CN108446895A - A kind of engineering construction project intelligent management system - Google Patents

A kind of engineering construction project intelligent management system Download PDF

Info

Publication number
CN108446895A
CN108446895A CN201810252305.XA CN201810252305A CN108446895A CN 108446895 A CN108446895 A CN 108446895A CN 201810252305 A CN201810252305 A CN 201810252305A CN 108446895 A CN108446895 A CN 108446895A
Authority
CN
China
Prior art keywords
project
engineering
module
management
management module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810252305.XA
Other languages
Chinese (zh)
Inventor
宋健民
肖俊生
宋冰炀
郑刘勇
马磊磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201810252305.XA priority Critical patent/CN108446895A/en
Publication of CN108446895A publication Critical patent/CN108446895A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of engineering construction project intelligent management systems of project management technical field, the system includes project information acquisition module, program assessment module, bidding management module, risk analysis module, resource management module, project tracking module, contract payment management module, engineering archive management module, project scheduling management module, project management techniques are combined by the present invention with modern information technologies, increase substantially the efficiency of management of engineering project, project manager is set easily to grasp the project progress of project, the various informations consolidated statement such as project quality and project cost, and it forms powerful background function module and supports platform, revolutionize project construction cost extensive style management status, realize the movable coordinating and unifying of project management and Efficient Operation.

Description

A kind of engineering construction project intelligent management system
Technical field
The invention discloses a kind of engineering construction project intelligent management systems, specially project management technical field.
Background technology
The management of engineering project is a complexity, arduous system engineering, is related to progress, quality, investment, contract, people Various work such as member, risk, Drawings and documents, numerous participating departments and unit so that common and coordination operational difficulties, A large amount of information needs effective management, especially domestic three universal side engineerings to increase the difficulty of engineering management.With interconnection The development of network technology and wireless communication technique, modern society stepped into the information age, traditional project management system, Seem more and more painstaking, has needed to find new Method and kit for.For this purpose, we have proposed a kind of inventions to come into operation, with It solves the above problems.
Invention content
The purpose of the present invention is to provide a kind of engineering construction project intelligent management systems, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the present invention provides the following technical solutions:A kind of engineering construction project intelligent management system, should System includes project information acquisition module, program assessment module, bidding management module, risk analysis module, resource management mould Block, project tracking module, contract payment management module, engineering archive management module, project scheduling management module;
The project information acquisition module is for being acquired and storing to the various project information in Process of Engineering Construction Into system server;
The program assessment module passes through progress difference, expense for assessing the progress and cost of engineering project The quantitative data that difference, schedule performance index and expense execute index carrys out objective reaction engineering general overview, is led convenient for project It leads and administrative staff grasps project overall information;
The bidding management module be directed to the qualification of relevant bidder in engineering project, pricing system, quality assurance, After-sale service and its history credit are examined, and are uploaded in system server;
The risk analysis module be used for during Engineering Project Construction duration and cost carry out quantitative analysis, according to Project schedule plan and estimated cost calculate Percent Complete;
The resource management module for realizing large scale equipment, the configuration of project personnel, optimization and management, reduce equipment at This, and control cost of human resources;
The project tracking module by being tracked by expense, project tracking, finance tracking, resource tracing holds engineering project The project information that common during row, needs are paid special attention to collects generation and grasps overall project information convenient for project manager Report;
The contract payment management module is used for engineering contract and progress payment in project construction process and pays work Whole Course Management;
The engineering archive management module is used to preserve the data information in Construction Process of Engineering Project, and in system background Chart is generated, for project management personnel's real-time query;
The project scheduling management module include the schedule in engineering project is managed, implementation plan management, Project progress typing and checking to the engineering of implementation phase.
Preferably, the information of project information acquisition module acquisition includes that engineering drawing, work order, material requistion, construction refer to It enables, materials warehouse information in the report of job order, project construction and engineering construction.
Preferably, the program assessment module can be generated by week, Yue Deng chronomeres and earn value analysis curve, and be had abundant Report and data function, react assessment result from different perspectives.
Preferably, the bidding management module allows User Defined multistage bid performance assessment criteria, allows several correlations Expert gives a mark to indices, and system summarizes the expert analysis mode summary sheet and detail list for generating bid producer automatically, in being It marks decision and foundation is provided.
Preferably, the risk analysis module by histogram, curve graph and pie chart intuitively show PROJECT TIME and Cost risk content.
Preferably, the contract payment management module includes bidding, engineering contract, scheduled fun application, modification of contract pipe The contents such as reason, scheduled fun payment, engineering funds clearing and expense allocation.
Preferably, the engineering construction project management system further includes user management module, the user management module packet Include the role of user department, the real name of user, the login account of user and password, user in engineering project.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is by project management techniques and modern information technologies Be combined, increase substantially the efficiency of management of engineering project, enable project manager easily grasp project project progress, The various informations consolidated statement such as project quality and project cost, and form powerful background function module and support platform, thoroughly Project construction cost extensive style management status is changed, the movable coordinating and unifying of project management and efficiently fortune are realized Make.
Description of the drawings
Fig. 1 is present system module map;
Fig. 2 is present system flow chart.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution:A kind of engineering construction project intelligent management system, the system Including project information acquisition module, program assessment module, bidding management module, risk analysis module, resource management module, item Mesh tracking module, contract payment management module, engineering archive management module, project scheduling management module;
The project information acquisition module is for being acquired and storing to the various project information in Process of Engineering Construction Into system server;
The program assessment module passes through progress difference, expense for assessing the progress and cost of engineering project The quantitative data that difference, schedule performance index and expense execute index carrys out objective reaction engineering general overview, is led convenient for project It leads and administrative staff grasps project overall information;
The bidding management module be directed to the qualification of relevant bidder in engineering project, pricing system, quality assurance, After-sale service and its history credit are examined, and are uploaded in system server;
The risk analysis module be used for during Engineering Project Construction duration and cost carry out quantitative analysis, according to Project schedule plan and estimated cost calculate Percent Complete;
The resource management module for realizing large scale equipment, the configuration of project personnel, optimization and management, reduce equipment at This, and control cost of human resources;
The project tracking module by being tracked by expense, project tracking, finance tracking, resource tracing holds engineering project The project information that common during row, needs are paid special attention to collects generation and grasps overall project information convenient for project manager Report;
The contract payment management module is used for engineering contract and progress payment in project construction process and pays work Whole Course Management;
