WO2007091647A1 - エレベータ用品の揚重装置及び揚重方法 - Google Patents

エレベータ用品の揚重装置及び揚重方法 Download PDF

Info

Publication number
WO2007091647A1
WO2007091647A1 PCT/JP2007/052254 JP2007052254W WO2007091647A1 WO 2007091647 A1 WO2007091647 A1 WO 2007091647A1 JP 2007052254 W JP2007052254 W JP 2007052254W WO 2007091647 A1 WO2007091647 A1 WO 2007091647A1
Authority
WO
WIPO (PCT)
Prior art keywords
lifting
pulley
hanging member
ceiling
elevator
Prior art date
Application number
PCT/JP2007/052254
Other languages
English (en)
French (fr)
Inventor
Naohiro Takamura
Original Assignee
Toshiba Elevator Kabushiki Kaisha
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Kabushiki Kaisha filed Critical Toshiba Elevator Kabushiki Kaisha
Priority to CN2007800036213A priority Critical patent/CN101374749B/zh
Publication of WO2007091647A1 publication Critical patent/WO2007091647A1/ja

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/005Mining-hoist operation installing or exchanging the elevator drive

Definitions

  • the present invention relates to an elevator equipment lifting apparatus and a lifting method for lifting an elevator product in a hoistway when the elevator is installed in a hoistway of a building.
  • the present invention has been made paying attention to such points, and the purpose of the present invention is to install an elevator article in the proximity of the ceiling of the hoistway when the elevator is installed in the hoistway of the building.
  • Lifting equipment and lifting method for elevator equipment that can lift to the position of To provide a law.
  • One form of the present invention includes a ceiling part of a hoistway of a building having a substantially U-shaped hanging member, and a pulley, and the pulley is arranged at a position above the lower end of the hanging member.
  • a lifting machine that is connected to the other end portion of the lifting wire rod and lifts the elevator gear by pulling the lifting wire rod.
  • a pulley apparatus including a pulley is disposed on a substantially U-shaped hanging member provided on a ceiling portion of a hoistway of a building, and the pulley is positioned above a lower end portion of the hanging member. It is installed so that it is placed, and a lifting wire is sprinkled on the pulley of this pulley device, an elevator article as a lifting object is placed on one end of this lifting wire, and a lifting machine is placed on the other end. Each elevator is connected, and the elevator is lifted by operating the lifting machine to pull the lifting wire.
  • the pulley device is inserted into the inside of the hanging member of the ceiling portion, and is hooked on the hanging member, and the body is crimped to the ceiling portion by tightening with a nut. It is characterized by having a hook member capable of.
  • the pulley device is attached to a vertical portion of the hanging member of the ceiling portion via a U bolt, and the U bolt is loosened in a direction around an axis of the vertical portion of the hanging member.
  • the feature is that it can be rotated! /
  • the pulley device includes a main body that is inserted inside a hanging member of the ceiling portion, and a bolt that is screwed into the main body with a lower force of the main body.
  • the fastening is characterized in that the main body can be pressed against the lower end of the hanging member and fixed to the hanging member by pressing the tip of the body against the ceiling.
  • One aspect of the invention is characterized in that a pair of hanging members are provided on the ceiling portion, and the pulley device is attached across the pair of hanging members.
  • FIG. 1 is an explanatory diagram showing a lifted state of a hoisting machine of a machineless elevator according to a first embodiment of the present invention.
  • FIG. 2 is a side view of the pulley device according to the first embodiment.
  • FIG. 3 is a plan view of the pulley apparatus according to the first embodiment.
  • FIG. 4 is a cross-sectional view taken along line AA in FIG.
  • FIG. 5 is a side view of a pulley apparatus according to a second embodiment of the present invention.
  • FIG. 6 is a plan view of a pulley apparatus according to a second embodiment of the present invention.
  • FIG. 7 is a plan view of a pulley apparatus according to a third embodiment of the present invention.
  • FIG. 8 is a front view of a pulley apparatus according to a third embodiment of the present invention.
  • FIG. 9 is a side view of a pulley apparatus according to a third embodiment of the present invention.
  • FIG. 10 is a plan view of a pulley apparatus according to a fourth embodiment of the present invention.
  • FIG. 11 is a side view of a pulley apparatus according to a fourth embodiment of the present invention.
  • FIG. 12 is a process diagram showing an example of a work process when carrying out the present invention.
  • FIG. 1 shows a first embodiment.
  • a machineless elevator hoisting machine 31 is installed at the top of a hoist way 1 provided in a building.
  • guide rails 2 and 3 are provided opposite to each other for guiding the elevator car or the balance and lifting of the weight.
  • These guide rails 2 and 3 are fixed to the side wall surface of the hoistway 1 through brackets 4 respectively.
  • a machine bed 5 for installing the hoisting machine 31 of the machineless elevator is mounted horizontally! /.
  • a pair of hanging members 6 and 7 each formed by bending a metal bar in a U shape are attached to the ceiling la of the hoistway 1 with a certain interval.
  • a pulley device 10 is provided inside one of the hanging members 6.
  • FIG. 2 is a side view of the pulley device 10
  • FIG. 3 is a plan view of the pulley device 10.
  • the pulley device 10 includes a main body 11.
  • the main body 11 is formed by integrally bonding a pair of side plates 12 facing each other with a steel material 13.
  • the body 11 has an approximately L shape with a horizontal portion 11a and a vertical portion 1 lb.
  • Steel members 14 are attached to the outer surfaces of both sides of the portion where the horizontal portion 1 la and the vertical portion 11 b intersect.
  • One steel material A pulley bolt 15 is also provided which also penetrates the both side plates 12 to reach the outer surface side of the other steel material 14.
