CN107330598A - A kind of security housing Project information management system - Google Patents
A kind of security housing Project information management system Download PDFInfo
- Publication number
- CN107330598A CN107330598A CN201710482059.2A CN201710482059A CN107330598A CN 107330598 A CN107330598 A CN 107330598A CN 201710482059 A CN201710482059 A CN 201710482059A CN 107330598 A CN107330598 A CN 107330598A
- Authority
- CN
- China
- Prior art keywords
- project
- management module
- management
- module
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/16—Real estate
Abstract
The invention discloses a kind of security housing Project information management system, realize the guarantee house source of houses and the information system management process of relevant item, solve original papery document and mode of operation causes that data acquisition channel disunity, inter-sectional information sharing be difficult, the low problem of management work efficiency, improve operating efficiency and service quality;In guarantee house Construction Project Management, advanced information management system is introduced, the standardization and standardization built is more beneficial for, improve level of decision-making and managerial skills, project progress is controlled, guarantee house Project Investment Risk, Improving Government public credibility and developer's image is reduced.
Description
Technical field
The invention belongs to housing management technical field, it is related to a kind of the house information management system, specifically a kind of protection
Housing Project information management system.
Background technology
In China's Development of China's Urbanization, security housing develops lifting as a kind of special housing type to social stability
Act on.Housing Guarantee is to improve the living conditions of the people as an important act of main purpose using government
Arrange, be conducive to optimization China housing construction, drive the industry, boost consumption, have important to the sound development for promoting real-estate market
Meaning.But, set, gently because relevant departments have reconstruction, guarantee house management develops more in terms of informationization
Fall behind, there are " information island ", administrative examination and approval data.In internet, the development of hair speed and mobile office are increasingly deep
Enter etc. under overall situation, go deep into guarantee house construction project IT application process extremely urgent.
The content of the invention
It is an object of the invention to provide a kind of security housing Project information management system.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of security housing Project information management system, including System Management Unit, project's earlier stage administrative unit, project
Perform administrative unit and project completion administrative unit;
The System Management Unit includes user management module, system setup module and authority management module;
The user management module, after system manager's login system, completes the establishment and management to other users,
Perform addition and delete user, modification user cipher operation;
The system setup module, for the setting of the complete paired systems secure context of system manager, Back ground Information is set
Put;
The authority management module, is that user distributes role and authority for system manager, realizes different role
Difference in functionality is used;
The project's earlier stage administrative unit includes basic information management module and early stage and check-ined module;
The basic information management module, using project as management unit, according to operation flow, adds for project leader
Plus item purpose essential information, starts all kinds of management works of the project;
The early stage check-ins module:Using project as management unit, for project leader the hair of project is changed formality,
The early stage situations of check-ining such as territory formality, planning formality and environmentally friendly formality are managed;
The project implementation administrative unit includes project management module, contract management module, construction drawing management module, placement
House Resource Management module and Project Cost Management module;
The project management module, for project leader to the area in building in project, house type, house attribute, supporting
User is managed, and makes data statistic;
The contract management module, for project leader to the contract signing countersign of project, contract progress, guarantee fund,
Office Of Contract Settlements, termination of contract etc. are managed, and performance of contract bank settlement situation is recorded;
The construction drawing management module, is examined the construction drawing of each or several building in project for project leader
Core, transfer, archive are managed;
The placement House Resource Management module, system automatically generates Lou Dong and source of houses original table, after project leader is to generation
Source of houses original table information enriched;
The Project Cost Management module, is managed for project leader for all kinds of reimbursement of expense situations of project,
All moneys of appropriating of project are counted and analyzed, manufacturing cost expenditure full edition;
The project completion administrative unit, including project issue management module, project acceptance inspection management module, project file pipe
Manage module and project data statistical module;
The project issue management module is there is provided project issue handling function, for project leader for project each
Phased project manager has found and needs the problem of higher level solves, and carries out Coordination Treatment;
The project acceptance inspection management module, what is still suffered from for project leader's management project completion information and before checking and accepting asks
Topic, is controlled to checking and accepting each timing node, and the problem of existing during to checking and accepting is recorded and handled;
The project file management module, for project leader to project from early stage to completion during, pass through system pipes
All kinds of data and informations of reason project, there is provided the lookup of project related data, annex for the various information of fast browsing project;
The project data statistical module, for disposing information, expense to appropriate the tables such as situation project essential information, the source of houses
It is single count by date automatically, or according to the ways of presentation of all kinds of lists of customer requirement self-defining.
Beneficial effects of the present invention:The security housing Project information management system that the present invention is provided, realizes guarantee house room
Source and the information system management process of relevant item, solve original papery document and mode of operation causes data acquisition channel not
Unified, inter-sectional information sharing is difficult, the low problem of management work efficiency, improves operating efficiency and service quality;Ensureing
In room Construction Project Management, advanced information management system is introduced, the standardization and standardization built is more beneficial for, improves decision-making
Level and managerial skills, control project progress, reduce guarantee house Project Investment Risk, Improving Government public credibility and developer's shape
As.
Brief description of the drawings
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the system schematic of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is all other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
As shown in figure 1, the invention provides a kind of security housing Project information management system, including system administration list
Member, project's earlier stage administrative unit, project implementation administrative unit and project completion administrative unit.
System Management Unit includes user management module, system setup module and authority management module.
User management module, after system manager's login system, completes the establishment and management to other users, performs
The operations such as user, modification user cipher are deleted in addition.
System setup module, for the setting of the complete paired systems secure context of system manager, the setting of Back ground Information is kept away
Exempt to re-enter.
Authority management module, is that user distributes role and authority for system manager, realizes the difference of different role
Function is used;Wherein, user role includes system manager, project leader etc..
Project's earlier stage administrative unit includes basic information management module and early stage and check-ined module.
Basic information management module, using project as management unit, according to operation flow, for project leader's add-ins
Purpose essential information, starts all kinds of management works of the project.
Early stage check-ins module:Using project as management unit, formality, territory are changed to the hair of project for project leader
The early stage situations of check-ining such as formality, planning formality and environmentally friendly formality are managed;Project's earlier stage check-ins to be born by project
Blame people to initiate, project, which is in charge of minister, counterpart and is in charge of minister, is responsible for coordination, carries out the formality of project each single item by this module
Management, while start flow can also be managed by this module opponent renewal, carries out Coordination Treatment, also with early stage by leading body at a higher level
Function is had a guide look of in formality, can see that a certain purpose check-ins general status with Check.
Project implementation administrative unit includes project management module, contract management module, construction drawing management module, the placement source of houses
Management module and Project Cost Management module.
Project management module, for project leader to the area in building, house type, house attribute, supporting user in project
(business user or non-business user profile) is managed, and makes data statistic;Wherein, data statistic is divided into fills out twice
Write, the data such as area, house type of security housing are completed first, then fill in the entirety of a few with applying mechanically room, after the completion of filling in,
System carries out calculating related associated data, raw column data automatically, and judges data reasonability.
Contract management module, contract is under the jurisdiction of some project, contract signing countersign, conjunction for project leader to project
Same progress, guarantee fund, Office Of Contract Settlements, termination of contract etc. are managed, and performance of contract bank settlement situation is recorded.
Construction drawing management module, construction drawing examination & verification, shifting for project leader to each or several building in project
Hand over, archive is managed;Wherein, the machine account is the process of a progressive updating, and system is supported to preserve and updated.
House Resource Management module is disposed, system automatically generates Lou Dong and source of houses original table, and project leader is to the room after generation
Source original table information is enriched, and sets floor and house type, area, management floor plan, setting placement situation, system is with most directly perceived
Diagram displaying source of houses placement situation, and collect related data automatically.
Project Cost Management module, is managed for project leader for all kinds of reimbursement of expense situations of project, to item
All moneys of appropriating of purpose are counted and analyzed, manufacturing cost expenditure full edition;Wherein, expense expenditure full edition can be counted and shown
Appropriating for each expense category is recorded and clearing situation.
Project completion administrative unit includes project management module, contract management module, construction drawing management module, the placement source of houses
Management module and Project Cost Management module.
Project issue management module is there is provided project issue handling function, for project leader for project in each stage
Project manager has found and needs the problem of higher level solves, and carries out Coordination Treatment;Project problem is generally initiated by project manager, by straight
The project leader being in charge of is met to be circulated and Coordination Treatment.
Project acceptance inspection management module, the problem of being still suffered from for project leader's management project completion information and before checking and accepting,
It is controlled to checking and accepting each timing node, the problem of existing during to checking and accepting is recorded and handled;Meanwhile, system can be set
To checking and accepting the function such as prompting in advance.
Project file management module, for project leader to project from early stage to completion during, pass through system administration
All kinds of data and informations of purpose, design a project overall information administration page, can fast browsing project various information,
Project related data, the lookup of annex are also provided.
Project data statistical module, for disposing information, expense to appropriate the lists such as situation and enter project essential information, the source of houses
Row is counted by date automatically, can also be according to the ways of presentation of all kinds of lists of customer requirement self-defining.
The security housing Project information management system that the present invention is provided, realizes the guarantee house source of houses and the information of relevant item
Change management process, solve original papery document and mode of operation causes data acquisition channel disunity, inter-sectional information to be total to
Difficult, the low problem of management work efficiency is enjoyed, operating efficiency and service quality is improved;In guarantee house Construction Project Management,
Advanced information management system is introduced, the standardization and standardization built is more beneficial for, level of decision-making and managerial skills, control are improved
Project progress processed, reduces guarantee house Project Investment Risk, Improving Government public credibility and developer's image.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
At least one implementation of the present invention is contained in reference to specific features, structure, material or the feature that the embodiment or example are described
In example or example.In this manual, identical embodiment or example are not necessarily referring to the schematic representation of above-mentioned term.
Moreover, specific features, structure, material or the feature of description can be closed in any one or more embodiments or example
Suitable mode is combined.
Above content is only to structure example of the present invention and explanation, affiliated those skilled in the art couple
Described specific embodiment is made various modifications or supplement or substituted using similar mode, without departing from invention
Structure surmounts scope defined in the claims, all should belong to protection scope of the present invention.
Claims (1)
1. a kind of security housing Project information management system, it is characterised in that:Managed including System Management Unit, project's earlier stage
Unit, project implementation administrative unit and project completion administrative unit;
The System Management Unit includes user management module, system setup module and authority management module;
The user management module, after system manager's login system, completes the establishment and management to other users, performs
User, modification user cipher operation are deleted in addition;
The system setup module, for the setting of the complete paired systems secure context of system manager, the setting of Back ground Information;
The authority management module, is that user distributes role and authority for system manager, realizes the difference of different role
Function is used;
The project's earlier stage administrative unit includes basic information management module and early stage and check-ined module;
The basic information management module, using project as management unit, according to operation flow, for project leader's add-ins
Purpose essential information, starts all kinds of management works of the project;
The early stage check-ins module:Using project as management unit, formality, territory are changed to the hair of project for project leader
The early stage situations of check-ining such as formality, planning formality and environmentally friendly formality are managed;
The project implementation administrative unit includes project management module, contract management module, construction drawing management module, the placement source of houses
Management module and Project Cost Management module;
The project management module, for project leader to the area in building, house type, house attribute, supporting user in project
It is managed, makes data statistic;
The contract management module, for project leader to the contract signing countersign of project, contract progress, guarantee fund, contract
Clearing, termination of contract etc. are managed, and performance of contract bank settlement situation is recorded;
The construction drawing management module, construction drawing examination & verification, shifting for project leader to each or several building in project
Hand over, archive is managed;
The placement House Resource Management module, system automatically generates Lou Dong and source of houses original table, and project leader is to the room after generation
Source original table information is enriched;
The Project Cost Management module, is managed for project leader for all kinds of reimbursement of expense situations of project, to item
All moneys of appropriating of purpose are counted and analyzed, manufacturing cost expenditure full edition;
The project completion administrative unit, including project issue management module, project acceptance inspection management module, project file management mould
Block and project data statistical module;
The project issue management module is there is provided project issue handling function, for project leader for project in each stage
Project manager has found and needs the problem of higher level solves, and carries out Coordination Treatment;
The project acceptance inspection management module, the problem of being still suffered from for project leader's management project completion information and before checking and accepting,
It is controlled to checking and accepting each timing node, the problem of existing during to checking and accepting is recorded and handled;
The project file management module, for project leader to project from early stage to completion during, pass through system administration
All kinds of data and informations of purpose, there is provided the lookup of project related data, annex for the various information of fast browsing project;
The project data statistical module, for disposing information, expense to appropriate the lists such as situation and enter project essential information, the source of houses
Row is counted by date automatically, or according to the ways of presentation of all kinds of lists of customer requirement self-defining.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710482059.2A CN107330598A (en) | 2017-06-22 | 2017-06-22 | A kind of security housing Project information management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710482059.2A CN107330598A (en) | 2017-06-22 | 2017-06-22 | A kind of security housing Project information management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107330598A true CN107330598A (en) | 2017-11-07 |
Family
ID=60195828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710482059.2A Pending CN107330598A (en) | 2017-06-22 | 2017-06-22 | A kind of security housing Project information management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107330598A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108108477A (en) * | 2018-01-04 | 2018-06-01 | 焦点科技股份有限公司 | The KPI systems and Rights Management System of a kind of linkage |
CN108229912A (en) * | 2017-12-28 | 2018-06-29 | 北京地厚云图科技有限公司 | Completion of works acceptance method and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1648907A (en) * | 2004-08-24 | 2005-08-03 | 徐州润发房地产有限公司 | Method of managing real estate enterprise item and managing information system |
CN102158379A (en) * | 2011-05-17 | 2011-08-17 | 福建求实电子有限公司 | Identification network managing system and method for residents of indemnificatory residences |
CN105117861A (en) * | 2015-09-22 | 2015-12-02 | 镇江锐捷信息科技有限公司 | Real estate information management system |
CN105184510A (en) * | 2015-10-13 | 2015-12-23 | 杨明幸 | Project management system |
CN106447550A (en) * | 2016-10-10 | 2017-02-22 | 合肥红珊瑚软件服务有限公司 | MySQL based real estate sales management system |
-
2017
- 2017-06-22 CN CN201710482059.2A patent/CN107330598A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1648907A (en) * | 2004-08-24 | 2005-08-03 | 徐州润发房地产有限公司 | Method of managing real estate enterprise item and managing information system |
CN102158379A (en) * | 2011-05-17 | 2011-08-17 | 福建求实电子有限公司 | Identification network managing system and method for residents of indemnificatory residences |
CN105117861A (en) * | 2015-09-22 | 2015-12-02 | 镇江锐捷信息科技有限公司 | Real estate information management system |
CN105184510A (en) * | 2015-10-13 | 2015-12-23 | 杨明幸 | Project management system |
CN106447550A (en) * | 2016-10-10 | 2017-02-22 | 合肥红珊瑚软件服务有限公司 | MySQL based real estate sales management system |
Non-Patent Citations (1)
Title |
---|
林文敬: "保障房建设项目信息管理系统的研究与分析", 《中国优秀硕士学位论文全文数据库信息科技辑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108229912A (en) * | 2017-12-28 | 2018-06-29 | 北京地厚云图科技有限公司 | Completion of works acceptance method and storage medium |
CN108108477A (en) * | 2018-01-04 | 2018-06-01 | 焦点科技股份有限公司 | The KPI systems and Rights Management System of a kind of linkage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Blanken et al. | PPPs in health: static or dynamic? | |
Shah et al. | Irrigation institutions in a dynamic economy: What is China doing differently from India? | |
CN103631763A (en) | Multi-people cooperation type large-size document editing device and method | |
Sun et al. | Utilities tunnel’s finance design for the process of construction and operation | |
CN105469188A (en) | Distribution network planning data online intelligent analysis system and distribution network planning data online intelligent analysis method | |
CN107330598A (en) | A kind of security housing Project information management system | |
CN110175741A (en) | A kind of information value chain construction method and storage medium based on power industry | |
CN103995886B (en) | A kind of various dimensions product-design knowledge pushes framework and construction method | |
CN214311539U (en) | Structure-adjustable display frame based on park service ecosystem | |
CN108446973A (en) | Credit solution on a kind of conventional banking facilities line based on finance opening platform | |
Chen et al. | Urban design governance in three Chinese ‘pioneer cities’ | |
Qun et al. | Energy-saving optimization of water supply pumping station life cycle based on BIM technology | |
Gao et al. | New rural pension system of China: is it possible? An exploratory study of Feidong County, Anhui Province | |
Li | Study on optimization of financial sharing service center | |
Lin et al. | Social constructions of GIS in China's changing urban governance: The case of Shenzhen | |
Chen et al. | Study on the Optimal Path of Solving Social Conflicts and Disputes in Zhejiang Online Court | |
Marichev et al. | Experience of implementing BIM technology in the company of the old and new sample | |
Wang | The impacts of improvements in the unified economic and environmental efficiency of transportation infrastructure on industrial structure transformation and upgrade from the perspective of resource factors | |
CN109377158A (en) | A kind of real estate and house property integrated management system | |
Qin | Research on the Problems and Countermeasures of Improving the Digital Governance Capacity of Urban Communities--Taking Meiyuan Xincun Community as an Example | |
CN102103709A (en) | Technology for realizing picture publishing, examination and verification flow | |
Djossou et al. | Digitalisation of public services in Benin: challenges and opportunities | |
Manetti et al. | Artistic-religious tourism after the pandemic: towards the innovation of sustainable tourism or the return to the pre-crisis business model? | |
Pallotti | Works and Traditions: Early Modern Encounters, edited by Angelo Deidda, Donatella Pallotti and Paola Pugliatti | |
CN101676936A (en) | Cheering squad information management platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171107 |