US20120042605A1 - Removable Support Cage For Top Of Drilled Pier - Google Patents

Removable Support Cage For Top Of Drilled Pier Download PDF

Info

Publication number
US20120042605A1
US20120042605A1 US12/858,206 US85820610A US2012042605A1 US 20120042605 A1 US20120042605 A1 US 20120042605A1 US 85820610 A US85820610 A US 85820610A US 2012042605 A1 US2012042605 A1 US 2012042605A1
Authority
US
United States
Prior art keywords
ring
sleeve
hole
concrete
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/858,206
Inventor
Michael L. Turner
John W. Gates
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US12/858,206 priority Critical patent/US20120042605A1/en
Publication of US20120042605A1 publication Critical patent/US20120042605A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/013Shuttering specially adapted therefor

Definitions

  • the present invention relates to a frame for sustaining the cylindrical shape of a flexible enclosure to properly form and contain the upper portion of a concrete pier.
  • a drilled concrete pier is a deep foundation system that is constructed by placing fresh concrete and reinforcing steel into a drilled shaft that transfers a load from the surface to a deep soil mass.
  • the shaft is constructed by rotary methods using either a self-contained drill unit or a crane mounted drill unit.
  • the hole is advanced through soil or rock to the desired bearing stratum.
  • the top one to two feet of the hole near earth grade is usually flared.
  • the top of the pier will conform to the flared portion of the hole, forming a mushroom shaped top on the pier.
  • the mushroom shaped top on the pier increases the area against which uplift pressures are asserted on the caisson by expansive soils.
  • flexible retainers are shaped into substantially cylindrical forms and inserted into the hole and placed on top of the wet concrete that has been poured to a level of twelve to twenty four inches below the anticipated top elevation of the pier and a few inches below the point at which the excavation becomes flared.
  • the object of the flexible retainer is to emulate the cylindrical shape of the poured pier, even though the retainer is, in at least one of its embodiments, constructed from an endless loop of corrugated plastic material having spaced apart scoring lines that, when expanded, creates a closed, flexible polygon having a plurality of flat chords (or sides) which forms a “substantially cylindrical” form or enclosure.
  • the primary purpose of the present invention to provide a removable frame, or cage, which can be inserted into the interior of the flexible form that will maintain its desired shape during the pouring of concrete into the form without the need for any external holding, supporting or backfilling.
  • Another object of the invention is to provide the supporting frame with means allowing the cage frame to be removed from the cylindrical form immediately following the pouring of concrete into the form.
  • the removable cage frame of the present invention comprises a split circular ring having upstanding handles and a plurality of circumferentially spaced apart rigid rods that depend from the split ring.
  • the split ring and depending rods are placed into the interior of a flexible polygonal shaped concrete sleeve form to stabilize the sides thereof and insure that concrete poured into the form will be shaped into a substantially cylindrical extension of the pier on top of which the form and the frame are disposed.
  • the frame may be removed following pouring of concrete into the form.
  • FIG. 1 is a diagrammatic perspective cross section of that portion of the earth into which a hole has been dug and filled with concrete to form a pier (caisson) on the top of which is shown a flexible polygonal form into which concrete is poured to form a substantially cylindrical top for the pier.
  • a pier caisson
  • FIG. 2 is a perspective view of the frame cage of the present invention.
  • FIG. 3 is a perspective view of the frame cage as it would appear as partially removed from the form sleeve following pouring of the concrete.
  • FIG. 1 illustrates the environment in which the cage frame of the present invention is intended to operate.
  • a concrete pier 5 is poured into a hole 8 that has been drilled into the earth 10 .
  • parts of the periphery of the hole are broken away to form a flared portion 12 having inclined slope sides at the top of the hole 8 .
  • a substantially cylindrical sleeve form 15 Positioned on the top of the uncured concrete pier 5 is a substantially cylindrical sleeve form 15 having a somewhat smaller diameter than that of the concrete pier. For example, if the pier was twenty four inches in diameter the sleeve form would preferably be approximately twenty two inches in diameter.
  • the concrete sleeve form when characterized as substantially circular or substantially cylindrical it means that the form is of a polygonal shape whose straight sides form the chords of a circle and which are small enough that the closed plane figure bounded by the straight sides substantially resembles a circle or cylinder.
  • the sleeve form 15 is constructed from an endless loop of corrugated plastic material having a plurality of longitudinal scores that define the sides or the chords forming the polygon.
  • the cage frame 20 of the present invention comprises a metal split ring 24 having a plurality of circumferentially spaced apart legs 28 each of whose proximal ends are secured by welding or similar means to the split ring 24 .
  • the length of the legs is equal to or very similar to the longitudinal length L of the sleeve form 15 .
  • the diameter of the ring 24 is slightly smaller, but very close to the diameter of the sleeve form 15 .
  • the legs 28 a and 28 b Prior to inserting the legs 28 into the sleeve form 15 , the legs 28 a and 28 b , which occupy proximal positions to either side of the open space 36 in the ring, are manually squeezed together to reduce the diameter of the ring by a small amount.
  • the process of using the cage frame of the present invention to complete the upward extension of a drilled pier begins with compressing the diameter of the cage ring by squeezing together the legs of the ring that depend from the extremities of the space 36 in the ring. Having shaped a sleeve form 15 into a substantial cylinder the depending legs of the cage frame are inserted into the interior of the form. When the legs of the frame are inserted their full length into the form compression of the ring is released, allowing the ring to expand to its normal diameter and causing the depending legs of the ring to bring radially outward pressure against the sides of the sleeve form, creating a rigid closed plane polygon figure.
  • the expanded sleeve form is then placed on top of the poured wet concrete that forms the pier.
  • the top of the poured pier is preferably one to two inches below the level of the hole where the flare 12 begins.
  • the lower perimeter of the expanded sleeve form is positioned on the surface of the wet concrete at the top of the poured pier but should not be knifed down into the concrete.
  • the form can be filled with concrete to the desired level, either the ground surface grade or several inches above ground grade.
  • the cage frame is lifted out of the sleeve form by using the handles 40 .
  • the cage 20 is then cleaned for another similar use. Because the sleeve form was rigidly supported by the cage frame during pouring of concrete into the form, backfilling with soil or maintaining other lateral support for the form was not required in order to create a substantially cylindrical pier extension that is aligned with the pier.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention is a method and apparatus for forming the upper portion of a drilled concrete pier that utilizes a flexible cylindrical form and a removable cage frame to stabilize the form during the pouring of concrete into the form. The cage frame comprises a circular ring having a space-forming split therein and a plurality of rigid leg rods each having proximal and distal ends, where the proximal ends of the rods are attached to the circular ring at circumferentially spaced apart points and the rods depend from the ring in mutually parallel relation. The legs of the cage frame are inserted into the cylindrical form prior to the concrete pour and removed immediately after the pour.

