CN106570055A - Information early-warning platform based on financial big data - Google Patents

Information early-warning platform based on financial big data Download PDF

Info

Publication number
CN106570055A
CN106570055A CN201610853398.2A CN201610853398A CN106570055A CN 106570055 A CN106570055 A CN 106570055A CN 201610853398 A CN201610853398 A CN 201610853398A CN 106570055 A CN106570055 A CN 106570055A
Authority
CN
China
Prior art keywords
early
warning
information
financial
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610853398.2A
Other languages
Chinese (zh)
Inventor
谢传家
崔乐乐
赵军华
李仰允
唐旋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Inspur Cloud Service Information Technology Co Ltd
Original Assignee
Shandong Inspur Cloud Service Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Inspur Cloud Service Information Technology Co Ltd filed Critical Shandong Inspur Cloud Service Information Technology Co Ltd
Priority to CN201610853398.2A priority Critical patent/CN106570055A/en
Publication of CN106570055A publication Critical patent/CN106570055A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/254Extract, transform and load [ETL] procedures, e.g. ETL data flows in data warehouses
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Technology Law (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an information early-warning platform based on financial big data. The information early-warning platform comprises a financial information acquisition sub-system, a big data management platform, an early-warning model centre and an information pushing centre, wherein the financial information acquisition sub-system is used for acquiring related data of various systems in a financial system, and providing basis metadata; the big data management platform is used for cleaning, processing and classifying the basis metadata acquired by the financial information acquisition sub-system, and forming a theme library; the early-warning model centre is used for managing an early-warming scheme model responding to all kinds of scenes; and the information pushing centre is used for precisely pushing early-warming information according to different management requirements. Compared with the prior art, the information early-warning platform based on the financial big data has the advantages that: the utilization efficiency and the schedule of financial fund can be comprehensively tracked through multiple early-warning monitoring models; problems can be found in time; leaders can be assisted to make decision; therefore, high-efficiency operation of the financial fund can be ensured; the practicability is high; and the application range is wide.

Description

A kind of information early warning platform based on financial big data
Technical field
The present invention relates to Computer Applied Technology field, specifically a kind of practical, based on financial big data Information early warning platform.
Background technology
As different business scenarios are tackled in the continuous development of information-based industry, the finance department, having built batch message should With system, the great-leap-forward transformation of non-support cable is realized, improve office efficiency.
But it is also more and more urgent to the integration application demand of data with the continuous lifting that management is required.Due to government's letter Breathization is built and lacks unified planning, more using independence, disperses the mode built, information resources effectively to share utilization, It is difficult to solve the problems, such as Data Integration by simple local upgrading.
With the development of big data technology, unified big data management platform is set up, become solution information barrier, data are not Symmetrical general scheme, based on this, now provides a kind of information early warning platform for being based on financial big data.
The content of the invention
The technical assignment of the present invention is for above weak point, there is provided a kind of practical, based on financial big data Information early warning platform.
A kind of information early warning platform based on financial big data, its structure includes financial information acquisition subsystem, big data Management platform, Early-warning Model center, information pushing center, wherein,
Financial information acquisition subsystem, for gathering the related data of each system in fiscal system inside, there is provided basic metadata;
Big data management platform, to financial information acquisition subsystem collect basic metadata cleaned, processed, formation of classifying Theme storehouse;
Early-warning Model center, the early warning scheme model of the various scenes of management reply;
Information pushing center, the information of early warning is precisely pushed by the different requirements of management.
The each system in fiscal system inside include budgeting system, budget execution system, higher level's transfer payment system, Accounting station billing and accounting system, surplus of carrying down system, corresponding, each system institute described in financial information acquisition subsystem automatic data collection Some financial revenue and expenditure information, i.e., including higher level's transfer payment information, budget compilation information, budget enforcement information, surplus of carrying down letter Breath, the basic business data of accounting station financial information.
The big data management platform is extracted to basic metadata, is cleaned, changed, synthesized and school by ETL instruments After testing, form subject data base, subject data base here include transferring payments theme storehouse, budget target theme storehouse, refer to Mark performs theme storehouse, surplus budgetary funds of carrying down theme storehouse.
The Early-warning Model center has management function is customized to financial Early-warning Model, and in the base of subject data base On plinth, Distribution Indexes progress Early-warning Model, target advance Early-warning Model, Payment Scheduling Early-warning Model and surplus of carrying down money is set up Golden Early-warning Model.
The distribution progress Early-warning Model is referred to:Constraint when being formulated according to index, what higher level was transferred payments divides Early warning is carried out with progress, when the distribution that all funds are not completed within the desired time, when being changed into executable index, triggering is pre- Alert event.
The target advance Early-warning Model is divided into two classes, and a class is natural time planning model, and another kind of is the project plan Model, wherein:Natural time planning model refers to, by nature month, monthly average index amount, of that month index executor does not carry When handing over fund using plan, or fund using plan to be less than monthly average amount, early warning event is triggered;Project plan model is referred to, according to item Situation is formulated in purpose schedule, contrasts actual fund using plan, less than project schedule when, trigger early warning event.
The Payment Scheduling Early-warning Model is referred to:When actual funds disbursed progress is within the time period of setting, not up to During fund using plan amount, early warning event is triggered.
The surplus early warning of carrying down is referred to:When carry down surplus budgetary funds setting time in, without fund using plan and pay into When spending, early warning event is triggered.
The priority of Early-warning Model is sequentially from high to low:Surplus budgetary funds of carrying down Early-warning Model, distribution progress Early-warning Model, Target advance Early-warning Model, Payment Scheduling Early-warning Model;The order of severity of Early-warning Model is sequentially from high to low:Surplus of carrying down is provided Golden Early-warning Model, Payment Scheduling Early-warning Model, target advance Early-warning Model, distribution progress Early-warning Model.
Described information pushes center includes that warning information template customization, early warning information push project management, early warning information and push away Query function is sent, and by carrying out early warning information push including letter, note, the push means of APP in station.
A kind of information early warning platform based on financial big data of the present invention, with advantages below:
A kind of information early warning platform based on financial big data that the present invention is provided, by setting up different forewarning management indexs, With reference to financial fund service data, the working order of monitor in real time financial fund, and abnormal conditions are carried out to continue precisely tracking, The information system management level of financial fund is improved, contributes to vitalizing financial fund, the value of financial fund is excavated to the full extent, It is practical, it is applied widely, it is easy to promote.
Description of the drawings
Accompanying drawing 1 realizes schematic diagram for the present invention's.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment the invention will be further described.
