CN106087958B CN201610505012.9A CN201610505012A CN106087958B CN 106087958 B CN106087958 B CN 106087958B CN 201610505012 A CN201610505012 A CN 201610505012A CN 106087958 B CN106087958 B CN 106087958B
Authority
CN
China
Prior art keywords
hole
floral tube
slip casting
disk
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610505012.9A
Other languages
Chinese (zh)
Other versions
CN106087958A (en
Inventor
王小军
蒋勇
韩凯吉
王文笛
周晓宇
王柳笛
程庆
李毅杰
周贤木
毛志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University Ningbo Institute of Technology Asset Management Co., Ltd.
Original Assignee
Ningbo Polytechnic Institute Of Science And Technology Zhejiang University Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Polytechnic Institute Of Science And Technology Zhejiang University Co Ltd filed Critical Ningbo Polytechnic Institute Of Science And Technology Zhejiang University Co Ltd
Priority to CN201610505012.9A priority Critical patent/CN106087958B/en
Publication of CN106087958A publication Critical patent/CN106087958A/en
Application granted granted Critical
Publication of CN106087958B publication Critical patent/CN106087958B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Abstract

The invention discloses a kind of method of basement process device and basement process, the device includes floral tube (1) and multiple slip casting disks (2);Floral tube (1) is provided with the multi-turn injected hole (5) of different floor heights;The positioning hole of different floor heights is additionally provided with floral tube (1);Each slip casting disk (2) includes a hollow disk body (7) and more grouting pipes (8);Whole grouting pipes (8) are located at disk body (7) side wall;Each disk body (7) is provided with the positioning component being used for the positioning hole positioning on floral tube (1);The key of this method is:After successively filling filler and tamping, it is put into slip casting disk (2), when being finally in the milk, slurries enter slip casting disk (2) through floral tube (1), expanded hole (22) periphery soil body is entered by grouting pipe (8) again and forms warty concrete (24), and the warty concrete (24) of different pile bodies is cross-linked with each other.The apparatus and method can effectively be reinforced to the region between stake and stake.

Description

The method of basement process device and basement process
Technical field
It is especially a kind of ground the present invention relates to the excessive soil body stiffening basic ground field of settlement by soaking and compression The method of processing unit and basement process.
Background technology
In the ground such as loess and miscellaneous fill, silt, cohesive soil, generally existing settlement by soaking and the excessive danger of compression Evil to ground, it is necessary to carry out consolidation process to improve its foundation bearing capacity.The foundation stabilization of prior art is developed using post hammer more Mode, i.e., first drill through basic hole, then partial filler is inserted into hole, then be repeatedly lifted up falling again by post hammer, by basic hole Impact expands, and filler is subsequently layered into expanded hole and continues to be hammered into shape by post and is tamped, and then forms post hammer and develops stake.On however, The load-carrying properties of handled consolidated subsoil layer are improved to a certain extent although stating post hammer and developing stake, due to the density of pile body It is much larger than institute soil mass consolidation with quality, so the stake soil body after reinforcing integrally easily causes the larger heavy of the subjacent bed soil body Drop.In order to avoid this sedimentation, it is thus proposed that, a micro-hole first is bored in basic hole bottom hole before post hammer develops, then arrangement of reinforcement is simultaneously Slip casing by pressure, to form a micro perfusion stake, a bottom is developed to support column hammer, avoids post hammer from developing stake and its reinforced Soil layer causes new sedimentation to the subjacent bed soil body.
However, the mode of the basement process of prior art still has a greatest drawback:That is post hammer develops stake to the soil body The coverage of ground extruding effect is smaller, and only in pile body scope, and there are still the unguyed of weakness between stake and stake Processing or the region of consolidation process insufficient strength.
The content of the invention
The invention solves a technical problem be to provide and a kind of region between stake and stake can effectively be reinforced Basement process device.
The technical solution of the present invention is to provide a kind of basement process device, it include vertical floral tube with Multiple slip casting disks being slidably fitted on floral tube;
Floral tube top is connected with a guide rod, and floral tube outer wall is provided with vertical guiding rib, and floral tube is provided with different floor heights Multi-turn injected hole;The positioning hole of different floor heights is additionally provided with floral tube;
Each slip casting disk includes a hollow disk body and the more grouting pipes connected with disk body cavity;Disk body is by top Plate, bottom end plate and annular sidewall are formed, and whole grouting pipes are located in side wall, are equipped with headboard and bottom end plate and are worn for floral tube The centre bore crossed, centre bore are provided with the breach of accommodating guiding rib;
Each disk body is provided with least two groups of positioning components, every group of positioning component including a horizontal sleeve pipe, a stage clip, One catch and a push rod for being used to insert floral tube positioning hole, sleeve pipe are fixed on the inside sidewalls of disk body, the opening position of sleeve pipe In on-fixed end, the inner of stage clip and push rod is respectively positioned in sleeve pipe, and stage clip both ends are inner fixed with sleeve pipe bottom wall and push rod respectively; Each catch lower end is provided with two vertical latches, and disk body bottom end plate is provided with to be slided with the one-to-one pin-and-hole of latch, each latch Coordinate in corresponding pin-and-hole, the bottom of each latch stretches out pin-and-hole and is provided with a spacing clubfoot;Push rod is under stage clip effect With catch against;Disk body headboard is provided with the collar, and pull rope is connected with the collar.
The invention solves another technical problem be to provide it is a kind of can between stake and stake region carry out effectively plus Solid using the basement process device carry out basement process method.
The technical solution of the present invention is to provide a kind of side that basement process is carried out using the basement process device Method, its step include:
A, one basic hole of subdrilling, a micro-hole then is bored in basic hole bottom hole, floral tube is inserted into micro-hole and with slightly Sand tamps;
B, partial filler is inserted into basic hole, then post hammer is inserted in guide rod and floral tube, then lifting column is hammered into shape repeatedly, will Basic hole impact is expanded into expanded hole, and will be enlarged by the filling tamped in hole into the intensive packing layer of first layer;
C, first layer slip casting disk is inserted in floral tube, and the guiding rib of floral tube is caught in the breach of centre bore to realize note It is spacing to starch the circumference of disk, slip casting disk is transferred to the intensive packing layer of first layer by hand-held pull rope, and this moment, spacing clubfoot is intensive by this Packing layer stops but slip casting disk other parts are still declining, and so, spacing clubfoot, latch and catch produce with respect to push rod It is relative to rise displacement so that the catch of rising staggers with push rod, and the push rod for losing catch stop withstands flower in the case where stage clip acts on The outer wall of pipe, and the push rod that catch is then protracted is blocked and can not declined;Then pull rope is above carried so that slip casting disk rises overally, It is inconjunction with push rod and also rises to first layer positioning hole height against floral tube, push rod inserts positioning hole, realizes the essence of slip casting disk height It is determined that position;
D, filler, and the intensive packing layer by the compacting of post hammer into last layer are continued to fill up;
E, last layer slip casting disk is inserted in floral tube and the intensive packing layer of last layer is transferred to by pull rope, then on drag traction Rope so that the slip casting disk of this layer positions in the positioning hole of the last layer of floral tube;
F, repeat step d~e, until being filled into ground level;
G, repeat step a~f, until all pile bodies are all filled into ground level;
H, the guide rod of the floral tube upper end of each pile body is pulled out, then floral tube is in the milk, grouting mini pile is formed in micro-hole, And enter the disk body cavity of slip casting disk in every layer of slip casting disk height, injected hole of the slurries through floral tube, then entered by grouting pipe The expanded hole periphery soil body forms warty concrete, and the warty concrete of different pile bodies is cross-linked with each other, to the area between stake and stake Domain is effectively reinforced.
Basement process device of the present invention and the method and prior art phase that basement process is carried out using the basement process device Than having following remarkable advantage and beneficial effect.
First, the technical scheme forms warty by slip casting disk and grouting pipe to the native internal injection around pile body Concrete, and the warty concrete of different pile bodies is also cross-linked with each other, so, just to the region between originally weak stake and stake Effectively reinforced, significantly improve overall foundation bearing capacity;It is accurate fixed to be provided between especially each slip casting disk and floral tube The device of position, this assures the warty concrete of the different pile bodies of same layer is contour, it is easy to the warty coagulation of different pile bodies Soil is full cross-linked in same layer, without because height offsets one from another, further strengthening the ground in region between stake and stake Bearing capacity;Moreover guide rod is secured above floral tube, post hammer is linked on guide rod and floral tube, it is ensured that each hammer downwards of post hammer The vertical degree hit, ensure that post hammer develops banketing for stake and fully tamped, further the overall foundation bearing capacity of enhancing.
Brief description of the drawings
Fig. 1 is the positive structure diagram of basement process device of the present invention.
Fig. 2 is the positive structure diagram after basement process device consolidation process of the present invention.
Fig. 3 is the partial enlargement section view that the spacing clubfoot of the positioning component of basement process device of the present invention does not stress under state Structural representation.
Fig. 4 is from the broken section structural representation in terms of A-A directions in Fig. 3.
Fig. 5 is that the positioning component of basement process device of the present invention and the partial enlargement sectional structure after floral tube positioning are illustrated Figure.
Fig. 6 is from the broken section structural representation in terms of B-B directions in Fig. 5.
Fig. 7 is the slip casting disk of basement process device of the present invention and the present invention looks up structural representation of floral tube.
1, floral tube shown in figure, 2, slip casting disk, 3, guide rod, 4, guiding rib, 5, injected hole, 6, positioning hole, 7, disk body, 8, Grouting pipe, 9, centre bore, 10, breach, 11, sleeve pipe, 12, stage clip, 13, catch, 14, push rod, 15, latch, 16, pin-and-hole, 17, The collar, 18, spacing clubfoot, 19, pull rope, 20, micro-hole, 21, post hammer, 22, expanded hole, 23, intensive packing layer, 24, warty Concrete.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, basement process device of the present invention, it includes a vertical flower Pipe 1 and multiple slip casting disks 2 being slidably fitted on floral tube 1.
The top of floral tube 1 is connected with a guide rod 3, and the external diameter of guide rod 3 is equal with the external diameter of floral tube 1, and both are through nipple It is spirally connected.The outer wall of floral tube 1 is provided with vertical guiding rib 4, and floral tube 1 is provided with the multi-turn injected hole 5 of different floor heights, a circle of sustained height Probably there are eight to ten injected holes 5.The positioning hole 6 of different floor heights is additionally provided with floral tube 1;As sustained height is provided with two positioning holes 6。
Each slip casting disk 2 includes a hollow disk body 7 and the more horizontal direction grouting pipes connected with the cavity of disk body 7 8.Disk body 7 is made up of headboard, bottom end plate and annular sidewall.Whole grouting pipes 8 be located in side wall and it is radial circumferentially It is uniformly distributed.The centre bore 9 passed through for floral tube 1 is equipped with headboard and bottom end plate, centre bore 9 is provided with accommodating guiding rib 4 Breach 10.Breach 10 and guiding rib 4 coordinate so that the process of decentralization slip casting disk 2 will not rotate, it is ensured that slip casting in subsequent step Push rod 14 inside disk 2 can smoothly insert the positioning hole 6 of floral tube 1.
Each disk body 7 is provided with least two groups of positioning components, and the present embodiment is exactly two groups.Every group of positioning component includes a water The flat catch 13 of stage clip 12, one of sleeve pipe 11, one and a push rod 14 for being used to insert the positioning hole 6 of floral tube 1.Sleeve pipe 11 is fixed In the inside sidewalls of disk body 7, the opening of sleeve pipe 11 is located at on-fixed end, and the inner of stage clip 12 and push rod 14 is respectively positioned on sleeve pipe 11 Interior, the both ends of stage clip 12 are inner fixed with the bottom wall of sleeve pipe 11 and push rod 14 respectively.Each lower end of catch 13 is provided with two vertical latches 15, the catch 13 of top and two latches 15 of lower section form inverted U-shaped.The bottom end plate of disk body 7 is provided with latch 15 one by one Corresponding pin-and-hole 16, each latch 15 be slidably fitted in corresponding in pin-and-hole 16, the bottom of each latch 15 stretch out pin-and-hole 16 and Provided with a spacing clubfoot 18.
On the premise of spacing clubfoot 18 does not stress vacantly, push rod 14 stage clip 12 effect under with catch 13 against.Disk body 7 Headboard is provided with the collar 17, and pull rope 19 is connected with the collar 17.
When the spacing lower section of clubfoot 18 rises with intensive packing layer 23 against stress, spacing clubfoot 18 is eventually stuck in disk body The namely lower opening of pin-and-hole 16 on 7 bottom end plates, now, the height of catch 13 is just above push rod 14, realize catch 13 with Push rod 14 staggers.
Above-mentioned pull rope 19 and the collar 17 is the contact method of U-shaped, i.e., a pull rope 19 is led through the collar 17 The head and end of messenger 19 is respectively positioned on outside stake holes, as such, it is desirable to when drawing while pull head and end, but needs pull rope 19 of dismantling When, head end traction end is unclamped it become convenient substantially that so that pull rope 19 departs from the collar 17, is easy to recovery pull rope 19.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, basement process is carried out using basement process device of the present invention Method, its step is as follows.
A, one basic hole of subdrilling, a micro-hole 20 then is bored in basic hole bottom hole, the aperture of micro-hole 20 is far smaller than Basic hole aperture.Floral tube 1 is inserted into micro-hole 20 and tamped with coarse sand so that the firm plug in micro-hole 20 of floral tube 1, but slightly Sand granularity is big, will not block the injected hole 5 of floral tube 1.
B, insert partial filler into basic hole, then post hammer 21 is inserted in guide rod 3 and floral tube 1, then lifting column repeatedly Hammer 21, the impact of basic hole is expanded into expanded hole 22, and will be enlarged by the filling tamped in hole 22 into the intensive packing layer 23 of first layer. The apical side height of every layer of intensive packing layer 23 can not accurately be held, but the height of every layer of positioning hole 6 of the big enable control in floral tube 1 In the range of the 10cm of degree lower section.
C, first layer slip casting disk 2 is inserted in floral tube 1, and the guiding rib 4 of floral tube 1 is caught in the breach 10 of centre bore 9 To realize that the circumference of slip casting disk 2 is spacing, slip casting disk 2 is transferred to the intensive packing layer 23 of first layer by hand-held pull rope 19, this moment, limit Position clubfoot 18 is stopped by the intensive packing layer 23 but the other parts of slip casting disk 2 are still declining, so, spacing clubfoot 18, latch 15 and catch 13 generated with respect to push rod 14 and relative rise displacement so that the catch 13 of rising staggers with push rod 14, loses The push rod 14 that catch 13 stops withstands the outer wall of floral tube 1 under the effect of stage clip 12, and the push rod 14 that catch 13 is then protracted blocks It can not decline;Then pull rope 19 is above carried so that slip casting disk 2 rises overally, and is inconjunction with push rod 14 and also rises to against floral tube 1 One layer of height of positioning hole 6, push rod 14 insert positioning hole 6, realize being accurately positioned for the height of slip casting disk 2.
D, filler, and the intensive packing layer 23 by the compacting of post hammer 21 into the last layer such as second layer are continued to fill up;This layer intensive The apical side height of packing layer 23 is also substantially controlled below the height of the positioning hole 6 of same layer in the range of 10cm.
E, the slip casting disk 2 of the last layer such as second layer is inserted in floral tube 1 and the last layer such as second layer is transferred to by pull rope 19 Intensive packing layer 23, then on drag pull rope 19 so that positioning of the slip casting disk 2 of this layer in the last layer such as second layer of floral tube 1 Hole 6 is accurately positioned.
F, repeat step d~e, until the expanded hole 22 is filled into ground level.
G, repeat step a~f, until the expanded hole 22 of all pile bodies is all filled into ground level.
H, the guide rod 3 of the upper end of floral tube 1 of each pile body is pulled out, then each floral tube 1 is in the milk, is formed and filled in micro-hole 20 Mini pile is starched, and in every layer of height of slip casting disk 2, the cavity of disk body 7 of injected hole 5 entrance slip casting disk 2 of the slurries through floral tube 1, then by Grouting pipe 8 enters the periphery soil body of expanded hole 22 and forms warty concrete 24, and the warty of the sustained height of different pile bodies is mixed Solidifying soil 24 is cross-linked with each other, and the region between stake and stake is effectively reinforced.

Claims (2)

  1. A kind of 1. basement process device, it is characterised in that:It includes a vertical floral tube (1) and multiple is slidably fitted in floral tube (1) the slip casting disk (2) on;
    Floral tube (1) top is connected with a guide rod (3), and floral tube (1) outer wall is provided with vertical guiding rib (4), and floral tube (1) is provided with The multi-turn injected hole (5) of different floor heights;The positioning hole (6) of different floor heights is additionally provided with floral tube (1);
    Each slip casting disk (2) includes a hollow disk body (7) and the more grouting pipes (8) connected with disk body (7) cavity;Disk Body (7) is made up of headboard, bottom end plate and annular sidewall, and more described grouting pipes (8) are arranged on annular sidewall, top The centre bore (9) passed through for floral tube (1) is equipped with end plate and bottom end plate, centre bore (9) is provided with lacking for accommodating guiding rib (4) Mouth (10);
    Each disk body (7) is provided with least two groups of positioning components, and every group of positioning component includes a horizontal sleeve pipe (11), a pressure Spring (12), a catch (13) and one are used for the push rod (14) for inserting floral tube (1) positioning hole (6), and sleeve pipe (11) is fixed on disk The inside sidewalls of body (7), the opening of sleeve pipe (11) are located at on-fixed end, and the inner of stage clip (12) and push rod (14) is respectively positioned on sleeve pipe (11) in, stage clip (12) both ends are inner fixed with sleeve pipe (11) bottom wall and push rod (14) respectively;Each catch (13) lower end is provided with Two vertical latches (15), disk body (7) bottom end plate are provided with sliding with the one-to-one pin-and-hole (16) of latch (15), each latch (15) Dynamic to coordinate in corresponding pin-and-hole (16), the bottom of each latch (15) stretches out pin-and-hole (16) and is provided with a spacing clubfoot (18);Push rod (14) stage clip (12) effect is lower and catch (13) against;Disk body (7) headboard is provided with the collar (17), the collar (17) pull rope (19) is connected with.
  2. 2. the method for basement process is carried out using the basement process device described in claim 1, it is characterised in that:Its step bag Include:
    A, one basic hole of subdrilling, a micro-hole (20) then is bored in basic hole bottom hole, floral tube (1) is inserted into micro-hole (20) And tamped with coarse sand;
    B, partial filler is inserted into basic hole, then hammers post into shape (21) and is inserted in guide rod (3) and floral tube (1), is then lifted repeatedly Post hammers (21) into shape, the impact of basic hole is expanded into expanded hole (22), and the filling tamped that will be enlarged by hole (22) is intensive into first layer Packing layer (23);
    C, first layer slip casting disk (2) is inserted in floral tube (1), and causes the guiding rib (4) of floral tube (1) to be caught in lacking for centre bore (9) To realize that the circumference of slip casting disk (2) is spacing in mouthful (10), hand-held pull rope (19) transfers to slip casting disk (2) that first layer is intensive to be filled out The bed of material (23), this moment, spacing clubfoot (18) is stopped by the intensive packing layer (23) but slip casting disk (2) other parts are still under Drop, so, spacing clubfoot (18), latch (15) and catch (13) generate relative rising displacement with respect to push rod (14), make The catch (13) that must rise staggers with push rod (14), and the push rod (14) for losing catch (13) stop is withstood under stage clip (12) effect The outer wall of floral tube (1), and the push rod (14) that catch (13) is then protracted is blocked and can not declined;Then pull rope (19) is above carried, is made Obtain slip casting disk (2) to rise overally, be inconjunction with push rod (14) and also rise to first layer positioning hole (6) height, push rod against floral tube (1) (14) positioning hole (6) is inserted, realizes being accurately positioned for slip casting disk (2) height;
    D, filler is continued to fill up, and (21) compacting is hammered into shape into the intensive packing layer (23) of last layer by post;
    E, last layer slip casting disk (2) is inserted in floral tube (1) and the intensive packing layer (23) of last layer is transferred to by pull rope (19), Pull rope (19) is dragged on again so that the slip casting disk (2) of this layer positions in the positioning hole (6) of the last layer of floral tube (1);
    F, repeat step d~e, until being filled into ground level;
    G, repeat step a~f, until all pile bodies are all filled into ground level;
    H, the guide rod (3) of floral tube (1) upper end of each pile body is pulled out, then floral tube (1) is in the milk, is formed and filled in micro-hole (20) Mini pile is starched, and enters the disk body (7) of slip casting disk (2) in every layer of slip casting disk (2) height, injected hole (5) of the slurries through floral tube (1) Cavity, then expanded hole (22) periphery soil body is entered by grouting pipe (8) and forms warty concrete (24), and the knurl of different pile bodies Shape concrete (24) is cross-linked with each other, and the region between stake and stake is effectively reinforced.
CN201610505012.9A 2016-06-27 2016-06-27 The method of basement process device and basement process Expired - Fee Related CN106087958B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610505012.9A CN106087958B (en) 2016-06-27 2016-06-27 The method of basement process device and basement process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610505012.9A CN106087958B (en) 2016-06-27 2016-06-27 The method of basement process device and basement process

Publications (2)

Publication Number Publication Date
CN106087958A CN106087958A (en) 2016-11-09
CN106087958B true CN106087958B (en) 2018-03-06

Family

ID=57214182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610505012.9A Expired - Fee Related CN106087958B (en) 2016-06-27 2016-06-27 The method of basement process device and basement process

Country Status (1)

Country Link
CN (1) CN106087958B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565619B (en) * 2019-09-17 2021-04-23 浙江海洋大学 Foundation tamping device for civil engineering
CN110904955B (en) * 2019-12-26 2021-04-09 淮安市建筑设计研究院有限公司 Foundation reinforcing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005320692A (en) * 2004-05-06 2005-11-17 Shimizu Corp Pile foundation and its construction method
CN101070702A (en) * 2007-06-14 2007-11-14 北京科技大学 Single-hole composite anchoring pile
CN202323973U (en) * 2011-11-15 2012-07-11 山西四建集团有限公司 Grouting sleeve valve tube structure for seepage insulation, closure and interception for building foundation
CN204000840U (en) * 2014-07-10 2014-12-10 安徽省金田建筑设计咨询有限责任公司 Concrete floral tube slip casting uplift pile
CN105178324A (en) * 2015-09-25 2015-12-23 广州市市政工程设计研究总院 Construction device for umbrella tray type special-shaped pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005320692A (en) * 2004-05-06 2005-11-17 Shimizu Corp Pile foundation and its construction method
CN101070702A (en) * 2007-06-14 2007-11-14 北京科技大学 Single-hole composite anchoring pile
CN202323973U (en) * 2011-11-15 2012-07-11 山西四建集团有限公司 Grouting sleeve valve tube structure for seepage insulation, closure and interception for building foundation
CN204000840U (en) * 2014-07-10 2014-12-10 安徽省金田建筑设计咨询有限责任公司 Concrete floral tube slip casting uplift pile
CN105178324A (en) * 2015-09-25 2015-12-23 广州市市政工程设计研究总院 Construction device for umbrella tray type special-shaped pile

Also Published As

Publication number Publication date
CN106087958A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN102587358A (en) Technology of high polymer material post-grouting squeezed cast-in-place pile
CN103835284A (en) Karst area drilling cast-in-place pile structure and construction method
CN106120706B (en) Foundation-reinforcing device and foundation reinforcement method
CN203741820U (en) Cast-in-situ bored pile structure for karst area
CN102433878A (en) Post-grouting device and construction method for pipe pile foundation
US2555359A (en) Pile structure and method of making same
US20160177528A1 (en) Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns
CN112127373A (en) Deep foundation pit pile-support integrated supporting system structure and segmented accurate grouting construction technology
CN106087958B (en) The method of basement process device and basement process
CN103114578B (en) Grouting molding pedestal pile and construction method thereof and pedestal expanding device
CN103437336A (en) PVC hole-pipe gravel pile and soft foundation processing method thereof
CN107675707A (en) Inclined rock base steel pile casting is fixed and bottom blocking method
CN107604902B (en) Grouting behind shaft or drift lining bored concrete pile and its construction technology
CN104674839B (en) Foundation structure for wind-driven generator
US3913337A (en) Piling
CN104389305B (en) A kind of back-up sand bamboo joint pile and construction method thereof
CN105133568A (en) Improved dynamic compaction hammer
CN100366829C (en) Method for construction of large head expanding combined pile
CN206681671U (en) A kind of jackstone stratigraphical drilling device
CN211973505U (en) A slip casting system for different filling type karsts
CN202247897U (en) Post-grouting device for pipe pile foundation
CN106759289A (en) The construction method and construction equipment of a kind of
CN204238209U (en) A kind of back-up sand bamboo joint pile
CN206971210U (en) A kind of long casing in pile foundation construction
CN112030961B (en) Vibration pipe following construction process for long spiral cast-in-place pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190523

Address after: Room 904, Executive Building No. 1 Qian Hunan Road, Yinzhou District, Ningbo City, Zhejiang Province, 315000

Patentee after: Zhejiang University Ningbo Institute of Technology Asset Management Co., Ltd.

Address before: 315048 Ningbo High-tech Zone, Zhejiang Province, No. 9 Building, Zone B, Lane 999, Yangfan Road, Ningbo City, China

Patentee before: Ningbo Polytechnic Institute of science and technology, Zhejiang University Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180306

Termination date: 20190627