KR970707350A KR1019970702757A KR19970702757A KR970707350A KR 970707350 A KR970707350 A KR 970707350A KR 1019970702757 A KR1019970702757 A KR 1019970702757A KR 19970702757 A KR19970702757 A KR 19970702757A KR 970707350 A KR970707350 A KR 970707350A
Authority
KR
South Korea
Prior art keywords
hole
port
cap body
barrel
concrete
Prior art date
Application number
KR1019970702757A
Other languages
English (en)
Other versions
KR100428018B1 (ko
Inventor
쇼겐 오가와
Original Assignee
쇼겐 오가와
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP22821595A external-priority patent/JPH0971933A/ja
Priority claimed from JP28364595A external-priority patent/JPH08209686A/ja
Application filed by 쇼겐 오가와 filed Critical 쇼겐 오가와
Publication of KR970707350A publication Critical patent/KR970707350A/ko
Application granted granted Critical
Publication of KR100428018B1 publication Critical patent/KR100428018B1/ko

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

콘크리트타설용 트레미관 16이 자유로이 삽통가능한 내부원통 2을 소정간격을 두고 외부원통 3으로 둘러싸는 동시에, 양 원통 2, 3의 상단을 환상의 천장판 1으로, 하단을 환상의 밑판 6으로 각각 계착하여 이중원통상의 켑본체 A를 형성하고, 또한, 이 캡본체 A의 상기 밑판 6에 소정간격을 두고 복수개의 항주근구멍 8을 뚫어 설치하는 동시에, 상기 천장판 1 및 밑판 6에 기액빼냄구멍 5(9)을 개구형성한 구성으로 한다.

Description

장소타항의 항두처리구, 항두처리공법(抗頭處理工法) 및 장소타항공법(場所打抗工法)
본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음
제1도는 캡본체의 사시도이다. 제2도는 캡본체의 일부 절결사시도이다. 제3도는 외부 원통의 밑판의 절곡전평면도이다. 제4도는 캡본체의 일부 절결종단면도이다. 제5도는 캡본체의 사용상태의 설명도이다. 제7도는 내부 원통의 콘크리트를 제거하는 설명도이다. 제8도는 캡본체 A의 다른 실시예를 나타내는 일부 절결사시도이다. 제9도는 캡본체 A의 다른 실시예를 나타내는 일부 절결사시도이다. 제10도는 캡본체 A의 또 다른 실시예를 나타내는 일부 절결사시도이다. 제11도는 캡본체 A의 다른 실시예의 사시도이다.

Claims (8)