The engineering archive management module is used to preserve the data information in Construction Process of Engineering Project, and in system background Chart is generated, for project management personnel's real-time query;
The project scheduling management module include the schedule in engineering project is managed, implementation plan management, Project progress typing and checking to the engineering of implementation phase.
Wherein, the information of project information acquisition module acquisition include engineering drawing, work order, material requistion, directives for construction, Materials warehouse information in job order, project construction report and engineering construction, the program assessment module can be by times such as week, the moons Value analysis curve is earned in unit generation, and has abundant report and data function, reacts assessment result, the trick from different perspectives Bidding management module allows User Defined multistage bid performance assessment criteria, and several associated specialists is allowed to beat indices Point, system summarizes the expert analysis mode summary sheet and detail list for generating bid producer automatically, and foundation, the wind are provided for acceptance of the bid decision Dangerous analysis module intuitively shows PROJECT TIME and cost risk content, the contract by histogram, curve graph and pie chart Payment management module includes bidding, engineering contract, scheduled fun application, contract change management, scheduled fun payment, engineering funds clearing And the contents such as expense allocation, the engineering construction project management system further includes user management module, the user management mould Block includes the angle of user department, the real name of user, the login account of user and password, user in engineering project Color.
Referring to Fig. 2, user sends service request by cell phone application/computer client, handled through WEB server, to system Database operated, output result be formatted as user needs form and be back to client, wherein client is to be The external interface part of system, i.e., the window that user interacts with Inter-System Information, when system receives what client browser was sent out When service request, BLL projects (Business Logic)) analysis request and the input parameter of WEB is converted to, when business processing is completed, WEB projects generate the corresponding page and are back in browser, and (i.e. the page is as obtained by the sequential operation on server for WEB projects The result gone out) for system business function to be shown on the page, made of Active Server Pages, BLL projects are complete At all business functions and logic judgment in system, DAL is data access layer, complete to the basic access of system database with Operation element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of engineering construction project intelligent management system, it is characterised in that:The system includes project information acquisition module, project Evaluation module, bidding management module, risk analysis module, resource management module, project tracking module, contract payment manage mould Block, engineering archive management module, project scheduling management module;
The project information acquisition module is for being acquired the various project information in Process of Engineering Construction and storing to being In system server;
The program assessment module for assessing the progress and cost of engineering project, by progress difference, expense variance, The quantitative data that schedule performance index and expense execute index carrys out objective reaction engineering general overview, convenient for project leadership and Administrative staff grasp project general overview;
The bidding management module is directed to the qualification of relevant bidder in engineering project, pricing system, quality assurance, after sale Service and its history credit are examined, and are uploaded in system server;
The risk analysis module be used for during Engineering Project Construction duration and cost carry out quantitative analysis, according to project Schedule and estimated cost calculate Percent Complete;
The resource management module reduces equipment cost for realizing large scale equipment, the configuration of project personnel, optimization and management, And control cost of human resources;
The project tracking module by being tracked by expense, project tracking, finance tracking, resource tracing executed engineering project The project information that common in journey, needs are paid special attention to collects generation and grasps overall project information report convenient for project manager It accuses;
The contract payment management module is used for engineering contract and progress payment in project construction process and pays the complete of work Process management;
The engineering archive management module is used to preserve the data information in Construction Process of Engineering Project, and is generated in system background Chart, for project management personnel's real-time query;
The project scheduling management module include the schedule in engineering project is managed, project progress typing and right The engineering of implementation phase check.
2. a kind of engineering construction project intelligent management system according to claim 1, it is characterised in that:The project information The information of acquisition module acquisition includes engineering drawing, work order, material requistion, directives for construction, job order, project construction report and work Materials warehouse information in Cheng Jianshe.
3. a kind of engineering construction project intelligent management system according to claim 1, it is characterised in that:The project evaluation Module can be generated by week, Yue Deng chronomeres and earn value analysis curve, and have abundant report and data function, from different perspectives React assessment result.
4. a kind of engineering construction project intelligent management system according to claim 1, it is characterised in that:The bidding pipe Managing module allows User Defined multistage bid performance assessment criteria, allows several associated specialists to give a mark indices, system It is automatic to summarize the expert analysis mode summary sheet and detail list for generating bid producer, provide foundation for acceptance of the bid decision.
5. a kind of engineering construction project intelligent management system according to claim 1, it is characterised in that:The risk analysis Module intuitively shows PROJECT TIME and cost risk content by histogram, curve graph and pie chart.
6. a kind of engineering construction project intelligent management system according to claim 1, it is characterised in that:The contract payment Management module include bidding, engineering contract, scheduled fun application, contract change management, scheduled fun payment, engineering funds clearing and The contents such as expense allocation.
7. a kind of engineering construction project intelligent management system according to claim 1, it is characterised in that:The engineering construction Project management system further includes user management module, the user management module include user department, user practical surname Name, the role of the login account of user and password, user in engineering project.
CN201810252305.XA 2018-03-26 2018-03-26 A kind of engineering construction project intelligent management system Pending CN108446895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810252305.XA CN108446895A (en) 2018-03-26 2018-03-26 A kind of engineering construction project intelligent management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810252305.XA CN108446895A (en) 2018-03-26 2018-03-26 A kind of engineering construction project intelligent management system

