CN103136626B - The online management method of engineering project - Google Patents

The online management method of engineering project Download PDF

Info

Publication number
CN103136626B
CN103136626B CN201210295321.XA CN201210295321A CN103136626B CN 103136626 B CN103136626 B CN 103136626B CN 201210295321 A CN201210295321 A CN 201210295321A CN 103136626 B CN103136626 B CN 103136626B
Authority
CN
China
Prior art keywords
computer installation
end computer
web application
application server
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210295321.XA
Other languages
Chinese (zh)
Other versions
CN103136626A (en
Inventor
李占国
牛立群
郭锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JIANLONG HEAVY INDUSTRY GROUP Co Ltd
Original Assignee
BEIJING JIANLONG HEAVY INDUSTRY GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JIANLONG HEAVY INDUSTRY GROUP Co Ltd filed Critical BEIJING JIANLONG HEAVY INDUSTRY GROUP Co Ltd
Priority to CN201210295321.XA priority Critical patent/CN103136626B/en
Publication of CN103136626A publication Critical patent/CN103136626A/en
Application granted granted Critical
Publication of CN103136626B publication Critical patent/CN103136626B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of online management method of engineering project, the method is based on a remote interaction platform, pass budgets end computer installation, multiple contract enterprises end computer installation, multiple evaluation end computer installations, application end computer installation, multiple end computer installations of submitting to a higher level for approval or revision, multiple examination & verification end computer installations, data transmission and data between multiple examination & verification end computer installations and server-side computer system process, achieve online bidding and the assessment of bids of engineering project, the on-line evaluation contracting enterprise of engineering project, work out an engineering project schedule online, the online tracing of engineering project progress performance, engineering project progress abnormal response and process, the online engineering project quality that generates checks and accepts form, the online application of engineering project progress payment, material and labour cost analysis generates project estimates online.

Description

The online management method of engineering project
Technical field
The present invention relates to a kind of online management method of engineering project, the method is based on a remote interaction platform, pass budgets end computer installation, contract enterprises end computer installation, evaluate end computer installation, application end computer installation, submit to a higher level for approval or revision end computer installation, examination & verification end computer installation and server-side computer system between data transmission and data process, it is achieved that the online management of engineering project.
Background technology
In the prior art, the engineering project management software being most widely used is mostly uniprocessor version, along with developing rapidly of Internet technology, the management level of the efficiency of management and modernization in order to improve engineering project, the online management of engineering project based on the Internet is the inexorable trend of future development.Chinese patent 01121134.2 discloses a kind of project progress state management method, this project progress state management method passes through the Internet, from terminal A1 of each operation field of multinomial architectural engineering, B1, C1, is transferred to server by the engineering information such as daily work report and project photograph and preserves.In server, this engineering information of editing and processing, it is fabricated to project progress state catalog and preserves.Engineering construction person passes through the Internet, and from terminal A, B, C recall this project progress state catalog, carries out reading management.Although being already based on the progress control method of the Internet, but simply achieve simultaneous display schedule on the internet and performance, progress control is not carried out the combination of target and responsibility, the delay process of schedule objective simultaneously and the change of target, adjust and lack tight supervision, bring difficulty to the realization of schedule objective.It is therefore desirable to propose a kind of online management method of engineering project.
Summary of the invention
It is an object of the invention to propose a kind of online management method of engineering project, the method is based on a remote interaction platform, pass budgets end computer installation, contract enterprises end computer installation, evaluate end computer installation, application end computer installation, submit to a higher level for approval or revision end computer installation, examination & verification end computer installation and server-side computer system between data transmission and data process, it is achieved that the online management of engineering project.
It is an object of the invention to be achieved through the following technical solutions: a kind of online management method of engineering project, described method includes Authorize to Invest management module, design management module, progress control module, material and labour cost analysis module, give out a contract for a project and contract management module, quality management module, expenses management module, fixed assets carry down module, site construction management module, contract business administration module, work peace environmental protection management module, photo information module, Improvement module, integrated management and enquiry module, verify and difference module, entitlement management module;
Process that described Authorize to Invest module performs the management of project verification process, data management is examined in government's project verification and the project that is not carried out is closed a case;
Described design management module performs design process management, design data management, design alteration management, introducing projects manages and by the management of site operation demand for services plan;
Described progress control module perform basic data set up, engineering coding set up with report to a higher authorities for approval, schedule establishment and report to a higher authorities for approval, progress performance feedback, progress abnormal response and process, final acceptance of construction inspection;
Described material and labour cost analysis module performs benchmark foundation and maintenance, first is for material management and control, Project Budget establishment and inventory of giving out a contract for a project exports, Project Budget changes, project progress is settled accounts, auditing for construction completion account;
Described give out a contract for a project and contract management module perform bidding process management, contract set up and change management;
Described quality management module perform quality management benchmark file maintenance, Construction in Preparatory Stage quality document report to a higher authorities for approval, engineering material, component and fitting and equipment site acceptance, inspection of engineering quality control point, acceptance of engineering quality, construction quality abnormality processing;
The management of described expenses management module execution cost, project payment pay, initial stage data import;
Described fixed assets are carried down, and module performs prerotation notice, fixed assets are carried down;
Described site construction management module performance of work MAT'L substitution is reported to a higher authorities for approval, on-the-spot temporary facility scheme is reported to a higher authorities for approval, on-the-spot special construction work permit is reported to a higher authorities for approval, construction site management withholds output, job site checks;
Described business administration module of contracting performs to contract valuation of enterprise and management, contract valuation of enterprise management;
Described work peace environmental protection management module perform Construction in Preparatory Stage work peace environmental protection file report to a higher authorities for approval, work peace green audit, work peace environmental protection abnormality processing, the construction management of key production division, work peace environmental protection scheme report to a higher authorities for approval;
Described photo information module performs photo information filing classification maintenance, engineering picture and text Data storage, engineering achieve data management, project file file consulting;
Described Improvement module performs interim project performance evaluation, overall performance appraisal;
Described integrated management performs integrated management, managerial report, supervisor's form, comprehensive inquiry, standard criterion data management, daily inquiry with enquiry module;
Described verification and difference module perform the reflection in time to systematical difference and feedback, technical interior self-inspection/special project verification;
Described entitlement management module performs process settings, rights management.
The purpose of the present invention can also be achieved through the following technical solutions: a kind of online management method of engineering project, mutual personnel carry out communication for information according to a remote interaction platform, and described remote interaction platform includes a server-side computer system, budget end computer installation, multiple contracts enterprises end computer installation, multiple evaluation end computer installation, application end computer installation, multiple end computer installation, multiple examination & verification end computer installation of submitting to a higher level for approval or revision;Described server-side computer system, budget end computer installation, contract enterprises end computer installation, evaluate end computer installation, application end computer installation, end computer installation of submitting to a higher level for approval or revision, examination & verification end computer installation are in a wan environment and realize network and connect, described wan environment is net territory based on INTERNET environment, and described server-side computer system includes database server, web application server and the software matched with described server-side computer system;Described budget end computer installation, contract enterprises end computer installation, evaluate end computer installation, application end computer installation, end computer installation of submitting to a higher level for approval or revision, examination & verification end computer installation are separately installed with engineering project management software;The step of described online management is:
The online bid of engineering project, bid, the assessment of bids
A, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and send one to described web application server and contract enterprises registration request, described web application server receives described after contracting enterprises registration request, sends one contract enterprises registration list to described enterprises end computer installation of contracting;
B, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and contract the essential information of enterprise according to the described project correspondence input arranged in enterprises registration list of contracting and contract the qualification information of enterprise;The described essential information contracting enterprise includes enterprise name information, type of business information, organization mechanism code or identification card number information, issuing bank information;The described qualification information contracting enterprise includes qualification name information, qualification type information, qualification grade information, qualification certificates information;
C, contracting the enterprises end computer installation of contracting described in the operated by personnel of enterprise and will fill in complete enterprises registration list of contracting and be sent to described web application server, described web application server is called AM method and is saved in described database server by described enterprises registration list of contracting;
D, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and send a request of submitting to a higher level for approval or revision contracting enterprises registration list to described web application server, the described request of submitting to a higher level for approval or revision contracting enterprises registration list is resolved by described web application server, call AM method from described database server, select qualified enterprises registration list of contracting, and the enterprises registration list of contracting chosen is sent to described examination & verification end computer installation;
E, auditor operate described examination & verification end computer installation and audit the log-on message contracted in enterprises registration list chosen, and auditing result is sent to described web application server;Described web application server is called AM method and will be contracted in Enterprise Lists to the most qualified by the company information interpolation of contracting of examination & verification, will not add the most pending contracting in Enterprise Lists by the company information of contracting of examination & verification;
The essential information that F, the web application server described in operated by personnel of competitive bid unit call for bid according to the project correspondence input arranged in bid application list, then create bid document according to the bid document masterplate selected, finally according to project correspondence input assessment of bids project, weight, the benchmark score value arranged in bid grade form, upload Bid Evaluation Method;The essential information of described bid includes way of bidding, assessment of bids mode, the preliminary budget amount of money, mode of giving out a contract for a project, predetermined tender out date;Described web application server is called AM method and is saved in described database server by described bid application list;
Described bid application form single-shot is given described examination & verification end computer installation by G, the web application server described in operated by personnel of competitive bid unit, auditor operates described examination & verification end computer installation and audits the information on bidding in described bid application list, the information of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the bid application form monolock in described database server is fixed;
Enterprises end computer installation of contracting described in H, the qualified operated by personnel contracting enterprise sends the inquiry request of a bid application list to described web application server, the inquiry request of described bid application list is resolved by described web application server, call AM method from described database server, select qualified bid application list, and the bid application form single-shot chosen is given described contract enterprises end computer installation;
The bid document contracted in the bid application list described in the download of enterprises end computer installation described in I, the qualified operated by personnel contracting enterprise and the tender documents masterplate of correspondence, contract and contract enterprises end computer installation according to the project correspondence input bid information and quotation information arranged in tender documents masterplate described in the operated by personnel of enterprise, and will fill in complete tender documents and be sent to described web application server;
Quotation information in described tender documents is collected by J, the web application server described in operated by personnel of competitive bid unit, askes agreed-upon price essential information, quotation information, inquiry agreed-upon price record information according to asking the project correspondence input arranged in agreed-upon price list;Described web application server is called AM method and be will fill in complete inquiry agreed-upon price list and be saved in described database server;
K, the web application server described in operated by personnel of competitive bid unit calculate assessment of bids basis quote, and the computing formula of assessment of bids basis quote is:,N≤5;Wherein Ai be each qualified contract the offer by tender of enterprise, N is that participate in submitting a tender qualified contracts the quantity of enterprise, A is the preliminary budget amount of money that competitive bid unit determines;Web application server described in the operated by personnel of competitive bid unit calculates the deviation value between each qualified quotation contracting enterprise and assessment of bids basis quote: P=Ai-C;Calculate assessment of bids PTS according to commercial bid total price scoring formula: BF=Q-(P × 100 × ∏ × δ), wherein ∏ be conversion score value, δ be assessment of bids Term Weight, Q be assessment of bids basis point;
L, the web application server described in operated by personnel of competitive bid unit generate report on the evaluation of tenders according to each qualified assessment of bids PTS contracting enterprise and intend certainly bag list, and described report on the evaluation of tenders and plan certainly bag list are sent to described examination & verification end computer installation;
M, auditor operate described examination & verification end computer installation and audit described report on the evaluation of tenders and plan certainly bag list, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and described report on the evaluation of tenders and plan certainly bag list is saved in described database server locking;
N, the web application server described in operated by personnel of competitive bid unit set up the project correspondence input tender price put according to certainly steamed bun mesh schedule of rates and info quote time is other, and described web application server is called AM method and is saved in described database server by described certainly steamed bun mesh unit price list;
O, the web application server described in operated by personnel of competitive bid unit according to report on the evaluation of tenders and intend certainly bag list and certainly steamed bun mesh unit price list generation notice on bid winning and acceptance of the bid result notice, and notice on bid winning is sent to middle target contracts enterprise, acceptance of the bid result notice is sent to target in and contracts enterprise;
The on-line evaluation contracting enterprise of engineering project
Submitting to a higher level for approval or revision end computer installation described in A, the operation of evaluation establishment officer sends one to described web application server and contracts valuation of enterprise application request, described web application server receives described after contracting valuation of enterprise application request, sends one to described end computer installation of submitting to a higher level for approval or revision and contracts valuation of enterprise application list;
Submitting to a higher level for approval or revision end computer installation described in B, the operation of evaluation establishment officer contracts essential information and the evaluation criterion information of valuation of enterprise application list according to the described project correspondence input arranged in valuation of enterprise application list of contracting, and the described essential information contracting valuation of enterprise application list includes contracting enterprise name information, PN, evaluation type information, evaluation establishment officer information, evaluating personnel's list information;The described evaluation criterion information contracting valuation of enterprise application list includes Basic Evaluation project information, special assessment item information, positive or negative points project information;
Described valuation of enterprise application form single-shot of contracting is given described web application server by the submitting to a higher level for approval or revision end computer installation described in C, the operation of evaluation establishment officer, and described web application server is called AM method and is saved in described database server by described valuation of enterprise application list of contracting;
Submitting to a higher level for approval or revision end computer installation described in D, the operation of evaluation establishment officer sends a request of submitting to a higher level for approval or revision contracting valuation of enterprise application list to described web application server, the described request of submitting to a higher level for approval or revision contracting valuation of enterprise application list is resolved by described web application server, call AM method from described database server, select qualified valuation of enterprise application list of contracting, and give described examination & verification end computer installation by the valuation of enterprise application form single-shot of contracting chosen;
E, auditor operate the described examination & verification end computer installation essential information contracted in valuation of enterprise application list to choosing and evaluation criterion information is audited, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and is determined by the valuation of enterprise application form monolock of contracting in described database server;
F, described web application server contract valuation of enterprise list according to the evaluation criterion information creating contracted in valuation of enterprise application list of examination & verification approval, and described is contracted each evaluation personnel that valuation of enterprise list is sent simultaneously in described evaluation personnel's list information set;
G, each evaluation personnel operate respectively one evaluate end computer installation receive described in contract valuation of enterprise list, contract the evaluation criterion information correspondence input arranged in valuation of enterprise list contract valuation of enterprise data according to described;And described valuation of enterprise data of contracting are sent to described web application server, described web application server is called AM method and described valuation of enterprise data of contracting is saved in described database server;Described valuation of enterprise data of contracting include Basic Evaluation project score, special assessment item score, positive or negative points project score;
Submitting to a higher level for approval or revision end computer installation described in H, the operation of evaluation establishment officer sends an inquiry request contracting valuation of enterprise data to described web application server, the described inquiry request contracting valuation of enterprise data is resolved by described web application server, call AM method from described database server, select qualified valuation of enterprise data of contracting, and the valuation of enterprise data of contracting chosen are sent to described end computer installation of submitting to a higher level for approval or revision;
Submitting to a higher level for approval or revision end computer installation described in I, the operation of evaluation establishment officer sends one to described web application server and contracts Enterprise Integrated evaluation request, described web application server receives described after contracting Enterprise Integrated evaluation request, sends one to described end computer installation of submitting to a higher level for approval or revision and contracts Enterprise Integrated and evaluate list;
J, evaluate the submitting to a higher level for approval or revision end computer installation described in establishment officer's operation and go out to contract Enterprise Integrated evaluating data according to the valuation of enterprise data summarization of contracting chosen, evaluate the project correspondence arranged in list and input according to described Enterprise Integrated of contracting and contract Enterprise Integrated evaluating data;And described Enterprise Integrated evaluating data of contracting is sent to described web application server, described web application server is called AM method and is saved in described database server by described Enterprise Integrated evaluating data of contracting;Described Enterprise Integrated evaluating data of contracting includes evaluating top score, evaluating minimum score, evaluation average, qualitative evaluation grade;
Submitting to a higher level for approval or revision end computer installation described in K, the operation of evaluation establishment officer sends a request of submitting to a higher level for approval or revision contracting Enterprise Integrated evaluating data to described web application server, the described request of submitting to a higher level for approval or revision contracting Enterprise Integrated evaluating data is resolved by described web application server, call AM method from described database server, select qualified Enterprise Integrated evaluating data of contracting, and the Enterprise Integrated evaluating data of contracting chosen is sent to described examination & verification end computer installation;
L, auditor operate described examination & verification end computer installation and audit the Enterprise Integrated evaluating data of contracting chosen, by examination & verification approval information be sent to described web application server, described web application server call AM method according to examination & verification approval the qualitative evaluation level adjustment contracted in Enterprise Integrated evaluating data described in database server in contract goodwill grade;
Work out an engineering project schedule online
A, project director sends an engineering project inquiry request by described end computer installation of submitting to a higher level for approval or revision to described web application server, the engineering project inquiry request received is resolved by the servlet container in described web application server, call in AM method engineering coded data table from described database server search to be suitable for the engineering of this engineering project and encode and generate engineering coding schedule monofile, many sub-project codes in this engineering project are had described in described engineering coding schedule monofile, multiple operational codes, described engineering coding schedule monofile is sent to described end computer installation of submitting to a higher level for approval or revision by described web application server;
B, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision, sequentially input the schedule data of each operation according to the operational code in described engineering coding schedule monofile, the schedule data of input are converted into Gantt chart graph data by gantt.js plug-in unit in real time;The schedule data of each operation include the linking relationship between operational code, ps, plan completion date, duration, and the schedule data of every operation, arrange the priority level of each operation;
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and the schedule data of each operation are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls AM method and the schedule data in XML format file is saved in the schedule tables of data in described database server;
D, project director send a request of submitting to a higher level for approval or revision by described end computer installation of submitting to a higher level for approval or revision to described web application server, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified schedule data, and schedule data composition XML format file is sent to described examination & verification end computer installation;
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the schedule data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, and described web application server is called AM method and the schedule tables of data in described database server locked;
The online tracing of engineering project progress performance
A, project director send an engineering project inquiry request by described end computer installation of submitting to a higher level for approval or revision to described web application server, the engineering project inquiry request received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified construction program data, and construction program data composition XML format file is sent to described end computer installation of submitting to a higher level for approval or revision;
B, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision, and sequentially input the actual progress data of each operation, and the actual progress data of input are converted into Gantt chart graph data by gantt.js plug-in unit in real time;The actual progress data of each operation include that operational code, actual starting date, current period actually accomplish percentage ratio, actual finish date;
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and the actual progress data of each operation are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls AM method and the actual progress data in XML format file is saved in the actual progress tables of data in described database server;
D, project director hold computer installation to the request of submitting to a higher level for approval or revision of described web application server by described submitting to a higher level for approval or revision, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified actual progress data, and actual progress data composition XML format file is sent to described examination & verification end computer installation;
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the actual progress data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, and described web application server is called AM method and the actual progress tables of data in described database server locked;
Engineering project progress abnormal response and process
A, described web application server regular star up engineering follow-up program, check the actual progress abnormal conditions of each operation, i.e. in Gantt chart graph data, actual progress location point falls in the left side of check data location point, sends abnormal job information to described end computer installation of submitting to a higher level for approval or revision according to the abnormal alert level arranged;
B, project director receive abnormal job information by described end computer installation of submitting to a higher level for approval or revision, call gantt.js plug-in unit abnormal job information is checked, project director is by described end computer installation input progress abnormality processing data of submitting to a higher level for approval or revision, and described progress abnormality processing data include progress declaration of exception, intend treatment measures, renewal ps, renewal plan completion date;
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and described progress abnormality processing data are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls in the progress abnormality processing tables of data that the progress abnormality processing data in XML format file are saved in described database server by AM method;
D, project director hold computer installation to the request of submitting to a higher level for approval or revision of described web application server by described submitting to a higher level for approval or revision, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified progress abnormality processing data, and progress abnormality processing data composition XML format file is sent to described examination & verification end computer installation;
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the progress abnormality processing data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, described web application server call AM method the ps in the schedule tables of data in described database server is revised as update ps, be intended to the target date be revised as update the plan completion date;
The online engineering project quality that generates checks and accepts form
A, project director operates the inquiry request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality list of an engineering project to described web application server, the inquiry request of the acceptance of engineering quality list to receiving of the servlet container in described web application server resolves, call AM method from the data base of described web application server, search for the acceptance of engineering quality formfile being suitable for this engineering project according to construction quality form benchmark catalogue, described acceptance of engineering quality formfile is sent to described end computer installation of submitting to a higher level for approval or revision by described web application server, the described file that acceptance of engineering quality formfile is html format;
B, project director operate described end computer installation of submitting to a higher level for approval or revision and described acceptance of engineering quality formfile are converted into acceptance of engineering quality forms pages file, and according to the project correspondence input acceptance of engineering quality data arranged in described acceptance of engineering quality forms pages file;
C, project director operate described end computer installation of submitting to a higher level for approval or revision and described acceptance of engineering quality data are sent to described web application server, described acceptance of engineering quality data are resolved by the servlet container in described web application server, call AM method and described acceptance of engineering quality data are saved in the acceptance of engineering quality tables of data in described database server;
D, project director operate described end computer installation of submitting to a higher level for approval or revision and send a request of submitting to a higher level for approval or revision to described web application server, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified acceptance of engineering quality data, and described acceptance of engineering quality data are sent to described examination & verification end computer installation;
E, auditor operate described examination & verification end computer installation and audit described acceptance of engineering quality data, auditor operates examination & verification end computer installation and the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and the acceptance of engineering quality tables of data in described database server locked;
F, project director operate the inquiry request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality data of an engineering project to described web application server, the inquiry request of the acceptance of engineering quality data to receiving of the servlet container in described web application server resolves, call AM method from described database server, select qualified acceptance of engineering quality data, and described acceptance of engineering quality data are sent to described end computer installation of submitting to a higher level for approval or revision;
G, project director operate the print request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality form of an engineering project to described web application server, the print request of the acceptance of engineering quality form to receiving of the servlet container in described web application server resolves, call AM method from described database server, select the Electronic Signature data corresponding with the auditor auditing these acceptance of engineering quality data, and described Electronic Signature data are sent to described end computer installation of submitting to a higher level for approval or revision;Described acceptance of engineering quality data and described Electronic Signature data are sent to printer, by printer printout acceptance of engineering quality form by described end computer installation of submitting to a higher level for approval or revision;
The online application of engineering project progress payment
A, contract management personnel operate the project correspondence input contract essential information arranged in described web application server based on contract masterplate, and described contract essential information are saved in described database server;Described contract essential information includes Business Name information, engineering project information, Contract NO, contract type, duration of contract, contracts company information, total Value of Contract, advance payment ratio, quality guarantee gold ratio;
B, supervisor of construction operate described application end computer installation and send an engineering predication application request to described web application server, after described web application server receives described engineering predication application request, send an engineering predication application list to described application end computer installation;
C, supervisor of construction operate described application end computer installation and input the amount of advance payment information of this application according to the project correspondence arranged in described engineering predication application list, need money day information, anticipated abatement to complete day information;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering predication application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering predication application list;
D, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering predication application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering predication application list is resolved by described web application server, call AM method from described database server, select qualified engineering predication application list, and give described examination & verification end computer installation by the engineering predication application form single-shot chosen;
The application information that E, auditor operate in the described examination & verification end computer installation engineering predication application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the engineering predication application form monolock in described database server is fixed;
F, supervisor of construction operate described application end computer installation and send an engineering temporary loan application request to described web application server, after described web application server receives the request of described engineering temporary loan application, send an engineering to described application end computer installation and borrow temporarily money application list;
G, supervisor of construction operate described application end computer installation and input the money amount information that borrows temporarily of this application according to the described engineering project correspondence arranged in money application list that borrows temporarily, need money day information, anticipated abatement to complete day information;Supervisor of construction operates the described application end computer installation money application form single-shot that described engineering borrowed temporarily and gives described web application server, and described web application server is called the AM method money application list that described engineering borrowed temporarily and is saved in described database server;
H, supervisor of construction operate described application end computer installation and send an engineering to described web application server and borrow temporarily the request of submitting to a higher level for approval or revision of money application list, the borrow temporarily described engineering request of submitting to a higher level for approval or revision of money application list of described web application server resolves, calling AM method selects qualified engineering to borrow temporarily money application list from described database server, and the money application form single-shot that the engineering chosen borrowed temporarily gives described examination & verification end computer installation;
I, auditor operate the application information that the engineering chosen borrows temporarily in money application list by described examination & verification end computer installation and audit, the message of examination & verification approval is sent to described web application server, and described web application server is called AM method and the engineering in described database server is borrowed temporarily money application form monolock calmly;
J, supervisor of construction operate described application end computer installation and send a progress payment application request to described web application server, after described web application server receives described progress payment application request, send a progress payment application list to described application end computer installation;
K, supervisor of construction operate described application end computer installation and input the progress payment amount information of this application according to the project correspondence arranged in described progress payment application list, need money day information, anticipated abatement to complete day information;Supervisor of construction operates described application end computer installation and gives described web application server by described progress payment application form single-shot, and described web application server is called AM method and is saved in described database server by described progress payment application list;
L, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of a progress payment application list to described web application server, the request of submitting to a higher level for approval or revision of described progress payment application list is resolved by described web application server, call AM method from described database server, select qualified progress payment application list, and give described examination & verification end computer installation by the progress payment application form single-shot chosen;
The application information that M, auditor operate in the described examination & verification end computer installation progress payment application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the progress payment application form monolock in described database server is fixed;
N, supervisor of construction operate described application end computer installation and send an engineering promise breaking deduction application request to described web application server, after described web application server receives described engineering promise breaking deduction application request, send an engineering promise breaking deduction application list to described application end computer installation;
O, supervisor of construction operate described application end computer installation and input this deducted amount information, promise breaking project information, promise breaking note to payment deduction information according to the project correspondence arranged in described engineering promise breaking deduction application list;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering promise breaking deduction application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering promise breaking deduction application list;
P, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering promise breaking deduction application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering promise breaking deduction application list is resolved by described web application server, call AM method from described database server, select qualified engineering promise breaking deduction application list, and give described examination & verification end computer installation by the engineering chosen promise breaking deduction application form single-shot;
The application information that Q, auditor operate in the described examination & verification end computer installation engineering promise breaking deduction application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method by fixed for the engineering promise breaking deduction application form monolock in described database server;
R, supervisor of construction operate described application end computer installation and send a contract to the request of ticket payment application to described web application server, described web application server receives after described contract asks to ticket payment application, sends a contract to ticket payment application list to described application end computer installation;
S, supervisor of construction operate the described application end computer installation abatement information according to the project correspondence input received payment arranged in described contract to ticket payment application list;Supervisor of construction operates described application end computer installation and gives described web application server by described contract to ticket payment application form single-shot, and described web application server is called AM method and is saved in described database server to ticket payment application list by described contract;
T, supervisor of construction operate described application end computer installation and send an engineering quality guarantee gold application request to described web application server, after described web application server receives described engineering quality guarantee gold application request, send an engineering quality guarantee gold application list to described application end computer installation;
U, supervisor of construction operate described application end computer installation and input the quality guarantee gold amount information of this application according to the project correspondence arranged in described engineering quality guarantee gold application list, need money day information, quality guarantee gold note to payment deduction information;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering quality guarantee gold application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering quality guarantee gold application list;
V, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering quality guarantee gold application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering quality guarantee gold application list is resolved by described web application server, call AM method from described database server, select qualified engineering quality guarantee gold application list, and give described examination & verification end computer installation by the engineering quality guarantee gold application form single-shot chosen;
The application information that W, auditor operate in the described examination & verification end computer installation engineering quality guarantee gold application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the engineering quality guarantee gold application form monolock in described database server is fixed;
Material and labour cost analysis generates project estimates online
A, construction budget person operate described budget end computer installation and send a request setting up material references to described web application server, after described web application server receives the described request setting up material references, send a material references data form to described budget end computer installation;
B, construction budget person operate described budget end computer installation according to the essential information of project correspondence input material benchmark arranged in described material references data form and the unit price information of material references;The essential information of described material references includes that material class number information, title material information, specifications and models information, measurement unit information, material specification and first are for information;The unit price information of described material references includes area unit price information, match ratio material unit price information;
C, construction budget person operate described budget end computer installation and will fill in complete material references data form and be sent to described web application server, and described web application server is called AM method and be will fill in complete material references data form and be saved in described database server;
D, construction budget person operate described budget end computer installation and send a request setting up budgetary discipline classification benchmark to described web application server, after described web application server receives the described request setting up budgetary discipline classification benchmark, send a budgetary discipline classification benchmark data list to described budget end computer installation;
E, construction budget person operate described budget end computer installation according to the project correspondence input budgetary discipline classification information arranged in described budgetary discipline classification benchmark data list and the budget thin item classification information of this budgetary discipline classification;Described budgetary discipline classification information includes budgetary discipline item name, class number;Described budget thin item classification information includes that budget thin item item name, thin item are numbered;
F, construction budget person operate described budget end computer installation and will fill in complete budgetary discipline classification benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete budgetary discipline classification benchmark data list and be saved in described database server;
G, construction budget person operate described budget end computer installation and send a request setting up artificial benchmark to described web application server, after described web application server receives the described request setting up artificial benchmark, send an artificial benchmark data list to described budget end computer installation;
H, construction budget person operate described budget end computer installation and input artificial reference information according to the project correspondence arranged in described artificial benchmark data list;Described artificial reference information includes category information, work post code information, measurement unit information, artificial unit price information;
I, construction budget person operate described budget end computer installation and will fill in complete artificial benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete artificial benchmark data list and be saved in described database server;
J, construction budget person operate described budget end computer installation and send a request setting up rate project benchmark to described web application server, after described web application server receives the described request setting up rate project benchmark, send a rate project benchmark data list to described budget end computer installation;
K, construction budget person operate described budget end computer installation according to the project correspondence input rate project reference information arranged in described rate project benchmark data list;Described rate project reference information includes rate bullets information, rate project name information, works category information, job location information, toll-ratio information;
L, construction budget person operate described budget end computer installation and will fill in complete rate project benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete rate project benchmark data list and be saved in described database server;
M, construction budget person operate described budget end computer installation and send a request setting up inventory specific item benchmark to described web application server, after described web application server receives the described request setting up inventory specific item benchmark, send an inventory specific item benchmark data list to described budget end computer installation;
N, construction budget person operate described budget end computer installation according to the project correspondence input inventory specific item information arranged in described inventory specific item benchmark data list;Described inventory specific item information includes that specific item encodes information, specific item name information, specific item unit information, characterization information, job content information;Select independent inventory specific item classification, in addition it is also necessary to input Business Name information, works category information, specific item base price information;Non-selected independent inventory specific item classification, input inventory specific item is detailed;
O, construction budget person operate described budget end computer installation and will fill in complete inventory specific item benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete inventory specific item benchmark data list and be saved in described database server;
P, construction budget person operate described budget end computer installation and send the request of an establishment construction budget to described web application server, after described web application server receives the request of described establishment construction budget, send a construction budget data form to described budget end computer installation;
Q, construction budget person operate described budget end computer installation according to project correspondence the input essential information of construction budget, inventory specific item information, main material information, the match ratio material information arranged in described construction budget data form;Construction budget person operates described budget end computer installation and inputs the quantities of inventory specific item, the quantities of main material, the amount of budget of match ratio material according to construction program data correspondence;
R, construction budget person operate described budget end computer installation and will fill in complete construction budget data form and be sent to described web application server, described web application server calculates the total price of inventory specific item automatically according to the quantities of the inventory specific item of input, the quantities of the main material according to input calculates the total price of main material automatically, automatically calculates the total price of match ratio material according to the amount of budget of the match ratio material of input;Described web application server is called the construction budget data form that calculating completes by AM method and is saved in described database server;
S, construction budget person operate described budget end computer installation and send the request of submitting to a higher level for approval or revision of a construction budget to described web application server, the request of submitting to a higher level for approval or revision of described construction budget is resolved by described web application server, call AM method from described database server, select qualified construction budget data form, and the total price information in described construction budget data form collected one construction budget of generation submit to a higher level for approval or revision list, list of being submitted to a higher level for approval or revision by described construction budget is sent to described examination & verification end computer installation;
T, auditor operate the summary information that described construction budget submitted to a higher level for approval or revision in list by described examination & verification end computer installation and audit, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method list of being submitted to a higher level for approval or revision by described construction budget and is saved in described database server locking.
The present invention compared with prior art has the advantage that
1, the present invention is based on a remote interaction platform, pass budgets end computer installation, multiple contract enterprises end computer installation, multiple evaluation end computer installation, application end computer installation, multiple submit to a higher level for approval or revision end computer installation, multiple examination & verification end computer installation, between multiple examination & verification end computer installation and server-side computer system data transmission and data process, it is achieved that the online management of engineering project.
2, the present invention issues OO operation interface by server-side computer system, data are stored in data base, the operator of all these interaction platforms of use is given in data sharing, by locking and authorization control operating right, controlling again data while ensureing real-time property can not arbitrarily change.
3, the present invention is by setting up bid application list, setting information on bidding and bid score information, and audit bid application list, the bid application list passed through by examination & verification is carried out calling for bid, submits a tender, the management of the assessment of bids, ensure that the objective of assessment of bids result, just.
4, the present invention is directed to different evaluation types, set corresponding evaluation personnel and evaluation criterion, evaluation personnel carry out on-line evaluation according to the evaluation criterion set to contracting enterprise, the degrees of comparison contracting enterprise is adjusted according to evaluation result, for giving out a contract for a project, contract signing, the optimum selecting such as bid contract enterprise and provide data support, improve the efficiency of Project Management.
5, the present invention is by setting up material references, budgetary discipline classification benchmark, artificial benchmark, rate project benchmark and inventory specific item benchmark, facilitates the collection of labor and materials data, simplifies the program of material and labour cost analysis, and the accuracy for material and labour cost analysis result provides guarantee.
6, present invention employs jaserreport technology, the information batch of input in each list can be exported to Excel file, make the editor of information easier;Have employed POI technology simultaneously, can import in each list by the information batch in Excel file, the collection making information is easier.
With embodiment, the present invention is described in detail below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the system architecture diagram of the embodiment of the present invention one;
Fig. 2 is the business relations figure in embodiment one between each module;
Fig. 3 is the flow chart of data processing block diagram in embodiment one;
Fig. 4 is the system schematic of embodiment two;
Fig. 5 is frame structure and the flow chart of data processing figure of embodiment two;
Fig. 6 is the operation interface of material references data form in embodiment two;
Fig. 7 is the operation interface of budgetary discipline classification benchmark data list in embodiment two;
Fig. 8 is the operation interface of artificial benchmark data list in embodiment two;
Fig. 9 is the operation interface of rate project benchmark data list in embodiment two;
Figure 10 is the operation interface of inventory specific item benchmark data list in embodiment two;
Figure 11 is the operation interface of the inventory specific item tab of construction budget list in embodiment two;
Figure 12 is the operation interface of the main material tab of construction budget list in embodiment two;
Figure 13 is the operation interface of the match ratio material tab of construction budget list in embodiment two;
Figure 14 is that in embodiment two, construction budget is submitted to a higher level for approval or revision the operation interface of list.
Detailed description of the invention
Embodiment one:
See Fig. 1 to Fig. 3, a kind of online management method of engineering project, described method includes Authorize to Invest management module, design management module, progress control module, material and labour cost analysis module, give out a contract for a project and contract management module, quality management module, expenses management module, fixed assets carry down module, site construction management module, contract business administration module, work peace environmental protection management module, photo information module, Improvement module, integrated management and enquiry module, verify and difference module, entitlement management module;
Process that described Authorize to Invest module performs the management of project verification process, data management is examined in government's project verification and the project that is not carried out is closed a case;
Described design management module performs design process management, design data management, design alteration management, introducing projects manages and by the management of site operation demand for services plan;
Described progress control module perform basic data set up, engineering coding set up with report to a higher authorities for approval, schedule establishment and report to a higher authorities for approval, progress performance feedback, progress abnormal response and process, final acceptance of construction inspection;
Described material and labour cost analysis module performs benchmark foundation and maintenance, first is for material management and control, Project Budget establishment and inventory of giving out a contract for a project exports, Project Budget changes, project progress is settled accounts, auditing for construction completion account;
Described give out a contract for a project and contract management module perform bidding process management, contract set up and change management;
Described quality management module perform quality management benchmark file maintenance, Construction in Preparatory Stage quality document report to a higher authorities for approval, engineering material, component and fitting and equipment site acceptance, inspection of engineering quality control point, acceptance of engineering quality, construction quality abnormality processing;
The management of described expenses management module execution cost, project payment pay, initial stage data import;
Described fixed assets are carried down, and module performs prerotation notice, fixed assets are carried down;
Described site construction management module performance of work MAT'L substitution is reported to a higher authorities for approval, on-the-spot temporary facility scheme is reported to a higher authorities for approval, on-the-spot special construction work permit is reported to a higher authorities for approval, construction site management withholds output, job site checks;
Described business administration module of contracting performs to contract valuation of enterprise and management, contract valuation of enterprise management;
Described work peace environmental protection management module perform Construction in Preparatory Stage work peace environmental protection file report to a higher authorities for approval, work peace green audit, work peace environmental protection abnormality processing, the construction management of key production division, work peace environmental protection scheme report to a higher authorities for approval;
Described photo information module performs photo information filing classification maintenance, engineering picture and text Data storage, engineering achieve data management, project file file consulting;
Described Improvement module performs interim project performance evaluation, overall performance appraisal;
Described integrated management performs integrated management, managerial report, supervisor's form, comprehensive inquiry, standard criterion data management, daily inquiry with enquiry module;
Described verification and difference module perform the reflection in time to systematical difference and feedback, technical interior self-inspection/special project verification;
Described entitlement management module performs process settings, rights management.
In the present embodiment, the major function of modules is as follows:
Authorize to Invest management module:
The management of process of 1, setting up the project: be provided with project verification suggestion table, project proposal management as project verification management management and control point, it is ensured that the feasibility study of investment decision and project is abundant, makes project verification process specification;
2, government's project verification examination & approval data management: government's project verification examination & approval data of management assembled item, to check at any time, reduces engineering construction risk;
3, the project that is not carried out is closed a case process: optionally can to item inspection time, to the process but unenforced project is closed a case of setting up the project, data of having closed a case after examination & verification will show the most in systems, only retains historical data in data base.
Design management module:
1, design process management: comprise that prospecting task delegation, design objective are entrusted, can be ground, preliminary design review result, construction drawing design examine, the management and control of significant process and project carry out the management of design liaison list in overall process during summary of telling somebody what one's real intentions are four designs;
2, design data management: comprise engineering design data, construction drawing records to figure, three management and control points of construction drawing granting record, and the drawing of project is carried out Classification Management and by the capsule information input system in Project design stage, for future reference;
3, design alteration management: comprise design alteration application, important technical project setting, the design alteration during record management project are carried out comprehensively, make whole design process have good grounds;
4, introduce projects management: comprise introduced project recommendation make a report on, technical and commercial negotiation result of introducing projects input, introduced project data make a report on, introduced project significant process content and related data are carried out special management;
5, by the management of site operation demand for services plan, the site operation service role that specification item is required during carrying out.
Progress control module:
1, basic data is set up: based on unified project structure division principle, form the coding rule of a set of multi-layer, set up unified engineering coding structure platform, as the basis of project structure breakdown, set up unified final acceptance of construction and check item rule, as reception test foundation when being completed;
2, engineering coding is set up and is reported to a higher authorities for approval: project is all based on unified coding rule and decomposes, depth requirements according to actual progress target management and control, select to meet the hierarchical structure of progress control, and give unique engineering coding according to rule by each level schedule objective simultaneously, select for the establishment of later stage progress, budget compilation, quality management etc. after setting up the readily identified engineering name corresponding with engineering coding;
3, schedule is worked out and reports to a higher authorities for approval: figure shows the task Gantt chart requiring the engineering name set up according to progress management and control, duration according to task, input duration node or adjust the duration by dilatory graphic length, mark milestone, mission critical, and set up the logical relation between Task Progress, Task Progress is carried out directly perceived, succinct display, simultaneously, the establishment of schedule, examine, consult, feed back and all make a report on realization by network, it is ensured that upgrade in time and share;
4, progress performance feedback: the director that each task of schedule is specified goes into operation according to this task actual and periodic feedback actual progress completion date input system, checks the page by progress, and schedule can simultaneous display performance;
5, progress abnormal response and process: system is analyzed with original plan according to the actual implementation status of project process, such as a certain task not by when performing in the original plan, system points out this task leader to make a report on laggard reason and degree automatically, supervises responsible person concerned to analyze reason;
6, final acceptance of construction inspection: after the Practical Completion that contract relates to, checks each item performance by rule, and after whole items complete, prompting related personnel arrange settlement of accounts work.
Material and labour cost analysis module:
1, benchmark is set up and safeguards: provide a kind of framework setting up the general standard schedule specific item of enterprises and labor and materials benchmark, specifically include artificial benchmark unit price, material references unit price, inventory specific item labor and materials benchmark, work load evaluation, the foundation of other rate project benchmark, wherein material and inventory specific item labor and materials benchmark can be suitable for the foundation of multiple company, are applied to the situation about there are differences of many companies;
2, first supplies material management and control: system for material budget quantities, incorporation engineering schedule according to engineering coding, first, automatically collects first and supplies material materials plan, for the reference of supervisor of construction's requisitioning for purchase;When first supplies the forward purchasing materials of material to be more than budgeted number, the automatic prediction occurring of system more than budgeted number or actual neck quantity, and prompting operating personnel carries out abnormality processing;
3, Project Budget establishment and inventory output of giving out a contract for a project: use the labor and materials benchmark set up, according to technical data such as drawings by different engineering codings, different budgetary discipline classification extraction built shelves labor and materials benchmark, preparation of proposed budgets, budget respectively, export inventory of giving out a contract for a project, wherein engineering coding should encode corresponding, to realize the combination of expense and progress with the engineering in construction schedule in progress module;
4, Project Budget change: after end of giving out a contract for a project, extraction unit price of giving out a contract for a project generates and gives out a contract for a project budget, when meeting the change condition of system regulations in work progress, should work out change budget according to change data in good time, extract, according to engineering coding, Contract NO, budget of giving out a contract for a project, carry out budget change;When changing budget amount beyond former budget amount regulation ratio, system prompt is automatically abnormal, need to be analyzed super investment reason;When change budget amount surpasses the contract value setup control amount of money or ratio, and system prompt is abnormal, and contracts dept need to handle modification of contract formality in time;Increase inventory specific item department of giving out a contract for a project simultaneously newly and should organize agreed-upon price in time, it is to avoid the generation of question at issue during clearing;
5, project progress clearing: after commencement of works, each fixed cycle reports project progress clearing, calculate progress completed percentage for scheduling system and expense system carry out scheduled fun and pays offer Data Source;
6, auditing for construction completion account: the Closing Check work deadline according to the final acceptance of construction qualified date, is controlled by system, need to the illustrating abnormal of not handling of exceeding the time limit, it is to avoid the phenomenon that clearing are failed to solve after a long delay after Practical Completion occurs;According to final account for completed project data, system is extracted the change budget of Final Issue, is carried out the establishment of final account for completed project;The settlement amounts of auditing department's authorization, as the foundation of expense system payment and settlement money, is both and carries down offer Data Source for handling fixed assets.
Give out a contract for a project and contract management module:
1, bidding process management: the mode that the bidding process that system provides can use competitive bidding, invited bidding or inquiry to negotiate a price is carried out, whole bidding process mainly comprise range set of giving out a contract for a project, bid application, ask agreed-upon price record makes a report on, report on the evaluation of tenders and intend certainly bag data input, certainly steamed bun mesh unit price input, bid six management and control points of result notice, each process is processed by each page of difference according to way of bidding respectively, bid document are carried out templating and are processed, ensure the standardization of bid document, reduce legal risk;
2, contract is set up and change management: comprises engineering contract and drafts and basic document typing, modification of contract two management and control points of input, contract basic document and amount of money alteration carry out implement examination & verification control, and as the support data for expenses management, it is ensured that pay the bill according to contract;Contract uses templating establishment simultaneously, it is ensured that contract text specification, reduces legal risk.
Quality management module:
1, quality management benchmark is filed maintenance: for the regulation and standardization of engineering quality control, according to country, the construction that local and industry is existing and acceptance specification, sets up, safeguards and renewal project quality control form;For critical process, keypoint part, set up and the management table of maintenance engineering qualifying point;
2, Construction in Preparatory Stage quality document is reported to a higher authorities for approval: before engineering project goes into operation, inputting, audit and preserve Design of Construction Organization (special construction plan), survey control measure (supervision regulations) and quality plan (quality planning), technology for full preparation is carried out in the enforcement smoothly for engineering project;
3, engineering material, component and fitting and equipment site acceptance: by preoperation inspection, check and accept and audit, guarantee that constituting the material of engineering entity, component and fitting and equipment meets the requirement of design drawing and specification, when the effective unit weight of portion of material of marching into the arena (such as reinforcing bar, section bar) there are differences, system prompt related personnel adjusts material budget;
4, inspection of engineering quality control point: the significant points of engineering project, critical process, according to schedule prepared in advance, can be set qualifying point and fill in corresponding audit report in system, it is simple to strictly control during management in system;
5, acceptance of engineering quality: the construction existing according to country, place and industry and acceptance specification, extracts the quality form that benchmark is set up in system, fills in, reports to a higher authorities for approval, preserves and prints acceptance of engineering quality and check result, provides basic data for management of graphics file and document;
6, construction quality abnormality processing: dispose the various abnormal quality situations occurred in work progress, prevent, stop the generation of quality accident, provides basic data for evaluating contractor unit.
Expenses management module:
1, expenses management: mainly comprise promise breaking withhold standard care, promise breaking withhold data input, engineering subsidy or reward application input, engineering cost estimate test input, engineering stop payment input with release, engineering retention money maintenance six management and control pages, it is achieved the technical confirmation of the amount of money payable to expense;
2, project payment pay: comprise engineering borrow temporarily money, engineering predication, to paying by check, engineering quality guarantee gold four types payment, the setting of four kinds of Payment Types can the payment of various contracts in flexible adaptation engineering, what employing invoice abatement entry and invoice were reported and submitted simultaneously simultaneously tests to paying by check mode and estimating of engineering cost management, it is ensured that the correctness of invoice to account and promptness;
3, initial stage data import: in view of the situation of the contract that whole system occurred before placement process, collect relevant payment information, by this page import system, it is ensured that contract is properly functioning before by this page and relevant form.
Fixed assets are carried down module:
1, prerotation notice: when meeting the fixed assets prerotation condition of system regulations, budgeter carries out valuation in fixed assets prerotation Notifications page to Construction And Install Ation Cost, Finance Department carries out valuation to original equipment cost, engineering construction other and interest and first for Master Cost, and handles fixed assets and carry down in advance;
2, fixed assets are carried down: when the final account for completed project examination of engineering contracts all under engineering project completes the most, system automatically extracts " engineering construction other expense and interest ", " building installation engineering expense ", " original equipment cost ", and expense can be decomposed by entr screen according to solid requirement that turn of fixed assets, merge by operating personnel;System is automatically performed " equipment fixed assets catalog (need not install) ", " equipment fixed assets catalog (needing to install) ", " house fixed assets catalog ", " structures fixed assets catalog ", the filling and presenting of " pipeline groove fixed assets catalog " list of carrying down according to above-mentioned process of work, completes work of carrying down.
Site construction management module:
1, engineering material is alternative reports to a higher authorities for approval: examines, examine whether MAT'L substitution meets design and code requirement;
2, on-the-spot temporary facility scheme is reported to a higher authorities for approval: before temporary facility is built, the temporary facility scheme that examination & approval unit in charge of construction reports, it is simple to temporary facility is unified to be arranged and management;
3, on-the-spot special construction work permit is reported to a higher authorities for approval: the on-the-spot special construction work permit of examination & approval, it is to avoid, reduce other construction areas and the impact of production;
4, construction site management is withholdd output: after Practical Completion, level, attitude and the rectification dynamics managed at the construction field (site) according to unit in charge of construction, and the suggestion of incorporation engineering project management each side, the promise breaking appraising and deciding construction site management is finally withholdd;
5, job site checks: the situations such as " material transit depots ", " territory, office and living quarter ", " defendance integrated management " and " job site operation " that preserves checks situation, disposes nonconformance.
Contract business administration module:
1, valuation of enterprise and management are contracted: comprise and contract enterprise qualification classification and safeguard, contract enterprise data editor, contract enterprise and stop asking or terminating dealing editor, all kinds of enterprise's data of contracting participated in system are carried out Classification Management, carry out contracting the classification of enterprise, the prompting preferentially selected or not use according to the evaluation and conventional achievement contracting enterprise simultaneously;
2, valuation of enterprise management is contracted, comprise contract valuation of enterprise personnel setting, evaluation index sets, contract valuation of enterprise input, contract valuation of enterprise result and report to a higher authorities for approval, contract five management processes of enterprise's result, this evaluates system and designs for all evaluation phases and the type of business, realize many people and certain is contracted individually evaluating and collecting scoring of enterprise, determining that this contracts the final grade of the evaluation of enterprise, for future, this selection contracting enterprise will provide reference frame.
Work peace environmental protection management module:
1, Construction in Preparatory Stage work peace environmental protection file is reported to a higher authorities for approval: before commencement of works, inputting and audit unit in charge of construction's safety assurance System Documents, dangerous matter sources, the safety and sanitation administrative provisions of construction unit, the safety measure etc. applying for illustrating and should take of getting angry that are existed job site inform contractor unit;
2, work peace green audit: preserve the work peace green audit situation of subsidiary's supervisory engineering department, safety management department and supervisor, dispose general nonconformance;
3, work peace environmental protection abnormality processing: dispose the work peace great abnormal conditions of environmental protection occurred in work progress, prevent, stop the generation of security incident, provide basic data for evaluating contractor unit;
4, the construction management of key production division: the construction of the key departments of subsidiary that come in and go out unit in charge of construction is managed, stops, in key production division, construction safety accident occurs, it is ensured that production management of key departments is perfectly safe;
5, work peace environmental protection scheme is reported to a higher authorities for approval: preserve and examine " special construction plan and Demonstration Report " that unit in charge of construction reports, " Safety Supervision scheme, detailed rules and regulations " that " work peace environmental protection accident scheme " and supervisor report.
Photo information module:
1, photo information filing classification is safeguarded: based on unified Data storage principle of classification, sets up filing classification platform, the basis collected as data;
2, engineering picture and text Data storage: all photo informations project uploaded in other module are automatically collected by filing classification and file, and check its integrity, as the foundation of the acceptance of work;As other modules do not upload related data, then uplink data is stored in system;
3, engineering achieves data management: check that the completion information delivering archives achieves situation, after completion of works, confirms to be stored in the architectural engineering archive of system and arranges the project file that specifies of specification and the most all achieve;
4, project file file consulting: according to authority the project file of consulting archive by unified classification.
Improvement module:
Project performance evaluation include from project decision, prepare, implement, be completed during the activity of evaluation of a certain stage or overall process, by the project implementation process, result and impact thereof being investigated and comprehensive system review, the target determined during contrast project decision and technology, economy, environment, social indicator, find out difference and change and analyze reason, summing up experience, propose countermeasure and suggestion, reach to improve investment decision level, the purpose of improved project management.
1, interim project performance evaluation: project intermediate evaluation is around the project implementation process, the change occurred with certain stage of project construction and impact thereof are for evaluating emphasis, servicing for adjusted iterm construction plan, group mainly comprises project decision Phase Evaluation, project preparation stage evaluation, project implementation phase evaluation and project completed papers evaluation;
2, overall performance appraisal: comprise self-appraisal and final evaluation reports two parts to a higher authorities for approval, after scoring terminates, according to appraisal report template establishment project performance evaluation report integrated in system.
Integrated management and enquiry module:
1, integrated management: currently comprise the engineering chronicle of events, engineering liaison, year key project setting, the main comprehensive affairs processed during engineering is carried out;
2, managerial report: according to the engineering management report form that engineering is current, part data are directly provided by engineering system, then carried out supplementing under partial line by subsidiary and formed after data, measure simultaneously in the statistical work that reduces a staff, it is ensured that the concordance of each managerial report each moon;
3, supervisor's form: devise engineering form essential information arrange, unified two pages of the page of downloading of engineering form for managing all supervisor's forms, periodically according to importing the corresponding form of template generation after the importing of template can be carried out;
4, comprehensive inquiry: collect intrasystem data, the data directly recorded in page display system according to querying condition;Currently comprise engineering basic condition inquiry (set up the project, design), (contract, expense), (progress, quality) three pages;
5, standard criterion data management: catalogue and data to engineering specification specification materials are uploaded and safeguarded, and realize checking the file uploaded online;
6, daily inquiry: be integrated into modules, it is achieved the inquiry of regular job personnel needs.
Verify and difference module:
1, reflection in time and the feedback to systematical difference: the difference kind being likely to occur during definition management engineering management and entry, by automatic monitoring, the person liable that difference is sent to by system when difference occurs be correlated with automatically processes and enters system pipes system and ensures that engineering the feedback in time of difference occurs and processes;
2, technical interior self-inspection/special project is verified: engineering project carries out self-inspection and the special management verified, verifying director and notify that the relevant item director related to arranges verifying required information, project leader must be at the appointed time according to requiring that arrangement related data is to be checked;Verify director relevant verification working result is summarized and is saved into system.
Entitlement management module:
1, process settings: the management and control page setup important to some auditing flow, the only person approving in auditing flow are audited by rear, is just considered as this data relevant information and uses as the formal information of other pages, or follow-up operation just can perform;
2, rights management: according to can authorizing the operation that the page performs, when user enters each page, the authority of this user is judged by system, limits the operation behavior of user, it is ensured that user can not unauthorized operation.
The templating application of document:
1, can realize any need templating file fill in control;
2, realize and contract template, bid template, the templating of engineering GB quality inspection form are filled in and filled in online and audit.
The management of project design overall process:
1, the management of the overall process of project design (include reconnoitring, can grind, Preliminary design, construction drawing design) is realized;
2, the management of engineering design liaison and design alteration is realized;
3, the management of engineering design data is realized;
4, design data and the management of process introduced projects in engineering design is realized.
The management of the overall process of construction investment:
1, a kind of framework setting up the general standard schedule specific item of enterprises and labor and materials benchmark is realized;
2, the engineering project first control mode for material is set up;
3, establishment and and the output of inventory of giving out a contract for a project of preliminary budget are realized;
4, the clearing of engineering project progress and the information process-of final account for completed project operation are realized;
5, four kinds of types of payment (advance payment, the money that borrows temporarily, to ticket payment, quality guarantee gold) are set, it is achieved the payment of all contracts of engineering project processes.
The management of the construction enterprises of Engineering Project Implementation overall process:
1, realize contracting the control that enterprise signs a contract and participates in bid;
2, realize contracting editor and the amendment of the basic document of enterprise;
3, realize contracting the evaluation procedure of enterprise and the management of result.
The evaluation of engineering project performance:
1, realize including from project decision, prepare, implement, be completed during the on-line evaluation in single stage;
2, the evaluation to engineering project overall process is realized.
The setting of system exception, automatically prompting and process are followed the tracks of:
1, the exception realizing system sets, and after setting, system is monitored automatically, and as found qualified exception, system is prompted to the person liable being correlated with automatically;
2, after abnormal appearance, system will process this exception from motion tracking, according to the rule prompting responsible person concerned set, until abnormality processing is complete.
The inquiry of engineering project key data and be periodically generated form according to template:
1, engineering management form (during Engineering Project Implementation, management is used), engineering comprehensive form (the collecting form of incorporation engineering system data), supervisor's form (for being responsible for the form of decision-making) are comprised;
2, engineering supervisor form achieves and is periodically generated according to template and regularly sends.
Realize the setting of page operation authority and auditing flow:
1, realize the page to authorize according to the behavior of operation, after only authorizing certain operation behavior after just the corresponding page can be increased newly, the operation behavior such as deletion;
2, the operation behavior realizing each page can be defined respectively;
3, realizing page function and increase flow process examination & verification, after having performed flow process examination & verification, the data of this page just formally can use in system.
Embodiment two:
See Fig. 4, Fig. 5, in the present embodiment, a kind of online management method of engineering project, mutual personnel carry out communication for information according to a remote interaction platform, and described remote interaction platform includes a server-side computer system 1, budget end computer installation 2, multiple contracts enterprises end computer installation 3, multiple evaluation end computer installation 4, application end computer installation 5, multiple end computer installation 6, multiple examination & verification end computer installation 7 of submitting to a higher level for approval or revision;Described server-side computer system, budget end computer installation, contract enterprises end computer installation, evaluate end computer installation, application end computer installation, end computer installation of submitting to a higher level for approval or revision, examination & verification end computer installation are in a wan environment and realize network and connect, described wan environment is net territory based on INTERNET environment, and described server-side computer system includes database server 8, web application server 9 and the software matched with described server-side computer system;Described budget end computer installation, contract enterprises end computer installation, evaluate end computer installation, application end computer installation, end computer installation of submitting to a higher level for approval or revision, examination & verification end computer installation are separately installed with engineering project management software.
In the present embodiment, a preferred disposition of the computer installation used is as follows:
Server-side computer system employing rack-mount server:
CPU frequency double-core more than 3000 megahertzs;
More than internal memory 1G;
SCSI more than hard disk 60GB;
Network interface capabilities 1000M.
Budget end computer installation:
CPU frequency more than 1500 megahertzs;
Internal memory more than 512,000,000;
More than SATA hard disc 40GB;
Network interface capabilities 100M;
128000000 display cards.
Contract enterprises end computer installation:
CPU frequency more than 1500 megahertzs;
Internal memory more than 512,000,000;
More than SATA hard disc 40GB;
Network interface capabilities 100M;
128000000 display cards.
Evaluation end computer installation:
CPU frequency more than 1500 megahertzs;
Internal memory more than 512,000,000;
More than SATA hard disc 40GB;
Network interface capabilities 100M;
128000000 display cards.
Application end computer installation:
CPU frequency more than 1500 megahertzs;
Internal memory more than 512,000,000;
More than SATA hard disc 40GB;
Network interface capabilities 100M;
128000000 display cards.
Submit to a higher level for approval or revision end computer installation:
CPU frequency more than 1500 megahertzs;
Internal memory more than 512,000,000;
More than SATA hard disc 40GB;
Network interface capabilities 100M;
128000000 display cards.
Examination & verification end computer installation:
CPU frequency more than 1500 megahertzs;
Internal memory more than 512,000,000;
More than SATA hard disc 40GB;
Network interface capabilities 100M;
128000000 display cards.
In the present embodiment, server-side computer system designs based on multistage server structure, has the characteristic such as across a network, distributed, dynamic equalization, data distribution, can be with stable operation on Windows or Linux platform, by expansion service device, it is allowed to more user is online.Owing to server-side computer system uses server cluster, there is the characteristic such as fault recovery, Dynamic Thermal backup, it is thus possible to provide the user round-the-clock continual service.
Server-side computer system in the present embodiment uses distributed server architecture, support tree-shaped and netted two kinds of server erecting structures, fault-tolerant by multilevel distributed master, multipoint communication service device Hot Spare, efficiently avoid from structure because single server fault, the whole system caused is paralysed.
In the present embodiment, mutual personnel include: contract the staff of enterprise, auditor, the staff of competitive bid unit, participate in pricer person, project director, supervisor of construction, contract management personnel, construction budget person.Described engineering project management software uses the program of OracleADF Development of Framework, and it has carried out further optimization and encapsulation to MVC framework, and foreground exploitation is provided substantial amounts of visualization component, facilitates layout and the displaying of content of pages.Contract the staff of enterprise, the staff of competitive bid unit, participate in pricer person, project director, supervisor of construction, contract management personnel, construction budget person, auditor according to the login account login service device end computer system distributed, server-side computer system is verified according to logging in account number, and gives corresponding use identity and operating right.
In the present embodiment, the step of described online management is:
The online bid of engineering project, bid, the assessment of bids
In the present embodiment, each operated by personnel one contracting enterprise contracts enterprises end computer installation and carries out application for registration, by auditor, this application for registration is audited, being set as qualified enterprise of contracting by the enterprise of contracting of examination & verification, qualified enterprise of contracting can carry out bidding document with login system and checks, downloads bid document, uploads the operations such as tender documents.Contracting enterprises registration list, bid application list, report on the evaluation of tenders and plan certainly bag list etc. will be through examination & verification approval, can be through one-level examination & verification approval or multistage auditing approval according to different auditing flow mechanism, an auditor is appointed in every one-level examination & verification, and competitive bid unit is that every auditor distributes an examination & verification end computer installation.
A, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and send one to described web application server and contract enterprises registration request, described web application server receives described after contracting enterprises registration request, sends one contract enterprises registration list to described enterprises end computer installation of contracting;Described contracts the file that enterprises registration list is html format.
In the present embodiment, described enterprises registration request of contracting is the XMLHttpRequest request that the AJAX program by contracting in enterprises end computer installation sends, and AJAX program is independent of browser and interaction platform;AJAX program is a kind of web application for creating the most faster and interactivity is higher, pass through AJAX, JavaScript can use the XMLHttpRequest object of JavaScript directly to communicate with server-side computer system, and JavaScript can be in the situation of not reload page and server-side computer systems exchange data.In the present embodiment in steps in be previously mentioned request identical with the content disclosed in this step, refer to this step disclosure and understand, be not repeated description.
B, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and contract the essential information of enterprise according to the described project correspondence input arranged in enterprises registration list of contracting and contract the qualification information of enterprise;The described essential information contracting enterprise includes enterprise name information, type of business information, organization mechanism code or identification card number information, issuing bank information;The described qualification information contracting enterprise includes qualification name information, qualification type information, qualification grade information, qualification certificates information.
In the present embodiment, enterprise's numbering one hurdle in contracting enterprises registration list inputs organization mechanism code or identification number, in described database server, the data of this field are arranged to unique major key, ensure that contracting enterprise for one can only register an account, it is achieved contract the uniqueness management of enterprise.Wherein enterprise name, the type of business, enterprise's numbering, issuing bank information are required item, contract and also include in enterprises registration list that partnership, purpose are contracted the choosings such as region and filled out item.The information such as the qualification type of enterprise, qualification title, qualification grade of contracting can select input from the list of systemic presupposition.
C, contracting the enterprises end computer installation of contracting described in the operated by personnel of enterprise and will fill in complete enterprises registration list of contracting and be sent to described web application server, described web application server is called AM method and is saved in described database server by described enterprises registration list of contracting.
D, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and send a request of submitting to a higher level for approval or revision contracting enterprises registration list to described web application server, the described request of submitting to a higher level for approval or revision contracting enterprises registration list is resolved by described web application server, call AM method from described database server, select qualified enterprises registration list of contracting, and the enterprises registration list of contracting chosen is sent to described examination & verification end computer installation.
In the present embodiment, the request of submitting to a higher level for approval or revision is resolved by described web application server by internal servlet container, servlet container is the java application of a kind of server end, has the characteristic independent of platform and agreement, can generate dynamic Web page.It takes on the intermediate layer of client's request (Web browser or other Http CLIENT PROGRAM) and server response (data base on Http server or application program).
E, auditor operate described examination & verification end computer installation and audit the log-on message contracted in enterprises registration list chosen, and auditing result is sent to described web application server;Described web application server is called AM method and will be contracted in Enterprise Lists to the most qualified by the company information interpolation of contracting of examination & verification, will not add the most pending contracting in Enterprise Lists by the company information of contracting of examination & verification.
In the present embodiment, the log-on message contracting enterprise is investigated by auditor by the technological means such as phone, network, finally determines that this contracts whether enterprise passes through examination & verification, and auditing result has by examination & verification with not by auditing;Give the qualified identity contracting enterprise by the enterprise of contracting of examination & verification and check bid information, download bid document, upload the authority of bidding document, do not give the pending identity contracting enterprise by the enterprise of contracting of examination & verification and check current the most by the state of examination & verification, the authority of checking the log-on message made a report on.
The essential information that F, the web application server described in operated by personnel of competitive bid unit call for bid according to the project correspondence input arranged in bid application list, then create bid document according to the bid document masterplate selected, finally according to project correspondence input assessment of bids project, weight, the benchmark score value arranged in bid grade form, upload Bid Evaluation Method;The essential information of described bid includes way of bidding, assessment of bids mode, the preliminary budget amount of money, mode of giving out a contract for a project, predetermined tender out date;Described web application server is called AM method and is saved in described database server by described bid application list;Described bid application list is the file of html format.
In the present embodiment, according to local bidding Management regulations and bid document specification, creating multiple bid document masterplate, competitive bid unit creates bid document according to bid document masterplate, it is ensured that the standardization of bid document online editing and the suitability;Bid document masterplate can increase or reduce.The staff of competitive bid unit can be according to the project correspondence input bidding content arranged in bid masterplate.Bid masterplate is and the e-file of paper bid document same format.
In the present embodiment, assessment of bids scheme is divided into commercial bid scoring and technical bid to mark, commercial bid mark+technical bid mark=100;Bid is different according to bidding content every time, and commercial bid and technical bid all can be arranged multinomial standards of grading and mark.Wherein commercial bid scoring item includes construction site management personnel, engineering construction scheme, enterprise construction qualification, construction schedule, the measure of guarantee duration, quality assurance measure, competitive bid unit business conventional to tenderer and the satisfaction of investigation;Commercial bid scoring weight accounts for 70%, and technical bid scoring weight accounts for 30%;I.e. commercial bid gross score 70 points, technical bid gross score 30 points.
Described bid application form single-shot is given described examination & verification end computer installation by G, the web application server described in operated by personnel of competitive bid unit, auditor operates described examination & verification end computer installation and audits the information on bidding in described bid application list, the information of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the bid application form monolock in described database server is fixed.
Enterprises end computer installation of contracting described in H, the qualified operated by personnel contracting enterprise sends the inquiry request of a bid application list to described web application server, the inquiry request of described bid application list is resolved by described web application server, call AM method from described database server, select qualified bid application list, and the bid application form single-shot chosen is given described contract enterprises end computer installation.
The bid document contracted in the bid application list described in the download of enterprises end computer installation described in I, the qualified operated by personnel contracting enterprise and the tender documents masterplate of correspondence, contract and contract enterprises end computer installation according to the project correspondence input bid information and quotation information arranged in tender documents masterplate described in the operated by personnel of enterprise, and will fill in complete tender documents and be sent to described web application server;Qualified contract that enterprise can download bid document, file is answerred questions in bid, the bid corrigendum electronic bits of data such as file.Described tender documents are the files of html format.
Quotation information in described tender documents is collected by J, the web application server described in operated by personnel of competitive bid unit, askes agreed-upon price essential information, quotation information, inquiry agreed-upon price record information according to asking the project correspondence input arranged in agreed-upon price list;Described web application server is called AM method and be will fill in complete inquiry agreed-upon price list and be saved in described database server;The operation that collects to the quotation information in tender documents includes: generates certain quote data by the way of importing and manually change combines, respectively contract enterprise's lowest bid to each specific item according to quotation information contrast, draws agreed-upon price.Ask agreed-upon price list and can preserve repeatedly inquiry agreed-upon price record.Ask the file that agreed-upon price list is html format.
K, the web application server described in operated by personnel of competitive bid unit calculate assessment of bids basis quote, and the computing formula of assessment of bids basis quote is:,N≤5;Wherein Ai be each qualified contract the offer by tender of enterprise, N is that participate in submitting a tender qualified contracts the quantity of enterprise, A is the preliminary budget amount of money that competitive bid unit determines;Web application server described in the operated by personnel of competitive bid unit calculates the deviation value between each qualified quotation contracting enterprise and assessment of bids basis quote: P=Ai-C;Calculate assessment of bids PTS according to commercial bid total price scoring formula: BF=Q-(P × 100 × ∏ × δ), wherein ∏ be conversion score value, δ be assessment of bids Term Weight, Q be assessment of bids basis point.