Description

    FIELD OF THE INVENTION
  • The present invention relates to a frame for sustaining the cylindrical shape of a flexible enclosure to properly form and contain the upper portion of a concrete pier.
  • BACKGROUND OF THE INVENTION
  • A drilled concrete pier (caisson) is a deep foundation system that is constructed by placing fresh concrete and reinforcing steel into a drilled shaft that transfers a load from the surface to a deep soil mass. The shaft is constructed by rotary methods using either a self-contained drill unit or a crane mounted drill unit. The hole is advanced through soil or rock to the desired bearing stratum. The top one to two feet of the hole near earth grade is usually flared. Following placement of the reinforcing steel into the hole, the hole is filled with concrete and, unless special measures are taken, the top of the pier will conform to the flared portion of the hole, forming a mushroom shaped top on the pier. Among other problems, the mushroom shaped top on the pier increases the area against which uplift pressures are asserted on the caisson by expansive soils.
  • To preclude the formation of mushroom tops on concrete piers flexible retainers are shaped into substantially cylindrical forms and inserted into the hole and placed on top of the wet concrete that has been poured to a level of twelve to twenty four inches below the anticipated top elevation of the pier and a few inches below the point at which the excavation becomes flared. The object of the flexible retainer is to emulate the cylindrical shape of the poured pier, even though the retainer is, in at least one of its embodiments, constructed from an endless loop of corrugated plastic material having spaced apart scoring lines that, when expanded, creates a closed, flexible polygon having a plurality of flat chords (or sides) which forms a “substantially cylindrical” form or enclosure.
  • As concrete is poured into the form it becomes necessary to brace or otherwise hold the form to its “cylindrical” shape by supporting one or more sides of the form against the pressure of the concrete being poured into the form to prevent displacement from its aligned position with the axis of the pier. In addition, as the concrete fills the flexible form the exterior of the form must be backfilled with loose soil in order to provide opposing pressure to the outward pressure of the wet concrete. Filling the form too quickly or failure to provide lateral support with backfill material will result in a misshapen top for the pier. In some cases the form can move completely out of its proper position on the pier.
  • Accordingly, it is the primary purpose of the present invention to provide a removable frame, or cage, which can be inserted into the interior of the flexible form that will maintain its desired shape during the pouring of concrete into the form without the need for any external holding, supporting or backfilling.
  • Another object of the invention is to provide the supporting frame with means allowing the cage frame to be removed from the cylindrical form immediately following the pouring of concrete into the form.
  • Other and further features, advantages and objectives of the present invention will become apparent upon a reading of the following detailed description of the invention taken in conjunction with the accompanying drawings.
  • SUMMARY OF THE INVENTION
  • The removable cage frame of the present invention comprises a split circular ring having upstanding handles and a plurality of circumferentially spaced apart rigid rods that depend from the split ring. The split ring and depending rods are placed into the interior of a flexible polygonal shaped concrete sleeve form to stabilize the sides thereof and insure that concrete poured into the form will be shaped into a substantially cylindrical extension of the pier on top of which the form and the frame are disposed. By exerting upward pressure on the handles, the frame may be removed following pouring of concrete into the form.
  • DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a diagrammatic perspective cross section of that portion of the earth into which a hole has been dug and filled with concrete to form a pier (caisson) on the top of which is shown a flexible polygonal form into which concrete is poured to form a substantially cylindrical top for the pier.
  • FIG. 2 is a perspective view of the frame cage of the present invention.
  • FIG. 3 is a perspective view of the frame cage as it would appear as partially removed from the form sleeve following pouring of the concrete.
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENT
  • FIG. 1 illustrates the environment in which the cage frame of the present invention is intended to operate. A concrete pier 5 is poured into a hole 8 that has been drilled into the earth 10. During the drilling operation parts of the periphery of the hole are broken away to form a flared portion 12 having inclined slope sides at the top of the hole 8. Positioned on the top of the uncured concrete pier 5 is a substantially cylindrical sleeve form 15 having a somewhat smaller diameter than that of the concrete pier. For example, if the pier was twenty four inches in diameter the sleeve form would preferably be approximately twenty two inches in diameter. In this specification and appended claims when the concrete sleeve form is characterized as substantially circular or substantially cylindrical it means that the form is of a polygonal shape whose straight sides form the chords of a circle and which are small enough that the closed plane figure bounded by the straight sides substantially resembles a circle or cylinder. The sleeve form 15 is constructed from an endless loop of corrugated plastic material having a plurality of longitudinal scores that define the sides or the chords forming the polygon.
  • The cage frame 20 of the present invention, as shown in FIG. 2, comprises a metal split ring 24 having a plurality of circumferentially spaced apart legs 28 each of whose proximal ends are secured by welding or similar means to the split ring 24. The length of the legs is equal to or very similar to the longitudinal length L of the sleeve form 15. The diameter of the ring 24 is slightly smaller, but very close to the diameter of the sleeve form 15. Prior to inserting the legs 28 into the sleeve form 15, the legs 28 a and 28 b, which occupy proximal positions to either side of the open space 36 in the ring, are manually squeezed together to reduce the diameter of the ring by a small amount. Reducing the ring diameter simplifies the insertion of the legs 28 into the interior of the sleeve form 15. Once the legs are fully inserted into the sleeve form the squeezing pressure on the legs 28 a and 28 b is released and the ring springs back to its normal shape and diameter causing the legs 28 to bear with pressure against the interior sides of the polygonal sleeve form 15. After wet concrete fills the sleeve form 15, the cage frame 20 is pulled out of the form by exerting upward force on the handles 40 that are attached to opposing sides of the ring and extend upwardly in a direction opposite to that of the legs 28.
  • The process of using the cage frame of the present invention to complete the upward extension of a drilled pier begins with compressing the diameter of the cage ring by squeezing together the legs of the ring that depend from the extremities of the space 36 in the ring. Having shaped a sleeve form 15 into a substantial cylinder the depending legs of the cage frame are inserted into the interior of the form. When the legs of the frame are inserted their full length into the form compression of the ring is released, allowing the ring to expand to its normal diameter and causing the depending legs of the ring to bring radially outward pressure against the sides of the sleeve form, creating a rigid closed plane polygon figure.
  • The expanded sleeve form is then placed on top of the poured wet concrete that forms the pier. The top of the poured pier is preferably one to two inches below the level of the hole where the flare 12 begins. The lower perimeter of the expanded sleeve form is positioned on the surface of the wet concrete at the top of the poured pier but should not be knifed down into the concrete. After the sleeve form is centered on the top of the poured pier the form can be filled with concrete to the desired level, either the ground surface grade or several inches above ground grade. After the concrete is poured to the appropriate level the cage frame is lifted out of the sleeve form by using the handles 40. The cage 20 is then cleaned for another similar use. Because the sleeve form was rigidly supported by the cage frame during pouring of concrete into the form, backfilling with soil or maintaining other lateral support for the form was not required in order to create a substantially cylindrical pier extension that is aligned with the pier.