Such as accompanying drawing 1, a kind of information early warning platform based on financial big data of the present invention, is to integrate to be related to finance at corresponding level The related all information resources of capital management, set up financial fund Warning Management System, from Distribution Indexes, target advance, payment Progress, carry down surplus angularly, the utilizing status of whole process supervision financial fund sufficiently excavate the value of financial fund.
Its structure is included in financial information acquisition subsystem, big data management platform, Early-warning Model center, information pushing The heart, wherein,
Financial information acquisition subsystem, gathers the related data of each system in fiscal system inside, and such as budgeting system, budget is held Row system, higher level's transfer payment system etc., there is provided basic metadata;
Financial big data management platform, cleans to the financial metadata that acquisition subsystem is collected, and processes, and classification forms theme Storehouse;
Early-warning Model center, the early warning scheme model of the various scenes of management reply;
Information pushing center, the information of early warning is precisely pushed by the different requirements of management.
Financial information acquisition subsystem collection higher level's transfer payment, budget compilation, budget enforcement, surplus of carrying down, meeting The basic business data of each operation systems such as meter station finance.
Financial information acquisition subsystem, for from financial existing system(Budgeting system, budget execution system, higher level Transfer payment system, accounting station billing and accounting system, surplus of carrying down system)In all of financial revenue and expenditure information of automatic data collection on time.
There is the financial big data management platform financial data to clean, and classification forms the function of subject data base, and builds Vertical theme storehouse of transferring payments, budget target theme storehouse, index perform theme storehouse, surplus budgetary funds of carrying down theme storehouse.
Financial big data management platform, the financial basis metadata data that financial information acquisition subsystem is gathered, is carried out Surface cleaning, classification forms special subject data base:Theme storehouse, budget target theme storehouse, the index of transferring payments performs master Exam pool, surplus budgetary funds of carrying down theme storehouse etc..
The Early-warning Model center has management function is customized to financial Early-warning Model, and sets up Distribution Indexes progress Early-warning Model, target advance Early-warning Model, Payment Scheduling Early-warning Model and surplus budgetary funds Early-warning Model of carrying down.
Early-warning Model center, based on different forewarning management dimensions, on the basis of all kinds of subject data bases, defines and manages Various financial Early-warning Models are managed, Distribution Indexes progress Early-warning Model, target advance Early-warning Model, Payment Scheduling Early-warning Model is set up And surplus budgetary funds Early-warning Model of carrying down.
Distribution progress Early-warning Model is referred to:Constraint when being formulated according to index, enters to the distribution that higher level transfers payments Degree carries out early warning, and the distribution of all funds is not completed such as within the desired time, is changed into executable index, then trigger early warning thing Part;
Target advance Early-warning Model is divided into two classes, and a class is natural time planning model, and another kind of is project plan model.It is natural Period planning model refers to, by nature month, monthly average index amount, of that month index executor does not submit fund using plan to, or When person's fund using plan is less than monthly average amount, then early warning event is triggered;Project plan model is referred to, according to the schedule of project Formulation situation, contrasts actual fund using plan, less than project schedule when, trigger early warning event;
Payment Scheduling early warning is referred to:Actual funds disbursed progress within the time period of setting, not up to fund using plan amount, Triggering early warning event;
Surplus of carrying down early warning is referred to:Within the time of setting, without fund using plan and during Payment Scheduling, triggering is pre- for surplus budgetary funds of carrying down Alert event.
The priority of Early-warning Model is sequentially from high to low:Surplus budgetary funds of carrying down Early-warning Model, distribution progress Early-warning Model, Target advance Early-warning Model, Payment Scheduling Early-warning Model;The order of severity of Early-warning Model is sequentially from high to low:Surplus of carrying down is provided Golden Early-warning Model, Payment Scheduling Early-warning Model, target advance Early-warning Model, distribution progress Early-warning Model.
Described information pushes center includes that warning information template customization, early warning information push project management, early warning information and push away Send query function.
Information pushing center includes that warning information template customization, early warning information push project management, early warning information and push and look into Ask function.For various level early warning information, different receivers, different information models are formulated, and realized in station Various push means such as letter, note, APP.
The present invention is transferred payments pipe based on budgeting system, budget execution system, accounting station billing and accounting system, higher level The financial fund information such as reason system, surplus of carrying down system, realize budget target(Project)From establishment, plan to the full mistake for performing Journey is tracked.
By various warning and monitoring models, comprehensively the utilization ratio and progress of tracking financial fund, pinpoints the problems in time, auxiliary Managerial decision is helped, so as to ensure financial fund high-efficiency operation, is further made rational planning for, prepared in advance, distributed according to need, it is to avoid fund Large area it is idle and lack of capital it is serious wait extreme phenomenon, so as to promote social high speed development.
Above-mentioned specific embodiment is only the concrete case of the present invention, and the scope of patent protection of the present invention is included but is not limited to Above-mentioned specific embodiment, a kind of claims of any information early warning platform based on financial big data for meeting the present invention And any technical field those of ordinary skill's appropriate change or replacement that it is done, should all fall into the special of the present invention Sharp protection domain.

Claims (10)

1. a kind of information early warning platform based on financial big data, it is characterised in that its structure includes that financial information gathers subsystem System, big data management platform, Early-warning Model center, information pushing center, wherein,
Financial information acquisition subsystem, for gathering the related data of each system in fiscal system inside, there is provided basic metadata;
Big data management platform, to financial information acquisition subsystem collect basic metadata cleaned, processed, formation of classifying Theme storehouse;
Early-warning Model center, the early warning scheme model of the various scenes of management reply;
Information pushing center, the information of early warning is precisely pushed by the different requirements of management.
2. a kind of information early warning platform based on financial big data according to claim 1, it is characterised in that the finance The each system in system inside include budgeting system, budget execution system, higher level's transfer payment system, accounting station billing and accounting system, Surplus of carrying down system, corresponding, all of financial revenue and expenditure letter of each system described in financial information acquisition subsystem automatic data collection Breath, i.e., including higher level's transfer payment information, budget compilation information, budget enforcement information, balance information of carrying down, accounting station finance letter The basic business data of breath.
3. a kind of information early warning platform based on financial big data according to claim 1, it is characterised in that the big number After being extracted to basic metadata, clean, changed, synthesized and verify by ETL instruments according to management platform, subject data is formed Storehouse, subject data base here performs theme storehouse, carries down including theme storehouse of transferring payments, budget target theme storehouse, index Surplus budgetary funds theme storehouse.
4. a kind of information early warning platform based on financial big data according to claim 1, it is characterised in that the early warning Model center has and is customized management function to financial Early-warning Model, and on the basis of subject data base, sets up index point With progress Early-warning Model, target advance Early-warning Model, Payment Scheduling Early-warning Model and surplus budgetary funds Early-warning Model of carrying down.
5. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that the distribution Progress Early-warning Model is referred to:Constraint when being formulated according to index, the distribution progress transferred payments to higher level carries out early warning, when The distribution of all funds is not completed within the desired time, when being changed into executable index, early warning event is triggered.
6. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that the plan Progress Early-warning Model is divided into two classes, and a class is natural time planning model, and another kind of is project plan model, wherein:When natural Between planning model refer to that by nature month, monthly average index amount, of that month index executor does not submit fund using plan to, or When fund using plan is less than monthly average amount, early warning event is triggered;Project plan model is referred to, formulated according to the schedule of project Situation, contrasts actual fund using plan, less than project schedule when, trigger early warning event.
7. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that the payment Progress Early-warning Model is referred to:When actual funds disbursed progress is within the time period of setting, not up to fund using plan amount when, touch Send out early warning event.
8. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that described to carry down Surplus early warning is referred to:When surplus budgetary funds are carried down within the time of setting, without fund using plan and during Payment Scheduling, early warning thing is triggered Part.
9. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that Early-warning Model Priority be sequentially from high to low:Surplus budgetary funds of carrying down Early-warning Model, distribution progress Early-warning Model, target advance early warning mould Type, Payment Scheduling Early-warning Model;The order of severity of Early-warning Model is sequentially from high to low:Surplus budgetary funds of carrying down Early-warning Model, Pay progress Early-warning Model, target advance Early-warning Model, distribution progress Early-warning Model.
10. a kind of information early warning platform based on financial big data according to claim 1, it is characterised in that the letter Breath push center includes that warning information template customization, early warning information push project management, early warning information and push query function, and lead to Cross carries out early warning information push including letter, note, the push means of APP in station.
CN201610853398.2A 2016-09-27 2016-09-27 Information early-warning platform based on financial big data Pending CN106570055A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610853398.2A CN106570055A (en) 2016-09-27 2016-09-27 Information early-warning platform based on financial big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610853398.2A CN106570055A (en) 2016-09-27 2016-09-27 Information early-warning platform based on financial big data

Publications (1)

Publication Number Publication Date
CN106570055A true CN106570055A (en) 2017-04-19

Family

ID=58532493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610853398.2A Pending CN106570055A (en) 2016-09-27 2016-09-27 Information early-warning platform based on financial big data

Country Status (1)

Country Link
CN (1) CN106570055A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107330629A (en) * 2017-07-06 2017-11-07 广东电网有限责任公司信息中心 The large-scale artificial cost monitoring of central enterprise's Power Group enterprise realizes system with analysis
CN108510381A (en) * 2018-03-21 2018-09-07 安徽天勤盛创信息科技股份有限公司 A kind of finance national treasury inventory statistics monitoring system
CN108510379A (en) * 2018-03-21 2018-09-07 安徽天勤盛创信息科技股份有限公司 A kind of financial revenue and expenditure statistic management system based on big data
CN108510380A (en) * 2018-03-21 2018-09-07 安徽天勤盛创信息科技股份有限公司 A kind of property tax analysis platform based on big data
CN109636352A (en) * 2018-12-20 2019-04-16 湖南晖龙集团股份有限公司 A kind of distributed content duplicate checking early warning system based on financial big data
CN110490785A (en) * 2019-07-08 2019-11-22 广东铭太信息科技有限公司 A kind of government budget measure of supervision, system and storage medium
WO2020000633A1 (en) * 2018-06-26 2020-01-02 平安科技(深圳)有限公司 Capital monitoring method, capital monitoring system, terminal and readable storage medium
CN112184156A (en) * 2020-09-24 2021-01-05 安徽政大数据软件有限公司 Economic analysis system based on big data management

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103441896A (en) * 2013-08-26 2013-12-11 苏州市吴江区人民政府国有资产监督管理办公室 Service data monitoring and early warning platform and early warning method
US20150095216A1 (en) * 2013-09-30 2015-04-02 The Toronto-Dominion Bank Methods and systems for determining and providing negative event notifications
CN105184642A (en) * 2015-09-02 2015-12-23 浪潮软件集团有限公司 Comprehensive tax administration platform
CN105761010A (en) * 2016-02-24 2016-07-13 国网山东省电力公司 Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition
CN105956985A (en) * 2016-06-29 2016-09-21 浪潮软件集团有限公司 Financial information sharing platform, system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103441896A (en) * 2013-08-26 2013-12-11 苏州市吴江区人民政府国有资产监督管理办公室 Service data monitoring and early warning platform and early warning method
US20150095216A1 (en) * 2013-09-30 2015-04-02 The Toronto-Dominion Bank Methods and systems for determining and providing negative event notifications
CN105184642A (en) * 2015-09-02 2015-12-23 浪潮软件集团有限公司 Comprehensive tax administration platform
CN105761010A (en) * 2016-02-24 2016-07-13 国网山东省电力公司 Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition
CN105956985A (en) * 2016-06-29 2016-09-21 浪潮软件集团有限公司 Financial information sharing platform, system and method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107330629A (en) * 2017-07-06 2017-11-07 广东电网有限责任公司信息中心 The large-scale artificial cost monitoring of central enterprise's Power Group enterprise realizes system with analysis
CN108510381A (en) * 2018-03-21 2018-09-07 安徽天勤盛创信息科技股份有限公司 A kind of finance national treasury inventory statistics monitoring system
CN108510379A (en) * 2018-03-21 2018-09-07 安徽天勤盛创信息科技股份有限公司 A kind of financial revenue and expenditure statistic management system based on big data
CN108510380A (en) * 2018-03-21 2018-09-07 安徽天勤盛创信息科技股份有限公司 A kind of property tax analysis platform based on big data
WO2020000633A1 (en) * 2018-06-26 2020-01-02 平安科技(深圳)有限公司 Capital monitoring method, capital monitoring system, terminal and readable storage medium
CN109636352A (en) * 2018-12-20 2019-04-16 湖南晖龙集团股份有限公司 A kind of distributed content duplicate checking early warning system based on financial big data
CN110490785A (en) * 2019-07-08 2019-11-22 广东铭太信息科技有限公司 A kind of government budget measure of supervision, system and storage medium
CN112184156A (en) * 2020-09-24 2021-01-05 安徽政大数据软件有限公司 Economic analysis system based on big data management

Similar Documents

Publication Publication Date Title
CN106570055A (en) Information early-warning platform based on financial big data
CN104468136B (en) Charging method, analysis center and charging center
Wang et al. Bayesian analytics for estimating risk probability in PPP waste-to-energy projects
CN103414577B (en) Accounting system and method for Hadoop platform
CN103136696A (en) Management method of media placement and system thereof
CN105023196A (en) Analysis method and device for charging transaction data of charging stations
CN104036139B (en) A kind of mobile object track monitoring method
CN103729778A (en) Omni-channel advertisement accurate delivery system and method
CN106204106A (en) A kind of specific user's recognition methods and system
CN103295104A (en) Quota design management method and project investment service platform for cost accounting
CN105184510A (en) Project management system
CN105809277A (en) Big data based prediction method for the refining and managing of electric power marketing inspection
CN102081781A (en) Finance modeling optimization method based on information self-circulation
CN110516155A (en) Marketing strategy generation method and system
CN110991985A (en) Project progress data processing method
CN106408271A (en) Method and device for monitoring project
CN105631612A (en) System and method of evaluating individual performance and capability of public servant based on big data
CN107766500A (en) The auditing method of fixed assets card
CN103761618A (en) Control method and system of science and technology item
Nieuwenhuijsen et al. The role of health impact assessment for shaping policies and making cities healthier
CN104599008A (en) Property management system based on C/S framework
CN114841788A (en) Engineering project construction management completion settlement overall process management system
CN105931142A (en) Method for determining electric charge collection ranks
CN114398941A (en) User payment behavior classification method, device, equipment and readable storage medium
Kolosov et al. Forming the capability of rural and settlement united territorial communities in Ukraine: using the experience of Poland.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419