In the present embodiment, rationally, offer by tender has not been limited to criterion with width under the base number of a tender of competitive bid unit, is otherwise considered as abandoned tender for, investment feasible with the design advanced person of tenderer.Select " formula integrated according to system calculates " in the grade form of bid application list, then system calculates assessment of bids score automatically according to the quotation contracting enterprise.Weight coefficient (percent) in the formula of above-mentioned calculating assessment of bids score be competitive bid unit staff according to working experience bid application list in set empirical data, contract the offer by tender A of enterpriseiIt is to read the quotation information in the tender documents uploaded.The grade form of bid application list also sets another kind of marking mode, manually marks according to being set in the Bid Evaluation Method uploaded.
Commercial bid scoring (weight accounts for 70%): the M%(weight of the maximum that the arithmetic mean of instantaneous value (weight takes N1%) after the offer by tender addition of each effective Bid people determines with competitive bid unit takes N2%) sum.The computing formula of assessment of bids basis quote:;Wherein AiBe each qualified contract the effectively quotation of enterprise, N is the qualified quantity contracting enterprise participating in submitting a tender, N≤5, A be the preliminary budget amount of money that determines of competitive bid unit, M be to set coefficient, the span of M is 60~100, N1, N2 are two weight coefficients, N1+N2=100.
Commercial bid total price scoring formula: BF=Q-(P × 100 × ∏ × δ), wherein BF be the quotation score of effective Bid people, ∏ be conversion score value, δ be assessment of bids Term Weight, Q be assessment of bids basis point, P be assessment of bids basis quote deviation value.
It is exemplified below: civil engineering comprehensively takes expense A1Quotation is 4%;A2Quotation is 5%;A3Quotation is 6%, and the maximum A that competitive bid unit determines is 7%.
The computational methods of assessment of bids basis quote C are: (4%+5%+6%) ÷ 3 × 50%+7% × 70% × 50%=4.95%;Wherein M=70, N1=50, N2=50;
Assessment of bids basis quote deviation value P computational methods are as follows:
A1Deviation value be: A1-C=4%-4.95%=-0.95%;
A2Deviation value be: A2-C=5%-4.95%=0.05%;
A3Deviation value be: A3-C=6%-4.95%=1.05%。
According to bid grade form, the proportionate relationship of 1% correspondence 12 points, conversion score value is 12, and the scoring event of the most each offerer is as follows:
A1Must be divided into: Q-(P × 100 × Π × δ)=60-(-0.95% × 100 × 12 × 60%)=66.84;
A2Must be divided into: Q-(P × 100 × Π × δ)=60-(0.05% × 100 × 12 × 60%)=59.64;
A3Must be divided into: Q-(P × 100 × Π × δ)=60-(1.05% × 100 × 12 × 60%)=52.44.
Illustrate:
(1) the determination principle of expense Project Bidding Evaluation basis quote C is comprehensively taken: it is 7% that civil engineering comprehensively takes expense maximum, virtual minimum lower limit set is 3%, then maximum is 5% with the intermediate value of virtual minimum lower limit, therefore the 70% of maximum 7% is taken as conversion factor (7% × 70% is 4.9%, close to the intermediate value of maximum Yu virtual minimum lower limit);Installing that comprehensively to take expense maximum be 50%, virtual minimum lower limit set is 20%, then the intermediate value of maximum and virtual minimum lower limit is 35%, therefore takes the 70% of maximum 50% as conversion factor (50% × 70% is 35%).
(2) conversion score value determines that principle is that maximum divides corresponding scoring item benchmark score value equally with the percent difference of virtual minimum lower limit.
L, the web application server described in operated by personnel of competitive bid unit generate report on the evaluation of tenders according to each qualified assessment of bids PTS contracting enterprise and intend certainly bag list, and described report on the evaluation of tenders and plan certainly bag list are sent to described examination & verification end computer installation.
M, auditor operate described examination & verification end computer installation and audit described report on the evaluation of tenders and plan certainly bag list, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and described report on the evaluation of tenders and plan certainly bag list is saved in described database server locking.
N, the web application server described in operated by personnel of competitive bid unit set up the project correspondence input tender price put according to certainly steamed bun mesh schedule of rates and info quote time is other, and described web application server is called AM method and is saved in described database server by described certainly steamed bun mesh unit price list.
In the present embodiment, consistent with the price asking quotation of negotiating a price that calls for bid in order to ensure the price of reality clearing during contract signing, by certainly steamed bun mesh schedule of rates single input tender price, choose info quote time according to the inquiry agreed-upon price record information ask in agreed-upon price list other as benchmark price, then simply change on the basis of benchmark price and preserve.
O, the web application server described in operated by personnel of competitive bid unit according to report on the evaluation of tenders and intend certainly bag list and certainly steamed bun mesh unit price list generation notice on bid winning and acceptance of the bid result notice, and notice on bid winning is sent to middle target contracts enterprise, acceptance of the bid result notice is sent to target in and contracts enterprise.
The on-line evaluation contracting enterprise of engineering project
In the present embodiment, needing the evaluation contracting enterprise to be participated in evaluating by multiple evaluation personnel, unit is that each evaluation personnel assignment one evaluation end computer installation completes to evaluate operation every time.The selected of evaluation personnel is responsible for by evaluating establishment officer, evaluates establishment officer and operates an end computer installation of submitting to a higher level for approval or revision and complete that valuation of enterprise request is contracted in proposition, valuation of enterprise application list is contracted in establishment, the operations such as Enterprise Integrated evaluates list, list is submitted to a higher level for approval or revision are contracted in establishment.Unit sets up only level to audit (auditor) or multistage auditing (several auditor) according to size and the hierarchical structure of scale, distributes an examination & verification end computer installation for every auditor.
Submitting to a higher level for approval or revision end computer installation described in A, the operation of evaluation establishment officer sends one to described web application server and contracts valuation of enterprise application request, described web application server receives described after contracting valuation of enterprise application request, sends one to described end computer installation of submitting to a higher level for approval or revision and contracts valuation of enterprise application list;Described valuation of enterprise application list of contracting is the file of html format.
Submitting to a higher level for approval or revision end computer installation described in B, the operation of evaluation establishment officer contracts essential information and the evaluation criterion information of valuation of enterprise application list according to the described project correspondence input arranged in valuation of enterprise application list of contracting, and the described essential information contracting valuation of enterprise application list includes contracting enterprise name information, PN, evaluation type information, evaluation establishment officer information, evaluating personnel's list information;The described evaluation criterion information contracting valuation of enterprise application list includes Basic Evaluation project information, special assessment item information, positive or negative points project information.
In the present embodiment, evaluate and lists of persons sets three evaluate personal informations, evaluate personal information for every and include appraiser employee number, evaluate personnel's name, position, be mainly responsible for content;Evaluate type option and be set with " evaluation of being shortlisted for ", " special evaluation ", " be completed and evaluate ".
In the present embodiment, Basic Evaluation project information includes assessment item title, benchmark score value and scoring explanation, and benchmark score value is the best result of corresponding Basic Evaluation project.
In the present embodiment, special assessment item information includes assessment item title, benchmark score value and scoring explanation, and benchmark score value is the best result of corresponding special assessment item.
In the present embodiment, positive or negative points project information includes assessment item title, attribute, benchmark score value and scoring explanation, and benchmark score value is the best result of corresponding positive or negative points project.
Described valuation of enterprise application form single-shot of contracting is given described web application server by the submitting to a higher level for approval or revision end computer installation described in C, the operation of evaluation establishment officer, and described web application server is called AM method and is saved in described database server by described valuation of enterprise application list of contracting.
Submitting to a higher level for approval or revision end computer installation described in D, the operation of evaluation establishment officer sends a request of submitting to a higher level for approval or revision contracting valuation of enterprise application list to described web application server, the described request of submitting to a higher level for approval or revision contracting valuation of enterprise application list is resolved by described web application server, call AM method from described database server, select qualified valuation of enterprise application list of contracting, and give described examination & verification end computer installation by the valuation of enterprise application form single-shot of contracting chosen.
In the present embodiment, servlet container is the java application of a kind of server end, has the characteristic independent of platform and agreement, can generate dynamic Web page.It takes on the intermediate layer of client's request (Web browser or other Http CLIENT PROGRAM) and server response (data base on Http server or application program).
E, auditor operate the described examination & verification end computer installation essential information contracted in valuation of enterprise application list to choosing and evaluation criterion information is audited, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and is determined by the valuation of enterprise application form monolock of contracting in described database server.
F, described web application server contract valuation of enterprise list according to the evaluation criterion information creating contracted in valuation of enterprise application list of examination & verification approval, and described is contracted each evaluation personnel that valuation of enterprise list is sent simultaneously in described evaluation personnel's list information set;Described contracts the file that valuation of enterprise list is html format.
G, each evaluation personnel operate respectively one evaluate end computer installation receive described in contract valuation of enterprise list, contract the evaluation criterion information correspondence input arranged in valuation of enterprise list contract valuation of enterprise data according to described;And described valuation of enterprise data of contracting are sent to described web application server, described web application server is called AM method and described valuation of enterprise data of contracting is saved in described database server;Described valuation of enterprise data of contracting include Basic Evaluation project score, special assessment item score, positive or negative points project score;In the present embodiment, having three evaluation personnel to participate in contracting valuation of enterprise, described web application server receives three groups altogether and contracts valuation of enterprise data.
Submitting to a higher level for approval or revision end computer installation described in H, the operation of evaluation establishment officer sends an inquiry request contracting valuation of enterprise data to described web application server, the described inquiry request contracting valuation of enterprise data is resolved by described web application server, call AM method from described database server, select qualified valuation of enterprise data of contracting, and the valuation of enterprise data of contracting chosen are sent to described end computer installation of submitting to a higher level for approval or revision.
Submitting to a higher level for approval or revision end computer installation described in I, the operation of evaluation establishment officer sends one to described web application server and contracts Enterprise Integrated evaluation request, described web application server receives described after contracting Enterprise Integrated evaluation request, sends one to described end computer installation of submitting to a higher level for approval or revision and contracts Enterprise Integrated and evaluate list.
J, evaluate the submitting to a higher level for approval or revision end computer installation described in establishment officer's operation and go out to contract Enterprise Integrated evaluating data according to the valuation of enterprise data summarization of contracting chosen, evaluate the project correspondence arranged in list and input according to described Enterprise Integrated of contracting and contract Enterprise Integrated evaluating data;And described Enterprise Integrated evaluating data of contracting is sent to described web application server, described web application server is called AM method and is saved in described database server by described Enterprise Integrated evaluating data of contracting;Described Enterprise Integrated evaluating data of contracting includes evaluating top score, evaluating minimum score, evaluation average, qualitative evaluation grade.
In the present embodiment, evaluate the end computer installation of submitting to a higher level for approval or revision described in establishment officer's operation and carry out contracting the establishment operation pages of Enterprise Integrated evaluation list, click on " overall merit " Shipping Options Page, evaluate top score according to the project input set, evaluate minimum score, evaluation average, qualitative evaluation grade.First contract valuation of enterprise data according to choose three groups to calculate three respectively and contract valuation of enterprise PTS, contract valuation of enterprise PTS=Basic Evaluation project score+special project assessment item score+positive or negative points project and add score-positive or negative points project and subtract score;Contract valuation of enterprise PTS for relatively three to obtain evaluating top score and evaluating minimum score, three are contracted the addition of valuation of enterprise PTS and obtains evaluating average divided by three again, select corresponding qualitative evaluation grade according to evaluating average.Qualitative evaluation grade be set as excellent, good, can, bad;Qualitative evaluation grade and the relation evaluated between average be: excellent: 90~100, good: 71~89, can: 60~70, bad: 0~59.
Submitting to a higher level for approval or revision end computer installation described in K, the operation of evaluation establishment officer sends a request of submitting to a higher level for approval or revision contracting Enterprise Integrated evaluating data to described web application server, the described request of submitting to a higher level for approval or revision contracting Enterprise Integrated evaluating data is resolved by described web application server, call AM method from described database server, select qualified Enterprise Integrated evaluating data of contracting, and the Enterprise Integrated evaluating data of contracting chosen is sent to described examination & verification end computer installation.
L, auditor operate described examination & verification end computer installation and audit the Enterprise Integrated evaluating data of contracting chosen, by examination & verification approval information be sent to described web application server, described web application server call AM method according to examination & verification approval the qualitative evaluation level adjustment contracted in Enterprise Integrated evaluating data described in database server in contract goodwill grade.During for giving out a contract for a project, signing a contract, optimum selecting is contracted enterprise and is provided data support.
In the present embodiment, described goodwill grade of contracting is set as " being preferentially shortlisted for ", " access enterprise ", " enterprise undetermined ", " not access enterprise ";Described goodwill grade of contracting with the relation of described qualitative evaluation grade is: excellent-" being preferentially shortlisted for ", good-" access enterprise ", can-" enterprise undetermined ", bad-" not access enterprise ".
Work out an engineering project schedule online
In the present embodiment, engineering project is all based on unified coding rule and carries out structural analysis, depth requirements according to actual progress target management and control, select to meet the hierarchical structure of progress control, and give unique engineering coding according to rule by each level schedule objective simultaneously, generate engineering coded data table and be saved in database server.Described engineering coded data table stores all of engineering coding reported to a higher authorities for approval and passed through.The next stage of each engineering project includes many sub-engineerings, and the next stage of every sub-engineering includes again multi-mode operation.
A, project director sends an engineering project inquiry request by described end computer installation of submitting to a higher level for approval or revision to described web application server, the engineering project inquiry request received is resolved by the servlet container in described web application server, call in AM method engineering coded data table from described database server search to be suitable for the engineering of this engineering project and encode and generate engineering coding schedule monofile, many sub-project codes in this engineering project are had described in described engineering coding schedule monofile, multiple operational codes, described engineering coding schedule monofile is sent to described end computer installation of submitting to a higher level for approval or revision by described web application server.
In the present embodiment, there is all engineerings coding being suitable for this engineering project described in described engineering coding schedule monofile;The inquiry of described engineering project can be to be inquired about by the Business Name belonging to this engineering project and engineering project title.
B, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision, sequentially input the schedule data of each operation according to the operational code in described engineering coding schedule monofile, the schedule data of input are converted into Gantt chart graph data by gantt.js plug-in unit in real time;The schedule data of each operation include the linking relationship between operational code, ps, plan completion date, duration, and the schedule data of every operation, arrange the priority level of each operation;First project director selects operational code from engineering coding schedule monofile, then passing through keyboard or select input ps, the plan completion date from calendar list, end microcomputer device of submitting to a higher level for approval or revision calculates the duration automatically according to ps and plan completion date.
In the present embodiment, the schedule data of every operation can be inputted by gantt.js plug-in unit, milestone operation is set, the priority of each operation is set, and the linking relationship between the schedule data of every operation, and show on Gantt chart.After performing to preserve order, XML format file can be exported.Linking relationship between the schedule data of described every operation includes: two operations need to go into operation simultaneously, i.e. " starts-start " linking relationship;One operation could start another operation after completing, i.e. " completes-start " linking relationship;Two operations need to complete simultaneously, i.e. " complete-complete " linking relationship.
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and the schedule data of each operation are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls AM method and the schedule data in XML format file is saved in the schedule tables of data in described database server.
In the present embodiment, servlet container is the java application of a kind of server end, has the characteristic independent of platform and agreement, can generate dynamic Web page.It takes on the intermediate layer of client's request (Web browser or other Http CLIENT PROGRAM) and server response (data base on Http server or application program).
D, project director send a request of submitting to a higher level for approval or revision by described end computer installation of submitting to a higher level for approval or revision to described web application server, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified schedule data, and schedule data composition XML format file is sent to described examination & verification end computer installation.
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the schedule data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, and described web application server is called AM method and the schedule tables of data in described database server locked.
The online tracing of engineering project progress performance
A, project director send an engineering project inquiry request by described end computer installation of submitting to a higher level for approval or revision to described web application server, the engineering project inquiry request received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified construction program data, and construction program data composition XML format file is sent to described end computer installation of submitting to a higher level for approval or revision.
B, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision, and sequentially input the actual progress data of each operation, and the actual progress data of input are converted into Gantt chart graph data by gantt.js plug-in unit in real time;The actual progress data of each operation include that operational code, actual starting date, current period actually accomplish percentage ratio, actual finish date.
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and the actual progress data of each operation are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls AM method and the actual progress data in XML format file is saved in the actual progress tables of data in described database server.
D, project director hold computer installation to the request of submitting to a higher level for approval or revision of described web application server by described submitting to a higher level for approval or revision, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified actual progress data, and actual progress data composition XML format file is sent to described examination & verification end computer installation.
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the actual progress data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, and described web application server is called AM method and the actual progress tables of data in described database server locked;Meanwhile, the actual progress data in actual progress tables of data can be synchronized in schedule tables of data.
Engineering project progress abnormal response and process
A, described web application server regular star up engineering follow-up program, check the actual progress abnormal conditions of each operation, i.e. in Gantt chart graph data, actual progress location point falls in the left side of check data location point, sends abnormal job information to described end computer installation of submitting to a higher level for approval or revision according to the abnormal alert level arranged;Can set alert level in project progress inspection program, when the actual progress of operation falls behind to a certain extent, exception job information can be sent to audit end microcomputer device by web application server automatically.
B, project director receive abnormal job information by described end computer installation of submitting to a higher level for approval or revision, call gantt.js plug-in unit abnormal job information is checked, project director is by described end computer installation input progress abnormality processing data of submitting to a higher level for approval or revision, and described progress abnormality processing data include progress declaration of exception, intend treatment measures, renewal ps, renewal plan completion date;Described abnormal job information includes: operational code, ps, plan completion date, abnormal prompt date, be not fully complete rate, progress abnormal cause, and above-mentioned abnormal job information is provided by server-side computer system.
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and described progress abnormality processing data are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls in the progress abnormality processing tables of data that the progress abnormality processing data in XML format file are saved in described database server by AM method.
D, project director hold computer installation to the request of submitting to a higher level for approval or revision of described web application server by described submitting to a higher level for approval or revision, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified progress abnormality processing data, and progress abnormality processing data composition XML format file is sent to described examination & verification end computer installation.
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the progress abnormality processing data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, described web application server call AM method the ps in the schedule tables of data in described database server is revised as update ps, be intended to the target date be revised as update the plan completion date.
The online engineering project quality that generates checks and accepts form
In the present embodiment, the acceptance of engineering quality formfile of engineering project is all based on what construction quality form benchmark catalogue carried out setting up, the corresponding one or more acceptance of engineering quality formfiles of each minimum level project in construction quality form benchmark catalogue.Construction quality form benchmark catalogue is made up of acceptance of engineering quality benchmark catalogue and inspection of engineering quality benchmark catalogue, and acceptance of engineering quality benchmark catalogue is that the requirement according to national project inspection of quality relevant law, laws and regulations requirement and the related specifications of place or industry is set up.Inspection of engineering quality benchmark catalogue is enterprise according to the engineering management of oneself becomes more meticulous degree and inspection project and the scope of examination that point of management control is formulated are unified into internal general style sheet.National project inspection of quality regulation and place or industry standard are exemplified below: a. " code for acceptance of construction quality of steel structures National Standard of the People's Republic of China ";B. " National Standard of the People's Republic of China's Code for Acceptance of Construction Quality of Building Energy-saving Engineering ";C. " code for acceptance of construction quality of conditioning works-National Standard of the People's Republic of China " (GB);D. " railway concrete engineering construction quality acceptance criteria " (industry standard);E. " Beijing's Apartment Decoration Quality acceptance criteria " (endemicity specification) etc..For meeting and adapting to different regulation, also there is the function that the acceptance of engineering quality form number under acceptance of engineering quality form benchmark catalogue carries out self-defined setting.
A, project director operates the inquiry request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality list of an engineering project to described web application server, the inquiry request of the acceptance of engineering quality list to receiving of the servlet container in described web application server resolves, call AM method from the data base of described web application server, search for the acceptance of engineering quality formfile being suitable for this engineering project according to construction quality form benchmark catalogue, described acceptance of engineering quality formfile is sent to described end computer installation of submitting to a higher level for approval or revision by described web application server, the described file that acceptance of engineering quality formfile is html format;The display graphical interfaces of described acceptance of engineering quality formfile is identical with the pattern of the acceptance of engineering quality form of printing made of paper, when country or provincial standard change, can be updated by the acceptance of engineering quality formfile preserved in the data base of change web application server.
B, project director operate described end computer installation of submitting to a higher level for approval or revision and described acceptance of engineering quality formfile are converted into acceptance of engineering quality forms pages file, and according to the project correspondence input acceptance of engineering quality data arranged in described acceptance of engineering quality forms pages file;The conversion of acceptance of engineering quality formfile can be completed by the acceptance of engineering quality Report Server Management software installed in end microcomputer device of submitting to a higher level for approval or revision, and opens an operation interface identical with the acceptance of engineering quality report style of printing made of paper for project director.Because the pattern of acceptance of engineering quality formfile is identical with the pattern of the acceptance of engineering quality form of printing made of paper, make project director can be easily adapted to when filling in acceptance of engineering quality data online.
C, project director operate described end computer installation of submitting to a higher level for approval or revision and described acceptance of engineering quality data are sent to described web application server, described acceptance of engineering quality data are resolved by the servlet container in described web application server, call AM method and described acceptance of engineering quality data are saved in the acceptance of engineering quality tables of data in described database server;The POST method sent in employing HTTP1.1 agreement of described acceptance of engineering quality data, the type sending data has JSONObject, Map, String, List, VO etc..All of acceptance of engineering quality data are all saved in an acceptance of engineering quality tables of data according to the attribute of definition, read and preserve the acceptance of engineering quality data of thousands of acceptance of engineering quality forms by AM method, substantially increase logic processing capability and system maintenance cost.
D, project director operate described end computer installation of submitting to a higher level for approval or revision and send a request of submitting to a higher level for approval or revision to described web application server, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified acceptance of engineering quality data, and described acceptance of engineering quality data are sent to described examination & verification end computer installation.
E, auditor operate described examination & verification end computer installation and audit described acceptance of engineering quality data, auditor operates examination & verification end computer installation and the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and the acceptance of engineering quality tables of data in described database server locked.
F, project director operate the inquiry request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality data of an engineering project to described web application server, the inquiry request of the acceptance of engineering quality data to receiving of the servlet container in described web application server resolves, call AM method from described database server, select qualified acceptance of engineering quality data, and described acceptance of engineering quality data are sent to described end computer installation of submitting to a higher level for approval or revision;The POST method sent in employing HTTP1.1 agreement of described acceptance of engineering quality data.
G, project director operate the print request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality form of an engineering project to described web application server, the print request of the acceptance of engineering quality form to receiving of the servlet container in described web application server resolves, call AM method from described database server, select the Electronic Signature data corresponding with the auditor auditing these acceptance of engineering quality data, and described Electronic Signature data are sent to described end computer installation of submitting to a higher level for approval or revision;Described acceptance of engineering quality data and described Electronic Signature data are sent to printer, by printer printout acceptance of engineering quality form by described end computer installation of submitting to a higher level for approval or revision;In the present embodiment, system gives one Customs Assigned Number of each auditor, represents and uses identity and operating right, the corresponding Electronic Signature data of the Customs Assigned Number of each auditor;In the Electronic Signature tables of data that described Electronic Signature data are stored in database server with the form of picture, when printing acceptance of engineering quality form, Electronic Signature covers and puts at signature information field.
The online application of engineering project progress payment
In the present embodiment, contract enterprise every time and supervisor of construction is all submitted in the application of progress payment, supervisor of construction's operation application end computer installation unify to apply for progress payment.An application end computer installation is distributed to complete payment application operation for supervisor of construction.Engineering predication application list, engineering borrow temporarily money application list, engineering promise breaking deduction application list, progress payment application list, engineering quality guarantee gold application list will through examination & verification approval, can be through one-level examination & verification approval or multistage auditing approval according to different auditing flow mechanism, an auditor is appointed in every one-level examination & verification, and enterprise is that every auditor distributes an examination & verification end computer installation.
A, contract management personnel operate the project correspondence input contract essential information arranged in described web application server based on contract masterplate, and described contract essential information are saved in described database server;Described contract essential information includes Business Name information, engineering project information, Contract NO, contract type, duration of contract, contracts company information, total Value of Contract, advance payment ratio, quality guarantee gold ratio.
In the present embodiment, the particulars of a contract made of paper signed are inputted in electronic contract according to the project correspondence that the contract masterplate being pre-stored in web application server is arranged by contract management personnel, wherein Business Name information, engineering project information, Contract NO are set as major key, for calling the querying condition of this contract essential information;Contract masterplate automatically calculates amount of advance payment according to the total Value of Contract inputted, advance payment ratio, quality guarantee gold ratio, stays and buckle the quality guarantee gold amount of money.When contract occurs change during Engineering Project Implementation, can need after modification of contract to examine through auditor in the information of contract side information Shipping Options Page input change, the information of examination & verification can be inquired at contract audit information labels page.
B, supervisor of construction operate described application end computer installation and send an engineering predication application request to described web application server, after described web application server receives described engineering predication application request, send an engineering predication application list to described application end computer installation;Described engineering predication application list is the file of html format.
C, supervisor of construction operate described application end computer installation and input the amount of advance payment information of this application according to the project correspondence arranged in described engineering predication application list, need money day information, anticipated abatement to complete day information;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering predication application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering predication application list.
In the present embodiment, Business Name, project name, the content of Contract NO select input by drop-down list, can uniquely point to a combination and call with essential information after selecting input.Wherein application odd numbers is automatically generated by system according to default coding rule, contracts enterprise name, advance payment ratio, amount of advance payment are the content in the contract essential information called.This application amount of money of supervisor of construction's input can not be more than the amount of advance payment in contract essential information, and needing money day is to contract enterprise to wish to receive the date of engineering predication, it is contemplated that having write off day is this fund abatement complete date.Engineering predication application can be submitted to repeatedly, and the amount of money repeatedly applied for is added up by the accumulative application amount of money, and the engineering predication amount of money of accumulative application can not be more than the amount of advance payment in contract essential information.
In the present embodiment, write off refer to pay advance payment, borrow temporarily money time do not issue invoice, need corresponding invoice input system within the time of regulation, it is ensured that the operation that invoice amount is consistent with payment.
D, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering predication application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering predication application list is resolved by described web application server, call AM method from described database server, select qualified engineering predication application list, and give described examination & verification end computer installation by the engineering predication application form single-shot chosen.
The application information that E, auditor operate in the described examination & verification end computer installation engineering predication application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the engineering predication application form monolock in described database server is fixed.
F, supervisor of construction operate described application end computer installation and send an engineering temporary loan application request to described web application server, after described web application server receives the request of described engineering temporary loan application, send an engineering to described application end computer installation and borrow temporarily money application list;The described engineering money application list that borrows temporarily is the file of html format;The money that borrows temporarily is applicable to contract enterprise's part fund ensure to go into operation on schedule because act of god causes needing to lend temporarily.
G, supervisor of construction operate described application end computer installation and input the money amount information that borrows temporarily of this application according to the described engineering project correspondence arranged in money application list that borrows temporarily, need money day information, anticipated abatement to complete day information;Supervisor of construction operates the described application end computer installation money application form single-shot that described engineering borrowed temporarily and gives described web application server, and described web application server is called the AM method money application list that described engineering borrowed temporarily and is saved in described database server.
In the present embodiment, Business Name, project name, the content of Contract NO select input by drop-down list, can uniquely point to a combination and call with essential information after selecting input.Wherein application odd numbers is automatically generated by system according to default coding rule, contracts enterprise name, amount of advance payment is the content in the contract essential information called.Contract enterprise to meet application and borrow temporarily the condition of money, carried out unifying application by supervisor of construction's operation application end computer installation, this application amount of money is the amount of money of the money that borrows temporarily needed for contracting enterprise, needing money day is to contract enterprise to wish to receive engineering and borrow temporarily date of money, it is contemplated that having write off day is that this fund writes off the complete date.The engineering money that borrows temporarily can be applied for several times.
H, supervisor of construction operate described application end computer installation and send an engineering to described web application server and borrow temporarily the request of submitting to a higher level for approval or revision of money application list, the borrow temporarily described engineering request of submitting to a higher level for approval or revision of money application list of described web application server resolves, calling AM method selects qualified engineering to borrow temporarily money application list from described database server, and the money application form single-shot that the engineering chosen borrowed temporarily gives described examination & verification end computer installation.
I, auditor operate the application information that the engineering chosen borrows temporarily in money application list by described examination & verification end computer installation and audit, the message of examination & verification approval is sent to described web application server, and described web application server is called AM method and the engineering in described database server is borrowed temporarily money application form monolock calmly.
J, supervisor of construction operate described application end computer installation and send a progress payment application request to described web application server, after described web application server receives described progress payment application request, send a progress payment application list to described application end computer installation;Described progress payment application list is the file of html format.
K, supervisor of construction operate described application end computer installation and input the progress payment amount information of this application according to the project correspondence arranged in described progress payment application list, need money day information, anticipated abatement to complete day information;Supervisor of construction operates described application end computer installation and gives described web application server by described progress payment application form single-shot, and described web application server is called AM method and is saved in described database server by described progress payment application list.
In the present embodiment, according to the progress payment amount of money of this application, project progress is estimated and test the amount of money drawn, estimating to test refers to during contract execution, in order to ensure being smoothed out of engineering construction, engineering sends out, contract both sides should arrange as agreed periodically or carry out examining of quantities stage by stage by the Practical Project progress data in the online tracing step of engineering project progress performance, and calculates its expense produced according to the pricing mode of contract engagement.
L, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of a progress payment application list to described web application server, the request of submitting to a higher level for approval or revision of described progress payment application list is resolved by described web application server, call AM method from described database server, select qualified progress payment application list, and give described examination & verification end computer installation by the progress payment application form single-shot chosen.
The application information that M, auditor operate in the described examination & verification end computer installation progress payment application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the progress payment application form monolock in described database server is fixed.
N, supervisor of construction operate described application end computer installation and send an engineering promise breaking deduction application request to described web application server, after described web application server receives described engineering promise breaking deduction application request, send an engineering promise breaking deduction application list to described application end computer installation;Described engineering promise breaking deduction application list is the file of html format.
O, supervisor of construction operate described application end computer installation and input this deducted amount information, promise breaking project information, promise breaking note to payment deduction information according to the project correspondence arranged in described engineering promise breaking deduction application list;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering promise breaking deduction application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering promise breaking deduction application list.
In the present embodiment, promise breaking project name carries out selecting input by drop-down list, and the project that this drop-down list is withholdd defined in standard according to breaking a contract is formulated.This deducted amount is that the concrete condition according to withhold standard and the promise breaking of contracting enterprise determines, promise breaking note to payment deduction is the supplementary notes of project of withholing this promise breaking.
P, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering promise breaking deduction application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering promise breaking deduction application list is resolved by described web application server, call AM method from described database server, select qualified engineering promise breaking deduction application list, and give described examination & verification end computer installation by the engineering chosen promise breaking deduction application form single-shot.
The application information that Q, auditor operate in the described examination & verification end computer installation engineering promise breaking deduction application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method by fixed for the engineering promise breaking deduction application form monolock in described database server.
R, supervisor of construction operate described application end computer installation and send a contract to the request of ticket payment application to described web application server, described web application server receives after described contract asks to ticket payment application, sends a contract to ticket payment application list to described application end computer installation;Described contract is the file of html format to ticket payment application list.
S, supervisor of construction operate the described application end computer installation abatement information according to the project correspondence input received payment arranged in described contract to ticket payment application list;Supervisor of construction operates described application end computer installation and gives described web application server by described contract to ticket payment application form single-shot, and described web application server is called AM method and is saved in described database server to ticket payment application list by described contract.The abatement information of received payment includes: invoice type, invoice number, invoice amount, invoice open day, non-pay on application invoice amount, this write off the amount of money.
T, supervisor of construction operate described application end computer installation and send an engineering quality guarantee gold application request to described web application server, after described web application server receives described engineering quality guarantee gold application request, send an engineering quality guarantee gold application list to described application end computer installation;Described engineering quality guarantee gold application list is the file of html format.
U, supervisor of construction operate described application end computer installation and input the quality guarantee gold amount information of this application according to the project correspondence arranged in described engineering quality guarantee gold application list, need money day information, quality guarantee gold note to payment deduction information;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering quality guarantee gold application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering quality guarantee gold application list.
In the present embodiment, after engineering project is completed, internal audit service and relevant staff to the signing of contract, fulfil, change, termination procedure and contract management carry out independent objectively supervision and evaluate, examination & verification confirms the auditing for construction completion account amount of money.Calculate to stay according to the quality guarantee gold ratio in the final account for completed project amount of money and contract essential information and buckle the quality guarantee gold amount of money.In the present embodiment, the final account for completed project amount of money is equal to the original contract amount of money, and calculating the quality guarantee gold amount of money according to quality guarantee gold ratio is the 10% of the original contract amount of money.This application amount of money of supervisor of construction's input typically can not be more than staying the button quality guarantee amount of money, and needing money day is to contract enterprise to wish to receive the date of engineering quality guarantee gold.Engineering quality guarantee gold application can only be submitted to once, if there is quality problems, in addition it is also necessary to fills in quality guarantee gold note to payment deduction information, including types of deductions, deducted amount, cause description of withholing.
V, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering quality guarantee gold application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering quality guarantee gold application list is resolved by described web application server, call AM method from described database server, select qualified engineering quality guarantee gold application list, and give described examination & verification end computer installation by the engineering quality guarantee gold application form single-shot chosen.
The application information that W, auditor operate in the described examination & verification end computer installation engineering quality guarantee gold application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the engineering quality guarantee gold application form monolock in described database server is fixed.
Material and labour cost analysis generates project estimates online
In the present embodiment, construction budget person's operating budget end computer installation completes the authorized strength work of construction budget, the construction budget data worked out need by examination & verification, can be through one-level examination & verification approval or multistage auditing approval according to different auditing flow mechanism, an auditor is appointed in every one-level examination & verification, and engineering unit is that every auditor distributes an examination & verification end computer installation.
In the present embodiment, in described web application server, storage has material references data form, budgetary discipline classification benchmark data list, artificial benchmark data list, rate project benchmark data list, inventory specific item benchmark data list, and above-mentioned list is all the file of html format.Wherein, budgetary discipline classification benchmark data list, artificial benchmark data list, rate project benchmark data list, inventory specific item benchmark data list set up incidence relation by " budgetary discipline classification " field.
A, construction budget person operate described budget end computer installation and send a request setting up material references to described web application server, after described web application server receives the described request setting up material references, send a material references data form to described budget end computer installation.
B, construction budget person operate described budget end computer installation according to the essential information of project correspondence input material benchmark arranged in described material references data form and the unit price information of material references;The essential information of described material references includes that material class number information, title material information, specifications and models information, measurement unit information, material specification and first are for information;The unit price information of described material references includes area unit price information, match ratio material unit price information;Each material references can comprise a plurality of unit price information.
See Fig. 6, in the present embodiment, illustrating each field in material references data form, the material class number in material references data form is 7~10, is made up of big class (the 1st), middle class (2~4), the name of an article (5~7), specifications parameter (8~10).For the hierarchical structure of display material benchmark intuitively, set up the tree-shaped Figure 10 of material classification according to material class number rule.First is for being fingernail for material, and first is the material provided by Party A for material, and this first arranges in Party A and contractor current events of signing a contract.Every first is for material, when marching into the arena by the common acceptance sampling of construction party and representative of Party A, qualified after can be used for engineering.Setting three querying conditions in material references data form, budget end computer installation utilizes Like function in SQL, it is allowed to construction budget person importation condition, it is achieved fuzzy query.Area unit price information and match ratio material unit price information both can directly enter, can also utilize jasperreport technology that material references data form is exported to Excel form document, typing corresponding unit price information in Excel form document, the unit price information batch in Excel form document is imported in material references data form by recycling POI technology.This information input mode may be used for too other data form information input, all lists are provided with " importing ", " derivation " button all can use above-mentioned selection input mode.Directly inputting according to budget valency, market price, bid price etc. for non-match ratio material, match ratio material is collected by Business Name by system: material unit price collects=∑ (unit price × quantity).
C, construction budget person operate described budget end computer installation and will fill in complete material references data form and be sent to described web application server, and described web application server is called AM method and be will fill in complete material references data form and be saved in described database server.
D, construction budget person operate described budget end computer installation and send a request setting up budgetary discipline classification benchmark to described web application server, after described web application server receives the described request setting up budgetary discipline classification benchmark, send a budgetary discipline classification benchmark data list to described budget end computer installation.
E, construction budget person operate described budget end computer installation according to the project correspondence input budgetary discipline classification information arranged in described budgetary discipline classification benchmark data list and the budget thin item classification information of this budgetary discipline classification;Described budgetary discipline classification information includes budgetary discipline item name, class number;Described budget thin item classification information includes that budget thin item item name, thin item are numbered;Each budgetary discipline classification can be subdivided into multiple budget thin item classification.
Seeing Fig. 7, in the present embodiment, illustrate each field in budgetary discipline classification benchmark data list, wherein, budgetary discipline class number automatically generated by system, according to A~Z order sequence;Budget thin item numbering is automatically generated by system, according to 1~9 order sequences.First complete the input of budgetary discipline classification information, after having inputted, click on " preservation " button.Before input budget thin item classification information, first from " budgetary discipline classification " drop-down list, select the most saved budgetary discipline classification, for the budgetary discipline classification budget increase thin item classification selected.
F, construction budget person operate described budget end computer installation and will fill in complete budgetary discipline classification benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete budgetary discipline classification benchmark data list and be saved in described database server.
G, construction budget person operate described budget end computer installation and send a request setting up artificial benchmark to described web application server, after described web application server receives the described request setting up artificial benchmark, send an artificial benchmark data list to described budget end computer installation.
H, construction budget person operate described budget end computer installation and input artificial reference information according to the project correspondence arranged in described artificial benchmark data list;Described artificial reference information includes category information, work post code information, measurement unit information, artificial unit price information;Every artificial reference information carries out inputting according to affiliated budgetary discipline classification.
Seeing Fig. 8, in the present embodiment, illustrate each field in artificial benchmark data list, wherein, budgetary discipline classification selects input by drop-down list, and this field contents reads from budgetary discipline classification benchmark data list.Category selects input by drop-down list, and category is divided into a comprehensive class work, comprehensive two class works, comprehensive three class works, comprehensive recruitment.Work post code is automatically generated by system, is made up of three bit codes: budgetary discipline class number (the 1st), category code (2~3), category code is R1, R2, R3, R4, can sequentially increase as required.Unit price benchmark unit price artificial with each department is identical.
I, construction budget person operate described budget end computer installation and will fill in complete artificial benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete artificial benchmark data list and be saved in described database server.
J, construction budget person operate described budget end computer installation and send a request setting up rate project benchmark to described web application server, after described web application server receives the described request setting up rate project benchmark, send a rate project benchmark data list to described budget end computer installation.
K, construction budget person operate described budget end computer installation according to the project correspondence input rate project reference information arranged in described rate project benchmark data list;Described rate project reference information includes rate bullets information, rate project name information, works category information, job location information, toll-ratio information;Every rate project reference information carries out inputting according to affiliated budgetary discipline classification.
Seeing Fig. 9, in the present embodiment, budgetary discipline classification is except selecting input by drop-down list, it is also possible to utilize POPU technology, selects input from the window ejected.Rate bullets is made up of three bit codes: budgetary discipline class number (the 1st);Expense thin item coding (the 2nd), from A~Z serial number, A-safety construction expense, other organiztion measure of B-expense, C-comprehensively take expense, D-tax;Serial number (the 3rd), according to works category, job location etc. according to 1~9 sequential organizations.Different budgetary discipline classifications, the expense that comprehensively the takes rate difference of different works category;The tax rate of different job locations is different.
L, construction budget person operate described budget end computer installation and will fill in complete rate project benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete rate project benchmark data list and be saved in described database server.
M, construction budget person operate described budget end computer installation and send a request setting up inventory specific item benchmark to described web application server, after described web application server receives the described request setting up inventory specific item benchmark, send an inventory specific item benchmark data list to described budget end computer installation.
N, construction budget person operate described budget end computer installation according to the project correspondence input inventory specific item information arranged in described inventory specific item benchmark data list;Described inventory specific item information includes that specific item encodes information, specific item name information, specific item unit information, characterization information, job content information;Select independent inventory specific item classification, in addition it is also necessary to input Business Name information, works category information, specific item base price information;Non-selected independent inventory specific item classification, input inventory specific item is detailed.
See Figure 10, in the present embodiment, the present situation carried out in conjunction with current list counts, set up independent inventory specific item and dependent inventory specific item respectively, the most independent inventory specific item is applicable to inventory bid, it is not necessary to arrange artificial, material, machinery specific item detail;Dependent inventory specific item refer to needs arrange manually, material, the detailed specific item of machinery, for there may be first, detail should be set for material, match ratio material or other detailed inventory specific item analyzed that needs when submitting a tender to carry out to offer.Specific item coding is made up of five-bit code, and wherein front two code is budgetary discipline class number and thin item numbering, and rear three bit codes are serial number, system automatically generate.The specific item base price of independent inventory directly inputs, the specific item base price of dependent inventory=[ (labour cost+fee of material+machinery in inventory specific item detail takes)+(labour cost in inventory specific item detail+machinery expense) × combined ratio ] × (1+ tax).Wherein labour cost is to select input unit price information from artificial benchmark data list, and fee of material is to select input unit price information from material references data form.
O, construction budget person operate described budget end computer installation and will fill in complete inventory specific item benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete inventory specific item benchmark data list and be saved in described database server.
P, construction budget person operate described budget end computer installation and send the request of an establishment construction budget to described web application server, after described web application server receives the request of described establishment construction budget, send a construction budget data form to described budget end computer installation.
Q, construction budget person operate described budget end computer installation according to project correspondence the input essential information of construction budget, inventory specific item information, main material information, the match ratio material information arranged in described construction budget data form;Construction budget person operates described budget end computer installation and inputs the quantities of inventory specific item, the quantities of main material, the amount of budget of match ratio material according to construction program data correspondence.
Seeing Figure 11 to Figure 13, in the present embodiment, illustrate field each in construction budget data form, the essential information of construction budget carries out selecting input by drop-down list.Wherein, budget sector need to be carried out giving out a contract for a project range set together with department of giving out a contract for a project, and generates numbering of giving out a contract for a project, and numbers in core budget data according to giving out a contract for a project.Information in inventory specific item tab selects input from inventory specific item benchmark data list, information in main material tab and the information in match ratio material select input from material references data form, the quantities in each tab is inputted according to construction program correspondence, system calculates the total price under each tab, total price=unit price × quantities (budgeted number) automatically.
R, construction budget person operate described budget end computer installation and will fill in complete construction budget data form and be sent to described web application server, described web application server calculates the total price of inventory specific item automatically according to the quantities of the inventory specific item of input, the quantities of the main material according to input calculates the total price of main material automatically, automatically calculates the total price of match ratio material according to the amount of budget of the match ratio material of input;Described web application server is called the construction budget data form that calculating completes by AM method and is saved in described database server.
S, construction budget person operate described budget end computer installation and send the request of submitting to a higher level for approval or revision of a construction budget to described web application server, the request of submitting to a higher level for approval or revision of described construction budget is resolved by described web application server, call AM method from described database server, select qualified construction budget data form, and the total price information in described construction budget data form collected one construction budget of generation submit to a higher level for approval or revision list, list of being submitted to a higher level for approval or revision by described construction budget is sent to described examination & verification end computer installation.
In the present embodiment, the request of submitting to a higher level for approval or revision is resolved by described web application server by internal servlet container, servlet container is the java application of a kind of server end, has the characteristic independent of platform and agreement, can generate dynamic Web page.It takes on the intermediate layer of client's request (Web browser or other Http CLIENT PROGRAM) and server response (data base on Http server or application program).
Seeing Figure 14, in the present embodiment, the field submitted to a higher level for approval or revision construction budget in list illustrates: inventory specific item expense is the total price of inventory specific item, and manufacturer buys the total price that main material is main material by oneself, buys main material without first by oneself for subtotal=inventory specific item expense+manufacturer;First is for the total price that Master Cost is match ratio material, total=supply Master Cost for subtotal+first without first.Construction cost per square meter=total ÷ construction area, construction area needs to be manually entered.
T, auditor operate the summary information that described construction budget submitted to a higher level for approval or revision in list by described examination & verification end computer installation and audit, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method list of being submitted to a higher level for approval or revision by described construction budget and is saved in described database server locking.
In the present embodiment, department of giving out a contract for a project by the module of giving out a contract for a project in project management system according to giving out a contract for a project numbering inquiry extract the budget data of correspondence, as bid, the reference frame negotiated a price, and determine bag data according to bid result typing.

