィンガー搬送する工程を含むことを特徴とする前記(1)~(3)のいずれか一つに記載の缶の製造方法。
(5)前記後工程プレス機は前記ブランクを絞り加工及び/又は絞りしごき加工した成形品を搬送するフィンガーを備え、
 前記フィンガーは樹脂材、またはゴム材で構成された接触部を備え、前記接触部により前記成形品を把持して搬送することを特徴とする前記(1)~(4)のいずれか一つに記載の缶の製造方法。
(6)前記缶はアルミ缶であることを特徴とする前記(1)~(5)のいずれか一つに記載の缶の製造方法。
(7)プレス機の深絞り加工による缶の製造システムにおいて、
 前工程プレス機、後工程プレス機及び前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送手段を備え、
 前記前工程プレス機は金属板に対してブランク加工及びブランクの板厚を減少させるコイニング加工を行うよう構成されており、
 前記後工程プレス機は絞り加工及び/又は絞りしごき加工を行い角型缶を成形するよう構成されたことを特徴とする缶の製造システム。
(8)前記前工程プレス機のストロークは前記後工程プレス機のストロークよりも短いことを特徴とする前記(7)に記載の缶の製造システム。
(9)前記前工程プレス機の加圧能力は前記後工程プレス機の加圧能力よりも高いことを特徴とする前記(7)又は(8)に記載の缶の製造システム。
(10)前記前工程プレス機は、前記ブランク加工を前記コイニング加工より先に行うよう構成され、前記ブランク加工により形成された前記ブランクを前記前工程プレス機内で搬送するフィンガーを有することを特徴とする前記(7)~(9)のいずれか一つに記載の缶の製造システム。
(11)前記後工程プレス機は前記ブランクを絞り加工及び/又は絞りしごき加工した成形品を搬送するフィンガーを備え、
 前記フィンガーの前記成形品との接触部は樹脂材、またはゴム材で構成されていることを特徴とする前記(7)~(10)のいずれか一つに記載の缶の製造システム。
(12)前記缶はアルミ缶であることを特徴とする前記(7)~(11)のいずれか一つに記載の缶の製造システム。
 以上、本発明に係る実施形態を、図面を参照して詳述してきたが、具体的な構成は、これらの実施の形態に限られるものではなく、本発明の要旨を逸脱しない範囲の設計の変更等があっても本発明に含まれる。
 また、前述の各実施形態は、その目的および構成等に特に矛盾や問題がない限り、互いの技術を流用して組み合わせることが可能である。
1    製造システム
2    前工程プレス機
21   前工程加工ステージ
21a  ブランク加工ステージ
21b  コイニング加工ステージ
22   スライド
221  パンチ
23   ボルスター
231  ダイ
24   トランスファー装置
241  フィンガー
2411 接触部
3    後工程プレス機
31   後工程加工ステージ
31a  受取ステージ
31b  1st成形加工ステージ
31c  最終成形加工ステージ
32   スライド
321  パンチ
33   ボルスター
331  ダイ
34   トランスファー装置
341  フィンガー
3411 接触部
4    ブランク搬送装置
5    カップ搬送装置
B    ブランク
C    カップ
S    アルミニウムシート

Claims (12)

  1.  プレス機の深絞り加工による缶の製造方法において、
     前工程プレス機、後工程プレス機及び前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送手段を備え、
     前記前工程プレス機で金属板に対してブランク加工及びブランクの板厚を減少させるコイニング加工を行う第1プレス工程と、
     前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送工程と、
     前記後工程プレス機で絞り加工及び/又は絞りしごき加工を行い角型缶の成形を行う第2プレス工程とを含むことを特徴とする缶の製造方法。
  2.  前記前工程プレス機のストロークは前記後工程プレス機のストロークよりも短いことを特徴とする請求項1に記載の缶の製造方法。
  3.  前記前工程プレス機の加圧能力は前記後工程プレス機の加圧能力よりも高いことを特徴とする請求項1に記載の缶の製造方法。
  4.  前記前工程プレス機は前記ブランク加工により形成された前記ブランクを搬送するフィンガーを備え、
     前記第1プレス工程では、前記ブランク加工を前記コイニング加工より先に行い、前記ブランク加工により形成された前記ブランクを前記前工程プレス機内でフィンガー搬送する工程を含むことを特徴とする請求項1~3のいずれか1項に記載の缶の製造方法。
  5.  前記後工程プレス機は前記ブランクを絞り加工及び/又は絞りしごき加工した成形品を搬送するフィンガーを備え、
     前記フィンガーは樹脂材、またはゴム材で構成された接触部を備え、前記接触部により前記成形品を把持して搬送することを特徴とする請求項1~3のいずれか1項に記載の缶の製造方法。
  6.  前記缶はアルミ缶であることを特徴とする請求項1~3のいずれか1項に記載の缶の製造方法。
  7.  プレス機の深絞り加工による缶の製造システムにおいて、
     前工程プレス機、後工程プレス機及び前記前工程プレス機から前記後工程プレス機へブランクを搬送する搬送手段を備え、
     前記前工程プレス機は金属板に対してブランク加工及びブランクの板厚を減少させるコイニング加工を行うよう構成されており、
     前記後工程プレス機は絞り加工及び/又は絞りしごき加工を行い角型缶を成形するよう構成されたことを特徴とする缶の製造システム。
  8.  前記前工程プレス機のストロークは前記後工程プレス機のストロークよりも短いことを特徴とする請求項7に記載の缶の製造システム。
  9.  前記前工程プレス機の加圧能力は前記後工程プレス機の加圧能力よりも高いことを特徴とする請求項7に記載の缶の製造システム。
  10.  前記前工程プレス機は、前記ブランク加工を前記コイニング加工より先に行うよう構成され、前記ブランク加工により形成された前記ブランクを前記前工程プレス機内で搬送するフィンガーを有することを特徴とする請求項7~9のいずれか1項に記載の缶の製造システム。
  11.  前記後工程プレス機は前記ブランクを絞り加工及び/又は絞りしごき加工した成形品を搬送するフィンガーを備え、
     前記フィンガーの前記成形品との接触部は樹脂材、またはゴム材で構成されていることを特徴とする請求項7~9のいずれか1項に記載の缶の製造システム。
  12.  前記缶はアルミ缶であることを特徴とする請求項7~9のいずれか1項に記載の缶の製造システム。
PCT/JP2023/014031 2022-07-28 2023-04-05 缶の製造方法及び製造システム WO2024024177A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-120500 2022-07-28
JP2022120500A JP2024017689A (ja) 2022-07-28 2022-07-28 缶の製造方法及び製造システム

Publications (1)

Publication Number Publication Date
WO2024024177A1 true WO2024024177A1 (ja) 2024-02-01

Family

ID=89705926

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/014031 WO2024024177A1 (ja) 2022-07-28 2023-04-05 缶の製造方法及び製造システム

Country Status (2)

Country Link
JP (3) JP2024017689A (ja)
WO (1) WO2024024177A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003275833A (ja) * 2002-03-18 2003-09-30 Asahi-Seiki Mfg Co Ltd 材料送り装置
JP2008068291A (ja) * 2006-09-14 2008-03-27 Aida Eng Ltd タンデムプレスシステム
JP2014231064A (ja) * 2013-05-28 2014-12-11 東洋製罐株式会社 有底缶の製造方法
JP2018051575A (ja) * 2016-09-27 2018-04-05 東洋製罐株式会社 角形缶の製造方法
JP2021023942A (ja) * 2019-07-31 2021-02-22 旭精機工業株式会社 プレス装置
JP2021183339A (ja) * 2020-05-21 2021-12-02 株式会社フロンティア 順送プレス用搬送装置及び順送プレス装置並びに金属製品の製造方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003275833A (ja) * 2002-03-18 2003-09-30 Asahi-Seiki Mfg Co Ltd 材料送り装置
JP2008068291A (ja) * 2006-09-14 2008-03-27 Aida Eng Ltd タンデムプレスシステム
JP2014231064A (ja) * 2013-05-28 2014-12-11 東洋製罐株式会社 有底缶の製造方法
JP2018051575A (ja) * 2016-09-27 2018-04-05 東洋製罐株式会社 角形缶の製造方法
JP2021023942A (ja) * 2019-07-31 2021-02-22 旭精機工業株式会社 プレス装置
JP2021183339A (ja) * 2020-05-21 2021-12-02 株式会社フロンティア 順送プレス用搬送装置及び順送プレス装置並びに金属製品の製造方法

Also Published As

Publication number Publication date
JP2024017689A (ja) 2024-02-08
JP2024039046A (ja) 2024-03-21
JP2024039045A (ja) 2024-03-21

Similar Documents

Publication Publication Date Title
WO2014177036A1 (zh) 一种开卷落料成形方法
US20120250062A1 (en) printing device for producing finished product by one-pass sheet-feed and operation method of the same
JP5730308B2 (ja) ホットプレスによる鋼板の成形方法
JP5373378B2 (ja) 鍛造加工方法
EP3181258A1 (en) Toolpack for vertical bodymaker
JP4379414B2 (ja) カップ状部品の成形方法及び成形装置
US10298103B2 (en) Manufacturing method of laminated core and manufacturing device of laminated core
CN105682823B (zh) 带底圆筒容器的成形方法
CN108284154B (zh) 一种碳刷支架的连续模具
CN108311610B (zh) 一种板式换热器冲床生产线及其工艺
US7562551B2 (en) Press die set for a multi-step press system
WO2024024177A1 (ja) 缶の製造方法及び製造システム
KR101069909B1 (ko) 머플러 플랜지용 자동 금형 장치
CN205200313U (zh) 一种卷制合金衬套的弯曲级进模具
CN111014446A (zh) 一种冲压拉伸全自动生产装置
WO2011070857A1 (ja) ワークの打ち抜き製造方法
US9533337B2 (en) Apparatus and method for producing at least partially closed hollow profiles with a short cycle time
US20060266094A1 (en) Transmission system component and method for making same
CN104128439A (zh) 一种折弯落料的连续生产工艺
CN210702021U (zh) 一种成形翻孔及双弯边的橡皮囊液压模具
CN214290439U (zh) 弯曲件冲压模
CN107252841B (zh) 一种加工高精度凸部的加热冲压方法
KR20160141886A (ko) 비대칭 프레스 가공물용 이송 스트립
EP3485994A1 (en) Method of forming a metal container
JP5929508B2 (ja) 動力伝達チェーン用リンクの製造方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23845917

Country of ref document: EP

Kind code of ref document: A1