  1. 콘크리트타설용 트레미관 16이 자유로이 삽통가능한 내부원통 2을 소정간격을 두고 외부원통 3으로 둘러싸는 동시에, 양 원통 2, 3의 상단을 환상의 천장판 1으로, 하단을 환상의 밑판 6으로 각각 계착하여 이중원통상의 캡본체 A를 형성하고, 또한, 이 캡본체 A의 상기 밑판 6에 소정간격을 두고 복수개의 항주근구멍 8을 뚫어 설치하는 동시에, 상기 천장판 1 및 밑판 6에 기액누출구멍 5(9)을 개구형성한 것을 특징으로 하는 장소타항(場所打抗)의 항두처리구(抗頭處理具).
  2. 제1항에 있어서, 상기 내부원통 2과 외부원통 3은 동일한 길이로 천장판 1 및 밑판 6을 수평판상으로 상기 양 원통 2, 3의 상단 및 하단에 계착한 것을 특징으로 하는 장소타항의 항두처리구.
  3. 외부원통 3의 천정판 1의 외부주위가장자리쪽에, 복수개의 기액빼냄구멍 5을 뚫어설치하는 동시에, 상기 천정판 1의 중앙에 콘크리트타설용 트레미관 16이 자유로이 삽통가능한 상부 트레미구 4를 뚫어 설치하고, 이 상부 트레미구 4의 하측에 계착하고, 상기 외부원통 3보다 2% 내지 3% 짧은 상하면 개방형의 내부원통 2을 관설하고 이중원통을 형성하여 이루어지는 캡본체 A에 있어서, 상기 외부원통 3의 밑판 6의 외부주위가장 자리쪽으로의 평탄지역 6a에, 거의 같은 간격으로 복수개의 항주근구멍 8을 뚫어 설치하고, 또한 이 밑판 6의 중앙에 뚫어 설치한 하부트레미구 7의 주위가장자리에, 방사상르로 절입한 복수개의 슬릿 9을, 거의 같은 간격에 또한 상기 평탄지역 6a을 남겨서 형성하고, 또한 각 슬릿 9에 의하여 생긴 슬릿편 9a을 경사지게 윗쪽으로 절곡하고, 이 슬릿편 9a의 선단을 상기 내부원통 2의 아래가장자리에 고착하여 형성한 것을 특징으로 하는 장소타항의 항두처리구.
  4. 제1항 내지 제3항 중 어느 하나의 항에 있어서, 상기 천장판 1 또는 밑판 6을, 망체 또는 펑칭메탈에 의하여 형성한 것을 특징으로 하는 장소타항의 항두처리구.
  5. 제1항 내지 제4항중의 어느하나의 항에 있어서, 상기 철근농 14에 캡본체 A를 관착하는 동시에, 캡본체 A와 철근농 14을 자유로이 착탈하는 체인과 와이어, 끈 등의 색조 23로 묶어서 고착하고, 이 철근농 14을 굴삭구멍 17에 세워넣도록 한 것을 특징으로 하는 장소타항의 항두처리구를 사용하는 항두처리공법.
  6. 제1항 내지 제4항중 어느 하나의 항에 있어서, 상기 철근농 14에 캡본체 A를 스타트용접으로 관삽고착하여 굴삭구멍 17에 세워넣고, 뒤이어 상기 캡본체 A의 내부원통 2에 의해 트레미관 16을 굴삭구멍 17에 세워넣으며, 상기 굴삭구멍 17의 밑부로부터 상기 내부원통 2천정면에 이르기까지, 연속적으로 콘크리트타설을 행한 후, 곧 캐리바 19에 취부한 굴삭바켓트 18를 회전시키므로써, 내부원통에 충전된 슬라임혼합콘크리트를 제거하는 것을 특징으로 하는 장소타항의 항두처리구를 사용하는 항두처리공법.
  7. 굴삭한 구멍에 철근집을 세워 넣은 후, 굴삭구멍내에 콘크리트를 타설하는 장소 타항공법에 있어서, 시트재로 형성된 밑면이 있는 통상의 자루체내에 철근집을 넣은 후, 자루체체내에 콘크리트를 타설하는 것을 특징으로 하는 장소타항공법.
  8. 제7항에 있어서, 상기 시트재로 형성된 밑면이 있는 통상(有底筒狀)으로서, 통부를 옆쪽으로 개구하기 위한 절결부가 통부(筒部)의 세로방향으로 설치되고, 또한 이 절결부에 파스너가 취부된 자루체를 이용하여, 파스너의 슬라이더를 끌어내려서 통부를 개구시킨 자루체의 밑부를, 굴삭구멍의 구멍입구에 위치시키는 동시에, 굴삭구멍의 구멍입구에 파스너의 슬라이더를 고정하고, 철근집의 세워넣음에 의하여 자루체를 구멍내로 밀어넣는 동시에, 구멍내의 수분을 자루체의 통부의 절결부에서 자루체내로 도입하면서 자루체의 통부를 파스너로 닫도록 한 것을 특징으로 하는 장소타항공법.
    ※ 참고사항 : 최초출원 내용에 의하여 공개하는 것임.
KR1019970702757A 1994-12-05 1995-11-27 현장치기콘크리트파일의파일헤드처리구,파일헤드처리공법및현장치기콘크리트파일공법 KR100428018B1 (ko)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
JP30058394 1994-12-05
JP94-300583 1994-12-05
JP22821595A JPH0971933A (ja) 1995-09-05 1995-09-05 場所打ちコンクリート杭工法
JP95-228215 1995-09-05
JP28364595A JPH08209686A (ja) 1994-12-05 1995-10-31 場所打杭の杭頭処理具及び杭頭処理工法
JP95-283645 1995-10-31

Publications (2)

Publication Number Publication Date
KR970707350A true KR970707350A (ko) 1997-12-01
KR100428018B1 KR100428018B1 (ko) 2004-09-10

Family

ID=27331373

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019970702757A KR100428018B1 (ko) 1994-12-05 1995-11-27 현장치기콘크리트파일의파일헤드처리구,파일헤드처리공법및현장치기콘크리트파일공법

Country Status (6)

Country Link
US (1) US5961253A (ko)
EP (1) EP0796948B1 (ko)
KR (1) KR100428018B1 (ko)
CN (1) CN1077942C (ko)
DE (1) DE69528377D1 (ko)
WO (1) WO1996018001A1 (ko)

Families Citing this family (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19746731A1 (de) * 1997-10-13 1999-05-06 Huang Chia Hsiung C-Profil-Pfahl und Verfahren zum Einbringen von C-Profil-Pfählen
JP3284110B2 (ja) * 1998-12-17 2002-05-20 韓国道路公社 鋼管杭用蓋板
CN1189630C (zh) * 2000-07-20 2005-02-16 斯马泰克工程技术株式会社 用于结合钢管桩的头部和混凝土基础的结合件和结合结构
KR200212743Y1 (ko) * 2000-08-09 2001-02-15 배정효 기초공사용 강관의 상단부 보강구조
US6568881B2 (en) 2001-10-15 2003-05-27 Walter Daniel Long Jet head device for sinking pilings
GB2400880A (en) * 2003-04-22 2004-10-27 Cordek Ltd Former for use in removing the tops of piles
US6893598B1 (en) 2003-09-05 2005-05-17 Mark A. March Finishing guide for concrete piers
US8206064B2 (en) * 2005-10-20 2012-06-26 University Of South Florida Voided drilled shafts
US7735273B2 (en) * 2006-01-17 2010-06-15 Morton Buildings Poured concrete column hole
US7360315B2 (en) 2006-01-17 2008-04-22 Morton Buildings Poured concrete column alignment and plumbing tool
KR100742540B1 (ko) * 2006-04-12 2007-07-25 (주) 대호바콘텍 확대기초구조물용 콘크리트 말뚝의 헤드커버
US20080008539A1 (en) * 2006-07-05 2008-01-10 Con-Tech Systems Ltd. Void form for constructing post-tensioned foundation piles
US8109057B2 (en) * 2008-03-03 2012-02-07 Daniel Stark Tower foundation system
US20100257794A1 (en) * 2009-04-10 2010-10-14 Stark N Daniel W Lateral support device
US8381479B1 (en) * 2009-09-28 2013-02-26 Felix E. Ferrer Pre-fabricated modular reinforcement cages for concrete structures
CN101812844A (zh) * 2010-02-10 2010-08-25 郭振国 一种桥梁桩基用护筒
US20120042605A1 (en) * 2010-08-17 2012-02-23 Turner Michael L Removable Support Cage For Top Of Drilled Pier
IT1402942B1 (it) * 2010-12-10 2013-09-27 Fondazioni Speciali S P A Palo di fondazione, particolarmente del tipo trivellato
CN102444117A (zh) * 2011-09-16 2012-05-09 中铁第四勘察设计院集团有限公司 黄土地区钢筋混凝土防护桩施工方法
JP6153764B2 (ja) * 2013-04-23 2017-06-28 株式会社サンエイ スライム除去バケットおよびこれを用いた杭頭処理工法
CN104234038A (zh) * 2014-03-03 2014-12-24 王磊 一种灌注桩免破碎桩头施工工艺
TWI609117B (zh) * 2014-04-07 2017-12-21 Centrifugal pre-tensioned concrete pile with exhaust function
CN104695424B (zh) * 2015-03-18 2016-08-31 建华建材(莱阳)有限公司 复合地基用预制空心桩桩帽及其固定方法
CN106400783B (zh) * 2016-08-12 2018-07-03 武汉志和岩土工程有限公司 采用展开式钢筋笼制成灌注桩的施工方法
JP6909607B2 (ja) * 2017-03-28 2021-07-28 大成建設株式会社 場所打ち杭および基礎の構築方法
CN106996107A (zh) * 2017-05-26 2017-08-01 中交第二航务工程局有限公司 一种灌注桩桩头的破除装置及其施工方法
CN107268627B (zh) * 2017-07-14 2019-08-23 中国一冶集团有限公司 一种适用于大型钻孔灌注桩桩头破除方法
US10808412B2 (en) * 2017-07-31 2020-10-20 Mohammad Reza Ehsani Spacers for repair of columns and piles
US20190311594A1 (en) * 2018-04-10 2019-10-10 Kidde Technologies, Inc. Container for lithium battery
WO2020000714A1 (zh) 2018-06-28 2020-01-02 北京金风科创风电设备有限公司 阻尼器以及具有该阻尼器的承载围护结构
CN110630680B (zh) * 2018-06-28 2020-12-18 北京金风科创风电设备有限公司 阻尼器以及具有该阻尼器的承载围护结构
CN109235437A (zh) * 2018-10-30 2019-01-18 中铁北京工程局集团有限公司 一种破除桩头方法
KR102016366B1 (ko) * 2019-04-12 2019-10-21 정훈식 현장타설 콘크리트파일의 두부정리장치 및 두부정리방법
CN110344389A (zh) * 2019-07-03 2019-10-18 深圳市工勘岩土集团有限公司 塔式地下水压力回灌设备
CN110725308A (zh) * 2019-09-17 2020-01-24 中铁大桥局集团第五工程有限公司 桩基钢筋笼安装平面位置精确定位的施工方法及限位装置
WO2023080774A1 (en) * 2021-11-05 2023-05-11 Will N Well Property Sdn Bhd A system for guiding tremie pipe placement and a method for using thereof
CN115075224B (zh) * 2022-07-12 2023-07-07 中建八局第一建设有限公司 一种钢柔结合的预制管桩多功能挡板及实现方法

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2571549A (en) * 1949-06-20 1951-10-16 Luther T Dunning Method of erecting reinforced concrete structures
DE1298459B (de) * 1965-09-08 1969-06-26 Pleuger Friedrich Wilhelm Schlauchschalung zum Herstellen von Ortbetonpfaehlen
US3487646A (en) * 1968-08-19 1970-01-06 Paul Henri Gatien Load bearing pile
JPS491007A (ko) * 1972-04-19 1974-01-08
CA1041780A (en) * 1975-03-26 1978-11-07 Pynford Limited Pile
JPS5880020A (ja) * 1981-11-02 1983-05-14 Hasegawa Komuten Co Ltd 場所打ち杭の杭頭処理工法
US4472085A (en) * 1981-12-14 1984-09-18 The Union Metal Manufacturing Co. Caisson cap
JPS6030714A (ja) * 1983-07-27 1985-02-16 Komatsu Ltd 場所打ち杭の杭頭処理装置
JPS60119815A (ja) * 1983-12-03 1985-06-27 Hasegawa Komuten Co Ltd 余盛コンクリ−ト除去用バケツト
JPH01219214A (ja) * 1988-02-26 1989-09-01 Shuzo Tamoto 場所打ちコンクリートぐいのくい頭処理方法
JPH01322020A (ja) * 1988-06-23 1989-12-27 Masaharu Ookawa 場所打杭の杭頭処理用キャップ
JP2844016B2 (ja) * 1990-10-11 1999-01-06 大成建設株式会社 場所打ち杭構築工法
CH683197A5 (de) * 1990-12-19 1994-01-31 Eggstein Ag Länglicher Stützkorb, zur Herstellung eines Betonpfahles.
US5359829A (en) * 1992-12-07 1994-11-01 Voita John M Fabrication and installation of steel reinforcement cages for pier foundations
US5423633A (en) * 1993-12-23 1995-06-13 Beheersmaatschappij Verstraeten B.V. Piling apparatus adapted to be provided in a tube

Also Published As

Publication number Publication date
WO1996018001A1 (fr) 1996-06-13
CN1077942C (zh) 2002-01-16
EP0796948A1 (en) 1997-09-24
CN1168707A (zh) 1997-12-24
KR100428018B1 (ko) 2004-09-10
US5961253A (en) 1999-10-05
EP0796948A4 (en) 1999-05-06
EP0796948B1 (en) 2002-09-25
DE69528377D1 (de) 2002-10-31

Similar Documents

Publication Publication Date Title
KR970707350A (ko) 장소타항의 항두처리구, 항두처리공법(抗頭處理工法) 및 장소타항공법(場所打抗工法)
GB2158493A (en) Method of installing a pile
EP0902129A3 (de) Verfahren und Vorrichtung für den Rohreinbau
JP2000144719A (ja) コンクリート矢板及びその打込み方法
DE10025966A1 (de) Stützschlauch-Säulen
JPH05230823A (ja) 超軟弱地盤改良用水平ドレーン材敷設方法
DE1784739A1 (de) Verfahren und Vorrichtung zur Herstellung von Schaechten,Revisionskammern und Roehrenverbindungen
JP7252608B2 (ja) 立坑用ケーシングおよび土留工法
JPH0673727A (ja) ソイル杭柱列山留め壁の構築方法と特殊h型鋼
JPS6044452B2 (ja) 地中埋設管の基礎定着方法
JPS6032200Y2 (ja) 砂杭案内管
JPS6233772Y2 (ko)
JPH09195267A (ja) 地盤の液状化防止装置
JPS60364Y2 (ja) 水中コンクリ−ト打設装置
JPH0411110A (ja) 浸透管及び浸透管の推進埋設工法
JPH11270130A (ja) コンクリ―ト成形型枠
KR100358994B1 (ko) 수로장치
JPS6133072Y2 (ko)
JPH0447247Y2 (ko)
JP2652567B2 (ja) トンネル等構築方法及び装置
JPH0771039A (ja) 法面用スペーサー
JP2858050B2 (ja) 立坑掘削工法
JP3014481U (ja) 水抜パイプインナー保持具
JPH0535175Y2 (ko)
JPS6178915A (ja) 地中連続壁の造成工法

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20070327

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee