WO2007091722A1 - 二次電池の残存容量推定装置および残存容量推定方法 - Google Patents
二次電池の残存容量推定装置および残存容量推定方法 Download PDFInfo
- Publication number
- WO2007091722A1 WO2007091722A1 PCT/JP2007/052550 JP2007052550W WO2007091722A1 WO 2007091722 A1 WO2007091722 A1 WO 2007091722A1 JP 2007052550 W JP2007052550 W JP 2007052550W WO 2007091722 A1 WO2007091722 A1 WO 2007091722A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- value
- secondary battery
- remaining capacity
- estimated
- correction
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/367—Software therefor, e.g. for battery testing using modelling or look-up tables
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/382—Arrangements for monitoring battery or accumulator variables, e.g. SoC
- G01R31/3842—Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
Definitions
- the present invention relates to a remaining capacity estimating device and a remaining capacity estimating method for a secondary battery configured to be rechargeable, and more particularly to a technique for more stably avoiding overcharge and overdischarge of a secondary battery.
- Secondary batteries are used in various fields, but in order to operate these secondary batteries efficiently, it is necessary to accurately control the charge and discharge of the secondary batteries. For this purpose, it is necessary to estimate the remaining capacity of the secondary battery (SOC: State of Charge; hereinafter also simply referred to as SOC) with high accuracy.
- SOC State of Charge
- a so-called current integration method in which the SOC is estimated by integrating the input / output current of the secondary battery.
- a current integration method for example, in a battery usage mode that does not fully charge (full charge), the error due to the digit loss of the least significant bit of the arithmetic unit (CPU) for current integration or capacity reduction due to self-discharge, etc.
- CPU arithmetic unit
- the remaining capacity control that corrects the charging efficiency ⁇ used for the estimation of the remaining capacity based on the current integration according to the output voltage.
- a method has been proposed (for example, 2-369391).
- charge / discharge control is performed based on the estimated SOC, so that charge is given priority or discharge is given priority, with the SOC control center value as the boundary. It is.
- overcharge and overdischarge are prevented by setting upper and lower limits in the S0C control range including the control center value. In other words, charging is restricted or prohibited when the control upper limit is exceeded, while discharge is restricted or prohibited when the control lower limit is exceeded.
- the estimated SOC value near the upper and lower limits of the S S C management range is higher. It is desirable to estimate with accuracy. Therefore, a large correction parameter for SOC is set near the upper and lower limits of the SOC management range.
- the correction value is determined so that the estimated SOC based on the integrated charge / discharge current is closer to the estimated SOC due to the electromotive voltage. Therefore, compared to the estimated S OC based on the electromotive voltage (for example, 80%), the estimated SOC based on the current integrated value (for example, .85%) is closer to the control upper limit (for example, 90%). Even in such a case, the estimated SOC based on the integrated current value is largely corrected in a lower direction, that is, in a direction away from the control upper limit value. From the viewpoint of avoiding overcharging of the secondary battery, such a correction is counterproductive and, on the contrary, increases the risk of overcharging.
- the estimated SO C based on the current integrated value (for example, 15%) 'is more controlled by the lower control limit (for example, 10%). Even if it is close to, the estimated SOC based on the integrated current value is greatly corrected in a higher direction, that is, in a direction away from the control lower limit value, which increases the risk of overdischarge.
- the time change rate of the remaining capacity of the secondary battery changes according to the charge / discharge current of the secondary battery. For this reason, there is a risk of overcharging if a large charge current occurs when the remaining capacity is close to the control upper limit, and if a large discharge current is generated when close to the control lower limit, There was a risk of discharge. Disclosure of the invention The present invention has been made to solve such problems, and its purpose is to estimate the remaining capacity of the secondary battery with high accuracy while avoiding overcharge and overdischarge more stably.
- a secondary battery remaining capacity estimating device and a remaining capacity estimating method are provided.
- a remaining capacity estimating device for a secondary battery configured to be charged and discharged.
- This secondary battery remaining capacity estimating device is a first estimating unit that calculates a first estimated value for the remaining capacity of the secondary battery based on the charge / discharge amount of the secondary battery since the previous estimated remaining capacity.
- a second estimation unit for calculating a second estimated value for the remaining capacity of the secondary battery based on the state value of the secondary battery, and an estimate at the time of the previous remaining capacity estimation for the second estimated value.
- the first estimated value is corrected by a correction value corresponding to the deviation of the pre-remaining capacity value that is the estimated remaining capacity value of the secondary battery; and a correction unit that generates the estimated remaining capacity value of the secondary battery; Is provided. Then, the correction unit calculates a correction value based on the magnitude of the previous value of the remaining capacity and the magnitude relationship between the previous value of the remaining capacity and the second estimated value.
- the first estimated value calculated based on the charge / discharge amount of the secondary battery from the previous estimated remaining capacity is Correction based on the magnitude of the previous value of the remaining capacity, which is the estimated value of the remaining capacity of the secondary battery, and the magnitude relationship between the previous value of the remaining capacity and the second estimated value.
- the region where the estimated remaining capacity of the previous secondary battery exists for example, whether it is a region close to overcharge or overdischarge
- the direction in which the correction value is generated for example, overcharge side
- the correction correction can be determined based on the force that generates the correction value in any direction on the overdischarge side.
- the estimated remaining capacity can be calculated to be on the safe side (more overcharge side or more overdischarge side) for the secondary battery in charge / discharge control.
- the followability to the second estimated value can be improved, and the estimation accuracy of the remaining capacity estimated value can be improved.
- the correction unit receives the second estimated value and the previous value of the remaining capacity, calculates a deviation, receives a deviation from the deviation calculation unit, and at least one correction for the deviation
- a correction value calculation unit that calculates a correction value by multiplying the gain, and an estimate that receives the correction value from the correction value calculation unit, adds the correction value to the first estimation value received from the first estimation unit, and outputs the result.
- a calculation unit is included. At least one correction gain includes the first correction gain, and the correction value calculation unit is based on the magnitude of the previous value of the remaining capacity and the magnitude relationship between the previous value of the remaining capacity and the second estimated value. And a first correction gain selection unit for selecting the first correction gain.
- the first correction gain selection unit is such that the previous remaining capacity value is in a first region close to overcharge of the secondary battery, and the second estimated value is greater than or equal to the first predetermined value.
- the first correction gain when the previous remaining capacity value is larger than the second estimated value is made smaller than when the previous remaining capacity value is smaller than the second estimated value.
- the last remaining capacity is the second estimated. The first correction gain when it is smaller than the fixed value is made smaller than when the previous remaining capacity is larger than the second estimated value.
- the first correction gain selection unit selects the first correction gain by referring to a predetermined map having the remaining capacity previous value and the second estimated value as inputs.
- the at least one correction gain further includes a second correction gain
- the correction value calculation unit includes an input / output current of the secondary battery for charging / discharging the secondary battery, a second estimated value, and And a second correction gain selection unit that selects the second correction gain based on the relationship.
- the second correction gain selection unit performs the second correction gain selection unit according to the increase in the input current to the secondary battery.
- the second correction value increases as the output current to the secondary battery increases. Increase the gain.
- the second correction gain selection unit selects the second correction gain by referring to a predetermined map having the input / output current of the secondary battery and the second estimated value as inputs.
- a secondary battery remaining capacity estimation device configured to be charged and discharged.
- This secondary battery remaining capacity estimation device uses the previous remaining capacity estimation A first estimation unit that calculates a first estimated value for the remaining capacity of the secondary battery based on the amount of charge / discharge of the secondary battery from the time, and a state of the secondary battery based on the state value of the secondary battery A second estimation unit that calculates a second estimated value for the remaining capacity, and a remaining capacity previous value that is a straightforward estimate of the remaining capacity of the secondary battery estimated at the time of the previous estimated remaining capacity with respect to the second estimated value.
- a correction unit that generates the estimated remaining capacity of the secondary battery by correcting the first estimated value with a correction value corresponding to the deviation of The correction unit is based on the relationship between the input / output current of the secondary battery for charging / discharging the secondary battery and the second estimated value! / Calculate the correction value.
- the first estimated value calculated based on the charge / discharge amount of the secondary battery from the previous estimated remaining capacity is The remaining capacity estimate of the secondary battery is calculated by correcting it based on the relationship between the input / output current of the battery and the second estimate. For this reason, the input / output current of the secondary battery corresponding to the region where the second estimated value exists (for example, an input current greater than a predetermined value is generated in a region close to overcharge, or a predetermined region is close to overdischarge.
- the correction value can be determined based on whether an output current exceeding the value is generated.
- the followability to the second estimated value can be improved, and the estimation accuracy of the remaining capacity estimated value can be improved.
- the correction unit receives the second estimated value and the previous remaining capacity value, receives a deviation from the deviation calculation unit that calculates the deviation, and multiplies the deviation by at least one correction gain.
- a correction value calculation unit that calculates a correction value
- an estimation value calculation unit that receives the correction value from the correction value calculation unit, adds the correction value to the first estimation value received from the first estimation unit, and outputs the result.
- the at least one correction gain includes the first correction gain, and the correction value calculation unit performs the first correction based on the relationship between the input / output current of the secondary battery and the second estimated value.
- a first correction gain selection unit for selecting a gain is included.
- the first correction gain selection unit performs the first correction gain according to the increase in the input current to the secondary battery. While the correction gain is increased, the second estimated value is the secondary battery overdischarge. When the value is equal to or less than the second predetermined value close to, the first correction gain is increased as the output current from the secondary battery increases.
- the first correction gain selection unit selects the first correction gain by referring to a predetermined map having the input / output current of the secondary battery and the second estimated value as inputs.
- the at least one correction gain further includes a third correction gain, and the correction value calculation unit selects a third correction gain based on the battery temperature of the secondary battery.
- a gain selection unit is further included.
- the third correction gain selection unit increases the third correction gain as the battery temperature of the secondary battery increases.
- the first estimating unit acquires the charge / discharge amount of the secondary battery based on the integration of the input / output current of the secondary battery. .
- the second estimation unit calculates the second estimated value based on the electromotive voltage of the secondary battery.
- an electromotive voltage calculation unit that calculates the electromotive voltage of the secondary battery based on the charge / discharge voltage of the secondary battery, the polarization voltage of the secondary battery, and the voltage drop caused by the internal resistance of the secondary battery is provided. Further prepare. .
- a method for estimating the remaining capacity of a secondary battery configured to be charged and discharged, based on the amount of charge and discharge of the secondary battery from the previous estimated remaining capacity, Calculating a first estimate for the remaining capacity of the secondary battery; calculating a second estimate for the remaining capacity of the secondary battery based on the state value of the secondary battery; By correcting the first estimated value by correcting the first estimated value with a correction value according to the deviation of the previous remaining capacity value, which is the estimated remaining capacity value of the secondary battery estimated at the previous estimated remaining capacity value. Generating an estimated remaining capacity of the battery.
- a correction value is calculated based on the magnitude of the previous remaining capacity value and the magnitude relationship between the previous remaining capacity value and the second estimated value.
- FIG. 1 is a schematic configuration diagram of a vehicle equipped with a remaining capacity estimating device for a secondary battery according to Embodiment 1 of the present invention.
- Figure 2 shows an example of charge / discharge control by the charge / discharge control unit.
- FIG. 3 is a block diagram showing processing in the S OC estimation unit.
- Fig. 4 shows an example of the relationship between the electromotive voltage of the secondary battery and SOC.
- FIG. 5A and FIG. 5B are diagrams for explaining the E value calculated by the S OC calculation unit.
- FIG. 6 shows an example of a map stored in the S OC estimated value dependent gain selection unit.
- Figure 7 shows the structure of the map stored in the battery temperature dependent gain selector.
- FIG. 9 is a block diagram showing processing in the SOC estimation unit according to the second embodiment of the present invention.
- FIG. 10 shows an example of a map stored in the input / output current dependent gain selection unit.
- FIG. 11A and FIG. 11B are diagrams for explaining the gain characteristics corresponding to each estimated S OC in the map shown in FIG.
- FIG. 12 is a block diagram showing processing in the SOC estimation unit according to the third embodiment of the present invention.
- BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described in detail with reference to the drawings. Note that the same or corresponding parts in the drawings are denoted by the same reference numerals and description thereof will not be repeated.
- a vehicle 100 includes a secondary battery 6, a PCU (Power Control Unit) 8, a motor generator (MG) 10, an ECU 1, and a voltage measurement unit 12.
- the current measuring unit 14 and the temperature measuring unit 16 are included.
- the vehicle 100 is a hybrid vehicle that travels by at least one of the driving force of the motor generator 10 and the driving force of an engine (not shown).
- a fuel vehicle equipped with a fuel cell or an electric vehicle that runs only with the driving force of a motor generator may be used.
- the secondary battery 6 is an assembled battery constructed by connecting a plurality of battery modules integrated in a series, and includes, for example, a lithium-ion battery or a nickel-hydrogen battery. .
- the secondary battery 6 is configured to be charged / discharged via the PCU 8.
- the PCU 8 ′ converts DC power supplied from the secondary battery 6 to AC power when the vehicle 100 is running, and supplies it to the motor generator 10. On the other hand, during regenerative braking of the vehicle 100 The AC power generated by the motor generator 10 is converted into DC power and supplied to the secondary battery 6 to recover the kinetic energy of the vehicle 100 as electric energy. Further, PCU 8 may include a step-up / down converter (D CZD C converter) that boosts DC power supplied from secondary battery 6 or steps down DC voltage supplied from motor generator 10.
- D CZD C converter step-up / down converter
- regenerative braking here refers to the generation of power by turning off the accelerator pedal while the vehicle is running, although it does not perform braking with power braking when the driver of the hybrid vehicle performs foot braking and does not operate the foot brake. This includes decelerating (or stopping acceleration) while braking.
- the motor generator 10 is, for example, a three-phase AC rotating electric machine, receives AC power supplied from the PCU 8, functions as an electric motor, and transmits driving force for running the vehicle 100 to wheels (not shown). In addition, the motor generator 10 receives a rotational driving force transmitted via the wheels and functions as a generator. Kinetic energy is converted into electric power and regenerated in the secondary battery 6 via the p CU 8.
- ECU1 calculates based on the driving state of vehicle 100, accelerator opening, shift position, SOC of secondary battery, and map and program stored in ROM (Read Only Memory) 3 built in ECU 1. Perform processing. As a result, the ECU 1 controls the devices mounted on the vehicle so as to be in a driving state according to the operation instruction of the driver.
- ROM Read Only Memory
- the ECU 1 includes a voltage measuring unit 12 that measures the charge / discharge voltage Vb of the secondary battery 6, a current measuring unit 14 that measures the input / output current 1b of the secondary battery 6, and the battery temperature of the secondary battery. A temperature measurement unit 16 for measuring Tb is connected.
- the ECU 1 includes a SOC estimation unit 2 and a charge / discharge control unit 5.
- the SO estimation unit 2 includes the voltage measurement unit 12, the current measurement unit 14, and the temperature measurement unit 16, which are measured by the charge / discharge voltage Vb of the secondary battery 6, the input / output current Ib of the secondary battery 6, and the secondary Based on the battery temperature T b of battery 6, the SOC of secondary battery 6 is estimated sequentially.
- the estimated SOC value of the secondary battery 6 is stored in a RAM (Random Access Memory) 4 built in the ECU 1. '
- the charge / discharge control unit 5 gives a control command to the PCU 8 in accordance with the estimated SOC value stored in the RAM 4, the amount of charge supplied from the motor generator 10 to the secondary battery 6, and the motor from the secondary battery 6 to the motor. Controls the amount of discharge supplied to generator 10.
- FIG. 2 shows an example of charge / discharge control by the charge / discharge control unit 5. In FIG. 2, S 1, S 2, S 3, and S 4 hold. "
- the charge / discharge control unit 5 determines that when the secondary battery 6 is close to an overcharged state and the estimated SOC value exceeds the state value S3, the secondary battery 6 increases as the estimated SOC value increases. Gradually decrease the amount of charge for. Further, when the estimated SOC value exceeds the state value S4, the charge / discharge control unit 5 sets the charge amount to zero. In this way, the charge / discharge control unit 5 restricts charging of the secondary battery 6 in the charge restriction region (state value S3 to state value S4), and in the charge prohibition region (state value S: to), Recharge secondary battery 6 is prohibited.
- the charge / discharge control unit 5 reduces the amount of discharge to the secondary battery 6 as the S0C estimate decreases. Is gradually reduced. Further, when the estimated SOC value falls below the state value S1, the charge / discharge control unit 5 sets the discharge amount to zero. In this way, the charge / discharge control unit 5 limits the discharge from the secondary battery 6 in the discharge restriction region (state value S2 to state value S1), and the discharge inhibition region (state value S1 to In), discharge from secondary battery 6 is prohibited.
- SOC estimator 2 executes a calculation process at a predetermined period (for example, every 100 msec), calculates the SOC estimated value at the previous estimation (one period before), and charging / discharging voltage Vb. Calculate current SOC estimate based on input / output current Ib and battery temperature Tb.
- the SOC estimation unit 2 includes a provisional SOC calculation unit 30, an electromotive voltage calculation unit 20, an estimated SOC calculation unit 28, and a SOC calculation unit 40.
- the provisional SOC calculation unit 30 calculates the first estimated value # SOC a for the remaining capacity of the secondary battery 6 based on the charge / discharge amount of the secondary battery 6 from the previous estimation of the remaining capacity (SOC). . That is, the provisional SOC calculation unit 30 calculates the first estimated value #SOCa by adding or subtracting the change in the amount of charge / discharge in the secondary battery 6 from the previous estimation time to the present time. As an example, the provisional SOC calculation unit 30 acquires the charge / discharge amount of the secondary battery 6 based on the integrated value of the input / output current Ib of the secondary battery 6.
- the provisional SOC calculation unit 30 outputs the sum of the integration unit 32 that integrates the input / output current Ib, the output value of the integration unit 32, and the previously estimated SOC estimated value as the first estimated value #SOCa. And an adding unit 34.
- the first estimation: #S OC a is also referred to as “provisional SOC”.
- the provisional SOC is an estimated value for the remaining capacity of the secondary battery 6 based on the charge / discharge amount of the secondary battery 6 from the previous estimated estimated remaining capacity.
- the electromotive voltage calculation unit 20 calculates the electromotive voltage of the secondary battery 6 based on the charge / discharge voltage Vb of the secondary battery 6, the polarization voltage of the secondary battery 6, and the voltage drop caused by the internal resistance of the secondary battery 6. calculate.
- the electromotive voltage calculation unit 20 includes a voltage drop calculation unit 22, a polarization voltage calculation unit 24, and an addition unit 26.
- the voltage drop calculation unit 22 calculates a voltage drop generated inside the secondary battery 6 based on the battery temperature T b and the input / output current I b. For example, a change in internal resistance with the battery temperature Tb as an input (parameter) is stored in advance as a map, and this voltage drop is determined by the product of the internal resistance and input / output current Ib obtained by referring to the map. calculate.
- the polarization voltage calculation unit 24 calculates the polarization voltage generated in the secondary battery 6 based on the battery temperature Tb and the input / output current Ib. This polarization voltage can also be calculated by storing a map in which the battery temperature T b and the input / output current I b are input (parameters) in advance and referring to the map.
- the addition unit 26 adds the voltage drop calculated by the voltage drop calculation unit 22 to the charge / discharge voltage Vb, and further subtracts the polarization voltage calculated by the polarization voltage calculation unit 24, thereby generating an electromotive voltage (open circuit) of the secondary battery 6. Voltage) Estimated value # ⁇ CV is calculated.
- the charge / discharge voltage Vb, the input / output current lb, and the battery temperature Tb used in the electromotive force calculation unit 20 may be average values in the period from the previous estimation to the present, for example.
- the estimated 300 calculation unit 28 calculates the second capacity for the remaining capacity of the secondary battery 6.
- Estimate # Calculate SOCb is also referred to as “estimated SOC”.
- the estimated SOC is an estimated value for the remaining capacity of the secondary battery 6 based on the state value of the secondary battery 6.
- the calculation of the estimated SOC is not limited to this configuration.
- the estimated SOC may be calculated based on the battery internal pressure of the secondary battery 6. That is, for estimated SOC, state values such as the charge / discharge voltage, input / output current, battery temperature, and battery internal pressure of the secondary battery can be obtained selectively and appropriately according to the type of the secondary battery. Is possible.
- the estimated SOC calculation unit 28 obtains a map value corresponding to the electromotive voltage #OCV of the secondary battery 6 by referring to the map as shown in FIG. #SOCb) can be calculated in the range of 0-100 (%) 0.
- SOC calculation unit 40 receives provisional SOC (#SOC a) and estimated SOC (# S0Cb.) From provisional SOC calculation unit 30 and estimated SOC calculation unit 28, respectively. Then, by correcting the provisional SOC (#SOC a) with the correction value calculated by a predetermined calculation, an estimated value of the remaining capacity (SOC) of the secondary battery 6 is generated. That is, the SOC calculation unit 40 functions as an integral element (I element) that corrects the provisional S0C (# S0Ca) to be close to the estimated SOC (#SOCb).
- I element integral element
- the SOC calculation unit 40 calculates the size of the SOC estimated value (hereinafter also referred to as “SOC estimated value (previous value)”) estimated at the previous remaining capacity estimation, Based on the magnitude relationship between the value (previous value) and the estimated SOC (# S0Cb), the complement value is calculated.
- the SOC calculation unit 40 includes a subtraction unit 42, a correction value calculation unit 50, and an addition unit 52.
- the correction value calculation unit 50 receives the deviation from the subtraction unit 42 and calculates a correction value by multiplying the deviation by a plurality of correction gains.
- the correction value calculation unit 50 includes a conversion gain unit 44, a SOC estimated value dependent gain selection unit 46, and a 'battery temperature dependent gain selection unit 48.
- the correction value is obtained by sequentially multiplying the deviation by the correction gain in each unit. Is calculated.
- the conversion gain unit 44 has a fixed value conversion gain K, and adjusts the deviation so that the output correction value width is appropriate according to the fluctuation range of the input deviation.
- the SOC estimated value dependent gain selection unit 46 calculates the correction gain G1 based on the magnitude of the S0C estimated value (previous value) and the magnitude relationship between the SOC estimated value (previous value) and the estimated SOC (#SOCb). Select.
- the SOC estimated value dependent gain selection unit 46 stores in advance a map in which the SOC estimated value (previous value) and the estimated SOC (#SOCb) are input (parameters), and by referring to the map.
- the correction gain G 1 can be selected.
- the SOC estimated value dependent gain selection unit 46 In the conversion gain section 44, the deviation after the conversion gain K is multiplied is further multiplied by its own correction gain G1 and output.
- the battery temperature dependent gain selection unit 48 selects the correction gain G 3 based on the battery temperature T b.
- the battery temperature-dependent gain selection unit 48 also stores in advance a map in which the battery temperature is input (parameter) as 13 hours and estimated 30 times (# SOCb), and a correction gain is obtained by referring to the map. G 3 can be selected. Then, the battery temperature dependent gain selection unit 48 further multiplies the value after the correction gain G 1 is multiplied by the SOC estimated value dependency gain selection unit 46 by its own correction gain G 3 to obtain a correction value ⁇ SOC. Output.
- the calorie calculation unit 52 receives the correction value ⁇ SO from the battery temperature dependent gain selection unit 48, and adds the correction value ASOO to the provisional S0C (#SOCa) received from the temporary SOC calculation unit 30. Calculated and output as SOC estimated value.
- Figure 5A shows the case where the SOC estimate is relatively large (close to overcharge), and Figure 5.B shows the case where the SOC estimate is relatively small (close to overdischarge).
- the SOC estimated value-dependent gain selection unit 46 performs estimation SO C (# S
- the estimated SOC value is estimated SOC (#SOC b) even though the estimated SOC value is close to overcharge. If it is larger, the SOC estimate is corrected to the opposite side of the overcharge side (low SOC side). Therefore, voltage measurement unit 1 2, current measurement unit 14 and temperature If there is an error in the estimated SOC (# SOCb) due to the measurement accuracy in the measurement unit 16, etc., a relatively small SOC estimation is performed despite the secondary battery 6 being overcharged. There is a risk of calculating the value.
- the estimated SOC value is close to the overdischarge, but the estimated SOC value is smaller than the estimated S0C (#SOCb).
- the SOC estimate is corrected to the opposite side (high SOC side) from overdischarge. Therefore, if there is an error in the estimated SOC (# S0Cb) due to the measurement accuracy in the voltage measurement unit 12, current measurement unit 14, and temperature measurement unit 16, the secondary battery 6 is in an overdischarged state. Despite this, there is a risk of calculating a relatively large SOC estimate.
- the SOC estimated value dependent gain selection unit 46 suppresses the calculation of an excessive correction value by relatively reducing the correction gain G 1 in such a situation, and the secondary battery in charge / discharge control. Calculate the SOC estimate so that it is on the safe side (more overcharge side or more overdischarge side) for 6.
- map 46 # is a two-dimensional map with SOC estimated value (previous value) and estimated SOC (#SOCb) as input, and the output map value is the corrected gain G 1 .
- This correction gain G 1 is a correction gain multiplied by the S0C estimated value-dependent gain selection unit 46 in FIG.
- Map 46 # shows the SOC region r 1 where the SOC estimate (previous value) is close to overcharge, and the SOC region r 2 where the SOC estimate (previous value) is close to overdischarge, and the characteristic lines 60 to 64 The area is defined.
- the characteristic line 60 indicates a position where the estimated SOC value (previous value) and the estimated SOC (#SOCb) coincide with each other.
- Characteristic lines 61 and 62 indicate positions where the estimated SOC (# S0Cb) is a predetermined value.
- Characteristic line 63 indicates the position where the deviation of the estimated SOC value from the estimated SOC (#SOCb) is 1 d 1.
- Characteristic line 64 shows SOC estimation for estimated S0C (#SOCb) Indicates the position where the value deviation is d2.
- the SOC estimate directly (previous value) is in the S0C region r1, which is close to the overcharge of the secondary battery 6, and the estimated SOC (# S0Cb) is a predetermined value. If it is above (below the characteristic line 6 1) and the SOC estimated value (previous value) is larger than the estimated SOC (#SOCb) (the upper side of the characteristic line 60) g 1 1 force S OC estimation It is set smaller than the gain value g15 when the value (previous value) is smaller than the estimated SO C (# SOCb) (below the characteristic line 60).
- the SOC region ir l can be selected so as to correspond to, for example, a charge limiting region (state value S3 to state value S4) as shown in FIG.
- a charge limiting region state value S3 to state value S4
- the estimated SOC value previously value
- the charge limit value state value S3
- it is corrected more safely correction gain G1 is relatively small. Therefore, after the battery charge has been raised to the charge prohibition value (state value S4), charging of the secondary battery 6 is prohibited, so that the tracking accuracy is improved and the estimation accuracy is improved (the correction gain G1 is restored to the original value). Is relatively large).
- the SOC estimated value (previous value) is in the SOC region r 1 close to overcharge, it is possible to perform correction on the safe side (relatively reducing the correction gain). What is needed is when the SOC estimate (previous value) is greater than the estimated S0C (# SOC b). Therefore, the area where the gain value g 1 1. is set in map 46 # is the area above the characteristic line 60, and the area below the characteristic line 60 has a gain value g 15 greater than the gain value g 11. Is set.
- the region where the smaller gain value g 1 1 is set is limited to the lower side of the characteristic line 61 where the estimated SOC (# S0Cb) is equal to or larger than the predetermined value.
- the amount of change in the electromotive voltage with respect to the SOC change is around 50% from the overcharge side (relatively large S0C) The larger the discharge side (relatively small SOC), the larger.
- Map 46 # the area where the measurement error of the estimated SOC (# S0Cb) is relatively large according to the electromotive voltage characteristics of the secondary battery 6 is defined by characteristic lines 61 and 62. Is done. A smaller gain is set in the region where the measurement error of S0C is relatively small, that is, in the lower region of the characteristic line 61 and the upper region of the characteristic line 62.
- Map 46 # the estimated value of S0C (previous value) is in the SQC region r2, which is close to the overdischarge of the secondary battery 6, and the estimated SOC (# S0Cb) is below the specified value (When the SOC estimated value (previous value) is smaller than the estimated SO C (#SOCb) (below the characteristic line 60) g 1 2 force SO
- 300 region 1: 2 can be selected so as to correspond to a discharge restriction region (state value S 2 to state value S 1) as shown in FIG. 2, for example.
- S OC previously value
- state value S 2 discharge limit value
- the correction is made more safely (the correction gain is made relatively small), while the discharge is After the voltage drops to the forbidden value (state value S 1), the secondary battery 6 is prohibited from being discharged. Therefore, the tracking accuracy is improved and the estimation accuracy is improved (the correction gain is restored to its original value or is relatively large). It is desirable that
- the estimated SOC value (previous value) is in the SOC region r 2 close to overdischarge, it is possible to perform correction on the safe side (relatively reducing the correction gain). What is needed is when the SOC estimate (previous value) is less than the estimated S0C (# S0Cb). Therefore, the area where gain value g 1 2 is set in map 46 # is the area below characteristic line 60, and the area above characteristic line 60 is set to gain value g 15 greater than gain value g 12. Is done.
- a smaller gain value g 12 is set for a region where the SOC measurement error is relatively small, that is, a region above the characteristic line 62.
- Map 46 # if the deviation of the SOC estimated value (previous value) from the estimated S0C (#SOCb) becomes excessive, the tracking accuracy is further improved and the estimation accuracy is improved.
- the area where the absolute value of the deviation is larger than I d 11 (the upper area of the characteristic line 6 3) and the area where the absolute value of the deviation is larger than I d 2 I (characteristic line 6) 4) a gain value g 1 3 and a gain value g 1 4 greater than the gain value g 1 5 are set.
- map 48 # is a two-dimensional map with battery temperature T b and estimated SO C (# S OC b) as inputs (parameters), and the output map is a correction gain G 3 is there.
- This correction gain G 3 is a correction gain multiplied by the battery temperature dependent gain selection unit 48 in FIG. '
- the secondary battery 6 charges and discharges electric energy (charge) using a chemical reaction.
- the activity of this chemical reaction changes depending on the battery temperature, and becomes more active as the battery temperature Tb increases. Due to such an increase in activity, the estimated electromotive voltage value #OCV of the secondary battery 6 is likely to fluctuate, so that the estimated S OC (# S OC b) also fluctuates relatively greatly. For this reason, it is desirable to increase the follow-up performance by increasing the correction gain G3 to improve the estimation accuracy of the remaining capacity estimation value.
- the map 48 # is set so that the correction gain G 3 showing such characteristics is selected.
- Figure 8 shows the change in correction gain G3 for estimated SOC (#SOCb) in Map 48 #. Note that temperatures Tl, ⁇ 2, ⁇ 3 in Fig. 8 correspond to temperatures 1, ⁇ 2, ⁇ 3 ( ⁇ ⁇ 2 ⁇ 3) shown in map 48 # of Fig.7.
- Map 48 # even if battery temperature Tb is any of temperature Tl, ⁇ 2, or ⁇ 3, estimated SOC (#SOCb) is overcharged and overcharged from around 50 ° / 0 , respectively.
- the correction gain G3 is set to increase as it is displaced toward the discharge side. That is, the battery temperature dependent gain selection unit 48 sets the correction gain G3 on the overcharge side and the overdischarge side to be relatively large, thereby improving the estimation accuracy. '
- the correction gain G 3 corresponding to each estimated S OC (#SOCb) is set to increase as the battery temperature T b of the secondary battery 6 increases. That is, as the battery temperature Tb increases, the characteristic line indicating the correction gain G′3 moves to the upper side of the graph. In this way, by increasing the correction gain G3 as the battery temperature Tb of the secondary battery 6 increases, the estimated S0C value for the secondary battery 6 can be stabilized regardless of the change in the battery temperature Tb. And can be calculated with high accuracy.
- the provisional SOC calculation unit 30 corresponds to the “first estimation unit”
- the estimated SOC calculation unit 28 force S corresponds to the “second 'estimation unit”
- the unit 40 corresponds to the “correction unit”
- the electromotive voltage calculation unit 20 corresponds to the “electromotive voltage calculation unit”.
- the subtractor 42 corresponds to the “deviation calculator”
- the correction value calculator 50 corresponds to the “correction value calculator”
- the adder 52 corresponds to the “estimated value calculator”.
- the SOC estimated value dependent gain selection unit 46 corresponds to the “first correction gain selection unit”
- the battery temperature dependent gain selection unit 48 corresponds to the “third correction gain selection unit”.
- the correction gains G 1 and G 3 are included in the SOC estimated value dependent gain selecting unit 46 and the battery temperature dependent gain selecting unit 48 included in the correction value calculating unit 50, respectively.
- the configuration for calculating the correction value ⁇ SOC by multiplication has been described, but the SOC estimation direct dependence gain selection unit 46 or the battery temperature dependence gain
- the correction value calculation unit may be configured to include only one of the selection units 48. In other words, the correction value ⁇ SOC is multiplied by either the correction gain G 1 selected by the SOC estimated value dependent gain selection unit 46 or the correction gain G 3 selected by the battery temperature dependent gain selection unit 48.
- the SOC estimated value dependent gain selection 3 ⁇ 4546 shows that the S ⁇ C estimated value (previous value) exists in a region close to overcharge, and the S0C estimated value (previous value) When correcting to a smaller value (SOC control center side), select a relatively small correction gain G1.
- the SOC estimated value-dependent gain selection unit 46 has a SOC estimated value (previous value) in a region close to overdischarge and a larger value than the SOC estimated value (previous value) (SC control). When correcting to the center side), select a smaller gain G1.
- the estimated SOC value previously value
- it will be on the safe side (more overcharge side or more overdischarge side) for the secondary battery in charge / discharge control.
- An estimated remaining capacity value is calculated. Therefore, it is possible to accurately estimate the remaining capacity of the secondary battery while avoiding overcharge and overdischarge more stably.
- the battery temperature dependent gain selection unit 48 adjusts the correction gain G 3 according to the estimated SO C (#SOCb) that varies relatively greatly as the battery temperature Tb increases. To improve the follow-up performance and improve the estimation accuracy of the remaining capacity estimation value.
- the battery temperature dependent gain selection unit 48 increases the correction gain G 3 relatively in accordance with the estimated SOC (# SOC b) that varies relatively greatly as it approaches the overcharge or overdischarge region. Improves tracking and improves the estimation accuracy of the remaining capacity estimation value.
- the correction value ⁇ SO C is calculated by the correction gain selected based on the estimated value of s0c (previous value), estimated SOC (#SOCb), and battery temperature.
- the configuration to be calculated has been described.
- SOC estimator 2 A is the same as SOC calculator 40 in SOC estimator 2 according to the first embodiment of the present invention shown in FIG. 4 Equivalent to replacing OA.
- the 300 calculation unit 40 is equivalent to the correction value calculation unit 50 replaced with the correction value calculation unit 5OA.
- the correction value calculation unit 50 A is equivalent to the SOC estimated value dependent gain selection unit 46 replaced with the input / output current dependent gain selection unit 47.
- the input / output current dependent gain selection unit 47 Select the correction gain G2.
- the input / output current dependent gain selection unit 47 stores in advance a map in which the input / output current I 1) is estimated (30) (# 30 ⁇ 15) as an input (parameter).
- the correction gain G 2 can be selected by referring to the map.
- the input / output current dependent gain selection unit 47 then multiplies the deviation after the conversion gain K is multiplied by the conversion gain unit 44 by its own correction gain G 2 and outputs the result. '
- the amount of change in the electromotive voltage with respect to the SOC change is around 50% from the overcharge side (relatively large SOC) or It becomes larger as it becomes the overdischarge side (relatively small SOC).
- the secondary battery 6 is almost overcharged, and the input current to the secondary battery 6 If (charging current) is large, the estimated SOC (#SOCb) may fluctuate significantly. Similarly, if the output current (discharge current) from the secondary battery 6 is large when the secondary battery 6 is close to overdischarge, the estimated SOC (# SOCb) may fluctuate greatly. Therefore, in such a situation, it is desirable to increase the correction value ⁇ S0C to improve followability and improve estimation accuracy.
- map 47 # stored in input / output current dependent gain selector 47 inputs input / output current Ib and estimated SO G (# S0Cb) of secondary battery 6 (parameter)
- the map value that is output is the correction gain G2.
- This correction gain G2 is a correction gain multiplied by the input / output current dependent gain selection unit 47 in FIG.
- the characteristic lines 67 and 68 are determined as appropriate according to the full charge capacity (A h), the input / output current value (A) of the secondary battery 6 and the electromotive voltage characteristics with respect to SOC.
- Map 47 # the gain values g21 and g22 are further subdivided and set so that the output correction gain G2 increases as the input current or output current increases.
- Figure 1 1 A and Figure 1 1 B show each estimated SOC (# S
- FIG. 1 1A shows the case where the estimated SOC (# S0Cb) is relatively large (close to overcharge)
- Fig. 1 1B shows the case where the estimated SOC (# S0Cb) is relatively small (overdischarge) Close to Les)) Show the case.
- the gain characteristic 70 when the estimated S0C (# S0Cb) is 50 ° / o does not intersect the characteristic lines 67 and 68. Regardless of the output current I b, a constant gain value g 21 is selected.
- the complementary E gain G2 gradually increases. Begin to. .
- Map 47 # when the estimated S0C (#SOCb) is greater than or equal to the specified value specified by the characteristic line 67, as the input current (charging current) increases, the estimated SO C As (#SOCb) increases, the output correction gain G2 is set to increase. '
- the gain characteristic 7 3 corresponding to the estimated SOC (#SOCb) smaller than the estimated SOC (#SOCb) corresponding to the gain characteristic 7.0 intersects the characteristic line 68. Therefore, when the input / output current Ib exceeds the predetermined output current value I3, the correction gain G2 starts to increase gradually.
- Map 47 # when the estimated SOC (#SOCb) is greater than or equal to the specified value specified by the characteristic line 68, as the output current (discharge current) increases, the estimated SOC (# The output correction gain G2 is set to increase as SOCb) decreases.
- the SOC estimated value for secondary battery 6 can be calculated stably and with high accuracy. Monkey.
- the provisional SOC calculation unit 30 corresponds to the “first estimation unit”
- the estimated SOC calculation unit 28 force S corresponds to the “second estimation unit”
- Part 4 OA corresponds to “correction part”
- electromotive voltage calculation part 20 corresponds to “electromotive voltage calculation part”.
- the subtractor 42 corresponds to the “deviation calculator”
- the correction value calculator 5 OA corresponds to the “correction value calculator”
- the adder 52 corresponds to the “estimated value calculator”.
- the input / output current dependent gain selection unit 47 corresponds to “a first correction gain selection unit”
- the battery temperature dependent gain selection unit 48 corresponds to a “third correction gain selection unit”.
- the input / output current dependent gain selecting unit 47 and the battery temperature dependent gain selecting unit 48 included in the correction value calculating unit 5 OA have the correction gains G 2 and G 3, respectively.
- the correction value ⁇ SOC is calculated to calculate the correction value ⁇ SOC, but the correction value calculation unit is configured to include only one of the input / output current dependent gain selection unit 47 and the battery temperature dependent gain selection unit 48. It may be configured. That is, the correction value ⁇ is obtained by multiplying either the correction gain G 2 selected by the input / output current dependent gain selection unit 47 or the correction gain G 3 selected by the battery temperature dependent gain selection unit 48.
- the input / output current dependent gain selection unit 471 is in a state close to overcharging, and when the input current (charging current) is large or in a state close to overdischarging.
- the tracking gain can be increased by relatively increasing the correction gain G2. Increase the accuracy of the estimated remaining capacity.
- the battery temperature dependent gain selecting unit 48 estimates SO C (#SOCb) that varies relatively greatly as the battery temperature Tb increases. Accordingly, the correction gain G3 is relatively increased to improve the follow-up performance, and the estimation accuracy of the remaining capacity estimation value is improved. In addition, the battery temperature dependent gain selection unit 48 increases the correction gain G 3 relatively in accordance with the estimated SOC (# SOC b) that varies relatively greatly as it approaches the overcharge or overdischarge region. Improves tracking and improves the estimation accuracy of the remaining capacity estimation value.
- the correction value is calculated by the correction gain selected based on the estimated SOC value (previous value), estimated SOC (# SOCb), and battery temperature
- the configuration for calculating the correction value using the correction gain selected based on the input / output current, estimated SOC (# SOC b), and battery temperature was explained.
- Embodiment 3 of the present invention a configuration for calculating a correction value using all the correction gains will be described. .
- the SOC estimation unit 2 B according to the third embodiment of the present invention is the same as the SOC calculation unit 40 in the SOC estimation unit 2 according to the first embodiment of the present invention shown in FIG. Equivalent to replacing 40 B.
- the SOC calculation unit 40 B is equivalent to the correction value calculation unit 50 replaced with the correction value calculation unit 50B.
- the correction value calculation unit 50 B is equivalent to the correction value calculation unit 50 further including an input / output current dependent gain selection unit 47 shown in FIG. 'Others are the same as in SOC estimation unit 2 according to the first embodiment of the present invention, and thus detailed description will not be repeated.
- the SOC estimated value dependent gain selecting unit 46, the input / output current dependent gain selecting unit 47, and the battery temperature dependent gain selecting unit 48 are each The correction gain is selected so that the remaining capacity of the secondary battery can be estimated with high accuracy while stably avoiding overcharge and overdischarge. Therefore, the SOC calculation unit 40B performs overcharge and overdischarge compared to the first or second embodiment. It is possible to calculate an estimated S0C value that more accurately estimates the remaining capacity of the secondary battery while avoiding it more stably.
- the provisional SOC calculation unit 30 corresponds to the force S ⁇ first estimation unit '' and the estimated SOC calculation unit 28 corresponds to ⁇ second estimation unit ''.
- SOC calculation unit 40 B corresponds to “correction unit”
- electromotive voltage calculation unit 20 corresponds to “electromotive voltage calculation unit”.
- the subtracting unit 42 corresponds to the “deviation calculating unit”
- the correction value calculating unit 50 B corresponds to the “correction value calculating unit j”
- the adding unit 52 corresponds to the “estimated value calculating unit”.
- the SOC estimated value dependent gain selection unit 46 corresponds to the “first correction gain selection unit”
- the input / output current dependency gain selection unit 47 corresponds to the “second correction gain selection unit”.
- the degree-dependent gain selector 4 8 corresponds to the “third correction gain selector”.
- Embodiment 3 of the present invention any of the effects of Embodiments 1 and 2 of the present invention described above can be realized simultaneously.
- the vehicle equipped with the secondary battery remaining capacity estimating device according to the present invention has been described.
- the present invention is charged and discharged based on the estimated SOC value.
- the secondary battery is configured as described above, it can be applied to any device and system. .
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Secondary Cells (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Tests Of Electric Status Of Batteries (AREA)
Abstract
SOC推定値依存ゲイン選択部(46)は、推定SOC(#SOCb)に対するSOC推定値(前回値)の偏差に補正ゲインG1を乗じて補正値を算出する。そして、SOC推定値依存ゲイン選択部(46)は、SOC推定値(前回値)が過充電に近い領域に存在し、かつ、SOC推定値(前回値)をより小さい値(SOC制御中心側)に補正する場合、ならびに、SOC推定値(前回値)が過放電に近い領域に存在し、かつ、SOC推定値(前回値)をより大きい値(SOC制御中心側)に補正する場合において、相対的に小さい補正ゲインG1を選択する。そのため、SOC推定値(前回値)が過充電または過放電に近い場合において、充放電制御における二次電池についての安全側となるように補正される。
Description
. 明細書 二次電池の残存容量推定装置および残存容量推定方法 技術分野
この発明は、 充電可能に構成される二次電池の残存容量推定装置および残存容 量推定方法に関し、 特に二次電池の過充電および過放電をより安定して回避する ための技術に関する。 背景技術
二次電池は、 種々の分野に使用されているが、 この二次電池の効率的な運用の ためには、 二次電池の充放電制御を的確に行なう必要がある。 このために、 二次 電池の残存容量 ( S〇 C : State of Charge;以下、 単に S O Cとも称す) を高 い精度で推定する必要がある。 '
従来から、 二次電池の入出力電流を積算することで S O Cを推 する、 いわゆ る電流積算方式が知られている。 このような電流積算方式では、 たとえば満充電 (フル充電) をしないような電池の使用形態においては、 電流積算にかかる演算 装置 (C P U) の最下位ビット桁落ちや自己放電による容量低下などによる誤差 の影響、 あるいは電流センサ精度への依存度が高いなどの理由により推定精度を 向上させるには限界があった。
そこで、 推定精度を向上させるため、 電池の起電圧 (開放電圧: Open Circuit Voltage;以下、 単に O C Vとも称す) および電流積算値の両方を用いて電池の 残存容量 (S O C ) を推定することが提案されている (たとえば、 特開 2 0 0 3 - 1 4 9 3 0 7号公報) 。 具体的には、 電池の起電圧により S O Cの捕正パラメ —タを決定し、 当該補正パラメータを使用して電流積算に基づく S〇Cを補正す ることを特徴とした電池の残存容量算出方法が提案されている。
同様に電流積算および二次電池の出力電圧の両方を用いて残存容量を演算する 手法としては、 電流積算に基づく残存容量推定に用いられる充電効率 ηを出力電 圧に応じて補正する残存容量制御方法が提案されている (たとえば、 特開 2 0 0
2- 369391号公報) 。
特に、 ハイブリッド車両などに搭載される二次電池に対しては、 推定された S OCに基づいて、 SOCの制御中心値を境界として、 充電を優先あるいは放電を 優先するように充放電制御が行なわれる。 さらに、 その制御中心値を含む S〇 C 管理範囲に上下限値を設定して、 過充電および過放電が防止される。 すなわち、 管理上限値を超えた場合には充電が制限または禁止される一方で、 管理下限値を 下回つた場合には放電が制限または禁止される。
そのため、 二次電池の充放電制御における安全性の確保、 すなわち二次電池の 過充電および過放電を回避する観点からは、 Sひ C管理範囲の上下限値付近での SOC推定値をより高精度で推定することが望ましい。 そこで、 SOC管理範囲 の上下限 付近では、 S O Cの補正パラメータが大きく設定される。
しかしながら、 補正値は、 充放電電流の積算値に基づく推定 SOCを起電圧に よる推定 SO Cに近付ける方向に決定される。 そのため、 起電圧に基づく推定 S OC (たとえば、 80%) に比較して、 電流積算値に基づく推定 SO C (たとえ ば、. 85%) がより管理上限値 (たとえば、 90%) に近接している場合であつ ても、 電流積算値に基づく推定 SO Cをより低い方向、 すなわち管理上限値から 離れる方向に大きく補正する。 二次電池の過充電を回避する観点からは、 このよ うな補正は逆効果であり、 かえって過充電の危険性を増大させてしまう。
同様にして、 起電圧に基づく推定 SO C (たとえば、 20%) に 匕較して、 電 流積算値に基づく推定 SO C (たとえば、 15%) 'がより管理下限値 (たとえば、 10%) に近接している場合であっても、 電流積算値に基づく推定 SO Cをより 高い方向、 すなわち管理下限値から離れる方向に大きく補正するため、 かえって 過放電の危険性を増大させてしまう。
また、 二次電池の充放電電流の大きさに応じて、 二次電池の残存容量の時間変 化率は変化する。 そのため、 残存容量が管理上限値に近接している場合において、 大きな充電電流が生じると過充電を生じる危険性があり、 管理下限ィ直に近接して いる場合において、 大きな放電電流が生じると過放電を生じる危険性があった。 発明の開示
この発明は、 このような問題点を解決するためになされたものであって、 その 目的は、 過充電および過放電をより安定的に回避しつつ、 二次電池の残存容量を 高精度に推定する二次電池の残存容量推定装置および残存容量推定方法を提供す ることである。
この発明のある局面に従えば、 充放電されるように構成された二次電池の残存 容量推定装置である。 この二次電池の残存容量推定装置は、 前回の残存容量推定 時からの二次電池の充放電量に基づき、 二次電池の残存容量についての第 1の推 定値を算出する第 1の推定部と、 二次電池の状態値に基づいて、 二次電池の残存 容量についての第 2の推定値を算出する第 2の推定部と、 第 2の推定値に対する 前回の残存容量推定時において推定された二次電池の残存容量推定値である残存 容量前同値の偏差に応じた補正値により、 第 1の推定値を補正する;とで、 二次 電池の残存容量推定値を生成する補正部とを備える。 そして、 補正部は、 残存容 量前回値の大きさ、 および残存容量前回値と第 2の推定値との大小関係に基づい て、 補正値を算出する。 '
の局面によれば、 二次電池の残存容量推定値を生成するために、 前回の残存 容量推定時からの二次電池の充放電量に基づいて算出され.た第 1の推定値を、 前 回の残存容量推定時において推定された二次電池の残存容量推定値である残存容 量前回値の大きさ、 および残存容量前回値と第 2の推定値との大小関係に基づい て補正することで二次電池の残存容量推定値を算出する。 そのため、 前回の二次 電池の残存容量推定値が存在する領域 (たとえば、 '過充電または過放電に近い領 域であるか否か) 、 および、 補正値が発生する方向 (たとえば、 過充電側または 過放電側のいずれの方向に補正値が発生する力 に基づいて、 補正 ί直を決定でき る。
よって、 過充電または過放電に近い領域にある場合には、 充放電制御における 二次電池についての安全側 (より過充電側またはより過放電側) となるように、 残存容量推定値を算出できる一方で、 それ以外の領域においては、 第 2の推定値 への追従性を高めて、 残存容量推定値の推定精度を向上させることができる。 好ましくは、 補正部は、 第 2の推定値および残存容量前回値を受け、 偏差を算 出する偏差算出部と、 偏差算出部から偏差を受け、 偏差に少なくとも 1個の補正
ゲインを乗じることで補正値を算出する補正値算出部と、 補正値算出部から補正 値を受け、 第 1の推定部から受けた第 1の推定値に補正値を加算して出力する推 定 :算出部とを含む。 そして、 少なくとも 1個の補正ゲインは、 第 1の補正ゲイ ンを含み、 補正値算出部は、 残存容量前回値の大きさ、 および残存容量前回値と 第 2の推定値との大小関係に基づいて、 第 1の補正ゲインを選択する第 1の補正 ゲイン選択部を含む。
さらに好ましくは、 第 1の補正ゲイン選択部は、 残存容量前回値が二次電池の 過充電に近い第 1の領域内であり、 かつ、 第 2の推定値が第 1の所定値以上であ る場合において、 残存容量前回値が第 2の推定値より大きいときの第 1の補正ゲ インを、 残存容量前回値が第 2の推定値より小さいときに比較して小さぐする一 方で、 残存容量前回値が二次電池の過放電に近い第 2の領域内であ,り、 かつ、 第 の推定値が第 2の所定値以下である場合において、 残存容量前回直が第 2の推 定値より小さいときの第 1の補正ゲインを、 残存容量前回値が第 2の推定値より 大きいときに比較して小さくする。
また好ましくは、 第 1の補正ゲイン選択部は、 残存容量前回値および第 2の推 定値を入力とする所定マップの参照により、 第 1の補正ゲインを選択する。
また好ましくは、 少なくとも 1個の補正ゲインは、 第 2の補正ゲインをさらに 含み、 補正値算出部は、 二次電池を充放電するための二次電池の入出力電流と第 2の推定値との関係に基づいて、 第 2の補正ゲインを選択する第 2の捕正ゲイン 選択部をさらに含む。
さらに好ましくは、 第 2の補正ゲイン選択部は、 第 2の推定値が二次電池の過 充電に近い第 3の所定値以上である場合において、 二次電池への入力電流の増大 に従い第 2の補正ゲインを大きくする一方で、 第 2の推定値が二次電池の過放電 に近い第 4の所定値以下である場合において、 二次電池への出力電流の増大に伴 い第 2の補正ゲインを大きくする。
また好ましくは、 第 2の補正ゲイン選択部は、 二次電池の入出力電流および第 2の推定値を入力とする所定マップの参照により、 第 2の補正ゲインを選択する。 この発明の別の局面に従えば、 充放電されるように構成された二次電池の残存 容量推定装置である。 この二次電池の残存容量推定装置は、 前回の残存容量推定
時からの二次電池の充放電量に基づき、 二次電池の残存容量についての第 1の推 定値を算出する第 1の推定部と、 二次電池の状態値に基づいて、 二次電池の残存 容量についての第 2の推定値を算出する第 2の推定部と、 第 2の推定値に対する 前回の残存容量推定時において推定された二次電池の残存容量推定 ί直である残存 容量前回値の偏差に応じた補正値により、 第 1の推定値を補正することで、 二次 電池の残存容量推定値を生成する補正部とを備える。 そして、 補正部は、 二次電 池を充放電するための二次電池の入出力電流と第 2の推定値との関係に基づ!/、て、 補正値を算出する。
この局面によれば、 二次電池の残存容量推定値を生成するために、 前回の残存 容量推定時からの二次電池の充放電量に基づいて算出された第 1の推定値を、 二 次電池の入出力電流と第 2の推定値との関係に基づいて補正することで二次電池 の残存容量推定値を算出する。 そのため、 第 2の推定値が存在する領域と対応す る二次電池の入出力電流 (たとえば、 過充電に近い領域で所定値以上の入力電流 が生じているか、 あるいは過放電に近い領域で所定値以上の出力電流が生じてい るかなど) に基づいて、 補正値を決定できる。 '
よって、 第 2の推定値が過充電に近い領域にあって、 二次電池への入力電流が 大きい場合や、 第 2の推定値が過放電に近い領域にあって、 二次電池からの出力 電流が大きい場合などには、 第 2の推定値への追従性を高めて、 残存容量推定値 の推定精度を向上させることができる。
好ましくは、 補正部は、 第 2の推定値および残存容量前回値を受け、 偏差を算 出する偏差算出部と、 偏差算出部から偏差を受け、 偏差に少なくとも 1個の補正 ゲインを乗じることで補正値を算出する補正値算出部と、 補正値算出部から捕正 値を受け、 第 1の推定部から受けた第 1の推定値に補正値を加算して出力する推 定値算出部とを含む。 そして、 少なくとも 1個の補正ゲインは、 第 1の補正ゲイ ンを含み、 補正値算出部は、 二次電池の入出力電流と第 2の推定値との関係に基 づいて、 第 1の補正ゲインを選択する第 1の補正ゲイン選択部を含む。
さらに好ましくは、 第 1の補正ゲイン選択部は、 第 2の推定値が二次電池の過 充電に近い第 1の所定値以上である場合において、 二次電池への入力電流の増大 に従い第 1の補正ゲインを大きくする一方で、 第 2の推定値が二次電池の過放電
に近い第 2の所定値以下である場合において、 二次電池からの出力電流の増大に 従い第 1の補正ゲインを大きくする。
また好ましくは、 第 1の補正ゲイン選択部は、 二次電池の入出力電流および第 2の推定値を入力とする所定マップの参照により、 第 1の補正ゲインを選択する。 また好ましくは、 少なくとも 1個の補正ゲインは、 第 3の補正ゲインをさらに 含み、 補正値算出部は、 二次電池の電池温度に基づいて、 第 3の補正ゲインを選 択する第 3の補正ゲイン選択部をさらに含む。
さらに好ましくは、 第 3の補正ゲイン選択部は、 二次電池の電池温度の上昇に 従い、 第 3の補正ゲインを大きくする。
また好ましくは、 第 1の推定部は、 二次電池の入出力電流の積算ィ直に基づいて、 二次電池の充放電量を取得する。 .
また好ましくは、 第 2の推定部は、 二次電池の起電圧に基づいて、 第 2の推定 値を算出する。
さらに好ましくは、 二次電池の充放電電圧、 二次電池の分極電圧、 および二次 電池の内部抵抗により生じる電圧降下、 に基づいて、 二次電池の起電圧を算出す る起電圧算出部をさらに備える。 .
この発明のさらに別の局面に従えば、 充放電されるように構成された二次電池 の残存容量推定方法であって、 前回の残存容量推定時からの二次電池の充放電量 に基づき、 二次電池の残存容量についての第 1の推定値を算出すること、 二次電 池の状態値に基づいて、 二次電池の残存容量についての第 2の推定 ί直を算出する こと、 第 2の推定値に対する前回の残存容量推定時において推定された二次電池 の残存容量推定値である残存容量前回値の偏差に応じた補正値により、 第 1の推 定値を補正することで、 二次電池の残存容量推定値を生成することを含む。 そし て、 二次電池の残存容量推定値の生成において、 残存容量前回値の大きさ、 およ び残存容量前回値と第 2の推定値との大小関係に基づいて、 補正値が算出される。 この発明のさらに別の局面に従えば、 充放電されるように構成された二次電池 の残存容量推定方法であって、 前回の残存容量推定時からの二次電池の充放電量 に基づき、 二次電池の残存容量についての第 1の推定値を算出すること、 二次電 池の状態値に基づいて、 二次電池の残存容量についての第 2の推定 を算出する
こと、 第 2の推定値に対する前回の残存容量推定時において推定された二次電池 の残存容量推定値である残存容量前回値の偏差に応じた補正値により、 第 1の推 定 :を補正することで、 二次電池の残存容量推定値を生成することを含む。 そし て、 二次電池の残存容量推定値の生成において、 二次電池を充放電するための二 次電池の入出力電流と第 2の推定値との関係に基づいて、 補正値が算出される。 この発明によれば、 過充電および過放電をより安定的に回避しつつ、 二次電池 の残存容量を高精度に推定する二次電池の残存容量推定装置および残存容量推定 方法を実現できる。 図面の簡単な説明
図 1 、 この発明の実施の形態 1に従う二次電池の残存容量推定 置を搭載し た車両の概略構成図である。
図 2は、 充放電制御部による充放電制御の一例を示す。
図 3は、 S O C推定部における処理を示すブロック図である。
図 4は、 二次電池の起電圧と S O Cとの関係の一例を示す。 '
図 5 A, 図 5 Bは、 S O C算出部において算出される補; E値を説明するための 図である。
図 6は、 S O C推定値依存ゲイン選択部に格納されるマップの一例を示す。 図 7は、 電池温度依存ゲイン選択部に格納.されるマップの構造を示す。
図 8は、 マップにおける推定 S O Cに関する補正ゲインの変化の一例を示す。 図 9は、 この発明の実施の形態 2に従う S O C推定部における処理を示すプロ ック図である。
図 1 0は、 入出力電流依存ゲイン選択部に格納されるマップの一例を示す。 図 1 1 A, 図 1 1 Bは、 図 1 0に示すマップの各推定 S O Cに対応するゲイン 特性を説明するための図である。
図 1 2は、 この発明の実施の形態 3に従う S O C推定部における処理を示すブ 口ック図である。 発明を実施するための最良の形態
この発明の実施の形態について、 図面を参照しながら詳細に説明する。 なお、 図中の同一または相当部分については、 同一符号を付してその説明は繰返さない。
[実施の形態 1 ]
図 1を参照して、 車両 1 0 0は、 二次電池 6 と、 P C U (Power Control Unit) 8と、 モータジェネレータ (MG : Motor Generator) 1 0と、 E C U 1 と、 電圧測定部 1 2と、 電流測定部 1 4と、 温度測定部 1 6とを含む。 この車両 1 0 0は、 モータジェネレータ 1 0の駆動力と、 図示しないエンジンの駆動力の 少なくともいずれか一方により走行するハイブリッド車両である。 なお、 ハイブ リッド車両に代えて、 燃料電池を搭載した燃料自動車やモータジェネレータの駆 動力だけで走行する電気自動車であってもよい。
二次霉池 6は、 複数の電池セルを一体化した電池モジュールを、 さらに複数直 列に接続して構成された組電池であり、 一例として、 リチウムィオン電池や二ッ ケル水素電池などからなる。 そして、 二次電池 6は、 P C U 8を介して充放電さ れるように構成さ;^る。
P C U 8 'は、 車両 1 0 0のカ行時には、 二次電池 6から供給される直流電力を 交流電力に変換し、 モータジェネレータ 1 0へ供給する一.方、 車両 1 0 0の回生 制動時には、 モータジェネレータ 1 0が発生する交流電力を直流電力に変換し、 二次電池 6へ供給することで、 車両 1 0 0の運動エネルギーを電気エネルギーと して回収する。 さらに、 P C U 8は、 二次電池 6から供給される直流電力を昇圧 したり、 モータジェネレータ 1 0から供給される直流電圧を降圧したりする昇降 圧コンバータ (D CZD Cコンバータ) を含んでもよい。
なお、 ここで言う回生制動とは、 ハイブリッド車両の運転者によるフットプレ ーキ操作があった場合における発電制動を伴う制動、 およびフットブレーキ操作 をしないものの、 走行中にアクセルペダルをオフすることで発電制動をさせなが ら減速 (または加速を中止) することを含む。
モータジェネレータ 1 0は、 たとえば三相交流回転電機であり、 P C U 8から 供給される交流電力を受けて電動機として機能し、 車両 1 0 0を走行させるため の駆動力を図示しない車輪に伝達する。 また、 モータジェネレータ 1 0は、 車輪 を介して伝達される回転駆動力を受けて発電機として機能し、 車両 1 0 0が有す
る運動エネルギーを電力に変換して、 p CU 8を介して二次電池 6に回生する。
ECU1は、 車両 100の運転状態、 アクセル開度、 シフトポジション、 二次 電池の SOC、 ならびに E CU 1に内蔵された ROM (Read Only Memory) 3に 格納されたマップぉよびプログラムなどに基づいて演算処理を行なう。 これによ り、 ECU 1は、 運転者の操作指示に応じた運転状態となるように、 車両に搭載 された機器類を制御する。
ECU 1には、 二次電池 6の充放電電圧 V bを測定する電圧測定部 1 2と、 二 次電池 6の入出力電流 1 bを測定する電流測定部 14と、 二次電池の電池温度 T bを測定する温度測定部 16とが接続されている。 そして、 ECU 1は、 SOC 推定部 2および充放電制御部 5を含む。
S O 推定部 2は、 それぞれ電圧測定部 12、 電流測定部 14お.よび温度測定 部 16が測定する、 二次電池 6の充放電電圧 Vb、 二次電池 6の入出力電流 I b および二次電池 6の電池温度 T bに基づいて、 二次電池 6の S O Cを逐次推定す る。 推定された二次電池 6の SOC推定値は、 E CU 1に内蔵された RAM (Random Access Memory) 4に格納される。 '
充放電制御部 5は、 RAM 4に格納された SO C推定値に応じて、 PCU8に 制御指令を与え、 モータジェネレータ 10から二次電池 6へ供給される充電量、 ならびに二次電池 6からモータジェネレータ 10へ供給される放電量を制御する。 図 2は、 充放電制御部 5による充放電制御の一例を示す。 なお、 図 2において は、 S 1く S 2く S 3く S 4が成立する。 "
図 2を参照して、 充放電制御部 5は、 二次電池 6が過充電状態に近くなり、 S OC推定値が状態値 S 3を超過すると、 SOC推定値の増加に伴い二次電池 6に 対する充電量を漸減させる。 さらに、 SOC推定値が状態値 S 4を超過すると、 充放電制御部 5は、 充電量をゼロとする。 このように、 充放電制御部 5は、 充電 制限領域 (状態値 S 3〜状態値 S4) において、 二次電池 6に対する充電を制限 し、 かつ、 充電禁止領域 (状態値 S :〜) において、 二次電池 6に対する充電を 禁止する。
一方、 充放電制御部 5は、 二次電池 6が過放電状態に近くなり、 SOC推定ィ直 が状態値 S 2を下回ると、 S〇C推定値の低下に伴い二次電池 6に対する放電量
を漸減させる。 さらに、 SOC推定値が状態値 S 1を下回ると、 充放電制御部 5 は、 放電量をゼロとする。 このように、 充放電制御部 5は、 放電制限領域 (状態 値 S 2〜状態値 S 1) において、 二次電池 6からの放電を制限し、 かつ、 放電禁 止領域 (状態値 S l〜) において、 二次電池 6からの放電を禁止する。
図 3を参照して、 S O C推定部 2は、 所定周期 (たとえば 100 m s e c毎) で演算処理を実行し、 前回推定時 (1周期前) に算出した SO C推定値と、 充放 電電圧 Vb、 入出力電流 I bおよび電池温度 Tbに基づいて、 現在の SO C推定 値を算出する。 そして、 SOC推定部 2は、 暫定 SO C算出部 30と、 起電圧算 出部 20と、 推定 SO C算出部 28と、 SOC算出部 40とからなる。
暫定 SOC算出部 30は、 前回の残存容量 (SOC) 推定時からの二次電池 6 の充放電量に基づいて、 二次電池 6の残存容量についての第 1の推定値 # S O C aを算出する。 すなわち、 暫定 SOC算出部 30は、 前回推定時から現在までの 二次電池 6におけ ¾充放電量の変化分を加算または減算することで、 第 1の推定 値 # SOC aを算出する。 一例として、 暫定 SO C算出部 30は、 二次電池 6の 入出力電流 I bの積算値に基づいて、 二次電池 6の充放電量を取得する。
そして、 暫定 SOC算出部 30は、 入出力電流 I bを積算する積算部 32と、 積算部 32の出力値および前回算出した S O C推定値との和を第 1の推定値 # S OC aとして出力する加算部 34とを含む。 なお、 以下では、 第 1の推定 :#S OC aを 「暫定 SOC」 とも称する。 ここで、 暫定 SO Cは、 前回の残存容量推 定値からの二次電池 6の充放電量に基づく、 二次電池 6の残存容量についての推 定値である。
起電圧算出部 20は、 二次電池 6の充放電電圧 Vb、 二次電池 6の分極電圧、 および二次電池 6の内部抵抗により生じる電圧降下、 に基づいて、 二次電池 6の 起電圧を算出する。 そして、 起電圧算出部 20は、 電圧降下算出部 22と、 分極 電圧算出部 24と、 加算部 26とを含む。
電圧降下算出部 22は、 電池温度 T bおよび入出力電流 I bに基づいて、 二次 電池 6内部に生じる電圧降下を算出する。 たとえば、 電池温度 Tbを入力 (パラ メータ) とする内部抵抗の変化を予めマップとして記憶しておき、 当該マップの 参照によって求められる内部抵抗と入出力電流 I bとの積によりこの電圧降下を
算出する。
分極電圧算出部 24は、 電池温度 T bおよび入出力電流 I bに基づいて、 二次 電池 6に生じる分極電圧を算出する。 この分極電圧の算出についても、 電池温度 T bおよび入出力電流 I bを入力 (パラメータ) とするマップを予め記憶してお き、 当該マップの参照によって行なうことができる。
なお、 電圧降下の算出方法および分極電圧の算出方法について特に限定される ものではなく、 周知技術を適用可能であるので、 その詳細な説明は fi1わない。 加算部 26は、 充放電電圧 Vbに電圧降下算出部 22で算出される電圧降下を 加え、 さらに分極電圧算出部 24で算出される分極電圧を差し引くことにより、 二次電池 6の起電圧 (開放電圧) の推定値 #〇CVを算出する。
なお、,起電圧算出部 20で用いられる、 充放電電圧 Vb、 入出力電流 l bおよ び電池温度 Tbについては、 たとえば、 前回推定時から現在までの期間における 平均値とすればよい。
推定3〇〇算出部28は、 起電圧算出部 20により算出された、 二次電池 6の 状態値の一例である起電圧 #OCVに基づいて、 二次電池 6の残存容量について の第 2の推定値 # SOCbを算出する。 なお、 以下では、 第 2の推定値 #SOC bを 「推定 SOC」 とも称する。 ここで、 推定 SO Cは、 二次電池 6の状態値に 基づく、 二次電池 6の残存容量についての推定値である。 ■ なお、 この発明の実施の形態 1においては、 二次電池 6の状態値に基づく残存 容量についての推定値を算出する一例として、 二次電池 6の起電圧に基づいて算 出する構成 (推定3〇。算出部28) について例示するが、 推定 SOCの算出は この構成に限定されることはない。 たとえば、 二次電池 6の電池内圧に基づいて 推定 SO Cを算出してもよい。 すなわち、 推定 SO Cについては、 二次電池の充 放電電圧、 入出力電流、 電池温度および電池内圧などの状態値を、 二次電池の種 類に応じて、 適宜選択的に用いて求めることが可能である。
図 4を参照して、 二次電池 6の SOCには、 起電圧〇CVとの対応関係が存在 する。 そこで、 推定 SO C算出部 28は、 予め記憶された図 4に示すようなマツ プの参照により、 二次電池 6の起電圧 # O C Vに対応するマツプ値を求めること で、 推定 S〇C (#SOCb) を 0〜100 (%) の範囲で算出することができ
0 る。
再度、 図 3を参照して、 SOC算出部 40は、 それぞれ暫定 SO C算出部 30 および推定 SO C算出部 28から、 暫定 SOC (#SOC a) および推定 SOC (#S〇Cb.) を受け、 暫定 SOC (#SOC a) を所定の演算によって算出さ れた補正値で補正することで、 二次電池 6の残存容量 (SOC) 推定値を生成す る。 すなわち、 SOC算出部 40は、 暫定 S〇C (# S〇C a) を推定 SOC (#SOCb) に近付けるように補正する積分要素 (I要素) として機能する。 具体的には、 SOC算出部 40は、 前回の残存容量推定時において推定された SOC推定値 (以下では、 「SOC推定値 (前回値) 」 とも称す) の大きさ、 お ょぴ SO C推定値 (前回値) と推定 SOC (# S〇Cb) との大小関係に基づい て、 補;^値を算出する。 そして、 SOC算出部 40は、 減算部 42と、 補正値算 出部 50と、 加算部 52とを含む。
減算部 42は、 推定 SOC算出部 28が算出する推定 SOC (#S〇Cb) と、 SOC推定値 (前回値) とを受けて、 推定 SOC (#SOCb) に対する SOC 推定値 (前回値) の偏差 (=推定 S〇C (# SOCb) —SO.C推定値 (前回 値) ) を算出する。 そして、 減算部 42は、 算出した偏差を補正値算出部 50へ 出力する。
補正値算出部 50は、 減算部 42から偏差を受け、 当該偏差に複数の補正グイ ンを乗じることで補正値を算出する。 そして、 補正値算出部 50は、 換算ゲイン 部 44と、 S O C推定値依存ゲイン選択部 46と、'電池温度依存ゲイン選択部 4 8とを含み、 偏差に各部における補正ゲインを順次乗じて補正値を算出する。 換算ゲイン部 44は、 固定値の換算ゲイン Kをもち、 入力される偏差の変動幅 に応じて、 出力される補正値幅が適切となるように偏差を調整する。
S O C推定値依存ゲイン選択部 46は、 S〇 C推定値 (前回値) の大きさ、 お よび SOC推定値 (前回値) と推定 SOC (#SOCb) との大小関係に基づい て、 補正ゲイン G1を選択する。 一例として、 SOC推定値依存ゲイン選択部 4 6は、 SOC推定値 (前回値) および推定 SOC (#SOCb) を入力 (パラメ ータ) とするマップを予め記憶しておき、 当該マップの参照によって捕正ゲイン G 1を選択することができる。 そして、 SOC推定値依存ゲイン選択部 46は、
換算ゲイン部 44において換算ゲイン Kが乗じられた後の偏差に自己の補正ゲイ ン G 1をさらに乗じて出力する。
電池温度依存ゲイン選択部 48は、 電池温度 T bに基づいて、 補正ゲイン G 3 を選択する。 一例として、 電池温度依存ゲイン選択部 48についても、 電池温度 丁 13ぉょび推定3〇じ (# SOCb) を入力 (パラメータ) とするマップを予め 記憶しておき、 当該マップの参照によって補正ゲイン G 3を選択することができ る。 そして、 電池温度依存ゲイン選択部 48は、 SO C推定値依存ゲイン選択部 46において補正ゲイン G 1が乗じられた後の値に自己の補正ゲイン G 3をさら に乗じて、 補正値 Δ SOCとして出力する。
なお、 S O C推定値依存ゲイン選択部 46および電池温度依存ゲイン選択部 4 8における補正ゲインの選択の詳細については後述する。 .
カロ算部 5 2は、 電池温度依存ゲイン選択部 48から補正値 Δ S O Cを受け、 暫 定 SOC算出部 3 0から受けた暫定 S〇C (# S OC a ) に補正値 A S〇Cを加 算して S〇C推定値として出力する。
.( SO C推定値依存ゲイン選択部) '
以下、 S〇 C推定値依存ゲイン選択部 46における補正グイン G 1の選択につ いて詳述する。
図 5 Aは、 SOC推定値が比較的大きい (過充電に近い) 場合を示し、 図 5.B は、 SOC推定値が比較的小さい (過放電に近い) 場合を示す。
図 5Aを参照して、 SOC推定値依存ゲイン選択部 46は、 推定 SO C (# S
OCb) に対する SOC推定値 (前回値) の偏差を算出し、 当該偏差に所定の補 正ゲインを乗じて補正値を算出する。 そのため、 推定 S〇C (# SOC b) < s OC推定値 (前回値) であれば、 負の偏差が生じるため、 SOC暫定値 (#so C a) には負の補正値が加算され、 SOC推定値はより低い値を示す推定 SO C (# SOCb) と一致する方向に補正され続ける。
そのため、 たとえば二次電池 6に対する充電が継続されている場合において、 S O C推定値が過充電に近い値を示しているにも関わらず、 S〇 C推定値が推定 SOC (# S〇C b) より大きければ、 SOC推定値は過充電側と反対側 (低 S OC側) に補正される。 そのため、 電圧測定部 1 2、 電流測定部 1 4および温度
測定部 16における測定精度などに起因して、 推定 SOC (# SOCb) に誤差 が生じていると、 二次電池 6が過充電状態になっているにも関わらず、 相対的に 小さい SO C推定値を算出してしまうおそれがある。
また、 図 5 Bを参照して、 推定 SOC (# SOCb) > SOC推定値 (前回 値) であれば、 正の偏差が生じるため、 SOC暫定値 (#SOC a) には正の補 正値が加算され、 SOC推定値は、 より大きい値を示す推定 SO C (# SOC b) と一致する方向に補正され続ける。
そのため、 たとえば二次電池 6に対する放電が継続されている場合において、 SOC推定値が過放電に近い値を示しているにも関わらず、 SOC推定値が推定 S〇C (#SOCb) より小さければ、 SOC推定値は過放電と反対側 (高 SO C側) に補正される。 そのため、 電圧測定部 12、 電流測定部 14および温度測 定部 16における測定精度などに起因して、 推定 SOC (#S〇Cb) に誤差が 生じていると、 二次電池 6が過放電状態になっているにも関わらず、 相対的に大 きい SO C推定値を算出してしまうおそれがある。
そこで、 SOC推定値依存ゲイン選択部 46は、 このような状況において、 補 正ゲイン G 1を相対的に小さくすることで、 過剰な補正値の算出を抑制し、 充放 電制御における二次電池 6についての安全側 (より過充電側、 またはより過放電 側) となるように、 SOC推定値を算出する。
図 6を参照して、 マップ 46 #は、 SOC推定値 (前回値) および推定 SOC (#SOCb) を入力とする 2次元マップであり、'出力されるマップ値は補正ゲ イン G 1である。 この補正ゲイン G 1は、 図 3における S〇C推定値依存ゲイン 選択部 46が乗じる補正ゲインである。
マップ 46 #は、 SOC推定値 (前回値) が過充電に近い SO C領域 r 1なら びに SO C推定値 (前回値) が過放電に近い SO C領域 r 2、 および特性線 60 〜64により、 領域が規定される。 ここで、 特性線 60は、 SOC推定値 (前回 値) と推定 SOC (#SOCb) とが互いに一致する位置を示す。 特性線 61お ょぴ 62は、 推定 SOC (# S〇Cb) がそれぞれ所定値となる位置を示す。 特 性線 63は、 推定 SOC (#SOCb) に対する SOC推定値の偏差が一d 1と なる位置を示す。 特性線 64は、 推定 S〇C (#SOCb) に対する SOC推定
値の偏差が d 2となる位置を示す。
そして、 マップ 46 #では、 SOC推定ィ直 (前回値) が二次電池 6の過充電に 近い S〇C領域 r 1内であり、 かつ、 推定 S OC (# S〇C b) が所定値以上 (特性線 6 1の下側) である場合において、 SOC推定値 (前回値) が推定 SO C (#SOCb) より大きいとき (特性線 60の上側) のゲイン値 g 1 1力 S OC推定値 (前回値) が推定 SO C (# SOCb) より小さいとき (特性線 60 の下側) のゲイン値 g 15に比較して小さく設定される。
ここで、 SOC領域 ir lは、 たとえば、 図 2に示したような充電制限領域 (状 態値 S 3〜状態値 S 4) に相当するように選択することができる。 すなわち、 S OC推定値 (前回値) が充電制限値 (状態値 S 3) まで上昇している場合には、 より安全側に補正を行なう (補正ゲイン G 1を相対的に小さくする). 一方で、 充 電禁止値 (状態値 S 4) まで上昇した後は、 二次電池 6に対する充電が禁止され るので、 より追従性を高めて推定精度を高める (補正ゲイン G 1を元に戻すまた は相対的に大きくする) ことが望ましい。 .
上述したように、 SOC推定値 (前回値) が過充電に近い SO C領域 r 1内で ある場合において、 このような安全側に補正を行なう (補正ゲインを相対的に小 さくする) ことが必要なのは、 SOC推定値 (前回値) が推定 S〇C (# SOC b) より大きい場合である。 そのため、 マップ 46 #においてゲイン値 g 1 1.が 設定される領域は、 特性線 60より上側の領域であり、 特性線 60の下側の領域 は、 ゲイン値 g 11より大きいゲイン値 g 15が設定される。
また、 マップ 46 #において、 より小さいゲイン値 g 1 1が設定される領域は、 推定 SOC (#S〇Cb) が所定値以上である特性線 61の下側に制限される。 図 4に示すような二次電池 6の起電圧と SOCとの関係によれば、 SOC変化 に対する起電圧の変化量は、 50%近傍から過充電側 (相対的に大きい S〇C) または過放電側 (相対的に小さい SOC) になるほど大きくなる。 すなわち、 S 〇Cが 50%近傍にあれば、 SOCの変化に対する起電圧変化が相対的に小さい (SOC変化に対する感度が低い) ので、 推定 SOC (#SOCb) の推定誤差 が相対的に大きくなる。 よって、 このような推定 SOC (#S〇Cb) の推定誤 差が相対的に大きくなるような領域においては、 より追従性を高めて推定精度を
高めることが望ましい。
そのため、 マップ 46 #においては、 二次電池 6の起電圧特性に応じて、 推定 SOC (# S〇Cb) の測定誤差が相対的に大きくなる領域が、 特性線 6 1およ び 62により規定される。 そして、 S〇Cの測定誤差が相対的に小さい領域、 す なわち特性線 6 1の下側領域および特性線 62の上側領域には、 より小さいゲイ ンが設定される。
一方、 マップ 46 #では、 S〇C推定値 (前回値) が二次電池 6の過放電に近 い SQC領域 r 2内であり、 かつ、 推定 SOC (#S〇Cb) が所定値以下 (特 性線 6 2の上側) である場合において、 SOC推定値 (前回値) が推定 SO C (#SOCb) より小さいとき (特性線 60の下側) のゲイン値 g 1 2力 SO
C推定値 . (前回値) が推定 S〇C (#S〇Cb) より大きいとき (特性線 60の 上側) のゲイン値 g 15に比較して小さく設定される。
ここで、 30〇領域1: 2は、 たとえば、 図 2に示したような放電制限領域 (状 態値 S 2〜状態値 S 1) に相当するように選択することができる。 すなわち、 S OC推定値 (前回値) が放電制限値 (状態値 S 2) まで低下している場合には、 より安全側に補正を行なう (補正ゲインを相対的に小さくする) 一方で、 放電禁 止値 (状態値 S 1) まで低下した後は、 二次電池 6に対する放電が禁止されるの で、 より追従性を高めて推定精度を高める (補正ゲインを元に戻すまたは相対的 に大きくする) ことが望ましい。
上述したように、 SOC推定値 (前回値) が過放電に近い SO C領域 r 2内で ある場合において、 このような安全側に補正を行なう (補正ゲインを相対的に小 さくする) ことが必要なのは、 SOC推定値 (前回値) が推定 S〇C (# S〇C b) より小さい場合である。 そのため、 マップ 46 #においてゲイン値 g 1 2が 設定される領域は、 特性線 60より下側の領域であり、 特性線 60の上側の領域 は、 ゲイン値 g 12より大きいゲイン値 g 15が設定される。
さらに、 上述したように、 SOC測定誤差が相対的に小さい領域、 すなわち特 性線 62の上側の領域に対してより小さいゲイン値 g 12が設定される。
また、 マップ 46 #においては、 推定 S〇C (#SOCb) に対する SOC推 定値 (前回値) の乖離が過剰となった場合には、 さらに追従性を高めて推定精度
を高める (補正ゲインをより大きくする) ために、 偏差の絶対値が I d 11より 大きい領域 (特性線 6 3の上側領域) および偏差の絶対値が I d 2 I より大きい 領域 (特性線 6 4の下側領域) に対して、 それぞれゲイン値 g 1 5より大きいゲ イン値 g 1 3およびゲイン値 g 1 4が設定される。
したがって、 マップ 4 6 #においては、 ゲイン値 g 1 1 , g 1 2くゲイン値 g 1 5くゲイン値 g 1 3 , g 1 4の関係が成立する。
上述のマップ 4 6 #においては、 それぞれ特性線 6 3, 6 4を規定するための 偏差 d l , d 2が互いに独立である場合について説明したが、 過充電側および過 放電側における補正値の算出を対称的に行なうために、 I d 11 = i d 2 Iとし てもよい。 また、 同様に理由で、 ゲイン値 g 1 1 =ゲイン値 g 1 2、 およびゲイ ン値 g 3 =ゲイン値 g 1 4としてもよレ、。 さらに、 上述したのと [^様の技術的 意味をもつのであれば、 ゲイン値 g 1 2, g 1 3 , g 1 4, g 1 5内をさらに細 分化したゲイン値を設定するようにしてもよい。
(電池温度依存ゲイン選択部).
以下、 電池温度依存ゲイン選択部 4 8における補正ゲイン G 3の選択について 詳述する。 .
図 7を参照して、 マップ 48 #は、 電池温度 T bおよび推定 SO C (# S OC b) を入力 (パラメータ) とする 2次元マップであり、 出力されるマップ は補 正ゲイン G 3である。 この補正ゲイン G 3は、 図 3における電池温度依存ゲイン 選択部 4 8が乗じる補正ゲインである。 '
二次電池 6は、 化学反応を利用して、 電気エネルギー (電荷) を充放電する。 この化学反応は、 電池温度によりその活性度が変化し、 電池温度 T bが上昇する に従い、 より活性化する。 このような活性度の高まりにより、 二次電池 6の起電 圧推定値 #OCVが変動しやすくなるので、 推定 S OC (# S OC b) も相対的 に大きく変動する。 そのため、 補正ゲイン G 3を相対的に高くして追従性を高め、 残存容量推定値の推定精度を向上させることが望ましい。
—方で、 推定 S OC (# SOC b) が過充電または過放電に近い場合において も、 二次電池 6の起電圧推定値 #OCVが変動しやすくなるので、 補正ゲイン G 3を相対的に高くして追従性を高め、 残存容量推定値の推定精度を向上させるこ
とが望ましい。
そこで、 マップ 48 #は、 このような特性を示す補正ゲイン G 3が選択される ように、 設定される。
図 8は、 マップ 48 #における推定 S〇C (#SOCb) に関する補正ゲイン G 3の変化を示す。 なお、 図 8における温度 T l, Τ 2, Τ 3は、 図 7のマップ 48 #に示す温度丁 1, Τ 2, Τ 3 (Τ ΚΤ 2<Τ 3) に対応する。
図 8を参照して、 マップ 48 #では、 電池温度 Tbが温度 T l, Τ 2, Τ3の いずれであっても、 推定 SOC (#SOCb) が 50°/0近傍からそれぞれ過充電 側および過放電側に変位するにつれ、 補正ゲイン G 3が大きくなるように設定さ れる。 すなわち、 電池温度依存ゲイン選択部 48は、 過充電側および過放電側に おける補正ゲイン G 3を相対的に大きく設定することで、 より推定精度を向上さ せる。 '
さらに、 マップ 48 #では、 二次電池 6の電池温度 T bの上昇に従い、 推定 S OC (#SOCb) の各々に対応する補正ゲイン G 3を大きくするように設定さ れる。 すなわち、 電池温度 Tbが上昇するに従い、 補正ゲイン G '3を示す特性線 は、 グラフの上側へ移動することになる。 このように、 二次電池 6の電池温度 T bの上昇に従い、 補正ゲイン G 3を大きくすることで、 電池温度 Tbの変化に関 わらず、 二次電池 6についての S〇 C推定値を安定して高精度で算出できる。 なお、 この発明の実施の形態 1においては、 暫定 SOC算出部 30が 「第 1の 推定部」 に対応し、 推定 SOC算出部 28力 S 「第 2'の推定部」 に対応し、 SOC 算出部 40が 「補正部」 に対応し、 起電圧算出部 20が 「起電圧算出部」 に対応 する。 そして、 減算部 42が 「偏差算出部」 に対応し、 補正値算出部 50が 「補 正値算出部」 に対応し、 加算部 52が 「推定値算出部」 に対応する。 さらに、 S OC推定値依存ゲイン選択部 46が 「第 1の補正ゲイン選択部」 に対応し、 電池 温度依存ゲイン選択部 48が 「第 3の補正ゲイン選択部」 に対応する。
なお、 上述のこの発明の実施の形態 1においては、 補正値算出部 50に含まれ る、 S O C推定値依存ゲイン選択部 46および電池温度依存ゲイン選択部 48力 それぞれ補正ゲイン G 1および G 3を乗じて補正値 Δ SO Cを算出する構成につ いて説明したが、 S O C推定直依存ゲイン選択部 46または電池温度依存ゲイン
選択部 48のいずれか一方だけを含むように補正値算出部を構成してもよレ、。 す なわち、 S O C推定値依存ゲイン選択部 46により選択される補正ゲイン G 1、 または電池温度依存ゲイン選択部 48により選択される補正ゲイン G 3のいずれ か一方だけを乗じて補正値 Δ SOCを算出する構成としても、 過充電および過放 電をより安定的に回避しつつ、 二次電池の残存容量の高精度な推定を実現できる。 この発明の実施の形態 1によれば、 S O C推定値依存ゲイン選択 ¾546は、 S ◦ C推定値 (前回値) が過充電に近い領域に存在し、 かつ、 S〇C推定値 (前回 値) をより小さい値 (SOC制御中心側) に補正する場合には、 相対的に小さい 補正ゲイン G 1を選択する。 また、 S〇C推定値依存ゲイン選択部 46は、 SO C推定値 (前回値) が過放電に近い領域に存在し、 かつ、 SOC推定値 (前回 値) を り大きい値 (S〇C制御中心側) に補正する場合には、 相 ^"的に小さい 捕正ゲイン G1を選択する。
そのため、 SOC推定値 (前回値) が過充電または過放電に近い領域にある場 合において、 充放電制御における二次電池についての安全側 (より過充電側また はより過放電側) となるような残存容量推定値が算出される。 よって、 過充電お よび過放電をより安定的に回避しつつ、 二次電池の残存容.量の高精度な推定を実 現できる。
また、 この発明の実施の形態 1によれば、 電池温度依存ゲイン選択部 48は、 電池温度 Tbの上昇に従い、 相対的に大きく変動する推定 SO C (#SOCb) に応じて、 補正ゲイン G 3を相対的に高くして追従性を高め、 残存容量推定値の 推定精度を向上させる。 また、 電池温度依存ゲイン選択部 48は、 過充電または 過放電の領域に近付くにつれ、 相対的に大きく変動する推定 SOC (# SOC b) に応じて、 補正ゲイン G 3を相対的に高くして追従性を高め、 残存容量推定 値の推定精度を向上させる。
そのため、 電池温度 T bが高い場合や過充電または過放電に近い領域にある場 合など、 残存容量推定値の推定精度が低下しやすい場合においても、 追従性を高 めて、 推定精度を向上させることができる。 よって、 過充電および過放電をより 安定的に回避しつつ、 二次電池の残存容量の高精度な推定を実現できる。
[実施の形態 2]
上述のこの発明の実施の形態 1においては、 s〇c推定値 (前回値) ならびに 推定 SOC (#SOCb) 、 および電池温度に基づいて、 それぞれ選択された補 正ゲインにより補正値 Δ SO Cを算出する構成について説明した。 一方、 この発 明の実施の形態 2においては、 入出力電流ならびに推定 SO C (#SOCb) 、 および電池温度に基づいて、 それぞれ選択された補正ゲインにより補正値 Δ S〇 Cを算出する構成について説明する。
図 9を参照して、 この発明の実施の形態 2に従う SOC推定部 2 Aは、 図 3に 示すこの発明の実施の形態 1に従う S〇C推定部 2において、 SOC算出部 40 を SOC算出部 4 OAに代えたものと等価である。 そして、 30〇算出部40入 は、 補正値算出部 50を補正値算出部 5 OAに代えたものと等価である。 さらに、 補正値算出部 50 Aは、 SO C推定値依存ゲイン選択部 46を入出力電流依存ゲ ィン選択部 47に代えたものと等価である。
入出力電流依存ゲイン選択部 47は、 電流測定部 14から受けた二次電池 6の 入出力電流 I bと、 推定 SOC算出部 28から受けた推定 SOC (#SOCb) との関係に基づいて、 補正ゲイン G 2を選択する。 一例として、 入出力電流依存 ゲイン選択部 47は、.入出力電流 I 1)ぉょび推定30〇.(#30< 15) を入力 (パラメータ) とするマツ.プを予め記憶しておき、 当該マップの参照によって補 正ゲイン G 2を選択することができる。 そして、 入出力電流依存ゲイン選択部 4 7は、 換算ゲイン部 44において換算ゲイン Kが乗じられた後の偏差に自己の補 正ゲイン G 2をさらに乗じて出力する。 '
その他については、 この発明の実施の形態 1に従う SOC推定部 2と同様であ るので、 詳細な説明は繰返さない。
(入出力電流依存ゲイン選択部)
以下、 入出力電流依存ゲイン選択部 47における補正ゲイン G 2の選択につい て詳述する。 ,.
再度図 4を参照して、 二次電池 6の起電圧と SOCとの関係によれば、 SOC 変化に対する起電圧の変化量は、 50%近傍から過充電側 (相対的に大きい SO C) または過放電側 (相対的に小さい SOC) になるほど大きくなる。
そのため、 二次電池 6が過充電に近い状態にぉレ、て、 二次電池 6への入力電流
(充電電流) が大きいと、 推定 SOC (#SOCb) が大きく変動する可能性が ある。 同様に、 二次電池 6が過放電に近い状態において、 二次電池 6からの出力 電流 (放電電流) が大きいと、 推定 SOC (# SOCb) が大きく変動する可能 性がある。 そこで、 このような状況においては、 補正値厶 S〇Cを大きくして、 追従性を高めて推定精度を向上させることが望ましい。
図 10を参照して、 入出力電流依存ゲイン選択部 47に格納されるマップ 47 #は、 二次電池 6の入出力電流 I bおよび推定 SO G (# S〇Cb) を入力 (パ ラメータ) とする 2次元マップであり、 出力されるマツプ値は補正ゲイン G 2で ある。 この補正ゲイン G2は、 図 9における入出力電流依存ゲイン選択部 47が 乗じる補正ゲインである。
マップ 47 #では、 推定 SOC (# SOCb) が二次電池' 6の過充電に近い所 定値 (特性線 67上で各入出力電流 I bに対応する推定 SOC (#SOCb) ) 以上である場合において、 二次電池 6への入力電流の増大に従い出力される補正 ゲイン G 2が大きく設定される。 一方で、 推定. SOC (#SOCb) が二次電池 6の過放電に近い所定値 (特性線 68上で各入出力電流 I bに対応する推定 S〇 C (#SOCb) ) 以下である場合において、 二次電池 6への出力電流の増大に 従い出力きれる補正ゲイン G 2が大きく設定される。
すなわち、 特性線 67の下側領域および特性線 68の上側領域においては、 'そ の他の領域に設定されるゲイン値 g 21より大きいゲイン値 g 22および g 23 が設定される。 なお、 特性線 6 7および 68は、 二次電池 6の満充電容量 (A h) 、 入出力電流値 (A) および SO Cに対する起電圧特性などに応じて適宜決 定される。 さらに、 マップ 47 #においては、 ゲイン値 g 21および g 22内が さらに細分化して設定されており、 入力電流または出力電流の増大に伴い、 出力 される補正ゲイン G 2が大きくなるように設定される。
図 1 1 Aおよび図 1 1 Bは、 図 10に示すマップ 47 #の各推定 SOC (# S
〇Cb) に対応するゲイン特性 70~ 74を説明するための図であり、 図 1 1A、 図 1 1 Bにおける符号 70〜74は、 図 10における符号 70〜74に対応する。 図 1 1Aは、 推定 SOC (# S〇Cb) が比較的大きい (過充電に近い) 場合 を示し、 図 1 1 Bは、 推定 SO C (#S〇C b) が比較的小さい (過放電に近
レ、) 場合を示す。
図 10および図 1 1 Aを参照して、 たとえば、 推定 S〇C (# S〇Cb) が 5 0 °/oである場合のゲイン特性 70は、 特性線 67および 68と交差しないので、 入出力電流 I bに関わらず、 一定値のゲイン値 g 21が選択される。
一方、 ゲイン特性 70に対応する推定 S〇C (#SOCb) より大きい推定 S
OC ( # S O C b ) に対応するゲイン特性 71では、 特性線 67と交差するので、 入出力電流 I bが所定の入力電流値 I 1を超過すると、 補正ゲイン G 2が漸増し 始める。
さらに、 より大きな推定 SOC (#SOCb) に対応する大きいゲイン特性 7 2では、 入出力電流 I bが入力電流値 I 1より小さな入力電流値 I 2を超過する と、 補 Eゲイン G 2が漸増し始める。 .
このように、 マップ 47 #においては、 推定 S〇C (#SOCb) が特性線 6 7で規定される所定値以上である場合において、 入力電流 (充電電流) が大きく なるに従って、 ならびに推定 SO C (#SOCb) が大きくなるに従って、 出力 される補正ゲイン G 2が大きくなるように設定される。 '
一方、 図 10および図 1 1 Bを参照して、 ゲイン特性 7.0に対応する推定 SO C (#SOCb) より小さい推定 SOC (# SOC b) に対応するゲイン特性 7 3では、 特性線 68と交差するので、 入出力電流 I bが所定の出力電流値 I 3を 超過すると、 補正ゲイン G 2は漸増し始める。
さらに、 より小さい推定 SOC (#S〇Cb) に対応するゲイン特性 74では、 入出力電流 I bが出力電流値 I 3より小さな出力電流値 I 4を超過すると、 補正 ゲイン G 2が漸増し始める。
このように、 マップ 47 #においては、 推定 SOC (#SOCb) が特性線 6 8で規定される所定値以上である場合において、 出力電流 (放電電流) が大きく なるに従って、 ならびに推定 SO C (#SOCb) が小さくなるに従って、 出力 される補正ゲイン G 2が大きくなるように設定される。
上述したように、 二次電池 6を過充電に至らしめるような入力電流、 または、 二次電池 6を過放電に至らしめるような出力電流に対して、 補正ゲイン G 2を大 きくすることで、 二次電池 6についての S O C推定値を安定して高精度で算出で
さる。
なお、 この発明の実施の形態 2においては、 暫定 SOC算出部 30が 「第 1の 推定部」 に対応し、 推定 SO C算出部 28力 S 「第 2の推定部」 に対応し、 SOC 算出部 4 OAが 「補正部」 に対応し、 起電圧算出部 20が 「起電圧算出部」 に対 応する。. そして、 減算部 42が 「偏差算出部」 に対応し、 補正値算出部 5 OAが 「補正値算出部」 に対応し、 加算部 52が 「推定値算出部」 に対応する.。 さらに、 入出力電流依存ゲイン選択部 47が'「第 1の補正ゲイン選択部」 に対応し、 電池 温度依存ゲイン選択部 48が 「第 3の補正ゲイン選択部」 に対応する。
なお、 上述のこの発明の実施の形態 2においては、 補正値算出部 5 OAに含ま れる、 入出力電流依存ゲイン選択部 47および電池温度依存ゲイン選択部 48が、 それぞれ補正ゲイン G 2および G 3を乗じて補正値 Δ S OCを算出する構成につ いて説明したが、 入出力電流依存ゲイン選択部 47、 または電池温度依存ゲイン 選択部 48のいずれか一方だけを含むように補正値算出部を構成してもよい。 す なわち、 入出力電流依存ゲイン選択部 47により選択される補正ゲイン G 2、 ま たは電池温度依存ゲイン選択部 48により選択される補正ゲイン G 3のいずれか 一方だけを乗じて補正値 Δ SO Cを算出する構成としても、 過充電および過放電 をより安定的に回避しつつ、 二次電池の残存容量の高精度な推定を実現できる。 この発明の実施の形態 2によれば、 入出力電流依存ゲイン選択部 471 過充 電に近い状態であって、 かつ、 入力電流 (充電電流) が大きい場合や、 過放電に 近い状態であって、 かつ、 出力電流 (放電電流) が大きい場合などのように、 推 定 SOC (#SOCb) が大きく変動する可能性がある状況において、 補正ゲイ ン G 2を相対的に高くして追従性を高め、 残存容量推定値の推定精度を向上させ る。
そのため、 過充電または過放電に近い領域において、 残存容量推定値の推定精 度が低下しやすい場合においても、 追従性を高めて、 推定精度を向上させること ができる。 よって、 過充電および過放電をより安定的に回避しつつ、 二次電池の 残存容量の高精度な推定を実現できる。
また、 この発明の実施の形態 2によれば、 電池温度依存ゲイン選択部 48は、 電池温度 Tbの上昇に従い、 相対的に大きく変動する推定 SO C (#SOCb)
に応じて、 補正ゲイン G 3を相対的に高くして追従性を高め、 残存容量推定値の 推定精度を向上させる。 また、 電池温度依存ゲイン選択部 48は、 過充電または 過放電の領域に近付くにつれ、 相対的に大きく変動する推定 SOC (# SOC b) に応じて、 補正ゲイン G 3を相対的に高くして追従性を高め、 残存容量推定 値の推定精度を向上させる。
そのため、 電池温度 T bが高い場合や過充電または過放電に近い領域にある場 合など、 残存容量推定値の推定精度が低下しやすい場合においても、 追従性を高 めて、 推定精度を向上させることができる。 よって、 過充電および過放電をより 安定的に回避しつつ、 二次電池の残存容量の高精度な推定を実現できる。
[実施の形態 3]
上述のこの発明の実施の形態 1および 2においては、 それぞれ、 SOC推定値 (前回値) 、 推定 SOC (# SOCb) 、 電池温度に基づいて選択された補正ゲ インにより補正値を算出する構成、 および入出力電流、 推定 SOC (# SOC b) 、 電池温度に基づいて選択された補正ゲインにより補正値を算出する構成に ついて説明した。 一方、 この発明の実施の形態 3においては、 すべての補正ゲイ ンを用いて補正値を算出する構成について説明する。 .
図 12を参照して、 この発明の実施の形態 3に従う SO C推定部 2 Bは、 図 3 に示すこの発明の実施の形態 1に従う SOC推定部 2において、 SOC算出部 4 0を SOC算出部 40 Bに代えたものと等価である。 そして、 SOC算出部 40 Bは、 補正値算出部 50を補正値算出部 50Bに代えたものと等価である。 さら に、 補正値算出部 50 Bは、 補正値算出部 50において、 図 9に示す入出力電流 依存ゲイン選択部 47をさらに備えたものと等価である。 ' その他については、 この発明の実施の形態 1に従う SOC推定部 2と同様であ るので、 詳細な説明は繰返さない。
上述のこの発明の実施の形態 1および 2で詳述したように、 SO C推定値依存 ゲイン選択部 46、 入出力電流依存ゲイン選択部 47、 および電池温度依存ゲイ ン選択部 48は、 各々が過充電および過放電を安定的に回避しつつ、 二次電池の 残存容量の高精度な推定を行なうように補正ゲインを選択する。 したがって、 S OC算出部 40Bは、 実施の形態 1または 2に比較して、 過充電および過放電を
より安定的に回避しつつ、 二次電池の残存容量をより高精度に推定した S〇 C推 定値を算出できる。
なお、 この発明の実施の形態 3においては、 暫定 S O C算出部 3 0力 S 「第 1の 推定部」 に対応し、 推定 S O C算出部 2 8カ 「第 2の推定部」 に対応し、. S O C 算出部 4 0 Bが 「補正部」 に対応し、 起電圧算出部 2 0が 「起電圧算出部」 に対 応する。 そして、 減算部 4 2が 「偏差算出部」 に対応し、 補正値算出部 5 0 Bが 「補正値算出部 j に対応し、 加算部 5 2が 「推定値算出部」 に対応する。 さらに、 S O C推定値依存ゲイン選択部 4 6が 「第 1の補正ゲイン選択部」 に対応し、 入 出力電流依存ゲイン選択部 4 7が 「第 2の補正ゲイン選択部」 に対応し、 電池温 度依存ゲイン選択部 4 8が 「第 3の補正ゲイン選択部」 に対応する。
この発明の実施の形態 3によれば、 上述したこの発明の実施の形 ^ 1および 2 におけるいずれの効果も同時に実現できる。
なお、 この発明の実施の形態 1〜 3においては、 この発明に係る二次電池の残 存容量推定装置を搭載した車両について説明したが、 この発明は、 S O C推定値 に基づいて充放電されるように構成された二次電池であれば、 いずれの装置なら びにシステムに対しても適用可能である。 .
今回開示された実施の形態はすべての点で例示であつて制限的なものではない と考えられるべきである。 本発明の範囲は、 上記した説明ではなく、 請求の範囲 によって示され、 請求の範囲と均等の意味および範囲内でのすべての変更が含ま れることが意図さ^る。
Claims
1 . 充放電されるように構成された二次電池の残存容量推定装置であって、 前回の残存容量推定時からの前記二次電池の充放電量に基づき、 前記二次電池
5 の残存容量についての第 1の推定値を算出する第 1の推定部と、
前記二次電池の状態直に基づいて、 前記二次電池の残存容量についての第 2の , 推定値を算出する第 2の推定部と、
前記第 2の推定値に対する前回の残存容量推定時において推定された前記二次 電池の残存容量推定値である残存容量前回値の偏差に応じた補正値により、 前記 10 第 1の推定値を補正することで、 前記二次電池の残存容量推定値を生成する補正 部とを磾え、 .
前記補正部は、 前記残存容量前回値の大きさ、 および前記残存容量前回値と前 記第 2の推定値との大小関係に基づいて、 前記補正値を算出する、 二次電池の残 存容量推定装置。
15 2 . 前記補正部は、 '
前記第 2の推定値および前記残存容量前回値を受け、 前貢己偏差を算出する偏差 算出部と、
前記偏差算出部から前記偏差を受け、 前記偏差に少なくとも 1個の補正ゲイン を乗じることで補正値を算出する補正値算出部と、
20 前記補正値算出部から前記補正値を受け、 前記第 1の推定部から受けた前記第 1の推定値に前記補正値を加算して出力する推定値算出部とを含み、
前記少なくとも 1個の補正ゲインは、 第 1の補正ゲインを含み、
前記補正値算出部は、 前記残存容量前回値の大きさ、 および前記残存容量前回 値と前記第 2の推定値との大小関係に基づいて、 前記第 1の補正ゲインを選択す 25 る第 1の補正ゲイン選択部を含む、 請求の範囲第 1項に記載の二次電池の残存容 量推定装置。
3 . 前記第 1の補正ゲイン選択部は、
前記残存容量前回値が前記二次電池の過充電に近い第 1の領域内であり、 かつ、 前記第 2の推定値が第 1の所定値以上である場合において、 前記残存容量前回ィ直
が前記第 2の推定値より大きいときの前記第 1の補正ゲインを、 前記残存容量前 回値が前記第 2の推定値より小さいときに比較して小さくする一方で、
前記残存容量前回値が前記二次電池の過放電に近い第 2の領域内であり、 かつ、 前記第 2の推定値が第 2の所定値以下である場合において、 前記残存容量前回値 が前記第 2の推定値より小さいときの前記第 1の補正ゲインを、 前記残存容量前 回値が前記第 2の推定値より大きいときに比較して小さくする、 請求の範囲第 2 項に記載の二次電池の残存容量推定装置。
4 . 前記第 1の補正ゲイン選択部は、 前記残存容量前回値および前記第 2の推 定値を入力とする所定マップの参照により、 前記第 1の補正ゲインを選択する、 請求の範囲第 2項に記載の二次電池の残存容量推定装置。
5 . 前記少なくとも 1個の補正ゲインは、 第 2の補正ゲインをさらに含み、 前記補正値算出部は、 前記二次電池を充放電するための前記二次電池の入出力 電流と前記第 2の推定値との関係に基づいて、 前記第 2の補正ゲインを選択する 第 2の補正ゲイン選択部をさらに含む、 請求の範囲第 2項に記載の二次電池の残 存容量推定装置。 '
6 . 前記第 2の補正ゲイン選択部は、 前記第 2の推定値が前記二次電池の過充 電に近い第 3の所定値以上である場合において、 前記二次電池への入力電流の増 大に従い前記第 2の補正ゲインを大きくする一方で、 前記第 2の推定値が前記二 次電池の過放電に近い第 4の所定値以下である場合において、 前記二次電池への 出力電流の増大に伴い前記第 2の補正ゲインを大ぎくする、 請求の範囲第 5項に 記載の二次電池の残存容量推定装置。
7 . 前記第 2の補正ゲイン選択部は、 前記二次電池の入出力電流および前記第 2の推定値を入力とする所定マップの参照により、 前記第 2の補正ゲインを選択 する、 請求の範囲第 5項に記載の二次電池の残存容量推定装置。
8 . 充放電されるように構成された二次電池の残存容量推定装置であって、 前回の残存容量推定時からの前記二次電池の充放電量に基づき、 前記二次電池 の残存容量についての第 1の推定値を算出する第 1の推定部と、
前記二次電池の状態値に基づいて、 前記二次電池の残存容量についての第 2の 推定値を算出する第 2の推定部と、
前記第 2の推定値に対する前回の残存容量推定時において推定された前記二次 電池の残存容量推定値である残存容量前回値の偏差に応じた補正値により、 前記 第 1の推定値を補正することで、 前記二次電池の残存容量推定値を生成する補正 部とを備え、
前記補正部は、 前記二次電池を充放電するための前記二次電池の入出力電流と 前記第 2の推定値との関係に基づいて、 前記補正値を算出する、 二次電池の残存 容量推定装置。
9 . 前記補正部は、
前記第 2の推定値および前記残存容量前回値を受け、 前記偏差を算出する偏差 算出部と、 . '
前記懾差算出部から前記偏差を受け、 前記偏差に少なくとも 1個の補正ゲイン を乗じることで補正値を算出する補正値算出部と、
前記補正値算出部から前記補正値を受け、 前記第 1の推定部から受けた前記第 1の推定値に前記補正値を加算して出力する推定値算出部とを含み、
前記少なくとも 1個の補正ゲインは、 第 1の補正ゲインを含みく
前記補正値算出部は、 前記二次電池の入出力電流と前記第 2の推定値との関係 に基づいて、 前記第 1の補正ゲインを選択する第 1の補正ゲイン選択部を含む、 請求の範囲第 8項に記載の二次電池の残存容量推定装置。
1 0 . 前記第 1の補正ゲイン選択部は、 前記第 2の推定値が前記二次電池の過 充電に近い第 1の所定値以上である場合において、 '前記二次電池への入力電流の 増大に従い前記第 1の補正ゲインを大きくする一方で、 前記第 2の推定値が前記 二次電池の過放電に近い第 2の所定値以下である場合において、 前記二次電池か らの出力電流の増大に従い前記第 1の捕正ゲインを大きくする、 請求の範囲第 9 項に記載の二次電池の残存容量推定装置。
1 1 . 前記第 1の補正ゲイン選択部は、 前記二次電池の入出力電流および前記 第 2の推定値を入力とする所定マップの参照により、 前記第 1の補正ゲインを選 択する、 請求の範囲第 9項に記載の二次電池の残存容量推定装置。
1 2 . 前記少なくとも 1個の補正ゲインは、 第 3の補正ゲインをさらに含み、 前記補正値算出部は、 前記二次電池の電池温度に基づいて、 前記第 3の捕正ゲ
インを選択する第 3の補正ゲイン選択部をさらに含む、 請求の範囲第 2項または 第 9項に記載の記載の二次電池の残存容量推定装置。
1 3 . 前記第 3の補正ゲイン選択部は、 前記二次電池の電池温度の上昇に従い、 前記第 3の補正ゲインを大きくする、 請求の範囲第 1 2項に記載の二次電池の残 存容量推定装置。
1 4 . 前記第 1の推定部は、 前記二次電池の入出力電流の積算値に基づいて、 前記二次電池の充放電量を取得する、 請求の範囲第 1項または第 8項に記載の二 次電池の残存容量推定装置。
1 5 . 前記第 2の推定部は、 前記二次電池の起電圧に基づいて、 前記第 2の推 定値を算出する、 請求の範囲第 1項または第 8項に記載の二次電池の残存容量推 定装置。, .
1 6 . 前記二次電池の充放電電圧、 前記二次電池の分極電圧、 および前記二次 電池の内部抵抗により生じる電圧降下、 に基づいて、 前記二次電池の起電圧を算 出する起電圧算出部をさらに備える、 請求の範囲第 1 5項に記載の二次電池の残 存容量推定装置。 ■ '
1 7 . 充放電されるように構成された二次電池の残存容量推定方法であって、 前回の残存容量推定時からの前記二次電池の充放電量に基づき、 前記二次電池 の残存容量についての第 1の推定値を算出すること、 ' 前記二次電池の状態値に基づいて、 前記二次電池の残存容量についての第 2の 推定値を算出すること、 '
前記第 2の推定値に対する前回の残存容量推定時において推定された前記二次 電池の残存容量推定値である残存容量前回値の偏差に応じた補正値により、 前記 第 1の推定値を補正することで、 前記二次電池の残存容量推定値を生成すること を含み、
前記二次電池の残存容量推定値の生成において、 前記残存容量前回値の大きさ、 および前記残存容量前回値と前記第 2の推定値との大小関係に基づいて、 前記補 正^ ί直が算出される、 二次電池の残存容量推定方法。
1 8 . 充放電されるように構成された二次電池の残存容量推定方法であって、 前回の残存容量推定時からの前記二次電池の充放電量に基づき、 前記二次電池
の残存容量についての第 1の推定値を算出すること、
前記二次電池の状態値に基づいて、 前記二次電池の残存容量についての第 2の 推定値を算出すること、
前記第 2の推定値に対する前回の残存容量推定時において推定された前記二次 電池の残存容量推定値である残存容量前回値の偏差に応じた補正値により、 前記 第 1の推定値を補正することで、 前記二次電池の残存容量推定値を生成すること を含み、
前記二次電池の残存容量推定値の生成において、 前記二次電池を充放電するた めの前記二次電池の入出力電流と前記第 2の推定値との関係に基づいて、 前記補 正値が算出する、 二次電池の残存容量推定方法。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/087,925 US8102146B2 (en) | 2006-02-09 | 2007-02-07 | Remaining-amount estimation device and method for secondary battery |
EP07708362.4A EP1983349B1 (en) | 2006-02-09 | 2007-02-07 | Secondary cell residual capacity estimating device and residual capacity estimating method |
CN2007800047805A CN101379409B (zh) | 2006-02-09 | 2007-02-07 | 二次电池剩余容量推定装置和方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006032679A JP4967362B2 (ja) | 2006-02-09 | 2006-02-09 | 二次電池の残存容量推定装置 |
JP2006-032679 | 2006-02-09 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2007091722A1 true WO2007091722A1 (ja) | 2007-08-16 |
Family
ID=38345308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2007/052550 WO2007091722A1 (ja) | 2006-02-09 | 2007-02-07 | 二次電池の残存容量推定装置および残存容量推定方法 |
Country Status (6)
Country | Link |
---|---|
US (1) | US8102146B2 (ja) |
EP (1) | EP1983349B1 (ja) |
JP (1) | JP4967362B2 (ja) |
KR (1) | KR101006214B1 (ja) |
CN (1) | CN101379409B (ja) |
WO (1) | WO2007091722A1 (ja) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012143018A (ja) * | 2010-12-28 | 2012-07-26 | Kawasaki Heavy Ind Ltd | 系統安定化装置および系統安定化方法 |
JP2012222895A (ja) * | 2011-04-06 | 2012-11-12 | Toyota Motor Corp | 充電制御装置 |
JP2013507628A (ja) * | 2009-10-16 | 2013-03-04 | バイエリッシェ モートーレン ウエルケ アクチエンゲゼルシャフト | バッテリの最大可能出力を決定および/または予測する方法 |
JP2013126258A (ja) * | 2011-12-13 | 2013-06-24 | Denso Corp | 2次電池の充電率相当量算出装置 |
JP2018189398A (ja) * | 2017-04-28 | 2018-11-29 | トヨタ自動車株式会社 | 電池システム |
Families Citing this family (46)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4640391B2 (ja) * | 2007-08-10 | 2011-03-02 | トヨタ自動車株式会社 | 電源システムおよびそれを備えた車両 |
JP4893653B2 (ja) * | 2008-02-19 | 2012-03-07 | トヨタ自動車株式会社 | 車両、二次電池の充電状態推定方法および車両の制御方法 |
JP4978662B2 (ja) * | 2009-06-24 | 2012-07-18 | トヨタ自動車株式会社 | 充電状態推定装置および充電状態推定方法 |
US8495423B2 (en) * | 2009-08-11 | 2013-07-23 | International Business Machines Corporation | Flash-based memory system with robust backup and restart features and removable modules |
EP2495576B1 (en) * | 2009-10-30 | 2018-10-24 | NGK Insulators, Ltd. | Method for controlling secondary cell and power storage device |
JP5379672B2 (ja) * | 2009-12-25 | 2013-12-25 | プライムアースEvエナジー株式会社 | 二次電池の分極電圧演算装置及び充電状態推定装置 |
CN102859324B (zh) * | 2010-04-19 | 2016-06-29 | 日产自动车株式会社 | 信息提供装置和信息提供方法 |
JP5771909B2 (ja) * | 2010-06-08 | 2015-09-02 | 日産自動車株式会社 | 二次電池の充電容量推定装置 |
JP5723589B2 (ja) * | 2010-09-30 | 2015-05-27 | 本田技研工業株式会社 | 前後輪駆動車両 |
KR101191624B1 (ko) * | 2010-10-13 | 2012-10-17 | 삼성에스디아이 주식회사 | 배터리 관리 시스템 및 이를 이용한 배터리 soc 추정 방법 |
US9293937B2 (en) * | 2011-04-18 | 2016-03-22 | Hitachi Automotive Systems, Ltd. | Electric storage device |
FR2974921B1 (fr) * | 2011-05-05 | 2015-07-17 | Renault Sas | Procede de traitement d'un signal quantifiant l'etat de charge d'une batterie electrique d'un vehicule automobile en fonction du temps |
US20140232302A1 (en) * | 2011-09-26 | 2014-08-21 | Toyota Jidosha Kabushiki Kaisha | Battery processing apparatus, vehicle, battery processing method, and battery processing program |
JPWO2013046250A1 (ja) * | 2011-09-26 | 2015-03-26 | トヨタ自動車株式会社 | バッテリの処理装置、車両、バッテリの処理方法及びバッテリの処理プログラム |
JP5595361B2 (ja) * | 2011-09-27 | 2014-09-24 | プライムアースEvエナジー株式会社 | 二次電池の充電状態推定装置 |
JP2013083612A (ja) * | 2011-10-12 | 2013-05-09 | Mitsumi Electric Co Ltd | 電池状態計測方法及び電池状態計測装置 |
JP2013182779A (ja) * | 2012-03-01 | 2013-09-12 | Toyota Industries Corp | 電池の状態制御方法及び装置 |
JP6040724B2 (ja) * | 2012-03-13 | 2016-12-07 | 日産自動車株式会社 | バッテリの残存容量算出装置及びバッテリの残存容量算出方法 |
CN103487755B (zh) * | 2012-06-08 | 2016-02-17 | 通用电气公司 | 用于预测电池功率传输性能的系统和方法 |
JP5835136B2 (ja) * | 2012-07-17 | 2015-12-24 | 株式会社デンソー | 車載充電制御装置 |
JP5831381B2 (ja) * | 2012-07-19 | 2015-12-09 | 株式会社デンソー | 車載充電制御装置 |
CN103576095B (zh) * | 2012-08-02 | 2016-06-22 | 同济大学 | 一种燃料电池内部性能实时检测系统及方法 |
KR101547006B1 (ko) * | 2012-10-26 | 2015-08-24 | 주식회사 엘지화학 | 배터리 잔존 용량 추정 장치 및 방법 |
CN103018680B (zh) * | 2012-12-11 | 2014-07-16 | 矽力杰半导体技术(杭州)有限公司 | 一种电池电量计量方法、计量装置以及电池供电设备 |
EP2940827B1 (en) * | 2012-12-26 | 2020-05-06 | Mitsubishi Jidosha Kogyo Kabushiki Kaisha | Electric power supply device using electric vehicle |
US10664562B2 (en) | 2013-02-24 | 2020-05-26 | Fairchild Semiconductor Corporation and University of Connecticut | Battery state of charge tracking, equivalent circuit selection and benchmarking |
CN104007390B (zh) * | 2013-02-24 | 2018-03-20 | 快捷半导体(苏州)有限公司 | 电池电荷状态跟踪、等效电路选择及基准测试方法及系统 |
JP6063337B2 (ja) * | 2013-04-25 | 2017-01-18 | 京セラ株式会社 | 電力制御装置、電力制御方法、及び電力制御システム |
US9770997B2 (en) * | 2013-06-11 | 2017-09-26 | Ford Global Technologies, Llc | Detection of imbalance across multiple battery cells measured by the same voltage sensor |
CN104241713B (zh) * | 2013-06-18 | 2017-02-01 | 北汽福田汽车股份有限公司 | 动力电池的荷电状态soc修正方法及装置 |
CN103630726B (zh) * | 2013-10-30 | 2017-01-25 | 惠州市亿能电子有限公司 | 一种bms休眠模式下电池极化电压的估算方法 |
JP6421411B2 (ja) * | 2013-11-29 | 2018-11-14 | 富士通株式会社 | 電池の充電率を推定する推定プログラム、電池の充電率を推定する推定方法、および、電池の充電率を推定する推定装置 |
KR101558363B1 (ko) * | 2013-12-12 | 2015-10-07 | 현대자동차 주식회사 | 배터리의 충방전 제어 방법 및 시스템 |
KR101558705B1 (ko) * | 2013-12-26 | 2015-10-07 | 현대자동차주식회사 | 배터리 충전 제어 장치 및 방법 |
JP2015155859A (ja) * | 2014-02-21 | 2015-08-27 | ソニー株式会社 | 電池残量推定装置、電池パック、蓄電装置、電動車両および電池残量推定方法 |
CN105574304A (zh) * | 2014-10-07 | 2016-05-11 | 深圳市沃特玛电池有限公司 | 磷酸铁锂动力电池组soc的估算方法 |
CN104535933B (zh) * | 2014-12-26 | 2017-08-29 | 湖南金杯新能源发展有限公司 | 电池剩余电量测量方法与系统 |
US20170274794A1 (en) * | 2015-02-13 | 2017-09-28 | Panasonic Intellectual Property Management Co., Ltd. | Cell status estimation device and power supply device |
JP6325497B2 (ja) * | 2015-09-10 | 2018-05-16 | ファナック株式会社 | バッテリー残量を報知する機能を有する電子機器 |
CN105676141B (zh) * | 2016-01-27 | 2018-06-19 | 浙江大学 | 一种基于阻尼振荡的电池容量在线测量系统及其测量方法 |
US11307261B2 (en) * | 2017-03-31 | 2022-04-19 | Mitsubishi Electric Corporation | Rechargeable battery state estimation device |
EP3647802B1 (en) * | 2017-06-29 | 2023-11-01 | Kabushiki Kaisha Toshiba | Remaining battery energy estimation device, remaining battery energy estimation method, and program |
CN110596596A (zh) * | 2019-10-12 | 2019-12-20 | 深圳中科新能源汽车技术有限公司 | 一种新型的基于ocv曲线的soc逐次校正方法 |
JP7226299B2 (ja) * | 2019-12-23 | 2023-02-21 | トヨタ自動車株式会社 | 燃料電池車両 |
CN111796185B (zh) * | 2020-06-16 | 2022-11-08 | 合肥力高动力科技有限公司 | 基于t-s型模糊算法的磷酸铁锂电池soc-ocv校准方法 |
CN117293979B (zh) * | 2023-11-27 | 2024-03-22 | 广汽埃安新能源汽车股份有限公司 | 电池均衡控制方法、存储介质和电子设备 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09171065A (ja) * | 1994-11-21 | 1997-06-30 | Seiko Epson Corp | バッテリ残存容量計及び残存容量算出方法 |
JP2001057246A (ja) * | 1999-08-18 | 2001-02-27 | Sony Corp | バッテリー機器及びバッテリーの管理方法 |
JP2002369391A (ja) | 2001-06-07 | 2002-12-20 | Matsushita Electric Ind Co Ltd | 二次電池の残存容量制御方法および装置 |
JP2003149307A (ja) | 2001-11-16 | 2003-05-21 | Toyota Motor Corp | 電池残存容量算出方法 |
JP2005049216A (ja) * | 2003-07-29 | 2005-02-24 | Sony Corp | 二次電池の残容量算出方法およびバッテリパック |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW300957B (ja) | 1994-11-21 | 1997-03-21 | Seiko Epson Corp | |
US6285163B1 (en) | 1998-05-28 | 2001-09-04 | Toyota Jidosha Kabushiki Kaisha | Means for estimating charged state of battery and method for estimating degraded state of battery |
JP4012644B2 (ja) | 1999-03-12 | 2007-11-21 | トヨタ自動車株式会社 | バッテリの充電状態検出装置 |
DE10002473A1 (de) * | 2000-01-21 | 2001-07-26 | Vb Autobatterie Gmbh | Verfahren zur Bestimmung des Ladezusatandes von Akkumulatoren |
DE10116593B4 (de) | 2001-04-03 | 2005-05-25 | Arvinmeritor Gmbh | Fahrzeugdach |
JP2003068370A (ja) | 2001-08-28 | 2003-03-07 | Toyota Motor Corp | バッテリの充電状態検出装置 |
US6845332B2 (en) | 2001-11-16 | 2005-01-18 | Toyota Jidosha Kabushiki Kaisha | State of charge calculation device and state of charge calculation method |
JP4032934B2 (ja) * | 2002-11-15 | 2008-01-16 | ソニー株式会社 | 電池容量算出方法、電池容量算出装置、及び電池容量算出プログラム |
JP4075762B2 (ja) * | 2003-10-10 | 2008-04-16 | トヨタ自動車株式会社 | 二次電池における残存容量の算出装置および算出方法 |
EP1736789A4 (en) * | 2004-03-25 | 2009-03-04 | Nec Corp | METHOD AND DEVICES FOR ESTIMATING THE REMAINING CAPACITY OF A MEMORY BATTERY |
JP4615439B2 (ja) * | 2005-12-28 | 2011-01-19 | 株式会社Nttファシリティーズ | 二次電池管理装置、二次電池管理方法及びプログラム |
JP2008136278A (ja) * | 2006-11-27 | 2008-06-12 | Matsushita Electric Works Ltd | 充電器 |
JP4893653B2 (ja) * | 2008-02-19 | 2012-03-07 | トヨタ自動車株式会社 | 車両、二次電池の充電状態推定方法および車両の制御方法 |
-
2006
- 2006-02-09 JP JP2006032679A patent/JP4967362B2/ja active Active
-
2007
- 2007-02-07 EP EP07708362.4A patent/EP1983349B1/en not_active Expired - Fee Related
- 2007-02-07 US US12/087,925 patent/US8102146B2/en active Active
- 2007-02-07 KR KR1020087021748A patent/KR101006214B1/ko not_active IP Right Cessation
- 2007-02-07 CN CN2007800047805A patent/CN101379409B/zh active Active
- 2007-02-07 WO PCT/JP2007/052550 patent/WO2007091722A1/ja active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09171065A (ja) * | 1994-11-21 | 1997-06-30 | Seiko Epson Corp | バッテリ残存容量計及び残存容量算出方法 |
JP2001057246A (ja) * | 1999-08-18 | 2001-02-27 | Sony Corp | バッテリー機器及びバッテリーの管理方法 |
JP2002369391A (ja) | 2001-06-07 | 2002-12-20 | Matsushita Electric Ind Co Ltd | 二次電池の残存容量制御方法および装置 |
JP2003149307A (ja) | 2001-11-16 | 2003-05-21 | Toyota Motor Corp | 電池残存容量算出方法 |
JP2005049216A (ja) * | 2003-07-29 | 2005-02-24 | Sony Corp | 二次電池の残容量算出方法およびバッテリパック |
Non-Patent Citations (1)
Title |
---|
See also references of EP1983349A4 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013507628A (ja) * | 2009-10-16 | 2013-03-04 | バイエリッシェ モートーレン ウエルケ アクチエンゲゼルシャフト | バッテリの最大可能出力を決定および/または予測する方法 |
JP2012143018A (ja) * | 2010-12-28 | 2012-07-26 | Kawasaki Heavy Ind Ltd | 系統安定化装置および系統安定化方法 |
JP2012222895A (ja) * | 2011-04-06 | 2012-11-12 | Toyota Motor Corp | 充電制御装置 |
JP2013126258A (ja) * | 2011-12-13 | 2013-06-24 | Denso Corp | 2次電池の充電率相当量算出装置 |
JP2018189398A (ja) * | 2017-04-28 | 2018-11-29 | トヨタ自動車株式会社 | 電池システム |
Also Published As
Publication number | Publication date |
---|---|
CN101379409A (zh) | 2009-03-04 |
EP1983349A4 (en) | 2012-11-14 |
CN101379409B (zh) | 2011-07-20 |
US20090024338A1 (en) | 2009-01-22 |
KR101006214B1 (ko) | 2011-01-07 |
EP1983349A1 (en) | 2008-10-22 |
EP1983349B1 (en) | 2013-12-25 |
KR20080097447A (ko) | 2008-11-05 |
JP2007212298A (ja) | 2007-08-23 |
JP4967362B2 (ja) | 2012-07-04 |
US8102146B2 (en) | 2012-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4967362B2 (ja) | 二次電池の残存容量推定装置 | |
JP6822300B2 (ja) | 充電率推定方法および車載の電池システム | |
US9475480B2 (en) | Battery charge/discharge control device and hybrid vehicle using the same | |
EP1526627B1 (en) | Control apparatus of electricity accumulation mechanism | |
JP5009223B2 (ja) | 二次電池の残存容量推定方法及び装置 | |
US9429626B2 (en) | Electric storage device management system, electric storage device pack, and method of estimating state of charge | |
KR101087632B1 (ko) | 전동차량, 충전상태 추정방법 및 충전상태 추정방법을 컴퓨터에 실행시키기 위한 프로그램을 기록한 컴퓨터 판독 가능한 기록매체 | |
JP4722976B2 (ja) | 蓄電容量制御装置 | |
KR20080072012A (ko) | 배터리의 작동점 제어 방법 및 장치 | |
JP6834757B2 (ja) | 電池システム | |
WO2005100075A1 (en) | Drive system and control method of the same | |
JP2005261034A (ja) | 蓄電機構の制御装置 | |
JP5092903B2 (ja) | 車両用電池の充放電制御装置 | |
JP4874646B2 (ja) | 電池用制御装置、電動車両、及び二次電池の制御方法 | |
JP6699533B2 (ja) | 電池システム | |
JP2005227164A (ja) | 二次電池の残存容量算出装置 | |
CN115864559A (zh) | 电池的充电方法 | |
JP2006025538A (ja) | 二次電池の残存容量推定方法、その残存容量推定方法をコンピュータに実行させるプログラムを記録した記録媒体および電池制御システム | |
JP3628912B2 (ja) | バッテリ充電状態検出装置 | |
JP3772876B2 (ja) | ハイブリッド車両の制御装置 | |
JP4680949B2 (ja) | 電動車両の制御装置 | |
JP4438442B2 (ja) | 車両の充放電制御装置 | |
JP2004187399A (ja) | 組電池の制御装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 12087925 Country of ref document: US |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2007708362 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 200780004780.5 Country of ref document: CN |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1020087021748 Country of ref document: KR |