Claims (8)

What is claimed is:
1. A removable cage frame for a flexible sleeve form comprising,
a circular ring having a space-forming split therein,
a plurality of rigid leg rods each having proximal and distal ends, where the proximal ends of the rods are attached to the circular ring at circumferentially spaced apart points and the rods depend from the ring in mutually parallel relation.
2. The apparatus of claim 1 where the ring is elastic and perimetrically compressible.
3. The apparatus of claim 1 and further including handle forming means attached to the ring and extending in a direction from the ring that is opposite to that of the leg rods.
4. The apparatus of claim 1 wherein a leg rod is attached to and depends from the ring proximal to the respective ends of the space in the ring.
5. The apparatus of claim 1 where the distal ends of the leg rods are curved.
6. A method of forming a drilled concrete pier comprising the steps of,
drilling a hole into the ground,
placing reinforcing metal members into the hole,
partially filling the hole with poured concrete,
placing a sleeve form having an interior cage frame into the hole at a depth where the bottom peripheral edge of the sleeve form is in contact with the top surface of the partially poured concrete pier,
filling the sleeve with poured concrete to a desired level, and
removing the cage frame from the sleeve.
7. The process of claim 6 and following the step of placing the sleeve, the further step of aligning the longitudinal axis of the sleeve with the longitudinal axis of the hole.
8. A method of forming a drilled concrete pier comprising the steps of,
drilling a hole into the ground,
partially filling the hole with poured concrete to form a pier,
perimetrically compressing a split ring cage frame having a plurality of legs depending from the split ring,
inserting the plurality of dependent legs of the split ring into a flexible sleeve concrete form,
releasing the perimetric compression on the split ring of the cage frame,
placing the sleeve form into the hole at a depth where the bottom peripheral edge of the sleeve form is in contact with the top of the partially poured concrete pier,
filling the sleeve form with poured concrete to a desired level, and
removing the cage frame from the sleeve form.
US12/858,206 2010-08-17 2010-08-17 Removable Support Cage For Top Of Drilled Pier Abandoned US20120042605A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/858,206 US20120042605A1 (en) 2010-08-17 2010-08-17 Removable Support Cage For Top Of Drilled Pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/858,206 US20120042605A1 (en) 2010-08-17 2010-08-17 Removable Support Cage For Top Of Drilled Pier

Publications (1)

Publication Number Publication Date
US20120042605A1 true US20120042605A1 (en) 2012-02-23

Family

ID=45592958

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/858,206 Abandoned US20120042605A1 (en) 2010-08-17 2010-08-17 Removable Support Cage For Top Of Drilled Pier

Country Status (1)

Country Link
US (1) US20120042605A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635231A (en) * 2012-04-13 2012-08-15 中铁十七局集团第三工程有限公司 Self-stabilization support system for inner film of circular reinforced concrete structure
US9771728B2 (en) 2012-05-23 2017-09-26 Dennard Charles Gilpin Device for forming a void in a concrete foundation
US20190032346A1 (en) * 2017-07-31 2019-01-31 Mohammad Reza Ehsani On-Site Construction and Repair of Structural Elements and Pipes of any Desired Diameter with Reusable Materials
US10449699B2 (en) * 2011-09-16 2019-10-22 Goss Construction, Inc. Concrete forming systems and methods

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2009867A (en) * 1933-11-09 1935-07-30 Charles M Biddle Trellis and plant protector
US2555951A (en) * 1947-01-09 1951-06-05 Allard Pierre Jean Ma Theodore Method for constructing piles or piers for foundations
US3159898A (en) * 1962-07-25 1964-12-08 Dougherty J J Removable form for concrete jacket
US3396546A (en) * 1965-09-08 1968-08-13 Friedrich W. Pleuger Method of producing concrete piles for foundations
US3958637A (en) * 1975-05-22 1976-05-25 The United States Of America As Represented By The Secretary Of The Interior Technique for lining shaft
US4275636A (en) * 1978-10-03 1981-06-30 Ets Van Doren Ties for the mouthpiece of a wind instrument
US4306893A (en) * 1980-10-28 1981-12-22 The Air Preheater Company, Inc. Snap-in assembly for bag filter
US4549755A (en) * 1983-06-16 1985-10-29 Efcor, Inc. Armored cable connector
US4713869A (en) * 1986-05-02 1987-12-22 Lisle Corporation Front wheel drive boot removal tool
US4999966A (en) * 1988-07-19 1991-03-19 Houston Industries Incorporated Method of forming an-before "immured"
JPH05230840A (en) * 1992-02-25 1993-09-07 Nkk Corp Pile head cage reinforcement fitting method
WO1994023135A1 (en) * 1993-03-28 1994-10-13 Soilex Ab A method of making cast-in-situ piles
US5431553A (en) * 1991-09-26 1995-07-11 Miller Pipeline Corporation Manhole seal molding apparatus
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
US5961253A (en) * 1994-12-05 1999-10-05 Okawa; Shogen Pile head dresser, pile head dressing method, and, placement of cast-in-place concrete piles
US6382878B1 (en) * 1999-12-03 2002-05-07 Yue-Chyou Yang Multi-sectioned concrete support structure and method of manufacture
US6594968B2 (en) * 2000-12-02 2003-07-22 Oceans Engineering Limited Method of making a foundation
US20090108170A1 (en) * 2007-10-25 2009-04-30 Blayde Penza Concrete forming system
US8002502B2 (en) * 2005-02-28 2011-08-23 Raymond J. Roussy Method and system for installing cast-in-place concrete piles with a sonic drill
US8074740B2 (en) * 2008-02-22 2011-12-13 Roussy Raymond J Method and system for installing cast-in-place concrete piles with a sonic drill and a removable or retrievable drill bit

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2009867A (en) * 1933-11-09 1935-07-30 Charles M Biddle Trellis and plant protector
US2555951A (en) * 1947-01-09 1951-06-05 Allard Pierre Jean Ma Theodore Method for constructing piles or piers for foundations
US3159898A (en) * 1962-07-25 1964-12-08 Dougherty J J Removable form for concrete jacket
US3396546A (en) * 1965-09-08 1968-08-13 Friedrich W. Pleuger Method of producing concrete piles for foundations
US3958637A (en) * 1975-05-22 1976-05-25 The United States Of America As Represented By The Secretary Of The Interior Technique for lining shaft
US4275636A (en) * 1978-10-03 1981-06-30 Ets Van Doren Ties for the mouthpiece of a wind instrument
US4306893A (en) * 1980-10-28 1981-12-22 The Air Preheater Company, Inc. Snap-in assembly for bag filter
US4549755A (en) * 1983-06-16 1985-10-29 Efcor, Inc. Armored cable connector
US4713869A (en) * 1986-05-02 1987-12-22 Lisle Corporation Front wheel drive boot removal tool
US4999966A (en) * 1988-07-19 1991-03-19 Houston Industries Incorporated Method of forming an-before "immured"
US5431553A (en) * 1991-09-26 1995-07-11 Miller Pipeline Corporation Manhole seal molding apparatus
JPH05230840A (en) * 1992-02-25 1993-09-07 Nkk Corp Pile head cage reinforcement fitting method
WO1994023135A1 (en) * 1993-03-28 1994-10-13 Soilex Ab A method of making cast-in-situ piles
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
US5961253A (en) * 1994-12-05 1999-10-05 Okawa; Shogen Pile head dresser, pile head dressing method, and, placement of cast-in-place concrete piles
US6382878B1 (en) * 1999-12-03 2002-05-07 Yue-Chyou Yang Multi-sectioned concrete support structure and method of manufacture
US6594968B2 (en) * 2000-12-02 2003-07-22 Oceans Engineering Limited Method of making a foundation
US8002502B2 (en) * 2005-02-28 2011-08-23 Raymond J. Roussy Method and system for installing cast-in-place concrete piles with a sonic drill
US20090108170A1 (en) * 2007-10-25 2009-04-30 Blayde Penza Concrete forming system
US8074740B2 (en) * 2008-02-22 2011-12-13 Roussy Raymond J Method and system for installing cast-in-place concrete piles with a sonic drill and a removable or retrievable drill bit

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10449699B2 (en) * 2011-09-16 2019-10-22 Goss Construction, Inc. Concrete forming systems and methods
US10836080B2 (en) 2011-09-16 2020-11-17 Goss Construction, Inc. Concrete forming systems and methods
US11559924B2 (en) 2011-09-16 2023-01-24 Goss Construction, Inc. Concrete forming systems and methods
CN102635231A (en) * 2012-04-13 2012-08-15 中铁十七局集团第三工程有限公司 Self-stabilization support system for inner film of circular reinforced concrete structure
US9771728B2 (en) 2012-05-23 2017-09-26 Dennard Charles Gilpin Device for forming a void in a concrete foundation
US10000938B2 (en) 2012-05-23 2018-06-19 Dennard Charles Gilpin Concrete void forming method and device
US20190032346A1 (en) * 2017-07-31 2019-01-31 Mohammad Reza Ehsani On-Site Construction and Repair of Structural Elements and Pipes of any Desired Diameter with Reusable Materials
US10808412B2 (en) * 2017-07-31 2020-10-20 Mohammad Reza Ehsani Spacers for repair of columns and piles

Similar Documents

Publication Publication Date Title
US8221033B2 (en) Extensible shells and related methods for constructing a support pier
JP6932544B2 (en) Construction method of support pile
JP5378860B2 (en) Foundation structure of buildings in soft ground
US9567723B2 (en) Open-end extensible shells and related methods for constructing a support pier
CA2828079A1 (en) Skirted foundation for penetrating soft material
CN106351270A (en) Self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation
US20120042605A1 (en) Removable Support Cage For Top Of Drilled Pier
JP2017095880A (en) Construction method of steel pipe pile
ES2671921T3 (en) Method and apparatus for manufacturing an expanded base pillar
KR20160025180A (en) Helical pile and construction method thereof
KR101051428B1 (en) Reinforcement structure for pile footing and fixed anchorage zone of tension members
KR101177395B1 (en) Apparatus and method for installing sub-structure of ocean tidal current power or offshore wind power turbines
CN107724392A (en) Steel-pipe pile drawing out soil equipment and soil basketing method
ES2949569T3 (en) Apparatus and method for land improvement
KR101008478B1 (en) Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure
US20230041358A1 (en) Extensible shells and related methods for constructing a ductile support pier
JP7107723B2 (en) Construction method of cast-in-place concrete pile and cast-in-place concrete pile
CN109267575A (en) The construction method of pattern foundation pit supporting structure is cheated in the hole of Soft Soil Area
CN206233260U (en) The coaxial piling bar offshore wind turbine foundation of reducing
CN104790397A (en) Sleeve method damaged pile treatment and construction method and construction device using same
CN111206630A (en) Leaning tower correcting method
CN204570695U (en) The construction equipment that a kind of sleeve method damaged stake process construction method is used
CN205934943U (en) Endogenetic radical anchor supporting device
CN114182933B (en) Construction method of ground scaffold for ultra-high steep rock slope
RU2535556C1 (en) Pile and its erection method

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION