EP3986819A1 - Kannenwechsler und verfahren zum wechseln einer kanne - Google Patents
Kannenwechsler und verfahren zum wechseln einer kanneInfo
- Publication number
- EP3986819A1 EP3986819A1 EP20701006.7A EP20701006A EP3986819A1 EP 3986819 A1 EP3986819 A1 EP 3986819A1 EP 20701006 A EP20701006 A EP 20701006A EP 3986819 A1 EP3986819 A1 EP 3986819A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pusher
- changer
- empty
- filled
- full
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000000151 deposition Methods 0.000 claims description 10
- 239000000835 fiber Substances 0.000 claims description 4
- 238000005429 filling process Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000002360 preparation method Methods 0.000 description 6
- CNQCVBJFEGMYDW-UHFFFAOYSA-N lawrencium atom Chemical compound [Lr] CNQCVBJFEGMYDW-UHFFFAOYSA-N 0.000 description 4
- 238000009987 spinning Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 3
- 239000004753 textile Substances 0.000 description 3
- 230000014759 maintenance of location Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 101100324525 Rattus norvegicus Asrgl1 gene Proteins 0.000 description 1
- 241000347389 Serranus cabrilla Species 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000012209 synthetic fiber Substances 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
- B65H67/04—Arrangements for removing completed take-up packages and or replacing by cores, formers, or empty receptacles at winding or depositing stations; Transferring material between adjacent full and empty take-up elements
- B65H67/0428—Arrangements for removing completed take-up packages and or replacing by cores, formers, or empty receptacles at winding or depositing stations; Transferring material between adjacent full and empty take-up elements for cans, boxes and other receptacles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/31—Textiles threads or artificial strands of filaments
- B65H2701/311—Slivers
Definitions
- the invention relates to a can changer and a method for changing a can according to the preamble of the independent claims.
- Can shifting devices are used in can changers, in particular as part of a textile machine, to move a full can away from a filling position and advantageously at the same time to move an empty can into the filling position.
- the can changer places sliver in the can located there in a known manner until the can is full.
- the lowering of the production speed from 500 m / min can be limited to around 100 m / min by means of a belt loop storage system.
- the object of the invention is to increase the efficiency of the spinning preparation machine through the design of the can rest. This object is achieved by the subject matter of the independent claims. Advantageous further developments are given in the subclaims.
- the can changer according to the invention comprises a receiving area which is designed to receive three cans with regard to its longitudinal extension.
- the can changer further comprises a first can pusher which is designed to move along the entire receiving area and to pick up two cans.
- the first can pusher is designed to pick up an empty can from a feed area and to push this empty can against a full can by moving it along the removal area and thus to move it into the area of a discharge path, the empty can remaining in a filling position as a can to be filled.
- the invention is characterized in that the can changer has a second can pusher in the area of the discharge path of the receiving area which is designed to move the full can onto the discharge path.
- the invention has the advantage that a very quick can change is possible, whereby, for example, the card only has to be reduced from a production speed of 500 m / min to 300 m / min when changing cans in combination with the belt loop storage. This increases the efficiency of the card with the draw frame integrated in the can depositing device.
- the first can pusher preferably has a substantially elongated frame with an open longitudinal side.
- the frame can be rectangular, curved or kidney-shaped. It is designed to accommodate two cans at the same time, so that the can pusher can move around the filling position along the receiving area.
- the first and the second can pusher engage the cans at a height which is above the lower quarter of the can height ensures that the cans are secure against tipping.
- the first and the second can pusher engage the can at the minimum height of 225 mm to 385 mm.
- the second can slide can be actuated independently of the first can slide. This means that the second can pusher can push the full can onto the discharge path and at the same time the first can pusher can already move back without waiting for the end position of the second can pusher. This allows the shift cycle to be shortened.
- the second can pusher can preferably be actuated transversely or orthogonally to the travel path of the first can pusher.
- the different travel paths of the two can pushers increase the speed at which the cans are changed.
- the second can pusher engages the cans at a height which is below the gripping height of the first can pusher, so that the latter can dive under the frame of the first can pusher.
- an engagement height of the second can pusher on the can which is at least a quarter of the can height, can increase the stability of the can and make the can change process safer.
- the can to be filled is held in the filling position by means of pivotable retaining elements.
- the sliver deposit can already be started while the full can is being transported away and while the first can slide moves back into its starting position and picks up the new empty can. This can shorten the time in which the machine runs at a lower speed.
- the retaining elements are arranged by means of supports at a height that is above the lower quarter of the can height, on the one hand the can can be held securely and secured against tipping over, on the other hand the first can changer can be moved into its own independently of the retaining elements and the can to be filled Move to the end position or its starting position.
- the receiving area preferably has an open longitudinal side, at the first end of which a feed area with a transport path is arranged, and at the opposite end of the longitudinal side a discharge path is arranged.
- the method according to the invention for operating a can changer has a receiving area with a first can pusher, one of which is a feed area Empty can is pushed into the first can pusher, and the can pusher moves the empty can into a filling position in which the can is filled with sliver as a can to be filled, while the first can pusher moves back to its starting position to pick up another empty can.
- the method according to the invention is characterized in that after completion of the filling process, the further empty can is pressed against the filled can (full can) by means of the first can slide, and by moving the can slide the full can is moved into a position for removal via a discharge path.
- the first can pusher thus moves around the filling position, which is occupied with a can to be filled for as long as possible, around the changing process and thus the shutdown of the
- the full can is preferably transported onto the discharge path by means of a second can pusher. In this way the time to change the cans can be further shortened, since during this time the can to be filled is filled with sliver.
- the process of changing the cans is further accelerated, since during the shifting time of the first can changer and second
- Can changer the can to be filled is filled with sliver.
- FIG. 1 an arrangement with a card and a downstream can changer
- FIGS. 3 to 12 show a can changer in plan view with the process of can changing
- FIG. 13 shows a can changer in side view.
- FIGS. 1 to 13 is intended for use on a spinning preparation machine (e.g. a card, draw frame or combing machine) for cotton, synthetic fibers or the like.
- a spinning preparation machine e.g. a card, draw frame or combing machine
- the same features in the drawing are each provided with the same reference symbols.
- the drawing is only shown in a simplified manner and, in particular, without a scale.
- the device 100 it is possible to deposit a carded, drawn or combed fiber sliver 6 in cans 5a-5c.
- the exemplary representation of a card does not restrict the use of the can changer to this, since combers and draw frames also have to adapt their production when changing cans.
- FIG. 1 shows an arrangement 1 with a card 2 and a downstream can depositing device 3 and an associated can changer 100.
- the card 2 produces a sliver 6 which is fed to a can depositing device 3 via a sliver store 4.
- the can depositing device 3 can have an integrated drafting system and a subsequent depositing plate, which is designed in combination with a rotation device for a can 5b to be filled, to deposit the fiber sliver in the can 5b, for example in the form of a cycloid.
- the can changer 100 has a receiving area 104 which, with regard to its longitudinal extension, is designed to receive an empty can 5a, a can 5b to be filled and a full can 5c, even if a maximum of two cans are located in the receiving area 104 over time.
- the jug 5b to be filled is in a filling position 105 and is held in its position by four pivotable retaining elements 106.
- the receiving area 104 is essentially rectangular and has a feed area 101 with a transport path on a longitudinal side that is kept open 102 and a discharge path 107 spaced therefrom. The cans are transported from the feed area 101 with the transport path 102 to the receiving area 104 and displaced in the direction of movement by 90 ° transversely into the filling position 105.
- the can changer has a first and a second can pusher 110, 120.
- the fact that the first can pusher 110 engages the cans 5a, 5b, 5c at a height that is above the lower quarter of the can height prevents the cans from tipping.
- the first can pusher 110 engages the can 5a, 5b, 5c at the minimum height Hno of 225 mm to 385 mm.
- the first can pusher 110 preferably engages the cans 5a, 5b, 5c at a height Hno which is between the lower third and half the can height.
- the retaining elements 106 are arranged by means of supports at a height Hiob which is above the lower quarter of the can height, the can can be held securely and secured against tipping over, and the first can changer 110 can be independently of the retaining elements 106 and the move the filling jug to its end position or its starting position.
- the first can pusher 110 does not move each can separately, but engages the empty can 5a, which presses against the can 5b to be filled or the full can 5c, so that both cans are shifted in position at the same time.
- FIG. 2 shows a plan view of the part of the can changer 100 below the can depositing device 3. That is, the view of the one can 5b to be filled here is released.
- the can changer 100 is shown in a state in which a can 5b to be filled, which is or has just been filled, is located on the receiving area 104.
- the jug 5b to be filled is held in its position by four retaining elements 106.
- Each retainer 106 may comprise a pivotable rod with a rotatable roller at the end.
- a first can changer 110 has a rectangular frame 111 which is designed to be open on one long side in order to receive and dispense two cans 5a, 5b or 5a, 5c.
- the cans 5a, 5b or 5a, 5c are only guided with the inner sides of the frame 111.
- the frame 111 does not have any cross members or elements which are arranged between the two cans.
- the empty can 5a thus always pushes the can 5b to be filled or the full can 5c into the next position.
- the first can changer 110 is formed along the whole To move the receiving area 104 in order to receive an empty can 5a, to hold a can 5b to be filled and to position it as a full can 5c in relation to the discharge path.
- the frame 111 has an inwardly arranged centering element 113 on each end face, with which the jug 5a, 5b, 5c is centered in the displacement direction.
- the centering element 113 is designed as two rotatably mounted rollers which interact with the circumference of the can 5a. It could also be an angled plate or some other centering.
- the frame 111 is moved linearly along a predetermined path via a drive 112, for example via a pneumatic cylinder or a motorized spindle or belt drive.
- the predetermined path corresponds to the length of the receiving area 104.
- the frame 111 is positioned at a height that is higher than the lower third of the jug. Tilting of the jug during movement and stopping can thus be avoided. Due to its height positioning, the frame 111 of the can pusher 110 is arranged above the retaining elements 106, which are also arranged on supports, and can drive over them completely.
- a second can pusher 120 is designed to push the full can 5c into the discharge path 107 transversely to the direction of travel of the first can pusher 110.
- the direction of travel is therefore essentially transverse to the longitudinal direction of the receiving area 104.
- the second can pusher 120 has a frame 121 which is designed as an open angle with two legs.
- the frame 121 can therefore accommodate a full can 5c with two sides and has a centering element 123 on one leg, which is opposite the discharge path 107.
- a drive 122 is designed to move the second can pusher 120 linearly along a predetermined path.
- the predetermined path can correspond to the width of the receiving area 104.
- the predetermined path can, however, also be smaller, provided that the full can 5c is moved away from the receiving area 104 on the discharge path 107.
- the drive 122 can also be designed as a pneumatic cylinder or as a motorized spindle or belt drive.
- the point of attack of the second can pusher 120 is at the height H120 below the frame 111 of the first can pusher 110 but above the receiving area 104 and can be actuated independently of this. However, it is only actuated when the first can pusher 110 with an empty can 5a moves a full can 5c from the filling position 105 into a push-out position while the empty can 5a remains in the filling position 105.
- the first can pusher 110 is then in the right end position in which the second can pusher 120 moves the full can 5c to the discharge path 107.
- the receiving area 104 is rectangular. It can also be rounded, kidney-shaped or round, at least the first Can pusher 110 adapts to this contour and moves linearly along a straight or curved path, an empty can being pressed against another can.
- the can 5b to be filled is still held in the filling position 105 by the four retaining elements 106.
- the transport track 102 is preferably driven and, in terms of control technology, coupled with a sensor for detecting the position on the receiving area 104 and with the position of the first can pusher 110.
- a further empty can 5a is arranged next to the can 5b to be filled within the can slide 110.
- Both can pushers 110, 120 are in their starting position, i.e.
- the first can pusher 110 is arranged in the left corner of the receiving area 104 opposite the feed area, and the second can pusher 120 is positioned in the right opposite corner of the receiving area 104 opposite the discharge path 107.
- FIGS. 4 and 5 show the displacement of the empty can 5a against the full can 5c by the first can pusher 110.
- the sliver 6 in the can depositing device 3 is separated.
- the frame 111 with the centering elements 113 presses against the outer wall of the empty can 5a, which in turn is pressed in the direction of the arrow directly against the full can 5c.
- the retaining elements 106 pivot in the direction of the second can pusher 120 until the full can 5c is completely in the new position ready for transport onto the discharge path 107, and the empty can 5a is in the filling position.
- the retaining elements 106 pivot back into their starting position and fix the empty can 5a, which is now in the filling position 105 as a can 5b to be filled.
- the full can 5c is pushed onto the discharge path 107 by the frame 121 of the second can pusher 120.
- the centering element 123 on the frame 121 engages the circumference of the full can 5c, as a result of which it is pushed from the receiving area 104 onto the discharge path 107.
- the first can pusher 110 can already move back.
- FIGS. 7 and 8 show the movement of the second can pusher 120, which in FIG. 7 is in the extended end position and in FIG. 8 in the retracted end position. In this position, the first can pusher 110 is in the extended end position.
- the first can pusher 110 has moved back into its retracted end position and is ready to receive a new empty can 5a.
- the jug 5b to be filled remains in its filling position.
- the retaining element 103 clears the path for the next empty can 5a to be pushed onto the receiving area 104.
- the empty cans 5a are pushed in the direction of the receiving area 104 by means of the driven conveyor track 102.
- FIG. 11 shows the positioning of a new empty can 5a in the receiving area 104.
- the retaining element 103 still clears the path for the empty can 5a and is in a wasted position.
- the retaining element 103 is wasted again in the blocking starting position.
- FIG. 12 is essentially identical to FIG. 3, with one empty can 5a less located in the feed area 101. The filling and jug pushing process is repeated.
- FIG. 13 shows the arrangement 1 in a side view, the height Hno of the first can slide 110 being arranged above the height of Job. If at least the lower quarter of a jug is used for the minimum height of Job, the height Hno of the first jug slide should be higher, i.e. preferably at a third of the jug height.
- the arrangement of the second can pusher 120, which engages the can above the can bottom at the height H120, can also be seen.
- an attack height H120 on the can which is at least a quarter of the can height can increase the security of the can 5c from tipping over and make the can change process safer.
Landscapes
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102019116609.8A DE102019116609A1 (de) | 2019-06-19 | 2019-06-19 | Kannenverschiebevorrichtung, Kannenwechsler und Textilmaschine |
PCT/EP2020/050910 WO2020253996A1 (de) | 2019-06-19 | 2020-01-15 | Kannenwechsler und verfahren zum wechseln einer kanne |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3986819A1 true EP3986819A1 (de) | 2022-04-27 |
EP3986819B1 EP3986819B1 (de) | 2024-04-17 |
Family
ID=69174482
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20701006.7A Active EP3986819B1 (de) | 2019-06-19 | 2020-01-15 | Kannenwechsler und verfahren zum wechseln einer kanne |
EP20728433.2A Pending EP3986820A1 (de) | 2019-06-19 | 2020-05-19 | Kannenverschiebevorrichtung, kannenwechsler und textilmaschine |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20728433.2A Pending EP3986820A1 (de) | 2019-06-19 | 2020-05-19 | Kannenverschiebevorrichtung, kannenwechsler und textilmaschine |
Country Status (4)
Country | Link |
---|---|
EP (2) | EP3986819B1 (de) |
CN (2) | CN114450240B (de) |
DE (1) | DE102019116609A1 (de) |
WO (2) | WO2020253996A1 (de) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102021114368A1 (de) * | 2021-06-02 | 2022-12-08 | Trützschler Group SE | Kannenschiebevorrichtung, Kannenwechsler und Textilmaschine |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3214799A (en) * | 1963-05-20 | 1965-11-02 | Gossett Machine Works Inc | Automatic can doffers for sliver processing machines |
CH589556A5 (de) * | 1974-12-24 | 1977-07-15 | Rieter Ag Maschf | |
IT1104290B (it) * | 1978-12-15 | 1985-10-21 | Rossi Mario | Dispositivo cambia-vasi automatico per carde |
US4292712A (en) * | 1979-04-23 | 1981-10-06 | John D. Hollingsworth On Wheels, Inc. | Card coiler can changer |
JPS5633356A (en) * | 1979-08-18 | 1981-04-03 | Hitachi Cable Ltd | Automatic change-over reeling-in apparatus for linear member |
DE3133438C2 (de) * | 1981-08-24 | 1983-11-03 | Heberlein Hispano S.A., 1214 Vernier-Genève | Verfahren und Vorrichtung zum automatischen Wechsen gefüllter Kannen gegen leere Kannen an einer Doppelkopfstrecke |
EP0082926A1 (de) * | 1981-12-22 | 1983-07-06 | Maschinenfabrik Rieter Ag | Vorrichtung zum Verschieben von Spinnkannen |
DE3713264A1 (de) * | 1987-04-18 | 1988-11-03 | Truetzschler & Co | Vorrichtung zum transport von spinnkannen mit einem umlaufenden foerderelement |
DE4025647A1 (de) * | 1989-10-19 | 1991-04-25 | Gregor Gebald | Transportbahn zum weiterleiten von kannen |
DE4318056A1 (de) * | 1992-08-01 | 1994-02-03 | Innovatex Materials Handling G | Einrichtung zum Transport und Austausch von Spinnkannen |
DE4407110B4 (de) * | 1993-05-14 | 2005-05-25 | Trützschler GmbH & Co KG | Verfahren und Vorrichtung zum Füllen von Kannen mit länglichem Querschnitt (Flachkannen) an einer Spinnereimaschine, z. B. Strecke |
IT1301822B1 (it) * | 1998-06-26 | 2000-07-07 | Flii Marzoli & C S P A | Dispositivo automatico perfezionato di raccolta e confezione in vasodel nastro prodotto da un gruppo di carda. |
ITMI20011569A1 (it) * | 2001-07-23 | 2003-01-23 | Marzoli Spa | Gruppo di raccolta del nastro di carda per il suo confezionamento in vasi di varia misura |
DE102004063026B4 (de) * | 2004-12-22 | 2017-10-12 | Trützschler GmbH & Co Kommanditgesellschaft | Vorrichtung an einer Spinnereivorbereitungsmaschine, z.B. Karde,Kardenstreckwerk, Strecke Kämmmaschine o.dgl., zum Wechseln von Spinnkannen |
DE102008000921B4 (de) * | 2008-04-01 | 2017-07-20 | Rieter Ingolstadt Gmbh | Strecke mit linearem Kannendurchschub |
CN201713625U (zh) * | 2009-12-08 | 2011-01-19 | 青岛东佳纺机(集团)有限公司 | 圈条器自动换筒机构 |
DE102015110585B4 (de) * | 2015-07-01 | 2024-10-10 | Trützschler GmbH + Co KG Textilmaschinenfabrik | Vorrichtung zum linearen Wechseln einer Kanne an einer Spinnereivorbereitungsmaschine |
DE102015113044A1 (de) * | 2015-08-07 | 2017-02-09 | TRüTZSCHLER GMBH & CO. KG | Vorrichtung zum Füllen einer Kanne mit Faserband |
DE102015113040A1 (de) * | 2015-08-07 | 2017-02-09 | TRüTZSCHLER GMBH & CO. KG | Vorrichtung zum Füllen einer Kanne mit Faserband |
DE102018114772A1 (de) * | 2018-06-20 | 2019-12-24 | Maschinenfabrik Rieter Ag | Kannenwechsler für eine Spinnereivorbereitungsmaschine sowie Verfahren zum Kannenwechsel |
-
2019
- 2019-06-19 DE DE102019116609.8A patent/DE102019116609A1/de active Pending
-
2020
- 2020-01-15 EP EP20701006.7A patent/EP3986819B1/de active Active
- 2020-01-15 WO PCT/EP2020/050910 patent/WO2020253996A1/de unknown
- 2020-01-15 CN CN202080044613.9A patent/CN114450240B/zh active Active
- 2020-05-19 CN CN202080044959.9A patent/CN114007969A/zh active Pending
- 2020-05-19 EP EP20728433.2A patent/EP3986820A1/de active Pending
- 2020-05-19 WO PCT/EP2020/063951 patent/WO2020254049A1/de unknown
Also Published As
Publication number | Publication date |
---|---|
EP3986819B1 (de) | 2024-04-17 |
WO2020253996A1 (de) | 2020-12-24 |
DE102019116609A1 (de) | 2020-12-24 |
CN114450240A (zh) | 2022-05-06 |
EP3986820A1 (de) | 2022-04-27 |
WO2020254049A1 (de) | 2020-12-24 |
CN114007969A (zh) | 2022-02-01 |
CN114450240B (zh) | 2024-05-28 |
WO2020253996A9 (de) | 2022-03-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2132122B1 (de) | Vorrichtung zum aufwickeln eines fadens | |
DE3431790C2 (de) | ||
CH623614A5 (de) | ||
DE3308171A1 (de) | Kopstransportsystem fuer einen spulautomaten | |
EP1991485A1 (de) | Vorrichtung zur spulenabnahme | |
DE2543621A1 (de) | Kannenwechseleinrichtung | |
DE3928648A1 (de) | Anlage mit einer oder mehreren spinnmaschinen und mit wenigstens einem wechselwagen zum wechseln von kannen | |
DE3000723A1 (de) | Beschickungssystem fuer eine maschine der papierverarbeitenden industrie mit kontinuierlicher zufuhr eines papierstreifens oder -bandes | |
DE69900527T2 (de) | Automatische Vorrichtung zum Sammeln und Packen von von einer Karde produziertem Faserband in eine Kanne | |
EP3986819B1 (de) | Kannenwechsler und verfahren zum wechseln einer kanne | |
DE8717985U1 (de) | Vorrichtung zum Beschicken einer Ringspinnmaschine mit Vorlagespulen | |
EP2271570B1 (de) | Vorrichtung und verfahren zur befüllung von kannen | |
CH691485A5 (de) | Verfahren und Vorrichtung zum Füllen von Kannen mit länglichem Querschnitt an einer Spinnereimaschine. | |
DE4038628A1 (de) | Zwischen einer spulmaschine und einer kopslieferstelle angeordnete vorrichtung zum abziehen von auf einzeltraeger aufgesteckten spulenhuelsen | |
DE102006009398A1 (de) | Vorrichtung und Verfahren zur Spulenentsorgung | |
DE8812622U1 (de) | Vorrichtung zum Auswechseln der Faserbandkannen einer Spinnmaschine | |
CH703975B1 (de) | Wickeleinrichtung für die Herstellung eines Wickels aus Fasermaterial. | |
DE19639402A1 (de) | Wickelvorrichtung | |
DE3810773A1 (de) | Verfahren und vorrichtung zum bereitstellen von kreuzspulenpaaren unterschiedlicher art | |
WO2017001297A1 (de) | Vorrichtung zum aufnehmen und abtransportieren von gewickelten spulen | |
DE102016109535B4 (de) | Streckanlage für textile Faserbänder | |
DE4407110A1 (de) | Verfahren und Vorrichtung zum Füllen von Kannen mit länglichem Querschnitt (Flachkannen) an einer Spinnereimaschine, z. B. Strecke | |
DE4407099A1 (de) | Verfahren zum Austauschen voller Spulen gegen leere Hülsen bei einer Ringspinnmaschine | |
CH674857A5 (de) | ||
DE3636654A1 (de) | Vorrichtung und verfahren zum automatischen abnehmen fertig gesponnener kopse von einer ringspinnmaschine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20220119 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: TRUETZSCHLER GROUP SE |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230622 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20231122 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502020007690 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20240417 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240417 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240417 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240817 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240417 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240417 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240417 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240718 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240819 |