WO2001073633A1 - Procede et systeme de gestion de machines de construction et dispositif de traitement arithmetique - Google Patents

Procede et systeme de gestion de machines de construction et dispositif de traitement arithmetique Download PDF

Info

Publication number
WO2001073633A1
WO2001073633A1 PCT/JP2001/002852 JP0102852W WO0173633A1 WO 2001073633 A1 WO2001073633 A1 WO 2001073633A1 JP 0102852 W JP0102852 W JP 0102852W WO 0173633 A1 WO0173633 A1 WO 0173633A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
construction machine
operating
replaced
construction
Prior art date
Application number
PCT/JP2001/002852
Other languages
English (en)
French (fr)
Inventor
Hiroyuki Adachi
Toichi Hirata
Genroku Sugiyama
Hiroshi Watanabe
Koichi Shibata
Hideki Komatsu
Original Assignee
Hitachi Construction Machinery Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co., Ltd. filed Critical Hitachi Construction Machinery Co., Ltd.
Priority to JP2001571276A priority Critical patent/JP4245842B2/ja
Priority to EP01921781A priority patent/EP1241608A4/en
Priority to US09/959,862 priority patent/US6810362B2/en
Publication of WO2001073633A1 publication Critical patent/WO2001073633A1/ja

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Definitions

  • the present invention relates to a construction machine management method and system, and an arithmetic processing device, and more particularly to a construction machine management method having a plurality of parts having different operation states, such as a front working machine part, a turning part, and a traveling part, such as a hydraulic shovel. And systems and arithmetic processing units. Background art
  • the main pump and pilot pump are '' Parts that operate during operation.
  • Arms, baguettes, and baguette claws operate during front operation (excavation).
  • Links and running rollers are components that operate during running.
  • the engine is operated by turning on the key switch, while the front, revolving unit, and traveling unit operate when the operator operates the engine while the engine is operating.
  • the operating time, turning time, and running time take different values.
  • a first object of the present invention is to provide a construction machine management method and system, and an arithmetic processing device, which can accurately predict the number of construction machines sold and can make an appropriate production plan of construction machines. That is.
  • a second object of the present invention is to provide a construction machine management method, a system, and an arithmetic processing unit capable of accurately predicting the sales number of parts of construction machines and making an appropriate production plan of parts. To provide.
  • the present invention relates to a construction machine management method, which measures the operating state of each of a plurality of construction machines operating in a market, and uses the measured base station computer A first procedure of transferring the data to a database and storing and accumulating the data as operation data in a database; and a second procedure of performing statistical processing on the operation data in the base station computer, and generating and outputting prediction data of the number of replaced construction machines. It is assumed that the number of replaced construction machines is predicted using the prediction data.
  • the operation status of each construction machine is stored and accumulated as operation data, and the prediction data of the number of construction machine replacements is generated and predicted, whereby the number of construction machine replacements can be determined based on the actual operation status. It is a prediction, and that prediction can be made accurately. As a result, it is possible to accurately forecast the sales volume of construction machinery, and to make an appropriate production plan for construction machinery.
  • the second procedure includes, as the prediction data, an operation state of a currently operating construction machine and its operation time based on the operation data.
  • the method includes a third procedure for obtaining a first correlation with the number of moving machines, and predicts the number of replaced construction machines based on the first correlation.
  • the second step includes, as the prediction data, a past operation state of the construction machine based on the replacement data and the operation data of the construction machine replaced in the past, and The method further includes a fourth step of obtaining a second correlation with the number of replaced machines, and comparing the first correlation and the second correlation to predict the number of replaced machines.
  • the second correlation between the operating state of construction machines in the past and the number of units replaced is calculated and compared with the first correlation described above, thereby predicting the number of replacements of construction machines reflecting past results. And the prediction can be made more accurately.
  • the second step is to obtain, as the prediction data, a number of construction machines that are currently operating and whose operation state exceeds a predetermined reference value from the operation data. It has a fifth procedure, and predicts the number of replacement construction machines based on this number.
  • the reference value is, for example, an average operation state of construction machines replaced in the past.
  • the second step is to calculate the correlation between the past operating state of the construction machine and the number of units replaced based on the replacement data and the operation data of the construction machine that was replaced in the past.
  • the method further includes a step, wherein the average operating state is a value obtained from the correlation.
  • the operating state is at least one of an operating time and a traveling distance. This makes it possible to predict the number of construction machines to be replaced using either the operating time or the mileage.
  • the operation state may be an operation time
  • the reference value may be a replacement judgment time determined from an intersection of a trade-in price curve and a repair cost curve.
  • the fact that the operating time has exceeded the replacement determination time indicates that it is time to recommend replacement of the construction machine.
  • sales can be promoted to users by promoting sales.
  • the present invention provides a construction machine management system that measures an operating state of each of a plurality of construction machines operating in a factory for each part, A first procedure of transferring these operating states to a base station computer and storing and accumulating the operating data in a database; and, in the base station computer, statistically processing the operating data and relating to each part. And a second procedure for generating and outputting prediction data of the number of repaired and replaced parts, and using the predicted data to predict the number of repaired and replaced parts for each part.
  • the operation status of each part is stored and accumulated as operation data for each construction machine, and the prediction data of the number of repairs and replacements of the parts related to each part is generated and predicted, based on the actual operation state.
  • the number of parts to be repaired and replaced is predicted, and the prediction can be made accurately. As a result, it is possible to accurately predict the number of parts sold and to make an appropriate production plan for the parts.
  • the second procedure includes, as the prediction data, based on repair / replacement data and operation data of a part which has been repaired / replaced in the past, for each part to which the part is related.
  • the second correlation between the past operation status and the number The method further includes four procedures, and compares the first correlation and the second correlation to predict the number of parts to be repaired and replaced for each part.
  • the second correlation between the past operating state and the number of repairs and replacements is obtained, and by comparing with the first correlation described above, the number of repairs and replacements of parts is predicted by reflecting the past results, The prediction can be made more accurately.
  • the first procedure measures a load for each part in addition to the operating state for each part, and stores the measured data as operation data in a database of the base station computer.
  • the second step further includes a fifth step of load-correcting the operating state in accordance with the degree of the load, and using the load-corrected operating state as operating data to calculate the prediction data. Produce evening.
  • the load can be corrected for the operating state of each unit, and the corrected data can be used as the operating data to generate prediction data. By predicting the repair and replacement of parts, the prediction can be performed more accurately.
  • the operating state is at least one of an operating time and the number of operations.
  • the construction machine is a hydraulic shovel (1)
  • the site is a hydraulic shovel front, a revolving superstructure, a running body, an engine, One of the hydraulic pumps.
  • the present invention provides a construction machine management system that measures the operating state of each of a plurality of construction machines operating in a market.
  • An operation data measurement / collection unit for measuring and collecting; and a base station computer having a database installed in the base station and storing and accumulating the operation state of the measured and collected construction machine as operation data.
  • Has a calculating means for performing statistical processing of the operation data, generating and outputting prediction data of the number of replaced construction machines, and predicting the number of replaced construction machines using the prediction data.
  • the calculation means includes, as the prediction data, a first correlation between an operating state of a currently operating construction machine and the number of operating machines based on the operating data.
  • the first correlation is calculated, and the number of replaced construction machines is predicted based on the first correlation.
  • the calculating means determines the past operating state of the construction machine based on the replacement data and the operating data of the construction machine replaced in the past as the prediction data.
  • the method further includes a second means for obtaining a second correlation with the number of replacement machines, and compares the first correlation with the second correlation to predict the number of replacement machines of construction equipment.
  • the arithmetic means is configured such that, as the prediction data, an operation state of a currently operating construction machine from the operation data exceeds a predetermined reference value. It has a third procedure for calculating the number of vehicles, and predicts the number of vehicles to be replaced based on this number.
  • the reference value is, for example, an average operating state of construction machines that have been replaced in the past.
  • the calculation procedure includes the past operation state of the construction machine and the number of the replaced construction machines based on the replacement data of the construction machine replaced in the past and the operation data.
  • the operating state is at least one of an operating time and a traveling distance.
  • the operation state may be an operation time
  • the reference value may be a replacement judgment time determined from an intersection of a purchase price curve and a repair cost curve.
  • the present invention provides a construction machine management system that measures and collects the operating state of each part of a plurality of construction machines operating in a market. Operating data measurement and collection means; and a base station computer which is installed in the base station and has a database for storing and accumulating the operating state of each of the measured and collected parts as operation data. And a calculating means for statistically processing the operation data to generate and output prediction data of the number of repair / replacement of parts relating to each part, and predicting the number of repair / replacement of parts relating to each part using the prediction data. I do.
  • the calculation means includes, as the prediction data, an operating state of each part of the currently operating construction machine based on the operating data and the number of operating units.
  • the arithmetic means includes, as the prediction data, a part based on repair / replacement data of a part which has been repaired / replaced in the past and operation data.
  • the data measurement and collection means measures and collects a load for each part in addition to the operating state for each part
  • the base station computer includes: The measured and collected operating state and load of each part are stored and accumulated in a database as operating data, and the calculating means further includes third means for correcting the operating state according to the degree of the load.
  • the predicted data is generated by using the load-corrected operation state as operation data.
  • the operation state is at least one of an operation time and an operation count.
  • the construction machine is a hydraulic shovel
  • the parts are a hydraulic shovel front, a swing body, a traveling body,
  • the present invention operates on the market.
  • An operation characterized by storing and accumulating the operation states of a plurality of construction machines as operation data, statistically processing the operation data, and generating and outputting prediction data of the number of replaced construction machines.
  • a processing device is provided.
  • the present invention stores and accumulates, as operation data, the operation state of each part for each of a plurality of construction machines operating in the market, Provided is an arithmetic processing device characterized by statistically processing data and generating and outputting a prediction data of the number of repaired parts to be replaced for each part.
  • FIG. 1 is an overall schematic diagram of a management system provided with a construction machine sales prediction system according to a first embodiment of the present invention.
  • FIG. 2 is a diagram showing the details of the configuration of the airframe controller.
  • FIG. 3 is a diagram showing details of a hydraulic shovel and a sensor group.
  • FIG. 4 is a functional block diagram showing an overview of the processing functions of the CPU of the base station server.
  • FIG. 5 is a flowchart showing a function of collecting the operating time of each part of the excavator in the CPU of the airframe controller.
  • FIG. 6 is a flowchart showing a processing function of the communication control unit of the aircraft controller when transmitting the collected operating time data.
  • FIG. 7 is a flowchart showing the processing functions of the aircraft / operation information processing unit of the base station center server when the operation time data is sent from the aircraft controller.
  • FIG. 8 is a flowchart showing a function of processing product replacement information in a product replacement / part replacement information processing section of the base station center server.
  • FIG. 9 is a flowchart showing the function of processing the part replacement information in the product replacement / part replacement information processing unit of the base station center server.
  • FIG. 10 is a diagram showing the storage status of the operation data, the actual maintenance data, and the replacement operation time data on a data base basis of the base station center server.
  • FIG. 11 is a flowchart showing a procedure for obtaining distribution data of the number of operating units with respect to the operating hours of the engine.
  • FIG. 12 is a flowchart showing a procedure for obtaining distribution data of the number of operating units with respect to the operating time of each component.
  • Fig. 13 is a diagram showing an example of a distribution diagram of the number of operating units of the hydraulic excavator of model X with respect to the operating time (engine operating time).
  • Fig. 14 is a diagram showing an example of a distribution diagram of the number of operated baggage claws versus the front operation time (digging time).
  • FIG. 15 is a diagram illustrating an example of a distribution diagram of the number of operating vehicles with respect to the traveling time of the traveling link.
  • FIG. 16 is a flowchart showing a procedure for calculating distribution data of the number of units to be replaced with respect to the operating time of the excavator replaced in the past and creating a distribution map thereof.
  • FIG. 17 is a diagram illustrating an example of a distribution diagram of the number of units to be replaced with respect to the operating time of the excavator replaced in the past.
  • FIG. 18 is a flowchart showing a procedure for calculating distribution data of the past number of replaced parts with respect to the operation time and creating the distribution chart.
  • FIG. 19 is a diagram illustrating an example of a distribution diagram of the number of past packet nail exchanges with respect to the front operation time.
  • FIG. 20 is a diagram showing an example of a daily report transmitted to an in-house computer and a user-side computer.
  • FIG. 21 is a diagram illustrating an example of a daily report transmitted to an in-house computer and a user-side computer.
  • FIG. 22 is a diagram showing details of the configuration of the machine-side controller in the construction machine management system according to the second embodiment of the present invention.
  • Fig. 23 is a flowchart showing the function of collecting the operating time and the number of operations for each part of the excavator in the CPU of the fuselage-side controller.
  • FIG. 24 is a flowchart showing the processing functions of the aircraft / operation information processing unit of the base station server when the operation data is sent from the aircraft controller.
  • Fig. 25 is a diagram showing the storage status of operation data in the database of the base station center server.
  • FIG. 26 is a flowchart showing the processing function of the product replacement information in the product replacement / part replacement information processing unit of the base station center server.
  • FIG. 27 is a flowchart showing the function of processing the part replacement information in the product replacement / part replacement information processing unit of the base station center server.
  • Figure 28 is a diagram showing the storage status of the actual maintenance data and the replacement operating time data in the database of the base station center server.
  • FIG. 29 is a flowchart showing a procedure for obtaining distribution data of the number of operating vehicles with respect to the traveling distance of each model.
  • FIG. 30 is a diagram illustrating an example of a distribution diagram of the number of operating units of the hydraulic excavator of model Y with respect to the traveling distance.
  • FIG. 31 is a flowchart showing details of the process of obtaining distribution data of the number of operations and the number of operating units for each component in step S36A of FIG.
  • FIG. 32 is a flowchart showing details of the process of correcting the number of operations for each component in step S42A in FIG. 24 by load and obtaining distribution data of the number of operations and the number of operating units after the load correction. .
  • FIG. 33 is a diagram showing the load frequency distribution obtained in step 437 of FIG.
  • FIG. 34 is a diagram showing a relationship between a preset average excavation load DM and a load correction coefficient.
  • FIG. 35 is a diagram illustrating an example of a distribution diagram of the number of operating units with respect to the number of front operations on the packet nail.
  • FIG. 36 is a diagram illustrating an example of a distribution diagram of the number of operating vehicles with respect to the number of traveling operations on the traveling link.
  • Fig. 37 is a flow chart showing the procedure for calculating the distribution of the number of vehicles replaced with respect to the mileage of the hydraulic shovel that was replaced in the past in step S47A in Fig. 26 and creating the distribution map. It is.
  • FIG. 38 is a diagram illustrating an example of a distribution diagram of the number of replaced excavators with respect to the traveling distance of the excavator replaced in the past.
  • FIG. 39 is a flowchart showing the details of the processing for load-correcting and storing the number of operations on the replaced part in step S55 of FIG. 27.
  • FIG. 40 is a flowchart showing a procedure for calculating distribution data of the number of component replacements with respect to the number of times of operation in which the load has been corrected in step S56A of FIG. 27 and creating a distribution chart thereof.
  • FIG. 41 is a diagram illustrating an example of a distribution diagram of the number of past bucket claw replacements with respect to the number of front operations.
  • FIG. 42 is a flowchart showing the processing functions of the machine / operation information processing unit in the base station center server in the construction machine management system according to the second embodiment of the present invention.
  • FIG. 43 is a diagram illustrating an example of replacement information transmitted to the in-house computer 4.
  • Figure 44 shows the relationship between the trade-in price curve and the repair cost curve for determining the replacement decision time.
  • FIG. 1 is an overall schematic diagram of a construction machine management system including a construction machine sales forecasting system according to a first embodiment of the present invention.
  • the management system includes a hydraulic excavator 1 operating in the market. , La, lb, lc,... (hereinafter, represented by reference numeral 1), the airframe controller 2, the base station center server 3 installed in the head office, branch offices, production factories, etc., and the branch, service factory, It has an in-house computer 4 installed in a company such as a production factory, and a user-side computer 5.
  • the location of the base station server 3 may be other than the above, and for example, a rental company having a plurality of hydraulic excavators may be used.
  • the controller 2 of each excavator 1 is for collecting operation information of each excavator 1, and the collected operation information is transmitted to the ground station by satellite communication with the communication satellite 6 together with the aircraft information (model and unit number). 7 and transmitted from the ground station 7 to the base station center server 3.
  • the acquisition of operation information to the base station center server 3 may be performed by using the personal computer 8 instead of the satellite communication.
  • the serviceman downloads the operation information collected by the controller 2 to the personal computer 8 together with the machine information (model and unit number), and sends it from the personal computer 8 to a floppy disk or communication line. For example, it is taken into the base station center server 3 via a public telephone line, the Internet or the like.
  • the service technician can manually input and collect the inspection information and repair information during the periodic inspection, in addition to the machine and operation information of the excavator 1, and the information can also be collected by the base station center server 3. It is taken in.
  • FIG. 2 shows the details of the configuration of the fuselage side controller 2.
  • the controller 2 includes input / output interfaces 2a and 2b, a CPU (central processing unit) 2c, a memory 2d, a memory 2e, and a communication control unit 2f. I have.
  • Detection of front, turning, and running pilot pressure detection signals and the operating time of the engine 32 from the sensor group (described later) via the input / output interface 2a Signal, pump pressure detection signal of hydraulic system, oil temperature detection signal of hydraulic system, and engine speed detection signal.
  • the CPU 2c processes the input information into predetermined operating information using a timer (including a clock function) 2e and stores the processed operating information in the memory 2d.
  • the communication control unit 2f periodically transmits the operation information to the base station center server 3 by satellite communication. Also, the operation information is downloaded to the personal computer 8 through the input / output interface 2b.
  • the aircraft-side controller 2 further includes an R 0 M storing a control program for causing the CPU 2 c to perform the above-described arithmetic processing, and an RAM for temporarily storing data during the arithmetic operation.
  • a hydraulic shovel 1 includes a traveling body 12, a revolving body 13 provided rotatably on the traveling body 12, an operator cab 14 provided on a front left side of the revolving body 13,
  • the revolving body 13 is provided with a front work machine (excavation work device), that is, a front 15 which is provided at the center of the front part of the revolving body 13 so as to be able to move up and down.
  • the front 15 has a boom 16 rotatably provided on the revolving body 13, an arm 17 provided rotatably at the tip of the boom 16, and a pivot 17 provided at the tip of the arm 17. It consists of a bucket 18 provided as possible.
  • the hydraulic excavator 1 is equipped with a hydraulic system 20.
  • the hydraulic system 20 includes hydraulic pumps 2 la and 21, boom control valves 22 a and 22 b, arm control valves 23 and bucket control valves. 24, Swivel control valve 25, Travel control valve 26a, 26b, Boom cylinder 27, Arm cylinder 28, Bucket cylinder 29, Swivel motor 30, Run It has a line mode 31a and 31b.
  • the hydraulic pumps 21a and 21b are driven by a diesel engine (hereinafter simply referred to as an engine) 32 to discharge hydraulic oil, and the control valves 22a, 22b to 26a and 26b are hydraulic pumps 21a.
  • 21b controls the flow (flow rate and flow direction) of the pressurized oil supplied to the actuators 27-31a, 31b, and the actuators 27-31a, 3 lb are the boom 16 and arm 17
  • the bucket 18, the revolving superstructure 13, and the traveling superstructure 12 are driven.
  • the hydraulic pumps 12 a and 21 b, the control valves 22 a and 22 b to 26 a and 26 b, and the engine 32 are installed in a storage room behind the revolving unit 13.
  • a bucket cloud pilot pressure or a bucket dump pilot pressure is generated and applied to the bucket control valve 24.
  • a left-handed pilot pressure and a right-handed pilot pressure are generated and applied to the traveling control valves 26a and 26b.
  • the operation lever devices 33 to 36 are arranged in the cab 14 together with the controller 2.
  • the hydraulic system 20 as described above is provided with sensors 40 to 46. Sensor
  • Reference numeral 40 denotes a pressure sensor that detects the pilot pressure of the arm cloud as an operation signal of the front 15, and sensor 41 denotes a pressure sensor that detects the pilot pressure of the turning taken out via the shuttle valve 41 a. Is a pressure sensor for detecting the pilot pressure of the running taken out through the shuttle valves 42a, 42b, 42c.
  • the sensor 43 detects the ON / OFF of the key switch of the engine 32.
  • the sensor 44 is a pressure sensor that detects the discharge pressure of the hydraulic pumps 21a and 21b taken out via the shuttle valve 44a, that is, the pump pressure, and the sensor 45 is a sensor that detects the pump pressure. It is an oil temperature sensor that detects the temperature (oil temperature) of the hydraulic oil of the hydraulic system 1.
  • the rotation speed of the engine 32 is detected by a rotation speed sensor 46. The signals of these sensors 40 to 46 are sent to the controller 2.
  • the base station center server 3 includes input / output interfaces 3a, 3b, a CPU 3c, and a storage device 3d forming a data base 100.
  • the input / output interface 3a inputs the machine and operation information and inspection information from the machine-side controller 2, and the input / output interface 3b inputs component replacement information from the in-house computer 4.
  • the CPU 3c stores and accumulates the input information in the database 100 of the storage device 3d and processes the information stored in the database 100 to produce a daily report, a maintenance report, a medical certificate, and the like. They are created and transmitted to the in-house computer 4 and the user-side computer 5 via the input / output interface 3b.
  • the base station center server 3 is also provided with a ROM for storing a control program and a RAM for temporarily storing data in the middle of calculation in order to cause the CPU 3c to perform the above-described calculation processing.
  • FIG. 4 is a functional block diagram showing an outline of the processing functions of the CPU 3c.
  • the CPU 3c is composed of an airframe, an operation information processing unit 50, product replacement, a part replacement information processing unit 51, an inspection information processing unit 52, an in-house comparison judgment processing unit 53, and an external comparison judgment processing unit 54. It has each processing function.
  • Aircraft-Operational information processing unit 50 performs predetermined processing using operation information input from aircraft-side controller 2 and replaces products.
  • Parts replacement information processing unit 51 replaces products and replaces parts input from in-house computer 4. The specified process is performed using the information (described later).
  • the inspection information processing unit 52 stores and accumulates the inspection information input from the personal computer 8 in the database 100, and processes the information to create a medical certificate.
  • the in-house comparison and judgment processing section 53 and the out-of-office comparison and judgment processing section 54 are, respectively, airframe and operation information processing section 50, product replacement and parts replacement information processing section 51, and inspection information processing section 52.
  • the necessary information is selected from the information created in step 1 and the information stored and stored in the database 100, and transmitted to the in-house computer 4 and the user side combination 5.
  • the processing functions of the airframe controller 2 and the base station center server 3 ⁇ operation information processing unit 50 and product replacement ⁇ parts replacement information processing unit 51 will be described with reference to flowcharts.
  • the processing function of the machine-side controller 2 has a function of collecting operating time for each part of the hydraulic excavator, and correspondingly, the machine of the base station center server 3 and the operating information processing unit 50 have a function of processing operating time. There is.
  • the product replacement / part replacement information processing section 51 has a function of processing product replacement information and a function of processing component replacement information.
  • Fig. 5 is a flowchart showing the function of collecting the operating time of each part of the excavator in the CPU 2c of the controller 2.
  • Fig. 6 shows the communication of the controller 2 when transmitting the collected operating time data for each part. This is a flowchart showing the processing function of the control unit 2f.
  • the CPU 2c first determines whether or not the engine is operating based on whether or not the engine speed signal of the sensor 46 is equal to or higher than a predetermined speed (step S9). If it is determined that the engine is not running, repeat step S9. If it is determined that the engine is running, the process proceeds to the next step S10, in which data on the pilot pressure detection signals for the front, turning, and traveling of the sensors 40, 41, and 42 are read (step s). Ten ) . Next, for each of the read pilot pressures of the front, turning, and running, the time when the pilot pressure exceeded the predetermined pressure was calculated using the time information of the timer 2e, and the time was calculated in association with the date and time. Store and accumulate in d (step S12).
  • the predetermined pressure is a pilot pressure that can be regarded as operating the front, turning, and running.
  • the engine operating time is calculated using the time information of the timer 2e, and stored in the memory 2d in association with the date and time. (Step S14).
  • the CPU 2 performs such processing at predetermined cycles while the power supply of the controller 2 is ⁇ N.
  • each calculated time may be added to the previously calculated time stored in the memory 2d and stored as the cumulative operating time. Good.
  • the communication control unit 2f monitors whether or not the timer 2e has reached the QN (step S20).
  • the timer 2e is turned on, the front and the turn stored and stored in the memory 2d are stored.
  • the operation time and engine operation time (with date and time) and the machine information of each part of the traveling are read out (step S22), and these data are transmitted to the base station center server 3 (step S24).
  • evening time 2e is set to turn on at a fixed time of the day, for example, midnight.
  • the one-day operation time data for the previous day is sent to the base station center server 3.
  • the CPU 2c and the communication control unit 2f repeatedly perform the above processing every day.
  • the data stored in the CPU 2c is deleted after a predetermined number of days, for example, 365 days (one year) after being transmitted to the base station center server 3.
  • FIG. 7 is a flowchart showing the processing functions of the machine / operation information processing unit 50 of the server 1 when the machine 'operation information is sent from the machine-side controller 2.
  • the airframe and operation information processing unit 50 monitors whether or not the airframe 'operation information has been input from the airframe controller 2 (step S30). Is read and stored and accumulated in the database 100 as operation data (described later) (step S32). The aircraft information includes the model and the unit number as described above. Next, the operation data for a predetermined number of days, for example, one month, is read from the database 100, and a daily report on the operation time is created (Step S34).
  • the operation data of all the hydraulic shovels currently operating in the market are read from the database 100, and the distribution data of the number of operating units with respect to the operation time is calculated for each hydraulic shovel model and each component (step S36).
  • a distribution map of the number of operating units is created based on the distribution data (step S38) (described later). Then, the daily report and the distribution chart created in this way are transmitted to the in-house computer 4, and the daily report is transmitted to the user-side computer 5 (step S40).
  • FIG. 8 is a flowchart showing the function of processing the product replacement information in the product replacement / part replacement information processing section 51 of the center server 3.
  • Step S44 When the product replacement information is input, the information is read (Step S45), where the product replacement information is the old one replaced for replacement of the excavator.
  • the database 100 is accessed to read out the operation data of the unit number of the old excavator, and the latest engine operation time is used as the operation time until the excavator is replaced (hereinafter referred to as “replacement operation time as appropriate”). It is stored in 0 (step S46).
  • step S47 distribution data of the number of replaced units with respect to the operation time is calculated, and a distribution map of the number of replaced units is created based on this data (step S47) (described later).
  • FIG. 9 is a flowchart showing the function of processing the part replacement information in the product replacement / part replacement information processing section 51 of the server 1.
  • the product replacement / part replacement information processing section 51 monitors whether or not part replacement information has been input from the in-house computer 4 by, for example, a serviceman (step S50). Then, the information is read (step S52).
  • the part replacement information is the model and the unit number of the excavator whose part was replaced, the date when the part was replaced, and the name of the replaced part.
  • the part replacement time interval is the time interval from when one part is incorporated into the machine to when it is replaced by a new part after a failure or its life has expired. It is calculated based on the operating time of the relevant part. For example, in the case of baguette claws, the relevant part is the front, and the front operation time (digging time) from the time one packet pawl is attached to the fuselage to the time it is broken and replaced is 1500 hours.
  • the bucket claw replacement time interval is calculated to be 1500 hours. Then, the latest actual maintenance data is read out, distribution data of the number of replaced parts with respect to the operation time is calculated, and a distribution chart of the number of replaced parts is created based on the distribution data (step S56) (described later).
  • Fig. 10 shows the storage status of the operation data, the actual maintenance data, and the replacement operation time data in the database 100.
  • a database 100 stores and accumulates operation data for each model and unit (hereinafter referred to as an operation database), and stores and stores actual maintenance data for each model and unit (hereinafter referred to as an operation database).
  • an operation database stores and stores actual maintenance data for each model and unit (hereinafter referred to as an operation database).
  • an actual maintenance database There are two sections: an actual maintenance database), a database that stores the switching operation time for each model and unit (hereinafter referred to as the replacement database).
  • Each of these databases stores data as follows.
  • the engine operation time, front operation time (hereinafter, appropriately referred to as excavation time), turning time, and travel time are stored as integrated values corresponding to the date. ing.
  • TNE (1) and TD (1) are the integrated value of the engine operating time and the integrated value of the front operation time of Model A Unit N on January 1, 2000, respectively.
  • TD (K) is the accumulated value of the engine operation time and the accumulated value of the front operation time of the Type A Unit N on March 16, 2000, respectively.
  • the cumulative turning times T S (1) to TS (K) and the total running times TT (1) to ⁇ ( ⁇ ) of model A No. N are also stored in association with the date. The same applies to model N N + 1, N + 2, ' ⁇ , model B, model C,....
  • TFB (1) and TFB (L) are the integrated values of the bucket claw replacement time intervals for the first and L-th buckets of Model A, Unit A (for example, 3400 hr, 12500 hr based on the front operation time).
  • TTL (l) and TTL (M) are the integrated values of the exchange time intervals of the first and Mth travel links of Unit N (for example, 5100 hr, 14900 hr on a travel time basis). The same applies to model A's N + 1, N + 2, ..., model B, model C, ... You.
  • TX (1) is the operating time (for example, 3200 hrs based on engine operating time) until the replacement of the first machine of model A
  • TX (L) is the time of machine L of machine A. This is the operating time until replacement (for example, 30000 hr based on the engine operating time).
  • step S36 shown in FIG. 7 the aircraft information processing section 50 uses the data stored in the above-mentioned operation database to execute the procedures shown in the flowcharts of FIGS. 11 and 12 in the market.
  • the distribution data of the number of operating excavators with respect to the operating time of the operating excavator is calculated for each excavator model and component.
  • the operating time for each part is calculated based on the operating time for each part to which the part relates.
  • the “operating time of each part to which a part is related” means a part to which the part is related such as a bucket, a packet claw, a front pin (for example, a connecting pin between a boom and an arm), and the like. Is the operation time of the front 15 (excavation time). If the part to which the parts are related, such as the slewing transport and the slewing motor, is the slewing body 13, the slewing time, the traction motor, the traction link If the part to which the parts are related, such as the traveling roller and the like, is the traveling body 12, it is the traveling time.
  • the engine operating time is used.
  • the parts related to parts such as hydraulic oil, hydraulic oil pump, main pump, pilot pump, etc. are the hydraulic power source of the hydraulic system
  • the engine operating time is regarded as the operating time of the parts related to these parts. It is also possible to detect the operating time when the discharge pressure of the hydraulic pumps 21a and 21b is equal to or higher than a predetermined level, or to subtract the no-load time from the engine operating time and use that time as the operating time of the hydraulic power source.
  • FIG. 11 is a flowchart showing a procedure for obtaining distribution data of the number of operating units with respect to the engine operating time for each model.
  • step S60 the engine operation time of all the units of the model A is read from the operation database shown in FIG. 10 (step S60).
  • step S60 the engine operation time is divided into 1000 hours, and the hydraulic system in each operation time range of the engine operation time is separated. Calculate the number of lover. In other words, 0 to: L 0000 hr, 10001 to 20000 hr, 20001 to 30000 hr, 30001 to 40000 hr, 4000 Calculate the number of excavators in the engine operating time range of 1 hr or more (step S62 to Step S70).
  • step S72 the number of hydraulic excavators in each engine operating time range for every 10,000 hours for the models B, C,... Is calculated.
  • Fig. 13 shows an example of a distribution diagram of the distribution of the number of operating units to the operating time (engine operating time) of a model X hydraulic excavator.
  • the horizontal axis of Fig. 13 is the number of operating excavators, and the vertical axis is the operating time of the excavator.
  • FIG. 12 is a flowchart showing a procedure for obtaining distribution data of the number of operating units with respect to the operating time of each component.
  • step S81 in order to process all data of the machine numbers 1 to Z of the model A, it is determined whether or not the machine number N is equal to or less than Z (step S81). For example, the latest front operation time (excavation time) integrated value TD (K) of model A No. N is read from the operation database shown in FIG. 10 (step S82). Next, the latest value of the bucket N replacement time interval TFB (M) of the No. N machine in the actual maintenance database shown in Fig. 10 is read (step S83), and the bucket nail currently in use is calculated by the following equation. The operation time (front operation time) of the vehicle is calculated (TLB) (step S84).
  • TFB front operation time
  • ⁇ TLFB TD (K) -TFB (M)
  • This process is performed for all of the machine numbers 1 to Z, and the operation time (front operation time) of the bucket claw currently in use for all hydraulic excavators of model A (front operation time) ⁇ TLFB is calculated.
  • the front operation time ATLFB for each bucket claw is divided every 500 hours, and the number of hydraulic excavators included in each operation time range is calculated. That is, 0 ⁇ 500 hr, 501 ⁇ : L 000 hr, 1001 ⁇ 1500 hr, 1501 ⁇ 20
  • the number of hydraulic shovels included in each of the front operation time ranges of 00 hr and 201 hr or more is calculated, and distribution data of the number of operating shovels is obtained (step S85).
  • the traveling link of each hydraulic excavator of model A the operating time (traveling time) of each link is calculated, and distribution data of the number of operating units for every 250 hr is obtained (step S86).
  • the operating time is similarly calculated for the other parts, and the distribution data of the number of operating units for each predetermined operating time range is calculated.
  • the operating time is calculated for each of the parts of the model B, the model C, and so on, and the distribution data of the number of operating units in each predetermined operating time range is calculated (step S87).
  • a distribution diagram of the operating units is created in the processing of step S38 and step S40 shown in FIG. Output to the company computer.
  • Fig. 14 shows an example of a distribution diagram of the number of operating units with respect to the front operation time (digging time) of the packet claw
  • Fig. 15 shows an example of a distribution diagram of the number of operating units with respect to the traveling time of the traveling link.
  • the horizontal axis in Fig. 14 and Fig. 15 is the number of operating excavators, and the vertical axis is the front operation time (digging time) and running time.
  • the product replacement / part replacement information processing section 51 uses the data of the replacement database shown in FIG. 10 in step S47 shown in FIG. 8, and shows a flowchart in FIG. By such a procedure, the distribution data of the number of replaced products with respect to the operating time of the excavator replaced in the past is calculated, and a distribution chart of the number of replaced products is created based on this data.
  • step S90 the operation time until the replacement of all the models A is read from the replacement database shown in FIG. 10 (step S90).
  • step S92 the distribution data of the number of product replacements with respect to the operation time is calculated from the operation time data, and a distribution chart of the number of product replacements is created based on this data (step S92). It can be obtained by the same method as the calculation of the distribution data of the number.
  • step S94 the distribution data of the number of replaced products is calculated, and a distribution chart is created (step S94).
  • the system waits for an instruction from the serviceman (step S 966), and upon receiving the instruction, outputs the created distribution diagram of the number of replaced products to the in-house computer (step S 988).
  • FIG. 17 shows an example of a distribution diagram of the number of product replacements with respect to the operating time of hydraulic shovels replaced in the past.
  • the horizontal axis in Fig. 17 is the operating time of the excavator, and the vertical axis is the number of replaced products.
  • the product replacement / part replacement information processing section 51 uses the data of the actual maintenance database shown in FIG. 10 in step S56 shown in FIG. 9 and performs the procedure shown in the flowchart in FIG.
  • the distribution data of the past number of replaced parts with respect to the operating time is calculated, and a distribution chart of the number of replaced parts is created based on the distribution data.
  • the maintenance data of all the units of the model A is read from the actual maintenance database shown in FIG. 10 (step S100).
  • step S102 it is determined whether or not the machine number N is equal to or less than Z.
  • the exchange time interval ATFB (i) is calculated from the accumulated value of the exchange time interval by the following equation (step S104).
  • TFB (i) TFB (i) —TFB (i-1)
  • the packet nail replacement time interval ATFB (i) is the time interval (lifetime) from the time when one packet nail is assembled into the machine to the time when it has failed or expired and is replaced with a new bucket nail.
  • the time is a value based on the operation time (digging time) of the front, which is the part where the bucket claw is involved. Then, this process is performed for all of the machine numbers 1 to Z, and the data of the exchange time interval ATFB for each bucket claw of all the hydraulic excavators of model A is collected.
  • the distribution data of the number of parts replaced with respect to the replacement time interval is calculated from the replacement time interval.
  • a distribution chart of the number of parts to be replaced is created based on this (step S106). This distribution data can be obtained by the same method as the above-described calculation of the distribution data of the number of operating units. Similarly, for other parts such as travel links, the distribution data of the number of replaced parts is calculated, and a distribution map is created (step S). 1 0 8).
  • the distribution data of the number of parts to be replaced is calculated for model B and model (:,%) to create a distribution map (step S110), and then wait for an instruction from a service person (step S1). 1 2) If there is an instruction, the created distribution map of the number of parts to be replaced is output to an in-house computer (step S 114).
  • Fig. 19 shows an example of a distribution diagram of the past number of bucket claw replacements with respect to the front operation time.
  • the horizontal axis in Fig. 19 is the front operation time, and the vertical axis is the number of packet nail exchanges.
  • FIGS. 20 and 21 show examples of daily reports transmitted to the in-house computer 4 and the user's computer 5.
  • Figure 20 shows graphs and numerical values of each operating time for one month, corresponding to the date.
  • the left side of Fig. 21 graphically shows the operating time of each part and the no-load engine operating time in the past six months, and the right side of Fig. 21 the loaded engine operating time and the no-load engine time in the past six months.
  • This graph shows the transition of the ratio of engine operation time.
  • the user can grasp the use situation and the change of the use efficiency of his excavator in the past six months.
  • sensors 40 to 46 and controller 2 are provided as data measurement and collection means in each of a plurality of hydraulic excavators 1 operating in the market. 6 and the operation time of each part (controller 2, front 15, revolving body 13, traveling body 12, hydraulic pump 2 la, 2 1 b) with different operation time for each hydraulic excavator by the controller 2
  • the operating time of each part is measured and stored in the base station computer 3 as operating data as shown in FIG. 10, and the base station computer 3 reads out the operating data for each hydraulic excavator.
  • a distribution chart of the number of operating excavators with respect to the operating time of the excavator (engine operating time) is created and output. The number can be predicted.
  • the prediction of the number of replacement excavators can be performed, for example, in the following procedure.
  • the number of excavators exceeding the average operation time in the example shown in FIG. 13 is the operation time 20000 :! 2 000 units at 300 000 hrs, 300 000 units at 300 000 hrs, 400 000 units at 400 000 hrs, and 200 000 units at 400 000 hrs or more It is.
  • the base station computer 3 reads the operation data for each hydraulic shovel, and determines the front operation time (excavation time) and the travel time as shown in FIGS. 14 and 15. Since a distribution map of the number of operating units is created and output, it is possible to predict the number of replacements of parts related to the front and traveling vehicles in the next term by looking at the distribution map.
  • the prediction of the number of parts to be replaced can be performed in the following procedure, similarly to the above-described prediction of the number of replaced excavators.
  • the average operation time is based on the operation time of the part to which the part is related.
  • the distribution diagram shown in Fig. 14 shows the hydraulic pressure for which the front operation time (digging time) exceeds the average operation time.
  • the total number of shovels is 2,800, 2000 units with operating hours of 1001-1500 hrs, 600 units with 150-2000 hrs, and 200 units with more than 200 hrs.
  • the number of hydraulic excavators that will be used without replacing the bucket claws in the next term will be about It is estimated that there is 10%, and the number of hydraulic excavators that replace bucket claws is estimated to be 2520 units.
  • the number of hydraulic excavators to replace bucket claws is 2520
  • the number of bucket claws per unit is four, so the number of bucket claws to be replaced in the next term is expected to be 1 0080 I do.
  • the base station computer 3 reads the excavator replacement data and the operation data as shown in FIG. 10 and compares the operation time with the operation time of the excavator that was replaced in the past as shown in FIG. A distribution chart of the number of product replacements is created and output, so the average operating time until replacement of the excavator can be determined by referring to this distribution chart, and the number of replacements of the next year's hydraulic excavators can be predicted more accurately. .
  • the average operating time until the excavator is replaced is
  • step (1) the engine operating time is assumed to be 2000 hours, and the accuracy of prediction of the number of excavator replacements will be determined by the appropriateness of the assumed average operating time.
  • a distribution chart of the actual number of units to be replaced as shown in FIG. 17 can be obtained.
  • the operating time TA near the maximum number of units to be replaced in this distribution diagram is calculated as the average operating time until the excavator is replaced. can do.
  • the average operating time TA until replacement of the excavator reflects the past performance, and the number of replaced excavators can be more accurately predicted. For this reason, the sales volume of hydraulic excavators in the next term can be more accurately predicted, and a more appropriate production plan of hydraulic excavators can be made.
  • the base station computer 3 reads out the actual maintenance data (repair replacement data of parts) and the operation data as shown in FIG.
  • a distribution chart of past replacement counts of parts with respect to the operating time is created and output on the basis of the operating time of each part concerned, so the average operating time TB until the replacement of parts can be determined by referring to this distribution chart.
  • the number of parts to be replaced in the next term can be accurately predicted.
  • the average operating time until packet packet replacement is assumed to be 100 hours based on the front operation time in the procedure described in 2 above.
  • the accuracy of the prediction of the number of bucket claws to be replaced will also be determined.
  • a distribution chart of the actual number of replacements as shown in FIG. 19 is obtained.
  • the operation time TB near the maximum number of replacements in this distribution diagram is calculated as the average operation time until the replacement of the bucket claw. It can be.
  • the average operating time until the replacement of the bucket nails reflects the past results, and the number of bucket nail replacements can be more accurately predicted.
  • the sales volume of parts for the next term can be more accurately predicted, and a more appropriate production plan for parts can be set.
  • the excavator and its parts The production plan can be set appropriately.
  • inventory management can be performed appropriately, and excess inventory and product shortage can be minimized.
  • the above is the effect when the management subject is a manufacturer of the excavator. If the management subject is a rental company, that is, if the installation location of the base station center server 3 is a rental company, the Predicting the number of units to be replaced makes it possible to appropriately plan the number of excavators to be purchased and traded in, and to plan the number of parts to be procured, making budget planning easier and managing assets properly. .
  • the user is provided with a daily report of operation information and a medical certificate of a maintenance and inspection result as appropriate, so that the user can grasp the operation status of his excavator on a daily basis, and It becomes easier to manage the hydraulic excavator.
  • FIG. 22 to 41 A second embodiment of the present invention will be described with reference to FIGS. 22 to 41 in addition to FIGS. 1, 3, 4, and 10.
  • FIG. 10 the running distance is grasped as the operating state of the construction machine, and the number of units sold is predicted, and the number of operations is grasped as the operating state of each part, the number of parts sold is predicted.
  • the load is corrected for the operating state (number of operations).
  • This embodiment is suitable for the management of construction equipment having a high running capacity such as a wheel type hydraulic excavator, a wheel loader, a tractor, and the like.
  • the hydraulic excavator is, for example, a wheel type
  • the airframe controller 2 includes It is mounted on a hydraulic excavator.
  • FIG. 22 is a diagram showing the details of the aircraft-side controller 2 according to the present embodiment and the input signals thereof.
  • the controller 2 receives the detection signals of the traveling distance in addition to the detection signals of the pilot pressure of the front, turning, and traveling, the engine operating time, the pump pressure, the oil temperature, and the engine speed.
  • the mileage is measured by the odometer 48 of the wheel type hydraulic excavator.
  • Aircraft-side controller 2 has a function of collecting data on operating time, number of operations, and mileage, and a function of collecting frequency distribution data.
  • the operation information processing section 50 includes the operation time, the number of operations, and the mileage. There is a processing function for each data and a processing function for frequency distribution data.
  • FIG. 23 is a flowchart showing a function of collecting data of the operation time, the number of operations, and the mileage of the aircraft-side controller 2.
  • the controller 2 performs the processing of steps S9 to S14 in the same manner as in the first embodiment shown in FIG. However, step S
  • step S16A the number of front (excavation), turning, and traveling operations is counted from the read front, turning, and traveling operation pilot pressures, and stored in the memory 2d in association with the date and time. accumulate.
  • the number of operations counts as one when the pilot pressure exceeds a predetermined pressure.
  • the number of front operations is counted, for example, by the pilot pressure of the arm pull, which is essential for excavation work. Note that the operation pilot pressure of the boom, arm, and bucket may be counted as one time for each operation.
  • step S16A every time the number of operations is counted in step S16A, the pump pressure after the elapse of a predetermined time (for example, 2 to 3 seconds) is detected and stored in the memory 2d in association with the number of operations. (Step S17A;). Next, proceeding to step S18A, the detection signal of the traveling distance is read and stored in the memory 2d in association with the date and time.
  • a predetermined time for example, 2 to 3 seconds
  • the machine and operation information stored and accumulated in this way is sent to the base station center server 3 once a day as described with reference to FIG. 6 in the first embodiment.
  • FIG. 24 is a flowchart showing the processing functions of the aircraft / operation information processing unit 50 of the server 1 when the aircraft / operation information is transmitted from the aircraft controller 2.
  • Aircraft and operation information processing unit 50 monitors whether data is input from the airframe controller 2 (step S3OA), and when the data is input, the data, that is, the operating time data, the front, and the turning. Then, the data of each operation number of travel, the pump pressure, and the travel distance are read, and stored and accumulated in the database 100 as operation data (step S32A). Next, the operation data for a predetermined number of days, for example, one month, is read from the database 100, and the operation time, the number of operations, the pump pressure, and the mileage are read. A daily report is prepared (step S34A).
  • step S36A the operation data of all the hydraulic shovels currently operating in the market is read from the database 100, and the distribution data of the number of operating units with respect to the mileage of each model and the distribution of the number of operating units with respect to the number of operations of each part are calculated ( In step S36A), a distribution diagram of the number of operating units is created based on the distribution data (step S38A) (described later).
  • step S38A the distribution data for each component obtained in step S36A
  • step S42A distribution data of the number of operating units with respect to the number of operations for which the load is corrected is calculated (step S42A) (described later).
  • a distribution chart of the number of operating parts for each component and the number of operations for which the load has been corrected is created (step S43A).
  • the daily report and the distribution chart created in this way are transmitted to the in-house computer 4, and the daily report is transmitted to the user-side computer 5 (step S40A).
  • FIG. 25 shows the storage status of operation data in the database 100.
  • the mileage, the number of front operations (number of digs), the number of slewing operations, and the number of traversing operations are stored as integrated values corresponding to the dates.
  • D (1) and SD (1) are the accumulated mileage and the number of front operations for Unit A of Model A on January 1, 2000, respectively
  • D (K) and SD (K ) Are the accumulated mileage and the number of front operations on March 16, 2000 for Model A, Unit N, respectively.
  • the total number of turning operations SS (1) to SS (K) and the total number of traveling operations ST (1) to ST (K) for model A No. N are also stored in association with the date. The same applies to model N N + 1, N + 2,..., Model B, model C,....
  • the pump load frequency distribution is stored and accumulated in association with the date for each operation of the front, turning, and traveling sections.
  • the front operation area on January 1, 2000 0 MPa or more and less than 5 MPa: 12 times, 5 MPa or more and less than 1 OMPa: 32 times, ..., 25 MPa
  • the number of operations is stored for each pump pressure band of 5 MPa, such as 28 to 30 MPa or more: 9 to 30 MPa or more.
  • the pump load frequency is stored in the area of the turning operation, the traveling operation, and the area of the date thereafter.
  • the product replacement / part replacement information processing section 51 monitors whether or not the product replacement information has been input from the in-house computer 4 by, for example, a service person (step S44A). Is read (step S45A).
  • the product replacement information is the model and unit number of the old hydraulic excavator replaced for replacement of the hydraulic excavator, the model and unit number of the new hydraulic excavator, and the date of the replacement date.
  • the database 100 is accessed to read the operation data of the unit number of the old excavator, and the latest travel distance is used as the travel distance until the excavator is replaced (hereinafter referred to as “replacement distance as appropriate”). Stored in 0 (step S4 6A).
  • step S47A the distribution data of the number of replaced products with respect to the mileage is calculated, and a distribution diagram of the number of replaced products is created based on this data (step S47A) (described later). ).
  • FIG. 27 is a flowchart showing the function of processing the part replacement information in the product replacement / part replacement information processing section 51 of the center server 3.
  • the processing of steps S50 to S54 in FIG. 27 is the same as the flowchart shown in FIG.
  • the database 100 is accessed, the operation data of the same unit number is read, and the number of operations on the replaced part is calculated based on the number of operations on the part to which the replaced part is related. It is stored as actual maintenance data in 0 and stored (Step S54A) (described later).
  • the number of operations is load corrected, and the number of operations whose load is corrected is also stored and accumulated in database 100 as actual maintenance data (step S55) (described later).
  • step S56A the latest actual maintenance data is read out, the distribution data of the number of replaced parts with respect to the number of operations for which the load is corrected is calculated, and a distribution chart of the number of replaced parts is created based on the distribution data (step S56A) ( See below).
  • Fig. 28 shows the storage status of the mileage data that was replaced in the database 100 during the actual maintenance data on the number of operations.
  • the actual number of operations and the load-corrected number of operations in the replacement time interval of the previously replaced parts for each model and for each unit are shown on the basis of the results for each model and each unit in the database 100. It is stored as an integrated value based on the number of times of operation of the part related to.
  • SFB (1) and SFB (L) are the integrated values of the number of front operations for the first and L-th bucket pawls of model A No. N (for example, 6800 times and 25000 times).
  • S 'FB (l) and S' FB (L) are the integrated values (for example, 6200 times and 21200 times) of the number of front operations after load correction for the same packet nail.
  • M is the integrated value of the number of travel operations for the first and M-th travel links of Unit N (for example, 1610 times, 10200 times), and S 'TL (1) and S' TL (M) are This is the integrated value (for example, 1820 times and 1 1800 times) of the number of travel operations for each of the same travel links after load correction.
  • N for example, 1610 times, 10200 times
  • S 'TL (1) and S' TL (M) are This is the integrated value (for example, 1820 times and 1 1800 times) of the number of travel operations for each of the same travel links after load correction. The same applies to model A's N + 1, N + 2,....
  • the mileage of the old excavator that has been replaced is stored for each model and unit.
  • DX (1) is the mileage (for example, 3200 km) before the replacement of Unit 1 of model A.
  • (L) is the mileage (for example, 3000 Km) before the replacement of Model A L Unit.
  • FIG. 29 is a flowchart showing the details of the process of obtaining distribution data of the mileage and the number of operating vehicles for each model in step S36A of FIG.
  • the mileage of all the units of model A is read from the operation data base (step S6OA).
  • the mileage is divided into 1000 km and the number of excavators in each range of mileage is calculated. In other words, 0 to: L 000 Km, 1001 to 2000 Km, 2001 to 3000 Km, 3001 to 4000 Km, and calculate the number of excavators within the travel distance range of 4001 Km or more (Step S 62 A to Step S 62 A) 7 OA;).
  • step S72A the number of hydraulic excavators within the traveling distance range of every 1000 km is calculated for the model B and the model (:, %) (step S72A).
  • Fig. 30 shows an example of a distribution diagram. The distribution map of the number is shown.
  • the horizontal axis in Fig. 30 is the number of operating hydraulic excavators, and the vertical axis is the traveling distance of the hydraulic excavator.
  • FIG. 31 is a flowchart showing the details of the process for obtaining distribution data of the number of operations and the number of operating units for each component in step S36A of FIG.
  • step S81A in order to perform processing on all data of the unit numbers 1 to Z of the model A, it is determined whether or not the unit number N is equal to or smaller than Z.
  • the latest integrated value SD (K) of the number of front operations of model A No. N is read from the operation database shown in step 25 (step S82A).
  • the latest accumulated value SFB (M) of the number of baguette claw operations of Unit N based on the actual maintenance data shown in Fig. 28 is read.
  • Step S83A the number of front operations ASLFB for the currently used bucket claw is calculated by the following equation (Step S84A).
  • This process is performed for all of the machine numbers 1 to Z, and the number of front operations ASLFB for the currently used bucket claw is calculated for all hydraulic excavators of model A.
  • the number of front operations ASLFB for each bucket claw is divided every 1000 times, and the number of hydraulic excavators included in each operation frequency range is calculated.
  • the number of operations (the number of traveling operations) for each link is calculated, and distribution data of the number of operating units for every 500 operations is obtained (step S86A).
  • the number of operations is similarly calculated for other parts, and distribution data of the number of operating units in each predetermined number of operations is calculated.
  • step S87A the number of operations is calculated for each of the parts of the model B, the model C, and so on, and the distribution data of the number of operating units in each predetermined operation number range is calculated.
  • FIG. 32 is a flow chart showing the details of the process of performing load correction on the number of operations for each component in step S42A in FIG. 24 and obtaining distribution data of the number of operations and the number of operating units after the load correction. .
  • step S430 the model of the hydraulic excavator to be verified and the unit number (for example, N) are set (step S430).
  • the latest integrated value TD (K) of the excavation time of the set No. N is read from the operation data base shown in FIG. 10 (step S433).
  • the latest integrated value TFB (M) of the packet nail exchange time interval of the set No. N is read from the actual maintenance database shown in FIG. 10 (step S433).
  • step S433 the current bucket nail operating time A TLFB is calculated as follows (step S433).
  • ⁇ TLFB TD (K)-TFB (M)
  • step S437 the data of the front operation area of the pump load frequency distribution is read from the operation database shown in Fig. 25, and the front operation load frequency distribution (excavation load frequency distribution) during the current bucket claw operation time A TLFB is read. ) Is calculated (step S437).
  • step S 438 an average excavation load DM per one operation of the current bucket claw is calculated. This calculation is performed, for example, as follows.
  • FIG. 33 is a diagram showing the load frequency distribution obtained in step 437. From this distribution, the product of each pump pressure and the number of front operations is obtained, and the sum of them is divided by the number of front operations to obtain the average excavation load per operation number, which is referred to as the average excavation load DM. Alternatively, the position of the center of gravity (marked by X) of the integrated value of the load frequency distribution shown in Fig. 33 may be obtained, and the pump pressure at this position of the center of gravity may be used as the average excavation load DM.
  • a load correction coefficient ⁇ is then obtained from the average digging load DM (step S 440). This calculation is performed using, for example, a relationship between a preset average excavation load DM and a load correction coefficient ⁇ as shown in FIG.
  • the relationship between the average excavation load DM and the load correction coefficient ⁇ is 1 when DM is the standard load, and when DM is larger than the standard load, the string gradually becomes larger than 1 and DM becomes larger than the standard load. It is set so that ⁇ becomes smaller gradually than 1 when it gets smaller.
  • the load correction coefficient is obtained in this way, the current number of bucket claw operations AS LFB is corrected with the correction coefficient ⁇ as follows, and the number of correction operations AS ′ LFB is obtained (step S444).
  • step S43A and step S4OA shown in FIG. A diagram is created and output to the company computer.
  • Fig. 35 shows an example of a distribution diagram of the number of operating vehicles with respect to the number of front operations with load correction
  • Fig. 36 shows an example of a distribution diagram of the number of operating vehicles with respect to the number of traveling operations with load correction.
  • the horizontal axis in Fig. 35 and Fig. 36 is the number of operating hydraulic excavators, and the vertical axis is the number of front operations and traveling operations after load correction.
  • FIG. 37 is a flowchart showing the distribution of the number of replaced products and the process of creating a distribution chart in step S47A of FIG. 26 in detail.
  • the mileage up to the replacement of all units of model A is read from the replacement database shown in Fig. 28 (step S9OA).
  • the distribution data of the number of product replacements with respect to the mileage is calculated from the night of the mileage, and a distribution map of the number of product replacements is created based on the data (step S92A).
  • step S92A the distribution map of the number of replaced products
  • the system waits for an instruction from the serviceman (step S996A), and upon receiving the instruction, outputs the distribution map of the number of replaced products to the in-house computer (step S98A).
  • Fig. 38 shows an example of a distribution diagram of the number of product replacements with respect to the traveling distance of the excavator.
  • the horizontal axis in Fig. 38 is the travel distance of the excavator, and the vertical axis is the number of products replaced.
  • DA is the mileage near the maximum number of vehicles replaced in the distribution map, that is, the average mileage.
  • FIG. 3 ⁇ is a flowchart showing the details of the processing for load-correcting and storing the number of operations on the replaced part in step S55 of FIG. 27.
  • TFB (i) TFB (i) -TFB (i-1)
  • the bucket claw replacement time interval ATFB (i) is a value based on the front operation time (digging time).
  • Step S404 the data in the front operation area of the pump load frequency distribution of Unit A of Model A in the operation database shown in Fig. 25 is read, and the frequency distribution of the excavation load at each bucket claw replacement time interval ATFB (i) is calculated.
  • the calculation of this frequency distribution is the same as that shown in Figure 33 except that the excavation operation time is at the exchange time interval ATFB (i).
  • This process is performed for all of the machine Nos. 1 to Z, and the data of the frequency distribution of the excavation load and the number of operation times ASFB (i) at each packet claw replacement time interval ATFB (i) for all the hydraulic excavators of model A are obtained. collect.
  • an average digging load DM (i) per operation of each packet claw corresponding to the exchange time interval ATFB (i) is calculated (step S408), and the load is corrected from the average digging load DM (i).
  • the coefficient (i) is obtained (step S410).
  • This processing is substantially the same as the processing in steps S438 and S440 of the flowchart shown in FIG.
  • the operation number ASFB (i) of each bucket claw obtained in step S406 is corrected by the correction coefficient a (i) as follows, and the load-corrected operation number AS 'FB (i) is obtained to obtain the distribution data Is stored in the database (step S412).
  • ⁇ S 'FB ASFBX a
  • the distribution data of the number of operations whose load has been similarly corrected is calculated and stored in the database (step S114).
  • the distribution data of the number of operations with load correction is calculated and stored in the data base (step S116).
  • FIG. 40 is a flowchart showing the details of the process of calculating the distribution data of the number of component replacements with respect to the number of times of the load-corrected operation in step S56A of FIG. 27 and creating a distribution diagram.
  • step S10OA the maintenance data of all the units of the model A is read from the actual maintenance database shown in FIG. 28.
  • step S102A it is determined whether or not the machine number N is equal to or less than Z.
  • the number of front operations ASFB (i) is calculated from the integrated value of the number of front operations by the following equation (step S104A).
  • Step S 106 A to create a diagram.
  • the distribution data of the number of replaced parts is calculated for other parts such as the traveling link, and a distribution map is created (step S108A).
  • the distribution data of the number of parts to be replaced is calculated for model B and model (:,%) to create a distribution diagram (step S11 OA)
  • a service man Waiting for an instruction step S112
  • the distribution map of the number of replaced parts created when the instruction is issued is output to an in-house computer (step S114).
  • Figure 41 shows an example of a distribution diagram of the number of past bucket claw replacements with respect to the number of front operations. Is shown. .
  • the horizontal axis is the number of front operations
  • the vertical axis is the number of baguette claws to be replaced.
  • DB is the mileage near the maximum number of exchanges in the distribution map, that is, the average mileage.
  • the prediction of the number of replaced excavators and the number of replaced parts can be performed using FIGS. 38 and 41 in the same manner as in the first embodiment. it can.
  • the manufacturer of the excavator can appropriately make a production plan for the excavator and its components.
  • inventory management can be performed appropriately, and excess inventory and product shortage can be minimized.
  • a hydraulic excavator rental company can appropriately plan the number of hydraulic excavators to be purchased and traded in, and the number of parts to be procured, making budget planning and asset management appropriate. It can be carried out.
  • the life of parts varies depending on the degree of load at each part.
  • the load for each part is measured and stored as operation data in the database 100 of the base station computer 3, and the data is stored according to the degree of the load. Since the operating state (number of operations) is load-compensated using the load-corrected operating state (number of operations), the number of parts to be repaired or replaced for each part is predicted, so that fluctuations in life due to differences in load can be corrected. Therefore, the number of repaired and replaced parts can be more accurately predicted.
  • the number of operations of each part is load-corrected, but the load may also be corrected for the traveling distance in the same manner, thereby correcting the change in the replacement timing of the hydraulic shovel due to the difference in load.
  • the number of excavator replacements can be more accurately predicted.
  • the operation time of the hydraulic excavator and the operation time of each part are used as they are, but the load is also corrected for these operation times in the same manner as the number of operations in the second embodiment.
  • the prediction accuracy can be improved.
  • a third embodiment of the present invention will be described with reference to FIGS. This embodiment predicts the number of units to be replaced using a separately determined replacement determination time instead of the average operation time.
  • the overall configuration of the construction machine management system according to the present embodiment is the same as that of the first embodiment, and has the same system configuration as the first embodiment shown in FIGS. 1 to 3. . Also, the aircraft-side controller 2 and the base station center one server 3 have the same processing functions as those described with reference to FIGS. 4 to 26, except for the following points. Hereinafter, differences from the first embodiment will be described.
  • FIG. 42 is a flowchart showing the processing functions of the machine / operation information processing unit 50 of the center server 3 according to the present embodiment.
  • steps S30 to S36 is the same as the processing of the first embodiment shown in FIG. 42.
  • step S36 After calculating the distribution data of the operation time in step S36, the operation data of all the hydraulic shovels currently in operation is read from the operation database portion of the database 100 shown in FIG. 10, and the operation time is calculated for each model. Calculates the number of hydraulic shovels that have exceeded the replacement judgment time set in advance and stores them in the database 100 as replacement information (step S38B). Then, the replacement information thus created is transmitted to the in-house computer 4 together with the daily report, and the daily report is transmitted to the user-side computer 5 (step S40B).
  • FIG. 43 shows an example of replacement information transmitted to the in-house computer 4.
  • the replacement judgment time can be determined, for example, as follows.
  • construction equipment such as hydraulic excavators decrease trade-in prices and increase repair costs as the operating time increases, as shown in Figure 44. Therefore, basically, the point P where the trade-in price curve X1 and the repair cost curve X2 intersect can be said to be the optimal replacement time. Therefore, a short time before the optimal replacement time is a preferable time for recommending replacement to the user, and the replacement determination time is set in consideration of this.
  • the curve in Fig. 44 is only a standard one, and the price and repair cost will increase or decrease depending on the condition of the construction equipment. Therefore, it is desirable to set the replacement judgment time taking this into consideration.
  • the optimal replacement timing may be determined from the survey results and the operating time, and the replacement determination time may be set based on that.
  • the replacement judgment time is set to a different value depending on the model.
  • the sales volume of the excavator can be accurately predicted, and as a result, the production plan of the excavator can be appropriately set.
  • the fact that the operating time of the excavator has exceeded the replacement determination time indicates that it is time to recommend replacement of the excavator. Therefore, sales can be promoted to the user based on the result obtained in step S38B.
  • the number of parts to be replaced is directly predicted from the operation data of the replaced parts with respect to the prediction of the number of replaced parts.
  • repairs including overhaul
  • the number of parts to be repaired may be estimated first, and the number of parts to be replaced required for the repair may be estimated from the man-hours required for repairing this part.
  • the manpower required for the repair can be predicted, and an appropriate staffing plan can be established.
  • the calculation and setting of the reference value are performed.
  • a reference value average operating time
  • the distribution data and the distribution map of the number of operating excavators with respect to the operating time of the excavator operating in the factory are created and transmitted daily together with the creation and transmission of the report by the center server 3.
  • the frequency may be different, such as not every day, or only creating distribution data every day, and creating and sending distribution maps every week.
  • the creation of the distribution data may be performed automatically by the center server 3, and the creation and transmission of the distribution map may be performed using an in-house computer and instructed by a service person. Ma In addition, both may be performed under the direction of a service person.
  • the distribution data and the distribution chart of the number of replaced products with respect to the operation time of the replaced old hydraulic excavator, and the distribution data and the distribution diagram of the number of replaced parts with respect to the operation time are defined as the product replacement data and the component replacement. This was performed each time data was input, but this may also be performed at another timing, such as performing it all at once at an appropriate time.
  • the engine operation time was measured using the engine speed sensor 46, but the sensor 43 may be used to detect the ON / OFF of the engine key switch and use this signal and the timer to measure. Alternatively, measurement may be made by turning on and off the alternator's power generation signal attached to the engine, and by measuring the engine's operating time by rotating the hour meter during the power generation.
  • the information created by the center server 3 is transmitted to the user and the company, but may be returned to the excavator 1.
  • the prediction of the sales number of a construction machine can be performed correctly, and the production plan of a construction machine can be set appropriately. For this reason, inventory management of construction machinery can be performed appropriately, and excess inventory and product shortage can be minimized.
  • a hydraulic excavator rental company can appropriately plan the number of excavators to be purchased and traded in, and the number of parts to be procured, which facilitates budget planning and asset management. Can be performed appropriately.

Description

明細書 建設機械の管理方法及びシステム並びに演算処理装置 技術分野
本発明は建設機械の管理方法及びシステム並びに演算処理装置に係わり、 特に、 油圧ショベルのようにフロント作業機部、 旋回部、 走行部等、 稼動状態の異なる 複数の部位を有する建設機械の管理方法及びシステム並びに演算処理装置に関す る。 背景技術
油圧ショベル等の建設機械のメーカは、 一般的に、 期毎に景気の動向や過去の 製品の販売台数等を検討し、 来期の製品 (建設機械本体及びその部品) の生産計 画を立てている。 発明の開示 '
製品の生産計画を立てるのに過去の製品の販売台数を検討するのは、 過去の製 品の販売台数から入れ替え台数 (ユーザの製品の買い替えによる新、 旧製品の入 れ替え台数 =ュ一ザの買い替え台数) を予測するためである。
しかし、 油圧ショベル等の建設機械の寿命はユーザ側での製品の稼動状況によ り影響を受け、 販売後の月日の経過時間が短くても、 ユーザ側の稼動時間が長け れば早く寿命が来るし、 逆に、 販売後の月日の経過時間が長くても、 その間の稼 動時間が短ければまだ十分に使用可能である。
従来は、 製品の実際の稼動時間ではなく、 販売後の経過時間から製品の入れ替 え台数を予測していたため、 製品の販売台数の正確な予測を行えなかった。 この ため、 製品の生産計画も適切に行えず、 過剰在庫や製品不足を生じがちであった。 また、 油圧ショベル等の建設機械の部品の実際の稼動状態 (稼動時間、 稼動回 数等) はその部品が係わる部位によって異なる。
つまり、 油圧ショベルの部品のうち、 メインポンプやパイロットポンプはェン '稼動時に稼動する部品であり、 アームやバゲット、 バゲット爪はフロント操 作 (掘削) 時に稼動する部品であり、 旋回輪や旋回モー夕は旋回時に稼動する部 品であり、 走行モー夕や走行リンク、 走行ローラは走行時に稼動する部品である。 ここで、 エンジンはキースィッチを O Nすることで稼動するのに対して、 フロ ント、 旋回体、 走行体はエンジン稼動中にオペレータが操作したときに稼動する ものであり、 例えばエンジン稼動時間、 フロント操作時間、 旋回時間、 走行時間 はそれぞれ異なる値をとる。
従来は、 部位毎の稼動状態を把握できなかったため、 部品の交換時期の予測も 正確に行えず、 部品の販売個数の予測も正確に行えなかった。 このため、 部品の 生産計画も適切に行えず、 過剰在庫や製品不足を生じがちであった。
本発明の第 1目的は、 建設機械の販売台数の予測を正確に行うことができ、 建 設機械の適切な生産計画を立てることができる建設機械の管理方法及びシステム 並びに演算処理装置を提供することである。
本発明の第 2目的は、 建設機械の部品の販売個数の予測を正確に行うことがで き、 部品の適切な生産計画を立てることができる建設機械の管理方法及びシステ ム並びに演算処理装置を提供することである。
( 1 ) 上記第 1の目的を達成するために、 本発明は、 建設機械の管理方法にお いて、 市場で稼動する複数台の建設機械のそれぞれの稼動状態を計測し、 これを 基地局コンピュータに転送しデータベースに稼動デ一夕として格納、 蓄積する第 1手順と、 前記基地局コンピュータにおいて、 前記稼動データを統計処理し、 建 設機械の入れ替え台数の予測データを生成し出力する第 2手順とを有し、 前記予 測データを用いて建設機械の入れ替え台数を予測するものとする。
このように建設機械のそれぞれの稼動状態を稼動データとして格納、 蓄積し、 建設機械の入れ替え台数の予測データを生成して予測をすることにより、 実際の 稼動状態に基づいて建設機械の入れ替え台数を予測することになり、 その予測を 正確に行うことができる。 その結果、 建設機械の販売台数の予測を正確に行うこ とができ、 建設機械の適切な生産計画を立てることができる。
( 2 ) 上記 (1 ) において、 好ましくは、 前記第 2手順は、 前記予測デ一夕と して、 前記稼動データに基づき、 現在稼動している建設機械の稼動状態とその稼 動台数との第 1相関を求める第 3手順を有し、 前記第 1相関により建設機械の入 れ替え台数を予測する。
これにより建設機械の入れ替え台数の予測データを生成できる。
( 3 ) 上記 (2 ) において、 好ましくは、 前記第 2手順は、 前記予測データと して、 過去に入れ換えられた建設機械の入れ替えデータと稼動データに基づき、 過去の建設機械の稼動状態とその入れ替え台数との第 2相関を求める第 4手順を 更に有し、 前記第 1相関と第 2相関とを比較し建設機械の入れ替え台数を予測す る。
このように過去の建設機械の稼動状態とその入れ替え台数との第 2相関を求め、 上記の第 1相関と比較することにより、 過去の実績を反映して建設機械の入れ替 え台数を予測することになり、 その予測を更に正確に行うことができる。
( 4 ) また、 上記 (1 ) において、 前記第 2手順は、 前記予測データとして、 前記稼動データから現在稼動している建設機械のうち稼動状態が予め定めた基準 値を超えている台数を求める第 5手順を有し、 この台数に基づいて建設機械の入 れ替え台数を予測する。
これにより現在の稼動データに基づいて建設機械の入れ替え台数の予測を正確 に行うことができる。
( 5 ) 上記 (4 ) において、 前記基準値は、 例えば過去に入れ換えられた建設 機械の平均稼動状態である。
これにより過去の実績を反映して建設機械の入れ替え台数の予測を更に正確に 行うことができる。
( 6 ) 上記 (5 ) において、 前記第 2手順は、 過去に入れ換えられた建設機械 の入れ替えデータと稼動データに基づき、 過去の建設機械の稼動状態とその入れ 替え台数との相関を求める第 6手順を更に有し、 前記平均稼動状態は前記相関か ら求めた値である。
これにより基準値としての過去に入れ換えられた建設機械の平均稼動状態を求 めることができる。
( 7 ) 上記 (1 ) 〜 ( 6 ) において、 好ましくは、 前記稼動状態は稼動時間と 走行距離の少なくとも一方である。 これにより稼動時間と走行距離のいずれかを用い、 建設機械の入れ替え台数を 予測することができる。
( 8 ) また、 上記 (4 ) において、 前記稼動状態が稼動時間であり、 前記基準 値は、 下取り価格曲線と修理コスト曲線の交点から求めた定めた買替判定時間で あってもよい。
これによつても建設機械の入れ替え台数を予測できる。
また、 稼動時間が買替判定時間を超えているということは、 その建設機械の買 替を推奨すべき時期に達していることを示している。 そこで、 ユーザに対して売 り込みを行い、 販売促進を図ることができる。
( 9 ) また、 上記第 2の目的を達成するために、 本発明は、 建設機械の管理シ ステムにおいて、 巿場で稼動する複数台の建設機械のそれぞれについて部位毎の 稼動状態を計測し、 これらの稼動状態を基地局コンピュータに転送しデータべ一 スに稼動データどして格納、 蓄積する第 1手順と、 前記基地局コンピュータにお いて、 前記稼動データを統計処理し、 各部位に係わる部品の修理交換個数の予測 データを生成し出力する第 2手順とを有し、 前記予測データを用いて各部位に係 わる部品の修理交換個数を予測するものとする。
このように建設機械のそれぞれについて部位毎の稼動状態を稼動データとして 格納、 蓄積し、 各部位に係わる部品の修理交換個数の予測データを生成して予測 することにより、 実際の稼動状態に基づいて部品の修理交換個数を予測をするこ とになり、 その予測を正確に行うことができる。 その結果、 部品の販売個数の予 測を正確に行うことができ、 部品の適切な生産計画を立てることができる。
( 1 0 ) 上記 (9 ) において、 前記第 2手順は、 前記予測データとして、 前記 稼動データに基づき、 現在稼動している建設機械の部位毎の稼動状態とその稼動 台数との第 1相関を求める第 3手順を有し、 前記第 1相関より各部位に係わる部 品の修理交換個数を予測する。
これにより部品の修理交換個数の予測データを生成できる。
( 1 1 ) 上記 (1 0 ) において、 好ましくは、 前記第 2手順は、 前記予測デー 夕として、 過去に修理交換した部品の修理交換データと稼動データに基づき、 そ の部品が係わる部位毎の過去の稼動状態と修理交換個数との第 2相関を求める第 4手順を更に有し、 前記第 1相関と第 2相関とを比較し各部位に係わる部品の修 理交換個数を予測する。
このように過去の稼動状態と修理交換個数との第 2相関を求め、 上記の第 1相 関と比較することにより、 過去の実績を反映して部品の修理交換個数を予測する ことになり、 その予測を更に正確に行うことができる。
( 1 2 ) また、 上記 (9 ) において、 好ましくは、 前記第 1手順は、 前記部位 毎の稼動状態に加えて部位毎の負荷を計測し、 前記基地局コンピュータのデータ ベースに稼動データとして格納、 蓄積し、 前記第 2手順は、 前記負荷の程度に応 じて前記稼動状態を負荷補正する第 5手順を更に有し、 この負荷補正した稼動状 態を稼動データとして用いて前記予測デ一夕を生成する。
建設機械にあっては、 部位毎に稼動状態だけでなく負荷も異なり、 各部位の負 荷の程度によっても部品の寿命 (交換時間間隔) が変動する。 つまり、 異なる建 設機械の同じ部位の部品であっても、 高負荷で稼動する頻度の高い部位の部品は 寿命が短く、 低負荷で稼動する頻度の高い部位の部品は寿命が長い。 従って、 部 位毎の稼動状態を負荷補正し、 これを稼動データとして用い予測データを生成し、 部品の修理交換個薮を予測することにより、 その予測をより正確に行うことがで さる。
( 1 3 ) また、 上記 (9 ) 〜 (1 2 ) において、 好ましくは、 前記稼動状態は 稼動時間と操作回数の少なくとも一方である。
これにより稼動時間と走行距離のいずれかを用い、 部品の修理交換個数を予測 することができる。
( 1 4 ) 更に、 上記 (9 ) 〜 (1 2 ) において、 好ましくは、 前記建設機械は 油圧ショベル (1 ) であり、 前記部位は、 油圧ショベルのフロント、 旋回体、 走 行体、 エンジン、 油圧ポンプのいずれかである。
これにより油圧ショベルのフロント、 旋回体、 走行体エンジン、 油圧ポンプに 係わる部品について修理交換個数を予測することができ、 それらの生産計画を適 切に行うことができる。
( 1 5 ) 更に、 上記第 1の目的を達成するために、 本発明は、 建設機械の管理 システムにおいて、 市場で稼動する複数台の建設機械のそれぞれの稼動状態を計 測、 収集する稼動データ計測収集手段と、 基地局に設置され、 前記計測、 収集し た建設機械の稼動状態を稼動データとして格納、 蓄積するデータベースを有する 基地局コンピュータとを備え、 前記基地局コンピュータは、 前記稼動データを統 計処理し、 建設機械の入れ替え台数の予測データを生成し出力する演算手段とを 有し、 前記予測データを用いて建設機械の入れ替え台数を予測する。
(16) 上記 (15) において、 好ましくは、 前記演算手段は、 前記予測デ一 夕として、 前記稼動データに基づき、 現在稼動している建設機械の稼動状態とそ の稼動台数との第 1相関を求める第 1手段を有し、 前記第 1相関により建設機械 の入れ替え台数を予測する。 、
(17) 上記 (16) において、 好ましくは、 前記演算手段は、 前記予測デ一 夕として、 過去に入れ換えられた建設機械の入れ替えデータと稼動データに基づ き、 過去の建設機械の稼動状態とその入れ替え台数との第 2相関を求める第 2手 段を更に有し、 前記第 1相関と第 2相関とを比較し建設機械の入れ替え台数を予 測する。
(18) また、 上記 (15) において、 好ましくは、 前記演算手段は、 前記予 測データとして、 前記稼動データから現在稼動している建設機械のうち稼動状態 が予め定めた基準値を超えている台数を求める第 3手順を有し、 この台数に基づ いて建設機械の入れ替え台数を予測する。
(19) 上記 (18) において、 前記基準値は、 例えば過去に入れ換えられた 建設機械の平均稼動状態である。
(20) 上記 (19) において、 好ましくは、 前記演算手順は、 過去に入れ換 えられた建設機械の入れ替えデ一夕と稼動データに基づき、 過去の建設機械の稼 動状態とその入れ替え台数との相関を求める第 4手順を更に有し、 前記平均稼動 状態は前記相関から求めた値である。
(21) また、 上記 (15) 〜 (20) において、 好ましくは、 前記稼動状態 は稼動時間と走行距離の少なくとも一方である。
(22) また、 上記 (18) において、 前記稼動状態が稼動時間であり、 前記 基準値は、 取り価格曲線と修理コスト曲線の交点から求めた定めた買替判定時間 であってもよい。 ( 2 3 ) また、 上記第 2の目的を達成するために、 本発明は、 建設機械の管理 システムにおいて、 市場で稼動する複数台の建設機械のそれぞれについて部位毎 の稼動状態を計測、 収集する稼動データ計測収集手段と、 基地局に設置され、 前 記計測、 収集した部位毎の稼動状態を稼動データとして格納、 蓄積するデータべ —スを有する基地局コンピュータとを備え、 前記基地局コンピュータは、 前記稼 動データを統計処理し、 各部位に係わる部品の修理交換個数の予測データを生成 し出力する演算手段を有し、 前記予測データを用いて各部位に係わる部品の修理 交換個数を予測する。
( 2 4 ) 上記 (2 3 ) において、 好ましくは、 前記演算手段は、 前記予測デ一 夕として、 前記稼動データに基づき、 現在稼動している建設機械の部位毎の稼動 状態とその稼動台数との第 1相関を求める第 1手段を有し、 前記第 1相関により 各部位に係わる部品の修理交換個数を予測する。
( 2 5 ) また、 上記 (2 3 ) において、 好ましくは、 前記演算手段は、 前記予 測データとして、 過去に修理交換した部品の修理交換データと稼動デ一夕に基づ き、 その部品が係わる部位毎の過去の稼動状態と修理交換個数との第 2相関を求 める第 2手段を更に有し、 前記第 1相関と第 2相関とを比較し各部位に係わる部 品の修理交換個数を予測する。
( 2 6 ) 更に、 上記 (2 3 ) において、 好ましくは、 前記データ計測収集手段 は、 前記部位毎の稼動状態に加えて部位毎の負荷を計測、 収集し、 前記基地局コ ンピュー夕は、 前記計測、 収集した部位毎の稼動状態と負荷をデータベースに稼 動データとして格納、 蓄積し、 前記演算手段は、 前記負荷の程度に応じて前記稼 動状態を補正する第 3手段を更に有し、 この負荷補正した稼動状態を稼動データ として用いて前記予測データを生成する。
( 2 7 ) また、 上記 (2 3 ) 〜 (2 6 ) において、 好ましくは、 前記稼動状態 は稼動時間と操作回数の少なくとも一方である。
( 2 8 ) 更に、 上記 (2 3 ) 〜 (2 6 ) において、 好ましくは、 前記建設機械 は油圧ショベルであり、 前記部位は、 油圧ショベルのフロント、 旋回体、 走行体、
'、 油圧ポンプのいずれかである。
( 2 9 ) また、 上記第 1の目的を達成するために、 本発明は、 市場で稼動する 複数台の建設機械のそれぞれの稼動状態を稼動データとして格納、 蓄積するとと もに、 前記稼動データを統計処理し、 建設機械の入れ替え台数の予測データを生 成し出力することを特徴とする演算処理装置を提供する。
( 3 0 ) 更に、 上記第 2の目的を達成するために、 本発明は、 市場で稼動する 複数台の建設機械のそれぞれについて部位毎の稼動状態を稼動データとして格納、 蓄積するとともに、 前記稼動データを統計処理し、 各部位に係わる部品の修理交 換個数の予測デ一夕を生成し出力することを特徴とする演算処理装置を提供する。 図面の簡単な説明
図 1は、 本発明の第一の実施の形態に係わる建設機械の販売予測システムを備 えた管理システムの全体概要図である。
図 2は、 機体側コントローラの構成の詳細を示す図である。
図 3は、 油圧ショベル及びセンサ群の詳細を示す図である。
図 4は、 基地局セン夕一サーバの C P Uの処理機能の概要を示す機能プロック 図である。
図 5は、 機体側コントローラの C P Uにおける油圧ショベルの部位毎の稼動時 間の収集機能を示すフローチャートである。
図 6は、 収集した稼動時間データを送信するときの機体側コントローラの通信 制御部の処理機能を示すフローチャートである。
図 7は、 機体側コントローラから稼動時間デー夕が送られてきたときの基地局 センターサーバの機体 ·稼動情報処理部の処理機能を示すフローチヤ一トである。 図 8は、 基地局センターサーバの製品入れ替え ·部品交換情報処理部における 製品入れ替え情報の処理機能を示すフローチャートである。
図 9は、 基地局センターサーバの製品入れ替え ·部品交換情報処理部における 部品交換情報の処理機能を示すフローチャートである。
図 1 0は、 基地局センターサーバのデ一夕ベースにおける稼動デ一夕、 実績メ ンテナンスデ一夕、 入れ替え稼動時間データの格納状況を示す図である。
図 1 1は、 エンジン稼動時間に対する稼動台数の分布データを得る手順を示す フローチヤ一トである。 図 1 2は、 部品毎の稼動時間に対する稼動台数の分布データを得る手順を示す フローチヤ一トである。
図 1 3は、 機種 Xの油圧ショベルの稼動時間 (エンジン稼動時間) に対する稼 動台数の分布図の一例を示す図である。
図 1 4は、 バゲット爪のフロント操作時間 (掘削時間) に対する稼動台数の分 布図の一例を示す図である。
図 1 5は、 走行リンクの走行時間に対する稼動台数の分布図の一例を示す図で ある。
図 1 6は、 過去に入れ替えられた油圧ショベルの稼動時間に対する入れ替え台 数の分布データを算出し、 その分布図を作成する手順を示すフローチャートであ る。
図 1 7は、 過去に入れ替えられた油圧ショベルの稼動時間に対する入れ替え台 数の分布図の一例を示す図である。
図 1 8は、 稼動時間に対する過去の部品交換個数の分布データを算出し、 その 分布図を作成する手順を示すフローチャートである。
図 1 9は、 フロント操作時間に対する過去のパケット爪交換個数の分布図の一 例を示す図である。
図 2 0は、 社内コンピュータ及びユーザ側コンピュータに送信する日報の一例 を示す図である。
図 2 1は、 社内コンピュータ及びユーザ側コンピュータに送信する日報の一例 を示す図である。
図 2 2は、 本発明の第 2の実施の形態に係わる建設機械の管理システムにおけ る機体側コントローラの構成の詳細を示す図である。
図 2 3は、 機体側コントローラの C P Uにおける油圧ショベルの部位毎の稼動 時間及び操作回数の収集機能を示すフローチヤ一卜である。
図 2 4は、 機体側コントローラから稼動デ一夕が送られてきたときの基地局セ ン夕ーサーバの機体 ·稼動情報処理部の処理機能を示すフローチャートである。 図 2 5は、 基地局センターサーバのデータべ一スにおける稼動データの格納状 況を示す図である。 図 2 6は、 基地局センターサーバの製品入れ替え ·部品交換情報処理部におけ る製品入れ替え情報の処理機能を示すフローチャートである。
図 2 7は、 基地局センターサーバの製品入れ替え ·部品交換情報処理部におけ る部品交換情報の処理機能を示すフローチャートである。
図 2 8は、 基地局センターサーバのデータベースにおける実績メンテナンスデ 一夕、 入れ替え稼動時間データの格納状況を示す図である。
図 2 9は、 機種毎の走行距離に対する稼動台数の分布データを得る手順を示す フローチヤ一トである。
図 3 0は、 機種 Yの油圧ショベルの走行距離に対する稼動台数の分布図の一例 を示す図である。
図 3 1は、 図 2 4のステップ S 3 6 Aにおける、 部品毎の操作回数と稼動台数 との分布データを得る処理の詳細を示すフローチヤ一トである。
図 3 2は、 図 2 4のステップ S 4 2 Aにおける部品毎の操作回数を負荷補正し、 この負荷補正した操作回数と稼動台数との分布データを得る処理の詳細を示すフ ローチャー卜である。
図 3 3は、 図 3 2のステップ 4 3 7で求めた負荷頻度分布を示す図である。 図 3 4は、 予め設定した平均掘削負荷 DMと負荷補正係数ひの関係を示す図であ る。
' 図 3 5は、 パケット爪についてのフロント操作回数に対する稼動台数の分布図 の一例を示す図である。
図 3 6は、 走行リンクについての走行操作回数に対する稼動台数の分布図の一 例を示す図である。
図 3 7は、 図 2 6のステップ S 4 7 Aにおける過去に入れ替えられた油圧ショ ベルの走行距離に対する入れ替え台数の分布デ一夕を算出し、 その分布図を作成 する手順を示すフローチヤ一卜である。
図 3 8は、 過去に入れ替えられた油圧ショベルの走行距離に対する入れ替え台 数の分布図の一例を示す図である。
図 3 9は、 図 2 7のステップ S 5 5における交換した部品についての操作回数 を負荷補正し格納する処理の詳細を示すフローチャートである。 図 4 0は、 図 2 7のステップ S 5 6 Aにおける負荷補正した操作回数に対する 部品交換個数の分布データを算出し、 その分布図を作成する手順を示すフローチ ャ一卜である。
図 4 1は、 フロント操作回数に対する過去のバケツト爪交換個数の分布図の一 例を示す図である。
図 4 2は、 本発明の第 2の実施の形態に係わる建設機械の管理システムにおけ る基地局センターサーバにおける機体 ·稼動情報処理部の処理機能を示すフロー チヤ一卜である。
図 4 3は、 社内コンピュータ 4に送信された買替情報の一例を示す図である。 図 4 4は、 買替判定時期を決めるための下取り価格曲線と修理コス卜曲線の関 係を示す図である。 発明を実施するための最良の形態
以下、 本発明の実施の形態を図面により説明する。
図 1は本発明の第 1の実施の形態に係わる建設機械の販売予測システムを備え た建設機械の管理システムの全体概要図であり、 この管理システムは、 市場で稼 動している油圧ショベル 1, l a, l b , l c, … (以下、 符号 1で代表する) に搭載された機体側コントローラ 2と、 本社、 支社、 生産工場等に設置した基地 局のセンターサーバ 3と、 支店、 サービス工場、 生産工場等の社内に設置した社 内コンピュータ 4と、 ユーザ側コンピュータ 5とを備えている。 なお、 基地局の セン夕—サーバ 3の設置場所としては上記以外であってもよく、 例えば複数台の 油圧ショベルを所有するレンタル会社であってもよい。
各油圧ショベル 1のコントローラ 2はそれぞれの油圧ショベル 1の稼動情報を 収集するためのものであり、 その収集した稼動情報は機体情報 (機種、 号機番 号) と共に通信衛星 6による衛星通信で地上局 7に送られ、 地上局 7から基地局 センターサーバ 3へと送信する。 機体 ·稼動情報の基地局センターサーバ 3への 取り込みは、 衛星通信に代えパソコン 8を用いてもよい。 この場合、 サービスマ ンがコントローラ 2に収集した稼動情報を機体情報 (機種、 号機番号) と共にパ ソコン 8にダウン口一ドし、 パソコン 8からフロヅピ一ディスク或いは通信回線、 例えば公衆電話回線、 インターネット等を介して基地局センターサーバ 3に取り 込まれる。 また、 パソコン 8を用いる場合は、 油圧ショベル 1の機体 ·稼動情報 に加え、 定期点検時の点検情報や修理情報をサービスマンが手入力し収集するこ ともでき、 その情報も基地局センターサーバ 3に取り込まれる。
機体側コントローラ 2の構成の詳細を図 2に示す。 図 2において、 コント口一 ラ 2は入出力インタ一フェース 2 a , 2 b , C P U (中央処理演算部) 2 c、 メ モリ 2 d、 夕イマ 2 e及び通信制御部 2 f とを備えている。
入出力イン夕一フェース 2 aを介してセンサ群 (後述) からフロント、 旋回、 走行のパイロット圧の検出信号、 エンジン 3 2 (図 3参照) の稼動時間 (以下、 エンジン稼動時間という) の検出信号、 油圧システムのポンプ圧の検出信号、 油 圧システムの油温の検出信号、 エンジン回転数の検出信号を入力する。 C P U 2 cは、 タイマ (時計機能を含む) 2 eを用いてそれらの入力情報を所定の稼動情 報に加工してメモリ 2 dに格納する。 通信制御部 2 f はその稼動情報を定期的に 衛星通信により基地局センターサーバ 3に送信する。 また、 入出力インターフエ ース 2 bを介してパソコン 8に稼動情報をダウン口一ドする。
機体側コントローラ 2は、 また、 C P U 2 cに上記の演算処理を行わせるため の制御プログラムを格納した R 0 Mや演算途中のデー夕を一時的に記憶する R A Mを備えている。
油圧ショベル 1及びセンサ群の詳細を図 3に示す。 図 3において、 油圧ショべ ル 1は走行体 1 2、 走行体 1 2上に旋回可能に設けれられた旋回体 1 3、 旋回体 1 3の前部左側に設けられた運転室 1 4、 旋回体 1 3の前部中央に俯仰動可能に 設けられたフロント作業機 (掘削作業装置) 、 即ちフロント 1 5を備えている。 フロント 1 5は、 旋回体 1 3に回動可能に設けられたブーム 1 6と、 このブーム 1 6の先端に回動可能に設けられたアーム 1 7と、 このアーム 1 7の先端に回動 可能に設けられたバケツト 1 8とで構成されている。
また、 油圧ショベル 1には油圧システム 2 0が搭載され、 油圧システム 2 0は、 油圧ポンプ 2 l a , 2 1 と、 ブーム制御弁 2 2 a , 2 2 b , アーム制御弁 2 3 、 バケット制御弁 2 4、 旋回制御弁 2 5、 走行制御弁 2 6 a , 2 6 bと、 ブームシ リンダ 2 7、 アームシリンダ 2 8、 バケツトシリンダ 2 9、 旋回モー夕 3 0、 走 行モー夕 31 a, 31 bとを備えている。 油圧ポンプ 21 a, 2 1 bはディーゼ ルエンジン (以下、 単にエンジンという) 32により回転駆動されて圧油を吐出 し、 制御弁 22 a, 22 b〜26 a, 26 bは油圧ポンプ 2 1 a, 21 bからァ クチユエ一夕 27〜31 a, 31 bに供給される圧油の流れ (流量及び流れ方 向) を制御し、 ァクチユエ一夕 27〜 31 a, 3 l bはブーム 16、 アーム 17、 バケツト 18、 旋回体 13、 走行体 12の駆動を行う。 油圧ポンプ 12 a, 21 b、 制御弁 22 a, 22 b〜 26 a, 26 b及びエンジン 32は旋回体 13の後 部の収納室に設置されている。
制御弁 22 a, 22 b〜26 a, 26 bに対して操作レバー装置 33, 34,
35, 36が設けられている。 操作レバ一装置 33の操作レバ一を十字の一方向 X 1に操作するとアームクラウドのパイロット圧又はアームダンプのパイロット 圧が生成され、 アーム制御弁 23に印加され、 操作レバー装置 33の操作レバ一 を十字の他方向 X 2に操作すると右旋回のパイ口ット圧又は左旋回のパイロット 圧が生成され、 旋回制御弁 25に印加される。 操作レバー装置 34の操作レバー を十字の一方向 X 3に操作するとブーム上げのパイロット圧又はブーム下げのパ イロッ卜圧が生成され、 ブーム制御弁 22 a, 22 bに印加され、 操作レバー装 置 34の操作レバーを十字の他方向 X 4に操作するとバケツトクラウドのパイ口 ット圧又はバケツ卜ダンプのパイロット圧が生成され、 バケツ卜制御弁 24に印 加される。 また、 操作レバー装置 35, 36の操作レバーを操作すると、 左走行 のパイ口ット圧及び右走行のパイ口ット圧が生成され、 走行制御弁 26 a, 26 bに印加される。
操作レバー装置 33〜36はコントローラ 2とともに運転室 14内に配置され ている。
以上のような油圧システム 20にセンサ 40〜46が設けられている。 センサ
40は、 フロント 15の操作信号としてアームクラウドのパイロット圧を検出す る圧力センサであり、 センサ 41はシャトル弁 41 aを介して取り出された旋回 のパイロット圧を検出する圧力センサであり、 センサ 42はシャトル弁 42 a, 42 b, 42 cを介して取り出された走行のパイロット圧を検出する圧力センサ である。 また、 センサ 43はエンジン 32のキ一スィッチの ON ·〇F Fを検出 するセンサであり、 センサ 4 4はシャトル弁 4 4 aを介して取り出された油圧ポ ンプ 2 1 a , 2 1 bの吐出圧力、 即ちポンプ圧を検出する圧力センサであり、 セ ンサ 4 5は油圧システム 1の作動油の温度 (油温) を検出する油温センサである また、 エンジン 3 2の回転数は回転数センサ 4 6により検出される。 これらセン サ 4 0〜4 6の信号はコントローラ 2に送られる。
図 1に戻り、 基地局センターサーバ 3は、 入出力インターフェース 3 a , 3 b , C P U 3 c、 デ一夕ベース 1 0 0を形成する記憶装置 3 dとを備えている。 入出 力インターフェース 3 aは機体側コントローラ 2からの機体 ·稼動情報及び点検 情報を入力し、 入出力インターフェース 3 bは社内コンピュータ 4から部品の交 換情報を入力する。 C P U 3 cはそれらの入力情報を記憶装置 3 dのデータべ一 ス 1 0 0に格納、 蓄積すると共に、 データベース 1 0 0に格納した情報を加工し て日報、 メンテナンス報告書、 診断書等を作成し、 これらを入出力インターフエ ース 3 bを介して社内コンピュータ 4及びユーザ側コンピュータ 5に送信する。 基地局センターサーバ 3は、 また、 C P U 3 cに上記の演算処理を行わせるた め、 制御プログラムを格納した R O Mや演算途中のデータを一次的に記憶する R AMを備えている。
図 4に C P U 3 cの処理機能の概要を機能ブロック図で示す。 C P U 3 cは、 機体 ·稼動情報処理部 5 0、 製品入れ替え ·部品交換情報処理部 5 1、 点検情報 処理部 5 2、 社内向け比較判定処理部 5 3、 社外向け比較判定処理部 5 4の各処 理機能を有している。 機体 ·稼動情報処理部 5 0は機体側コントローラ 2から入 力した稼動情報を用いて所定の処理を行い、 製品入れ替え ·部品交換情報処理部 5 1は社内コンピュータ 4から入力した製品入れ替え、 部品交換情報を用いて所 定の処理を行う (後述) 。 点検情報処理部 5 2はパソコン 8から入力した点検情 報をデータベース 1 0 0に格納、 蓄積すると共に、 その情報を加工して診断書を 作成する。 社内向け比較判定処理部 5 3及び社外向け比較判定処理部 5 4は、 そ れぞれ、 機体 ·稼動情報処理部 5 0、 製品入れ替え ·部品交換情報処理部 5 1、 点検情報処理部 5 2で作成された情報及びデータベース 1 0 0に格納、 蓄積され た情報のうち必要なものを選別し、 社内コンピュータ 4及びユーザ側コンビユー 夕 5に送信する。 機体側コントローラ 2及び基地局センターサーバ 3の機体 ·稼動情報処理部 5 0及び製品入れ替え ·部品交換情報処理部 5 1の処理機能をフローチャートによ り説明する。
機体側コントローラ 2の処理機能には、 油圧ショベルの部位毎の稼動時間の収 集機能があり、 それに対応して基地局センターサーバ 3の機体 ·稼動情報処理部 5 0には稼動時間の処理機能がある。 また、 製品入れ替え ·部品交換情報処理部 5 1には製品入れ替え情報の処理機能と部品交換情報の処理機能がある。
まず、 機体側コントローラ 2の油圧ショベルの部位毎の稼動時間の収集機能に ついて説明する。
図 5はコントローラ 2の C P U 2 cにおける油圧ショベルの部位毎の稼動時間 の収集機能を示すフローチヤ一トであり、 図 6は収集した部位毎の稼動時間デー 夕を送信するときのコントローラ 2の通信制御部 2 f の処理機能を示すフローチ ヤー卜である。
図 5において、 C P U 2 cは、 まずセンサ 4 6のエンジン回転数信号が所定の 回転数以上になっているかどうかでエンジンが稼動中であるかどうかを判断する (ステップ S 9 ) 。 エンジンが稼動中でないと判断した場合はステップ S 9を繰 り返す。 エンジンが稼動中であると判断すると、 次のステップ S 1 0へ進み、 セ ンサ 4 0, 4 1, 4 2のフロント、 旋回、 走行のパイロット圧の検出信号に関す るデータを読み込む (ステップ s 1 0 ) 。 次いで、 読み込んだフロント、 旋回、 走行のパイロット圧のそれぞれについて、 夕イマ 2 eの時間情報を用い、 パイ口 ット圧が所定圧を超えた時間を計算し、 日付及び時間と関連付けてメモリ 2 dに 格納、 蓄積する (ステップ S 1 2 ) 。 ここで、 所定圧とはフロント、 旋回、 走行 を操作したとみなし得るパイロット圧である。 また、 ステップ S 9でエンジンが 稼動中であると判断されている間、 夕イマ 2 eの時間情報を利用しエンジン稼動 時間を計算し、 日付及び時間と関連付けてメモリ 2 dに格納、 蓄積する (ステツ プ S 1 4 ) 。 C P U 2はこのような処理をコントローラ 2の電源が〇Nの間、 所 定サイクル毎に行う。
ステップ S 1 2 , S 1 4において、 計算した各々の時間をメモリ 2 dに記憶し ている過去に計算した時間に加算し、 累積稼動時間として記憶するようにしても よい。
図 6において、 通信制御部 2 f は、 夕イマ 2 eが QNになったかどうかを監視 し (ステップ S 20) 、 タイマ 2 eが ONになると、 メモリ 2 dに格納、 蓄積し たフロント、 旋回、 走行の部位毎の稼動時間及びエンジン稼動時間 (日付及び時 間付き) と機体情報を読み出し (ステップ S 22) 、 これらデータを基地局セン ターサーバ 3に送信する (ステップ S 24) 。 ここで、 夕イマ 2 eは 1日の決ま つた時刻、 例えば午前 0時になると ONするように設定しておく。 これにより、 午前 0時になると、 前日の 1日分の稼動時間データが基地局センターサーバ 3に 送られる。
CPU 2 c及び通信制御部 2 f は以上の処理を日々繰り返して行う。 CPU 2 cに格納されたデータは基地局センターサーバ 3に送信後、 所定日数、 例えば 3 65日 (1年) を経過すると消去される。
図 7は機体側コントローラ 2から機体 '稼動情報が送られてきたときのセン夕 一サーバ 3の機体 ·稼動情報処理部 50の処理機能を示すフローチャートである。 図 7において、 機体,稼動情報処理部 50は機体側コントロ一ラ 2から機体 ' 稼動情報が入力されたかどうかを監視し (ステップ S 30) 、 機体 '稼動情報が 入力されると、 それらの情報を読み込み、 稼動データ (後述) としてデータべ一 ス 100に格納、 蓄積する (ステップ S 32) 。 機体情報には、 前述したように 機種、 号機番号が含まれる。 次いで、 データベース 100から所定日数分、 例え ば 1ヶ月分の稼動データを読み出し、 稼動時間に関する日報を作成する (ステツ プ S 34) 。 また、 データベース 100から現在市場で稼動している全油圧ショ ベルの稼動データを読み出し、 稼動時間に対する稼動台数の分布データを油圧シ ョベルの機種毎、 部品毎に算出し (ステップ S 36) 、 この分布デ一夕に基づい て稼動台数の分布図を作成する (ステップ S 38) (後述) 。 そして、 このよう に作成した日報及び分布図を社内コンピュータ 4に送信し、 かつ日報をユーザ側 コンピュータ 5に送信する (ステップ S 40) 。
図 8はセンターサーバ 3の製品入れ替え ·部品交換情報処理部 51における製 品入れ替え情報の処理機能を示すフローチャートである。
図 8において、 製品入れ替え ·部品交換情報処理部 5 1は社内コンピュータ 4 から例えばサービスマンにより製品入れ替え情報が入力されたかどうかを監視し
(ステップ S 4 4 ) 、 製品入れ替え情報が入力されると、 それらの情報を読み込 む (ステップ S 4 5 ) 、 ここで、 製品入れ替え情報とは、 油圧ショベルの買い替 えのため入れ替えた旧油圧ショベルの機種及び号機番号、 新油圧ショベルの機種 及び号機番号及び入れ替え日の日付である。
次いで、 データベース 1 0 0にアクセスし、 旧油圧ショベルの号機番号の稼動 データを読み出し、 その最新のエンジン稼動時間を油圧ショベルの入れ替えまで の稼動時間 (以下、 適宜入れ替え稼動時間という) としてデータベース 1 0 0に 格納する (ステップ S 4 6 ) 。
そして、 最新の入れ替え稼動時間データを読み出し、 稼動時間に対する入れ替 え台数の分布データを算出し、 このデータに基づいて入れ替え台数の分布図を作 成する (ステップ S 4 7 ) (後述) 。
図 9はセン夕一サーバ 3の製品入れ替え ·部品交換情報処理部 5 1における部 品交換情報の処理機能を示すフローチャートである。
図 9において、 製品入れ替え ·部品交換情報処理部 5 1は社内コンピュータ 4 から例えばサービスマンにより部品交換情報が入力されたかどうかを監視し (ス テツプ S 5 0 ) 、 部品交換情報が入力されると、 それらの情報を読み込む (ステ ップ S 5 2 ) 。 ここで、 部品交換情報とは、 部品を交換した油圧ショベルの機種 及び号機番号と部品を交換した日付けと交換した部品名である。
次いで、 データベース 1 0 0にアクセスし、 同じ機種及び号機番号の稼動デー 夕を読み出し、 交換した部品が係わる部位の稼動時間ベースでその部品の交換時 間間隔を計算し、 データベース 1 0 0に実績メンテナンスデータとして格納、 蓄 積する (ステップ S 5 4 ) 。 ここで、 部品の交換時間間隔とは、 1つの部品が機 体に組み込まれてから故障或いは寿命がきて新しい部品に交換されるまでの時間 間隔であり、 上記のようにその時間はその部品が係わる部位の稼動時間ベースで 計算される。 例えば、 バゲット爪の場合、 それが係わる部位はフロントであり、 1つのパケット爪が機体に付けられてから破損して交換するまでの間のフロント 操作時間 (掘削時間) が 1 5 0 0時間であれば、 そのバケツト爪の交換時間間隔 は 1 5 0 0時間であると計算する。 そして、 最新の実績メンテナンスデータを読み出し、 稼動時間に対する部品交 換個数の分布データを算出し、 この分布データに基づいて部品交換個数の分布図 を作成する (ステップ S 56) (後述) 。
図 10にデータベース 100における稼動データ、 実績メンテナンスデ一夕、 入れ替え稼動時間データの格納状況を示す。
図 10において、 データベース 100には、 機種別、 号機毎の稼動データを格 納、 蓄積したデータベース (以下、 稼動データベースという) 、 機種別、 号機毎 の実績メンテナンスデータを格納、 蓄積したデータベース (以下、 実績メンテナ ンスデータベースという) 、 機種別、 号機毎の入れ替え稼動時間を格納したデー 夕ベース (以下、 入れ替えデータベースという) の各セクションがあり。 これら 各データベースには次のようにデータが格納されている。
機種別、 号機毎の稼動データベースには、 機種別、 号機毎にエンジン稼動時間、 フロント操作時間 (以下、 適宜、 掘削時間という) 、 旋回時間、 走行時間が日付 と対応して積算値で格納されている。 図示の例では、 TNE (1) 及び TD (1) は それぞれ機種 Aの N号機の 2000年 1月 1日におけるエンジン稼動時間の積算 値及びフロント操作時間の積算値であり、 TNE (K) 及び TD (K) はそれぞれ機 種 Aの N号機の 2000年 3月 16日におけるエンジン稼動時間の積算値及びフ ロント操作時間の積算値である。 同様に、 機種 Aの N号機の旋回時間の積算値 T S (1) 〜TS (K) 及び走行時間の積算値 TT (1) 〜ΤΤ (Κ) も日付と関連付 けて格納されている。 機種 Αの N+ 1号機、 N+2号機、 '··、 機種 B、 機種 C、 …についても同様である。
機種別、 号機毎の実績メンテナンスデータベースには、 機種別、 号機毎に過去 に交換した部品の交換時間間隔がその部品が係わる部位の稼動時間ベースの積算 値で格納されている。 図示の例では、 TFB (1) 及び TFB (L) はそれぞれ機種 Aの N号機の 1回目及び L回目のバケツト爪の交換時間間隔の積算値 (例えば、 フロント稼動時間ベースで 3400 h r, 12500 h r) であり、 TTL (l) 及び TTL (M) はそれぞれ N号機の 1回目及び M回目の走行リンクの交換時間間 隔の積算値 (例えば走行時間ベースで 5100 h r, 14900 h r) である。 機種 Aの N+ 1号機、 N+2号機、 ···、 機種 B、 機種 C、 …についても同様であ る。
機種別、 号機毎の入れ替えデータベースには、 機種別、 号機毎に、 入れ替えら れた旧油圧ショベルの稼動時間がェンジン稼動時間ベースの値で格納されている。 図示の例では、 TX ( 1 ) は機種 Aの 1号機の入れ替えまでの稼動時間 (例えばェ ンジン稼動時間ベースで 3 2 0 0 0 h r ) であり、 TX ( L ) は機種 Aの L号機の 入れ替えまでの稼動時間 (例えばエンジン稼動時間ベースで 3 0 0 0 0 h r ) で ある。 機種 B , C , …についても同様である。
機体 '稼動情報処理部 5 0は、 図 7に示したステップ S 3 6において、 上記稼 動データベースに格納したデータを用い、 図 1 1及び図 1 2にフローチャートで 示すような手順により、 市場で稼動している油圧ショベルの稼動時間に対する稼 動台数の分布データを油圧ショベルの機種毎、 部品毎に算出する。 部品毎の稼働 時間は、 その部品が係わる部位毎の稼働時間で計算する。
ここで、 本実施の形態において 「部品が係わる部位毎の稼動時間」 とは、 バケ ット、 パケット爪、 フロントピン (例えばブームとアームの連結ピン) 等、 その 部品が係わる部位がフロント 1 5である場合は、 フロント 1 5の操作時間 (掘削 時間) であり、 旋回輸、 旋回モータ等、 部品が係わる部位が旋回体 1 3である場 合は、 旋回時間であり、 走行モータ、 走行リンク、 走行ローラ等、 部品が係わる 部位が走行体 1 2である場合は、 走行時間である。 また、 エンジンオイルゃェン ジンオイルフィルタ等、 部品が係わる部位がエンジン 3 2である場合は、 ェンジ ン稼動時間である。 更に、 作動油、 作動油フィル夕、 メインポンプ、 パイロット ポンプ等、 部品が係わる部位が油圧システムの油圧源である場合は、 エンジン稼 動時間をそれら部品が係わる部位の稼動時間とみなす。 なお、 油圧ポンプ 2 1 a, 2 1 bの吐出圧が所定レベル以上の稼動時間を検出するか、 エンジン稼動時間か ら無負荷時間を差し引いてその時間を油圧源の稼動時間としてもよい。
図 1 1は機種毎のエンジン稼動時間に対する稼動台数の分布データを得る手順 を示すフロ一チヤ一トである。
図 1 1において、 まず、 図 1 0に示した稼動データベースより機種 Aの全号機 のエンジン稼動時間を読み出す (ステップ S 6 0 ) 。 次いで、 エンジン稼動時間 を 1 0 0 0 0時間毎に区切り、 エンジン稼動時間の各稼動時間範囲にある油圧シ ョベルの台数を計算する。 つまり、 0〜: L 0000 h r、 10001〜 2000 0 h r、 20001〜30000 h r、 30001〜40000 h r、 4000 1 h r以上のそれぞれのエンジン稼動時間範囲にある油圧ショベルの台数を計算 する (ステップ S 62〜ステップ S 70) 。
同様に、 機種 B、 機種 C、 …についても 10000時間毎の各エンジン稼動時 間範囲にある油圧ショベルの台数を計算する (ステップ S 72) 。 このようにし て稼動時間範囲毎に稼動台数の分布データが算出されると、 図 7に示したステツ プ S 38及びステップ S 40の処理においてその稼動台数の分布図を作成し、 社 内コンピュータへと出力される。
図 13に分布図の一例として、 機種 Xの油圧ショベルの稼動時間 (エンジン稼 動時間) に対する稼動台数の分布図を示す。 図 13の横軸は油圧ショベルの稼動 台数であり、 縦軸は油圧ショベルの稼動時間である。
図 12は部品毎の稼動時間に対する稼動台数の分布データを得る手順を示すフ ローチャートである。
図 12において、 まず、 機種 Aの号機番号 1〜Zの全デ一夕について処理を行 うため、 号機番号 Nが Z以下かどうかの判定を行い (ステップ S 81) 、 Nが Z 以下であれば、 図 10に示した稼動データベースより機種 Aの N号機の最新のフ ロント操作時間 (掘削時間) 積算値 TD (K) を読み出す (ステップ S 82) 。 次 いで、 図 10に示した実績メンテナンスデータベースの N号機の最新のバケツ卜 爪交換時間間隔の積算値 TFB (M) を読み出し (ステップ S 83) 、 下記式によ り現在使用中のバケツト爪についての稼動時間 (フロント操作時間) 厶 TLFBを計 算する (ステップ S 84) 。
△ TLFB=TD (K) -TFB (M)
そして、 この処理を号機番号 1〜Zの全てについて行い、 機種 Aの全油圧ショべ ルについて現在使用中のバケツト爪についての稼動時間 (フロント操作時間) △ TLFBを計算する。
次いで、 各バケツト爪についてのフロント操作時間 ATLFBを 500時間毎に区 切り、 各操作時間範囲に含まれる油圧ショベルの台数を計算する。 つまり、 0〜 500 h r、 501〜: L 000 h r、 1001〜 1500 h r、 1501〜20 0 0 h r、 2 0 0 1 h r以上のそれぞれのフロント操作時間範囲に含まれる油圧 ショベルの台数を計算し、 稼動台数の分布データを得る (ステップ S 8 5 ) 。 同様に機種 Aの各油圧ショベルの走行リンクについてもリンク毎の稼動時間 (走行時間) を計算し、 2 5 0 h r毎の稼動台数の分布データを得る (ステップ S 8 6 ) 。 以下、 その他の部品についても同様に稼動時間を計算し、 所定の稼動 時間範囲毎の稼動台数の分布データを計算する。
同様に、 機種 B、 機種 C、 …の各部品についても稼動時間を計算し、 所定の稼 動時間範囲毎の稼動台数の分布データを計算する (ステップ S 8 7 ) 。
このように機種毎、 部品毎に稼動時間と稼動台数の分布データが算出されると、 図 7に示したステップ S 3 8及びステップ S 4 0の処理においてその稼動台数の 分布図を作成し、 社内コンピュータへと出力される。
図 1 4にパケット爪についてのフロント操作時間 (掘削時間) に対する稼動台 数の分布図の一例を、 図 1 5に走行リンクについての走行時間に対する稼動台数 の分布図の一例をそれぞれ示す。 図 1 4、 図 1 5の横軸は油圧ショベルの稼動台 数であり、 縦軸はフロント操作時間 (掘削時間) 及び走行時間である。
製品入れ替え ·部品交換情報処理部 5 1は、 図 8に示したステップ S 4 7にお いて、 図 1 0に示した入れ替えデータベースのデ一夕を用い、 図 1 6にフローチ ャ一卜で示すような手順により、 過去に入れ替えられた油圧ショベルの稼動時間 に対する製品入れ替え台数の分布データを算出し、 このデータに基づいて製品入 れ替え台数の分布図を作成する。
図 1 6において、 まず、 図 1 0に示した入れ替えデータベースより機種 Aの全 号機の入れ替えまでの稼動時間を読み出す (ステップ S 9 0 ) 。 次いで、 この稼 動時間のデータから稼動時間に対する製品入れ替え台数の分布データを算出し、 このデータに基づいて製品入れ替え台数の分布図を作成する (ステップ S 9 2 ) この分布デー夕は上述した稼動台数の分布デー夕の演算と同様の方法で求めるこ とができる。 機種 B、 機種 C、 …についても同様に製品入れ替え台数の分布デー 夕を演算し、 分布図を作成する (ステップ S 9 4 ) 。 次いで、 サービスマンから の指示を待ち (ステップ S 9 6 ) 、 指示があると作成した製品入れ替え台数の分 布図を社内コンピュータへ出力する (ステップ S 9 8 ) 。 図 1 7に過去に入れ替えられた油圧ショベルの稼動時間に対する製品入れ替え 台数の分布図の一例を示す。 図 1 7の横軸は油圧ショベルの稼動時間であり、 縦 軸は製品入れ替え台数である。
また、 製品入れ替え ·部品交換情報処理部 5 1は、 図 9に示したステップ S 5 6において、 図 1 0に示した実績メンテナンスデータベースのデータを用い、 図 1 8にフローチャートで示すような手順により、 稼動時間に対する過去の部品交 換個数の分布データを算出し、 この分布データに基づいて部品交換個数の分布図 を作成する。
図 1 8において、 まず、 図 1 0に示した実績メンテナンスデータベースより機 種 Aの全号機のメンテナンスデータを読み出す (ステップ S 1 0 0 ) 。 次いで、 機種 Aの号機番号 1〜Zの全データについて処理を行うため、 号機番号 Nが Z以 下かどうかの判定を行い (ステップ S 1 0 2 ) 、 Nが Z以下であれば、 読み出し た N号機のデータのうち例えばまずバケツト爪について、 その交換時間間隔の積 算値から下記式により交換時間間隔 ATFB ( i ) を演算する (ステップ S 1 0 4 ) 。
△ TFB ( i ) = TFB ( i ) —TFB ( i - 1 )
i = l〜L ( Lは N号機のバケツト爪の交換回数)
ここで、 パケット爪の交換時間の間隔 ATFB ( i ) とは、 1つのパケット爪が機 体に組み込まれてから故障或いは寿命がきて新しいバケツ卜爪に交換されるまで の時間間隔 (寿命) であり、 その時間は、 バケツト爪が係わる部位であるフロン 卜の操作時間 (掘削時間) ベースの値である。 そして、 この処理を号機番号 1〜 Zの全てについて行い、 機種 Aの全油圧ショベルの各バケツト爪についての交換 時間間隔 ATFBのデータを収集する。
このようにして全油圧ショベルのバケツト爪について交換時間間隔△ T FBのデ 一夕収集が完了すると、 この交換時間間隔から交換時間間隔に対する部品交換個 数の分布データを算出し、 この分布データに基づいて部品交換個数の分布図を作 成する (ステップ S 1 0 6 ) 。 この分布データは上述した稼動台数の分布データ の演算と同様の方法で求めることができる。 走行リンク等、 その他の部品につい ても同様に部品交換個数の分布データを演算し、 分布図を作成する (ステップ S 1 0 8 ) 。 機種 B、 機種 (:、 …についても同様に部品交換個数の分布データを演 算し、 分布図を作成する (ステップ S 1 1 0 ) 。 次いで、 サービスマンからの指 示を待ち (ステップ S 1 1 2 ) 、 指示があると作成した部品交換個数の分布図を 社内コンピュータへ出力する (ステップ S 1 1 4 ) 。
図 1 9にフロント操作時間に対する過去のバケツト爪交換個数の分布図の一例 を示す。 図 1 9の横軸はフロント操作時間であり、 縦軸はパケット爪交換個数で ある。
図 2 0及び図 2 1に社内コンピュータ 4及びユーザ側コンピュータ 5に送信す る日報の一例を示す。 図 2 0は 1ヶ月分の各稼動時間デ一夕を日付と対応してグ ラフ及び数値で示したものである。 これによりユーザは過去 1ヶ月間の自分の油 圧ショベルの使用状況の変化を把握することができる。 図 2 1の左側は過去半年 間の部位毎の稼動時間と無負荷エンジン稼動時間をグラフ化して示したものであ り、 図 2 1の右側は過去半年間の有負荷エンジン稼動時間と無負荷エンジン稼動 時間の割合の推移をグラフ化して示したものである。 これによりユーザは過去半 年間の自分の油圧ショベルの使用状況及び使用効率の変化を把握することができ る。
以上のように構成した本実施の形態においては、 市場で稼動する複数台の油圧 ショベル 1のそれぞれにデータ計測収集手段としてセンサ 4 0〜4 6及びコント ローラ 2を設け、 このセンサ 4 0〜4 6及びコントローラ 2により油圧ショベル 毎に稼動時間の異なる複数の部位 (エンジン 3 2、 フロント 1 5、 旋回体 1 3、 走行体 1 2、 油圧ポンプ 2 l a , 2 1 b ) について部位毎の稼動時間を計測し、 この部位毎の稼動時間を基地局コンピュータ 3に図 1 0に示すような稼動データ として格納、 蓄積し、 基地局コンピュータ 3において、 油圧ショベル毎にその稼 動データを読み出し、 図 1 3に示すような油圧ショベルの稼動時間 (エンジン稼 動時間) に対する稼動台数の分布図を作成、 出力するので、 その分布図を見て来 期の油圧ショベルの入れ替え台数を予測することができる。
この油圧ショベルの入れ替え台数の予想は、 例えば次のような手順で行うこと ができる。
①油圧ショベルの入れ替えまでの平均稼動時間を想定する。 ただし、 その平均 稼動時間はエンジン稼動時間ベースの値とする。
.例えば、 エンジン稼動時間ベースで 2 0 0 0 0時間と想定する。
②稼動台数の分布図から平均稼動時間を超えている油圧ショベルの台数を計算 する。
例えば、 平均稼動時間を上記のように 2 0 0 0 0時間と想定した場合、 図 1 3 に示す例で平均稼動時間を超えている油圧ショベルの台数は、 稼動時間 2 0 0 0 :!〜 3 0 0 0 0 h rの 2 0 0 0台、 3 0 0 0 1〜 4 0 0 0 0 h rの 6 0 0台、 4 0 0 0 1 h r以上の 2 0 0台の合計 2 8 0 0台である。
③平均稼動時間を超えている油圧ショベルの台数から来期の油圧ショベルの入 れ替え台数を予測する。
例えば、 図 1 3に示す例では、 2 0 0 0 0時間の平均稼動時間を超えている 2 8 0 0台の油圧ショベルのうち、 来期も買い替えずに使用する油圧ショベルの台 数を、 現在と同様、 3 0 0 0 1〜4 0 0 0 0 h rに 6 0 0台、 4 0 0 0 1 h r以 上に 2 0 0台あると推定し、 来期の油圧ショベルの入れ替え台数を 2 0 0 0台で あると予測する。
そしてこのように油圧ショベルの入れ替え台数を予測できる結果、 来期の油圧 ショベルの販売台数の予測を正確に行うことができ、 油圧ショベルの適切な生産 計画を立てることができる。
また、 本実施の形態では、 同様に基地局コンピュータ 3において、 油圧ショべ ル毎にその稼動データを読み出し、 図 1 4及び図 1 5に示すようなフロント操作 時間 (掘削時間) や走行時間に対する稼動台数の分布図を作成、 出力するので、 その分布図を見て来期のフロントや走行体に係わる部品の交換個数を予測するこ とができる。
この部品の交換個数の予測は、 上述した油圧ショベルの入れ替え台数の予測と 同様に、 次のような手順で行うことができる。
①部品の交換までの平均稼動時間を想定する。 ただし、 その平均稼動時間はそ の部品が係わる部位の稼動時間ベースの値とする。
例えば、 バゲット爪を例にとると、 フロント操作時間ベースで 1 0 0 0時間と 想定する。 ②その部品が係わる稼動時間に対する稼動台数の分布図から平均稼動時間を超 えている油圧ショベルの台数を計算する。
例えば、 バケツト爪のフロント操作時間ベースでの平均稼動時間を上記のよう に 1 000時間と想定した場合、 図 14に示す分布図でフロント稼動時間 (掘削 時間) が平均稼動時間を超えている油圧ショベルの台数は、 稼動時間 1 00 1〜 1 500 h rの 2000台、 1 50 1〜2000 h rの 600台、 200 1 h r 以上の 200台の合計 2800台である。
③平均稼動時間を超えている油圧ショベルの台数から来期に部品を交換する油 圧ショベルの台数を推定する。
例えば、 図 14に示す例では、 フロント操作時間が 1 000時間の平均稼動時 間を超えている 2800台の油圧ショベルのうち、 来期もバケツト爪を交換せず に使用する油圧ショベルの台数が約 1割りあると推定し、 バケツト爪を交換する 油圧ショベルの台数を 2520台であると推定する。
④油圧ショベルの推定台数に 1台当たりの部品の個数を掛け、 来期の部品の交 換個数を予測する。
例えば、 バケツト爪を交換する油圧ショベルの台数を 2520台であると推定 すると、 1台当たりのバゲット爪の個数は 4個であるので、 来期のバケツト爪の 交換個数は 1 0080個であると予想する。
他の部品の場合も同様であり、 例えば走行リンクの場合、 交換までの平均稼動 時間を走行時間ベースで 500時間と想定することにより、 図 1 5に示す分布図 から同様に来期の走行リンクの交換個数を予測することができる。
そしてこのように部品の交換個数を予測できるの結果、 来期の部品の販売個数 の予測を正確に行うことができ、 部品の適切な生産計画を立てることができる。 更に、 本実施の形態では、 基地局コンピュータ 3において、 図 1 0に示すよう な油圧ショベルの入れ替えデータと稼動データを読み出し、 図 1 7に示すような 過去に入れ換えられた油圧ショベルの稼動時間に対する製品入れ替え台数の分布 図を作成、 出力するので、 この分布図を見て油圧ショベルの入れ替えまでの平均 稼動時間を定めることができ、 より正確に来期の油圧ショベルの入れ替え台数を 予測することができる。 つまり、 上記の説明では、 油圧ショベルの入れ替えまでの平均稼動時間を上記
①の手順でエンジン稼動時間ベースで 2 0 0 0 0時間と想定しており、 この想定 した平均稼動時間がどの程度適切かどうかにより油圧ショベルの入れ替え台数の 予測の精度も決まる。
本実施の形態では、 図 1 7に示すような実際の入れ替え台数の分布図が得られ るので、 例えばこの分布図の最大入れ替え台数付近の稼動時間 TAを油圧ショベル の入れ替えまでの平均稼動時間とすることができる。 これにより油圧ショベルの 入れ替えまでの平均稼動時間 TAは過去の実績を反映したものとなり、 より正確に 油圧ショベルの入れ替え台数を予測できる。 このため、 来期の油圧ショベルの販 売台数の予測を更に正確に行うことができ、 油圧ショベルのより適切な生産計画 を立てることができる。
また、 本実施の形態では、 同様に基地局コンピュータ 3において、 図 1 0に示 すような実績メンテナンスデータ (部品の修理交換データ) と稼動データを読み 出し、 図 1 9に示すようなその部品が係わる部位毎の稼動時間ベースで稼動時間 に対する過去の部品の交換個数の分布図を作成、 出力するので、 この分布図を見 て部品の交換までの平均稼動時間 TBを定めることができ、 より正確に来期の部品 の交換個数を予測することができる。
つまり、 上記の説明では、 パケット爪の交換までの平均稼動時間を上記①の手 順でフロント操作時間ベースで 1 0 0 0時間と想定しており、 この想定した平均 稼動時間がどの程度適切かどうかによりバケツト爪の交換個数の予測の精度も決 まる。
本実施の形態では、 図 1 9に示すような実際の交換個数の分布図が得られるの で、 例えばこの分布図の最大交換個数付近の稼動時間 T Bをバケツト爪の交換ま での平均稼動時間とすることができる。 これによりバケツト爪の交換までの平均 稼動時間は過去の実績を反映したものとなり、 より正確にバケツト爪の交換個数 を予測できる。 このため、 来期の部品の販売個数の予測を更に正確に行うことが でき、 部品のより適切な生産計画を立てることができる。
以上のように本実施の形態によれば、 油圧ショベルの販売台数及びその部品の 販売個数の予測を正確に行うことができ、 その結果油圧ショベル及びその部品の 生産計画を適切に立てることができる。 また、 生産計画が適切であるので、 在庫 管理が適切に行え、 過剰在庫や製品不足の発生を極力減らすことができる。 また、 以上は管理主体が油圧ショベルのメーカである場合の効果であるが、 管 理主体がレンタル会社である場合、 つまり基地局センターサーバ 3の設置場所を レンタル会社とした場合は、 油圧ショベルの入れ替え台数が予測できることによ り、 油圧ショベルの購入台数、 下取り台数の計画や部品の調達個数の計画を適切 に立てることができ、 予算の立案が容易となりかつ資産管理を適切に行うことが できる。
また、 本実施の形態によれば、 ユーザ側に稼動情報の日報や保守点検結果の診 断書を適宜提供するので、 ユーザ側で自身の油圧ショベルの稼動状況を日々把握 でき、 ユーザ側での油圧ショベルの管理が行い易くなる。
本発明の第 2の実施の形態を図 1、 図 3、 図 4、 図 1 0に加え、 図 2 2〜図 4 1を用いて説明する。 本実施の形態は建設機械の稼動状態として走行距離を把握 し、 販売台数の予測を行うとともに、 各部位の稼動状態として操作回数を把握し て部品の販売個数の予測を行い、 かつ各部位の稼動状態 (操作回数) を負荷補正 するものである。
まず、 本実施の形態に係わる建設機械の管理システムの全体構成を説明する。 本実施の形態はホイール式油圧ショベル、 ホイールローダ、 トラクタ一等、 走行 能力の高い建設機械の管理に適しており、 図 1において油圧ショベルは例えばホ ィール式であり、 機体側コントローラ 2はこのホイール式油圧ショベルに搭載さ れている。
図 2 2は、 本実施の形態に係わる機体側コントローラ 2とその入力信号の詳細 を示す図である。 コントローラ 2には、 フロント、 旋回、 走行のパイロット圧、 エンジン稼動時間、 ポンプ圧、 油温、 エンジン回転数の各検出信号に加え、 走行 距離の検出信号が入力される。 走行距離はホイール式油圧ショベルの走行距離計 4 8により計測される。
機体側コントローラ 2は、 稼動時間、 操作回数、 走行距離の各データの収集機 能と、 頻度分布デ一夕の収集機能があり、 それに対応して図 4に示す基地局セン 夕一サーバ 3の機体 ·稼動情報処理部 5 0には稼動時間、 操作回数、 走行距離の 各データの処理機能と頻度分布データの処理機能がある。
図 2 3は機体側コントローラ 2の稼動時間、 操作回数、 走行距離の各データの 収集機能を示すフローチャートである。 コントローラ 2は図 5に示した第 1の実 施の形態と同様にステップ S 9〜S 1 4までの処理を行う。 ただし、 ステップ S
1 0 Aでは、 ポンプ圧の検出信号も読み込む。 次いでステップ S 1 6 Aにおいて、 読み込んだフロント、 旋回、 走行の操作パイロット圧からフロント (掘削) 、 旋 回、 走行の各操作回数をカウントし、 日付及び時刻と関連付けてメモリ 2 dに格 納、 蓄積する。 ここで、 操作回数はパイロット圧が所定圧以上になると 1回と力 ゥントする。 また、 フロントの操作回数は、 例えば掘削作業で必須となるアーム 引きのパイロット圧でカウントする。 なお、 ブーム、 アーム、 バケツ卜の操作パ ィロット圧のそれぞれで 1回とカウントしてもよいが、 この場合は、 複合操作を
1回とカウントするために、 ブーム、 アーム、 バケツ卜の操作パイロット圧のい ずれかが所定圧以上にあるときに他の操作パイロット圧が所定圧以上になったと きは、 それらの" 〇R " をとり 1回とカウントする。
次いで、 ステップ S 1 6 Aで操作回数がカウントされる都度、 所定時間 (例え ば 2〜3秒) 経過後のポンプ圧を検出し、 操作回数に対応付けてメモリ 2 dに格 納、 蓄積する (ステップ S 1 7 A;) 。 次いで、 ステップ S 1 8 Aに進み、 走行距 離の検出信号を読み込み、 日付及び時刻と関連付けてメモリ 2 dに格納、 蓄積す る。
このように格納、 蓄積された機体,稼動情報は、 第 1の実施の形態で図 6を用 いて説明したように、 1日に 1回、 基地局センターサーバ 3に送られる。
図 2 4は機体側コントローラ 2から機体 ·稼動情報が送られてきたときのセン 夕一サーバ 3の機体 ·稼動情報処理部 5 0の処理機能を示すフローチヤ一トであ る。 機体 ·稼動情報処理部 5 0は機体側コントローラ 2からデータが入力された かどうかを監視し (ステップ S 3 O A) 、 データが入力されるとそれらのデータ、 つまり稼動時間データと、 フロント、 旋回、 走行の各操作回数、 ポンプ圧、 走行 距離の各データを読み込み、 稼動データとしてデータベース 1 0 0に格納、 蓄積 する (ステップ S 3 2 A) 。 次いで、 データベース 1 0 0から所定日数分、 例え ば 1ヶ月分の稼動データを読み出し、 稼動時間、 操作回数、 ポンプ圧、 走行距離 に関する日報を作成する (ステップ S 34A) 。 また、 データベース 100から 現在市場で稼動している全油圧ショベルの稼動データを読み出し、 機種毎の走行 距離に対する稼動台数の分布データ、 部品毎の操作回数に対する稼動台数の分布 デ一夕を算出し (ステップ S 36 A) 、 この分布データに基づいて稼動台数の分 布図を作成する (ステップ S 38 A) (後述) 。 また、 ステップ S 36 Aで求め た部品毎の操作回数を負荷補正し、 負荷補正した操作回数に対する稼動台数の分 布データを算出する (ステップ S 42 A) (後述) 。 次いで、 この分布データに 基づいて部品毎の稼動台数と負荷補正した操作回数の分布図を作成する (ステツ プ S 43A) 。 次いで、 このように作成した日報及び分布図を社内コンピュータ 4に送信し、 かつ日報をユーザ側コンピュータ 5に送信する (ステップ S 40 A) 。
図 25にデータベース 100における稼動データの格納状況を示す。 デ一夕べ ース 100の機種別、 号機毎の稼動データベースには、 走行距離、 フロント操作 回数 (掘削回数) 、 旋回操作回数、 走行操作回数が日付と対応して積算値で格納 されている。 図示の例では、 D (1) 及び SD (1) はそれぞれ機種 Aの N号機の 2000年 1月 1日における走行距離積算値及びフロント操作回数積算値であり、 D (K) 及び SD (K) はそれぞれ機種 Aの N号機の 2000年 3月 16日におけ る走行距離積算値及びフロント操作回数積算値である。 同様に、 機種 Aの N号機 の旋回操作回数積算値 SS (1) 〜SS (K) 及び走行操作回数の積算値 ST (1) 〜ST (K) も日付と関連付けて格納されている。 機種 Αの N+ 1号機、 N+2号 機、 ···、 機種 B、 機種 C, …についても同様である。
また、 機種別、 号機毎の稼動データベースには、 フロント、 旋回、 走行の各部 位の操作毎に、 ポンプ負荷頻度分布が日付と関連づけて格納、 蓄積されている。 図示の例では、 2000年 1月 1日のフロント操作の領域に、 0 MP a以上〜 5 MP a未満: 12回、 5 MP a以上〜 1 OMP a未満: 32回、 ···、 25MP a 以上〜 30 MP a未満: 28回、 30 M P a以上: 9回というように、 5 MP a のポンプ圧力帯域毎に操作回数が格納されている。 旋回操作、 走行操作の領域、 及びその後の日付の領域についても、 それぞれ同様にポンプ負荷頻度が格納され ている。 図 2 6はセンタ一サーバ 3の製品入れ替え ·部品交換情報処理部 5 1における 製品入れ替え情報の処理機能を示すフローチャートである。 製品入れ替え ·部品 交換情報処理部 5 1は社内コンピュータ 4から例えばサービスマンにより製品入 れ替え情報が入力されたかどうかを監視し (ステップ S 4 4 A) 、 製品入れ替え 情報が入力されると、 それらの情報を読み込む (ステップ S 4 5 A) 。 前述した ように、 製品入れ替え情報とは、 油圧ショベルの買い替えのため入れ替えた旧油 圧ショベルの機種及び号機番号、 新油圧ショベルの機種及び号機番号及び入れ替 え日の日付である。
次いで、 データベース 1 0 0にアクセスし、 旧油圧ショベルの号機番号の稼動 データを読み出し、 その最新の走行距離を油圧ショベルの入れ替えまでの走行距 離 (以下、 適宜入れ替え走行距離という) としてデータベース 1 0 0に格納する (ステップ S 4 6 A) 。
そして、 最新の入れ替え走行距離データを読み出し、 走行距離に対する製品入 れ替え台数の分布データを算出し、 このデータに基づいて製品入れ替え台数の分 布図を作成する (ステップ S 4 7 A) (後述) 。
図 2 7はセンターサーバ 3の製品入れ替え ·部品交換情報処理部 5 1における 部品交換情報の処理機能を示すフローチャートである。 図 2 7のステップ S 5 0 〜S 5 4までの処理は図 9に示したフローチャートと同じである。 ステップ S 5 4の後、 データベース 1 0 0にアクセスし、 同じ号機番号の稼動データを読み出 し、 交換した部品が係わる部位の操作回数ベースでその部品についての操作回数 を計算し、 データベース 1 0 0に実績メンテナンスデータとして格納、 薔積する (ステップ S 5 4 A) (後述) 。 また、 その操作回数を負荷補正し、 負荷補正し た操作回数もデータベース 1 0 0に実績メンテナンスデータとして格納、 蓄積す る (ステップ S 5 5 ) (後述) 。
そして、 最新の実績メンテナンスデータを読み出し、 負荷補正した操作回数に 対する部品交換個数の分布データを算出し、 この分布データに基づいて部品交換 個数の分布図を作成する (ステップ S 5 6 A) (後述) 。
図 2 8にデータベース 1 0 0における操作回数の実績メンテナンスデ一夕、 入 れ替え走行距離データの格納状況を示す。 図 28において、 データベース 100の機種別、 号機毎の実績, 一夕ベースには、 機種別、 号機毎に過去に交換した部品の交換時間間隔における 実際の操作回数と負荷補正した操作回数がその部品が係わる部位の操作回数べ一 スの積算値で格納されている。 図示の例では、 SFB (1) 及び SFB (L) はそれ ぞれ機種 Aの N号機の 1回目及び L回目のバケツト爪についてのフロント操作回 数の積算値 (例えば、 6800回、 25000回) であり、 S' FB (l) 及び S ' FB (L) はそれぞれ同じパケット爪についての負荷補正したフロント操作回数 の積算値 (例えば、 6200回、 21200回) である。 STL (1) 及び STL
(M) はそれぞれ N号機の 1回目及び M回目の走行リンクについての走行操作回 数の積算値 (例えば 1610回、 10200回) であり、 S ' TL (1) 及び S ' TL (M) はそれぞれ同じ走行リンクについての負荷補正した走行操作回数の積算 値 (例えば 1820回、 1 1800回) である。 機種 Aの N+ 1号機、 N + 2号 機、 …についても同様である。
機種別、 号機毎の入れ替えデータベースには、 機種別、 号機毎に、 入れ替えら れた旧油圧ショベルの走行距離が格納されている。 図示の例では、 DX (1) は機 種 Aの 1号機の入れ替えまでの走行距離 (例えば 3200Km) であり、 DX
(L) は機種 Aの L号機の入れ替えまでの走行距離 (例えば 3000 Km) であ る。 機種 B, C, …についても同様である。
図 29は、 図 24のステップ S 36 Aにおける機種毎の走行距離と稼動台数と の分布データを得る処理の詳細を示すフローチャートである。 まず、 稼動デ一夕 ベースより機種 Aの全号機の走行距離を読み出す (ステップ S 6 OA) 。 次いで、 走行距離を 1000 Km毎に区切り、 走行距離の各範囲にある油圧ショベルの台 数を計算する。 つまり、 0〜: L 000 Km、 1001〜2000 Km、 2001 〜 3000 Km、 3001〜 4000 Km、 4001 Km以上のそれぞれの走行 距離範囲にある油圧ショベルの台数を計算する (ステップ S 62 A〜ステップ S 7 OA;) 。
同様に、 機種 B、 機種 (:、 …についても 1000 Km毎の走行距離範囲にある 油圧ショベルの台数を計算する (ステップ S 72 A) 。
図 30に分布図の一例として、 機種 Yの油圧ショベルの走行距離に対する稼動 台数の分布図を示す。 図 30の横軸は油圧ショベルの稼動台数であり、 縦軸は油 圧ショベルの走行距離である。
図 31は、 図 24のステップ S 36 Aにおける部品毎の操作回数と稼動台数と の分布データを得る処理の詳細を示すフローチャートである。 まず、 機種 Aの号 機番号 1〜 Zの全デ一夕について処理を行うため、 号機番号 Nが Z以下かどうか の判定を行い (ステップ S 81 A) 、 Nが Z以下であれば、 図 25に示した稼動 データベースより機種 Aの N号機の最新のフロント操作回数の積算値 SD (K) を 読み出す (ステップ S 82A) 。 次いで、 図 28に示した実績メンテナンスデ一 夕ベースの N号機の最新のバゲット爪操作回数の積算値 SFB (M) を読み出し
(ステップ S 83 A) 、 下記式により現在使用中のバケツト爪についてのフロン 卜操作回数 ASLFBを計算する (ステップ S 84A) 。
△ SLFB=SD (K) -SFB (M)
そして、 この処理を号機番号 1〜Zの全てについて行い、 機種 Aの全油圧ショべ ルについて現在使用中のバケツト爪についてのフロント操作回数 ASLFBを計算す る。
次いで、 各バケツト爪についてのフロント操作回数 ASLFBを 1000回毎に区 切り、 各操作回数範囲に含まれる油圧ショベルの台数を計算する。 つまり、 0〜 1000回、 1001〜2000回、 2001〜3000回、 3001〜400 0回、 400 1回以上のそれぞれのフロント操作回数範囲に含まれる油圧ショべ ルの台数を計算し、 稼動台数の分布データを得る (ステップ S 85 A) 。
同様に機種 Aの各油圧ショベルの走行リンクについてもリンク毎の操作回数 (走行操作回数) を計算し、 500回毎の稼動台数の分布データを得る (ステツ プ S 86A) 。 以下、 その他の部品についても同様に操作回数を計算し、 所定の 操作回数範囲毎の稼動台数の分布データを計算する。
同様に、 機種 B、 機種 C、 …の各部品についても操作回数を計算し、 所定の操 作回数範囲毎の稼動台数の分布データを計算する (ステップ S 87 A) 。
このように機種毎、 部品毎に操作回数と稼動台数の分布データが算出されると、 図 24に示したステップ S 38 A及びステップ S 40 Aの処理においてその稼動 台数の分布図を作成し、 社内コンピュータへと出力される。 図 3 2は、 図 2 4のステップ S 4 2 Aにおける部品毎の操作回数を負荷補正し、 この負荷補正した操作回数と稼動台数との分布データを得る処理の詳細を示すフ ローチャートである。
図 3 2において、 まず、 検証する油圧ショベルの機種、 号機番号 (例えば N) を設定する (ステップ S 4 3 0 ) 。 次に、 図 1 0に示した稼動デ一夕ベースから 設定機種の N号機の最新の掘削時間の積算値 TD (K) を読み込む (ステップ S 4 3 2 ) 。 また、 図 1 0に示した実績メンテナンスデータベースから設定機種の N 号機の最新のパケット爪交換時間間隔の積算値 TFB (M) を読み込む (ステップ S 4 3 4 ) 。 次に、 現在のバケツト爪の稼動時間 A TLFBを次のように演算する (ステップ S 4 3 6 ) 。
△ TLFB= TD (K) - TFB (M)
次に、 図 2 5に示した稼動データベースからポンプ負荷頻度分布のフロント操 作領域のデータを読み出し、 現在のバケツ卜爪の稼動時間 A TLFBの間におけるフ ロント操作負荷頻度分布 (掘削負荷頻度分布) を演算する (ステップ S 4 3 7 ) 。 次に、 現在のバケツト爪についての操作回数 1回当たりの平均掘削負荷 DMを計算 する (ステップ S 4 3 8 ) 。 この計算は、 例えば次のように行う。
図 3 3は、 ステップ 4 3 7で求めた負荷頻度分布を示す図である。 この分布よ り各ポンプ圧とフロント操作回数との積を求め、 それらの和をフロント操作回数 で除すことで操作回数 1回当たりの平均掘削負荷を求め、 これを平均掘削負荷 D Mとする。 また、 図 3 3に示した負荷頻度分布の積分値の重心 (X印) の位置を求 め、 この重心位置におけるポンプ圧を平均掘削負荷 DMとしてもよい。
このようにステップ S 4 3 8で現在のバケツト爪についての平均掘削負荷 DMが 求まると、 次に平均掘削負荷 DMより負荷補正係数 αを求める (ステップ S 4 4 0 ) 。 この計算は、 例えば図 3 4に示すような予め設定した平均掘削負荷 DMと負 荷補正係数 αの関係を用いて行う。
図 3 4において、 平均掘削負荷 DMと負荷補正係数 αの関係は、 DMが標準負荷 の時にひ = 1で、 DMが標準負荷より大きくなるとひが 1よりも次第に大きくなり、 D Mが標準負荷より小さくなると αが 1よりも次第に小さくなるように設定されて いる。 このようにして負荷補正係数ひを求めると、 現在のバケツト爪の操作回数 A S LFBを補正係数 αで次のように補正し、 補正操作回数 A S ' LFBを求める (ステツ プ S 4 4 2 ) 。
△ S ' LFB= A S LFB X
以上のように負荷補正した操作回数に関して部品毎の稼動台数の分布データが 算出されると、 図 2 4に示したステップ S 4 3 A及びステップ S 4 O Aの処理に おいてその稼動台数の分布図を作成し、 社内コンピュータへと出力される。
図 3 5に負荷補正したフロント操作回数に対する稼動台数の分布図の一例を、 図 3 6に負荷補正した走行操作回数に対する稼動台数の分布図の一例をそれぞれ 示す。 図 3 5、 図 3 6の横軸は油圧ショベルの稼動台数であり、 縦軸は負荷補正 したフロント操作回数及び走行操作回数である。
図 3 7は、 図 2 6のステップ S 4 7 Aにおける製品入れ替え台数の分布デ一夕 及び分布図を作成する処理の詳細を示すフローチャートである。 まず、 図 2 8に 示した入れ替えデータベースより機種 Aの全号機の入れ替えまでの走行距離を読 み出す (ステップ S 9 O A) 。 次いで、 この走行距離のデ一夕から走行距離に対 する製品入れ替え台数の分布データを算出し、 このデータに基づいて製品入れ替 え台数の分布図を作成する (ステップ S 9 2 A) 。 機種 B、 機種 C、 …について も同様に製品入れ替え台数の分布データを演算し、 分布図を作成する (ステップ S 9 4 A) 。 次いで、 サービスマンからの指示を待ち (ステップ S 9 6 A) 、 指 示があると作成した製品入れ替え台数の分布図を社内コンピュータへ出力する (ステップ S 9 8 A) 。
図 3 8に油圧ショベルの走行距離に対する製品入れ替え台数の分布図の一例を 示す。 図 3 8の横軸は油圧ショベルの走行距離であり、 縦軸は製品入れ替え台数 である。 また、 DAは分布図の最大入れ替え台数付近の走行距離、 つまり平均走行 距離である。
図 3 δは、 図 2 7のステップ S 5 5における交換した部品についての操作回数 を負荷補正し格納する処理の詳細を示すフローチャートである。 まず、 機種 Αの 号機番号 1〜Zの全データについて処理を行うため、 号機番号 Nが Z以下かどう かの判定を行い (ステップ S 4 0 0 ) 、 Nが Z以下であれば、 図 1 0に示した実 :'一夕ベースの N号機のバケツト爪交換時間間隔の格納部分にァ クセスし、 その積算値から下記式により交換時間間隔 ATFB ( i) を演算する (ステップ S 402) 。
△ TFB ( i ) =TFB ( i ) -TFB ( i - 1 )
i = l〜L (Lは N号機のパケット交換回数)
ここで、 バケツ卜爪の交換時間間隔 ATFB ( i ) はフロントの操作時間 (掘削 時間) ベースの値である。
次いで、 図 25に示した稼動データベースにおける機種 Aの N号機のポンプ負 荷頻度分布のフロント操作領域のデータを読み出し、 バケツト爪の各交換時間間 隔 ATFB (i) における掘削負荷の頻度分布を演算する (ステップ S 404) 。 この頻度分布の計算は、 掘削稼動時間が交換時間間隔 ATFB ( i) におけるもの となる点を除いて図 33に示したのと同様である。
次いで、 図 28に示した実績メンテナンスデータベースの N号機のバケツト爪 操作回数の格納部分にアクセスし、 その積算値から下記式によりバケツト爪の各 交換時間間隔 ATFB ( i ) における操作回数 ASFB ( i ) を演算する (ステップ S 406) 。
△ SFB ( i ) =SFB ( i ) - SFB ( i— 1)
i = l〜L (Lは N号機のバケツト爪の交換回数)
そして、 この処理を号機番号 1〜Zの全てについて行い、 機種 Aの全油圧ショ ベルについてパケット爪の各交換時間間隔 ATFB ( i ) における掘削負荷の頻度 分布及び操作回数 ASFB ( i ) のデータを収集する。
次いで、 交換時間間隔 ATFB ( i) に対応する各パケット爪についての操作回 数 1回当たりの平均掘削負荷 DM ( i) を計算し (ステップ S 408) 、 平均掘削 負荷 DM ( i ) より負荷補正係数ひ ( i ) を求める (ステップ S 410) 。 この処 理は、 図 32に示したフローチャートのステップ S 438, S 440における処 理と実質的に同じである。 そして、 ステップ S 406で求めた各バケツト爪の操 作回数 ASFB ( i) を補正係数 a ( i) で次のように補正し、 負荷補正した操作 回数 AS' FB ( i ) を求め、 分布データとしてデータベースに格納する (ステツ プ S 412) 。 △ S ' FB = ASFBX a
走行リンク等、 その他の部品についても同様に負荷補正した操作回数の分布デ —夕を演算し、 データベースに格納する (ステップ S 1 14) 。 機種 B、 機種 (:、 …の各部品についても同様に負荷補正した操作回数の分布デ一夕を演算し、 デー 夕ベースに格納する (ステップ S 1 16) 。
図 40は、 図 27のステップ S 56 Aにおける負荷補正した操作回数に対する 部品交換個数の分布データを算出し、 分布図を作成する処理の詳細を示すフロー チヤ一卜である。
図 40において、 まず、 図 28に示した実績メンテナンスデータベースより機 種 Aの全号機のメンテナンスデータを読み出す (ステップ S 10 OA) 。 次いで、 機種 Aの号機番号 1〜Zの全データについて処理を行うため、 号機番号 Nが Z以 下かどうかの判定を行い (ステップ S 102A) 、 Nが Z以下であれば、 読み出 した N号機のデ一夕のうち例えばまずバケツト爪について、 フロント操作回数の 積算値から下記式によりフロント操作回数 ASFB ( i) を演算する (ステップ S 104 A) 。
△ SFB ( i ) =SFB ( i ) 一 SFB ( i - 1 )
i = l〜L (Lは N号機のパケット爪の交換回数)
そして、 この処理を号機番号 1〜Zの全てについて行い、 機種 Aの全油圧ショ ベルの各バケツト爪についてフロント操作回数 ASFBのデ一夕を収集する。
このようにして全油圧ショベルのバケツト爪についてフロント操作回数 ASFB のデータ収集が完了すると、 このデータからフロント操作回数に対する部品交換 個数の分布データを算出し、 この分布データに基づいて部品交換個数の分布図を 作成するステップ S 106 A) 。 走行リンク等、 その他の部品についても同様に 部品交換個数の分布データを演算し、 分布図を作成する (ステップ S 108A) 。 機種 B、 機種 (:、 …についても同様に部品交換個数の分布データを演算し、 分布 図を作成する (ステップ S 1 1 OA) 。 次いで、 第 1の実施の形態と同様、 サー ビスマンからの指示を待ち (ステップ S 1 12) 、 指示があると作成した部品交 換個数の分布図を社内コンピュータへ出力する (ステップ S 1 14) 。
図 41にフロント操作回数に対する過去のバケツト爪交換個数の分布図の一例 を示す。 .図 4 1の横軸はフロント操作回数であり、 縦軸はバゲット爪交換個数で ある。 また、 DBは分布図の最大交換個数付近の走行距離、 つまり平均走行距離で ある。
以上のように構成した本実施の形態において、 油圧ショベルの入れ替え台数の 予測及び部品の交換個数の予測は、 第 1の実施の形態と同様に図 3 8及び図 4 1 を用いて行うことができる。
従って、 本実施の形態によっても、 稼動状態として走行距離と操作回数を用い、 油圧ショベルの入れ替え台数の予測及び部品の交換個数の予測を行うことができ る。 その結果、 油圧ショベルのメーカにあっては、 油圧ショベル及びその部品の 生産計画を適切に立てることができる。 また、 生産計画が適切であるので、 在庫 管理が適切に行え、 過剰在庫や製品不足の発生を極力減らすことができる。 更に、 油圧ショベルのレンタル会社にあっては、 油圧ショベルの購入台数、 下取り台数 の計画や部品の調達個数の計画を適切に立てることができ、 予算の立案が容易と なりかつ資産管理を適切に行うことができる。
また、 油圧ショベル等の建設機械にあっては、 部位毎に稼動状態だけでなく負 荷も異なり、 各部位の負荷の程度によっても部品の寿命 (交換時間間隔) が変動 する。 本実施の形態では、 部位毎の稼動状態 (操作回数) に加えて部位毎の負荷 を計測して基地局コンピュータ 3のデータベース 1 0 0に稼動データとして格納、 蓄積し、 その負荷の程度に応じて稼動状態 (操作回数) を負荷補正し、 この負荷 補正した稼動状態 (操作回数) を用いて各部位に係わる部品の修理交換個数を予 測するので、 負荷の相違による寿命の変動を修正でき、 部品の修理交換個数をよ り正確に予測することができる。
なお、 上記第 2の実施の形態では各部位の操作回数を負荷補正したが、 走行距 離も同様に負荷補正してもよく、 これにより油圧ショベルについても負荷の相違 による入れ替え時期の変動を修正でき、 油圧ショベルの入れ替え台数をより正確 に予測することができる。
また、 第 1の実施の形態では、 油圧ショベルの稼動時間及び部位毎の稼動時間 をそのまま用いたが、 これらの稼動時間についても第 2の実施の形態における操 作回数と同様に負荷補正し、 予測精度を向上させることができる。 本発明の第 3の実施の形態を図 4 2〜図 4 4により説明する。 本実施の形態は 平均稼動時間の代わりに別途定めた買換判定時間を用い、 入れ替え台数を予測す るものである。
本実施の形態に係わる建設機械の管理システムの全体構成は第 1の実施の形態 と同じであり、 図 1〜図 3に示した第 1の実施の形態と同様なシステム構成を有 している。 また、 機体側コントローラ 2及び基地局センタ一サーバ 3は下記する 点を除いて、 図 4〜図 2 6を用いて説明したのと同様の処理機能を有している。 以下に、 第 1の実施の形態との相違点を説明する。
図 4 2は本実施の形態に係わるセンターサーバ 3の機体 ·稼動情報処理部 5 0 の処理機能を示すフローチヤ一トである。
図 4 2において、 ステップ S 3 0〜S 3 6までの処理は図 7に示した第 1の実 施の形態の処理と同じである。
ステップ S 3 6で稼動時間の分布データを算出した後、 データベース 1 0 0の 図 1 0に示した稼動データベース部分から現在稼動している全油圧ショベルの稼 動データを読み出し、 機種毎に稼動時間が予め設定した買替判定時間を超えてい る油圧ショベルの台数を計算し、 買替情報としてデータベース 1 0 0に格納する (ステップ S 3 8 B ) 。 そして、 このように作成した買替情報を日報とともに社 内コンピュータ 4に送信し、 かつ日報をユーザ側コンピュータ 5に送信する (ス テツプ S 4 0 B ) 。 図 4 3は社内コンピュータ 4に送信された買替情報の一例を 示すものである。
ここで、 上記買替判定時間は例えば次のようにして決定することができる。 一般に油圧ショベル等の建設機械では、 図 4 4に示すように稼動時間の増加に 従って下取り価格は減少し、 逆に修理コストは増大する。 従って、 基本的には下 取り価格曲線 X 1と修理コスト曲線 X 2の交わる点 Pが最適買替時期といえる。 従って、 その最適買替時期よりも少し前がユーザに対して買替を推奨するのに好 ましい時期であり、 これを考慮して上記買替判定時間が設定される。 ただし、 図 4 4の曲線はあくまでも標準的なものであり、 建設機械の状態等によって価格や 修理コストは増減するから、 そのことも考慮に入れて買替判定時間を設定するの が望ましい。 或いは、 サービス員を各地に派遣して油圧ショベルの状態を調査し、 その調査結果と稼動時間とから最適買替時期を決定し、 それに基づいて買替判定 時間を設定しても良い。 また、 下取り価格曲線及び修理コスト曲線は機種によつ て異なるので、 買替判定時間も機種によって異なる値が設定される。
本実施の形態によっても、 第 1の実施の形態と同様、 油圧ショベルの販売台数 の予測を正確に行うことができ、 その結果油圧ショベルの生産計画を適切に立て ることができる。
また、 油圧ショベルの稼動時間が買替判定時間を超えているということは、 そ の油圧ショベルの買替を推奨すべき時期に達していることを示している。 そこで、 ステップ S 3 8 Bで求めた結果に基づいてユーザに対して売り込みを行い、 販売 促進を図ることができる。
なお、 第 1及び第 2の実施の形態では、 部品の交換個数の予測に関して交換し た部品の稼動データから直接交換個数を予測したが、 エンジン、 油圧ポンプ等、 修理 (オーバーホールを含む) を要する部品については、 まず部品の修理個数を 予測し、 この部品の修理工数からその修理に要する部品の交換個数を予測しても よい。 また、 この場合は、 部品の修理個数が予測できるので、 その修理に要する マンパワーを予測でき、 適切な人員計画を立てることができる。
また、 第 1及び第 2の実施の形態では、 稼動状態 (稼動時間) が基準値 (平均 稼動時間) を超えた機械台数、 部品個数の計算をするとき、 この計算及びその基 準値の設定を図 1 7及び図 1 9或いは図 3 8及び図 4 1のような分布図を出力し て人間が行うものとして説明したが、 それらの計算及び設定も例えば基地局セン 夕一サーバの製品入れ替え ·部品交換情報処理部で行うようにしてもよく、 これ により人間サイドの負担を軽減できるとともに、 正確なデータを得ることができ る。
更に、 以上の実施の形態では、 巿場で稼動している油圧ショベルの稼動時間に 対する稼動台数の分布データ及び分布図の作成 ·送信は、 センターサーバ 3で曰 報の作成 ·送信と共に毎日行ったが、 毎日でなくてもよいし、 分布データの作成 のみ毎日行い、 分布図の作成 ·送信は 1週間毎に行う等、 頻度を異ならせてもよ い。 また、 分布デ一夕の作成はセンタ一サーバ 3で自動で行い、 分布図の作成 - 送信は、 社内コンピュータを用いサービスマンの指示によって行ってもよい。 ま た、 両方共サービスマンの指示によって行ってもよい。
また、 上記実施の形態では、 入れ替えた旧油圧ショベルにの稼動時間に対する 製品入れ替え台数の分布データ及び分布図や、 稼動時間に対する部品交換個数の 分布データ及び分布図の作成を製品入れ替えデータ及び部品交換データを入力す る都度行ったが、 これも適当な時期に一括して行うなど、 他のタイミングで行つ てもよい。
更に、 エンジン稼動時間の計測は、 エンジン回転数センサ 4 6を用いたが、 セ ンサ 4 3によりエンジンキースィヅチの O N · O F Fを検出し、 この信号とタイ マを用いて計測してもよいし、 エンジンに付属するオルターネー夕の発電信号の O N · O F Fと夕イマで計測したり、 そのオル夕ネー夕の発電でアワーメータを 回転させ、 エンジン稼動時間を計測してもよい。
更に、 センターサーバ 3で作成した情報はユーザ側及び社内に送信したが、 更 に油圧ショベル 1側に戻すようにしてもよい。 産業上の利用可能性
本発明によれば、 建設機械の販売台数の予測を正確に行うことができ、 建設機 械の生産計画を適切に立てることができる。 このため、 建設機械の在庫管理が適 切に行え、 過剰在庫や製品不足の発生を極力減らすことができる。
また、 本発明によれば、 建設機械の部品の販売個数の予測を正確に行うことが でき、 その部品の生産計画を適切に立てることができる。 このため、 部品の在庫 管理が適切に行え、 過剰在庫や製品不足の発生を極力減らすことができる。 また、 本発明によれば、 油圧ショベルのレンタル会社において、 油圧ショベル の購入台数、 下取り台数の計画や部品の調達個数の計画を適切に立てることがで き、 予算の立案が容易となりかつ資産管理を適切に行うことができる。

Claims

請求の範囲
1 . 市場で稼動する複数台の建設機械(1 , l a, l b, l c)のそれぞれの稼動状態を計測 し、 これを基地局コンピュータ(3)に転送しデ一夕べ一ス(100)に稼動データとし て格納、 蓄積する第 1手順(S9-14, S20-24, S30-32)と、
前記基地局コンピュータにおいて、 前記稼動データを統計処理し、 建設機械の 入れ替え台数の予測データを生成し出力する第 2手順(S36-40,S44-47)とを有し、 前記予測データを用いて建設機械の入れ替え台数を予測することを特徴とする建 設機械の管理方法。
2 . 請求項 1記載の建設機械の管理方法において、 前記第 2手順は、 前記予測デ 一夕として、 前記稼動データに基づき、 現在稼動している建設機械の稼動状態と その稼動台数との第 1相関を求める第 3手順(S36- 40, S60-72)を有し、 前記第 1相 関により建設機械の入れ替え台数を予測することを特徴とする建設機械の管理方 法。
3 . 請求項 2記載の建設機械の管理方法において、 前記第 2手順は、 前記予測デ 一夕として、 過去に入れ換えられた建設機械の入れ替えデータと稼動データに基 づき、 過去の建設機械の稼動状態とその入れ替え台数との第 2相関を求める第 4 手順(S44- 47,S90-98)を更に有し、 前記第 1相関と第 2相関とを比較し建設機械の 入れ替え台数を予測することを特徴とする建設機械の管理方法。
4 . 請求項 1記載の建設機械の管理方法において、 前記第 2手順は、 前記予測デ 一夕として、 前記稼動デ一夕から現在稼動している建設機械のうち稼動状態が予 め定めた基準値を超えている台数を求める第 5手順(S36- 40, S60- 72)を有し、 この 台数に基づいて建設機械の入れ替え台数を予測することを特徴とする建設機械の 管理方法。
5 . 請求項 4記載の建設機械の管理方法において、 前記基準値は、 過去に入れ換 えられた建設機械の平均稼動状態(TA;DA)であることを特徴とする建設機械の管理 方法。
6 . 請求項 5記載の建設機械の管理方法において、 前記第 2手順は、 過去に入れ 換えられた建設機械の入れ替えデータと稼動データに基づき、 過去の建設機械の 稼動状態とその入れ替え台数との相関を求める第 6手順(S44- 47, S90-98)を更に有 し、 前記平均稼動状態は前記相関から求めた値 (TA:DA)であることをを特徴とする 建設機械の管理方法。
7 . 請求項 1〜 6のいずれか 1項記載の建設機械の管理方法において、 前記稼動 状態は稼動時間と走行距離の少なくとも一方であることを特徴とする建設機械の 管理方法。
8 . 請求項 4記載の建設機械の管理方法において、 前記稼動状態が稼動時間であ り、 前記基準値は、 下取り価格曲線 (XI)と修理コスト曲線 (X2)の交点 (P)から求め た定めた買替判定時間であることを特徴とする建設機械の管理方法。
9 . 市場で稼動する複数台の建設機械(1, l a, l b, lc)のそれぞれについて部位毎(1 2, 13, 15, 21 a, 21 b, 32)の稼動状態を計測し、 これらの稼動状態を基地局コンビユー 夕(3)に転送しデータベースに稼動デ一夕として格納、 蓄積する第 1手順(S9-14, S20-24, S30-32)と、
前記基地局コンピュータにおいて、 前記稼動データを統計処理し、 各部位に係 わる部品の修理交換個数の予測データを生成し出力する第 2手順(S36-40, S50-5 6)とを有し、 前記予測データを用いて各部位に係わる部品の修理交換個数を予測 することを特徴とする建設機械の管理方法。
1 0 . 請求項 9記載の建設機械の管理方法において、 前記第 2手順は、 前記予測 データとして、 前記稼動データに基づき、 現在稼動している建設機械の部位毎の 稼動状態とその稼動台数との第 1相関を求める第 3手順(S36- 40, S81- 87)を有し、 前記第 1相関より各部位に係わる部品の修理交換個数を予測することを特徴とす る建設機械の管理方法。
1 1. 請求項 1 0記載の建設機械の管理方法において、 前記第 2手順は、 前記予 測データとして、 過去に修理交換した部品の修理交換デ一夕と稼動データに基づ き、 その部品が係わる部位毎の過去の稼動状態と修理交換個数との第 2相関を求 める第 4手順(S50-56,S100-114)を更に有し、 前記第 1相関と第 2相関とを比較し 各部位に係わる部品の修理交換個数を予測することを特徴とする建設機械の管理 方法。
1 2. 請求項 9項記載の建設機械の管理方法において、 前記第 1手順 (S9-S18A,S 20-24,S30A-32A)は、 前記部位毎の稼動状態に加えて部位毎の負荷を計測し、 前記 基地局コンピュータ(3)のデータベース(100)に稼動データとして格納、 蓄積し、 前記第 2手順は、 前記負荷の程度に応じて前記稼動状態を負荷補正する第 5手 順(S42A,S430- 442)を更に有し、 この負荷補正した稼動状態を稼動データとして用 いて前記予測データを生成することを特徴とする建設機械の管理方法。
1 3. 請求項 9〜1 2のいずれか 1項記載の建設機械の管理方法において、 前記 稼動状態は稼動時間と部位毎の操作回数の少なくとも一方であることを特徴とす る建設機械の管理方法。
1 4. 請求項 9〜1 2のいずれか 1項記載の建設機械の管理方法において、 前記 建設機械は油圧ショベル(1)であり、 前記部位は、 油圧ショベルのフロント(15)、 旋回体(13)、 走行体(12)、 エンジン(32)、 油圧ポンプ (21a,21b)のいずれかである ことを特徴とする建設機械の管理方法。
1 5. 市場で稼動する複数台の建設機械(1, la, lb,lc)のそれぞれの稼動状態を計 測、 収集する稼動データ計測収集手段(2, 40-46, 48, S9-14)と、
基地局に設置され、 前記計測、 収集した建設機械の稼動状態を稼動デ一夕とし て格納、 蓄積するデータベース(100)を有する基地局コンピュー夕(3)とを備え、 前記基地局コンピュータは、 前記稼動データを統計処理し、 建設機械の入れ替 え台数の予測データを生成し出力する演算手段(50, 51 , S36-40,S44-47)とを有し、 前記予測データを用いて建設機械の入れ替え台数を予測することを特徴とする建 設機械の管理:
1 6 . 請求項 1 5記載の建設機械の管理システムにおいて、 前記演算手段は、 前 記予測データとして、 前記稼動データに基づき、 現在稼動している建設機械の稼 動状態とその稼動台数との第 1相関を求める第 1手段(50, S36-40, S60-72)を有し、 前記第 1相関により建設機械の入れ替え台数を予測することを特徴とする建設機 械の管理システム。
1 7 . 請求項 1 6記載の建設機械の管理システムにおいて、 前記演算手段は、 前 記予測データとして、 過去に入れ換えられた建設機械の入れ替えデータと稼動デ —夕に基づき、 過去の建設機械の稼動状態とその入れ替え台数との第 2相関を求 める第 2手段(51 , S44-47, S90-98)を更に有し、 前記第 1相関と第 2相関とを比較 し建設機械の入れ替え台数を予測することを特徴とする建設機械の管理シ
1 8 . 請求項 1 5記載の建設機械の管理システムにおいて、 前記演算手段は、 前 記予測データとして、 前記稼動データから現在稼動して。 いる建設機械のうち稼 動状態が予め定めた基準値を超えている台数を求める第 3手順(50, S36-40, S60-7 2)を有し、 この台数に基づいて建設機械の入れ替え台数を予測することを特徴と する建設機械の管理システム。
1 9 . 請求項 1 8記載の建設機械の管理システムにおいて、 前記基準値は、 過去 に入れ換えられた建設機械の平均稼動状態(TA;DA)であることを特徴とする建設機 械の管理:
2 0 . 請求項 1 9記載の建設機械の管理方法において、 前記演算手順は、 過去に 入れ換えられた建設機械の入れ替えデータと稼動データに基づき、 過去の建設機 械の稼動状態とその入れ替え台数との相関を求める第 4手順(51,S44-47, S90-98) を更に有し、 前記平均稼動状態は前記相関から求めた値であることをを特徴とす る建設機械の管理システム。
2 1 . 請求項 1 5〜 2 0のいずれか 1項記載の建設機械の管理システムにおいて、 前記稼動状態は稼動時間と走行距離の少なくとも一方であることを特徴とする建 設機械の管理システム。
2 2 . 請求項 1 8記載の建設機械の管理システムにおいて、 前記稼動状態が稼動 時間であり、 前記基準値は、 下取り価格曲線 (XI)と修理コスト曲線 (X2)の交点 (P)から求めた定めた買替判定時間であることを特徴とする建設機械の管理システ ム。
2 3 . 市場で稼動する複数台の建設機械(1, l a, l b,l c)のそれぞれについて部位毎 (12, 13,15, 21 a,21 b,32)の稼動状態を計測、 収集する稼動データ計測収集手段(2, 40 - 46, 48, S9— 14)と、
基地局に設置され、 前記計測、 収集した部位毎の稼動状態を稼動データとして 格納、 蓄積するデータベース(100)を有する基地局コンピュータ(3, S30-32)とを備 え、
前記基地局コンピュータは、 前記稼動データを統計処理し、 各部位に係わる部 品の修理交換個数の予測データを生成し出力する演算手段(50, 51, S36-40, S50 - 5
6)を有し、 前記予測データを用いて各部位に係わる部品の修理交換個数を予測す ることを特徴とする建設機械の管理システム。
2 4 . 請求項 2 3記載の建設機械の管理システムにおいて、 前記演算手段は、 前 記予測デ一夕として、 前記稼動データに基づき、 現在稼動している建設機械の部 位毎の稼動状態とその稼動台数との第 1相関を求める第 1手段(50, S36-40, S81 -8
7)を有し、 前記第 1相関により各部位に係わる部品の修理交換個数を予測するこ とを特徴とする建設機械の管理システム。
2 5 . 請求項 2 3記載の建設機械の管理システムにおいて、 前記演算手段は、 前 記予測データとして、 過去に修理交換した部品の修理交換データと稼動データに 基づき、 その部品が係わる部位毎の過去の稼動状態と修理交換個数との第 2相関 を求める第 2手段(51 , S50-56, S100-1 14)を更に有し、 前記第 1相関と第 2相関と を比較し各部位に係わる部品の修理交換個数を予測することを特徴とする建設機 械の管理システム。
2 6 . 請求項 2 3記載の建設機械の管理システムにおいて、 前記データ計測収集 手段(2, 40-46, 48, S9- 1 8A)は、 前記部位毎の稼動状態に加えて部位毎の負荷を計測, 収集し、
前記基地局コンピュータ(3,S30A-32A)は、 前記計測、 収集した部位毎の稼動状 態と負荷をデータベースに稼動デ一夕として格納、 蓄積し、
前記演算手段は、 前記負荷の程度に応じて前記稼動状態を補正する第 3手段(5 0, S42A, S430-442)を更に有し、 この負荷補正した稼動状態を稼動データとして用 いて前記予測データを生成することを特徴とする建設機械の管理システム。
2 7 . 請求項 2 3〜2 6のいずれか 1項記載の建設機械の管理システムにおいて、 前記稼動状態は稼動時間と操作回数の少なくとも一方であることを特徴とする建 設機械の管理:
2 8 . 請求項 2 3〜 2 6のいずれか 1項記載の建設機械の管理システムにおいて、 前記建設機械は油圧ショベル(1 )であり、 前記部位は、 油圧ショベルのフロント (1 5)、 旋回体(13)、 走行体(1 2)、 エンジン(32)、 油圧ポンプ(21 a, 21 b)のいずれか であることを特徴とする建設機械の管理システム。
2 9 . 市場で稼動する複数台の建設機械(l,l a, l b, l c)のそれぞれの稼動状態を稼 動データとして格納、 蓄積するとともに、 前記稼動データを統計処理し、 建設機 械の入れ替え台数の予測データを生成し出力することを特徴とする演算処理装置。
30. 市場で稼動する複数台の建設機械(1, la, lb, lc)のそれぞれについて部位(1 2, 13, 15, 21a, 21b, 32)毎の稼動状態を稼動デ一夕として格納、 蓄積するとともに、 前記稼動データを統計処理し、 各部位に係わる部品の修理交換個数の予測データ を生成し出力することを特徴とする演算処理装置。
PCT/JP2001/002852 2000-03-31 2001-04-02 Procede et systeme de gestion de machines de construction et dispositif de traitement arithmetique WO2001073633A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2001571276A JP4245842B2 (ja) 2000-03-31 2001-04-02 建設機械の管理システム
EP01921781A EP1241608A4 (en) 2000-03-31 2001-04-02 METHOD AND SYSTEM FOR ADMINISTERING A BUILDING MACHINE AND ARITHMETIC PROCESSING DEVICE
US09/959,862 US6810362B2 (en) 2000-03-31 2001-04-02 Construction machine managing method and system, and arithmetic processing device

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2000-98055 2000-03-31
JP2000-99164 2000-03-31
JP2000099164 2000-03-31
JP2000098055 2000-03-31

Publications (1)

Publication Number Publication Date
WO2001073633A1 true WO2001073633A1 (fr) 2001-10-04

Family

ID=26589162

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2001/002852 WO2001073633A1 (fr) 2000-03-31 2001-04-02 Procede et systeme de gestion de machines de construction et dispositif de traitement arithmetique

Country Status (6)

Country Link
US (1) US6810362B2 (ja)
EP (2) EP1241608A4 (ja)
JP (1) JP4245842B2 (ja)
KR (1) KR100656578B1 (ja)
CN (1) CN100409216C (ja)
WO (1) WO2001073633A1 (ja)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004062675A (ja) * 2002-07-30 2004-02-26 Komatsu Ltd 移動機械の部品情報管理システム、移動機械の部品情報管理方法、およびこの方法をコンピュータに実行させるためのプログラム
JP2005173979A (ja) * 2003-12-11 2005-06-30 Komatsu Ltd 補給部品生産予測システム、補給部品生産予測方法及びプログラム
JP2007272314A (ja) * 2006-03-30 2007-10-18 Hitachi Constr Mach Co Ltd 建設機械選定システム
US7480903B2 (en) 2002-03-25 2009-01-20 Hitachi Construction Machinery Co., Ltd. Operation data collection system for work machine
US10620596B2 (en) 2016-12-19 2020-04-14 Fanuc Corporation Maintenance component management device, maintenance component management method and computer readable medium
JP2022073650A (ja) * 2020-11-02 2022-05-17 マースシフト株式会社 利用料算出システム、サーバ、及び利用料算出方法

Families Citing this family (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8090598B2 (en) 1996-01-29 2012-01-03 Progressive Casualty Insurance Company Monitoring system for determining and communicating a cost of insurance
US8140358B1 (en) 1996-01-29 2012-03-20 Progressive Casualty Insurance Company Vehicle monitoring system
US7166475B2 (en) * 1999-02-26 2007-01-23 Cyclacel Ltd. Compositions and methods for monitoring the modification state of a pair of polypeptides
JP2005165371A (ja) * 2001-06-13 2005-06-23 Honda Motor Co Ltd 整備者スキル管理システム
US8014974B2 (en) 2001-12-19 2011-09-06 Caterpillar Inc. System and method for analyzing and reporting machine operating parameters
US6832141B2 (en) * 2002-10-25 2004-12-14 Davis Instruments Module for monitoring vehicle operation through onboard diagnostic port
US7110918B2 (en) * 2003-11-05 2006-09-19 Shoplogix Inc. Self-contained system and method for remotely monitoring machines
US20080140306A1 (en) * 2005-11-30 2008-06-12 Snodgrass Ken L Voice recognition method and system for displaying charts and maps
US20070150138A1 (en) 2005-12-08 2007-06-28 James Plante Memory management in event recording systems
US10878646B2 (en) 2005-12-08 2020-12-29 Smartdrive Systems, Inc. Vehicle event recorder systems
US20070132773A1 (en) * 2005-12-08 2007-06-14 Smartdrive Systems Inc Multi-stage memory buffer and automatic transfers in vehicle event recording systems
US20070135979A1 (en) * 2005-12-09 2007-06-14 Smartdrive Systems Inc Vehicle event recorder systems
US20070135980A1 (en) * 2005-12-09 2007-06-14 Smartdrive Systems Inc Vehicle event recorder systems
CA2642334A1 (en) * 2006-02-16 2007-08-23 Shoplogix Inc. System and method for managing manufacturing information
US9201842B2 (en) 2006-03-16 2015-12-01 Smartdrive Systems, Inc. Vehicle event recorder systems and networks having integrated cellular wireless communications systems
EP2002369B1 (en) 2006-03-16 2015-08-05 Smartdrive Systems, Inc. Vehicle event recorded systems and networks having parallel communication links
US8996240B2 (en) 2006-03-16 2015-03-31 Smartdrive Systems, Inc. Vehicle event recorders with integrated web server
US20090090102A1 (en) * 2006-05-03 2009-04-09 Wilfred Busse Method of reducing the load of one or more engines in a large hydraulic excavator
US8649933B2 (en) * 2006-11-07 2014-02-11 Smartdrive Systems Inc. Power management systems for automotive video event recorders
US8989959B2 (en) 2006-11-07 2015-03-24 Smartdrive Systems, Inc. Vehicle operator performance history recording, scoring and reporting systems
US8868288B2 (en) * 2006-11-09 2014-10-21 Smartdrive Systems, Inc. Vehicle exception event management systems
US8139820B2 (en) 2006-12-13 2012-03-20 Smartdrive Systems Inc. Discretization facilities for vehicle event data recorders
US8239092B2 (en) 2007-05-08 2012-08-07 Smartdrive Systems Inc. Distributed vehicle event recorder systems having a portable memory data transfer system
US20090171482A1 (en) * 2007-12-31 2009-07-02 Spencer Mindeman Attachment controller
JP4539722B2 (ja) * 2008-01-14 2010-09-08 株式会社デンソー 地図配信サーバおよび地図配信システム
US9916625B2 (en) 2012-02-02 2018-03-13 Progressive Casualty Insurance Company Mobile insurance platform system
US20110056194A1 (en) * 2009-09-10 2011-03-10 Bucyrus International, Inc. Hydraulic system for heavy equipment
CN103154898B (zh) 2010-05-14 2016-07-06 哈尼施费格尔技术公司 机器警示的远程监视
US8718845B2 (en) 2010-10-06 2014-05-06 Caterpillar Global Mining Llc Energy management system for heavy equipment
US8626403B2 (en) 2010-10-06 2014-01-07 Caterpillar Global Mining Llc Energy management and storage system
US8606451B2 (en) 2010-10-06 2013-12-10 Caterpillar Global Mining Llc Energy system for heavy equipment
JP2013186740A (ja) * 2012-03-08 2013-09-19 Fanuc Ltd 機械の管理システム
US9728228B2 (en) 2012-08-10 2017-08-08 Smartdrive Systems, Inc. Vehicle event playback apparatus and methods
US9190852B2 (en) 2012-09-21 2015-11-17 Caterpillar Global Mining Llc Systems and methods for stabilizing power rate of change within generator based applications
US9501878B2 (en) 2013-10-16 2016-11-22 Smartdrive Systems, Inc. Vehicle event playback apparatus and methods
US9610955B2 (en) 2013-11-11 2017-04-04 Smartdrive Systems, Inc. Vehicle fuel consumption monitor and feedback systems
US8892310B1 (en) 2014-02-21 2014-11-18 Smartdrive Systems, Inc. System and method to detect execution of driving maneuvers
JP6178739B2 (ja) * 2014-03-07 2017-08-09 ヤンマー株式会社 遠隔サーバ
US9663127B2 (en) 2014-10-28 2017-05-30 Smartdrive Systems, Inc. Rail vehicle event detection and recording system
US11069257B2 (en) 2014-11-13 2021-07-20 Smartdrive Systems, Inc. System and method for detecting a vehicle event and generating review criteria
US9679420B2 (en) 2015-04-01 2017-06-13 Smartdrive Systems, Inc. Vehicle event recording system and method
WO2020013252A1 (ja) * 2018-07-10 2020-01-16 住友重機械工業株式会社 建設機械の表示方法及び建設機械の支援装置
CN112581155A (zh) * 2019-09-30 2021-03-30 北京国双科技有限公司 一种数据处理方法及装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03242529A (ja) * 1990-02-20 1991-10-29 Mitsubishi Electric Corp 保守支援評価装置
JPH0526784A (ja) * 1991-07-23 1993-02-02 Fujita Corp 建設用作業機械の故障発生集中管理方法
JPH06116988A (ja) * 1992-10-06 1994-04-26 Hitachi Constr Mach Co Ltd 建設機械のメンテナンスモニタ装置
JPH0787005A (ja) * 1993-09-10 1995-03-31 Hitachi Constr Mach Co Ltd 移動作業機械の管理システム
JPH07294365A (ja) * 1994-03-31 1995-11-10 Caterpillar Inc ポンプ効率を表示するための方法及び装置
JPH09329051A (ja) * 1996-06-12 1997-12-22 Komatsu Ltd 自走車両

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1247743A (en) * 1985-01-24 1988-12-28 Izuru Morita Operation data recording system
DE4008560C2 (de) * 1989-03-17 1995-11-02 Hitachi Ltd Verfahren und Vorrichtung zum Bestimmen einer Restlebensdauer eines Aggregats
KR0173835B1 (ko) * 1994-06-01 1999-02-18 오까다 하지모 건설기계의 영역제한 굴삭제어장치
JP3242529B2 (ja) 1994-06-07 2001-12-25 松下通信工業株式会社 ステレオ画像対応付け方法およびステレオ画像視差計測方法
US5737215A (en) * 1995-12-13 1998-04-07 Caterpillar Inc. Method and apparatus for comparing machines in fleet
KR100240085B1 (ko) * 1995-12-30 2000-01-15 토니헬 굴삭기의 조작장치
JP2001507144A (ja) * 1996-11-27 2001-05-29 サンドストランド・コーポレイション 疲労破損を受けやすい構成要素を保全する方法
US5808907A (en) * 1996-12-05 1998-09-15 Caterpillar Inc. Method for providing information relating to a mobile machine to a user
EP0905325A4 (en) * 1996-12-12 2000-05-31 Caterpillar Mitsubishi Ltd CONSTRUCTION MACHINE CONTROL DEVICE
JPH10237904A (ja) * 1997-02-25 1998-09-08 Shin Caterpillar Mitsubishi Ltd 建設機械の制御方法およびその装置
DE19712767A1 (de) * 1997-03-26 1998-10-01 Esg Elektronik System Gmbh Verfahren zum Abschätzen der Ausfallsrate von Komponenten technischer Einrichtungen
JP3335106B2 (ja) * 1997-07-16 2002-10-15 株式会社小松製作所 機械のメンテナンス時期判定方法および装置
JP3366837B2 (ja) * 1997-08-15 2003-01-14 株式会社小松製作所 機械の異常監視装置および方法
US6680694B1 (en) * 1997-08-19 2004-01-20 Siemens Vdo Automotive Corporation Vehicle information system
JP4023643B2 (ja) * 1998-06-02 2007-12-19 株式会社小松製作所 建設機械の機器性能データ測定方法及び装置
JP2000027236A (ja) * 1998-07-07 2000-01-25 Komatsu Ltd 建設機械のデータ記憶装置およびデータ処理装置
EP0989525A3 (en) * 1998-08-31 2001-09-19 Kabushiki Kaisha Kobe Seiko Sho Management system for construction machines
CN1238510A (zh) * 1999-05-07 1999-12-15 郑彦忠 一种具有烫色标识的鞋材及其制作工艺
CN1199138C (zh) * 2000-03-31 2005-04-27 日立建机株式会社 建筑机械的租赁费用设定系统
US6611740B2 (en) * 2001-03-14 2003-08-26 Networkcar Internet-based vehicle-diagnostic system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03242529A (ja) * 1990-02-20 1991-10-29 Mitsubishi Electric Corp 保守支援評価装置
JPH0526784A (ja) * 1991-07-23 1993-02-02 Fujita Corp 建設用作業機械の故障発生集中管理方法
JPH06116988A (ja) * 1992-10-06 1994-04-26 Hitachi Constr Mach Co Ltd 建設機械のメンテナンスモニタ装置
JPH0787005A (ja) * 1993-09-10 1995-03-31 Hitachi Constr Mach Co Ltd 移動作業機械の管理システム
JPH07294365A (ja) * 1994-03-31 1995-11-10 Caterpillar Inc ポンプ効率を表示するための方法及び装置
JPH09329051A (ja) * 1996-06-12 1997-12-22 Komatsu Ltd 自走車両

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP1241608A4 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7480903B2 (en) 2002-03-25 2009-01-20 Hitachi Construction Machinery Co., Ltd. Operation data collection system for work machine
JP2004062675A (ja) * 2002-07-30 2004-02-26 Komatsu Ltd 移動機械の部品情報管理システム、移動機械の部品情報管理方法、およびこの方法をコンピュータに実行させるためのプログラム
JP2005173979A (ja) * 2003-12-11 2005-06-30 Komatsu Ltd 補給部品生産予測システム、補給部品生産予測方法及びプログラム
JP2007272314A (ja) * 2006-03-30 2007-10-18 Hitachi Constr Mach Co Ltd 建設機械選定システム
US10620596B2 (en) 2016-12-19 2020-04-14 Fanuc Corporation Maintenance component management device, maintenance component management method and computer readable medium
JP2022073650A (ja) * 2020-11-02 2022-05-17 マースシフト株式会社 利用料算出システム、サーバ、及び利用料算出方法

Also Published As

Publication number Publication date
US20020161551A1 (en) 2002-10-31
EP2228493A3 (en) 2012-06-27
EP2228493A2 (en) 2010-09-15
EP1241608A4 (en) 2009-07-01
KR20020020707A (ko) 2002-03-15
JP4245842B2 (ja) 2009-04-02
EP1241608A1 (en) 2002-09-18
CN100409216C (zh) 2008-08-06
KR100656578B1 (ko) 2006-12-11
US6810362B2 (en) 2004-10-26
CN1365481A (zh) 2002-08-21

Similar Documents

Publication Publication Date Title
WO2001073633A1 (fr) Procede et systeme de gestion de machines de construction et dispositif de traitement arithmetique
JP4689134B2 (ja) 建設機械の管理方法及びシステム並びに演算処理装置
JP4593055B2 (ja) 建設機械の管理方法及びシステム並びに演算処理装置
JP4689136B2 (ja) 作業現場に配備された作業機械の実稼動時間の検出方法、データ収集・管理システム、および基地局
US6449884B1 (en) Method and system for managing construction machine, and arithmetic processing apparatus
KR100487598B1 (ko) 고장대처법 출력방법
CN107408227B (zh) 工程机械的更换件管理系统
US9637891B2 (en) Management server for working machine and management method for working machine
JP2000297443A (ja) 建設機械の情報管理装置
JP2002188183A (ja) 作機機械の管理装置
JP4619386B2 (ja) 建設機械の情報管理装置
JP4540695B2 (ja) 建設機械の情報管理装置
JP6441849B2 (ja) 作業機械の部品交換時期算出システム
JP7461899B2 (ja) 保守支援システム
JP2002121775A (ja) 作業機械の表示装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 01800729.5

Country of ref document: CN

AK Designated states

Kind code of ref document: A1

Designated state(s): CN JP KR US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR

ENP Entry into the national phase

Ref document number: 2001 571276

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2001921781

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 09959862

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 1020017014530

Country of ref document: KR

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWP Wipo information: published in national office

Ref document number: 1020017014530

Country of ref document: KR

WWP Wipo information: published in national office

Ref document number: 2001921781

Country of ref document: EP

WWR Wipo information: refused in national office

Ref document number: 1020017014530

Country of ref document: KR