Publications (1)

Publication Number Publication Date
CN108446895A true CN108446895A (en) 2018-08-24

Family

ID=63196712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810252305.XA Pending CN108446895A (en) 2018-03-26 2018-03-26 A kind of engineering construction project intelligent management system

Country Status (1)

Country Link
CN (1) CN108446895A (en)

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108830515A (en) * 2018-09-25 2018-11-16 晋能清洁能源光伏发电有限责任公司 A kind of photovoltaic plant capital construction information management system
CN109493003A (en) * 2018-11-08 2019-03-19 国家电网有限公司 Item data management method and terminal device
CN109711758A (en) * 2019-01-28 2019-05-03 上海建科工程咨询有限公司 A kind of whole process engineering consulting service evaluation method and system
CN109726513A (en) * 2019-01-29 2019-05-07 杭州凌望建筑科技有限公司 Project big data analysis system based on BIM
CN109766379A (en) * 2018-12-29 2019-05-17 福建华闽通达信息技术有限公司 A kind of construction project credit wire examination method Internet-based and system
CN110084633A (en) * 2019-03-14 2019-08-02 深圳市丰浩达工程项目管理有限公司 Project cost, bid, consulting total management system
CN110147957A (en) * 2019-05-21 2019-08-20 大连地拓重工有限公司 A kind of manufacturing enterprise's internal contract team competence assessment system
CN110163581A (en) * 2019-05-31 2019-08-23 黄亮清 A kind of intelligentized project management method and system
CN110503321A (en) * 2019-08-13 2019-11-26 湖北省水利水电规划勘测设计院 General contract of civil engineering project management system
CN110930025A (en) * 2019-11-21 2020-03-27 中国十九冶集团有限公司 Project management system for engineering construction
CN111291994A (en) * 2020-02-12 2020-06-16 普元信息技术股份有限公司 Multi-project management system and method suitable for agile development mode in big data environment
CN111369116A (en) * 2020-02-26 2020-07-03 国网上海市电力公司 Project early-stage and project early-stage management system based on visualization technology
CN111369211A (en) * 2020-03-02 2020-07-03 辽宁工程技术大学 Project operation data management system and method based on business intelligence
CN111507681A (en) * 2020-03-23 2020-08-07 南京熊猫电子股份有限公司 Building engineering integrated management system
CN111652493A (en) * 2020-05-28 2020-09-11 南京维斯德软件有限公司 Multi-project collaborative management system based on ACM platform
CN111738669A (en) * 2020-04-22 2020-10-02 汇智赛服(北京)科技有限公司 SGO sports event flow management system
CN111898853A (en) * 2020-06-18 2020-11-06 深圳瑞和建筑装饰股份有限公司 Engineering construction fine management system
CN112085481A (en) * 2020-09-22 2020-12-15 国网山东省电力公司烟台供电公司 Whole-process tracking system for electric power engineering project management
CN112085361A (en) * 2020-08-28 2020-12-15 上海谊逅信息技术有限公司 Construction engineering overall process management method
CN112418806A (en) * 2020-11-27 2021-02-26 上海妙一生物科技有限公司 Clinical research project management system
CN112560044A (en) * 2020-12-03 2021-03-26 星汉供应链有限公司 Project bug tracking and counting method, system and equipment
CN112862341A (en) * 2021-02-25 2021-05-28 中铁一局集团有限公司 Project cost management system
CN113379195A (en) * 2021-05-14 2021-09-10 南京智慧建筑研究院有限公司 Management system of project under construction based on wisdom building
CN113379369A (en) * 2021-05-14 2021-09-10 南京智慧建筑研究院有限公司 Full life cycle's management system based on wisdom building
CN113837533A (en) * 2021-08-16 2021-12-24 江苏金小满信息科技有限公司 Multi-dimensional examination and evaluation system for real estate engineering project management
CN113935598A (en) * 2021-09-29 2022-01-14 国网浙江省电力有限公司杭州供电公司 Information management platform based on heat supply and demand relationship and data processing method thereof
CN114037316A (en) * 2021-11-17 2022-02-11 北京中百信信息技术股份有限公司 Information system engineering supervision project risk situation query method
CN114462953A (en) * 2020-11-07 2022-05-10 苏州冀联通信工程有限公司 Intelligent management system for communication engineering
CN114676993A (en) * 2022-03-17 2022-06-28 中铁上海工程局集团第五工程有限公司 Engineering project economic activity analysis system
CN114677117A (en) * 2022-03-29 2022-06-28 广州华炬质量技术服务有限公司 Building engineering management system and device
CN117273456A (en) * 2023-09-27 2023-12-22 深圳叮当科技技术有限公司 Project cost intelligent management system based on big data technology
CN117541052A (en) * 2023-11-13 2024-02-09 安徽省招标集团股份有限公司 Engineering bid management risk pre-control system and method
CN117670262A (en) * 2024-01-31 2024-03-08 成都双流建工建设集团有限公司 Project management system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
US20110307281A1 (en) * 2010-06-11 2011-12-15 Satterfield & Pontikes Construction, Inc. Model inventory manager
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN104318408A (en) * 2014-11-25 2015-01-28 上海建科工程咨询有限公司 Multi-target and multi-dimension risk management system for large building engineering construction
CN107437167A (en) * 2017-07-19 2017-12-05 中诚工程建设管理(苏州)股份有限公司 Construction-engineering project data handling system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
US20110307281A1 (en) * 2010-06-11 2011-12-15 Satterfield & Pontikes Construction, Inc. Model inventory manager
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN104318408A (en) * 2014-11-25 2015-01-28 上海建科工程咨询有限公司 Multi-target and multi-dimension risk management system for large building engineering construction
CN107437167A (en) * 2017-07-19 2017-12-05 中诚工程建设管理(苏州)股份有限公司 Construction-engineering project data handling system

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108830515A (en) * 2018-09-25 2018-11-16 晋能清洁能源光伏发电有限责任公司 A kind of photovoltaic plant capital construction information management system
CN109493003A (en) * 2018-11-08 2019-03-19 国家电网有限公司 Item data management method and terminal device
CN109766379A (en) * 2018-12-29 2019-05-17 福建华闽通达信息技术有限公司 A kind of construction project credit wire examination method Internet-based and system
CN109711758A (en) * 2019-01-28 2019-05-03 上海建科工程咨询有限公司 A kind of whole process engineering consulting service evaluation method and system
CN109726513A (en) * 2019-01-29 2019-05-07 杭州凌望建筑科技有限公司 Project big data analysis system based on BIM
CN110084633A (en) * 2019-03-14 2019-08-02 深圳市丰浩达工程项目管理有限公司 Project cost, bid, consulting total management system
CN110147957A (en) * 2019-05-21 2019-08-20 大连地拓重工有限公司 A kind of manufacturing enterprise's internal contract team competence assessment system
CN110163581A (en) * 2019-05-31 2019-08-23 黄亮清 A kind of intelligentized project management method and system
CN110503321A (en) * 2019-08-13 2019-11-26 湖北省水利水电规划勘测设计院 General contract of civil engineering project management system
CN110503321B (en) * 2019-08-13 2023-06-30 湖北省水利水电规划勘测设计院 Project total contractor management system
CN110930025A (en) * 2019-11-21 2020-03-27 中国十九冶集团有限公司 Project management system for engineering construction
CN111291994A (en) * 2020-02-12 2020-06-16 普元信息技术股份有限公司 Multi-project management system and method suitable for agile development mode in big data environment
CN111369116A (en) * 2020-02-26 2020-07-03 国网上海市电力公司 Project early-stage and project early-stage management system based on visualization technology
CN111369211A (en) * 2020-03-02 2020-07-03 辽宁工程技术大学 Project operation data management system and method based on business intelligence
CN111507681A (en) * 2020-03-23 2020-08-07 南京熊猫电子股份有限公司 Building engineering integrated management system
CN111738669A (en) * 2020-04-22 2020-10-02 汇智赛服(北京)科技有限公司 SGO sports event flow management system
CN111652493A (en) * 2020-05-28 2020-09-11 南京维斯德软件有限公司 Multi-project collaborative management system based on ACM platform
CN111898853A (en) * 2020-06-18 2020-11-06 深圳瑞和建筑装饰股份有限公司 Engineering construction fine management system
CN112085361A (en) * 2020-08-28 2020-12-15 上海谊逅信息技术有限公司 Construction engineering overall process management method
CN112085481A (en) * 2020-09-22 2020-12-15 国网山东省电力公司烟台供电公司 Whole-process tracking system for electric power engineering project management
CN114462953A (en) * 2020-11-07 2022-05-10 苏州冀联通信工程有限公司 Intelligent management system for communication engineering
CN112418806A (en) * 2020-11-27 2021-02-26 上海妙一生物科技有限公司 Clinical research project management system
CN112560044A (en) * 2020-12-03 2021-03-26 星汉供应链有限公司 Project bug tracking and counting method, system and equipment
CN112862341A (en) * 2021-02-25 2021-05-28 中铁一局集团有限公司 Project cost management system
CN113379369A (en) * 2021-05-14 2021-09-10 南京智慧建筑研究院有限公司 Full life cycle's management system based on wisdom building
CN113379195A (en) * 2021-05-14 2021-09-10 南京智慧建筑研究院有限公司 Management system of project under construction based on wisdom building
CN113837533A (en) * 2021-08-16 2021-12-24 江苏金小满信息科技有限公司 Multi-dimensional examination and evaluation system for real estate engineering project management
CN113935598A (en) * 2021-09-29 2022-01-14 国网浙江省电力有限公司杭州供电公司 Information management platform based on heat supply and demand relationship and data processing method thereof
CN114037316A (en) * 2021-11-17 2022-02-11 北京中百信信息技术股份有限公司 Information system engineering supervision project risk situation query method
CN114676993A (en) * 2022-03-17 2022-06-28 中铁上海工程局集团第五工程有限公司 Engineering project economic activity analysis system
CN114677117A (en) * 2022-03-29 2022-06-28 广州华炬质量技术服务有限公司 Building engineering management system and device
CN117273456A (en) * 2023-09-27 2023-12-22 深圳叮当科技技术有限公司 Project cost intelligent management system based on big data technology
CN117273456B (en) * 2023-09-27 2024-08-23 深圳叮当科技技术有限公司 Project cost intelligent management system based on big data technology
CN117541052A (en) * 2023-11-13 2024-02-09 安徽省招标集团股份有限公司 Engineering bid management risk pre-control system and method
CN117670262A (en) * 2024-01-31 2024-03-08 成都双流建工建设集团有限公司 Project management system and method
CN117670262B (en) * 2024-01-31 2024-04-26 成都双流建工建设集团有限公司 Project management system and method

Similar Documents

Publication Publication Date Title
CN108446895A (en) A kind of engineering construction project intelligent management system
Shi et al. Enterprise resource planning for construction business management
US20110071867A1 (en) Transformation of data centers to manage pollution
CN105955753B (en) A kind of creation method of integration whole process fining intelligence ERP workbench
GB2380835A (en) Monitoring the profitability of a manufacturing plant
CN109034610A (en) Software development cloud platform based on different periods difference distribution mechanism
CN115719207A (en) Super-automation platform system
CN115170090A (en) Project management method and device, electronic equipment and readable storage medium
JP2016110610A (en) Management support program
US20110029450A1 (en) Computer-implemented method, system, and computer program product for connecting contract management and claim management
Jung et al. Informatization index for the construction industry
Luo et al. Conceptual framework for the service-oriented management of construction labor resource
CN112990886B (en) Aviation industry data management display system based on mobile phone terminal
RU2480830C2 (en) Method for automated data processing for making managerial decisions on project or project portfolio
CN109102168A (en) Exploitation cloud platform based on page metering and timeliness control
CN116739208A (en) Unified management system for power supply service
CN115577971A (en) Staff ability dynamic value evaluation system based on algorithm model
Nikiforova et al. Solution to CAD Designer Effort Estimation based on Analogy with Software Development Metrics.
KR20210053564A (en) A method of construction information management system with using big data processing
KR20210053563A (en) Construction information management system with using big data processing
CN111311037A (en) Method for compiling custom construction plan, progress summarizing and data analysis
Yunna et al. On the method and model of energy enterprise project portfolio selection and optimal allocation of resources
CN111652466B (en) Table box repairing application method based on work order management
Ma et al. Application Analysis of Business Intelligence in Enterprise Material Management
Rzepka et al. Implementation and Use of Green Computing in Polish Companies versus Implementation of Features Characteristic of Teal Organizations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination