CN105184510A - Project management system - Google Patents
Project management system Download PDFInfo
- Publication number
- CN105184510A CN105184510A CN201510655828.5A CN201510655828A CN105184510A CN 105184510 A CN105184510 A CN 105184510A CN 201510655828 A CN201510655828 A CN 201510655828A CN 105184510 A CN105184510 A CN 105184510A
- Authority
- CN
- China
- Prior art keywords
- module
- project
- verification
- design
- cost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a project transparent management system, including a project approval module, a concept design module, a design deepening module, a construction drawing design module, a bid inviting module, a project implementation module and a project completion final account module. Based on a computer and a network, the project management system realizes on-line operation management and auditing of a project, thereby saving resources, improving auditing speed and work efficiency, realizing perspective management of all the modules, facilitating monitoring of the rate of progress and quality of the project, and improving the automated management level of the project.
Description
Technical field
The present invention relates to a kind of management system, specifically, relate to a kind of engineering project transparent management system.
Background technology
Project management is a subdiscipline of management, and definitions refers in project activity and uses special knowledge, technical ability, tool and method, enables project under limited resources qualifications, realizes or exceedes the demand of setting and the process of expectation.
In the engineering construction project management, how to accomplish to save, reduce costs, extremely important.An engineering construction is divided into design phase and construction stage, and the design phase accounts for the 80%-85% of whole engineering cost, at present mainly by controlling construction cost, accomplish the cost control of construction stage, but can not carry out effective cost control to the design phase, in existing project management, each plate of design phase is all audited by the form of file, not only causes the waste of resource, and examination & verification speed is slow, causes work efficiency low.
Summary of the invention
The object of the present invention is to provide a kind of engineering project transparent management system, can the cost in control engineering Project design stage, reduce the wasting of resources, improve speed and the work efficiency of examination & verification.
The technical scheme that Engineering Project Mgmt System disclosed by the invention adopts is: a kind of engineering project transparent management system, comprises project verification module, conceptual design module, design in-depth module, construction drawing design module, bid module, project implementation module and final account for completed project module; The described project verification module cost of land performed in project verification process is audited, expenses for the resettlement of residents and the removal of obstacles are audited and municipal expense auditing; Structure in described conceptual design module implementation concept design process walk abreast cost audit and the material installation of cost audit, curtain wall that walk abreast walks abreast cost audit; Described design in-depth module performs the material cost examination & verification designed in deepening process, material cost difference examination & verification, cost of labor examination & verification and artificial price differential and audits; The determination of described construction drawing design module execution technique index and the payment of material fund and progress are monitored; Described bid module performs determines construction costs and service fee norm, and the information of simultaneously collecting bidding process carries out transparent management; Described project implementation module carries out quantitative management to drawing, collects the examination & approval that project progress information carries out transparent management and the payment of performance of work money; Described final account for completed project module is examined material cost difference and artificial price differential and is analyzed.
Preferably, the data that described project verification module also comprises approval for land use, removing and resettlement examination & approval and municipal administration are examined is collected and is managed.
Preferably, described bid module carries out collection management to bid and middle target enterprise data and bid contract.
Preferably, described project implementation module also comprises warning module, and described warning module compares to the engineering funds needing to pay with budget in early stage and analyzes.
The beneficial effect of Engineering Project Mgmt System disclosed by the invention is: Engineering Project Mgmt System of the present invention comprises project verification module, conceptual design module, design in-depth module, construction drawing design module, bid module, project implementation module and final account for completed project module, based on cyber-net, realize engineering project on-line operation management and examination & verification, save resource, improve speed and the work efficiency of examination & verification, realize the perspectiveization management of modules, be convenient to monitor the progress of engineering project and quality, improve the automatic management level of engineering project, and stopped the problem of the wasting of resources caused because of opaque.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of Engineering Project Mgmt System of the present invention.
Embodiment
Below in conjunction with specific embodiment and Figure of description the present invention be further elaborated and illustrate:
Please refer to Fig. 1, Engineering Project Mgmt System of the present invention, comprise project verification module, conceptual design module, design in-depth module, construction drawing design module, bid module, project implementation module and final account for completed project module, each module installation user right, there is the user of authority to auditing the corresponding operating of corresponding module and examine, and the user not possessing corresponding authority is merely able to check.
The described project verification module cost of land performed in project verification process is audited, expenses for the resettlement of residents and the removal of obstacles are audited and municipal expense auditing; Module of simultaneously setting up the project is collected the facilitation document that the facilitation document of approval for land use, the facilitation document of removing and resettlement and municipal administration are examined and is managed, and the file such as management method, removal cycle, arrangement way simultaneously for removing and resettlement carries out collecting and managing.
Structure in described conceptual design module implementation concept design process walk abreast cost audit and the material installation of cost audit, curtain wall that walk abreast walks abreast cost audit; Described design in-depth module performs the material cost examination & verification designed in deepening process, cost of labor examination & verification and price differential examination & verification, material cost comprises the buildings such as reinforcing bar cost, cement material cost, described price differential examination & verification comprises material cost difference examination & verification and the examination & verification of artificial price differential, because material price is variation, cost of labor is different, for the ease of management, design in-depth module is audited material cost difference and artificial price differential; The determination of described construction drawing design module execution technique index and the payment of material fund and progress are monitored; Described bid module performs determines construction costs and service fee norm, and the information of simultaneously collecting bidding process is carried out transparent management bid module and also carried out collection management to bid and middle target enterprise data and bid contract.
Described project implementation module carries out quantitative management to drawing, collects project progress information simultaneously and carries out transparent management, the examination & approval of performance of work money payment; Described project implementation module also comprises warning module, and described warning module compares to the engineering funds needing to pay with budget in early stage and analyzes.
Described final account for completed project module is examined material cost difference and artificial price differential and is analyzed.
Engineering Project Mgmt System provided by the invention is based on cyber-net, realize on-line operation management and the examination & verification of engineering project, save resource, improve speed and the work efficiency of examination & verification, achieve the perspectiveization management of modules simultaneously, be convenient to monitor the progress of engineering project and quality, improve the automatic management level of engineering project further, the problem of the wasting of resources caused because of opaque can also be stopped.
Finally should be noted that; above embodiment is only in order to illustrate technical scheme of the present invention; but not limiting the scope of the invention; although done to explain to the present invention with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify to technical scheme of the present invention or equivalent replacement, and not depart from essence and the scope of technical solution of the present invention.
Claims (4)
1. an engineering project transparent management system, is characterized in that, comprises project verification module, conceptual design module, design in-depth module, construction drawing design module, bid module, project implementation module and final account for completed project module; The described project verification module cost of land performed in project verification process is audited, expenses for the resettlement of residents and the removal of obstacles are audited and municipal expense auditing; Structure in described conceptual design module implementation concept design process walk abreast cost audit and the material installation of cost audit, curtain wall that walk abreast walks abreast cost audit; Described design in-depth module performs the material cost examination & verification designed in deepening process, material cost difference examination & verification, cost of labor examination & verification and artificial price differential and audits; The determination of described construction drawing design module execution technique index and the payment of material fund and progress are monitored; Described bid module performs determines construction costs and service fee norm, and the information of simultaneously collecting bidding process carries out transparent management; Described project implementation module carries out quantitative management to drawing, collects the examination & approval that project progress information carries out transparent management and the payment of performance of work money; Described final account for completed project module is examined material cost difference and artificial price differential and is analyzed.
2. Engineering Project Mgmt System as claimed in claim 1, is characterized in that, the data that described project verification module also comprises approval for land use, removing and resettlement examination & approval and municipal administration are examined is collected and managed.
3. Engineering Project Mgmt System as claimed in claim 1, is characterized in that, described bid module carries out collection management to bid and middle target enterprise data and bid contract.
4. Engineering Project Mgmt System as claimed in claim 1, it is characterized in that, described project implementation module also comprises warning module, and described warning module compares to the engineering funds needing to pay with budget in early stage and analyzes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510655828.5A CN105184510A (en) | 2015-10-13 | 2015-10-13 | Project management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510655828.5A CN105184510A (en) | 2015-10-13 | 2015-10-13 | Project management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105184510A true CN105184510A (en) | 2015-12-23 |
Family
ID=54906573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510655828.5A Pending CN105184510A (en) | 2015-10-13 | 2015-10-13 | Project management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105184510A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105956825A (en) * | 2016-04-29 | 2016-09-21 | 广州建皓信息技术有限公司 | Project management design platform |
CN106096915A (en) * | 2016-06-08 | 2016-11-09 | 国网安徽省电力公司检修公司 | A kind of engineering project data handling system |
CN106096905A (en) * | 2016-05-31 | 2016-11-09 | 北京诚公通信工程监理股份有限公司 | A kind of project management method and system |
CN107194544A (en) * | 2017-04-28 | 2017-09-22 | 夏胜军 | A kind of municipal works management system |
CN107330598A (en) * | 2017-06-22 | 2017-11-07 | 安徽山鼎信息科技有限公司 | A kind of security housing Project information management system |
CN107491936A (en) * | 2017-08-04 | 2017-12-19 | 鸿鑫互联科技(北京)股份有限公司 | A kind of intelligent engineering project control platform and method |
CN109003048A (en) * | 2018-07-03 | 2018-12-14 | 重庆中设工程设计股份有限公司 | Engineering design project process management system and its method |
CN109376986A (en) * | 2018-09-06 | 2019-02-22 | 北京华城建设监理有限责任公司 | A kind of Engineering cost audit management method |
CN112036815A (en) * | 2020-08-20 | 2020-12-04 | 湖北四位元电力有限公司 | Method for establishing power distribution network engineering cost index system |
CN112150109A (en) * | 2020-09-17 | 2020-12-29 | 水发规划建设有限公司 | Water conservancy design construction management method and system for EPC general contract project |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
-
2015
- 2015-10-13 CN CN201510655828.5A patent/CN105184510A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105956825A (en) * | 2016-04-29 | 2016-09-21 | 广州建皓信息技术有限公司 | Project management design platform |
CN106096905A (en) * | 2016-05-31 | 2016-11-09 | 北京诚公通信工程监理股份有限公司 | A kind of project management method and system |
CN106096915A (en) * | 2016-06-08 | 2016-11-09 | 国网安徽省电力公司检修公司 | A kind of engineering project data handling system |
CN107194544A (en) * | 2017-04-28 | 2017-09-22 | 夏胜军 | A kind of municipal works management system |
CN107330598A (en) * | 2017-06-22 | 2017-11-07 | 安徽山鼎信息科技有限公司 | A kind of security housing Project information management system |
CN107491936A (en) * | 2017-08-04 | 2017-12-19 | 鸿鑫互联科技(北京)股份有限公司 | A kind of intelligent engineering project control platform and method |
CN109003048A (en) * | 2018-07-03 | 2018-12-14 | 重庆中设工程设计股份有限公司 | Engineering design project process management system and its method |
CN109376986A (en) * | 2018-09-06 | 2019-02-22 | 北京华城建设监理有限责任公司 | A kind of Engineering cost audit management method |
CN112036815A (en) * | 2020-08-20 | 2020-12-04 | 湖北四位元电力有限公司 | Method for establishing power distribution network engineering cost index system |
CN112150109A (en) * | 2020-09-17 | 2020-12-29 | 水发规划建设有限公司 | Water conservancy design construction management method and system for EPC general contract project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105184510A (en) | Project management system | |
CN104850940B (en) | Budget needed for the completion of projects preparation method and system based on engineering Whole Course Management | |
CN106447405A (en) | Automatic pricing method for electric power marketing project bidding and system thereof | |
CN104573892A (en) | Whole process visual project management system for engineering construction | |
CN106570055A (en) | Information early-warning platform based on financial big data | |
CN104992285A (en) | Enterprise budget cost controlling system | |
CN108846643A (en) | A kind of general management of projects system | |
CN104794532A (en) | Automatic demand response system and automatic demand response method based on cloud computing PaaS platform | |
TW202414131A (en) | Hybrid system and method of carbon and energy managements for green intelligent manufacturing | |
CN104574004A (en) | Auxiliary distribution network state maintenance system | |
CN115456472A (en) | Industrial product purchase supply chain carbon asset digital management method and system | |
Raghutla et al. | Public-private partnerships investment in energy as new determinant of renewable energy: The role of political cooperation in China and India | |
CN104598698A (en) | On-line framework system and water supply pipe network model modeling method based on on-line framework system | |
Setyawan | Formulating revolving fund scheme to support energy efficiency projects in Indonesia | |
Xu et al. | Reassessing the linkage between natural resources and economic growth in China: Delving into the impacts of national resource taxes, renewable energy, financial advancements, and provincial fiscal expenditures | |
CN112181954A (en) | System and method for carrying out measurement design by software delivery of full link data | |
CN103136597A (en) | Decision support system for company management based on statistical indicators and application method thereof | |
Smerichevskyi et al. | FINANCIAL AND ACCOUNTING SUPPORT OF MARKETING STRATEGIES FOR ENERGY EFFICIENCY OF COAL MINES. | |
Akhmetzianov et al. | Technical and economic indicators of strategic management accounting in the development companies based on the life cycle of the produce | |
Nthutang et al. | Integration of Small and Medium Enterprises for Industry 4.0 in the South African Water Services Sector: A Case Study for Johannesburg Water | |
CN112700171A (en) | Intelligent fund management system | |
CN104809557A (en) | Transaction processing system based on Oracle EBS platform | |
CN108764730A (en) | A kind of power grid analysis of prices and auxiliary review system | |
CN104036368A (en) | Method and device for asset collection | |
CN104424590A (en) | House-leasing contract cost calculation method based on multi-Agent collaborative technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160719 Address after: 518000 Guangdong city of Shenzhen province Nanshan District science and technology eight South Road No. 2 building 13F-B Howell Technology Applicant after: Shenzhen Municipal Engineering Co. Ltd. Prendergast quota management Address before: Nine road 518000 Guangdong city of Shenzhen province Futian District Antoine Hill No. 2 golden tennis garden 11 6F Applicant before: Yang Mingxing |
|
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151223 |
|
RJ01 | Rejection of invention patent application after publication |