CN106570055A - Information early-warning platform based on financial big data - Google Patents
Information early-warning platform based on financial big data Download PDFInfo
- Publication number
- CN106570055A CN106570055A CN201610853398.2A CN201610853398A CN106570055A CN 106570055 A CN106570055 A CN 106570055A CN 201610853398 A CN201610853398 A CN 201610853398A CN 106570055 A CN106570055 A CN 106570055A
- Authority
- CN
- China
- Prior art keywords
- early
- warning
- information
- financial
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/254—Extract, transform and load [ETL] procedures, e.g. ETL data flows in data warehouses
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
- G06Q40/125—Finance or payroll
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Technology Law (AREA)
- General Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Economics (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an information early-warning platform based on financial big data. The information early-warning platform comprises a financial information acquisition sub-system, a big data management platform, an early-warning model centre and an information pushing centre, wherein the financial information acquisition sub-system is used for acquiring related data of various systems in a financial system, and providing basis metadata; the big data management platform is used for cleaning, processing and classifying the basis metadata acquired by the financial information acquisition sub-system, and forming a theme library; the early-warning model centre is used for managing an early-warming scheme model responding to all kinds of scenes; and the information pushing centre is used for precisely pushing early-warming information according to different management requirements. Compared with the prior art, the information early-warning platform based on the financial big data has the advantages that: the utilization efficiency and the schedule of financial fund can be comprehensively tracked through multiple early-warning monitoring models; problems can be found in time; leaders can be assisted to make decision; therefore, high-efficiency operation of the financial fund can be ensured; the practicability is high; and the application range is wide.
Description
Technical field
The present invention relates to Computer Applied Technology field, specifically a kind of practical, based on financial big data
Information early warning platform.
Background technology
As different business scenarios are tackled in the continuous development of information-based industry, the finance department, having built batch message should
With system, the great-leap-forward transformation of non-support cable is realized, improve office efficiency.
But it is also more and more urgent to the integration application demand of data with the continuous lifting that management is required.Due to government's letter
Breathization is built and lacks unified planning, more using independence, disperses the mode built, information resources effectively to share utilization,
It is difficult to solve the problems, such as Data Integration by simple local upgrading.
With the development of big data technology, unified big data management platform is set up, become solution information barrier, data are not
Symmetrical general scheme, based on this, now provides a kind of information early warning platform for being based on financial big data.
The content of the invention
The technical assignment of the present invention is for above weak point, there is provided a kind of practical, based on financial big data
Information early warning platform.
A kind of information early warning platform based on financial big data, its structure includes financial information acquisition subsystem, big data
Management platform, Early-warning Model center, information pushing center, wherein,
Financial information acquisition subsystem, for gathering the related data of each system in fiscal system inside, there is provided basic metadata;
Big data management platform, to financial information acquisition subsystem collect basic metadata cleaned, processed, formation of classifying
Theme storehouse;
Early-warning Model center, the early warning scheme model of the various scenes of management reply;
Information pushing center, the information of early warning is precisely pushed by the different requirements of management.
The each system in fiscal system inside include budgeting system, budget execution system, higher level's transfer payment system,
Accounting station billing and accounting system, surplus of carrying down system, corresponding, each system institute described in financial information acquisition subsystem automatic data collection
Some financial revenue and expenditure information, i.e., including higher level's transfer payment information, budget compilation information, budget enforcement information, surplus of carrying down letter
Breath, the basic business data of accounting station financial information.
The big data management platform is extracted to basic metadata, is cleaned, changed, synthesized and school by ETL instruments
After testing, form subject data base, subject data base here include transferring payments theme storehouse, budget target theme storehouse, refer to
Mark performs theme storehouse, surplus budgetary funds of carrying down theme storehouse.
The Early-warning Model center has management function is customized to financial Early-warning Model, and in the base of subject data base
On plinth, Distribution Indexes progress Early-warning Model, target advance Early-warning Model, Payment Scheduling Early-warning Model and surplus of carrying down money is set up
Golden Early-warning Model.
The distribution progress Early-warning Model is referred to:Constraint when being formulated according to index, what higher level was transferred payments divides
Early warning is carried out with progress, when the distribution that all funds are not completed within the desired time, when being changed into executable index, triggering is pre-
Alert event.
The target advance Early-warning Model is divided into two classes, and a class is natural time planning model, and another kind of is the project plan
Model, wherein:Natural time planning model refers to, by nature month, monthly average index amount, of that month index executor does not carry
When handing over fund using plan, or fund using plan to be less than monthly average amount, early warning event is triggered;Project plan model is referred to, according to item
Situation is formulated in purpose schedule, contrasts actual fund using plan, less than project schedule when, trigger early warning event.
The Payment Scheduling Early-warning Model is referred to:When actual funds disbursed progress is within the time period of setting, not up to
During fund using plan amount, early warning event is triggered.
The surplus early warning of carrying down is referred to:When carry down surplus budgetary funds setting time in, without fund using plan and pay into
When spending, early warning event is triggered.
The priority of Early-warning Model is sequentially from high to low:Surplus budgetary funds of carrying down Early-warning Model, distribution progress Early-warning Model,
Target advance Early-warning Model, Payment Scheduling Early-warning Model;The order of severity of Early-warning Model is sequentially from high to low:Surplus of carrying down is provided
Golden Early-warning Model, Payment Scheduling Early-warning Model, target advance Early-warning Model, distribution progress Early-warning Model.
Described information pushes center includes that warning information template customization, early warning information push project management, early warning information and push away
Query function is sent, and by carrying out early warning information push including letter, note, the push means of APP in station.
A kind of information early warning platform based on financial big data of the present invention, with advantages below:
A kind of information early warning platform based on financial big data that the present invention is provided, by setting up different forewarning management indexs,
With reference to financial fund service data, the working order of monitor in real time financial fund, and abnormal conditions are carried out to continue precisely tracking,
The information system management level of financial fund is improved, contributes to vitalizing financial fund, the value of financial fund is excavated to the full extent,
It is practical, it is applied widely, it is easy to promote.
Description of the drawings
Accompanying drawing 1 realizes schematic diagram for the present invention's.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment the invention will be further described.
Such as accompanying drawing 1, a kind of information early warning platform based on financial big data of the present invention, is to integrate to be related to finance at corresponding level
The related all information resources of capital management, set up financial fund Warning Management System, from Distribution Indexes, target advance, payment
Progress, carry down surplus angularly, the utilizing status of whole process supervision financial fund sufficiently excavate the value of financial fund.
Its structure is included in financial information acquisition subsystem, big data management platform, Early-warning Model center, information pushing
The heart, wherein,
Financial information acquisition subsystem, gathers the related data of each system in fiscal system inside, and such as budgeting system, budget is held
Row system, higher level's transfer payment system etc., there is provided basic metadata;
Financial big data management platform, cleans to the financial metadata that acquisition subsystem is collected, and processes, and classification forms theme
Storehouse;
Early-warning Model center, the early warning scheme model of the various scenes of management reply;
Information pushing center, the information of early warning is precisely pushed by the different requirements of management.
Financial information acquisition subsystem collection higher level's transfer payment, budget compilation, budget enforcement, surplus of carrying down, meeting
The basic business data of each operation systems such as meter station finance.
Financial information acquisition subsystem, for from financial existing system(Budgeting system, budget execution system, higher level
Transfer payment system, accounting station billing and accounting system, surplus of carrying down system)In all of financial revenue and expenditure information of automatic data collection on time.
There is the financial big data management platform financial data to clean, and classification forms the function of subject data base, and builds
Vertical theme storehouse of transferring payments, budget target theme storehouse, index perform theme storehouse, surplus budgetary funds of carrying down theme storehouse.
Financial big data management platform, the financial basis metadata data that financial information acquisition subsystem is gathered, is carried out
Surface cleaning, classification forms special subject data base:Theme storehouse, budget target theme storehouse, the index of transferring payments performs master
Exam pool, surplus budgetary funds of carrying down theme storehouse etc..
The Early-warning Model center has management function is customized to financial Early-warning Model, and sets up Distribution Indexes progress
Early-warning Model, target advance Early-warning Model, Payment Scheduling Early-warning Model and surplus budgetary funds Early-warning Model of carrying down.
Early-warning Model center, based on different forewarning management dimensions, on the basis of all kinds of subject data bases, defines and manages
Various financial Early-warning Models are managed, Distribution Indexes progress Early-warning Model, target advance Early-warning Model, Payment Scheduling Early-warning Model is set up
And surplus budgetary funds Early-warning Model of carrying down.
Distribution progress Early-warning Model is referred to:Constraint when being formulated according to index, enters to the distribution that higher level transfers payments
Degree carries out early warning, and the distribution of all funds is not completed such as within the desired time, is changed into executable index, then trigger early warning thing
Part;
Target advance Early-warning Model is divided into two classes, and a class is natural time planning model, and another kind of is project plan model.It is natural
Period planning model refers to, by nature month, monthly average index amount, of that month index executor does not submit fund using plan to, or
When person's fund using plan is less than monthly average amount, then early warning event is triggered;Project plan model is referred to, according to the schedule of project
Formulation situation, contrasts actual fund using plan, less than project schedule when, trigger early warning event;
Payment Scheduling early warning is referred to:Actual funds disbursed progress within the time period of setting, not up to fund using plan amount,
Triggering early warning event;
Surplus of carrying down early warning is referred to:Within the time of setting, without fund using plan and during Payment Scheduling, triggering is pre- for surplus budgetary funds of carrying down
Alert event.
The priority of Early-warning Model is sequentially from high to low:Surplus budgetary funds of carrying down Early-warning Model, distribution progress Early-warning Model,
Target advance Early-warning Model, Payment Scheduling Early-warning Model;The order of severity of Early-warning Model is sequentially from high to low:Surplus of carrying down is provided
Golden Early-warning Model, Payment Scheduling Early-warning Model, target advance Early-warning Model, distribution progress Early-warning Model.
Described information pushes center includes that warning information template customization, early warning information push project management, early warning information and push away
Send query function.
Information pushing center includes that warning information template customization, early warning information push project management, early warning information and push and look into
Ask function.For various level early warning information, different receivers, different information models are formulated, and realized in station
Various push means such as letter, note, APP.
The present invention is transferred payments pipe based on budgeting system, budget execution system, accounting station billing and accounting system, higher level
The financial fund information such as reason system, surplus of carrying down system, realize budget target(Project)From establishment, plan to the full mistake for performing
Journey is tracked.
By various warning and monitoring models, comprehensively the utilization ratio and progress of tracking financial fund, pinpoints the problems in time, auxiliary
Managerial decision is helped, so as to ensure financial fund high-efficiency operation, is further made rational planning for, prepared in advance, distributed according to need, it is to avoid fund
Large area it is idle and lack of capital it is serious wait extreme phenomenon, so as to promote social high speed development.
Above-mentioned specific embodiment is only the concrete case of the present invention, and the scope of patent protection of the present invention is included but is not limited to
Above-mentioned specific embodiment, a kind of claims of any information early warning platform based on financial big data for meeting the present invention
And any technical field those of ordinary skill's appropriate change or replacement that it is done, should all fall into the special of the present invention
Sharp protection domain.
Claims (10)
1. a kind of information early warning platform based on financial big data, it is characterised in that its structure includes that financial information gathers subsystem
System, big data management platform, Early-warning Model center, information pushing center, wherein,
Financial information acquisition subsystem, for gathering the related data of each system in fiscal system inside, there is provided basic metadata;
Big data management platform, to financial information acquisition subsystem collect basic metadata cleaned, processed, formation of classifying
Theme storehouse;
Early-warning Model center, the early warning scheme model of the various scenes of management reply;
Information pushing center, the information of early warning is precisely pushed by the different requirements of management.
2. a kind of information early warning platform based on financial big data according to claim 1, it is characterised in that the finance
The each system in system inside include budgeting system, budget execution system, higher level's transfer payment system, accounting station billing and accounting system,
Surplus of carrying down system, corresponding, all of financial revenue and expenditure letter of each system described in financial information acquisition subsystem automatic data collection
Breath, i.e., including higher level's transfer payment information, budget compilation information, budget enforcement information, balance information of carrying down, accounting station finance letter
The basic business data of breath.
3. a kind of information early warning platform based on financial big data according to claim 1, it is characterised in that the big number
After being extracted to basic metadata, clean, changed, synthesized and verify by ETL instruments according to management platform, subject data is formed
Storehouse, subject data base here performs theme storehouse, carries down including theme storehouse of transferring payments, budget target theme storehouse, index
Surplus budgetary funds theme storehouse.
4. a kind of information early warning platform based on financial big data according to claim 1, it is characterised in that the early warning
Model center has and is customized management function to financial Early-warning Model, and on the basis of subject data base, sets up index point
With progress Early-warning Model, target advance Early-warning Model, Payment Scheduling Early-warning Model and surplus budgetary funds Early-warning Model of carrying down.
5. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that the distribution
Progress Early-warning Model is referred to:Constraint when being formulated according to index, the distribution progress transferred payments to higher level carries out early warning, when
The distribution of all funds is not completed within the desired time, when being changed into executable index, early warning event is triggered.
6. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that the plan
Progress Early-warning Model is divided into two classes, and a class is natural time planning model, and another kind of is project plan model, wherein:When natural
Between planning model refer to that by nature month, monthly average index amount, of that month index executor does not submit fund using plan to, or
When fund using plan is less than monthly average amount, early warning event is triggered;Project plan model is referred to, formulated according to the schedule of project
Situation, contrasts actual fund using plan, less than project schedule when, trigger early warning event.
7. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that the payment
Progress Early-warning Model is referred to:When actual funds disbursed progress is within the time period of setting, not up to fund using plan amount when, touch
Send out early warning event.
8. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that described to carry down
Surplus early warning is referred to:When surplus budgetary funds are carried down within the time of setting, without fund using plan and during Payment Scheduling, early warning thing is triggered
Part.
9. a kind of information early warning platform based on financial big data according to claim 4, it is characterised in that Early-warning Model
Priority be sequentially from high to low:Surplus budgetary funds of carrying down Early-warning Model, distribution progress Early-warning Model, target advance early warning mould
Type, Payment Scheduling Early-warning Model;The order of severity of Early-warning Model is sequentially from high to low:Surplus budgetary funds of carrying down Early-warning Model,
Pay progress Early-warning Model, target advance Early-warning Model, distribution progress Early-warning Model.
10. a kind of information early warning platform based on financial big data according to claim 1, it is characterised in that the letter
Breath push center includes that warning information template customization, early warning information push project management, early warning information and push query function, and lead to
Cross carries out early warning information push including letter, note, the push means of APP in station.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610853398.2A CN106570055A (en) | 2016-09-27 | 2016-09-27 | Information early-warning platform based on financial big data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610853398.2A CN106570055A (en) | 2016-09-27 | 2016-09-27 | Information early-warning platform based on financial big data |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106570055A true CN106570055A (en) | 2017-04-19 |
Family
ID=58532493
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610853398.2A Pending CN106570055A (en) | 2016-09-27 | 2016-09-27 | Information early-warning platform based on financial big data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106570055A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107330629A (en) * | 2017-07-06 | 2017-11-07 | 广东电网有限责任公司信息中心 | The large-scale artificial cost monitoring of central enterprise's Power Group enterprise realizes system with analysis |
CN108510381A (en) * | 2018-03-21 | 2018-09-07 | 安徽天勤盛创信息科技股份有限公司 | A kind of finance national treasury inventory statistics monitoring system |
CN108510379A (en) * | 2018-03-21 | 2018-09-07 | 安徽天勤盛创信息科技股份有限公司 | A kind of financial revenue and expenditure statistic management system based on big data |
CN108510380A (en) * | 2018-03-21 | 2018-09-07 | 安徽天勤盛创信息科技股份有限公司 | A kind of property tax analysis platform based on big data |
CN109636352A (en) * | 2018-12-20 | 2019-04-16 | 湖南晖龙集团股份有限公司 | A kind of distributed content duplicate checking early warning system based on financial big data |
CN110490785A (en) * | 2019-07-08 | 2019-11-22 | 广东铭太信息科技有限公司 | A kind of government budget measure of supervision, system and storage medium |
WO2020000633A1 (en) * | 2018-06-26 | 2020-01-02 | 平安科技(深圳)有限公司 | Capital monitoring method, capital monitoring system, terminal and readable storage medium |
CN112184156A (en) * | 2020-09-24 | 2021-01-05 | 安徽政大数据软件有限公司 | Economic analysis system based on big data management |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103441896A (en) * | 2013-08-26 | 2013-12-11 | 苏州市吴江区人民政府国有资产监督管理办公室 | Service data monitoring and early warning platform and early warning method |
US20150095216A1 (en) * | 2013-09-30 | 2015-04-02 | The Toronto-Dominion Bank | Methods and systems for determining and providing negative event notifications |
CN105184642A (en) * | 2015-09-02 | 2015-12-23 | 浪潮软件集团有限公司 | Comprehensive tax administration platform |
CN105761010A (en) * | 2016-02-24 | 2016-07-13 | 国网山东省电力公司 | Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition |
CN105956985A (en) * | 2016-06-29 | 2016-09-21 | 浪潮软件集团有限公司 | Financial information sharing platform, system and method |
-
2016
- 2016-09-27 CN CN201610853398.2A patent/CN106570055A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103441896A (en) * | 2013-08-26 | 2013-12-11 | 苏州市吴江区人民政府国有资产监督管理办公室 | Service data monitoring and early warning platform and early warning method |
US20150095216A1 (en) * | 2013-09-30 | 2015-04-02 | The Toronto-Dominion Bank | Methods and systems for determining and providing negative event notifications |
CN105184642A (en) * | 2015-09-02 | 2015-12-23 | 浪潮软件集团有限公司 | Comprehensive tax administration platform |
CN105761010A (en) * | 2016-02-24 | 2016-07-13 | 国网山东省电力公司 | Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition |
CN105956985A (en) * | 2016-06-29 | 2016-09-21 | 浪潮软件集团有限公司 | Financial information sharing platform, system and method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107330629A (en) * | 2017-07-06 | 2017-11-07 | 广东电网有限责任公司信息中心 | The large-scale artificial cost monitoring of central enterprise's Power Group enterprise realizes system with analysis |
CN108510381A (en) * | 2018-03-21 | 2018-09-07 | 安徽天勤盛创信息科技股份有限公司 | A kind of finance national treasury inventory statistics monitoring system |
CN108510379A (en) * | 2018-03-21 | 2018-09-07 | 安徽天勤盛创信息科技股份有限公司 | A kind of financial revenue and expenditure statistic management system based on big data |
CN108510380A (en) * | 2018-03-21 | 2018-09-07 | 安徽天勤盛创信息科技股份有限公司 | A kind of property tax analysis platform based on big data |
WO2020000633A1 (en) * | 2018-06-26 | 2020-01-02 | 平安科技(深圳)有限公司 | Capital monitoring method, capital monitoring system, terminal and readable storage medium |
CN109636352A (en) * | 2018-12-20 | 2019-04-16 | 湖南晖龙集团股份有限公司 | A kind of distributed content duplicate checking early warning system based on financial big data |
CN110490785A (en) * | 2019-07-08 | 2019-11-22 | 广东铭太信息科技有限公司 | A kind of government budget measure of supervision, system and storage medium |
CN112184156A (en) * | 2020-09-24 | 2021-01-05 | 安徽政大数据软件有限公司 | Economic analysis system based on big data management |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106570055A (en) | Information early-warning platform based on financial big data | |
CN104468136B (en) | Charging method, analysis center and charging center | |
Wang et al. | Bayesian analytics for estimating risk probability in PPP waste-to-energy projects | |
CN103414577B (en) | Accounting system and method for Hadoop platform | |
CN103136696A (en) | Management method of media placement and system thereof | |
CN105023196A (en) | Analysis method and device for charging transaction data of charging stations | |
CN104036139B (en) | A kind of mobile object track monitoring method | |
CN103729778A (en) | Omni-channel advertisement accurate delivery system and method | |
CN106204106A (en) | A kind of specific user's recognition methods and system | |
CN103295104A (en) | Quota design management method and project investment service platform for cost accounting | |
CN105184510A (en) | Project management system | |
CN105809277A (en) | Big data based prediction method for the refining and managing of electric power marketing inspection | |
CN102081781A (en) | Finance modeling optimization method based on information self-circulation | |
CN110516155A (en) | Marketing strategy generation method and system | |
CN110991985A (en) | Project progress data processing method | |
CN106408271A (en) | Method and device for monitoring project | |
CN105631612A (en) | System and method of evaluating individual performance and capability of public servant based on big data | |
CN107766500A (en) | The auditing method of fixed assets card | |
CN103761618A (en) | Control method and system of science and technology item | |
Nieuwenhuijsen et al. | The role of health impact assessment for shaping policies and making cities healthier | |
CN104599008A (en) | Property management system based on C/S framework | |
CN114841788A (en) | Engineering project construction management completion settlement overall process management system | |
CN105931142A (en) | Method for determining electric charge collection ranks | |
CN114398941A (en) | User payment behavior classification method, device, equipment and readable storage medium | |
Kolosov et al. | Forming the capability of rural and settlement united territorial communities in Ukraine: using the experience of Poland. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170419 |