CN106351270A - Self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation - Google Patents

Self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation Download PDF

Info

Publication number
CN106351270A
CN106351270A CN201611007782.7A CN201611007782A CN106351270A CN 106351270 A CN106351270 A CN 106351270A CN 201611007782 A CN201611007782 A CN 201611007782A CN 106351270 A CN106351270 A CN 106351270A
Authority
CN
China
Prior art keywords
pile
pile foundation
foundation
self
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611007782.7A
Other languages
Chinese (zh)
Inventor
沈志平
陈德茂
张建磊
袁江文
朱军
付君宜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zhengye Engineering & Investment Inc Ltd
Original Assignee
Guizhou Zhengye Engineering & Investment Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zhengye Engineering & Investment Inc Ltd filed Critical Guizhou Zhengye Engineering & Investment Inc Ltd
Priority to CN201611007782.7A priority Critical patent/CN106351270A/en
Publication of CN106351270A publication Critical patent/CN106351270A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • E02D35/005Lowering or lifting of foundation structures

Abstract

The invention discloses a self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation. The self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation comprises a micro steel pipe pile, a pile foundation expansion platform, a cushion block, and a screw jack. The micro steel pipe pile is mounted under the ground around the original foundation platform; the pile foundation expansion platform and the original foundation platform form a monolithic structure; the cushion block is mounted to the top of the micro steel pipe pile; the screw jack is placed vertically in between the cushion block and the pile foundation expansion platform. A self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation can solve the problem of a long construction period and high cost of current pile foundation deviation correction measures, according to which, independent pile foundation platforms are connected into a monolithic structure like a raft board, a reaction frame and a jack are mounted to the monolithic pile foundation platform, and the jack can force a new pile under the ground to replace the original pile of which the bearing capacity is insufficient or lost, and prevent the damages caused by differential settlement of pile foundation structures.

Description

A kind of self-locking underpinned pile correcting offset of base reinforces steel pile structure
Technical field
The present invention relates to a kind of correcting and then reinforcing steel pile structure, more particularly, to a kind of self-locking underpinned pile correcting offset of base reinforcing steel Pilework, belongs to building field.
Background technology
Greatly develop infrastructural project with currently domestic, continue to bring out out many new building forms, due to building Build various change of thing upper body structure and the various and complexity of base form, existing building Inclination Accident in the last few years Occur repeatedly it is however generally that, if the slope of existing building is close to 4 ‰, the people in building have building dangerous and The uncomfortable sensation of the suitability, when building inclination rate is close to 7 ‰ about, existing building may produce major structural and damage Bad.Currently for the satisfactory after correcting of pile foundation building, usual method is that independent pile foundation support table is linked to be entirety, forms entirety Pile foundation support table is similar to raft foundation, installs reaction frame and jack on forming overall pile foundation support table, will be new by jack Stake press-in stratum to replace the Lack of support of original or the problem of inefficacy;Said method work progress is complicated, long in time limit And high cost.How to solve the problems, such as that the harm that pile foundation differential settlement of buildings is brought is the difficulty needing in foundation stabilization to solve Topic.
Content of the invention
It is an object of the invention to provide a kind of self-locking underpinned pile correcting offset of base reinforces steel pile structure, using a kind of self-locking Tight underpinned pile correcting offset of base reinforces the satisfactory after correcting currently for pile foundation building for the steel pile structure solution, and usual method is by independence Pile foundation support table be linked to be entirety, form overall pile foundation support table and be similar to raft foundation, install on forming overall pile foundation support table New stake is pressed into stratum by jack and replaces asking of the Lack of support of original or inefficacy by reaction frame and jack Topic, thus long in time limit and high cost, solves the problems, such as the harm that pile foundation differential settlement of buildings is brought.
The technical scheme of the offer of the present invention is: a kind of self-locking underpinned pile correcting offset of base reinforces steel pile structure, including micro- Shaped steel pile tube, pile foundation expand cushion cap, cushion block and screw jack, and described miniature steel pipe pile is arranged on around original basis cushion cap In stratum;It is overall structure that described pile foundation expands cushion cap with original basis cushion cap;Described cushion block is arranged on the top of miniature steel pipe pile Portion;Screw jack is vertically placed on cushion block and pile foundation expands between cushion cap.
Described miniature steel pipe pile is circular cross-section, and miniature steel pipe pile bottom is sharp, and sharp position is ring-like knife-like.
The mounting means that described pile foundation expands cushion cap is that reinforcing bar is implanted the mode after-pouring of original basis cushion cap in basis Around cushion cap;Described pile foundation expands cushion cap plan-position with miniature steel pipe pile on the same axis.
Described cushion block is steel plate.
Described screw jack has auto-lock function.
Described plate size is 350mm × 350mm × 10mm.
Carry out the piling work of miniature steel pipe pile first, squeeze on design supporting course;Carry out pile foundation afterwards and expand cushion cap Make, cushion block is placed after completing on the miniature steel pipe pile expose earth's surface and lays screw jack;Screw jack It is manually operated, with the jacking realization purpose of raising former pile foundation support table of screw jack, in screw jack work When whole device force path be: dead load → former pile foundation support table → pile foundation expand cushion cap → screw jack → cushion block → Miniature steel pipe pile → design supporting course, because miniature steel pipe pile bottom has reached design supporting course, therefore it is in steady statue.By Carry auto-lock function in screw jack, lifting operation can be stopped at any time during screw jack jacking it is not necessary to interim Envelope stake, it is possible to achieve the total tune lifting of structure.
A kind of self-locking underpinned pile correcting offset of base of the present invention is reinforced steel pile structure and is mainly included miniature steel pipe pile, and basis is expanded Large platform, money advanced for somebody to be paid back later and four major parts of screw jack, miniature steel pipe pile squeezes into original basis cushion cap week by pile driving equipment stake In the stratum enclosed, stake is long, and depending on bearing stratum depth, its section is circular cross-section, and stake bottom is sharp, presents cutting ring shape, Merogenesis squeezes into stratum.Pile foundation expand cushion cap by by reinforcing bar implant original basis cushion cap by way of pour around foundation platform with former Foundation platform forms entirety, and plan-position is with miniature steel pipe pile on the same axis;Cushion block be many chip sizes 350mm × The steel plate of 350mm × 10mm, the top being positioned over miniature steel pipe pile is used for laying screw jack.
The miniature steel pipe pile of the present invention is circular cross-section, and miniature steel pipe pile bottom is sharp, and sharp position is ring-like knife-like, adopts Uniform force can be ensured with this structure circle, sharp steel-pipe pile bottom is easy to for miniature steel pipe pile to squeeze into pile foundation expansion cushion cap, Decrease difficulty of construction, improve work efficiency.
The mounting means that the pile foundation of the present invention expands cushion cap is that reinforcing bar is implanted the mode after-pouring of original basis cushion cap in base Around plinth cushion cap;Described pile foundation expands cushion cap plan-position with miniature steel pipe pile on the same axis so that structure is in entirety More flexible during lifting, it is easy to the total tune lifting of all pile foundation support tables, compensate for pile foundation support table and be not linked to be entirety The problem of difficult to reach entirety lifting, both having saved the duration also saves operating expenses.
The cushion block of the present invention is steel plate, increased intensity, improves stability.
The screw jack of the present invention has auto-lock function, and the self-locking function of screw jack can during allowing jacking To stop lifting operation at any time.
The plate size of the present invention is 350mm × 350mm × 10mm, can need to adjust different steel plate layer according to thickness Number.
For pile foundation rectifying of leaned building, because design supporting course is deeper, can only be underpined by the way of again driving piles The superstructure load that former stake is born.The present invention is using the mode of " first drive piles, then underpin ", quiet compared to traditional reaction frame Defeat the mode of " the underpining in piling " of stake, structure is safer during piling, also eliminates traditional method in pile extension When need the interim operation sealing stake.Piling carries out jacking, screw jack using screw jack to pile foundation cushion cap after finishing Self-locking function allow jacking during can stop lifting operation at any time so that structure is cleverer during overall lifting Live, be easy to the total tune lifting of all pile foundation support tables, compensate for pile foundation support table and be not linked to be overall difficult to reach entirety lifting Problem, both having saved the duration also saves operating expenses.Screw jack is welded after finishing by jacking, finally expands in pile foundation The following formwork supporting plate of cushion cap, will expose the miniature steel pipe pile of earth's surface, cushion block, and screw jack is by the way of cast-in-place concrete and stake Base expands cushion cap and is linked to be entirety, completes permanent envelope stake.Due to being driven piles using pile driving equipment, thus eliminate static pressed pile to need to arrange The technique of reaction frame.
In sum, reinforce steel pile structure using a kind of self-locking underpinned pile correcting offset of base of the present invention can solve at present For the satisfactory after correcting of pile foundation building, usual method is that independent pile foundation support table is linked to be entirety, forms overall pile foundation and holds Platform is similar to raft foundation, installs reaction frame and jack on forming overall pile foundation support table, by jack by new stake pressure Enter stratum to replace the Lack of support of original or the problem of inefficacy, thus long in time limit and high cost, solve pile foundation building The harm problem that differential settlement is brought.
Brief description
Fig. 1 is present configuration schematic plan view;
Fig. 2 is present configuration constructed profile;
In figure labelling: 1, miniature steel pipe pile, 2, pile foundation expand cushion cap, 3, cushion block, 4, screw jack.
Specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail.
Referring to shown in Fig. 1~2, a kind of self-locking underpinned pile correcting offset of base reinforces steel pile structure, including miniature steel pipe pile 1, Pile foundation expands cushion cap 2, cushion block 3 and screw jack 4, and miniature steel pipe pile 1 is arranged in the stratum around original basis cushion cap;Pile foundation Expanding cushion cap 2 with original basis cushion cap is overall structure;Cushion block 3 is arranged on the top of miniature steel pipe pile 1;Screw jack 4 is vertical It is placed on cushion block 3 and pile foundation expands between cushion cap 2.
First former pile foundation support table is dug out it is ensured that digging the work surface of 0.8 × 0.8m under pile foundation support table surrounding, cutting depth is The buried depth of pile foundation support table.It is necessary to ensure that work surface has clear height not less than 2.2m it is impossible to ensure to consider during work surface clear height Stall floor is punched.
Miniature steel pipe pile 1 is that the steel of diameter 200mm is cut pipe 1.5m mono- section, first segment is squeezed into the stake end processing in soil Become sharp annular edge of a knife shape, squeeze into ground section by section, internode using being welded to connect, stake long depending on bearing stratum depth, piling sets Standby limit for height 1.95m.
Piling starts after finishing to build pile foundation expansion cushion cap 2 above stake axis, passes through bar planting on former pile foundation support table Mode pours pile foundation and expands cushion cap 2, pile foundation is expanded cushion cap 2 and is linked to be entirety with former pile foundation support table.
After the intensity that pile foundation expands cushion cap 2 meets requirement, start to lay screw jack 4, miniature steel pipe pile 1 is put Put steel plate cushion block 3, cushion block 3 is the steel plate of 350mm × 350mm × 10mm, places a number of cushion block according to practical situation, and On cushion block 3 and expand pile foundation support table 2 time placement screw jack 4, the maximum output of screw jack 4 try hard to keep demonstrate,prove 75 tons with On.
Start lifting operation after placing screw jack 4, permissible according to building actual lifting situation during jacking Freely adjust the top lifting height of the screw jack 4 of diverse location, the auto-lock function due to screw jack 4 can be interim at any time Stop lifting operation without the stake of interim envelope.After the completion for the treatment of structure integral jacking operation, can be by the rotation wire bond of screw jack Extremely it is ensured that screw jack will not receive cylinder.
Last expand the following formwork supporting plate of cushion cap 2 in pile foundation, very heavy by exposing the miniature steel pipe pile 1 of earth's surface, cushion block 3, spiral Top 4 expands cushion cap 2 with pile foundation by the way of cast-in-place concrete and is linked to be entirety, thus completing final envelope stake work.
For pile foundation rectifying of leaned building, because design supporting course is deeper, can only be underpined by the way of again driving piles The superstructure load that former stake is born.The present invention is using the mode of " first drive piles, then underpin ", quiet compared to traditional reaction frame Defeat the mode of " the underpining in piling " of stake, structure is safer during piling, also eliminates traditional method in pile extension When need the interim operation sealing stake.Piling carries out jacking, screw jack using screw jack to pile foundation cushion cap after finishing Self-locking function allow jacking during can stop lifting operation at any time so that structure is cleverer during overall lifting Live, be easy to the total tune lifting of all pile foundation support tables, compensate for pile foundation support table and be not linked to be overall difficult to reach entirety lifting Problem, both having saved the duration also saves operating expenses.Screw jack is welded after finishing by jacking, finally expands in pile foundation The following formwork supporting plate of cushion cap, will expose the miniature steel pipe pile of earth's surface, cushion block, and screw jack is by the way of cast-in-place concrete and stake Base expands cushion cap and is linked to be entirety, completes permanent envelope stake.Due to being driven piles using pile driving equipment, thus eliminate static pressed pile to need to arrange The technique of reaction frame.
The above, be only presently preferred embodiments of the present invention, not inventing type is made with any pro forma restriction, appoints What any is simply repaiied according to what the technical spirit of the present invention made to above example without departing from technical solution of the present invention content Change, equivalent variations and modification, all still fall within the range of technical solution of the present invention.

Claims (6)

1. a kind of self-locking underpinned pile correcting offset of base reinforces steel pile structure, include miniature steel pipe pile (1), pile foundation expansion cushion cap (2), Cushion block (3) and screw jack (4) it is characterised in that: described miniature steel pipe pile (1) is arranged on the ground around original basis cushion cap In layer;It is overall structure that described pile foundation expands cushion cap (2) with original basis cushion cap;Described cushion block (3) is arranged on miniature steel pipe pile (1) top;Screw jack (4) is vertically placed on cushion block (3) and pile foundation expands between cushion cap (2).
2. a kind of self-locking underpinned pile correcting offset of base according to claim 1 reinforce steel pile structure it is characterised in that: described Miniature steel pipe pile (1) be circular cross-section, miniature steel pipe pile (1) bottom is sharp, and sharp position is ring-like knife-like.
3. a kind of self-locking underpinned pile correcting offset of base according to claim 1 reinforce steel pile structure it is characterised in that: described Pile foundation expand cushion cap (2) mounting means be by reinforcing bar implant original basis cushion cap mode after-pouring around foundation platform; Described pile foundation expands cushion cap (2) plan-position with miniature steel pipe pile (1) on the same axis.
4. a kind of self-locking underpinned pile correcting offset of base according to claim 1 reinforce steel pile structure it is characterised in that: described Cushion block (3) be steel plate.
5. a kind of self-locking underpinned pile correcting offset of base according to claim 1 reinforce steel pile structure it is characterised in that: described Screw jack (4) there is auto-lock function.
6. a kind of self-locking underpinned pile correcting offset of base according to claim 4 reinforce steel pile structure it is characterised in that: described Plate size be 350mm × 350mm × 10mm.
CN201611007782.7A 2016-11-16 2016-11-16 Self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation Pending CN106351270A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611007782.7A CN106351270A (en) 2016-11-16 2016-11-16 Self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611007782.7A CN106351270A (en) 2016-11-16 2016-11-16 Self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation

Publications (1)

Publication Number Publication Date
CN106351270A true CN106351270A (en) 2017-01-25

Family

ID=57861950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611007782.7A Pending CN106351270A (en) 2016-11-16 2016-11-16 Self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation

Country Status (1)

Country Link
CN (1) CN106351270A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703092A (en) * 2017-03-13 2017-05-24 兰州铁道设计院有限公司 Connecting structure and method for foundation piles and bearing platform in pile foundation underpinning
CN107044142A (en) * 2017-04-20 2017-08-15 南京工业大学 Adjustable reinforcement and rectification method and structure for reducing house differential settlement
CN107190768A (en) * 2017-06-06 2017-09-22 西安科技大学 A kind of static pressure pile structure and its construction method for building strengthening of foundation
CN107237345A (en) * 2017-06-15 2017-10-10 广州市胜特建筑科技开发有限公司 A kind of method and system of quick control building settlement
CN108978742A (en) * 2018-09-30 2018-12-11 兰州理工大学 One kind cutting stake forced-landing tilt correcting structure, method
CN109356210A (en) * 2018-11-21 2019-02-19 兰州理工大学 A kind of pile foundation building inclination rectification cuts stake and underpins position limiting structure and its construction method
CN110029695A (en) * 2019-04-22 2019-07-19 中国矿业大学 A kind of method for correcting error of combined high-voltage transmission pole differential settlement
CN110273441A (en) * 2019-06-17 2019-09-24 北京筑福建筑科学研究院有限责任公司 A kind of old factory building foundation uses the structural strengthening and construction method of newly-increased steel-pipe pile and newly-increased concrete bearing platform
CN112554250A (en) * 2020-12-28 2021-03-26 兰州理工大学 Pile foundation building micro composite steel pipe pile underpinning inclination correcting structure and construction method thereof
CN113323011A (en) * 2021-06-30 2021-08-31 武汉武建机械施工有限公司 Novel underpinning construction method for steel pipe under existing building foundation
CN116290899A (en) * 2023-04-12 2023-06-23 中交第四航务工程局有限公司 Foundation system for pile replacement and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU636328A1 (en) * 1976-07-28 1978-12-05 Центральный научно-исследовательский и проектно-экспериментальный институт промышленных зданий и сооружений Method of protecting structures with columns and cold contour from effect of bed soil frost heaving
CN1113282A (en) * 1995-05-17 1995-12-13 广州市鲁班建筑防水补强专业公司 Method for connecting anchor-rod type supporting table
CN102864788A (en) * 2012-10-19 2013-01-09 江苏华通工程检测有限公司 Method for underpinning reinforced bridge pile foundation by bear-type static pressure cluster pile
CN103452147A (en) * 2013-08-20 2013-12-18 中冶集团武汉勘察研究院有限公司 Self-balance anchor counter weight broken pile forced landing rectification method
CN206189482U (en) * 2016-11-16 2017-05-24 贵州正业工程技术投资有限公司 Rectify based on self -locking underpinned pile basis and consolidate piling bar structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU636328A1 (en) * 1976-07-28 1978-12-05 Центральный научно-исследовательский и проектно-экспериментальный институт промышленных зданий и сооружений Method of protecting structures with columns and cold contour from effect of bed soil frost heaving
CN1113282A (en) * 1995-05-17 1995-12-13 广州市鲁班建筑防水补强专业公司 Method for connecting anchor-rod type supporting table
CN102864788A (en) * 2012-10-19 2013-01-09 江苏华通工程检测有限公司 Method for underpinning reinforced bridge pile foundation by bear-type static pressure cluster pile
CN103452147A (en) * 2013-08-20 2013-12-18 中冶集团武汉勘察研究院有限公司 Self-balance anchor counter weight broken pile forced landing rectification method
CN206189482U (en) * 2016-11-16 2017-05-24 贵州正业工程技术投资有限公司 Rectify based on self -locking underpinned pile basis and consolidate piling bar structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘一彪: "建筑工程静压桩钢管托换施工技术应用", 《中外建筑》 *
赵明华主编: "《土力学与基础工程 第4版》", 31 July 2014 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703092A (en) * 2017-03-13 2017-05-24 兰州铁道设计院有限公司 Connecting structure and method for foundation piles and bearing platform in pile foundation underpinning
CN107044142A (en) * 2017-04-20 2017-08-15 南京工业大学 Adjustable reinforcement and rectification method and structure for reducing house differential settlement
CN107190768A (en) * 2017-06-06 2017-09-22 西安科技大学 A kind of static pressure pile structure and its construction method for building strengthening of foundation
CN107190768B (en) * 2017-06-06 2022-09-13 西安科技大学 Construction method of static pressure pile structure for building foundation reinforcement
CN107237345A (en) * 2017-06-15 2017-10-10 广州市胜特建筑科技开发有限公司 A kind of method and system of quick control building settlement
CN108978742A (en) * 2018-09-30 2018-12-11 兰州理工大学 One kind cutting stake forced-landing tilt correcting structure, method
CN109356210A (en) * 2018-11-21 2019-02-19 兰州理工大学 A kind of pile foundation building inclination rectification cuts stake and underpins position limiting structure and its construction method
CN110029695A (en) * 2019-04-22 2019-07-19 中国矿业大学 A kind of method for correcting error of combined high-voltage transmission pole differential settlement
CN110273441A (en) * 2019-06-17 2019-09-24 北京筑福建筑科学研究院有限责任公司 A kind of old factory building foundation uses the structural strengthening and construction method of newly-increased steel-pipe pile and newly-increased concrete bearing platform
CN112554250A (en) * 2020-12-28 2021-03-26 兰州理工大学 Pile foundation building micro composite steel pipe pile underpinning inclination correcting structure and construction method thereof
CN113323011A (en) * 2021-06-30 2021-08-31 武汉武建机械施工有限公司 Novel underpinning construction method for steel pipe under existing building foundation
CN116290899A (en) * 2023-04-12 2023-06-23 中交第四航务工程局有限公司 Foundation system for pile replacement and construction method

Similar Documents

Publication Publication Date Title
CN106351270A (en) Self-locking steel pile structure for deviation correction and reinforcement of underpinned pile foundation
CN206189482U (en) Rectify based on self -locking underpinned pile basis and consolidate piling bar structure
JP2011510195A (en) Caisson structure and method of precisely laying caisson structure underground
CN106638663A (en) Foundation reinforcing and integral inclination rectifying and shifting method for high-voltage transmission tower in subsidence area
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN209243794U (en) A kind of pile foundation building inclination rectification cuts stake and underpins position limiting structure
CN102425184A (en) Cap preserved hole construction method for deep-water soft soil foundation reverse low pile cap composite foundation
CN103195114A (en) High-rise building foundation strengthening construction method on weak geological conditions
CN109403350A (en) Foundation pit supporting construction and foundation pit supporting method
CN110439025A (en) Portal type building pile foundation underpinning structure in narrow space and construction method
CN102864796B (en) Construction spreading foundation adaptive to filled ground settlement and construction method
EP2236677A2 (en) Method for creating a building under an architectural monument
CN203768914U (en) Foundation pit bracing diagonal support pile structure
JPH08260500A (en) Restoring construction method for unevenly settled building
CN210766861U (en) Portal formula building pile foundation underpins structure under narrow and small space
US20120042605A1 (en) Removable Support Cage For Top Of Drilled Pier
JP2006070513A (en) Height adjusting method of structure
JP3202558U (en) Support structure for building foundation
CN102134856B (en) Tower crane foundation
JP4868610B2 (en) Building subsidence restoration method
CN108018859B (en) Emergency treatment method and structure for sudden surge of foundation pit
CN212175798U (en) Whole strutting arrangement of deep basal pit
CN211285666U (en) Narrow and long open caisson in thick soft soil layer and supporting structure thereof
CN105603966B (en) A kind of construction method of variable cross-section wall vertical support structure for contrary sequence method
CN209482313U (en) Foundation pit supporting construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125

RJ01 Rejection of invention patent application after publication