  • a pair of pulleys 18 are rotatably supported so as to be arranged in parallel between the side plates 12 via the pulley bolts 15.
  • Reference numeral 16 denotes a nut screwed to the tip of the pulley bolt 15.
  • a hook member 20 is provided below the vertical portion l ib in the main body 11. As shown in FIG. 4, the hook member 20 is supported so as to be disposed between both side plates 12 through a steel material 21 having a U-shaped cross section provided between the both side plates 12.
  • a steel material 21 having a U-shaped cross section is rotatably attached to both side plates 12 via a support shaft 22, and the lower end portion of the hook member 20 is slidably inserted into the steel material 21, and the lower side thereof
  • a nut 23 is screwed onto the hook member 20 so that the entire hook member 20 can rotate integrally with the steel material 21 around the support shaft 22 in the direction around the axis.
  • the horizontal portion 11a of the main body 11 is inserted inside the U-shaped hanging member 6, and in this state, the main body 11
  • the hook member 20 is provided on the vertical part 1 lb. of the hook and the hook member 20 is rotated and the tip thereof is hooked on the lower end of the hooking member 6, and the nut 23 is tightened to move the hook member 20 in the axial direction.
  • the upper surface of the 11 horizontal portion 11a is pressed against the ceiling la of the hoistway 1 to be crimped. As a result, the entire pulley apparatus 10 is firmly and stably fixed to the ceiling portion la of the hoistway 1.
  • the lifting line is attached to the pulley 18 of the pulley device 10 as shown in FIG.
  • One end of the sling wire 27 is connected to a hoisting machine 31 as an elevator article, and the other end is connected to a lifting machine 30.
  • the wire 32 on the lifting side of the lifting machine 30 is hooked on a lifting portion 33 provided on the side wall surface of the hoistway 1.
  • the lifting machine 30 is operated to pull the sling wire 27 toward the lifting machine 30, and the lifting machine 31 is lifted toward the upper part of the hoistway 1.
  • the lifting machine 31 reaches a position above the machine bed 5
  • the operation of the lifting machine 30 is stopped and the lifting machine 3 1 is placed on the machine bed 5.
  • the hoisting machine 31 is moved along the machine bed 5.
  • bolts and clips Using the fastening parts such as the above, the lifting machine 31 is fixed to the machine bed 5 and fixed, and the slinging wire 27 is also removed from the lifting machine 31.
  • a pulley 18 serving as a suspended top of the hoisting machine 31 is provided on the ceiling la of the hoistway 1 and is arranged inside the hanging member 6 so that the ceiling la For this reason, the lifting machine 31 can be lifted up to a close distance of the ceiling 1a and the lifting machine 31 can be installed on the uppermost part near the ceiling la.
  • other elevator equipment can be lifted in the same way.
  • FIG. 5 and FIG. 6 show the structure of the pulley device 10 according to the second embodiment of the present invention.
  • FIG. 5 is a side view of the pulley apparatus 10
  • FIG. 6 is a plan view of the same.
  • the pulley apparatus 10 includes a base 36, and three support plates 37, 38, and 39 are attached to the base 36 via bolts 40 so as to face each other while being spaced apart from each other.
  • a pulley bolt 41 is installed between the support plates 37 and 38, and a pair of pulleys 42 are rotatably supported between the support plates 37 and 38 via the pulley bolt 41.
  • a contact plate 44 is provided so as to be disposed across both of the support plates 38, 39.
  • the contact plate 44 is detachably attached to the end faces of the support plates 38 and 39 via bolts 45, respectively.
  • the U-bolt 47 can now be attached to the inside of the contact plate 44.
  • This pulley apparatus 10 is attached to the hanging member 6 of the ceiling part la of the hoistway 1 in the following procedure. First, with the abutment plate 44 removed, the vertical portion on one side of the hanging member 6 having a U shape from the side of the pulley device 10 is inserted into the space between the support plates 38 and 39. Next, the contact plate 44 is abutted against the end surfaces of the support plates 38, 39, and the contact plate 44 is fastened to the end surfaces of the support plates 38, 39 with bolts 45 and fixed.
  • the U bolt 47 is inserted so as to hold the vertical portion of the hanging member 6 from the inside of the abutment plate 44, and nuts 48 are screwed to the end portions on the insertion side, and these nuts 48 are tightened, and the U bolt The vertical part of the hanging member 6 is sandwiched between 47 and the contact plate 44 and tightened.
  • the pulley apparatus 10 is horizontally attached to the vertical portion of the hanging member 6, and the pulley 42 is disposed at a position above the lower end portion of the hanging member 6.
  • the sling wire 27 as a lifting wire is wound around the pulley 42 of the pulley device 10, and the sling One end of the wire 27 is connected to an elevator article that is a lifting object, and the other end is connected to a lifting machine. Then the elevator is operated to lift the elevator equipment.
  • the pulley 42 which is the lifting top of the elevator article, is disposed above the lower end of the hanging member 6 provided on the ceiling la of the hoistway 1, so that the elevator article Can be lifted to a higher position near the ceiling la and installed at the top position near the ceiling la.
  • FIG. 7 to 9 show the structure of the pulley apparatus 10 according to the third embodiment of the present invention.
  • 7 is a plan view of the pulley apparatus 10
  • FIG. 8 is a front view
  • FIG. 9 is a side view.
  • the pulley apparatus 10 includes a main body 51 having a pair of side plates 50.
  • Each side plate 50 is formed in an L-shaped cross section having a horizontal portion 50a and a vertical portion 50b.
  • the horizontal portions 50a of the side plates 50 are directed outward.
  • Two pulley bolts 52 are installed between the vertical portions 50b with the vertical portions 50b facing each other. Both side plates 50 are connected to each other by these pulley bolts 52 and assembled as an integral main body 51.
  • a pulley 53 is rotatably provided on each pulley bolt 52.
  • notches 54 and 55 are formed in an intermediate portion of the front end edge of the horizontal portion 50a and an intermediate portion of the lower end edge of the vertical portion 50b, respectively.
  • push bolts 56 are also screwed vertically into the side plate 50 near the both ends of the horizontal portion 50a, and a bolt 57 is screwed onto each of the push bolts 56 to prevent loosening. Yes.
  • This pulley apparatus 10 is attached to the hanging member 6 of the ceiling part la of the hoistway 1 by the following procedure.
  • the main body 51 is inserted inside the hanging member 6 having a U-shape.
  • the main body 51 is inserted inside the hanging member 6 with each side plate 50 tilted slightly.
  • the main body 51 is erected, the notch 54 is fitted to the vertical portion of the hanging member 6, and the notch 55 is fitted to the hanging member 6. It is made to fit in the lower end part.
  • each push bolt 56 is turned with a tool, and its tip is pressed against the ceiling la of the hoistway 1. Then, each nut 57 is tightened to prevent each push bolt 56 from loosening.
  • the entire pulley apparatus 10 is firmly and stably fixed between the ceiling portion la of the hoistway 1 and the hanging member 6. Then, after attaching the pulley device 10 to the hanging member 6 in this manner, as in the case described above, the sling wire 27 as a lifting wire is wound around the pulley 53 of the pulley device 10, and the sling wire 27 One end is connected to the elevator equipment that is the object to be lifted, the other end is connected to the lifting equipment, and the elevator equipment is lifted by operating the lifting equipment.
  • the pulley 53 which is the lifting top of the elevator article, is disposed above the lower end of the hanging member 6 provided in the ceiling la of the hoistway 1, so that the elevator article Can be lifted to a higher position near the ceiling la and installed at the top position near the ceiling la.
  • FIG. 10 is a plan view of the pulley apparatus 10
  • FIG. 11 is a front view
  • FIG. 10 is a side view.
  • the pulley apparatus 10 is attached across both the pair of hanging members 6 and 7 provided on the ceiling la of the hoistway 1 and is larger than the separation pitch of the pair of hanging members 6 and 7. Equipped with a long base plate 60!
  • Support plates 61 are attached to one surface of both ends of the base plate 60 by welding or the like.
  • Pulley bolts 62 are installed between the support plate 61 and both ends of the base plate 60, and the pulleys 63 are rotatably provided on the pulley bolts 62, respectively.
  • the base plate 60 is provided with U-bolts 66 that can be tightened with nuts 65 at the same pitch positions as the spacing pitch of the pair of hanging members 6 and 7.
  • the pulley device 10 is attached to the hanging members 6 and 7 of the ceiling la of the hoistway 1 in the following procedure. First, with each U bolt 66 removed from the base plate 60, the base plate 60 is abutted against the vertical portions of the pair of hook members 6 and 7. Then, each U bolt 66 is held from one side of the base plate 60 so as to hold the vertical portions of the hanging members 6 and 7. Into the plate 60. Then, nuts 65 are screwed onto the insertion tips of the respective U bolts 66, and these nuts 65 are tightened. As a result, the vertical portions of the hanging members 6 and 7 are sandwiched between the U bolts 66 and the base plate 60, and the entire pulley apparatus 10 is stably fixed to the hanging members 6 and 7.
  • the sling wire 27 as a lifting wire is wound around the pulley 63 of the pulley device 10 in the same manner as described above.
  • One end of the sling wire 27 is connected to an elevator article that is a lifting object, the other end is connected to a lifting machine, and the elevator equipment is lifted by operating the lifting machine.
  • the pulley 63 which is the lifting top of the elevator article, is disposed above the lower end of the hanging member 6 provided on the ceiling la of the hoistway 1, so that the elevator article Can be lifted to a higher position near the ceiling la and installed at the top position near the ceiling la.
  • FIG. 12 shows the work steps in order. First, carry scaffolding equipment into the hoistway of the building (Sl). Next, the scaffold is assembled at the required level in the hoistway using the scaffold equipment (S2). Next, a foot is placed on the scaffold and the pulley device is attached to the hanging member on the ceiling of the hoistway (S3).
  • elevator equipment such as a lifting machine and other equipment such as a lifting machine and a wire rod for lifting are carried into the hoistway (S4).
  • the lifting wire is wound around the pulley of the pulley device (S5).
  • a lifting machine as an elevator article is connected to one end of the lifting wire, and a lifting machine is connected to the other end.
  • the lifting wire of the lifting machine is connected to the lifting side of the side wall of the hoistway.
  • the lifting machine is operated to lift the hoisting machine and place it at the uppermost position of the hoistway (S7).
  • the hoisting machine is placed on the uppermost machine bed of the guide rail, and the hoisting machine is fastened and fixed to the machine bed using fastening parts such as bolts (S8). Further, necessary elevator equipment is lifted by the lifting machine and installed at a predetermined position, and then the pulley apparatus is removed from the hanging member on the ceiling of the hoistway (S9). This completes the construction.
  • the hoisting machine is mounted on the uppermost part of the guide rail. It is not limited to assembling the head and mounting it on the machine bed, but it may also be the case of mounting directly on the top of the guide rail using fastening parts such as bolts and clips.
  • an elevator equipment lifting device and a lifting method capable of lifting the elevator equipment to a position at a close distance on the ceiling of the hoistway are provided. it can.

Abstract

滑車(18)を備える滑車装置(10)を、建屋の昇降路(1)の天井部(1a)に設けられたほぼU字状の掛け部材(6)に、前記滑車(18)がその掛け部材(6)の下端部より上方の位置に配置するように取り付け、この滑車装置(10)の滑車(18)に揚重用線条材としての玉掛けワイヤ(27)を巻き掛け、この玉掛けワイヤ(27)の一端部を揚重対象物としての巻上機(31)に連結し、他端部を揚重機(30)に連結し、かつ揚重機(30)の吊元側のワイヤ(32)を昇降路1の側壁面の吊元部(33)に連結し、この状態で揚重機(30)を操作して玉掛けワイヤ(27)を引張って巻上機(31)を昇降路(1)の最上部に位置にまで吊り上げる。

Description

明 細 書
エレベータ用品の揚重装置及び揚重方法 技術分野
[0001] 本発明は、建屋の昇降路内にエレベータを据え付けるに当ってそのエレベータ用 品を昇降路内で揚重するエレベータ用品の揚重装置及び揚重方法に関する。 背景技術
[0002] 建屋の昇降路内にエレベータを据え付ける際には、そのエレベータの各種の用品 を揚重装置を用いて揚重する作業が伴う。例えば、マシンレスエレベータの場合に、 その卷上機を揚重してガイドレール上部のマシンヘッドに据え付ける。
[0003] このような揚重の作業に当っては、日本の特開 2004— 331348に見られるように、 昇降路の天井部に設けられている掛け部材に揚重機を掛け止めて吊下げ、その揚 重機カゝら垂下されたロープで揚重対象物を揚重する方法や、日本の特開 2003— 6 3777に見られるように、昇降路の天井部の掛け部材に滑車を備える天秤装置を掛 け止めて吊下げ、その天秤の一端部にワイヤを介して揚重対象物を支持し、天秤の 他端部を引き下げることで揚重対象物を揚重する方法が知られている。
[0004] ところで、エレベータ用品のうちには、昇降路内のより高い位置にまで揚重すること が必要なものがある。例えばマシンレスエレベータの場合の卷上機であり、この場合 の卷上機は昇降路内の最も高い最上部にまで揚重して据え付けることが必要である
[0005] し力しながら、従来の揚重方法では、昇降路の天井部の掛け部材に揚重機を掛け 止めて吊下げ、その揚重機カゝら垂下したロープで揚重対象物を揚重する形態である ため、昇降路の天井部の至近距離の位置にまで揚重対象物を揚重することができな いという課題がある。
発明の開示
[0006] 本発明はこのような点に着目してなされたもので、その目的とするところは、建屋の 昇降路内にエレベータを据え付ける際に、そのエレベータ用品を昇降路の天井部の 至近距離の位置にまで揚重することができるエレベータ用品の揚重装置及び揚重方 法を提供することにある。
[0007] 本発明の一形態は、ほぼ U字状の掛け部材を備える建屋の昇降路の天井部と、滑 車を備え、その滑車が前記掛け部材の下端部より上方の位置に配置するように前記 掛け部材に取り付けられる滑車装置と、前記滑車装置の滑車に巻き掛けられる揚重 用線条材と、前記揚重用線条材の一端部に連結される揚重対象物としてのエレべ一 タ用品と、前記揚重用線条材の他端部に連結され、該揚重用線条材を引張ることに より前記エレベータ用品を吊り上げる揚重機とを具備することを特徴としている。
[0008] 発明の一形態は、滑車を備える滑車装置を、建屋の昇降路の天井部に設けられた ほぼ U字状の掛け部材に、前記滑車がその掛け部材の下端部より上方の位置に配 置するように取り付け、この滑車装置の滑車に揚重用線条材を卷き掛け、この揚重用 線条材の一端部に揚重対象物としてのエレベータ用品を、他端部に揚重機をそれ ぞれ連結し、その揚重機を操作して前記揚重用線条材を引張って前記エレベータ用 品を吊り上げることを特徴としている。
[0009] 発明の一形態は、前記滑車装置が、前記天井部の掛け部材の内側に挿入される 本体と、前記掛け部材に引っ掛けられ、ナットによる締め付けで前記本体を前記天井 部に圧着させることが可能なフック部材を備えることを特徴としている。
[0010] 発明の一形態は、前記滑車装置が、前記天井部の掛け部材の垂直部に Uボルトを 介して取り付けられ、その Uボルトを緩めることにより前記掛け部材の垂直部の軸回り 方向に回動することが可能となって 、ることを特徴として!/、る。
[0011] 発明の一形態は、前記滑車装置が、前記天井部の掛け部材の内側に挿入される 本体と、前記本体にその下側力ゝら螺挿されたボルトとを備え、前記ボルトを締め付け 、その先端を前記天井部に押し当てることで前記本体を前記掛け部材の下端部に押 圧して該掛け部材に固定することが可能となっていることを特徴としている。
[0012] 発明の一形態は、前記天井部には一対の掛け部材が設けられ、前記滑車装置は その一対の掛け部材に跨って取り付けられて 、ることを特徴として 、る。
図面の簡単な説明
[0013] [図 1]図 1は、本発明の第 1の実施形態に係るマシンレスエレベータの卷上機の揚重 状態を示す説明図である。 [図 2]図 2は、その第 1の実施形態に係る滑車装置の側面図である。
[図 3]図 3は、その第 1の実施形態に係る滑車装置の平面図である。
[図 4]図 4は、図 2中の A— A線に沿う断面図である。
[図 5]図 5は、本発明の第 2の実施形態に係る滑車装置の側面図である。
[図 6]図 6は、本発明の第 2の実施形態に係る滑車装置の平面図である。
[図 7]図 7は、本発明の第 3の実施形態に係る滑車装置の平面図である。
[図 8]図 8は、本発明の第 3の実施形態に係る滑車装置の正面図である。
[図 9]図 9は、本発明の第 3の実施形態に係る滑車装置の側面図である。
[図 10]図 10は、本発明の第 4の実施形態に係る滑車装置の平面図である。
[図 11]図 11は、本発明の第 4の実施形態に係る滑車装置の側面図である。
[図 12]図 12は、本発明を実施する際の作業工程の一例を示す工程図である。
発明を実施するための最良の形態
[0014] 以下、本発明の実施の形態について図面を参照して説明する。
[0015] 図 1には第 1の実施形態を示してあり、この実施形態は建屋に設けられた昇降路 (h oist way) 1内の最上部にマシンレスエレベータの卷上機 31を据え付ける場合の例 である。昇降路 1内にはエレベータの乗りかご (car)あるいは釣合 、重りの昇降をガイ ドするガイドレール 2, 3が互いに対向して設けられている。これらガイドレール 2, 3は それぞれブラケット 4を介して昇降路 1の側壁面に固定されている。そして一方のガイ ドレール 2の上端部には、マシンレスエレベータの卷上機 31を据え付けるためのマシ ンベット 5が水平に取り付けられて!/、る。
[0016] また、昇降路 1の天井部 laには、それぞれ金属棒材を U字状に曲成してなる一対 の掛け部材 6, 7が一定の間隔をあけて取り付けられている。そして一方の掛け部材 6 の内側に滑車装置 10が設けられている。
[0017] 滑車装置 10の構造を図 2及び図 3に示す。図 2は滑車装置 10の側面図で、図 3は 滑車装置 10の平面図である。滑車装置 10は本体 11を備えている。この本体 11は互 いに対向する一対の側板 12が鋼材 13で一体的に結合されてなる。本体 11は水平 部 11 aと垂直部 1 lbとを有するほぼ L形状をなして 、る。その水平部 1 laと垂直部 11 bとが交差する部分の両側外面には鋼材 14が取り付けられている。その一方の鋼材 14の外面力も前記両側板 12を貫通して他方の鋼材 14の外面側に達する滑車ボル ト 15が設けられている。この滑車ボルト 15を介して両側板 12間に一対の滑車 18が 並列するようにそれぞれ回転自在に支持されている。なお、 16は前記滑車ボルト 15 の先端部に螺着されたナットである。
[0018] 本体 11における垂直部 l ibの下部にはフック部材 20が設けられている。このフック 部材 20は図 4に示すように両側板 12間に設けられた断面コ字状の鋼材 21を介して その両側板 12間に配置するように支持されて!、る。断面コ字状の鋼材 21は支持軸 2 2を介して両側板 12に対して回動自在に取り付けられ、フック部材 20の下端部は鋼 材 21に摺動自在に貫挿され、その下側にナット 23が螺着され、フック部材 20の全体 が鋼材 21と一体的に支持軸 22を中心としてその軸回り方向に回動することが可能と なっている。
[0019] 滑車装置 10を掛け部材 6に取り付ける手順について説明すると、まず図 2に示すよ うに、本体 11の水平部 11aを U字状の掛け部材 6の内側に挿入し、この状態で本体 11の垂直部 1 lbに設けられて 、るフック部材 20を回動してその先端部を掛け部材 6 の下端部に掛け止めるとともに、ナット 23を締め付け、フック部材 20を軸方向に移動 させて本体 11の水平部 11aの上面を昇降路 1の天井部 laに押し付けて圧着させる。 これにより滑車装置 10の全体が昇降路 1の天井部 laに強固にかつ安定して固定さ れている。
[0020] このように、昇降路 1の天井部 laに設けられた掛け部材 6の内側に滑車装置 10を 取り付けた後には、この滑車装置 10の滑車 18に図 1に示すように揚重用線条材とし ての玉掛けワイヤ 27を巻き掛ける。そしてこの玉掛けワイヤ 27の一端部をエレベータ 用品としての卷上機 31に連結し、他端部を揚重機 30に連結する。揚重機 30の吊元 側のワイヤ 32は、昇降路 1の側壁面に設けられている吊元部 33に掛け止める。
[0021] この状態で、揚重機 30を操作して玉掛けワイヤ 27を揚重機 30側に引き込み、卷上 機 31を昇降路 1の上部に向けて吊り上げる。そして卷上機 31がマシンベット 5より上 方の位置にまで達した際に揚重機 30の操作を停止し、マシンベット 5の上に卷上機 3 1を乗せる。卷上機 31を横にずらすことが必要なときには、卷上機 31をマシンベット 5 に沿って移動させる。卷上機 31が所定の位置に配置された後には、ボルトやクリップ などの締結部品を用いて卷上機 31をマシンベット 5に据え付けて固定し、卷上機 31 力も玉掛けワイヤ 27を取り外す。
[0022] このような揚重形態においては、卷上機 31の吊上頂部となる滑車 18が昇降路 1の 天井部 laに設けられて 、る掛け部材 6の内側に配置されて天井部 laの間近にあり、 このため卷上機 31を天井部 1 aの至近距離まで吊り上げて卷上機 31を天井部 laの 間近の最上部に据え付けることができる。なお、卷上機 31の場合のほか、他のエレ ベータ用品につ ヽても同様に吊り上げることができる。
[0023] 図 5及び図 6にはこの発明の第 2の実施形態に滑車装置 10の構造を示してある。
図 5はその滑車装置 10の側面図で、図 6は同じく平面図である。この滑車装置 10は 、ベース 36を備え、このベース 36の上に 3つの支持板 37, 38, 39力 ^それぞれ互!ヽ に離間して対向するようにボルト 40を介して取り付けられている。支持板 37, 38間に は滑車ボルト 41が架設され、この滑車ボルト 41を介して支持板 37, 38間において 一対の滑車 42がそれぞれ回転自在に支持されて 、る。
[0024] 支持板 38, 39の一方の端面側にはその支持板 38, 39の双方に跨って配置するよ うに当板 44が設けられている。この当板 44はそれぞれボルト 45を介して支持板 38, 39の端面に着脱可能に取り付けられている。そしてこの当板 44の内側に Uボルト 47 を取り付けることができるようになって 、る。
[0025] この滑車装置 10は昇降路 1の天井部 laの掛け部材 6に次のような手順で取り付け る。まず、当板 44を取り外した状態で、滑車装置 10の側方側から U字状をなす掛け 部材 6の片側の垂直部を支持板 38, 39間の空間内に介入させる。次に、前記支持 板 38, 39の端面に当板 44を突き当て、この当板 44をボルト 45で支持板 38, 39の 端面に締結して固定する。次に、当板 44の内側から前記掛け部材 6の垂直部を抱え 込むように Uボルト 47を挿入し、その挿入側の端部にナット 48を螺着し、これらナット 48を締め付け、 Uボルト 47と当板 44とで掛け部材 6の垂直部を挟み込んで締め付け る。これにより、滑車装置 10が掛け部材 6の垂直部に水平に取り付けられ、滑車 42 が掛け部材 6の下端部より上方に位置に配置される。
[0026] このように掛け部材 6に滑車装置 10を取り付けた後には、前述の場合と同様に、滑 車装置 10の滑車 42に揚重用線条材としての玉掛けワイヤ 27を巻き掛け、その玉掛 けワイヤ 27の一端部を揚重対象物であるエレベータ用品に連結し、他端部を揚重機 に連結する。そして揚重機を操作してエレベータ用品を吊り上げる。
[0027] この場合においても、エレベータ用品の吊上頂部となる滑車 42が昇降路 1の天井 部 laに設けられている掛け部材 6の下端部より上方に配置されているから、そのエレ ベータ用品を天井部 laの間近となるより高い位置にまで吊り上げて天井部 laの間近 の最上部の位置に据え付けることができる。
[0028] そしてこの場合には、滑車装置 10が掛け部材 6の垂直部に Uボルト 47を介して取り 付けられているため、その Uボルト 47を緩めることにより滑車装置 10の全体をその掛 け部材 6の垂直部の軸回り方向に回動してその向きを変えることができる。したがって 、エレベータ用品を吊り上げる揚重方向が変わるような場合であってもそれに容易に 対応することができる。
[0029] 図 7乃至図 9にはこの発明の第 3の実施形態に係る滑車装置 10の構造を示してあ る。図 7はその滑車装置 10の平面図、図 8は同じく正面図、図 9は同じく側面図であ る。
[0030] この滑車装置 10は一対の側板 50を有する本体 51を備えている。各側板 50は、そ れぞれ水平部 50aと垂直部 50bとを有する断面 L字状に形成されて 、る。その各側 板 50の水平部 50aがそれぞれ外側を向 、て ヽる。垂直部 50bが互いに対向する状 態でその両垂直部 50b間に 2本の滑車ボルト 52が架設されている。これら滑車ボルト 52で両側板 50が互いに連結されて一体的な本体 51として組み立てられている。そ して前記各滑車ボルト 52にそれぞれ滑車 53が回転自在に設けられている。
[0031] 各側板 50における水平部 50aの先端縁の中間部及び垂直部 50bの下端縁の中間 部にはそれぞれ切欠部 54, 55が形成されている。また、また各側板 50における水平 部 50aの両端寄りの部分にはその下面側力も押しボルト 56が垂直に螺挿され、これ ら押しボルト 56にはそれぞれ緩み止め用のナット 57が螺着されている。
[0032] この滑車装置 10は昇降路 1の天井部 laの掛け部材 6に次のような手順で取り付け る。まず、本体 51を U字状をなす掛け部材 6の内側に挿入する。この際、各側板 50 がやや傾く姿勢で本体 51を掛け部材 6の内側に挿入する。そして挿入後に、本体 5 1を正立させ、切欠部 54を掛け部材 6の垂直部に嵌合させ、切欠部 55を掛け部材 6 の下端部に嵌合させる。次に、各押しボルト 56を工具を用いて回し、その先端を昇降 路 1の天井部 laに圧接させる。この後、各ナット 57を締め付けて各押しボルト 56の緩 み止めを図る。
[0033] これにより滑車装置 10の全体が昇降路 1の天井部 laと掛け部材 6との間に強固に 安定して固定される。そして、このように掛け部材 6に滑車装置 10を取り付けた後に、 前述の場合と同様に、滑車装置 10の滑車 53に揚重用線条材としての玉掛けワイヤ 27を巻き掛け、その玉掛けワイヤ 27の一端部を揚重対象物であるエレベータ用品に 連結し、他端部を揚重機に連結し、その揚重機を操作してエレベータ用品を吊り上 げる。
[0034] この場合においても、エレベータ用品の吊上頂部となる滑車 53が昇降路 1の天井 部 laに設けられている掛け部材 6の下端部より上方に配置されているから、そのエレ ベータ用品を天井部 laの間近となるより高い位置にまで吊り上げて天井部 laの間近 の最上部の位置に据え付けることができる。
[0035] 図 10及び図 11にはこの発明の第 4の実施形態に係る滑車装置 10を示してある。
図 10はその滑車装置 10の平面図、図 11は同じく正面図、図は同じく側面図である。
[0036] この滑車装置 10は昇降路 1の天井部 laに設けられた一対の掛け部材 6, 7の双方 に跨って取り付けられるもので、その一対の掛け部材 6, 7の離間ピッチよりも大きい 長さのベースプレート 60を備えて!/、る。
[0037] ベースプレート 60の両端部の片面にはそれぞれ支持板 61が溶接などにより取り付 けられている。これら支持板 61とベースプレート 60の両端部との間にそれぞれ滑車 ボルト 62が架設され、これら滑車ボルト 62にそれぞれ滑車 63が回転自在に設けられ ている。また、ベースプレート 60には前記一対の掛け部材 6, 7の離間ピッチと同じピ ツチの位置にそれぞれナット 65での締め付けが可能な Uボルト 66が設けられている
[0038] この滑車装置 10は昇降路 1の天井部 laの掛け部材 6, 7に次のような手順で取り付 ける。まず、ベースプレート 60から各 Uボルト 66を取り外した状態でそのベースプレ ート 60を一対の掛け部材 6, 7の垂直部に突き当てる。そしてベースプレート 60の一 方の片面側から各 Uボルト 66を前記掛け部材 6, 7の垂直部を抱え込むようにしてベ ースプレート 60に挿入する。そして各 Uボルト 66の挿入先端部にナット 65を螺着し、 これらナット 65を締め付ける。これにより掛け部材 6, 7の垂直部が Uボルト 66とべ一 スプレート 60とで挟み付けられ、滑車装置 10の全体がその掛け部材 6, 7に安定して 固定される。
[0039] そして、このように掛け部材 6, 7に滑車装置 10を取り付けた後に、前述の場合と同 様に、滑車装置 10の滑車 63に揚重用線条材としての玉掛けワイヤ 27を巻き掛け、 その玉掛けワイヤ 27の一端部を揚重対象物であるエレベータ用品に連結し、他端部 を揚重機に連結し、その揚重機を操作してエレベータ用品を吊り上げる。
[0040] この場合においても、エレベータ用品の吊上頂部となる滑車 63が昇降路 1の天井 部 laに設けられている掛け部材 6の下端部より上方に配置されているから、そのエレ ベータ用品を天井部 laの間近となるより高い位置にまで吊り上げて天井部 laの間近 の最上部の位置に据え付けることができる。
[0041] 以上のような揚重方法を実施する際の全体の作業工程について説明すると、次の 通りである。図 12にはその作業工程を順に示してある。まず、建屋の昇降路内に足 場用機材を搬入する (Sl)。次に、その足場用機材を用いて昇降路内の所要の各レ ベルの位置に足場を組み立てる(S2)。次に、その足場に足を掛けて昇降路の天井 部の掛け部材に滑車装置を取り付ける (S3)。
[0042] 次に、昇降路内に卷上機などのエレベータ用品ゃ揚重機、揚重用線条材などの機 材を搬入する (S4)。次に、前記揚重用線条材を前記滑車装置の滑車に巻き掛ける (S5)。次に、揚重用線条材の一端部にエレベータ用品としての卷上機を連結し、他 端部に揚重機を連結し、その揚重機の吊元ワイヤを昇降路の側壁面の吊元部に接 続する (S6)。次に、前記揚重機を操作して前記卷上機を吊り上げ、昇降路の最上 部の位置に配置させる(S7)。次に、その卷上機をガイドレールの最上部のマシンべ ットの上に乗せ、ボルトなどの締結部品を用いてその卷上機をマシンベットに締結し て固定する(S8)。さらに、必要なエレベータ用品を前記揚重機で揚重して所定の位 置に据え付け、この後、前記滑車装置を昇降路の天井部の掛け部材から取り外す( S9)。以上により施工が完了する。
[0043] なお、マシンレスエレベータの場合の卷上機は、ガイドレールの最上部にマシンべ ッドを組み立ててそのマシンベットの上に据え付ける場合に限らず、ボルトやクリップ などの締結部品を用いてガイドレールの最上部に直接据え付けるような場合であつ てもよい。
[0044] なお、本発明を実施するに当たって、前記実施形態以外にも、各部材の形状や数 等、本発明の構成要素を発明の要旨を逸脱しない範囲で適宜変形して実施できるこ とは言うまでもない。
産業上の利用可能性
[0045] 建屋の昇降路内にエレベータを据え付ける際に、そのエレベータ用品を昇降路の 天井部の至近距離の位置にまで揚重できるエレベータ用品の揚重装置及び揚重方 法を提供することができる。

Claims

請求の範囲
[1] ほぼ U字状の掛け部材 (6)を備える建屋の昇降路(1)の天井部(la)と、
滑車(18)を備え、その滑車(18)が前記掛け部材 (6)の下端部より上方の位置に 配置するように前記掛け部材 (6)に取り付けられる滑車装置( 10)と、
前記滑車装置(10)の滑車に巻き掛けられる揚重用線条材 (27)と、
前記揚重用線条材(27)の一端部に連結される揚重対象物としてのエレベータ用 品(31)と、
前記揚重用線条材(27)の他端部に連結され、該揚重用線条材(27)を引張ること により前記エレベータ用品(31)を吊り上げる揚重機(30)と、
を具備することを特徴とするエレベータ用品の揚重装置。
[2] 滑車を備える滑車装置(10)を、建屋の昇降路の天井部に設けられたほぼ U字状 の掛け部材 (6)に、前記滑車がその掛け部材 (6)の下端部より上方の位置に配置す るように取り付け、この滑車装置(10)の滑車に揚重用線条材 (27)を巻き掛け、この 揚重用線条材(27)の一端部に揚重対象物としてのエレベータ用品(31)を、他端部 に揚重機 (30)をそれぞれ連結し、その揚重機 (30)を操作して前記揚重用線条材( 27)を引張って前記エレベータ用品(31)を吊り上げることを特徴とするエレベータ用 品の揚重方法。
[3] 前記滑車装置(10)は、前記天井部(la)の掛け部材 (6)の内側に挿入される本体
(11)と、前記掛け部材 (6)に引っ掛けられ、ナット(23)による締め付けで前記本体( 11)を前記天井部(la)に圧着させることが可能なフック部材 (20)を備えることを特 徴とする請求項 1に記載のエレベータ用品の揚重装置。
[4] 前記滑車装置(10)は、前記天井部(la)の掛け部材 (6)の内側に挿入される本体
(11)と、前記掛け部材 (6)に引っ掛けられ、ナット(23)による締め付けで前記本体( 11)を前記天井部(la)に圧着させることが可能なフック部材 (20)を備えることを特 徴とする請求項 2に記載のエレベータ用品の揚重方法。
[5] 前記滑車装置(10)は、前記天井部の掛け部材 (6)の垂直部に Uボルト (47)を介 して取り付けられ、その Uボルト (47)を緩めることにより前記掛け部材 (6)の垂直部 の軸回り方向に回動することが可能となって 、ることを特徴とする請求項 1に記載の エレベータ用品の揚重装置。
[6] 前記滑車装置(10)は、前記天井部の掛け部材 (6)の垂直部に Uボルト (47) (66) を介して取り付けられ、その Uボルト (47)を緩めることにより前記掛け部材 (6)の垂直 部の軸回り方向に回動することが可能となっていることを特徴とする請求項 2に記載 のエレベータ用品の揚重方法。
[7] 前記滑車装置(10)は、前記天井部の掛け部材 (6)の内側に挿入される本体と、前 記本体にその下側から螺挿されたボルトとを備え、前記ボルトを締め付け、その先端 を前記天井部に押し当てることで前記本体を前記掛け部材 (6)の下端部に押圧して 該掛け部材に固定することが可能となっていることを特徴とする請求項 1に記載のェ レベータ用品の揚重装置。
[8] 前記滑車装置(10)は、前記天井部の掛け部材 (6)の内側に挿入される本体と、前 記本体にその下側から螺挿されたボルトとを備え、前記ボルトを締め付け、その先端 を前記天井部に押し当てることで前記本体を前記掛け部材 (6)の下端部に押圧して 該掛け部材に固定することが可能となっていることを特徴とする請求項 2に記載のェ レベータ用品の揚重方法。
[9] 前記天井部には一対の掛け部材 (6、 7)が設けられ、前記滑車装置(10)はその一 対の掛け部材 (6、 7)に跨って取り付けられていることを特徴とする請求項 1に記載の エレベータ用品の揚重装置。
[10] 前記天井部には一対の掛け部材 (6、 7)が設けられ、前記滑車装置(10)はその一 対の掛け部材 (6、 7)に跨って取り付けられていることを特徴とする請求項 2に記載の エレベータ用品の揚重方法。
PCT/JP2007/052254 2006-02-09 2007-02-08 エレベータ用品の揚重装置及び揚重方法 WO2007091647A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007800036213A CN101374749B (zh) 2006-02-09 2007-02-08 电梯用具的起重装置以及起重方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006032472A JP4959986B2 (ja) 2006-02-09 2006-02-09 エレベータ用品の揚重装置及び揚重方法
JP2006-032472 2006-02-09

Publications (1)

Publication Number Publication Date
WO2007091647A1 true WO2007091647A1 (ja) 2007-08-16

Family

ID=38345241

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2007/052254 WO2007091647A1 (ja) 2006-02-09 2007-02-08 エレベータ用品の揚重装置及び揚重方法

Country Status (3)

Country Link
JP (1) JP4959986B2 (ja)
CN (1) CN101374749B (ja)
WO (1) WO2007091647A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112623981B (zh) * 2020-12-09 2023-05-26 日立电梯(中国)有限公司 吊装设备的安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08284305A (ja) * 1995-04-17 1996-10-29 Koyo Kizai Kk 吊りボルト支持具
JP2001114483A (ja) * 1999-10-18 2001-04-24 Toshiba Elevator Co Ltd 機械室レスエレベータの巻上機据付方法及びその装置
JP2001153124A (ja) * 1999-11-26 2001-06-08 Toshiba Elevator Co Ltd フック取付け装置
JP2002276206A (ja) * 2000-05-02 2002-09-25 Kozai Steel:Kk 挟持板、それを使用したフェンスの固定具及びフェンス構造体
JP2002332174A (ja) * 2001-05-10 2002-11-22 Fujitec Co Ltd エレベータ機器の吊り上げ装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6397588A (ja) * 1986-10-08 1988-04-28 株式会社日立製作所 エレベ−タ−の防振装置
JPH0920482A (ja) * 1995-07-04 1997-01-21 Hitachi Building Syst Eng & Service Co Ltd エレベータの機械室部品の搬送装置
US6446763B1 (en) * 2000-07-19 2002-09-10 Otis Elevator Company Integrated elevator installation hoist tool
WO2002079068A1 (fr) * 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Mecanisme de fixation pour monte-charge
JP4828084B2 (ja) * 2001-03-29 2011-11-30 三菱電機株式会社 巻上機の据付方法
JP2003292263A (ja) * 2002-04-05 2003-10-15 Fujitec Co Ltd エレベータ機器の吊り上げ装置及び方法
JP2005067813A (ja) * 2003-08-25 2005-03-17 Toshiba Elevator Co Ltd エレベータの巻上機の揚重治具及び揚重方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08284305A (ja) * 1995-04-17 1996-10-29 Koyo Kizai Kk 吊りボルト支持具
JP2001114483A (ja) * 1999-10-18 2001-04-24 Toshiba Elevator Co Ltd 機械室レスエレベータの巻上機据付方法及びその装置
JP2001153124A (ja) * 1999-11-26 2001-06-08 Toshiba Elevator Co Ltd フック取付け装置
JP2002276206A (ja) * 2000-05-02 2002-09-25 Kozai Steel:Kk 挟持板、それを使用したフェンスの固定具及びフェンス構造体
JP2002332174A (ja) * 2001-05-10 2002-11-22 Fujitec Co Ltd エレベータ機器の吊り上げ装置

Also Published As

Publication number Publication date
JP4959986B2 (ja) 2012-06-27
CN101374749A (zh) 2009-02-25
CN101374749B (zh) 2011-05-04
JP2007210744A (ja) 2007-08-23

Similar Documents

Publication Publication Date Title
KR100703766B1 (ko) 리프트용 독립 지주식 가이드레일
EP2844600B1 (en) Method of installing a machine in an elevator system
JP2002003124A (ja) エレベータの据付け装置及びその据付け工法
JP2008222382A (ja) 据付用昇降装置移動方法
WO2007091647A1 (ja) エレベータ用品の揚重装置及び揚重方法
JPWO2018138831A1 (ja) エレベータの据付方法
WO2007066667A1 (ja) エレベータの重量物仮置装置および重量物の据付方法
JP4929045B2 (ja) 機械室レスエレベータのガイドレール据え付け工法
JP4443171B2 (ja) 工事用エレベータのロープ繰り出し装置
JP2001114483A (ja) 機械室レスエレベータの巻上機据付方法及びその装置
KR101976724B1 (ko) 엘리베이터 승강로 가이드 레일의 설치방법
JP6218483B2 (ja) エレベータの主索固定装置、及びエレベータの改修方法
JP2004224452A (ja) ロープ吊り上げガイド治具
JP2014020157A (ja) 柱の立設方法
JP5748558B2 (ja) エレベータのカゴ固定装置
JP4260453B2 (ja) ゴンドラの安全装置
JPH08133637A (ja) ジャンプアップエレベーターの仮設機械室用ロープグリッパー
JP2748812B2 (ja) エレベーター用のガイドレール吊上げ装置
JP2005067813A (ja) エレベータの巻上機の揚重治具及び揚重方法
JP2001354374A (ja) エレベータの昇降路内揚重装置
WO2008001681A1 (fr) Dispositif pour lever un composant d'ascenseur
JP2008195487A (ja) エレベータの綱止機構の吊り下げ治具
JP7468604B1 (ja) エレベータのガイドレール支持構造、およびエレベータのガイドレール施工方法
JP5382443B2 (ja) エレベータのリニューアル方法
JP2005154116A (ja) エレベータロープの端末支持装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 200780003621.3

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07708238

Country of ref document: EP

Kind code of ref document: A1