Claims (1)

1. the online management method of engineering project, it is characterized in that: mutual personnel carry out communication for information according to a remote interaction platform, described remote interaction platform includes a server-side computer system, budget end computer installation, multiple contracts enterprises end computer installation, multiple evaluation end computer installation, application end computer installation, multiple end computer installation, multiple examination & verification end computer installation of submitting to a higher level for approval or revision;Described server-side computer system, budget end computer installation, contract enterprises end computer installation, evaluate end computer installation, application end computer installation, end computer installation of submitting to a higher level for approval or revision, examination & verification end computer installation are in a wan environment and realize network and connect, described wan environment is net territory based on INTERNET environment, and described server-side computer system includes database server, web application server and the software matched with described server-side computer system;Described budget end computer installation, contract enterprises end computer installation, evaluate end computer installation, application end computer installation, end computer installation of submitting to a higher level for approval or revision, examination & verification end computer installation are separately installed with engineering project management software;The step of described online management is:
The online bid of engineering project, bid, the assessment of bids
A, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and send one to described web application server and contract enterprises registration request, described web application server receives described after contracting enterprises registration request, sends one contract enterprises registration list to described enterprises end computer installation of contracting;
B, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and contract the essential information of enterprise according to the described project correspondence input arranged in enterprises registration list of contracting and contract the qualification information of enterprise;The described essential information contracting enterprise includes enterprise name information, type of business information, organization mechanism code or identification card number information, issuing bank information;The described qualification information contracting enterprise includes qualification name information, qualification type information, qualification grade information, qualification certificates information;
Described enterprises registration list of contracting is sent to described web application server by C, the enterprises end computer installation of contracting described in operated by personnel contracting enterprise, and described web application server is called AM method and is saved in described database server by described enterprises registration list of contracting;
D, contract the enterprises end computer installation of contracting described in the operated by personnel of enterprise and send a request of submitting to a higher level for approval or revision contracting enterprises registration list to described web application server, the described request of submitting to a higher level for approval or revision contracting enterprises registration list is resolved by described web application server, call AM method from described database server, select qualified enterprises registration list of contracting, and the enterprises registration list of contracting chosen is sent to described examination & verification end computer installation;
E, auditor operate described examination & verification end computer installation and audit the log-on message contracted in enterprises registration list chosen, and auditing result is sent to described web application server;Described web application server is called AM method and will be contracted in Enterprise Lists to the most qualified by the company information interpolation of contracting of examination & verification, will not add the most pending contracting in Enterprise Lists by the company information of contracting of examination & verification;
The essential information that F, the web application server described in operated by personnel of competitive bid unit call for bid according to the project correspondence input arranged in bid application list, then create bid document according to the bid document masterplate selected, finally according to project correspondence input assessment of bids project, weight, the benchmark score value arranged in bid grade form, upload Bid Evaluation Method;The essential information of described bid includes way of bidding, assessment of bids mode, the preliminary budget amount of money, mode of giving out a contract for a project, predetermined tender out date;Described web application server is called AM method and is saved in described database server by described bid application list;
Described bid application form single-shot is given described examination & verification end computer installation by G, the web application server described in operated by personnel of competitive bid unit, auditor operates described examination & verification end computer installation and audits the information on bidding in described bid application list, the information of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the bid application form monolock in described database server is fixed;
Enterprises end computer installation of contracting described in H, the qualified operated by personnel contracting enterprise sends the inquiry request of a bid application list to described web application server, the inquiry request of described bid application list is resolved by described web application server, call AM method from described database server, select qualified bid application list, and the bid application form single-shot chosen is given described contract enterprises end computer installation;
The bid document contracted in the bid application list described in the download of enterprises end computer installation described in I, the qualified operated by personnel contracting enterprise and the tender documents masterplate of correspondence, contract and contract enterprises end computer installation according to the project correspondence input bid information and quotation information arranged in tender documents masterplate described in the operated by personnel of enterprise, and will fill in complete tender documents and be sent to described web application server;
Quotation information in described tender documents is collected by J, the web application server described in operated by personnel of competitive bid unit, askes agreed-upon price essential information, quotation information, inquiry agreed-upon price record information according to asking the project correspondence input arranged in agreed-upon price list;Described web application server is called AM method and be will fill in complete inquiry agreed-upon price list and be saved in described database server;
K, the web application server described in operated by personnel of competitive bid unit calculate assessment of bids basis quote, and the computing formula of assessment of bids basis quote is:,N≤5;Wherein AiFor each qualified contracting the offer by tender of enterprise, N be that participate in submitting a tender qualified contracts the quantity of enterprise, A is the preliminary budget amount of money that determines of competitive bid unit, M is to set coefficient, the span of M is 60~100, N1, N2 are two weight coefficients, N1+N2=100;Web application server described in the operated by personnel of competitive bid unit calculates the deviation value between each qualified quotation contracting enterprise and assessment of bids basis quote: P=Ai-C;Calculate assessment of bids PTS according to commercial bid total price scoring formula: BF=Q-(P × 100 × ∏ × δ), wherein ∏ be conversion score value, δ be assessment of bids Term Weight, Q be assessment of bids basis point;
L, the web application server described in operated by personnel of competitive bid unit generate report on the evaluation of tenders according to each qualified assessment of bids PTS contracting enterprise and intend certainly bag list, and described report on the evaluation of tenders and plan certainly bag list are sent to described examination & verification end computer installation;
M, auditor operate described examination & verification end computer installation and audit described report on the evaluation of tenders and plan certainly bag list, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and described report on the evaluation of tenders and plan certainly bag list is saved in described database server locking;
N, the web application server described in operated by personnel of competitive bid unit set up the project correspondence input tender price put according to certainly steamed bun mesh schedule of rates and info quote time is other, and described web application server is called AM method and is saved in described database server by described certainly steamed bun mesh unit price list;
O, the web application server described in operated by personnel of competitive bid unit according to report on the evaluation of tenders and intend certainly bag list and certainly steamed bun mesh unit price list generation notice on bid winning and acceptance of the bid result notice, and notice on bid winning is sent to middle target contracts enterprise, acceptance of the bid result notice is sent to target in and contracts enterprise;
The on-line evaluation contracting enterprise of engineering project
Submitting to a higher level for approval or revision end computer installation described in A, the operation of evaluation establishment officer sends one to described web application server and contracts valuation of enterprise application request, described web application server receives described after contracting valuation of enterprise application request, sends one to described end computer installation of submitting to a higher level for approval or revision and contracts valuation of enterprise application list;
Submitting to a higher level for approval or revision end computer installation described in B, the operation of evaluation establishment officer contracts essential information and the evaluation criterion information of valuation of enterprise application list according to the described project correspondence input arranged in valuation of enterprise application list of contracting, and the described essential information contracting valuation of enterprise application list includes contracting enterprise name information, PN, evaluation type information, evaluation establishment officer information, evaluating personnel's list information;The described evaluation criterion information contracting valuation of enterprise application list includes Basic Evaluation project information, special assessment item information, positive or negative points project information;
Described valuation of enterprise application form single-shot of contracting is given described web application server by the submitting to a higher level for approval or revision end computer installation described in C, the operation of evaluation establishment officer, and described web application server is called AM method and is saved in described database server by described valuation of enterprise application list of contracting;
Submitting to a higher level for approval or revision end computer installation described in D, the operation of evaluation establishment officer sends a request of submitting to a higher level for approval or revision contracting valuation of enterprise application list to described web application server, the described request of submitting to a higher level for approval or revision contracting valuation of enterprise application list is resolved by described web application server, call AM method from described database server, select qualified valuation of enterprise application list of contracting, and give described examination & verification end computer installation by the valuation of enterprise application form single-shot of contracting chosen;
E, auditor operate the described examination & verification end computer installation essential information contracted in valuation of enterprise application list to choosing and evaluation criterion information is audited, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and is determined by the valuation of enterprise application form monolock of contracting in described database server;
F, described web application server contract valuation of enterprise list according to the evaluation criterion information creating contracted in valuation of enterprise application list of examination & verification approval, and described is contracted each evaluation personnel that valuation of enterprise list is sent simultaneously in described evaluation personnel's list information set;
G, each evaluation personnel operate respectively one evaluate end computer installation receive described in contract valuation of enterprise list, contract the evaluation criterion information correspondence input arranged in valuation of enterprise list contract valuation of enterprise data according to described;And described valuation of enterprise data of contracting are sent to described web application server, described web application server is called AM method and described valuation of enterprise data of contracting is saved in described database server;Described valuation of enterprise data of contracting include Basic Evaluation project score, special assessment item score, positive or negative points project score;
Submitting to a higher level for approval or revision end computer installation described in H, the operation of evaluation establishment officer sends an inquiry request contracting valuation of enterprise data to described web application server, the described inquiry request contracting valuation of enterprise data is resolved by described web application server, call AM method from described database server, select qualified valuation of enterprise data of contracting, and the valuation of enterprise data of contracting chosen are sent to described end computer installation of submitting to a higher level for approval or revision;
Submitting to a higher level for approval or revision end computer installation described in I, the operation of evaluation establishment officer sends one to described web application server and contracts Enterprise Integrated evaluation request, described web application server receives described after contracting Enterprise Integrated evaluation request, sends one to described end computer installation of submitting to a higher level for approval or revision and contracts Enterprise Integrated and evaluate list;
J, evaluate the submitting to a higher level for approval or revision end computer installation described in establishment officer's operation and go out to contract Enterprise Integrated evaluating data according to the valuation of enterprise data summarization of contracting chosen, evaluate the project correspondence arranged in list and input according to described Enterprise Integrated of contracting and contract Enterprise Integrated evaluating data;And described Enterprise Integrated evaluating data of contracting is sent to described web application server, described web application server is called AM method and is saved in described database server by described Enterprise Integrated evaluating data of contracting;Described Enterprise Integrated evaluating data of contracting includes evaluating top score, evaluating minimum score, evaluation average, qualitative evaluation grade;
Submitting to a higher level for approval or revision end computer installation described in K, the operation of evaluation establishment officer sends a request of submitting to a higher level for approval or revision contracting Enterprise Integrated evaluating data to described web application server, the described request of submitting to a higher level for approval or revision contracting Enterprise Integrated evaluating data is resolved by described web application server, call AM method from described database server, select qualified Enterprise Integrated evaluating data of contracting, and the Enterprise Integrated evaluating data of contracting chosen is sent to described examination & verification end computer installation;
L, auditor operate described examination & verification end computer installation and audit the Enterprise Integrated evaluating data of contracting chosen, by examination & verification approval information be sent to described web application server, described web application server call AM method according to examination & verification approval the qualitative evaluation level adjustment contracted in Enterprise Integrated evaluating data described in database server in contract goodwill grade;
Work out an engineering project schedule online
A, project director sends an engineering project inquiry request by described end computer installation of submitting to a higher level for approval or revision to described web application server, the engineering project inquiry request received is resolved by the servlet container in described web application server, call in AM method engineering coded data table from described database server search to be suitable for the engineering of this engineering project and encode and generate engineering coding schedule monofile, many sub-project codes in this engineering project are had described in described engineering coding schedule monofile, multiple operational codes, described engineering coding schedule monofile is sent to described end computer installation of submitting to a higher level for approval or revision by described web application server;
B, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision, sequentially input the schedule data of each operation according to the operational code in described engineering coding schedule monofile, the schedule data of input are converted into Gantt chart graph data by gantt.js plug-in unit in real time;The schedule data of each operation include the linking relationship between operational code, ps, plan completion date, duration, and the schedule data of every operation, arrange the priority level of each operation;
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and the schedule data of each operation are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls AM method and the schedule data in XML format file is saved in the schedule tables of data in described database server;
D, project director send a request of submitting to a higher level for approval or revision by described end computer installation of submitting to a higher level for approval or revision to described web application server, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified schedule data, and schedule data composition XML format file is sent to described examination & verification end computer installation;
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the schedule data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, and described web application server is called AM method and the schedule tables of data in described database server locked;
The online tracing of engineering project progress performance
A, project director send an engineering project inquiry request by described end computer installation of submitting to a higher level for approval or revision to described web application server, the engineering project inquiry request received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified construction program data, and construction program data composition XML format file is sent to described end computer installation of submitting to a higher level for approval or revision;
B, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision, and sequentially input the actual progress data of each operation, and the actual progress data of input are converted into Gantt chart graph data by gantt.js plug-in unit in real time;The actual progress data of each operation include that operational code, actual starting date, current period actually accomplish percentage ratio, actual finish date;
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and the actual progress data of each operation are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls AM method and the actual progress data in XML format file is saved in the actual progress tables of data in described database server;
D, project director hold computer installation to the request of submitting to a higher level for approval or revision of described web application server by described submitting to a higher level for approval or revision, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified actual progress data, and actual progress data composition XML format file is sent to described examination & verification end computer installation;
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the actual progress data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, and described web application server is called AM method and the actual progress tables of data in described database server locked;
Engineering project progress abnormal response and process
A, described web application server regular star up engineering follow-up program, check the actual progress abnormal conditions of each operation, i.e. in Gantt chart graph data, actual progress location point falls in the left side of check data location point, sends abnormal job information to described end computer installation of submitting to a higher level for approval or revision according to the abnormal alert level arranged;
B, project director receive abnormal job information by described end computer installation of submitting to a higher level for approval or revision, call gantt.js plug-in unit abnormal job information is checked, project director is by described end computer installation input progress abnormality processing data of submitting to a higher level for approval or revision, and described progress abnormality processing data include progress declaration of exception, intend treatment measures, renewal ps, renewal plan completion date;
C, project director call gantt.js plug-in unit by described end computer installation of submitting to a higher level for approval or revision and described progress abnormality processing data are preserved into XML format file cocurrent give described web application server, XML format file is resolved by the servlet container in described web application server, calls in the progress abnormality processing tables of data that the progress abnormality processing data in XML format file are saved in described database server by AM method;
D, project director hold computer installation to the request of submitting to a higher level for approval or revision of described web application server by described submitting to a higher level for approval or revision, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified progress abnormality processing data, and progress abnormality processing data composition XML format file is sent to described examination & verification end computer installation;
E, auditor call gantt.js plug-in unit by described examination & verification end computer installation and audit the progress abnormality processing data in XML format file, the information that examination & verification is passed through is sent to described web application server by examination & verification end computer installation by auditor, described web application server call AM method the ps in the schedule tables of data in described database server is revised as update ps, be intended to the target date be revised as update the plan completion date;
The online engineering project quality that generates checks and accepts form
A, project director operates the inquiry request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality list of an engineering project to described web application server, the inquiry request of the acceptance of engineering quality list to receiving of the servlet container in described web application server resolves, call AM method from the data base of described web application server, search for the acceptance of engineering quality formfile being suitable for this engineering project according to construction quality form benchmark catalogue, described acceptance of engineering quality formfile is sent to described end computer installation of submitting to a higher level for approval or revision by described web application server, the described file that acceptance of engineering quality formfile is html format;
B, project director operate described end computer installation of submitting to a higher level for approval or revision and described acceptance of engineering quality formfile are converted into acceptance of engineering quality forms pages file, and according to the project correspondence input acceptance of engineering quality data arranged in described acceptance of engineering quality forms pages file;
C, project director operate described end computer installation of submitting to a higher level for approval or revision and described acceptance of engineering quality data are sent to described web application server, described acceptance of engineering quality data are resolved by the servlet container in described web application server, call AM method and described acceptance of engineering quality data are saved in the acceptance of engineering quality tables of data in described database server;
D, project director operate described end computer installation of submitting to a higher level for approval or revision and send a request of submitting to a higher level for approval or revision to described web application server, the request of submitting to a higher level for approval or revision received is resolved by the servlet container in described web application server, call AM method from described database server, select qualified acceptance of engineering quality data, and described acceptance of engineering quality data are sent to described examination & verification end computer installation;
E, auditor operate described examination & verification end computer installation and audit described acceptance of engineering quality data, auditor operates examination & verification end computer installation and the information of examination & verification approval is sent to described web application server, and described web application server is called AM method and the acceptance of engineering quality tables of data in described database server locked;
F, project director operate the inquiry request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality data of an engineering project to described web application server, the inquiry request of the acceptance of engineering quality data to receiving of the servlet container in described web application server resolves, call AM method from described database server, select qualified acceptance of engineering quality data, and described acceptance of engineering quality data are sent to described end computer installation of submitting to a higher level for approval or revision;
G, project director operate the print request that described end computer installation of submitting to a higher level for approval or revision sends the acceptance of engineering quality form of an engineering project to described web application server, the print request of the acceptance of engineering quality form to receiving of the servlet container in described web application server resolves, call AM method from described database server, select the Electronic Signature data corresponding with the auditor auditing these acceptance of engineering quality data, and described Electronic Signature data are sent to described end computer installation of submitting to a higher level for approval or revision;Described acceptance of engineering quality data and described Electronic Signature data are sent to printer, by printer printout acceptance of engineering quality form by described end computer installation of submitting to a higher level for approval or revision;
The online application of engineering project progress payment
A, contract management personnel operate the project correspondence input contract essential information arranged in described web application server based on contract masterplate, and described contract essential information are saved in described database server;Described contract essential information includes Business Name information, engineering project information, Contract NO, contract type, duration of contract, contracts company information, total Value of Contract, advance payment ratio, quality guarantee gold ratio;
B, supervisor of construction operate described application end computer installation and send an engineering predication application request to described web application server, after described web application server receives described engineering predication application request, send an engineering predication application list to described application end computer installation;
C, supervisor of construction operate described application end computer installation and input the amount of advance payment information of this application according to the project correspondence arranged in described engineering predication application list, need money day information, anticipated abatement to complete day information;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering predication application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering predication application list;
D, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering predication application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering predication application list is resolved by described web application server, call AM method from described database server, select qualified engineering predication application list, and give described examination & verification end computer installation by the engineering predication application form single-shot chosen;
The application information that E, auditor operate in the described examination & verification end computer installation engineering predication application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the engineering predication application form monolock in described database server is fixed;
F, supervisor of construction operate described application end computer installation and send an engineering temporary loan application request to described web application server, after described web application server receives the request of described engineering temporary loan application, send an engineering to described application end computer installation and borrow temporarily money application list;
G, supervisor of construction operate described application end computer installation and input the money amount information that borrows temporarily of this application according to the described engineering project correspondence arranged in money application list that borrows temporarily, need money day information, anticipated abatement to complete day information;Supervisor of construction operates the described application end computer installation money application form single-shot that described engineering borrowed temporarily and gives described web application server, and described web application server is called the AM method money application list that described engineering borrowed temporarily and is saved in described database server;
H, supervisor of construction operate described application end computer installation and send an engineering to described web application server and borrow temporarily the request of submitting to a higher level for approval or revision of money application list, the borrow temporarily described engineering request of submitting to a higher level for approval or revision of money application list of described web application server resolves, calling AM method selects qualified engineering to borrow temporarily money application list from described database server, and the money application form single-shot that the engineering chosen borrowed temporarily gives described examination & verification end computer installation;
I, auditor operate the application information that the engineering chosen borrows temporarily in money application list by described examination & verification end computer installation and audit, the message of examination & verification approval is sent to described web application server, and described web application server is called AM method and the engineering in described database server is borrowed temporarily money application form monolock calmly;
J, supervisor of construction operate described application end computer installation and send a progress payment application request to described web application server, after described web application server receives described progress payment application request, send a progress payment application list to described application end computer installation;
K, supervisor of construction operate described application end computer installation and input the progress payment amount information of this application according to the project correspondence arranged in described progress payment application list, need money day information, anticipated abatement to complete day information;Supervisor of construction operates described application end computer installation and gives described web application server by described progress payment application form single-shot, and described web application server is called AM method and is saved in described database server by described progress payment application list;
L, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of a progress payment application list to described web application server, the request of submitting to a higher level for approval or revision of described progress payment application list is resolved by described web application server, call AM method from described database server, select qualified progress payment application list, and give described examination & verification end computer installation by the progress payment application form single-shot chosen;
The application information that M, auditor operate in the described examination & verification end computer installation progress payment application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the progress payment application form monolock in described database server is fixed;
N, supervisor of construction operate described application end computer installation and send an engineering promise breaking deduction application request to described web application server, after described web application server receives described engineering promise breaking deduction application request, send an engineering promise breaking deduction application list to described application end computer installation;
O, supervisor of construction operate described application end computer installation and input this deducted amount information, promise breaking project information, promise breaking note to payment deduction information according to the project correspondence arranged in described engineering promise breaking deduction application list;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering promise breaking deduction application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering promise breaking deduction application list;
P, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering promise breaking deduction application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering promise breaking deduction application list is resolved by described web application server, call AM method from described database server, select qualified engineering promise breaking deduction application list, and give described examination & verification end computer installation by the engineering chosen promise breaking deduction application form single-shot;
The application information that Q, auditor operate in the described examination & verification end computer installation engineering promise breaking deduction application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method by fixed for the engineering promise breaking deduction application form monolock in described database server;
R, supervisor of construction operate described application end computer installation and send a contract to the request of ticket payment application to described web application server, described web application server receives after described contract asks to ticket payment application, sends a contract to ticket payment application list to described application end computer installation;
S, supervisor of construction operate the described application end computer installation abatement information according to the project correspondence input received payment arranged in described contract to ticket payment application list;Supervisor of construction operates described application end computer installation and gives described web application server by described contract to ticket payment application form single-shot, and described web application server is called AM method and is saved in described database server to ticket payment application list by described contract;
T, supervisor of construction operate described application end computer installation and send an engineering quality guarantee gold application request to described web application server, after described web application server receives described engineering quality guarantee gold application request, send an engineering quality guarantee gold application list to described application end computer installation;
U, supervisor of construction operate described application end computer installation and input the quality guarantee gold amount information of this application according to the project correspondence arranged in described engineering quality guarantee gold application list, need money day information, quality guarantee gold note to payment deduction information;Supervisor of construction operates described application end computer installation and gives described web application server by described engineering quality guarantee gold application form single-shot, and described web application server is called AM method and is saved in described database server by described engineering quality guarantee gold application list;
V, supervisor of construction operate described application end computer installation and send the request of submitting to a higher level for approval or revision of an engineering quality guarantee gold application list to described web application server, the request of submitting to a higher level for approval or revision of described engineering quality guarantee gold application list is resolved by described web application server, call AM method from described database server, select qualified engineering quality guarantee gold application list, and give described examination & verification end computer installation by the engineering quality guarantee gold application form single-shot chosen;
The application information that W, auditor operate in the described examination & verification end computer installation engineering quality guarantee gold application list to choosing is audited, the message of examination & verification approval is sent to described web application server, and described web application server calls AM method, and the engineering quality guarantee gold application form monolock in described database server is fixed;
Material and labour cost analysis generates project estimates online
A, construction budget person operate described budget end computer installation and send a request setting up material references to described web application server, after described web application server receives the described request setting up material references, send a material references data form to described budget end computer installation;
B, construction budget person operate described budget end computer installation according to the essential information of project correspondence input material benchmark arranged in described material references data form and the unit price information of material references;The essential information of described material references includes that material class number information, title material information, specifications and models information, measurement unit information, material specification and first are for information;The unit price information of described material references includes area unit price information, match ratio material unit price information;
C, construction budget person operate described budget end computer installation and will fill in complete material references data form and be sent to described web application server, and described web application server is called AM method and be will fill in complete material references data form and be saved in described database server;
D, construction budget person operate described budget end computer installation and send a request setting up budgetary discipline classification benchmark to described web application server, after described web application server receives the described request setting up budgetary discipline classification benchmark, send a budgetary discipline classification benchmark data list to described budget end computer installation;
E, construction budget person operate described budget end computer installation according to the project correspondence input budgetary discipline classification information arranged in described budgetary discipline classification benchmark data list and the budget thin item classification information of this budgetary discipline classification;Described budgetary discipline classification information includes budgetary discipline item name, class number;Described budget thin item classification information includes that budget thin item item name, thin item are numbered;
F, construction budget person operate described budget end computer installation and will fill in complete budgetary discipline classification benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete budgetary discipline classification benchmark data list and be saved in described database server;
G, construction budget person operate described budget end computer installation and send a request setting up artificial benchmark to described web application server, after described web application server receives the described request setting up artificial benchmark, send an artificial benchmark data list to described budget end computer installation;
H, construction budget person operate described budget end computer installation and input artificial reference information according to the project correspondence arranged in described artificial benchmark data list;Described artificial reference information includes category information, work post code information, measurement unit information, artificial unit price information;
I, construction budget person operate described budget end computer installation and will fill in complete artificial benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete artificial benchmark data list and be saved in described database server;
J, construction budget person operate described budget end computer installation and send a request setting up rate project benchmark to described web application server, after described web application server receives the described request setting up rate project benchmark, send a rate project benchmark data list to described budget end computer installation;
K, construction budget person operate described budget end computer installation according to the project correspondence input rate project reference information arranged in described rate project benchmark data list;Described rate project reference information includes rate bullets information, rate project name information, works category information, job location information, toll-ratio information;
L, construction budget person operate described budget end computer installation and will fill in complete rate project benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete rate project benchmark data list and be saved in described database server;
M, construction budget person operate described budget end computer installation and send a request setting up inventory specific item benchmark to described web application server, after described web application server receives the described request setting up inventory specific item benchmark, send an inventory specific item benchmark data list to described budget end computer installation;
N, construction budget person operate described budget end computer installation according to the project correspondence input inventory specific item information arranged in described inventory specific item benchmark data list;Described inventory specific item information includes that specific item encodes information, specific item name information, specific item unit information, characterization information, job content information;Select independent inventory specific item classification, in addition it is also necessary to input Business Name information, works category information, specific item base price information;Non-selected independent inventory specific item classification, input inventory specific item is detailed;
O, construction budget person operate described budget end computer installation and will fill in complete inventory specific item benchmark data list and be sent to described web application server, and described web application server is called AM method and be will fill in complete inventory specific item benchmark data list and be saved in described database server;
P, construction budget person operate described budget end computer installation and send the request of an establishment construction budget to described web application server, after described web application server receives the request of described establishment construction budget, send a construction budget data form to described budget end computer installation;
Q, construction budget person operate described budget end computer installation according to project correspondence the input essential information of construction budget, inventory specific item information, main material information, the match ratio material information arranged in described construction budget data form;Construction budget person operates described budget end computer installation and inputs the quantities of inventory specific item, the quantities of main material, the amount of budget of match ratio material according to construction program data correspondence;
R, construction budget person operate described budget end computer installation and will fill in complete construction budget data form and be sent to described web application server, described web application server calculates the total price of inventory specific item automatically according to the quantities of the inventory specific item of input, the quantities of the main material according to input calculates the total price of main material automatically, automatically calculates the total price of match ratio material according to the amount of budget of the match ratio material of input;Described web application server is called the construction budget data form that calculating completes by AM method and is saved in described database server;
S, construction budget person operate described budget end computer installation and send the request of submitting to a higher level for approval or revision of a construction budget to described web application server, the request of submitting to a higher level for approval or revision of described construction budget is resolved by described web application server, call AM method from described database server, select qualified construction budget data form, and the total price information in described construction budget data form collected one construction budget of generation submit to a higher level for approval or revision list, list of being submitted to a higher level for approval or revision by described construction budget is sent to described examination & verification end computer installation;
T, auditor operate the summary information that described construction budget submitted to a higher level for approval or revision in list by described examination & verification end computer installation and audit, the information of examination & verification approval is sent to described web application server, and described web application server is called AM method list of being submitted to a higher level for approval or revision by described construction budget and is saved in described database server locking.
CN201210295321.XA 2011-11-29 2012-08-20 The online management method of engineering project Active CN103136626B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210295321.XA CN103136626B (en) 2011-11-29 2012-08-20 The online management method of engineering project

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201110386914 2011-11-29
CN201110386914.2 2011-11-29
CN2011103869142 2011-11-29
CN201210295321.XA CN103136626B (en) 2011-11-29 2012-08-20 The online management method of engineering project

Publications (2)

Publication Number Publication Date
CN103136626A CN103136626A (en) 2013-06-05
CN103136626B true CN103136626B (en) 2016-08-03

Family

ID=48496435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210295321.XA Active CN103136626B (en) 2011-11-29 2012-08-20 The online management method of engineering project

Country Status (1)

Country Link
CN (1) CN103136626B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107437154A (en) * 2017-08-15 2017-12-05 安徽婧文科技有限公司 Project management information processing system based on computer technology
CN108229699A (en) * 2017-12-29 2018-06-29 苏州泽达兴邦医药科技有限公司 A kind of Chinese medicine extractor management method

Families Citing this family (104)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390215A (en) * 2013-07-15 2013-11-13 黄静波 Engineering construction project real-time cloud management system and method
CN103413197A (en) * 2013-07-19 2013-11-27 广东电网公司佛山供电局 Method and system for monitoring electric power marketing work plan
CN103440264B (en) * 2013-08-01 2017-03-08 广东电网公司 The realization method and system of electric power field operation form
CN104599004A (en) * 2013-10-31 2015-05-06 南京思润软件有限公司 Project management system based on C/S (Client/Server) structure
CN103646315A (en) * 2013-12-16 2014-03-19 国家电网公司 Method and device for data processing in electricity bureau engineering project workflow
CN103729733A (en) * 2013-12-18 2014-04-16 中国铁道科学研究院电子计算技术研究所 Production and construction system and method for large road maintaining machine
CN103942658A (en) * 2014-05-07 2014-07-23 国家电网公司 Design flow management system for electric power engineering
US11288613B2 (en) 2014-07-11 2022-03-29 Textura Corporation Construction project performance management
CN104318408A (en) * 2014-11-25 2015-01-28 上海建科工程咨询有限公司 Multi-target and multi-dimension risk management system for large building engineering construction
CN104599061A (en) * 2015-01-13 2015-05-06 上海建工集团股份有限公司 Method for calculating project amount of road bridge engineering project
CN104778537A (en) * 2015-03-19 2015-07-15 中国石油化工股份有限公司 Three-simultaneousness managing system of construction projects
CN104899799A (en) * 2015-06-30 2015-09-09 江苏冲浪软件科技有限公司 Project management system
CN104992381A (en) * 2015-07-14 2015-10-21 国网冀北电力有限公司经济技术研究院 Power grid project quantity list evaluation application software platform establishing method
CN105373875A (en) * 2015-08-26 2016-03-02 吕曼 Intelligent engineering construction project management system
CN105354653A (en) * 2015-08-26 2016-02-24 吕曼 Intelligent management system for engineering construction project
CN105184510A (en) * 2015-10-13 2015-12-23 杨明幸 Project management system
CN105303332A (en) * 2015-11-30 2016-02-03 国家电网公司 Electric power engineering project management system
CN106940628B (en) * 2016-01-04 2020-09-18 平安科技(深圳)有限公司 Document printing method and device
CN105654254A (en) * 2016-03-22 2016-06-08 成都甲图乙网络科技有限公司 Multiparty interactive project management method and system
CN105678482A (en) * 2016-04-01 2016-06-15 上海建科工程咨询有限公司 Method and corresponding device for processing project data information
CN107680003A (en) * 2016-08-01 2018-02-09 北京地厚云图科技有限公司 The node tree generation method and device of project supervision task
CN107688922A (en) * 2016-08-04 2018-02-13 北京地厚云图科技有限公司 Project supervision task processing method and device based on node tree
CN106529779A (en) * 2016-10-24 2017-03-22 深圳神马宝典信息技术有限公司 Information management system of construction project
CN106779325A (en) * 2016-11-29 2017-05-31 河北建筑工程学院 A kind of engineering management monitoring system and method
CN106845762B (en) * 2016-12-12 2020-10-13 国网北京市电力公司 Data management system, method and device based on data analysis
CN107545405A (en) * 2016-12-21 2018-01-05 济南采止网络科技有限公司 A kind of architectural design project management method and its system
TWI606349B (en) * 2016-12-21 2017-11-21 財團法人工業技術研究院 Online cloud-based service processing system, online evaluation method and computer program product thereof
CN106803155B (en) * 2017-01-25 2021-04-20 深圳市万科房地产有限公司 Construction quality control method and system
CN107169788A (en) * 2017-04-28 2017-09-15 庞大信息技术(上海)有限公司 A kind of online contract system of instant on-line pricing of construction decoration
CN107274073A (en) * 2017-05-26 2017-10-20 北京戴纳实验科技有限公司 Demand information searching system for laboratory engineering design
CN107358340B (en) * 2017-06-23 2018-05-15 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
CN107369002A (en) * 2017-07-07 2017-11-21 邓华 Engineering project information processing method and system
CN107527142A (en) * 2017-08-04 2017-12-29 鸿鑫互联科技(北京)股份有限公司 The control method of personnel's authority, device and mobile terminal in project management
CN107491936A (en) * 2017-08-04 2017-12-19 鸿鑫互联科技(北京)股份有限公司 A kind of intelligent engineering project control platform and method
CN107609837A (en) * 2017-08-04 2018-01-19 鸿鑫互联科技(北京)股份有限公司 Affixed one's seal in a kind of project management the control method and system of examination & verification
CN107644315B (en) * 2017-09-08 2022-07-15 泰州市抗震办公室(泰州市建设工程施工图设计审查中心) Construction drawing joint examination system
CN107767121A (en) * 2017-10-31 2018-03-06 深圳市彩业建设有限公司 A kind of system and method for the interior decoration Life cycle service based on internet
CN107862057A (en) * 2017-11-10 2018-03-30 上海建工五建集团有限公司 Information amending method and system
CN107909527A (en) * 2017-11-14 2018-04-13 嘉兴云顶在线信息科技有限公司 One kind enterprise feelings on-line system
CN107945000A (en) * 2017-11-24 2018-04-20 国网内蒙古东部电力有限公司 A kind of power grid technological transformation overhaul engineering settlement management system and its control method
CN109840748A (en) * 2017-11-29 2019-06-04 镇江市新创计算机系统集成有限公司 A kind of project management system and method
CN108241965A (en) * 2017-12-08 2018-07-03 广州供电局有限公司 Gauge table installation management method and system, computer equipment and storage medium
CN109961266A (en) * 2017-12-26 2019-07-02 广东电网有限责任公司电力调度控制中心 A kind of production project contractor management system and method
CN108074078A (en) * 2017-12-27 2018-05-25 橙志(上海)环保技术有限公司 A kind of environmental impact assessment industry contract management system
CN108022103A (en) * 2017-12-28 2018-05-11 北京路捞互联网科技有限公司 Merchandise suitable for the Web intelligence of complex transaction form
CN108376320A (en) * 2018-03-21 2018-08-07 湖南润安危物联科技发展有限公司 Fulfilling data managing method and device
CN108416533A (en) * 2018-03-23 2018-08-17 中国十七冶集团有限公司 A kind of project management data management system and its method based on business intelligence
CN108446895A (en) * 2018-03-26 2018-08-24 郑州大学 A kind of engineering construction project intelligent management system
CN108537648A (en) * 2018-03-27 2018-09-14 四川国际招标有限责任公司 Invitation system on a kind of line
CN108197910A (en) * 2018-03-27 2018-06-22 四川国际招标有限责任公司 A kind of project for bidding project verification management system
CN108564207B (en) * 2018-03-30 2021-05-18 合肥工业大学 BIM-based construction engineering intelligent bidding decision management system
CN108647994A (en) * 2018-04-10 2018-10-12 广东万饰网络科技有限公司 A kind of ERP software automatic quotation system
CN108764610B (en) * 2018-04-12 2022-04-01 福建工程学院 Standard process engineering project construction management method based on big data and storage medium
CN108647311B (en) * 2018-05-10 2021-01-22 厦门海迈科技股份有限公司 Electronic processing system and method for engineering construction management process file
CN108804639A (en) * 2018-06-04 2018-11-13 平安科技(深圳)有限公司 Method for exhibiting data, electronic equipment and computer readable storage medium
CN108694515A (en) * 2018-06-06 2018-10-23 浪潮软件股份有限公司 A kind of food based on model-driven manages the method and system of on-site verification
CN109063956A (en) * 2018-06-22 2018-12-21 深圳市中电数通智慧安全科技股份有限公司 A kind of industry park project management system
CN108830503A (en) * 2018-06-28 2018-11-16 友谊国际工程咨询有限公司 A kind of whole process engineering consulting method of servicing and system
CN109064126B (en) * 2018-07-18 2021-03-26 长江勘测规划设计研究有限责任公司 Hydropower engineering metering information management method based on quality driving
CN108960451A (en) * 2018-07-19 2018-12-07 河北地质大学 A kind of bargh's production scheduling approaches to IM and system
CN109359125A (en) * 2018-08-27 2019-02-19 中铁建工集团有限公司 A kind of progress fine-grained management method and its system for construction project
CN109213784A (en) * 2018-09-04 2019-01-15 北京海数宝科技有限公司 Report on the evaluation of tenders generation method, device, electronic equipment and storage medium
CN109460962A (en) * 2018-09-18 2019-03-12 中车工业研究院有限公司 Design objective crowdsourcing management system and method based on full Photographing On-line platform
CN109657911A (en) * 2018-11-14 2019-04-19 遵义华正电缆桥架有限公司 System is instructed in a kind of assessment of power construction
CN109583534B (en) * 2018-11-27 2022-06-14 国家电网有限公司 Equipment purchase fee automatic statistical method based on material ID and Internet of things label
CN109767073A (en) * 2018-12-15 2019-05-17 深圳壹账通智能科技有限公司 Calculation method, device, computer equipment and the storage medium of the project budget
CN109636351B (en) * 2018-12-18 2019-11-19 金润方舟科技股份有限公司 A kind of calling for tenders of project management system based on big data
CN109658014A (en) * 2019-01-24 2019-04-19 周瑜 A kind of construction overall management method
CN109918414A (en) * 2019-02-03 2019-06-21 北京海数宝科技有限公司 Data processing method, device, storage medium and computer equipment based on building quantity inventory
CN109903015A (en) * 2019-02-26 2019-06-18 安徽虹桥交通建设监理有限公司 A kind of engineering process acceptance method and system
CN109961269A (en) * 2019-03-12 2019-07-02 佛山市均林人防工程有限公司 A kind of project in construction management method
CN109978676A (en) * 2019-03-21 2019-07-05 广州翔实工程咨询有限公司 A kind of automatic settlement method, system and storage medium
CN109947805A (en) * 2019-03-22 2019-06-28 国网上海市电力公司 A kind of engineering project process management system and its management method
CN111563716A (en) * 2019-04-19 2020-08-21 上海约顺信息科技有限公司 Cross-system budget management system and method
CN111833005A (en) * 2019-04-23 2020-10-27 中国石化工程建设有限公司 Shell-and-tube heat exchanger frame type bidding management platform
CN110175885A (en) * 2019-04-26 2019-08-27 武汉欧铭达科技有限公司 A kind of project Real-Time Sharing trading platform system
CN110428176B (en) * 2019-08-05 2020-10-30 中国电力企业联合会电力建设技术经济咨询中心 Project progress auditing method and system
CN112734348B (en) * 2019-10-14 2024-03-29 冠呈能源环控有限公司 Green building engineering electromechanical device performance inspection management system
CN110852635A (en) * 2019-11-14 2020-02-28 上海新蕴力电子商务有限公司 Platform system in electricity merchant operation
CN112819662A (en) * 2019-11-15 2021-05-18 上海唯链信息科技有限公司 Information management method and device
CN110910092A (en) * 2019-11-21 2020-03-24 四川高路交通信息工程有限公司 Highway construction information management platform
CN111126016A (en) * 2019-12-05 2020-05-08 北京明略软件系统有限公司 Gantt chart drawing method and device, computer storage medium and terminal
CN111178680B (en) * 2019-12-09 2024-02-27 河北建投新能源有限公司 Wind power plant engineering quality overall process management system, method and equipment
CN111159101A (en) * 2019-12-11 2020-05-15 中国电建集团华东勘测设计研究院有限公司 Electronic file full life cycle management method in hydraulic and hydroelectric engineering construction management
TW202129560A (en) * 2020-01-21 2021-08-01 郭素蓮 Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner
CN111798080A (en) * 2020-04-27 2020-10-20 汕头市高博电子科技有限公司 Help item data management method and system
CN111767247A (en) * 2020-06-28 2020-10-13 杭州远大档案技术有限公司 File specification and synchronous forming control platform for real-time supervision of engineering data
CN111859479B (en) * 2020-07-09 2024-02-20 宁波智讯联科科技有限公司 Method and system for managing whole life cycle of engineering change in PDM system
CN112967025B (en) * 2020-07-09 2022-06-17 北京中百信信息技术股份有限公司 Information engineering supervision project image progress management system
CN111951042A (en) * 2020-07-21 2020-11-17 北京思特奇信息技术股份有限公司 Method and system for scheme management
CN111898984A (en) * 2020-07-29 2020-11-06 海南中金德航科技股份有限公司 Merchant background project management system
CN112000724A (en) * 2020-08-27 2020-11-27 四川公路桥梁建设集团有限公司 Highway engineering collaborative computation amount information management system based on custom formula
CN111985854A (en) * 2020-09-11 2020-11-24 武汉空心科技有限公司 Internet-based work platform task management and control system and management and control method thereof
CN112235265B (en) * 2020-09-29 2022-05-31 上海药明康德新药开发有限公司 System and method for external network to access project progress
CN112418823A (en) * 2020-12-11 2021-02-26 许江丽 Engineering overall process consultation service evaluation device
CN112686569A (en) * 2021-01-11 2021-04-20 武汉建工集团股份有限公司 Job site divides unit management system of grading based on wisdom building site management platform
CN113240252B (en) * 2021-04-28 2024-01-12 中核工程咨询有限公司 Nuclear power engineering quality evaluation data processing method, device, equipment and storage medium
CN113379369A (en) * 2021-05-14 2021-09-10 南京智慧建筑研究院有限公司 Full life cycle's management system based on wisdom building
CN113570339B (en) * 2021-07-30 2023-05-09 中国电建集团成都勘测设计研究院有限公司 Omnibearing progress management method based on information system
CN114925308B (en) * 2022-04-29 2023-10-03 北京百度网讯科技有限公司 Webpage processing method and device of website, electronic equipment and storage medium
CN115357630B (en) * 2022-10-24 2023-01-17 北京国电通网络技术有限公司 Information detection method, apparatus, device, computer readable medium and program product
CN116485283B (en) * 2023-06-19 2023-09-26 鼎信数智技术集团股份有限公司 Digitalized management platform based on big data bid-inviting data
CN116663848A (en) * 2023-06-28 2023-08-29 雅安紫木工程咨询有限公司 Multi-terminal full-flow engineering resource interaction management system and method
CN116644943B (en) * 2023-07-26 2023-09-29 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1351304A (en) * 2000-10-26 2002-05-29 Pc网络大厦株式会社 QC control for constructioning
CN102034134A (en) * 2009-09-27 2011-04-27 和舰科技(苏州)有限公司 Integrated project management system and method
CN102073632A (en) * 2009-07-18 2011-05-25 苏州鼎思科技有限公司 Comprehensive construction management knowledge base data structure for construction engineering

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10254745B2 (en) * 2010-05-20 2019-04-09 Mechanical Software Technologies, Inc. Computer-implemented automated design, modeling and manufacturing system for a project

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1351304A (en) * 2000-10-26 2002-05-29 Pc网络大厦株式会社 QC control for constructioning
CN102073632A (en) * 2009-07-18 2011-05-25 苏州鼎思科技有限公司 Comprehensive construction management knowledge base data structure for construction engineering
CN102034134A (en) * 2009-09-27 2011-04-27 和舰科技(苏州)有限公司 Integrated project management system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107437154A (en) * 2017-08-15 2017-12-05 安徽婧文科技有限公司 Project management information processing system based on computer technology
CN108229699A (en) * 2017-12-29 2018-06-29 苏州泽达兴邦医药科技有限公司 A kind of Chinese medicine extractor management method

Also Published As

Publication number Publication date
CN103136626A (en) 2013-06-05

Similar Documents

Publication Publication Date Title
CN103136626B (en) The online management method of engineering project
CN112950164B (en) Information system engineering supervision working hour recording information system based on standardized rules
CN111815283B (en) Information system engineering supervision enterprise business management system
CN111815168B (en) Information system engineering supervision project quality management system
CN111815424B (en) Information system engineering supervision project cost accounting management system
CN111815281B (en) Information system project supervision project bid management system
Coulson Value for money in PFI proposals: A commentary on the UK Treasury Guidelines for Public Sector Comparators
US8341089B2 (en) Real estate management system and method
CN106251082A (en) System for managing stock service of business
Kurowski et al. Investment Project Design: a guide to financial and economic analysis with constraints
Hashim et al. Treasury reference model
CN110599203A (en) Service transaction traceability and risk control system
KR20140099349A (en) To analyze and estimate the integration costs that apply to defense portal system and method.
Hashim et al. Information systems for government fiscal management
Ismail National Land Code 1965: Electronic Land Administration System in Land Registries
Hashim et al. Core Functional Requirements for Fiscal Management Systems
Küfeoğlu Blockchain applications and peer-to-peer tradings
Panneerselvam et al. Project management
Siva Developing a national single window: implementation issues and considerations
AU2021107406A4 (en) Computer implemented system and method for a construction projects user to perform accounting and finances as part of an integrated project control system
Nešić et al. A model of information flow management in the function of business processes improvement
Clarke of the Monterey Peninsula Water Management District
CN114298592A (en) Construction site management and control system and method
Heinze Cost Control
Thorpe Information flow in house building organisations

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant