CN204570695U - The construction equipment that a kind of sleeve method damaged stake process construction method is used - Google Patents

The construction equipment that a kind of sleeve method damaged stake process construction method is used Download PDF

Info

Publication number
CN204570695U
CN204570695U CN201520284510.6U CN201520284510U CN204570695U CN 204570695 U CN204570695 U CN 204570695U CN 201520284510 U CN201520284510 U CN 201520284510U CN 204570695 U CN204570695 U CN 204570695U
Authority
CN
China
Prior art keywords
stake
sleeve
steel pipe
pipe sleeve
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520284510.6U
Other languages
Chinese (zh)
Inventor
张继红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520284510.6U priority Critical patent/CN204570695U/en
Application granted granted Critical
Publication of CN204570695U publication Critical patent/CN204570695U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to the raked pile in field of civil engineering, the construction equipment that sleeve method damaged stake process construction method in broken pile or residual stake process engineering field is used, this construction equipment comprises pitching pile machine (1) and steel pipe sleeve (2) two parts, wherein pitching pile machine (1) comprises crane (3), vibrating device (4) and sleeve fixture (5) three part, utilize steel pipe sleeve (2) pending stake (6) to be enclosed within steel pipe sleeve (2) to carry out rectifying a deviation or extracting process, processing speed is fast, cost is low, treatment effect is good, and it is little on surrounding enviroment impact after process.

Description

The construction equipment that a kind of sleeve method damaged stake process construction method is used
Technical field
The present invention relates to the raked pile in field of civil engineering, broken pile or residual stake process engineering field.
Background technology
In current excavation of foundation pit and Other Engineering field, often running into soil body displacement causes stake to damage problem, also to run in the soil body residual stake and need the problem of extracting, existing damage stake and the high and difficult quality guarantee of residual stake disposal cost, it is very expensive that operating expenses is extracted in residual stake.
Summary of the invention
First object of the present invention is to provide the first sleeve method damaged stake process construction method, the stake righting that this construction method can will tilt fast, and can guarantee the secondary damage not causing pile strength in righting process, and speed of application is fast, at the bottom of cost.
This first sleeve method damaged stake process construction method comprises the following steps:
A) location needs the stake of the inclination of correction righting;
B) pile crown of raked pile is placed in steel pipe sleeve;
C) steel pipe sleeve is progressively inserted the soil body along the incline direction of raked pile;
D) by steel pipe sleeve together with the stake of inclination or the tilting section righting of stake that are positioned at steel pipe sleeve;
E) refilling step d) hole stayed in the soil body of constructing.
In above-mentioned the first sleeve method damaged stake process construction method, the step c above-mentioned) in, can adopt vibratory drilling method that steel pipe sleeve is inserted the soil body.
In above-mentioned the first sleeve method damaged stake process construction method, the steps d above-mentioned) in, after the tilting section righting of the stake that will tilt or stake, steel pipe sleeve is extracted recycling.
In above-mentioned the first sleeve method damaged stake process construction method, the steps d above-mentioned) in, after the tilting section righting of the stake that will tilt or stake, utilize vibration, static pressure or heavy tamping method by pile body from section position compound.
In above-mentioned the first sleeve method damaged stake process construction method, the steps d above-mentioned) in, after the tilting section righting of the stake that will tilt or stake, for hollow shell pill, reinforce from disconnected place by filling steel concrete in hollow part.
Second object of the present invention is to provide the second sleeve method damaged stake process construction method, and the stake residued in the soil body can be extracted by this construction method fast, and speed of application is fast, at the bottom of cost.
This second sleeve method damaged stake process construction method comprises the following steps:
A) stake needing to extract is located;
B) pile crown of stake to be extracted is placed in steel pipe sleeve;
C) steel pipe sleeve is inserted the soil body along the direction employing vibratory drilling method of stake;
D) steel pipe sleeve is extracted together with stake to be pulled out.
In above-mentioned the second sleeve method damaged stake process construction method, step b above-mentioned) in, at the sidewall of steel pipe sleeve, Grouting Pipe can be installed, steps d above-mentioned) in, while pile pulling, the one or more combination of cement paste, mortar or sand is injected pile pulling hole location in time.
3rd object of the present invention is the damaged stake process construction equipment providing sleeve method damaged stake process construction method used, and this construction equipment can realize the process to damaged stake smoothly, and equipment is simple, and cost is low, easy construction.
This construction equipment comprises pitching pile machine, steel pipe sleeve two parts, wherein pitching pile machine comprises crane, vibrating device, sleeve fixture three part, vibrating device is lifted on crane, wherein vibrating device is for providing the equipment of pitching pile or pile pulling power by vibration, sleeve fixture is be connected to the utensil that steel pipe sleeve can firmly be clamped by vibrating device, and steel pipe sleeve is pending damaged stake to be put tubular device in the inner.
In above-mentioned construction equipment, on the sidewall of steel pipe sleeve, Grouting Pipe can be installed.
Accompanying drawing explanation
Fig. 1 is first embodiment of the present invention and second embodiment sleeve method damaged stake process construction method used construction equipment structure organigram used.
Detailed description of the invention
As an embodiment as shown in Figure 1 of the present invention, main purpose is operating principle and the implementation method of introducing the first sleeve method damaged stake process construction method and construction equipment used thereof.First, composition graphs 1 introduces sleeve method of the present invention damaged stake process construction method construction equipment structure structure used and operating principle.This construction equipment comprises pitching pile machine (1), steel pipe sleeve (2) two parts, wherein pitching pile machine (1) comprises crane (3), vibrating device (4), sleeve fixture (5) three part, crane (3) is wherein connect vibrating device (4) with sleeve fixture (5) to have the facility of certain altitude, vibrating device (4) is for providing the equipment of pitching pile or pile pulling power, sleeve fixture (5) is for being connected to the utensil that steel pipe sleeve (2) can firmly clamp by crane (3), steel pipe sleeve (2) is the tubular device pending damaged stake can put in the inner.Vibrating device (4) in the present embodiment can be vibratory equipment as vibrating hammer, pneumatic vibrating equipment, hydraulic vibration equipment, the one or more combination in hammering equipment (as pile hammer), silent piling dynamicliquid pressure device also can be selected to substitute vibrating device (4).The facility that crane (3) can match with vibrating device (4), such as, when adopting vibrating hammer as vibrating device (4), crane (3) can be selected to carry out coordinative construction, also can vibrating device (4) be installed on digging machine, be made into manipulator.The present embodiment with lower part, introduce the first sleeve method damaged stake process construction method.The main purpose of this first the first sleeve method damaged stake process construction method is by stake (6) the correcting and then reinforcing process of tilting or rupture.This first sleeve method damaged stake process construction method comprises following five steps.First, location needs the stake (6) of the inclination of correction righting.Complete the first step, enter second step.In this step, utilize steel pipe sleeve (2) as shown in Figure 1, the pile crown of the stake (6) of tilting is placed in steel pipe sleeve (2).Complete second step, enter the 3rd step.In this step, steel pipe sleeve (2) is progressively inserted the soil body along stake (6) incline direction tilted.The method inserted can adopt pitching pile machine (1) as shown in Figure 1 to implement, when the angle of inclination of stake (6) is larger, by the direction of crane (3) adjustment steel pipe sleeve (2), make the direction of insertion of steel pipe sleeve (2) consistent with the direction of stake (6).The insertion depth of steel pipe sleeve (2) can be determined according to the tilting section length of stake (6), can be basically identical with the tilting section length of stake (6).Thus complete the 3rd step of the present embodiment, enter the 4th step.In this step, object is by the tilting section righting of steel pipe sleeve (2) together with the raked pile or stake that are positioned at steel pipe sleeve (2).The method of righting; can at the top time horizontal force of steel pipe sleeve (2) by steel pipe sleeve (2) together with stake (6) righting being positioned at steel pipe sleeve (2); under the protection of steel pipe sleeve (2), stake (6) can be avoided occurring the secondary damage such as bending in by the process of righting.Before stake (6) righting, in soil body squeeze side, Pile side soil body can also be removed, so that righting construction.Thus complete the 4th step of the present embodiment, enter the 5th step.In this step, back of the body soil side in stake (6) righting process can leave the space stayed after pile body moves, for the ease of the use of stake after righting (6), the hole that the fillers such as sand, cement, mortar can be adopted the 4th step to be constructed stay in the soil body thus complete the first sleeve method of the present invention damaged stake process construction method, completes the correcting and then reinforcing of stake (6).In the present embodiment, as the PHC pile tube that stake (6) is hollow, reinforcing can be filled at the hollow part steel concrete of stake (6).In the present embodiment, after by the righting of stake (6), sleeve can be extracted recycling.In the present embodiment, after by stake (6) righting, utilize vibration, static pressure or heavy tamping method by pile body from disconnected position compound.
As second embodiment as shown in Figure 1 of the present invention, main purpose is to introduce the second sleeve method damaged stake process construction method, and the main purpose of this processing method is extracted at the waste and old stake (6) residued in the soil body.Same first embodiment of construction equipment that the present embodiment is used.The second sleeve method damaged stake process construction method that the present embodiment is introduced comprises four steps, and first three step is wherein similar to first embodiment.In the 4th step of the present embodiment, be to utilize steel pipe sleeve (2) together to extract together with the stake (6) being positioned at steel pipe sleeve (2) with the difference of first embodiment.Because generally the stake (6) residued in soil mostly is reinforced concrete pile, because the anti-pulling capacity of reinforced concrete pile is low, in addition pile side resistance is large, stake (6) is directly extracted by general being difficult to from the soil body, after steel pipe sleeve (2) is inserted in the outside of stake (6), pile pulling collateral resistance is born primarily of steel pipe sleeve (2), therefore pile pulling difficulty of construction is greatly reduced, and by vibrating the mode of steel pipe sleeve (2), pile pulling collateral resistance is significantly reduced.After pile pulling completes, in order to avoid surface collapse, the space that easy filling pile pulling in time stays.At the sidewall of steel pipe sleeve (2), Grouting Pipe can be installed, realize synchronously carrying out hole backfill construction in pile pulling process, and grouting pressure can be utilized as a part for pile pulling power, counter-force pile-pulling construction method can also be pressed to complete micro-disturbance pile pulling construction with hole.Slip casting slurries used can be the materials such as cement paste, mortar.
This patent includes but not limited to other construction methods of the alternative use of professional person in this area.

Claims (2)

1. the construction equipment that a sleeve method damaged stake process construction method is used, comprise pitching pile machine (1), steel pipe sleeve (2) two parts, wherein pitching pile machine (1) comprises crane (3), vibrating device (4), sleeve fixture (5) three part, vibrating device (4) is lifted on crane (3), vibrating device (4) is for providing the equipment of pitching pile or pile pulling power by vibration, sleeve fixture (5) is for being connected to the utensil that steel pipe sleeve (2) can firmly clamp by vibrating device (4), steel pipe sleeve (2) is the tubular device pending damaged stake can put in the inner.
2. the construction equipment that sleeve method according to claim 1 damaged stake process construction method is used, is characterized in that installing Grouting Pipe at the sidewall of steel pipe sleeve (2).
CN201520284510.6U 2015-05-05 2015-05-05 The construction equipment that a kind of sleeve method damaged stake process construction method is used Active CN204570695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520284510.6U CN204570695U (en) 2015-05-05 2015-05-05 The construction equipment that a kind of sleeve method damaged stake process construction method is used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520284510.6U CN204570695U (en) 2015-05-05 2015-05-05 The construction equipment that a kind of sleeve method damaged stake process construction method is used

Publications (1)

Publication Number Publication Date
CN204570695U true CN204570695U (en) 2015-08-19

Family

ID=53863358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520284510.6U Active CN204570695U (en) 2015-05-05 2015-05-05 The construction equipment that a kind of sleeve method damaged stake process construction method is used

Country Status (1)

Country Link
CN (1) CN204570695U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790397A (en) * 2015-05-05 2015-07-22 张继红 Sleeve method damaged pile treatment and construction method and construction device using same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790397A (en) * 2015-05-05 2015-07-22 张继红 Sleeve method damaged pile treatment and construction method and construction device using same

Similar Documents

Publication Publication Date Title
CN104420486B (en) A kind of extending shallow foundation and be additionally arranged at the bottom of method and the structure of steel-pipe pile
CN106013151A (en) Continuous pile wall construction method and construction device used for continuous pile wall construction method
CN110424380A (en) The accurate guide construction method of cast-in-situ bored pile
CN107366290A (en) Foundation pit supporting method and raked pile
KR101236765B1 (en) Method for placing adhesive filling into the expanded drill hole to increase bearing capacity of piles and tention members and apparatus therefor
CN109208594A (en) Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
CN102561329B (en) Construction method of underwater concrete cast-in-place pipe pile
CN209958343U (en) Connecting joint for connecting reinforced concrete cast-in-place piles
CN107740419A (en) Foundation pit supporting method and raked pile
CN108411904B (en) Reinforced concrete cloth bag pile structure for local filling of large karst stratum and process
CN107620309A (en) Foundation pit supporting method
CN104790397A (en) Sleeve method damaged pile treatment and construction method and construction device using same
CN204570695U (en) The construction equipment that a kind of sleeve method damaged stake process construction method is used
CN106087958B (en) The method of basement process device and basement process
CN207277312U (en) A kind of compacting pile construction device
CN206887957U (en) A kind of construction of prefabricated piles auxiliary stand
CN202543908U (en) Extruding and enlarging device of slip casting enlarged cast-in-situ bored pile
CN112030961B (en) Vibration pipe following construction process for long spiral cast-in-place pile
CN107574825A (en) Foundation pit supporting method and raked pile
CN103790162B (en) Synchronous mode steel sheet pile stake holes filling device
JP6319942B2 (en) Steel pipe sheet pile press-in method and pipes
CN207244630U (en) Raked pile
CN107630456A (en) Foundation pit supporting method and raked pile
CN207073136U (en) Raked pile
CN207362852U (en) Raked pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant