CN113884056A - 一种大跨度连续梁挂篮悬臂现浇梁测量方法 - Google Patents
一种大跨度连续梁挂篮悬臂现浇梁测量方法 Download PDFInfo
- Publication number
- CN113884056A CN113884056A CN202111195940.7A CN202111195940A CN113884056A CN 113884056 A CN113884056 A CN 113884056A CN 202111195940 A CN202111195940 A CN 202111195940A CN 113884056 A CN113884056 A CN 113884056A
- Authority
- CN
- China
- Prior art keywords
- encrypted
- measuring
- hanging basket
- template
- measurement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 238000005259 measurement Methods 0.000 claims abstract description 29
- 238000010276 construction Methods 0.000 claims abstract description 24
- 238000012544 monitoring process Methods 0.000 claims abstract description 6
- 230000000694 effects Effects 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 description 3
- 230000008520 organization Effects 0.000 description 2
- 230000008094 contradictory effect Effects 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种大跨度连续梁挂篮悬臂现浇梁测量方法,包括:在挂篮所在的已浇筑节段梁顶面布设两个加密测量点,用于前方模板放样和调整;在梁体温度梯度为零或接近零的状态下,利用施工控制网精确测定连续梁端加密测量点的坐标和高程值;在设计图纸和监控指令的基础上,计算前端模板在梁体温度梯度为零状态下的目标值;利用梁端的加密测量点设置全站仪,按照上一步计算的目标值进行模板的测量和调整;检核对立模节段与前节已浇段的轴线偏角及相对高差,无误后完成测量;本发明本方法简单易行,适用于大跨度悬臂梁梁体施工测量作业,对于日温度梯度变化大的工况效果更为显著,利用该方法,使立模测量时间限制得以优化,现场施工安排更为灵活。
Description
技术领域
本发明涉及大跨度悬臂梁梁体施工测量技术领域,特别地是一种大跨度连续梁挂篮悬臂现浇梁测量方法。
背景技术
常规大跨度悬臂梁梁体施工测量原理:
常规大跨度悬臂梁梁体施工测量中,由监控单位根据桥梁荷载分布、梁体预应力张拉情况、梁体在温度梯度可以忽略时所测各工况下梁体实际线形、混凝土弹性模量等数据,计算施工节段前端高程的相关预抬值。
参考设计图纸及监控指令,综合确定施工节段架设(模板)的高程目标值,前端梁体架设(模板)的高程调整,选择在梁体温度梯度为零或较小的时间(一般为早上6~8点),利用桥梁施工控制网进行端梁体架设(模板)的高程测量精调,其轴线按照设计线形控制。
发明内容
本发明的目的在于避开了对测量时间的限制,可以全天候安排施工段调梁作业,而无需考虑梁体温度梯度的影响,提供了一种大跨度连续梁挂篮悬臂现浇梁测量方法,可以间接节约成本,提高工效。
本发明通过以下技术方案实现的:
一种大跨度连续梁挂篮悬臂现浇梁测量方法,包括以下步骤:
步骤S1、连续梁挂篮悬臂施工时,在挂篮所在的已浇筑节段梁顶面布设两个加密测量点,用于前方模板放样和调整,两个加密测量点间距取最大值;加密测量点与龙口的距离小于节段梁长的一半;
步骤S2、在梁体温度梯度为零或接近零的状态下,利用施工控制网精确测定连续梁端加密测量点的坐标和高程值;
步骤S3、在设计图纸和监控指令的基础上,计算前端模板在梁体温度梯度为零状态下的目标值;
步骤S4、利用梁端的加密测量点设置全站仪,两个加密测量点可以相互作为后视、检核,按照步骤S3计算的目标值进行模板的测量和调整;
步骤S5、模板调整合格后,检核对立模节段与前节已浇段的轴线偏角及相对高差,无误后完成测量。
进一步地,所述步骤S1中,梁体顶面布设的加密测量点,包括平面坐标值和高程值,加密测量点刻有十字丝,且十字丝露出混凝土梁面大于3mm。
进一步地,所述步骤S1中,梁体顶面布设的两个加密测量点应注意相互通视,且易于架设全站仪及前端测量,条件限制时,可以增加一个加密测量点。
进一步地,所述步骤S3中,目标值包括坐标和高程。
本发明的有益效果:
本发明的大跨度连续梁挂篮悬臂现浇梁测量方法,避开了对测量时间(梁体温度梯度为零)的限制,可以全天候安排施工段调梁(调模)作业,而无需考虑梁体温度梯度的影响;有利于现场施工组织安排,减少因测量条件不具备而带来的施工间隔时间。可以间接节约成本,提高工作效率。
附图说明
图1为梁面加密测量点布设俯视示意图;
图2为梁面加密测量点布设正视示意图。
具体实施方式
下面将结合附图以及具体实施例来详细说明本发明,在此以本发明的示意下面将结合附图以及具体实施例来详细说明本发明,在此以本发明的示意性实施例及说明用来解释本发明,但并不作为对本发明的限定。
需要说明,在本发明中如涉及“第一”、“第二”的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本发明要求的保护范围之内。
参照图1和图2,一种大跨度连续梁挂篮悬臂现浇梁测量方法,包括以下步骤:
步骤S1、连续梁挂篮悬臂施工时,在挂篮所在的已浇筑节段梁顶面布设两个加密测量点,用于前方模板放样和调整,两个加密测量点间距取最大值;加密测量点与龙口的距离小于节段梁长的一半;
步骤S2、在梁体温度梯度为零或接近零的状态下,利用施工控制网精确测定连续梁端加密测量点的坐标和高程值;
步骤S3、在设计图纸和监控指令的基础上,计算前端模板在梁体温度梯度为零状态下的目标值;
步骤S4、利用梁端的加密测量点设置全站仪,两个加密测量点可以相互作为后视、检核,按照步骤S3计算的目标值进行模板的测量和调整;
步骤S5、模板调整合格后,检核对立模节段与前节已浇段的轴线偏角及相对高差,无误后完成测量。本方法简单易行,适用于大跨度悬臂梁梁体施工测量作业,对于日温度梯度变化大的工况效果更为显著,利用该方法,使立模测量时间限制得以优化,现场施工安排更为灵活。
具体的,本实施例方案中,所述步骤S1中,梁体顶面布设的加密测量点,包括平面坐标值和高程值,加密测量点刻有十字丝,且十字丝露出混凝土梁面大于3mm。
具体的,本实施例方案中,所述步骤S1中,梁体顶面布设的两个加密测量点应注意相互通视,且易于架设全站仪及前端测量,条件限制时,可以增加一个加密测量点。
具体的,本实施例方案中,所述步骤S3中,目标值包括坐标和高程。
本发明的大跨度连续梁挂篮悬臂现浇梁测量方法,避开了对测量时间(梁体温度梯度为零)的限制,可以全天候安排施工段调梁(调模)作业,而无需考虑梁体温度梯度的影响;有利于现场施工组织安排,减少因测量条件不具备而带来的施工间隔时间。可以间接节约成本,提高工作效率。
以上对本发明实施例所提供的技术方案进行了详细介绍,本文中应用了具体个例对本发明实施例的原理以及实施方式进行了阐述,以上实施例的说明只适用于帮助理解本发明实施例的原理;同时,对于本领域的一般技术人员,依据本发明实施例,在具体实施方式以及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本发明的限制。
Claims (4)
1.一种大跨度连续梁挂篮悬臂现浇梁测量方法,其特征在于,包括以下步骤:
步骤S1、连续梁挂篮悬臂施工时,在挂篮所在的已浇筑节段梁顶面布设两个加密测量点,用于前方模板放样和调整,两个加密测量点间距取最大值;加密测量点与龙口的距离小于节段梁长的一半;
步骤S2、在梁体温度梯度为零或接近零的状态下,利用施工控制网精确测定连续梁端加密测量点的坐标和高程值;
步骤S3、在设计图纸和监控指令的基础上,计算前端模板在梁体温度梯度为零状态下的目标值;
步骤S4、利用梁端的加密测量点设置全站仪,两个加密测量点可以相互作为后视、检核,按照步骤S3计算的目标值进行模板的测量和调整;
步骤S5、模板调整合格后,检核对立模节段与前节已浇段的轴线偏角及相对高差,无误后完成测量。
2.根据权利要求1所述的一种大跨度连续梁挂篮悬臂现浇梁测量方法,其特征在于:所述步骤S1中,梁体顶面布设的加密测量点,包括平面坐标值和高程值,加密测量点刻有十字丝,且十字丝露出混凝土梁面大于3mm。
3.根据权利要求1所述的一种大跨度连续梁挂篮悬臂现浇梁测量方法,其特征在于:所述步骤S1中,梁体顶面布设的两个加密测量点应注意相互通视,且易于架设全站仪及前端测量,条件限制时,可以增加一个加密测量点。
4.根据权利要求1所述的一种大跨度连续梁挂篮悬臂现浇梁测量方法,其特征在于:所述步骤S3中,目标值包括坐标和高程。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111195940.7A CN113884056B (zh) | 2021-10-14 | 2021-10-14 | 一种大跨度连续梁挂篮悬臂现浇梁测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111195940.7A CN113884056B (zh) | 2021-10-14 | 2021-10-14 | 一种大跨度连续梁挂篮悬臂现浇梁测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113884056A true CN113884056A (zh) | 2022-01-04 |
CN113884056B CN113884056B (zh) | 2024-05-14 |
Family
ID=79002656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111195940.7A Active CN113884056B (zh) | 2021-10-14 | 2021-10-14 | 一种大跨度连续梁挂篮悬臂现浇梁测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113884056B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115491938A (zh) * | 2022-09-19 | 2022-12-20 | 中铁大桥局集团第一工程有限公司 | 用于长联大跨铁路钢桥上无砟轨道的精调方法 |
Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH281356A (de) * | 1949-04-27 | 1952-03-15 | Dyckerhoff & Widmann Ag | Hängebrücke für schwere Verkehrslasten. |
DE3244413A1 (de) * | 1982-12-01 | 1984-07-12 | Rhein-Lippe Straßen- und Tiefbau GmbH, 4300 Essen | Verfahren zum erstellen oder erneuern der strassendecke von stahlbetonbruecken |
JPH11142152A (ja) * | 1997-11-06 | 1999-05-28 | Sumitomo Heavy Ind Ltd | アライメント用標尺 |
JP2009235847A (ja) * | 2008-03-28 | 2009-10-15 | Kawaguchi Metal Industries Co Ltd | 橋梁用伸縮装置及び橋梁用伸縮構造 |
KR20100028694A (ko) * | 2008-09-05 | 2010-03-15 | 한국건설기술연구원 | 교량용 가동 받침의 이동량 계측 시스템 |
KR20100054309A (ko) * | 2008-11-14 | 2010-05-25 | 현대건설주식회사 | 장대 교량의 선형 관리 시스템 |
CN101799276A (zh) * | 2010-02-26 | 2010-08-11 | 中铁大桥局股份有限公司 | 斜拉桥塔梁同步施工时塔柱及索道管的测量控制方法 |
CN101994294A (zh) * | 2010-03-05 | 2011-03-30 | 安通建设有限公司 | 公路工程三角轻型挂篮悬臂浇筑施工 |
CN202907207U (zh) * | 2012-10-22 | 2013-04-24 | 西安建筑科技大学 | 用于钢筋混凝土桥梁耐久性监测的无线传感器网络节点 |
CN103115609A (zh) * | 2013-02-07 | 2013-05-22 | 中铁上海设计院集团有限公司 | 基于温度的桥梁三角高程传递修正方法 |
CN103806375A (zh) * | 2014-03-10 | 2014-05-21 | 广东省长大公路工程有限公司 | 一种混凝土斜拉桥主梁施工浇筑过程免调索力施工方法 |
RU2563868C1 (ru) * | 2014-08-22 | 2015-09-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уральский государственный университет путей сообщения" (УрГУПС) | Многопролетная неразрезная балка (варианты) |
CN105696469A (zh) * | 2015-11-16 | 2016-06-22 | 中铁四局集团有限公司 | 一种特大桥大跨度双向纵坡钢箱梁顶推安装施工方法 |
CN107476204A (zh) * | 2017-07-13 | 2017-12-15 | 高军 | 一种高速铁路连续梁的线性控制方法 |
CN207032055U (zh) * | 2017-07-27 | 2018-02-23 | 中铁大桥局集团有限公司 | 斜拉桥塔梁同步施工测量装置 |
CN108677739A (zh) * | 2018-07-20 | 2018-10-19 | 长沙理工大学 | 斜拉桥和悬索桥索塔施工过程温度变形修正方法及系统 |
CN109594474A (zh) * | 2018-10-29 | 2019-04-09 | 合肥市公路桥梁工程有限责任公司 | 一种大跨径s形钢箱梁的少支架施工方法 |
CN109972517A (zh) * | 2017-12-27 | 2019-07-05 | 中交第二航务工程局有限公司 | 一种钢混结合梁斜拉桥主梁的施工方法 |
CN110318340A (zh) * | 2019-06-21 | 2019-10-11 | 中交第二航务工程局有限公司 | 一种悬臂施工挂篮模板快速定位装置及定位方法 |
CN111155383A (zh) * | 2020-01-03 | 2020-05-15 | 中铁十五局集团路桥建设有限公司 | 大跨度自锚式钢箱梁悬索桥轨道放样与测量方法 |
CN211668427U (zh) * | 2019-10-17 | 2020-10-13 | 江苏省特种设备安全监督检验研究院 | 一种大板梁挠度测量装置 |
CN112342923A (zh) * | 2020-10-30 | 2021-02-09 | 中国电建市政建设集团有限公司 | 大跨度超宽钢箱梁桥施工线型控制技术 |
CN112962462A (zh) * | 2021-02-07 | 2021-06-15 | 陕西华山路桥集团有限公司 | 一种多节段钢箱梁拼装方法 |
CN113216010A (zh) * | 2021-05-10 | 2021-08-06 | 中交路桥建设有限公司 | 波形钢腹板桥梁合龙段施工方法 |
-
2021
- 2021-10-14 CN CN202111195940.7A patent/CN113884056B/zh active Active
Patent Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH281356A (de) * | 1949-04-27 | 1952-03-15 | Dyckerhoff & Widmann Ag | Hängebrücke für schwere Verkehrslasten. |
DE3244413A1 (de) * | 1982-12-01 | 1984-07-12 | Rhein-Lippe Straßen- und Tiefbau GmbH, 4300 Essen | Verfahren zum erstellen oder erneuern der strassendecke von stahlbetonbruecken |
JPH11142152A (ja) * | 1997-11-06 | 1999-05-28 | Sumitomo Heavy Ind Ltd | アライメント用標尺 |
JP2009235847A (ja) * | 2008-03-28 | 2009-10-15 | Kawaguchi Metal Industries Co Ltd | 橋梁用伸縮装置及び橋梁用伸縮構造 |
KR20100028694A (ko) * | 2008-09-05 | 2010-03-15 | 한국건설기술연구원 | 교량용 가동 받침의 이동량 계측 시스템 |
KR20100054309A (ko) * | 2008-11-14 | 2010-05-25 | 현대건설주식회사 | 장대 교량의 선형 관리 시스템 |
CN101799276A (zh) * | 2010-02-26 | 2010-08-11 | 中铁大桥局股份有限公司 | 斜拉桥塔梁同步施工时塔柱及索道管的测量控制方法 |
CN101994294A (zh) * | 2010-03-05 | 2011-03-30 | 安通建设有限公司 | 公路工程三角轻型挂篮悬臂浇筑施工 |
CN202907207U (zh) * | 2012-10-22 | 2013-04-24 | 西安建筑科技大学 | 用于钢筋混凝土桥梁耐久性监测的无线传感器网络节点 |
CN103115609A (zh) * | 2013-02-07 | 2013-05-22 | 中铁上海设计院集团有限公司 | 基于温度的桥梁三角高程传递修正方法 |
CN103806375A (zh) * | 2014-03-10 | 2014-05-21 | 广东省长大公路工程有限公司 | 一种混凝土斜拉桥主梁施工浇筑过程免调索力施工方法 |
RU2563868C1 (ru) * | 2014-08-22 | 2015-09-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уральский государственный университет путей сообщения" (УрГУПС) | Многопролетная неразрезная балка (варианты) |
CN105696469A (zh) * | 2015-11-16 | 2016-06-22 | 中铁四局集团有限公司 | 一种特大桥大跨度双向纵坡钢箱梁顶推安装施工方法 |
CN107476204A (zh) * | 2017-07-13 | 2017-12-15 | 高军 | 一种高速铁路连续梁的线性控制方法 |
CN207032055U (zh) * | 2017-07-27 | 2018-02-23 | 中铁大桥局集团有限公司 | 斜拉桥塔梁同步施工测量装置 |
CN109972517A (zh) * | 2017-12-27 | 2019-07-05 | 中交第二航务工程局有限公司 | 一种钢混结合梁斜拉桥主梁的施工方法 |
CN108677739A (zh) * | 2018-07-20 | 2018-10-19 | 长沙理工大学 | 斜拉桥和悬索桥索塔施工过程温度变形修正方法及系统 |
CN109594474A (zh) * | 2018-10-29 | 2019-04-09 | 合肥市公路桥梁工程有限责任公司 | 一种大跨径s形钢箱梁的少支架施工方法 |
CN110318340A (zh) * | 2019-06-21 | 2019-10-11 | 中交第二航务工程局有限公司 | 一种悬臂施工挂篮模板快速定位装置及定位方法 |
CN211668427U (zh) * | 2019-10-17 | 2020-10-13 | 江苏省特种设备安全监督检验研究院 | 一种大板梁挠度测量装置 |
CN111155383A (zh) * | 2020-01-03 | 2020-05-15 | 中铁十五局集团路桥建设有限公司 | 大跨度自锚式钢箱梁悬索桥轨道放样与测量方法 |
CN112342923A (zh) * | 2020-10-30 | 2021-02-09 | 中国电建市政建设集团有限公司 | 大跨度超宽钢箱梁桥施工线型控制技术 |
CN112962462A (zh) * | 2021-02-07 | 2021-06-15 | 陕西华山路桥集团有限公司 | 一种多节段钢箱梁拼装方法 |
CN113216010A (zh) * | 2021-05-10 | 2021-08-06 | 中交路桥建设有限公司 | 波形钢腹板桥梁合龙段施工方法 |
Non-Patent Citations (5)
Title |
---|
张静;: "大体积混凝土承合水化热及温控措施研究", 铁道建筑技术, no. 01, 20 January 2013 (2013-01-20), pages 17 - 20 * |
杨磊: "濮阳特大铁路连续梁桥悬臂浇筑施工技术及应用", 广东水利电力职业技术学院学报, 31 December 2020 (2020-12-31), pages 29 - 32 * |
王炎: "大跨度连续弯梁桥施工控制关键技术研究", 中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑, pages 034 - 205 * |
邓振全 等: "大跨连续梁悬浇施工监控技术与应用研究", 山西建筑, 30 April 2018 (2018-04-30), pages 147 - 149 * |
高军 等: "武广高铁桥梁设计施工及动力学检测关键技术", 长江出版社, pages: 104 - 116 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115491938A (zh) * | 2022-09-19 | 2022-12-20 | 中铁大桥局集团第一工程有限公司 | 用于长联大跨铁路钢桥上无砟轨道的精调方法 |
Also Published As
Publication number | Publication date |
---|---|
CN113884056B (zh) | 2024-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107587429B (zh) | 悬索桥索夹安装位置修正方法 | |
CN109680615A (zh) | 短线法节段梁的三维坐标测量施工方法 | |
CN113884056A (zh) | 一种大跨度连续梁挂篮悬臂现浇梁测量方法 | |
CN107476204A (zh) | 一种高速铁路连续梁的线性控制方法 | |
EP4086804A1 (en) | Method for determining number of crossed hangers for cooperative system bridge | |
CN105091838A (zh) | 一种长距离输水渠道糙率原型观测测定方法 | |
CN108414367B (zh) | 一种基于共振的简支梁抗弯刚度测量系统及方法 | |
CN107478358A (zh) | 一种混凝土支撑应力监测数据的处理与优化方法 | |
CN108088409A (zh) | 一种用于桥梁施工的测量控制方法 | |
CN109682352A (zh) | 一种船舶构件倾斜角度测量调整装置及其测量调整方法 | |
CN113656861A (zh) | 一种由铁路桥梁变形导致的无砟轨道空间映射变形的计算方法 | |
CN211178454U (zh) | 一种高支模智能安全监控装置 | |
CN108416116A (zh) | 拱脚增大截面加固抛物线拱时拱顶压重量的确定方法 | |
CN218928178U (zh) | 一种短线法节段梁预制系统 | |
CN111896200B (zh) | 短索抗弯刚度测试方法 | |
CN110184936A (zh) | 基于温度监控的大跨度曲线刚构桥变形控制方法及系统 | |
CN114486033B (zh) | 支撑轴力确定方法、装置、设备及存储介质 | |
CN110287609B (zh) | 百万核电机组汽缸全缸通流间隙数据的计算系统及方法 | |
CN211173079U (zh) | 多曲率球壳体混凝土结构模架的曲率校准装置 | |
CN111898072B (zh) | 短索边界条件静力识别方法 | |
CN106758870B (zh) | 桥梁悬臂法施工中不平衡荷载监测及整体稳定性判断方法 | |
CN114112174B (zh) | 一种基于应变测量的隧道水土压力监测方法 | |
CN107607075A (zh) | 一种局部视线遮挡情况下的拱桥主拱线形测量方法 | |
CN212426785U (zh) | 全桥单幅顶升监测系统 | |
CN108413860A (zh) | 一种闭口截面薄壁梁约束扭转变形的实时监测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |