CN110930025A - Project management system for engineering construction - Google Patents

Project management system for engineering construction Download PDF

Info

Publication number
CN110930025A
CN110930025A CN201911149081.0A CN201911149081A CN110930025A CN 110930025 A CN110930025 A CN 110930025A CN 201911149081 A CN201911149081 A CN 201911149081A CN 110930025 A CN110930025 A CN 110930025A
Authority
CN
China
Prior art keywords
construction
module
information
project
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911149081.0A
Other languages
Chinese (zh)
Inventor
李吉
黄建娟
蔡仲斌
胡伟山
罗振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN201911149081.0A priority Critical patent/CN110930025A/en
Publication of CN110930025A publication Critical patent/CN110930025A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the field of building construction, and discloses a project management system for engineering construction, which is used for systematically managing construction of construction projects so as to improve the working efficiency of related personnel. The system comprises an acquisition module, a progress module, a personnel management module, an equipment management module, a material management module, a fund management module and a storage module; personnel, equipment and materials in project implementation are managed in a unified mode through the personnel management module, the equipment management module and the material management module, and task planning is carried out on the project through progress, so that the working efficiency of related personnel is improved. The invention is suitable for engineering construction project management.

Description

Project management system for engineering construction
Technical Field
The invention relates to the field of building construction, in particular to a project management system for engineering construction.
Background
In the engineering project implementation process of China at present, most enterprises still adopt the traditional project management mode of personnel real-time investigation and manual analysis and recording, the time and the labor are consumed, the management is complicated, the arrangement of personnel and the equipment movement are prone to error, and therefore the work efficiency of related personnel is reduced.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: a project management system for construction of a construction project is provided to systematically manage the construction of the construction project so as to improve the work efficiency of the related personnel.
In order to solve the problems, the invention adopts the technical scheme that: a project management system for engineering construction comprises a main control platform, an acquisition module, a progress module, a personnel management module, an equipment management module, a material management module, a fund management module and a storage module, wherein the main control platform is used by a general engineering management department and is the management core of the project management system, and the main control platform is connected with the acquisition module, the progress module, the personnel management module, the equipment management module, the material management module, the fund management module and the storage module; wherein,
the construction system comprises an acquisition module, a construction management module and a construction management module, wherein the acquisition module is used for acquiring construction engineering information, and the construction engineering information comprises construction project information, construction equipment information, construction fund information and constructor information;
the storage module is used for recording the construction project information, the construction equipment information, the construction fund information and the constructor information which are acquired by the acquisition module;
the progress module is in information interconnection with the storage module, formulates construction period numbers based on construction project information, divides the construction period numbers into a plurality of task targets, sets implementation starting time for each group of task targets, and predicts completion time and latest completion time;
the personnel management module is interconnected with the storage module and the progress module, distributes task responsible persons and constructors based on each group of task targets, and records personnel information and authority distributed by each group of task targets;
the equipment management module is in information interconnection with the storage module and the progress module, and distributes construction equipment according to the specific construction tasks of each group of task targets, wherein each group of construction equipment is provided with a service life and is distributed with specific equipment responsible persons;
the material management module is in information interconnection with the storage module and the progress module, counts materials required by construction based on construction project information budget, and distributes the quantity of the materials required by construction of the task targets according to each group of task targets;
and the fund management module is respectively in information interconnection with the storage module, the progress module, the personnel management module, the equipment management module and the material management module and is used for total fund budget of project construction, settlement of wages of personnel, equipment renting and purchasing funds, settlement of quantity of construction materials, unit price and total price of the construction materials, wherein each group of task targets are located.
Furthermore, in order to facilitate supervision of project construction safety, the system also comprises a safety supervision module which is interconnected with the progress module information and used by a safety supervision unit.
Furthermore, in order to facilitate the control of the authority owned by the responsible person and the constructor of the task target, the invention also comprises an authority module which is in information interconnection with the personnel management module, wherein the authority comprises login authority for the system login of the responsible person and the constructor, internal data acquisition authority required by project construction and conference information push authority of the corresponding task target.
Furthermore, in order to facilitate the construction quality inspection after each group of task targets are completed, the construction quality inspection system also comprises a quality supervision module which is interconnected with the progress module information and used by a quality inspection unit, records and stores the construction quality information, then pushes the construction quality information to a main platform, and the main platform checks and determines whether to carry out the construction of the next task target.
Furthermore, in order to facilitate the observation of the completion degree of the construction period number, the construction progress display system also comprises a display module which is in information interconnection with the progress module and simultaneously displays the construction project name, the completed task target, the task target performed at the current stage, the responsible person and the constructor of the task target at the current stage, the predicted completion time of the task target at the current stage, the task target predicted to be performed at the next stage and the predicted start time.
Further, the construction project information may include construction design files, material tables, approval notices, and various data, the construction equipment information includes equipment name, equipment model, and equipment quantity, the construction fund information includes docking bank account, fund expenditure account information, financial responsible person and responsible person authority information, and the constructor information includes constructor name, certificate number, job position of the task target and authority owned by the job position.
The invention has the beneficial effects that:
(1) the implementation project can be planned and constructed in stages through the progress module, and constructors and construction equipment of each group of task targets are distributed and managed through the personnel management module and the equipment management module, so that the working efficiency of related personnel is improved;
(2) the real-time tracking of the construction progress can be realized through the display modules arranged on the building construction site, the construction tasks of constructors are conveniently planned, and the working efficiency of the constructors is further improved.
Drawings
Fig. 1 is a schematic diagram of the structure of the management system of the present invention.
FIG. 2 is a schematic diagram of a fund management module connection structure according to the present invention.
Detailed Description
The invention provides a project management system for engineering construction, which is used for uniformly managing personnel, equipment and materials in project implementation and carrying out task planning on projects so as to improve the working efficiency of related personnel. Referring to fig. 1-2, a project management system for engineering construction includes a supervisor platform, an acquisition module, a progress module, a personnel management module, an equipment management module, a material management module, a fund management module and a storage module, wherein the supervisor platform is used by a general engineering management department, is a management core of the project management system, and is connected with the acquisition module, the progress module, the personnel management module, the equipment management module, the material management module, the fund management module and the storage module;
the acquisition module is used for acquiring construction engineering information, and the construction engineering information comprises construction project information, construction equipment information, construction fund information and constructor information. The construction project information comprises construction design files, material tables, examination and approval notices and various data, and the construction equipment information comprises equipment names, equipment models and equipment quantity; the construction fund information comprises a docking bank account, fund expenditure account information, a financial responsible person and responsible person right information; the constructor information comprises constructor name, certificate number, position of the task target and the authority of the position.
The storage module is used for recording the construction engineering information acquired by the acquisition module;
the progress module is in information interconnection with the storage module, formulates construction period numbers based on construction project information, and divides the construction period numbers into a plurality of task targets, wherein each group of task targets is provided with implementation starting time, predicted completion time and latest completion time;
the personnel management module is interconnected with the storage module and the progress module, distributes task responsible persons and constructors based on each group of task targets, and records personnel information and authority distributed by each group of task targets;
the equipment management module is in information interconnection with the storage module and the progress module, and distributes construction equipment according to the specific construction tasks of each group of task targets, wherein each group of construction equipment is provided with a service life and is distributed with specific equipment responsible persons;
the material management module is in information interconnection with the storage module and the progress module, counts materials required by construction based on construction project information budget, and distributes the quantity of the materials required by construction of the task targets according to each group of task targets;
and the fund management module is respectively in information interconnection with the storage module, the progress module, the personnel management module, the equipment management module and the material management module and is used for total fund budget of project construction, settlement of wages of personnel, equipment renting and purchasing funds, settlement of quantity of construction materials, unit price and total price of the construction materials, wherein each group of task targets are located.
In addition, the invention also comprises a safety supervision module which is interconnected with the progress module information and used by a safety supervision unit for supervising the construction safety of projects.
The system also comprises a permission module which is in information interconnection with the personnel management module and is used for controlling the authorities owned by the responsible persons and the constructors of the task targets, wherein the authorities comprise login authorities for system login of the responsible persons and the constructors, internal data acquisition authorities required by project construction and conference information push authorities of the corresponding task targets.
The construction quality inspection system also comprises a quality supervision module which is interconnected with the progress module information and used by a quality inspection unit for the construction quality inspection after each group of task targets are completed, the construction quality information is recorded and stored, then the construction quality information is pushed to a main platform, and the main platform checks and determines whether to carry out the construction of the next task target.
The invention also comprises a display module which is interconnected with the progress module information and is used for displaying the completion degree of the construction period number and simultaneously displaying the name of the construction project, the completed task target, the task target carried out at the current stage, the responsible person and constructor of the task target at the current stage, the predicted completion time of the task target at the current stage, the predicted task target to be carried out at the next stage and the predicted start time.
The system of the invention can be carried out in the following way:
1. before the engineering project is implemented, firstly, acquiring construction project information, construction equipment information, construction fund information and constructor information through an acquisition module, and recording and storing all the collected information into a storage module; the construction project information comprises construction design files, material tables, approval notices and various data, the construction equipment information comprises equipment names, equipment models and equipment quantity, the construction fund information comprises a docking bank account, fund expenditure account information, financial responsible persons and responsible person authority information, and the constructor information comprises constructor names, certificate numbers, positions serving as task targets and authorities owned by the positions.
2. The progress module extracts construction project information through the storage module, formulates a project construction scheme and construction period number, divides the construction period number into a plurality of task targets, and achieves the overall implementation completion of the engineering project by gradually finishing the task targets.
3. And the personnel management module and the equipment management module call all constructor information and all construction equipment information through the storage module, allocate implementing personnel and implementing equipment according to each group of task targets, and simultaneously perform system management on the implementing personnel and the implementing equipment.
4. And distributing the construction materials required by the task target under construction at the current stage through a material management module, and simultaneously carrying out systematic management on the construction materials.
5. And carrying out fund flow management on manpower, equipment and materials implemented by the project through a fund management module.
6. And the construction of the supervision project is safe through the safety supervision module.
7. The authority module controls authorities owned by a responsible person and a constructor of the task target, wherein the authorities include login authorities for system login of the responsible person and the constructor, internal data acquisition authorities required by project construction, and conference information push authorities of the corresponding task target.
8. And the quality supervision module is used for checking the construction quality of each group of task targets after the task targets are completed, recording and storing the construction quality information, then pushing the construction quality information to the main platform, and the main platform checks and determines whether to carry out construction of the next task target.
10. The completion degree of the construction period number is displayed through the display module, and meanwhile, the name of a construction project, the completed task target, the task target performed at the current stage, the responsible persons and constructors of the task target at the current stage, the predicted completion time of the task target at the current stage, the predicted task target to be performed at the next stage and the predicted start time are displayed.

Claims (6)

1. A project management system for construction of a project, comprising:
the construction system comprises an acquisition module, a construction management module and a construction management module, wherein the acquisition module is used for acquiring construction engineering information, and the construction engineering information comprises construction project information, construction equipment information, construction fund information and constructor information;
the storage module is used for recording the construction engineering information acquired by the acquisition module;
the progress module is interconnected with the storage module in information, and formulates construction period numbers based on the construction project information, the construction period numbers are divided into a plurality of task targets, and each group of task targets are provided with implementation starting time, predicted completion time and latest completion time;
the personnel management module is interconnected with the storage module and the progress module, distributes task responsible persons and constructors based on each group of task targets, and records personnel information and authority distributed by each group of task targets;
the equipment management module is in information interconnection with the storage module and the progress module, and distributes construction equipment according to the specific construction tasks of each group of task targets, wherein each group of construction equipment is provided with a service life and is distributed with specific equipment responsible persons;
the material management module is in information interconnection with the storage module and the progress module, counts materials required by construction based on construction project information budget, and distributes the quantity of the materials required by construction of the task targets according to each group of task targets;
and the fund management module is respectively in information interconnection with the storage module, the progress module, the personnel management module, the equipment management module and the material management module and is used for total fund budget of project construction, settlement of wages of personnel, equipment renting and purchasing funds, settlement of quantity of construction materials and unit price and total price of the materials of each group of task targets.
2. The project management system for engineering construction of claim 1, further comprising a safety supervision module, interconnected with the progress module information, for use by a safety supervision entity for supervising project construction safety.
3. The project management system for engineering construction as claimed in claim 1, further comprising a permission module, wherein the permission module is in information interconnection with the personnel management module, and is used for controlling the permissions owned by the responsible persons and the constructors of the task targets, and the permissions include login permissions for system login of the responsible persons and the constructors, internal data acquisition permissions required by project construction, and conference information push permissions of the corresponding task targets.
4. The project management system for engineering construction according to claim 1, comprising a quality supervision module, wherein the quality supervision module is interconnected with the progress module information, is used by a quality inspection unit, is used for construction quality inspection after each group of task objects are completed, records and stores construction quality information, and then pushes the construction quality information to a supervisor platform.
5. The project management system for engineering construction according to claim 1, further comprising a display module, wherein the display module is interconnected with the progress module for displaying the completion degree of the construction period number, and also displaying the name of the construction project, the completed task goal, the task goal performed at the current stage, the responsible person and constructor of the task goal at the current stage, the predicted completion time of the task goal at the current stage, the predicted task goal to be performed at the next stage, and the predicted start time.
6. The project management system for engineering construction according to claim 1, wherein the construction project information includes construction design files, material tables, and approval notices, and the construction equipment information includes equipment name, equipment model, equipment number; the construction fund information comprises a docking bank account, fund expenditure account information, a financial responsible person and responsible person right information; the constructor information comprises constructor names, certificate numbers, positions serving as task targets and authorities owned by the positions.
CN201911149081.0A 2019-11-21 2019-11-21 Project management system for engineering construction Pending CN110930025A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911149081.0A CN110930025A (en) 2019-11-21 2019-11-21 Project management system for engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911149081.0A CN110930025A (en) 2019-11-21 2019-11-21 Project management system for engineering construction

Publications (1)

Publication Number Publication Date
CN110930025A true CN110930025A (en) 2020-03-27

Family

ID=69850546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911149081.0A Pending CN110930025A (en) 2019-11-21 2019-11-21 Project management system for engineering construction

Country Status (1)

Country Link
CN (1) CN110930025A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815290A (en) * 2020-07-20 2020-10-23 云南财经大学 Territorial space planning system based on GIS
CN113191741A (en) * 2021-05-21 2021-07-30 贵州建工集团第二建筑工程有限责任公司 Information management system for constructional engineering
CN113222259A (en) * 2021-05-18 2021-08-06 盐城工学院 Progress management system for construction cost
CN114648207A (en) * 2022-02-25 2022-06-21 江苏峘宇建设有限公司 Management coordination type system of construction engineering
CN117217676A (en) * 2023-08-01 2023-12-12 山东黄河河务局工程建设中心 Intelligent management system and method for engineering construction project

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102955982A (en) * 2011-08-18 2013-03-06 大连博特软件科技有限公司 System for managing construction project contracting
CN106022649A (en) * 2016-06-13 2016-10-12 四川省兴华工程项目管理有限公司 Comprehensive management system for engineering project supervision, cost, bidding, and consultation
CN106096919A (en) * 2016-08-09 2016-11-09 湖南宝信云建筑综合服务平台股份有限公司 engineering project process online management system
CN107085758A (en) * 2017-01-19 2017-08-22 北京恒华伟业科技股份有限公司 A kind of project management method, apparatus and system
CN107292592A (en) * 2017-07-19 2017-10-24 中诚工程建设管理(苏州)股份有限公司 Construction-engineering project data automatic classification orients supplying system
CN108009714A (en) * 2017-11-28 2018-05-08 昆明理工大学 A kind of electromechanical project generalized information management system and method based on BIM
CN108133299A (en) * 2016-12-01 2018-06-08 黄玉新 A kind of smart items manage system
CN108446895A (en) * 2018-03-26 2018-08-24 郑州大学 A kind of engineering construction project intelligent management system
CN109559054A (en) * 2018-12-04 2019-04-02 国网山东省电力公司无棣县供电公司 A kind of Phase of Electric Power Projects information processing system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102955982A (en) * 2011-08-18 2013-03-06 大连博特软件科技有限公司 System for managing construction project contracting
CN106022649A (en) * 2016-06-13 2016-10-12 四川省兴华工程项目管理有限公司 Comprehensive management system for engineering project supervision, cost, bidding, and consultation
CN106096919A (en) * 2016-08-09 2016-11-09 湖南宝信云建筑综合服务平台股份有限公司 engineering project process online management system
CN108133299A (en) * 2016-12-01 2018-06-08 黄玉新 A kind of smart items manage system
CN107085758A (en) * 2017-01-19 2017-08-22 北京恒华伟业科技股份有限公司 A kind of project management method, apparatus and system
CN107292592A (en) * 2017-07-19 2017-10-24 中诚工程建设管理(苏州)股份有限公司 Construction-engineering project data automatic classification orients supplying system
CN108009714A (en) * 2017-11-28 2018-05-08 昆明理工大学 A kind of electromechanical project generalized information management system and method based on BIM
CN108446895A (en) * 2018-03-26 2018-08-24 郑州大学 A kind of engineering construction project intelligent management system
CN109559054A (en) * 2018-12-04 2019-04-02 国网山东省电力公司无棣县供电公司 A kind of Phase of Electric Power Projects information processing system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815290A (en) * 2020-07-20 2020-10-23 云南财经大学 Territorial space planning system based on GIS
CN111815290B (en) * 2020-07-20 2023-08-11 云南财经大学 Territorial space planning system based on GIS
CN113222259A (en) * 2021-05-18 2021-08-06 盐城工学院 Progress management system for construction cost
CN113191741A (en) * 2021-05-21 2021-07-30 贵州建工集团第二建筑工程有限责任公司 Information management system for constructional engineering
CN114648207A (en) * 2022-02-25 2022-06-21 江苏峘宇建设有限公司 Management coordination type system of construction engineering
CN117217676A (en) * 2023-08-01 2023-12-12 山东黄河河务局工程建设中心 Intelligent management system and method for engineering construction project

Similar Documents

Publication Publication Date Title
CN110930025A (en) Project management system for engineering construction
CN105373901A (en) Grid fault worksheet handling method, apparatus, and system
CN104809591A (en) Electric power construction engineering supervision mechanism based on big data
CN107909280A (en) A kind of electricity power engineering managing and control system and its control method based on bill of quantities
CN113112233A (en) BIM-based intelligent management method and platform for full life cycle of wind power project
CN106355256A (en) Multivariate visualization overhaul management system
RU91198U1 (en) AUTOMATED INFORMATION AND ANALYTICAL SYSTEM FOR MONITORING PROJECTS (AIASMP)
CN116562802A (en) Intelligent construction application platform of track traffic based on BIM
CN110570109A (en) Data center full life cycle integrated service test process supervision system
RU122793U1 (en) DEVICE OF AUTOMATED FORMATION, CALCULATION AND ANALYSIS OF WORKERS SALES AT THE PRODUCTION ENTERPRISE
CN111105333B (en) Intelligent traffic professional operation service management system and method
CN111860895A (en) BIM-based bridge auxiliary facility operation maintenance management system
CN115759637A (en) Intelligent construction informatization integrated management platform
CN114677117A (en) Building engineering management system and device
CN115034613A (en) Intelligent production scheduling system of precast beam field
CN114493138A (en) Land-air integrated intelligent construction system and management method
Toan et al. Comparing the risk management standpoint between the project participants for the urban road transport projects in Hanoi
JP2021026496A (en) Power generation cost price calculation server of hydroelectric power station, power generation cost price calculation system of hydroelectric power station, and power generation cost price calculation method of hydroelectric power station
Ganesh et al. Optimization in men & material cost using AWP technology
Zhang et al. Study on the cost control of construction project
Sinenko Analyzing the functional capabilities of modern systems, methods and means for scheduling
Michal et al. IAEA perspectives on preparation for decommissioning
CN114819907A (en) Building engineering project cost management equipment
Darabos Software package for controlling water supply systems
CN114757476A (en) Intelligent factory management system based on 5G application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200327