WO2001051237A1 - Procede de coulee sous pression et machine de coulee sous pression - Google Patents

Procede de coulee sous pression et machine de coulee sous pression Download PDF

Info

Publication number
WO2001051237A1
WO2001051237A1 PCT/JP2001/000071 JP0100071W WO0151237A1 WO 2001051237 A1 WO2001051237 A1 WO 2001051237A1 JP 0100071 W JP0100071 W JP 0100071W WO 0151237 A1 WO0151237 A1 WO 0151237A1
Authority
WO
WIPO (PCT)
Prior art keywords
cavity
die
die casting
vacuum
sleeve
Prior art date
Application number
PCT/JP2001/000071
Other languages
English (en)
French (fr)
Inventor
Yukio Kuramasu
Osamu Yoshida
Yoshihiro Tajima
Takaaki Ikari
Original Assignee
Nippon Light Metal Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Light Metal Co., Ltd. filed Critical Nippon Light Metal Co., Ltd.
Priority to US10/169,865 priority Critical patent/US6648054B2/en
Priority to EP01900648A priority patent/EP1252949B1/en
Priority to AU2001225478A priority patent/AU2001225478A1/en
Priority to JP2001551644A priority patent/JP3994735B2/ja
Publication of WO2001051237A1 publication Critical patent/WO2001051237A1/ja

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/14Machines with evacuated die cavity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/20Accessories: Details
    • B22D17/32Controlling equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D2/00Arrangement of indicating or measuring devices, e.g. for temperature or viscosity of the fused mass

Definitions

  • the present invention relates to a method and apparatus for manufacturing a die-cast product in which structural defects such as nests and blowholes are suppressed and which can be used not only as a structural material but also as a functional material.
  • molten aluminum melt or molten aluminum alloy hereinafter referred to as “molten metal”
  • molten metal molten aluminum melt or molten aluminum alloy
  • molds designed for thin-walled products and products with complex shapes are likely to create fluid bottlenecks, making it difficult to completely remove gas components from cavities.
  • the gas remaining in the cavity is entrained inside the aluminum material when the molten aluminum is cooled and solidified in the mold, and as a structural defect such as nests and blow holes, etc. Be brought in.
  • the obtained die cast product is inferior in mechanical properties such as strength and elongation, and is used as a functional material for scrolls, pistons, cylinder blocks, connecting rods, suspension parts, etc. It was considered unsuitable for use. Suppressing structural defects caused by residual gas expands the application field of the die-cast method with excellent productivity.
  • the vacuum die casting method is known as a method for eliminating the adverse effects of residual gas.
  • the cavity is evacuated before the molten aluminum is injected to remove air from the cavity.
  • air enters through the seam of the mold, and air is mixed in when injecting the molten aluminum into the sleeve.
  • the degree of vacuum in the cavity stays at 200-500 mbar, The degree of vacuum cannot be improved more than this.
  • Vacuum die force Although the air entrapment is smaller than that of the normal die-strength products, structural defects such as porosity caused by gas entrapment are still detected in products obtained by the gas method. It is far from being used as a functional material.
  • the oxygen die casting method was developed (see Japanese Patent Publication No. 50-21143).
  • oxygen die-cast method oxygen is filled in the cavity at a pressure higher than the atmospheric pressure in order to replace the gas in the cavity with oxygen.
  • Oxygen sent into the cavity is blown out from the joint and injection port of the mold, so that air can be prevented from entering the cavity from the joint and injection port of the mold.
  • the oxygen in the cavities sent in reacts with the molten aluminum to form fine AI2O3, which disperses in the product and does not adversely affect the die cast product.
  • the present inventors vacuum-evacuate the mold cavity to a vacuum of 100 mbar or less, and then blow a reactive gas such as oxygen into the mold to reduce the atmospheric pressure of the cavity.
  • a reactive gas such as oxygen
  • the reactive gas is sent to the vacuum cavity, so that the reactive gas spreads to every corner of the mold, and the air remaining in the cavity and moisture derived from the release agent are efficiently released. .
  • the vacuum suction and the injection of the reactive gas cannot be performed at the same time, and the reactive gas is injected after the vacuum suction is stopped. Therefore, during this time, air can enter the cavity from the mating surface of the mold and remain easily.
  • the reactive gas injection port is located only in the cavity, the inside of the sleeve cannot be filled with the reactive gas during the injection of the molten aluminum alloy, and air entering the cavity through the gap between the plunger tip and the sleeve.
  • the present invention has been devised to solve such a problem.
  • the present invention relates to a vacuum-oxygen die-casting method that utilizes the advantages of the vacuum die-casting method and the oxygen die-casting method.
  • unreacted reactive gas is exhausted from the cavity by vacuum suction of the cavity again through the overflow section, runner or sleeve, and the entrained gas is compared with conventional die cast products.
  • the aim is to significantly reduce the volume and obtain a die-cast product that can be used not only as a structural material but also as a functional component.
  • the cavity of the die casting mold is evacuated to 100 mbar or less, and then the reactive gas is blown into the cavity from the sleeve by overlapping the vacuum suction.
  • the atmosphere pressure of the cavity is increased to the atmospheric pressure or higher, and the molten aluminum alloy is injected into the sleeve while continuously blowing the reactive gas.
  • the cavity is evacuated again, and the plunger is advanced to advance the aluminum in the sleeve. It is characterized in that molten alloy is pressed into the cavity.
  • Vacuum suction is preferably performed at a suction speed of 500 mbar / sec or more, and the cavity is sucked in vacuum through a hot runner and an exhaust pipe opened in the overflow section.
  • Reactive gas such as oxygen is blown into the vacuum so as to overlap with the vacuum, and the cavity is set to an atmospheric pressure higher than the atmospheric pressure.
  • the injection of the reactive gas may be stopped before the plunger is advanced, or may be continued until the production is completed.
  • the aluminum alloy melt to be manufactured is injected into the sleeve from the hot water supply port, and is injected into the cavity by the advance of the plunger. At this time, it is preferable to temporarily stop the plunger once the plunger tip has passed through the hot water supply port of the sleeve.
  • the vacuum suction again starts after the injection of the aluminum alloy melt and continues until the end of the production.
  • the cavities are vacuum suctioned via the exhaust pipe opening to the overflow section. Vacuum suction via a runner can also be used.
  • the die casting machine used in this method includes an exhaust pipe that opens into a runner that guides the molten aluminum alloy injected into the sleeve to the cavity of the die casting mold, and an overflow portion in the die casting mold.
  • a vacuum suction mechanism connected to a gas supply / discharge pipe that opens to the sleeve, and a reactive gas supply connected to a gas supply pipe that opens to a supply port provided on the die-casting mold side of the hot water supply port of the sleeve Mechanism.
  • a chill vent between the opening of the gas supply / discharge pipe and a part of the overflow port in order to prevent leakage of the mail into the vacuum system.
  • packing is sandwiched between mating surfaces surrounding the cavity between the fixed die and the movable die of the die-casting die.
  • the fixed die and the movable die of the die-casting die It is possible to adopt a method in which a groove surrounding the cavity formed on the mating surface between the mold and the mold is connected to a vacuum suction mechanism.
  • the gas supply / exhaust pipe that opens to the overflow section is used for both vacuum suction and compressed air injection, and therefore branches into an exhaust pipe connected to the vacuum suction mechanism and an air supply pipe connected to the compressed air ejection mechanism.
  • the gas supply and exhaust pipes can be equipped with pressure gauges, humidity meters, etc. that measure the atmospheric pressure and humidity of the cavity.
  • the gas components contained in die cast products are usually derived from the air remaining in the mold cavity in the die casting method. Residual air can be significantly reduced by the vacuum die-cast method or the oxygen die-cast method. However, even if the residual air in the cavity is reduced, the resulting diecast product still suffers from gas-induced defects.
  • the vacuum / oxygen die-casting method proposed in Japanese Patent Application No. 11-154566 evaporation of water from the release agent is promoted by reducing the cavity to a vacuum of 100 mbar or less in the vacuum suction step. The reactive gas is then blown into the cavity under vacuum to spread the reactive gas throughout the cavity. When the atmosphere pressure of the cavity is increased to the atmospheric pressure or higher by blowing the reactive gas, the invasion of outside air into the cavity is prevented, and the moisture evaporated from the release agent is taken out of the system.
  • a highly airtight structure is required for the mating surface of the mold, the molten metal injection section, and the overflow section.
  • the highly airtight structure is also effective in keeping the reactive gas blown in the next reactive gas injection process in the cavity and maintaining an oxygen atmosphere above atmospheric pressure.
  • Blow write Murrell reactive gases all react with the molten aluminum alloy A1 2 0 instead 3 to become one, some remains remains unreacted. Unreacted reactive gas is extruded into the overflow area by the molten aluminum alloy that is injected into the cavity, but depending on the mold shape of the mold, the path for pushing out the unreacted reactive gas may be blocked by metal. There is. In such a case, a part of the unreacted reactive gas is taken into the substance. This tendency is even stronger in cavities where the metal flow path is complicatedly divided and merged.
  • the gas flow path opened to the overflow portion and the runner is It is connected to a vacuum suction device to vacuum-react reactive gas from the cavity during press-fitting of the aluminum alloy melt, greatly reducing unreacted reactive gas taken into the aluminum alloy melt. Since the vacuum suction is performed through the gas flow path opened to the overflow section, the reactive gas injection and the vacuum suction can be performed at the same time. Reactive gas can be exhausted, and the amount of unreacted reactive gas remaining in the cavity is significantly reduced. At this time, vacuum suction may be performed through a gas flow path opened to the runner.
  • Figure 1 is a schematic diagram of a die cast machine incorporating a vacuum mechanism and a reactive gas supply mechanism.
  • FIG. 2 is a schematic cross-sectional view of the die-casting machine viewed from an axial direction of a plunger.
  • FIG. 3 is a diagram illustrating the operating position of the plunger. BEST MODE FOR CARRYING OUT THE INVENTION
  • the present invention will be described specifically with reference to the drawings.
  • the cavity is vacuum-vacuated into a reduced-pressure atmosphere having a vacuum of 100 mbar or less
  • the cavity is brought into an atmosphere pressure of at least atmospheric pressure by blowing oxygen.
  • a method of vacuum suction of the cavity again when the molten aluminum alloy is injected (hereinafter referred to as the DVO process) is adopted.
  • a die force machine schematically shown in FIG. 1 is used.
  • a cavity 30 corresponding to the product shape is formed between the fixed mold 10 and the movable mold 20.
  • a runner 11 communicating with the sleeve 40 is formed in the fixed mold 10, and the molten aluminum alloy M injected from the hot water supply port 4 1 is pressed into the cavity 30 via the runner 11 by the plunger 4 2. .
  • the runner 11 communicates with the cavity 30 via a plurality of gates 12 (FIG. 2) according to the product shape so that the aluminum alloy melt M is supplied to each part of the cavity 30.
  • the cavity 30 includes an overflow section 31 formed on the fixed mold 10 or the movable mold 20 side, and a chill vent 32 is provided outside the overflow section 31.
  • the overflow section 31 stabilizes the flow of the molten aluminum alloy M in the cavity 30.
  • the chill vent 32 is an uneven or corrugated portion formed between the fixed mold 10 and the movable mold 20 as shown in the figure, and serves to solidify the molten aluminum alloy M in contact with the chill vent 32. To prevent metal from being sucked into the vacuum system. By providing the chill vent 32, the cavity 30 can be vacuum sucked during the injection of the aluminum alloy melt M without metal insertion.
  • An ejector pin 21 is incorporated in the movable mold 20 so as to be able to move forward and backward in order to remove a die-cast article after fabrication.
  • a packing 51 such as a 0-ring is interposed on the mating surface of the fixed mold 10 and the movable mold 20.
  • the packing 51 is filled in a groove surrounding the cavity 30 and shuts off air from entering through a gap between the fixed mold 10 and the movable mold 20.
  • the packing 52 is also inserted into the pin hole 22 through which the ejector pin 21 is pushed, so that the airtightness between the inner wall of the pin hole 22 and the ejector pin 21 is maintained.
  • the sealing using the packings 51 and 52 allows the cavity 30 to be depressurized to a vacuum atmosphere of 100 mbar or less, and also allows vacuum suction during the injection of the molten aluminum alloy M.
  • a vacuum suction groove 69 surrounding the cavity 30 (Fig. 2) is engraved on the mating surface of the fixed mold 10 and the movable mold 20 and the vacuum suction groove 69 is attached to the vacuum suction mechanism 6. Can be connected to 0.
  • An exhaust pipe 61 connected to the vacuum suction mechanism 60 is open to the runner 11 in order to vacuum suction the cavity 30.
  • a vacuum valve 63 which is opened and closed by a drive cylinder 62, is provided at an opening of the exhaust pipe 61 facing the runner 11.
  • an exhaust pipe 65 branching from a gas supply / discharge pipe 64 opening between the chill vent 32 and the packing 51 at the mating surface of the fixed mold 10 and the movable mold 20 connects the vacuum valve 66. Connected to the vacuum suction mechanism 60 via
  • a pressure gauge 67 is attached to the gas supply / discharge pipe 64. Further, in order to control the humidity in the cavity 30, it is preferable to attach a hygrometer 68 to the gas supply / discharge pipe 64.
  • the gas supply / discharge pipe 64 is also used to feed compressed air to the cavity 3 °
  • the branched supply pipe 71 is connected to the compressed air ejection mechanism 70 via the check valve 72. After the die is opened after the die casting, compressed air is blown into the gas supply / discharge pipe 64 to remove foreign substances adhering to the vacuum suction mechanism.
  • a reactive gas supply mechanism 80 is additionally provided since a reactive gas such as oxygen is blown after vacuum suction of the cavity 30.
  • the reactive gas is sent from the reactive gas supply mechanism 80 into the sleeve 40 via the gas supply pipe 81 and the air supply port 82.
  • the gas supply pipe 81 incorporates a dryer 83 for dehumidifying the reactive gas in order to keep the humidity of the cavity 30 low.
  • the atmospheric pressure and humidity in the cavity 30 are detected by a pressure gauge 67 and a hygrometer 68 provided in the gas supply / discharge pipe 64.
  • the detection value from the pressure gauge 67 is sent to the control system that controls the drive of the vacuum suction mechanism 60, the compressed air ejection mechanism 70, and the reactive gas supply mechanism 80, and the vacuum suction ⁇ oxygen blowing ⁇ vacuum Used for suction timing control.
  • the detection value from the hygrometer 68 becomes 15% RH or less and the pressure in the cavity 30 becomes higher than the atmospheric pressure, the supply of the molten aluminum alloy M to the sleeve 40 is started.
  • the DV ⁇ process according to the present invention will be described.
  • the movable mold 20 is aligned with the fixed mold 10, the mold is closed, and the cavity 30 is evacuated through the runner 11.
  • a gas supply / discharge pipe 64 opened at the mating surface between the chill vent 32 and the packing 51 is also used.
  • the vacuum suction is continued until the atmospheric pressure of the cavity 30 detected by the pressure gauge 67 becomes 100 mbar or less.
  • the plunger tip 43 is positioned between the hot water supply port 41 of the sleeve 40 and the air supply port 82 to prevent air from entering the hot water supply port 41 (FIG. 3). Since the vacuum suction is performed through the runner 11, the lubricant from the sleeve 40 is discharged out of the system without reaching the cavity 30.
  • vacuum suction it is preferable to set a suction speed of 500 mbar seconds or more. Even when the cavity 30 has a complicated shape, gas is removed from all corners of the cavity 30 by setting the suction speed to preferably 500 milliseconds or more. In addition, when the cavity 30 is vacuum-vacuated at a suction speed of 500 milliseconds or more, the moisture contained in the release agent and the like adhering to the inner surfaces of the molds 10 and 20 is bumped, and the cavity 3 The water content in 0 is greatly reduced.
  • Vacuum suction is preferably continued for about 2 seconds with the plunger 42 closing the hot water supply port 41.
  • the suction time is set relatively long compared to the conventional vacuum die casting method in which the hot water supply port 41 is not closed and the suction time is less than 1 second.
  • the cavity 30 is evacuated to a degree of vacuum of 100 mbar or less by vacuum suction. Moisture contained in the release agent and the like adhering to the inner surface of the mold is converted into water vapor by vacuum suction, separated from the inner surface of the mold, and discharged out of the system.
  • Reactive gas is fed into the cavity 30 from the air supply port 82 because the cavity 30 is evacuated to less than 100 mbar.
  • the vacuum is stopped after a slight overlap with the injection of the reactive gas. Due to this overlap, the supplied reactive gas spreads to all corners of the cavity 30 and also suppresses the invasion of outside air from the mounting surface of the mold.
  • the injection of the reactive gas is continued until the atmospheric pressure of the cavity 30 detected by the pressure gauge 67 becomes equal to or higher than the atmospheric pressure.
  • the reactive gas When the reactive gas is blown, measure the humidity inside the cavity 30 with a hygrometer 68 and control the humidity so that the humidity of the cavity 30 does not exceed 15% RH. As a result, the amount of water which is brought into the cavity 30 along with the reactive gas and generates hydrogen gas by reaction with the molten aluminum alloy M decreases. In order to reduce the humidity inside the cavity 30, it is preferable to inject the reactive gas that has passed through the dryer 83 into the cavity 30.
  • the plunger tip 43 is retracted to the hot water supply position (FIG. 3), and the hot water inlet 41 is opened.
  • an amount of the molten aluminum alloy M required for one die force is injected into the sleeve 40.
  • the cavity 30 is maintained at an atmospheric pressure equal to or higher than the atmospheric pressure, invasion of outside air is prevented by the reactive gas ejected from the hot water supply port 41.
  • the plunger 42 is advanced to cut off the communication with the cavity 30.
  • the cavity 30 is again vacuum-sucked through the overflow section 31.
  • a vacuum system via the runner 11 and the exhaust pipe 61 can be used. It is preferable that the vacuum suction and the injection of the reactive gas be slightly overlapped. The injection of the reactive gas can be continued until after the end of the production. Due to this overlap, excess reactive gas is exhausted from the cavity 30, and water derived from the release agent / sleeve lubricant is effectively removed from the cavity 30 accompanying the reactive gas. . Also, the invasion of outside air, which tends to occur when vacuum suction is performed again after the injection of the reactive gas (Japanese Patent Publication No. 1-146224), is also eliminated.
  • Plunger 42 is advanced while vacuum suction is performed again, and plunger tip 43 is supplied. It moves forward at a low speed beyond the gate 4 to the high-speed injection start position (Fig. 3). At this time, the vacuum suction is started again when the vacuum start position is reached.
  • the advance of the plunger 42 may be temporarily stopped when the vacuum start position is reached. By temporarily stopping the plunger 42, the vacuum suction time becomes longer by that amount, so that the gas components and water vapor exhausted from the cavity 30 further increase.
  • the plunger 42 is advanced at a high speed from the high-speed injection start position to the injection limit position, and the aluminum alloy melt M is pressed into the cavity 30.
  • the cavity 30 is suctioned under vacuum, unreacted reactive gas is effectively removed from the cavity 30 with the press-fitting of the aluminum alloy melt M.
  • the flow of the reactive gas to the vacuum suction mechanism is quickly formed. Therefore, the path leading to the reactive gas vacuum suction mechanism is blocked by metal, and the reactive gas is surrounded by metal, and is not taken into the metal in an unreacted state.
  • the vacuum suction is continued until the cavity 30 is filled with the aluminum alloy melt M.
  • the vacuum suction is stopped, the mold is opened, and the compressed air is blown out from the compressed air jetting mechanism 70 into the air supply pipe 71 and the gas supply / discharge pipe 64 to remove foreign substances remaining on the vacuum system. .
  • Example 1 By taking the timing between the vacuum suction, the blowing of the reactive gas, and the vacuum suction again, the residual gas and the unreacted reactive gas are removed from the cavity 30.
  • the reactive gas in the cavity 30 reacts with the aluminum alloy melt M to produce a die-cast product without gas entrainment. Since the obtained die-cast product has an extremely low gas component, even if it is subjected to a heat treatment such as T6 treatment, blistering due to expansion of the gas component does not occur, and the required strength is provided.
  • Example 1 Example 1:
  • a die-casting die is produced by hermetically sealing the space between the ejector pin 21 and the pin hole 22 with a packing 52 and hermetically sealing the joint between the fixed die 10 and the movable die 20 with the packing 51.
  • the mold was heated to 180 ° C, and a release agent was applied to the inner surface of the mold for 5 seconds.
  • the hot water supply port 41 was closed with the plunger 42, and the gas in the cavity 30 and the sleeve 40 was sucked through the exhaust pipe 61 and the gas supply / discharge pipe 64 at a suction speed of 700 mbar / sec for 1.5 seconds. . Vacuum suction continued until the pressure gauge 67 indicated 75 mbar.
  • the plunger 42 After checking with a pressure gauge 67 that the atmospheric pressure of the cavity 30 is higher than the atmospheric pressure and with a hygrometer 68 that is less than 15% RH, the plunger 42 is retracted to supply hot water.
  • the mouth 41 was opened, and the molten aluminum alloy M was injected into the sleeve 40.
  • the oxygen injection was continued during the injection of the aluminum alloy melt M, and stopped after the sleeve 40 was completely filled with the aluminum alloy melt M, or oxygen was continuously injected throughout the entire process up to the end of the structure. .
  • the plunger 42 was advanced to the high-speed injection start position (FIG. 3), and this state was maintained for 1 second.
  • the plunger 42 was advanced at a high speed, and the molten aluminum alloy M was injected into the cavity 30 at an injection speed of 3 m / sec.
  • the cavity 30 was vacuum-suctioned through the exhaust pipe 61 and the gas supply / discharge pipe 64, and the vacuum suction was stopped after the production was completed.
  • the mold is opened, compressed air is blown in from the compressed air ejection mechanism 70 to clean the gas supply / discharge pipe 64, and the ejector pins 21 are pushed out to the cavity 30 to be ejected from the mold.
  • the die-cast stuff was taken out.
  • Table 1 shows the timing of vacuum suction, oxygen injection and re-vacuum suction in the DVO process described above, together with the injection of the molten aluminum alloy M and the elapsed time from the start of vacuum suction.
  • Manufacturing example 3 is an example in which plunger 42 is temporarily stopped In comparison with Production Examples 1 and 2, the time from the end of the injection of the molten metal into the sleeve 40 to the start of the injection of the molten metal into the cavity 30 is longer by that much.
  • Table 1 shows, as a comparative example, a case where vacuum suction, oxygen blowing, and vacuum suction were switched in sequence without overlapping each other. Table 1: Elapsed time at each manufacturing stage (seconds)
  • the elapsed time was measured from the start of vacuum suction by measuring the amount of gas contained in the die-cast product by the Lansley method and measuring the mechanical properties.
  • a die-cast product is manufactured by press-fitting an aluminum alloy molten metal into a cavity while performing vacuum suction, injection of a reactive gas, and vacuum suction again.
  • vacuum suction air is evacuated by reducing the cavity to a degree of vacuum of 100 mbar or less, and the atmospheric pressure of the cavity is raised to atmospheric pressure or higher by blowing a reactive gas. Gas components such as steam remaining on the inner surface of the mold are completely removed from the cavity.
  • vacuum suction is performed again at the time of press-fitting the molten aluminum alloy to remove unreacted reactive gas remaining in the cavity from the cavity, thereby preventing unreacted reactive gas from being taken into the molten aluminum alloy.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Description

明細書
ダイ カス ト方法及びダイ カス トマシーン 発明の背景
本発明は、 巣、 ブローホール等の铸造欠陥が抑制され、 構造用材料は勿 論、 機能材料と しても使用可能なダイ力ス ト製品を製造する方法及びダイ 力ス ト装置に関する。 通常のダイカス ト法では、 スリーブに注入された溶融アルミ二ゥム溶湯 又は溶融アルミニウム合金 (以下、 「溶湯」 という) をプランジャによつ て金型のキヤビティ に圧入している。 キヤビティ に充満している空気, 水 蒸気等のガスは、 アルミ二ゥム溶湯の圧入によって大半がキヤ ビティから パージされるが、 圧入後もキヤビティ に残留するものもある。 特に薄肉製 品や複雑形状をもつ製品用に設計された金型では、 流体の隘路となる部分 が生じ易く、 キヤビティからガス成分を完全に除去することは困難である。 キヤビティ に残留しているガスは、 金型内でアルミ二ゥム溶湯が冷却凝 固するとき、 アルミニウム材料の内部に巻き込まれ、 巣、 ブローホール等 の铸造欠陥と してダイ力ス ト製品に持ち込まれる。 その結果、 得られたダ イカス ト製品は、 強度. 伸び等の機械的特性に劣り、 スクロール, ピス ト ン, シリ ンダブロ ック, 連結ロッ ド, サスペンシ ョ ン部品等の機能材と し ての用途には不向きなものとされていた。 残留ガスに起因する銬造欠陥が 抑制されると、 優れた生産性をもつダイカス ト法の適用対象分野が広げら れる。
残留ガスによる悪影響を解消するものとして、 真空ダイカス ト法が知ら れている。 真空ダイ カス ト法では、 キヤ ビティから空気を除去するため、 アルミ二ゥム溶湯の注入に先立ってキヤビティ を真空吸引している。 しか し、 金型の合せ目からの空気の侵入があり、 スリーブ内にアルミニウム溶 湯を注入する際にも空気の混入があるので、キヤビティ の真空度が 200〜5 00ミ リバールに留まり、 それ以上に真空度を良くできない。 真空ダイ 力ス ト法で得られた製品にあっても、 普通ダイ力ス ト製品に比較すると空気の 巻込みが少なく なっているものの、 依然と してガス巻込みに起因するポロ シティ等の铸造欠陥が検出され、 機能材と しての用途には程遠い。
真空ダイカス ト法の欠点を解消するものと して、 酸素ダイカス ト法が開 発された (特公昭 50— 21 143号公報参照) 。 酸素ダイカス ト法では、 キ ヤ ビティ 内のガスを酸素に置換するため、 大気圧以上の圧力で酸素をキャ ビ ティ に充満させている。 キ ヤビティ に送り込まれた酸素は金型の合せ目や 注入口から吹き出すため、 金型の合せ目や注入口から空気がキヤビティ に 侵入することが防止される。 送り込まれたキヤ ビティ 内の酸素は、 アルミ 二ゥム溶湯と反応して微細な AI2O3になって製品内に分散し、 ダイカス ト 製品に悪影響を及ぼすことはない。
しかし、 大気圧以上で酸素をキ ヤビティ に送り込むことによつても、 キ ャ ビティから空気を完全に除去することは困難である。 空気の残留は、 キ ャビティが複雑形状をもつ場合に発生しがちである。 すなわち、 複雑形状 をもつ金型のキヤ ビティでは、 酸素が供給されない隘路が生じ、 隘路では 空気. 水蒸気等のガスが酸素と置換されずに残留する。 この残留したガス がダイ カス ト製品に取り込まれ、 铸造欠陥を発生させる原因になる。 铸造欠陥の原因となるキヤビティ 内の空気は、 真空吸引と同時に酸素ガ スを注入するとき、 効率よく酸素ガスで置換される (特公昭 57— 140号公 報) 。 しかし、 真空吸引と同時に酸素ガスを注入しても, 水分の除去には 有効でない。 実際、 製造されたダイカス ト製品には、 依然としてガス起因 の踌造欠陥が検出される。 真空吸引後に酸素ガスを注入する方法 (特公平 1一 46224号公報) も知られている力;、 キ ヤビティ 内が 200〜400ミ リバー ル程度の減圧雰囲気に維持されるに過ぎず、 ガスに起因した铸造欠陥を十 分に抑制できていない。
そこで、 本発明者等は、 金型のキ ヤビティ を真空吸引して 100ミ リバー ル以下の真空度にした後、 金型に酸素等の反応性ガスを吹き込み、 キ ヤビ ティの雰囲気圧が大気圧を越えた時点でアルミ 二ゥム合金溶湯の圧入を 開始する方法を開発した (特願平 11一 154566号) 。 100ミ リバール以下の 真空度にキヤビティ を減圧することにより、 金型内面に付着している離型 剤からの水分蒸発が加速される。 次いで真空状態のキヤビティ に反応性ガ スが送り込まれるため、 反応性ガスは金型の隅々まで行き渡り、 キヤ ビテ ィ に残存している空気や離型剤由来の水分等が効率よく放出される。 その 結果、 ガス量が大幅に軽減されたダイカス ト製品が得られ、 ガス起因の欠 陥が抑制される。 また、 加熱された場合でも残存ガスに起因するフク レが 発生しないため、 T 6処理等の熱処理で機械的性質を向上させることが可 能なダイ カス ト製品となる。
キヤ ビティ に送りまれた反応性ガスの多く は射出されたアルミ ニウム 合金溶湯と反応して微細な A1203となって製品内に分散し、 一部はアルミ ニゥム合金溶湯によってキヤビティから押し出される。 しかし、 製品形状 によっては、 アルミニウム合金溶湯の圧入後にもキヤビティ に残留し、 ダ イ カス ト製品に未反応のまま取り込まれる反応性ガスもある。 たとえば、 複雑形状のダイ 力ス ト製品を製造する金型では複数のメ タル流路が分 流, 合流するキヤビティ形状に設計されるが、 合流点近傍では双方のメタ ル流路を流れるメ タルによつて反応性ガスの押し出される経路が塞がれ、 反応性ガスの逃げ場がない袋小路状になる。
キヤ ビティ に通じたバイパス通路を開いてキヤ ビティ を真空吸引する 方式 (特公平 1一 46224号公報) では、 次に掲げる理由から到達真空度が 2 00〜400ミ リバール程度に留まり、かなりの空気が残留するばかりでなく、 未反応の反応性ガスも十分に放出されないため、 ダイカス ト製品に取り込 まれるガス成分が十分に低減できない。
キヤビティ 内で真空吸引するため、 狭いゲー トを介したスリ一ブゃラン ナ一部分の吸引に時間がかかる。 しかも、 キヤビティ 内を最初に真空吸引 しているので、 減圧効果によって気化したス リ一ブ潤滑剤までもがキヤビ ティ に吸引され、 キヤビティ 内の湿度が高くなる。 高い湿度は、 キヤビテ ィ に圧入されたアルミニゥム合金溶湯と水分との反応で生じる水素ガス が铸物に取り込まれる原因となる。 ス リーブ潤滑剤は、 一部が液状のまま で吸引されることもあり、 結果としてキヤビティ を汚染する。 また、 真空吸引機構とキヤ ビティ とを弁機構で仕切っているため、 アル ミ 二ゥム合金溶湯の圧入終了まで真空吸引を継続すると弁の隙間からメ タルが差し込む虞がある。 そのため、 アルミニウム合金溶湯が仕切り弁に 達するまでに仕切り弁を閉じて真空吸引を中止する必要があり、 アルミ二 ゥム合金溶湯の圧入中に残存ガスを最後まで吸引できず、 未反応の反応性 ガスがキヤビティ 内に残留しやすい。
更に、 真空吸引及び反応性ガスの注入に同じ開口を使用しているので、 真空吸引及び反応性ガスの注入を同時に行えず、 真空吸引を中止した後で 反応性ガスを注入することになる。 そのため、 この間に金型の合せ面から 空気がキヤビティ に侵入し、 残留しやすい。 しかも、 反応性ガスの注入口 がキヤビティ 内にしかないため、 アルミニゥ厶合金溶湯の圧入中にスリ一 ブ内を反応性ガスで充満できず、 プランジャチップとスリーブとの隙間か らキヤビティ に侵入する空気もある。 発明の開示
本発明は、 このような問題を解消すべく案出されたものであり、 真空ダ イ カス ト法及び酸素ダイ力ス ト法の長所を活用した真空 ·酸素ダイ力ス ト 法において、 アルミ二ゥム溶湯の圧入時にオーバーフロー部や湯道又はス リーブを介してキヤビティ を再度真空吸引することにより、 未反応の反応 性ガスをキヤビティから排気し、 従来のダイカス ト製品に比較して巻込み ガス量を大幅に低下させ、 構造材は勿論、 機能部品としても使用可能なダ イカス ト製品を得ることを目的とする。
本発明のダイカス ト法は、 その目的を達成するため、 ダイカス ト金型の キヤビティ を 100ミ リバール以下に真空吸引した後、 真空吸引にオーバ一 ラップさせてスリーブから反応性ガスをキヤビティ に吹き込み、 キヤビテ ィ の雰囲気圧を大気圧以上にし、 反応性ガスの吹込みを継続しながらス リ ーブにアルミニゥム合金溶湯を注入し、 次いでキヤビティ を再度真空吸引 し、 プランジャを前進させてスリーブ内のアルミニゥム合金溶湯をキヤ ビ ティ に圧入することを特徴とする。 真空吸引は吸引速度 500ミ リバール/秒以上で行うことが好ま しく、 湯 道更にはオーバ一フロー部に開口 した排気管を介しキヤ ビティ が真空吸 引される。 真空吸引にオーバーラップさせて酸素等の反応性ガスを吹き込 み、 キヤビティ を大気圧以上の雰囲気圧にする。 このとき、 除湿された反 応性ガスを吹き込むことにより、 キヤビティ を湿度 15%RH以下に維持す ることが好ましい。 反応性ガスの吹込みは、 ブランジャを前進させる前に 中止し、 或いは铸造終了まで継続させても良い。
铸造されるアルミニゥム合金溶湯は、 給湯口からスリーブに注入され、 プランジャの前進によってキヤ ビティ に圧入される。 このとき、 プランジ ャチップがス リーブの給湯口を通過した時点でブランジャを一旦停止さ せることが好ましい。
再度の真空吸引は、 アルミニウム合金溶湯の注入後に開始され、 铸造終 了まで継続される。 再度の真空吸引では、 オーバーフロー部に開口する排 気管を経由してキヤビティが真空吸引される。 湯道を経由する真空吸引も 併用できる。
この方法に使用されるダイカス トマシーンは、 スリーブに注入されたァ ルミニゥム合金溶湯をダイ カス ト金型のキヤビティ に導く湯道に開口す る排気管及びダイ 力ス 卜金型内のオーバ一フロー部に開口するガス給排 管が接続された真空吸引機構と、 スリーブの給湯口より もダイ カス ト金型 側に設けられた給気口に開口するガス供給管が接続された反応性ガス供 給機構とを備えている。
ガス給排管の開口部とオーバーフ口一部との間には、 真空系へのメ夕ル 漏出を防止するためチルベン トを設けることが好ま しい。 キヤビティ を外 気と遮断する上で、 ダイカス ト金型の固定金型と可動金型との間のキヤ ビ ティ を取り囲む合せ面にパッキンを挟み込む方式, ダイカス ト金型の固定 金型と可動金型との間の合せ面に形成したキヤ ビティ を取り囲む溝を真 空吸引機構に接続する方式等が採用可能である。 また、 可動金型を貫通し てキヤビティ に臨むピン孔にェジヱクタピンが進退自在に設け、 ピン孔内 壁とェジ: Lクタピンとの間を気密シールすることも有効である。 オーバーフロー部に開口するガス給排管は、 真空吸引及び圧縮空気吹込 みに兼用されるため、 真空吸引機構に接続される排気管と圧縮空気噴出機 構に接続される給気管に分岐している。 ガス給排管には、 キヤビティの雰 囲気圧及び湿度を測定する圧力計, 湿度計等を取り付けることができる。 また、 反応性ガス供給機構からス リーブの給気口まで延びたガス供給管の 途中に乾燥機を設けることが好ま しい。 ダイカスト製品に含まれるガス成分は、 普通ダイカスト法では金型キヤビティ に残存する空気に由来する。 残存空気は、 真空ダイカス ト法や酸素ダイカス ト法 で大幅に軽減できる。 しかし、 キヤビティの残存空気を減少しても、 得られたダ イカスト製品には依然としてガス起因の欠陥が避けられない。 これに対し、 特願 平 11一 154566号で提案した真空 ·酸素ダイカスト法では、真空吸引工程でキヤビ ティを 100ミ リバール以下の真空度にすることにより離型剤等からの水分の蒸発 を促進させ、 次いで真空状態のキヤビティに反応性ガスを吹き込むことによりキ ャビティの隅々まで反応性ガスを行き渡らせている。 反応性ガスの吹込みにより キヤビティの雰囲気圧を大気圧以上にすると、 キヤビティへの外気の侵入が防止 されることは勿論、 離型剤から蒸発した水分が系外に持ち去られる。
真空吸引工程でキヤビティを 100ミ リバール以下に減圧することから、 金型の 合せ面や溶湯注入部, オーバ一フロー部に気密性の高い構造が必要となる。 気密 性の高い構造は、 次の反応性ガス吹込み工程で吹き込まれた反応性ガスをキヤビ ティ内に保持し、 大気圧以上の酸素雰囲気を維持する上でも有効である。 吹き込 まれる反応性ガスは、 全部がアルミニウム合金溶湯と反応して A1203になるもの ではなく、 一部が未反応のままで残留する。 未反応の反応性ガスは、 キヤビティ に圧入されるアルミニウム合金溶湯によりオーバ一フロー部に押し出されるが、 金型のキヤビティ形状によっては未反応の反応性ガスを押し出す経路がメタルに よって塞がれることがある。 このような場合、 未反応の反応性ガスの一部が踌物 内部に取り込まれることになる。 特にメタル流路が複雑に分流 ·合流する形状の キヤビティでは、 その傾向が一層強くなる。
そこで、 本発明においては、 オーバ一フロー部及び湯道に開口したガス流路を 真空吸引装置に接続し、 アルミニウム合金溶湯圧入時にキヤビティから反応性ガ スを真空吸引し、 アルミニウム合金溶湯に取り込まれる未反応の反応性ガスを大 幅に軽減している。 オーバ一フロー部に開口したガス流路を介した真空吸引であ るため、 反応性ガス吹込みと真空吸引とを同時に行うことができ、 且つアルミ二 ゥム合金溶湯の圧入終了まで未反応の反応性ガスを排気でき、 キヤビティに残留 する未反応の反応性ガスが大幅に少なくなる。 このとき、 湯道に開口したガス流 路を介して真空吸引してもよい。
真空吸引によって未反応の反応性ガスを吸引しているので、 真空吸引機構につ ながる経路がメタルで塞がれる前に未反応の反応性ガスを真空吸引する経路が形 成される。 したがって、 未反応の反応性ガスが閉じ込められることがなくなる。 更に、 アルミニウム合金溶湯が湯道に進入する前の段階では、 湯道を介した真空 吸引も可能である。
この点、 キヤビティから未反応ガスを直接に真空吸引する方式 (特公平 1— 462 24号公報) では、 キヤビティにバイパス通路が開口しているため真空吸引工程で 100ミリバール以下の真空度に到達することができず、 外気の侵入や未反応の反 応性ガスの残留が避けられず、 複雑形状のダイカスト製品にあっては未反応の反 応性ガスに起因するガス欠陥を含む铸物になりがちである。 図面の簡単な説明
図 1は、 真空機構, 反応性ガス供給機構を組み込んだダイ カス トマシー ンの概略図である。
図 2は、 同ダイカス トマシーンをプランジャの軸方向から見た概略断面 図である。
図 3は、 プランジャの動作位置を説明する図である。 発明を実施するための最良の形態
次いで、 図面を参照しながら、 実施例によって本発明を具体的に説明する。 本発明のダイカスト法では、 キヤビティを真空度 100ミ リバール以下の減圧雰 囲気に真空吸引した後、 酸素吹込みによりキヤビティを大気圧以上の雰囲気圧と し、 更にアルミニウム合金溶湯の圧入に際してキヤビティを再度真空吸引する方 式 (以下、 D V Oプロセスという) が採用される。
この D V Oプロセスでは、 たとえば図 1に概略を示すダイ力ストマシーンが使 用される。 固定金型 1 0と可動金型 2 0との間に製品形状に対応するキヤビティ 3 0が形成される。スリーブ 4 0に連通する湯道 1 1が固定金型 1 0に形成され、 給湯口 4 1から注入されたアルミニウム合金溶湯 Mが湯道 1 1を経てキヤビティ 3 0にプランジャ 4 2により圧入される。 湯道 1 1は、 キヤビティ 3 0の各部に アルミニウム合金溶湯 Mが供給されるように製品形状に応じた複数のゲート 1 2 (図 2 ) を介してキヤビティ 3 0に連通している。
キヤビティ 3 0は、 固定金型 1 0又は可動金型 2 0側に形成されたオーバーフ ロー部 3 1を備え、 オーバーフロー部 3 1の外側にチルベント 3 2が設けられて いる。 オーバーフロー部 3 1は、 キヤビティ 3 0内のアルミニウム合金溶湯 Mの フローを安定化させる。 チルベント 3 2は、 図示するように固定金型 1 0と可動 金型 2 0との間に形成された凹凸又は波状の合せ部であり、 チルベント 3 2に接 触するアルミニウム合金溶湯 Mの凝固を促進させ、 真空系にメタルが吸引される ことを防止する。 チルベント 3 2を設けることにより、 メタルの差込みなくアル ミニゥム合金溶湯 Mの注入中にキヤビティ 3 0を真空吸引できる。
可動金型 2 0には、 銬造後のダイカスト铸物を取り外すため、 ェジヱクタピン 2 1が進退自在に組み込まれている。
外気に対しキヤビティ 3 0を気密に維持するため、 固定金型 1 0と可動金型 2 0との合せ面に 0リング等のパッキン 5 1が介装される。 パッキン 5 1は、 キヤ ビティ 3 0を取り囲む溝に充填され、 固定金型 1 0と可動金型 2 0との隙間から 侵入しょうとする空気を遮断する。 ェジヱクタピン 2 1が押通されるピン孔 2 2 にもパッキン 5 2が揷入され、 ピン孔 2 2の内壁とェジヱクタピン 2 1との間の 気密性が保たれる。 パッキン 5 1 , 5 2を用いたシールにより、 キヤビティ 3 0 を 100ミ リバール以下の真空雰囲気に減圧できると共に、 アルミニウム合金溶湯 Mの注入中にも真空吸引が可能になる。
パッキン 5 1が装着された溝を真空吸引装置 6 0に接続し、 該溝からも真空吸 引するとき、 外気侵入が一層効果的に抑制される。 或いは、 パッキン 5 1装着部 以外に、 キヤビティ 3 0を取り囲む真空吸引用溝 6 9 (図 2 ) を固定金型 1 0と 可動金型 2 0との合せ面に刻設し、 真空吸引用溝 6 9を真空吸引機構 6 0に接続 することもできる。
キヤビティ 3 0を真空吸引するため、 真空吸引機構 6 0に接続された排気管 6 1が湯道 1 1に開口している。 湯道 1 1に臨む排気管 6 1の開口部には、 駆動シ リンダ 6 2で開閉作動される真空弁 6 3が設けられている。 また、 チルベント 3 2とパッキン 5 1との間で固定金型 1 0及び可動金型 2 0の合せ面に開口するガ ス給排管 6 4から分岐した排気管 6 5が真空弁 6 6を介して真空吸引機構 6 0に 接続されている。
キヤビティ 3 0の雰囲気圧を検出するため、 圧力計 6 7をガス給排管 6 4に取 り付けている。 また、 キヤビティ 3 0内の湿度を管理するため、 湿度計 6 8をガ ス給排管 6 4に取り付けることが好ましい。
ガス給排管 6 4は、 キヤビティ 3◦に圧縮空気を送り込むことにも使用される ことから、 分岐した給気管 7 1がチヱックバルブ 7 2を介して圧縮空気噴出機構 7 0に接続されている。 ダイカスト終了後に型開きした後で、 ガス給排管 6 4に 圧縮空気が吹き込まれ、 真空吸引機構に付着している異物が除去される。
D V Oプロセスでは、 キヤビティ 3 0を真空吸引した後で酸素等の反応性ガス を吹き込むことから、 反応性ガス供給機構 8 0を付設している。 反応性ガスは、 反応性ガス供給機構 8 0からガス供給管 8 1及び給気口 8 2を経てスリーブ 4 0 内に送り込まれる。 ガス供給管 8 1には、 キヤビティ 3 0の湿度を低く維持する ため反応性ガスを除湿する乾燥機 8 3が組み込まれている。
キヤビティ 3 0内の雰囲気圧及び湿度は、 ガス給排管 6 4に設けた圧力計 6 7 及び湿度計 6 8で検出される。 圧力計 6 7からの検出値は、 真空吸引機構 6 0 , 圧縮空気噴出機構 7 0 , 反応性ガス供給機構 8 0それぞれの駆動を制御する制御 系に送られ、 真空吸引→酸素吹込み→真空吸引のタイミング制御に使用される。 湿度計 6 8からの検出値が 15%RH以下となり、 キヤビティ 3 0内の圧力が大気 圧以上になつた時点でスリーブ 4 0へのアルミ二ゥム合金溶湯 Mの供給を開始す る。 次いで、 本発明に従った D V〇プロセスを説明する。
固定金型 1 0に可動金型 2 0を合せて型閉めし、 湯道 1 1を介してキヤビティ 3 0を真空吸引する。 キヤビティ 3 0の真空吸引には、 チルベント 3 2とパツキ ン 5 1との間の合せ面に開口したガス給排管 6 4も使用される。 真空吸引は、 圧 力計 6 7で検出されるキヤビティ 3 0の雰囲気圧が 100ミ リバール以下になるま で継続される。 このとき、 スリーブ 4 0の給湯口 4 1と給気口 8 2との間にブラ ンジャチップ 4 3を位置させ、 給湯口 4 1からの空気侵入を防止する (図 3 ) 。 湯道 1 1を介した真空吸引であるため、 スリーブ 4 0からの潤滑剤は、 キヤビテ ィ 3 0に至ることなく系外に排出される。
真空吸引では、 500ミリバール 秒以上の吸引速度に設定することが好ましい。 キヤビティ 3 0が複雑な形状をもつ場合でも、 吸引速度を好ましくは 500ミ リバ ール 秒以上に設定することにより、 キヤビティ 3 0の隅々からガスが除去され る。 また、 500ミ リバール 秒以上の吸引速度でキヤビティ 3 0を真空吸引する と、金型 1 0 , 2 0の内面に付着している離型剤等に含まれている水分が突沸し、 キヤビティ 3 0内の水分が大幅に減少する。
真空吸引は、 プランジャ 4 2で給湯口 4 1を閉塞した状態で:!〜 2秒程度継続さ せることが好ましい。 この点、給湯口 4 1が塞がれておらず 1秒未満の吸引時間で ある従来の真空ダイカスト法に比較して、 吸引時間を比較的長く設定している。 キヤビティ 3 0は、 真空吸引によって 100ミ リバール以下の真空度まで減圧され る。 金型の内面に付着している離型剤等に含まれている水分は、 真空吸引によつ て水蒸気となり、 金型の内面から分離され系外に排出される。
しかし、 真空度が 100ミリバールに達しない真空吸引では、 キヤビティ 3 0内 に比較的多量の空気が残存し、 後続する反応性ガス注入工程で反応性ガスにより 置換されず製品に巻き込まれ、 ブローホール. 膨れ等の欠陥を発生させる虞があ る。 他方、 到達真空度を 100ミ リバール以下に設定すると、 離型剤等に含まれて いる水分の蒸発が効果的に促進され、 水蒸気となって系外に持ち去られる。 なか でも、 吸引速度 500ミリバール Z秒以上の高速で真空吸引すると、 突沸現象によ つて離型剤等の内部からも水分蒸発が加速され、 残留水分が大幅に減少する。 吸 引速度は、 真空吸引装置の能力を考慮すると 800ミ リバール/秒程度が上限であ る。
キヤビティ 3 0が 100ミ リバール以下に真空吸引されたことをまって、 給気口 8 2から反応性ガスをキヤビティ 3 0に送り込む。 真空吸引は、 反応性ガスの注 入に若干オーバ一ラップさせた後で停止する。 このオーバーラップにより、 送り 込まれた反応性ガスがキヤビティ 3 0の隅々まで行き渡ると共に、 金型の台せ面 からの外気侵入も抑制される。 反応性ガスの注入は、 圧力計 6 7で検出されるキ ャビティ 3 0の雰囲気圧が大気圧以上になるまで継続される。
反応性ガスの吹込みに際し、 キヤビティ 3 0内の湿度を湿度計 6 8で測定し、 キヤビティ 3 0の湿度が 15%RHを超えないように湿度管理する。 これにより、 反応性ガスに随伴してキヤビティ 3 0に持ち込まれ、 アルミニウム合金溶湯 Mと の反応によって水素ガスを発生させる水分量が少なくなる。 キヤビティ 3 0内の 湿度を下げるため、 乾燥機 8 3を通過した反応性ガスをキヤビティ 3 0に注入す ることが好ましい。
キヤビティ 3 0の雰囲気圧が大気圧以上になった後、 プランジャチップ 4 3を 給湯位置 (図 3 ) まで後退させ、 給湯口 4 1を開放する。 次いで、 1回のダイ力 ストに必要な量のアルミニウム合金溶湯 Mをスリーブ 4 0に注入する。このとき、 キヤビティ 3 0が大気圧以上の雰囲気圧に維持されているので、 給湯口 4 1から 噴き出す反応性ガスによって外気の侵入が防止される。 給湯口 4 1は、 アルミ二 ゥム合金溶湯 Mの注入完了後、 プランジャ 4 2を前進させることによりキヤビテ ィ 3 0への連通状態が遮断される。
注湯後、 オーバーフロー部 3 1を介しキヤビティ 3 0が再度真空吸引される。 再度の真空吸引には、 湯道 1 1, 排気管 6 1を経由する真空系も使用できる。 再 度の真空吸引と反応性ガスの注入は、若干オーバ一ラップさせることが好ましい。 反応性ガスの注入は、 铸造終了後まで継続することも可能である。 このオーバー ラップにより、 余剰の反応性ガスがキヤビティ 3 0から排気されると共に、 離型 剤ゃスリーブ潤滑剤に由来する水分が反応性ガスに随伴されてキヤビティ 3 0か ら効果的に除去される。 また、 反応性ガス注入後に再度真空吸引する場合 (特公 平 1一 46224号公報) に生じがちな外気の侵入もなくなる。
再度真空吸引しながらプランジャ 4 2を前進させ、 プランジャチップ 4 3が給 湯口 4 1を越えて高速射出開始位置 (図 3 ) まで低速前進させる。 この際、 真空 開始位置に達した時点で、再度の真空吸引を開始する。プランジャ 4 2の前進は、 真空開始位置に達した時点で一旦中断しても良い。 プランジャ 4 2の一旦停止に より、 真空吸引時間がその分だけ長くなるのでキヤビティ 3 0内から排気される ガス成分や水蒸気が一層多くなる。
次いで、高速射出開始位置から射出限位置までプランジャ 4 2を高速前進させ、 アルミニウム合金溶湯 Mをキヤビティ 3 0内に圧入する。 このとき、 キヤビティ 3 0が真空吸引されているので、 アルミニウム合金溶湯 Mの圧入に伴って未反応 の反応性ガスがキヤビティ 3 0から効果的に除去される。 特にメタル流路が複雑 に分流 ·合流する形状のキヤビティ 3 0でも、 真空吸引機構に至る反応性ガスの 流れが素早く形成される。 そのため、 反応性ガスの真空吸引機構に至る経路がメ タルで塞がれ、 反応性ガスがメタルで取り囲まれ、 未反応の状態でメタルに取り 込まれることがなくなる。 真空吸引は、 キヤビティ 3 0をアルミニウム合金溶湯 Mで充満させるまで継続される。
铸造終了後、 真空吸引を停止させ、 型開きし、 圧縮空気噴出機構 7 0から圧縮 空気を給気管 7 1 , ガス給排管 6 4に吹き出し、 真空系に付着残留している異物 を除去する。
このように真空吸引, 反応性ガスの吹込み及び再度の真空吸引との間にタイミ ングを採ることによって、 キヤビティ 3 0から残留ガス及び未反応の反応性ガス が除去される。 また、 キヤビティ 3 0内にある反応性ガスがアルミニウム合金溶 湯 Mと反応することにより、 ガス巻込みのないダイカスト製品が製造される。 得 られたダイカスト製品は、 ガス成分が極めて低く抑えられているため、 T6処理等 熱処理を施してもガス成分の膨張によるフクレが発生せず、 必要強度が付与され る。 実施例 1 :
複数のリブで内部が仕切られた薄肉箱状のキヤビティ 3 0が形成され、 部分的 な冷却が可能な水冷機構を備えた金型を用いたダイカストに本発明を適用した例 を説明する。 ェジェクタピン 2 1とピン孔 2 2との間をパッキン 5 2で気密シールし、 固定 金型 1 0及び可動金型 2 0の合せ目をパッキン 5 1で気密シールしたダイカスト 金型を作製し、 ダイカストマシンにセッ トした。 金型を 180°Cに加熱し、 5秒間離 型剤を金型の内面に塗布した。
次いで、 給湯口 4 1をプランジャ 4 2で塞ぎ、 排気管 6 1 , ガス給排管 6 4を 介してキヤビティ 3 0及びスリーブ 4 0内のガスを吸引速度 700ミ リバール/秒 で 1.5秒吸引した。真空吸引は、圧力計 6 7が 75ミリバールを指示するまで継続し た。
真空吸弓 Iを継続しながら、 反応性ガス供給機構 8 0からスリーブ 4 0に反応性 ガスとして酸素を吹き込んだ。酸素吹込み開始から 2秒経過した時点で真空吸引を 中止し、 キヤビティ 3 0の雰囲気圧が大気圧以上になるまで酸素吹込みを継続し た。
キヤビティ 3 0の雰囲気圧が大気圧以上になったことを圧力計 6 7で、湿度が 1 5%RH以下になったことを湿度計 6 8で確認した後、 プランジャ 4 2を後退させ て給湯口 4 1を開き、 アルミニウム合金溶湯 Mをスリーブ 4 0に注入した。 酸素 の吹込みは、 アルミニウム合金溶湯 Mの注入中も継続し、 スリーブ 4 0内がアル ミニゥム合金溶湯 Mで完全に充満した後で停止し、 或いは铸造終了までの全工程 を通じて酸素を吹き込み続けた。
アルミニウム合金溶湯 Mをスリーブ 4 0に注入した後、 プランジャ 4 2を高速 射出開始位置 (図 3 ) まで前進させ、 この状態を 1秒保持した。 次いで、 プランジ ャ 4 2を高速前進させ、射出速度 3m/秒でアルミニウム合金溶湯 Mをキヤビティ 3 0に圧入した。 アルミニウム合金溶湯 Mの圧入中、 排気管 6 1及びガス給排管 6 4を介してキヤビティ 3 0を真空吸引し、 铸造終了後に真空吸引を中止した。 铸造終了から 20秒経過した時点で型開きして、 圧縮空気噴出機構 7 0から圧縮 空気を吹き込んでガス給排管 6 4内を清掃し、 ェジヱクタピン 2 1をキヤビティ 3 0に突き出し、 金型からダイカスト铸物を取り出した。
以上に説明した D V Oプロセスにおける真空吸引, 酸素吹込み及び再度の真空 吸引のタイミングをアルミニウム合金溶湯 Mの圧入と共に、 真空吸引の開始時点 からの経過時間で表 1に示す。 製造例 3は、 プランジャ 4 2を一旦停止させた例 であり、 製造例 1 , 2に比較してスリーブ 4 0への溶湯注入終了からキヤビティ 3 0への溶湯圧入開始までの時間がその分だけ長くなっている。なお、表 1では、 互いにオーバ一ラップさせることなく真空吸引, 酸素吹込み及び再度の真空吸引 を順次切り替えた場合を比較例として示す。 表 1 : 各铸造段階の経過時間 (秒)
Figure imgf000016_0001
経過時間は、 真空吸引の開始時点から起算 得られたダイカスト製品に含まれているガス量をランズレー法で測定すると共 に、 機械的特性を測定した。
表 2の測定結果にみられるように、 製造例 1〜3で得られたダイカスト製品は、 製造例 4で得られたダイカスト製品に比較して Ν2, Η2等のガス量が極めて少なく なっている。 伸び, 引張強さ等も、 製造例 4よりも高い値を示した。 更に、 製造 例 1〜3のダイカスト製品は、 ガス量が極めて少ないことから Τ6処理 (510°C x 3 時間→水冷— 160°C x 5時間) 等の熱処理を施してもフクレが発生せず、 機械的特 性が更に向上した。 これに対し、 製造例 4のダイカスト製品では、铸造時にメタル が合流した部分で T6処理後にフクレが観察され、 若干のガス成分が取り込まれて いることが判った。 表 2 :製造条件の相違がダイカスト材及び T6材の物性に及ぼす影響
Figure imgf000017_0001
産業上の利用可能性
以上に説明したように、 本発明においては、 真空吸引, 反応性ガスの吹込み及 び再度の真空吸引をォ一バーラップさせながらキヤビティにアルミニウム合金溶 湯を圧入し、 ダイカスト製品を製造している。 真空吸引ではキヤビティを 100ミ リバール以下の真空度に減圧することにより空気を排気し、 反応性ガスの吹込み でキャビティの雰囲気圧を大気圧以上にすることによりキヤビティ内の残留空気 は勿論、 金型内面に付着残留している水蒸気等のガス成分をキヤビティから完全 に除去している。 更に、 アルミニウム合金溶湯の圧入時に再度真空吸引すること により、 キヤビティに残存する未反応の反応性ガスをキヤビティから除去するこ とにより、 未反応の反応性ガスがアルミニウム合金溶湯に取り込まれることを防 止し、 ガス成分が大幅に軽減されたダイカスト製品を得ている。 このようにして 得られたダイカスト製品にはガス起因の巣, ブローホール等の铸造欠陥がなく、 熱処理で強度を付与できるため生産性に優れたダイカスト法を活用して機能材と しても使用可能な製品となる。

Claims

請求の範囲
I. ダイカスト金型のキヤビティを 100ミ リバール以下に真空吸引した後、真空 吸引にオーバーラップさせてスリーブから反応性ガスをキヤビティに吹き込 み、 キヤビティの雰囲気圧を大気圧以上にし、 反応性ガスの吹込みを継続しな がらスリーブにアルミニウム合金溶湯を注入し、 次いでキヤビティのオーバー フロー部に開口したガス給排管を介してキヤビティを再度真空吸引し、 プラン ジャを前進させてスリーブ内から湯道を経てアルミニウム合金溶湯をキヤビ ティに圧入することを特徴とするダイカスト方法。
2. 吸引速度 500 ミリバール/秒以上でキヤビティを真空吸引する請求項 1記 載のダイカスト方法。
3. 湯道を経由してキヤビティを真空吸引する請求項 1記載のダイカスト方法。
4. 湯道及びオーバ一フロー部を経由してキヤビティを真空吸引する請求項 1 記載のダイカスト方法。
5. 除湿した反応性ガスの吹込みによりキヤビティを湿度 15%RH 以下に維持 する請求項 1記載のダイカスト方法。
6. 反応性ガスの吹込みを中止した後でプランジャを前進させる請求項 1記載 のダイカスト方法。
7. 铸造終了まで反応性ガスの吹込みを継続する請求項 1記載のダイカスト方 法。
8. スリ一ブの給湯口をブランジャチップが通過した時点でブランジャを一旦 停止させる請求項 1記載のダイカスト方法。
9. 铸造終了まで再度の真空吸引を継続する請求項 1記載のダイカスト方法。
10. オーバ一フロー部を経由してキヤビティを再度真空吸引する請求項 1記載 のダイカスト方法。
II. 給湯口から注入されたアルミニウム合金溶湯を収容するスリーブと、 スリー ブ内で前後進可能なプランジャと、 スリーブから湯道を介して圧入されるキヤ ビティを形成する相互に気密接触可能な固定金型及び可動金型をもち、 固定金 型と可動金型との合せ面にチルベント及び Z又は溝が必要に応じて形成され たダイカスト铸型と、 ピン孔に取外し自在に挿入され、 可動金型を貫通してキ ャビティに臨む少なくとも 1本のェジヱクタピンと、 湯道に開口する排気管及 びキヤビティのオーバ一フロー部に開口するガス給排管が接続された真空吸 引機構と、 スリーブの給湯口よりもダイカスト金型側に設けられた給気口に開 口するガス供給管が接続された反応性ガス供給機構とを備えていることを特 徴とするダイカストマシーン。
12. キヤビティを取り囲むダイカスト金型の固定金型及び可動金型の合せ面に パッキンが挟み込まれている請求項 1 1記載のダイカストマシーン。
13. ダイカスト金型の固定金型と可動金型との間の合せ面にキヤビティを取り 囲む溝が形成され、 該溝が真空吸引機構に接続されている請求項 1 1記載のダ イカストマシーン。
14. 可動金型を貫通してキヤビティに臨むピン孔にェジヱクタピンが進退自在 に設けられ、 ピン孔内壁とェジ Xクタピンとの間が気密シールされている請求 項 1 1記載のダイカストマシーン。
15. オーバーフロー部に開口するガス給排管は、真空吸引機構に接続される排気 管と圧縮空気噴出機構に接続される給気管に分岐している請求項 1 1記載の ダイカストマシーン。
16. キヤビティの雰囲気圧を測定する圧力計がガス給排管に設けられている請 求項 1 1記載のダイカストマシーン。
17. キヤビティ内の湿度を測定する湿度計がガス給排管に設けられている請求 項 1 1記載のダイカストマシーン。
18. 反応性ガス供給機構からスリーブの給気口まで延びたガス供給管の途中に 乾燥機が設けられている請求項 1 1記載のダイカストマシーン。
PCT/JP2001/000071 2000-01-12 2001-01-11 Procede de coulee sous pression et machine de coulee sous pression WO2001051237A1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US10/169,865 US6648054B2 (en) 2000-01-12 2001-01-11 Die casting method and die casting machine
EP01900648A EP1252949B1 (en) 2000-01-12 2001-01-11 Die cast method and die cast machine
AU2001225478A AU2001225478A1 (en) 2000-01-12 2001-01-11 Die cast method and die cast machine
JP2001551644A JP3994735B2 (ja) 2000-01-12 2001-01-11 ダイカスト方法及びダイカストマシーン

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2000-003208 2000-01-12
JP2000003208 2000-01-12

Publications (1)

Publication Number Publication Date
WO2001051237A1 true WO2001051237A1 (fr) 2001-07-19

Family

ID=18532189

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2001/000071 WO2001051237A1 (fr) 2000-01-12 2001-01-11 Procede de coulee sous pression et machine de coulee sous pression

Country Status (8)

Country Link
US (1) US6648054B2 (ja)
EP (1) EP1252949B1 (ja)
JP (1) JP3994735B2 (ja)
KR (1) KR100828896B1 (ja)
CN (2) CN1296160C (ja)
AU (1) AU2001225478A1 (ja)
MY (1) MY130713A (ja)
WO (1) WO2001051237A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007167914A (ja) * 2005-12-22 2007-07-05 Ahresty Corp 耐摩耗性製品の製造方法
JP2013031872A (ja) * 2011-08-02 2013-02-14 Honda Motor Co Ltd 鋳造用金型装置
CN113677456A (zh) * 2019-02-20 2021-11-19 芝浦机械株式会社 压铸机、带模具的压铸机、压铸机用控制装置以及压铸方法
CN116140579A (zh) * 2023-04-20 2023-05-23 宁波力劲科技有限公司 一种生产薄壁制品的冷室压铸机

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6953079B2 (en) * 2002-11-06 2005-10-11 Toshiba Kikai Kabushiki Kaisha Die casting machine
DE10252183B4 (de) * 2002-11-09 2007-12-27 Kunz, Susanne Vorrichtung zur Entlüftung von Druckgussformen
DE10357365B4 (de) * 2002-12-11 2007-05-03 Metal Technologies Sachs Giesserei Gmbh Druckgießvorrichtung und Verfahren zum Druckgießen mit einem definierten Forminnendruck
US7172476B2 (en) * 2004-05-07 2007-02-06 Yamaha Marine Kabushiki Kaisha Outboard motor with bracket assembly
DE102004057325A1 (de) * 2004-11-27 2006-06-01 Pfeiffer Vacuum Gmbh Vakuumdruckgussverfahren
DE102004057324A1 (de) * 2004-11-27 2006-06-01 Pfeiffer Vacuum Gmbh Vakuumdruckgussverfahren
JP2006183122A (ja) * 2004-12-28 2006-07-13 Denso Corp ダイカスト用アルミニウム合金およびアルミニウム合金鋳物の製造方法
JP4442598B2 (ja) * 2006-10-12 2010-03-31 トヨタ自動車株式会社 減圧鋳造方法、及び、減圧鋳造装置
US20100032123A1 (en) * 2008-08-05 2010-02-11 Ratte Robert W Molding of die-cast product and method of
CN101954471A (zh) * 2010-09-06 2011-01-26 重庆硕龙科技有限公司 一种带补压功能的高压铸造模具型腔抽真空方法及装置
JP5770012B2 (ja) * 2010-11-24 2015-08-26 東芝機械株式会社 品質管理装置及びダイカストマシン
US8863817B2 (en) * 2011-06-30 2014-10-21 United Technologies Corporation System and method for high temperature die casting tooling
US8714235B2 (en) 2011-12-30 2014-05-06 United Technologies Corporation High temperature directionally solidified and single crystal die casting
DE102012220513B4 (de) * 2012-11-12 2023-02-16 Bayerische Motoren Werke Aktiengesellschaft Verfahren und Vorrichtung zur Herstellung eines Druckgussteils
CN103934428B (zh) * 2014-03-31 2016-04-20 清华大学 充氧-真空压铸模具装置和充氧-真空压铸工艺
CH709493A2 (de) * 2014-04-14 2015-10-15 Fondarex Sa Vorrichtung und Verfahren zur Messung der Feuchtigkeit in Druckgiessformen.
KR101483717B1 (ko) * 2014-07-10 2015-01-16 고동근 고도의 진공환경에서 금속을 성형하는 금형장치
EP3535078A2 (de) 2016-11-04 2019-09-11 MAGNA BDW technolgies GmbH Vorrichtung, steuerung und filtermodul zur herstellung von druckgussteilen, sowie verfahren dazu
DE102016221675B4 (de) * 2016-11-04 2020-07-16 Magna BDW technologies GmbH Filtermodul für eine Vorrichtung zur Herstellung von Druckgussteilen
CN107570677A (zh) * 2017-09-24 2018-01-12 广东鸿泰科技股份有限公司 一种用于高压压铸工艺的料管抽真空的加工方法
CN109226711A (zh) * 2018-09-30 2019-01-18 广州市型腔模具制造有限公司 一种用于高真空模具的流道抽气结构
DE102019100282B4 (de) * 2019-01-08 2020-07-30 InterGuss Gießereiprodukte GmbH Vakuumdruckgussanlage und Strömungsventil zur Verwendung in einer Vakuumdruckgussanlage
JP7215409B2 (ja) * 2019-12-19 2023-01-31 トヨタ自動車株式会社 鋳造方法
JP7157840B1 (ja) * 2021-03-31 2022-10-20 本田技研工業株式会社 鋳造金型の検査方法および鋳造装置
KR102510242B1 (ko) * 2021-04-16 2023-03-14 고병문 무공성 다이캐스팅 시스템 및 그 방법
KR102510235B1 (ko) * 2021-04-16 2023-03-14 고병문 다이캐스팅을 위한 무공성 장치 및 그 동작방법
TWI773304B (zh) * 2021-05-07 2022-08-01 多電工業股份有限公司 壓鑄機之射出增壓控制系統及方法
CN113664175B (zh) * 2021-08-17 2024-06-07 无锡佳浩多精密机械有限公司 一种铝合金通讯腔体真空压铸成形方法及设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS558382A (en) * 1978-07-05 1980-01-21 Kawasaki Heavy Ind Ltd Diecast method
JPS56144855A (en) * 1980-04-15 1981-11-11 Ube Ind Ltd Method and device for two-stage die casting under reduced pressure
JPH0513649U (ja) * 1991-01-23 1993-02-23 広島アルミニウム工業株式会社 鋳造装置
EP1034863A1 (de) * 1999-03-05 2000-09-13 Alusuisse Technology & Management AG Verfahren zum Druckgiessen von Leichtmetallen

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5441053B2 (ja) * 1973-06-27 1979-12-06
CA1163410A (en) * 1980-05-01 1984-03-13 Robert F. Navin Method for making coated molded articles
JPS6446224A (en) * 1987-08-13 1989-02-20 Konishiroku Photo Ind Production of magnetic recording medium
JPH0513649A (ja) * 1991-07-03 1993-01-22 Fujitsu Ltd Pgaパツケージ
JPH0558382A (ja) * 1991-08-30 1993-03-09 Nec Corp ケーブル敷設船
US5860468A (en) * 1993-07-28 1999-01-19 Cook; Arnold J. Vacuum die casting
JP3508627B2 (ja) * 1998-07-14 2004-03-22 日本軽金属株式会社 ダイカスト法及びダイカスト製品

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS558382A (en) * 1978-07-05 1980-01-21 Kawasaki Heavy Ind Ltd Diecast method
JPS56144855A (en) * 1980-04-15 1981-11-11 Ube Ind Ltd Method and device for two-stage die casting under reduced pressure
JPH0513649U (ja) * 1991-01-23 1993-02-23 広島アルミニウム工業株式会社 鋳造装置
EP1034863A1 (de) * 1999-03-05 2000-09-13 Alusuisse Technology & Management AG Verfahren zum Druckgiessen von Leichtmetallen

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP1252949A4 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007167914A (ja) * 2005-12-22 2007-07-05 Ahresty Corp 耐摩耗性製品の製造方法
JP2013031872A (ja) * 2011-08-02 2013-02-14 Honda Motor Co Ltd 鋳造用金型装置
CN113677456A (zh) * 2019-02-20 2021-11-19 芝浦机械株式会社 压铸机、带模具的压铸机、压铸机用控制装置以及压铸方法
CN113677456B (zh) * 2019-02-20 2024-04-09 芝浦机械株式会社 压铸机、带模具的压铸机、压铸机用控制装置以及压铸方法
CN116140579A (zh) * 2023-04-20 2023-05-23 宁波力劲科技有限公司 一种生产薄壁制品的冷室压铸机
CN116140579B (zh) * 2023-04-20 2023-09-05 宁波力劲科技有限公司 一种生产薄壁制品的冷室压铸机

Also Published As

Publication number Publication date
JP3994735B2 (ja) 2007-10-24
CN1394153A (zh) 2003-01-29
AU2001225478A1 (en) 2001-07-24
KR100828896B1 (ko) 2008-05-09
CN1197672C (zh) 2005-04-20
MY130713A (en) 2007-07-31
US20030041993A1 (en) 2003-03-06
EP1252949A1 (en) 2002-10-30
KR20020086890A (ko) 2002-11-20
CN1296160C (zh) 2007-01-24
EP1252949B1 (en) 2005-12-14
EP1252949A4 (en) 2004-03-17
CN1600475A (zh) 2005-03-30
US6648054B2 (en) 2003-11-18

Similar Documents

Publication Publication Date Title
WO2001051237A1 (fr) Procede de coulee sous pression et machine de coulee sous pression
JP2004249334A (ja) 酸素シールドを用いた高真空ダイカスト法
US6308766B1 (en) Process for die-casting light-weight metals
RU2650465C1 (ru) Способ литья под низким давлением и устройство литья под низким давлением
JP2003191061A (ja) ダイカストマシーン
JP2008246503A (ja) 鋳造方法及びダイカストマシン
JP2003191059A (ja) ダイカストマシーン
JP2002018912A (ja) 射出成形用金型装置及び射出成形方法
JP3967305B2 (ja) 内燃機関用ピストンの製造方法
JP2003191060A (ja) ダイカストマシーン
KR100663301B1 (ko) 다이캐스팅 방법 및 다이캐스팅 제품
JP3508627B2 (ja) ダイカスト法及びダイカスト製品
KR102269253B1 (ko) 다이캐스팅용 보조장치
JPS61182868A (ja) 減圧加圧鋳造方法およびその装置
JP2933255B2 (ja) 吸引差圧鋳造方法
JPH05123845A (ja) 真空鋳造装置および真空鋳造方法
JPH06179046A (ja) 離型剤塗布装置
JPH0349864Y2 (ja)
JPS59222321A (ja) 金型キヤビテイ−の真空排気方法およびその装置
JPH0233468B2 (ja)
JP3502585B2 (ja) 粉体離型剤塗布方法および金型
JPH06320246A (ja) 粉体離型剤の吹付装置
EP0972593A1 (en) Pressure die-casting method and products obtained thereby
JPH10314918A (ja) 真空ダイカスト装置および真空ダイカスト方法
JPH11309555A (ja) ダイカスト鋳造方法

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ DE DK EE ES FI GB GE GH GM HR HU ID IL IS JP KE KG KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT UA UG US UZ VN YU ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
ENP Entry into the national phase

Ref country code: JP

Ref document number: 2001 551644

Kind code of ref document: A

Format of ref document f/p: F

WWE Wipo information: entry into national phase

Ref document number: 018035477

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 10169865

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 1020027008952

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 2001900648

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 2001900648

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1020027008952

Country of ref document: KR

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWG Wipo information: grant in national office

Ref document number: 2001900648

Country of ref document: EP