CN109726513A - Project big data analysis system based on BIM - Google Patents
Project big data analysis system based on BIM Download PDFInfo
- Publication number
- CN109726513A CN109726513A CN201910084954.8A CN201910084954A CN109726513A CN 109726513 A CN109726513 A CN 109726513A CN 201910084954 A CN201910084954 A CN 201910084954A CN 109726513 A CN109726513 A CN 109726513A
- Authority
- CN
- China
- Prior art keywords
- module
- project
- bim
- unit
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The project big data analysis system based on BIM that the invention discloses a kind of, including project drawing board, tissue profiling module, user management module, BIM library module and management module;The tissue profiling module includes construction project module and unit of taking part in building's module, and the construction project module is built-in with the construction project information;Unit of taking part in building's module is built-in with the unit information of designing unit, construction unit or reviewing authority;The user management module is built-in with the worker information in unit of taking part in building;The BIM library module is built-in with the BIM buildings model established based on BIM, and the BIM library module is connected with construction project module.The present invention strengthens the business cooperation ability of the constituent parts in project, improves the efficiency of management of engineering project, so that project manager is easily grasped various information and summarize along the segregation of duties for having managed staff in project.
Description
Technical field
The present invention relates to engineering management field, in particular to a kind of project big data analysis system based on BIM.
Background technique
The management of engineering project is a complexity, arduous system engineering, is related to progress, quality, investment, contract, people
Various work such as member, risk, Drawings and documents, numerous participating departments and unit, so that operational difficulties that are common and coordinating,
A large amount of information needs effective management, and especially domestic three universal side engineerings increase the difficulty of engineering management.With interconnection
The development of network technology and wireless communication technique, modern society stepped into the information age, traditional project management system,
Seem more and more painstaking, has needed to find new Method and kit for.The full name in English of architecture information model (BIM) is
Building Information Modeling is a complete information model, can be by engineering project in Life cycle
In each different phase engineering information, process and resources integration in a model, easily used by each participant of engineering.
By real information possessed by 3-dimensional digital technical modelling building, provided for engineering design and construction mutually coordinated, internal
Consistent information model makes the model reach the integration of design and construction, and each profession cooperates, to reduce engineering production
Cost ensures that engineering presses matter completion on time.BIM technology can be applied to each ranks such as engineering project prospecting, design, construction, O&M
Section is realized data sharing of the building each participant of full lifetime on the basis of same multidimensional Building Information Model, is passed through for industrial chain
Logical, industrialization is built and booming architectural creation provides technical guarantee;It supports to engineering-environment, economy, quality, safety etc.
Analysis checks, provides foundation for the scheme optimization and science decision of project overall process;Each profession is supported to cooperate, project
Virtual construction and fine-grained management create conditions for the upgrading synergy of construction industry, energy conservation and environmental protection.At present in the construction of building operation
In the process, due to not making full use of information technology, BIM technology, traditional Project design management system is relied solely on, has been shown
It is more and more painstaking to obtain, and can not fast and effectively be managed to construction project.
Summary of the invention
The project big data analysis system based on BIM that the object of the present invention is to provide a kind of.The present invention has made project in order
The segregation of duties of middle staff strengthens the business cooperation ability of the constituent parts in project, improves the management effect of engineering project
Rate;On the other hand the management and analysis for being conducive to project big data, enable project manager easily to grasp construction project
Various information.
Technical solution of the present invention: a kind of project big data analysis system based on BIM, including BIM project drawing board, it is described
BIM project drawing board include project information plate, bid section accounting chart plate, monthly completion chart plate, single payment chart
Plate, BIM model display plate, quality problems chart plate, personal management chart plate, security risk chart plate, drawing
Change diagram board block, project Dynamically Announce plate, Project Cost chart plate, trend prediction chart module, vivid progress chart
Module and overall objective chart module;The management system includes tissue profiling module, user management module, BIM library module
And editor module;
The tissue profiling module includes construction project module and unit of taking part in building's module, and the construction project module is built-in with
The construction project information;Unit of taking part in building's module is built-in with the unit information of designing unit, construction unit or reviewing authority;
The user management module is built-in with the worker information in unit of taking part in building;
The BIM library module is built-in with the BIM buildings model established based on BIM, the BIM library module and construction project
Module is connected, and generates and show in BIM model display plate.
Editor's movement that the editor module is inquired, increased newly, modified, delete and selected;The editor module and group
Knit profiling module, user management module is connected with BIM library module;
The user management module includes account listing function module and Role Management functional module, the account list
Functional module be for Add User account or delete user account and to worker information carry out editor and it is perfect, it is described
Role management module be that keyword search is carried out to account or account user by editor module, account or account will be contained
The item entry of user is shown by way of table;
User inputs user information in user management module, and user management module judges user information, such as uses
Family information, which is not inconsistent, then not to be entered, after meeting such as user information, by organizing profiling module to adhere to the design in construction project separately
In unit, construction unit or reviewing authority;And jump and log on to corresponding BIM project drawing board, by editor module to BIM project
Each plate is edited in drawing board.
In the above-mentioned project big data analysis system based on BIM, the construction project information includes entry name
Title, project manager, contact method, construction unit, designing unit, unit in charge of construction, surveying unit, supervisor, is examined item address
Count unit and project picture.
In project big data analysis system above-mentioned based on BIM, the unit information includes organization, list
Bit address, unit registered capital, in-service employee's number and unit property.
In project big data analysis system above-mentioned based on BIM, the worker information includes account, account use
People, affiliated unit, position, contact method and E-mail address.
Compared with prior art, the invention has the following advantages:
The present invention makes the staff of each construction project can along the segregation of duties for having managed staff in construction project
To understand and check the general overview of the construction project through the invention, and carried out by corresponding responsibility in the construction project
Work data and BIM model checked, so that it is single to strengthen each designing unit on construction project, construction unit, audit
Business cooperation ability between position, forms the engineering management business norms of uniformity, realizes flattening and centralized management,
The various information that Construction Project Management personnel can easily grasp construction project summarizes, and changes data acquisition directly and facilitation,
Communication efficiency is improved, communication cost is reduced, realizes the movable coordinating and unifying of project management and Efficient Operation.This hair
It is bright by setting project drawing board, tissue profiling module, user management module, BIM library module and editor module, be convenient for multi-party unit
Project Exhibition and editor are carried out in system, and checks or manage the BIM buildings model of the project in BIM library module, simultaneously
It is equipped with inquiry, newly-increased, modification again, deletes and the functions such as selection, it is convenient to the further more new management of project, it conveniently looks into real time
Ask correlation circumstance.
Detailed description of the invention
Fig. 1 is system flow schematic diagram of the invention;
Fig. 2 is the schematic diagram of project drawing board of the invention;
Fig. 3 is worker information schematic diagram of the invention;
Fig. 4 is information of building project schematic diagram of the invention;
Fig. 5 is practical effect figure of the invention.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, but be not intended as to the present invention limit according to
According to.
Embodiment: a kind of project big data analysis system based on BIM, as shown in attached drawing 1-5, including BIM project drawing board,
The BIM project drawing board includes project information plate, bid section accounting chart plate, monthly completion chart plate, single payment
Chart plate, BIM model display plate, quality problems chart plate, personal management chart plate, security risk chart plate,
Drawing changes diagram board block, project Dynamically Announce plate, Project Cost chart plate, trend prediction chart module, vivid progress
Chart module and overall objective chart module;The management system includes tissue profiling module, user management module, the library BIM
Module and editor module;
The project information plate is for showing project profile information;
The bid section accounting chart plate is for showing the chart containing bid section title, bid section contract price and bid section accounting
Information;
The monthly completion chart plate is for showing the figure containing construction time information, planned cost and actual cost
Table information;
For showing projects month, this month has paid believes the single payment chart plate with the chart of contract price
Breath;
The BIM model display plate is for showing project BIM model;
The quality problems chart plate with display the chart-information containing defective in quality type and quantity;
The personal management chart plate is used to show the figure of the newly-increased number of each bid section, distancing number and current persons count
Table information;
The security risk chart plate is for showing security risk type, editing safety hidden danger entry and whole safety
Hidden danger changes the chart-information of entry;
The drawing change diagram board block contains relevant unit for display, proposition problem, rectification problem, goes out figure again
The practicable chart-information with scene;
The project Dynamically Announce plate is for showing project multidate information;
The Project Cost chart plate is used to show the chart of the title containing projects and operating expenses;
The trend prediction chart plate is used to show the chart-information in construction month and investment amount;
The vivid progress diagram board block is used to show the texts and pictures information of whole bid section progress and each bid section progress;
The overall objective chart is for showing total construction period, overall floorage, overall investment and placement amount chart letter
Breath.
The tissue profiling module includes construction project module and unit of taking part in building's module, and the construction project module is built-in with
The construction project information;The construction project information includes project name, item address, project manager, contact method, construction
Unit, designing unit, unit in charge of construction, surveying unit, supervisor, audit unit and project picture.The unit information packet
Include organization, unit address, unit registered capital, in-service employee's number and unit property.
The user management module is built-in with the worker information in unit of taking part in building;The worker information includes
Account, account user, affiliated unit, position, contact method and E-mail address.
The BIM library module is built-in with the BIM buildings model established based on BIM, the BIM library module and construction project
Module is connected;And it generates and shows in BIM model display plate.
Editor's movement that the editor module is inquired, increased newly, modified, delete and selected;The editor module and group
Knit profiling module, user management module is connected with BIM library module;
The user management module includes account listing function module and Role Management functional module, the account list
Functional module be for Add User account or delete user account and to worker information carry out editor and it is perfect, it is described
Role management module be that keyword search is carried out to account or account user by editor module, account or account will be contained
The item entry of user is shown by way of table.
User inputs user information in user management module, and user management module judges user information, such as uses
Family information, which is not inconsistent, then not to be entered, after meeting such as user information, by organizing profiling module to adhere to the design in construction project separately
In unit, construction unit or reviewing authority;And jump and log on to corresponding BIM project drawing board, by editor module to BIM project
Each plate is edited in drawing board.
The present invention makes the staff of each construction project can along the segregation of duties for having managed staff in construction project
To understand and check the general overview of the construction project through the invention, and carried out by corresponding responsibility in the construction project
Work data and BIM model checked, so that it is single to strengthen each designing unit on construction project, construction unit, audit
Business cooperation ability between position, forms the engineering management business norms of uniformity, realizes flattening and centralized management,
The various information that Construction Project Management personnel can easily grasp construction project summarizes, and changes data acquisition directly and facilitation,
Communication efficiency is improved, communication cost is reduced, realizes the movable coordinating and unifying of project management and Efficient Operation.This hair
It is bright by setting project drawing board, tissue profiling module, user management module, BIM library module and editor module, be convenient for multi-party unit
Project Exhibition and editor are carried out in system, and checks or manage the BIM buildings model of the project in BIM library module, simultaneously
It is equipped with inquiry, newly-increased, editor again, deletes and the functions such as selection, it is convenient to the further more new management of project, it conveniently looks into real time
Ask correlation circumstance.
Claims (4)
1. the project big data analysis system based on BIM, including BIM project drawing board, the BIM project drawing board includes project letter
Cease plate, bid section accounting chart plate, monthly completion chart plate, single payment chart plate, BIM model display plate, matter
Amount problem chart plate, personal management chart plate, security risk chart plate, drawing change diagram board block, project dynamic are aobvious
Show plate, Project Cost chart plate, trend prediction chart module, vivid progress chart module and overall objective chart module;
It is characterized by: the management system includes tissue profiling module, user management module, BIM library module and editor module;
The tissue profiling module includes construction project module and unit of taking part in building's module, and the construction project module is built-in with this and builds
If project information;Unit of taking part in building's module is built-in with the unit information of designing unit, construction unit or reviewing authority;
The user management module is built-in with the worker information in unit of taking part in building;
The BIM library module is built-in with the BIM buildings model established based on BIM, the BIM library module and construction project module
It is connected, and generates and show in BIM model display plate;
Editor's movement that the editor module is inquired, increased newly, modified, delete and selected;The editor module and tissue are general
Condition module, user management module are connected with BIM library module;
The user management module includes account listing function module and Role Management functional module, the account listing function
Module be for Add User account or delete user account and to worker information carry out editor and perfect, described angle
Color management module is to carry out keyword search to account or account user by editor module, will be used containing account or account
The item entry of people is shown by way of table;
User inputs user information in user management module, and user management module judges user information, as user believes
Breath, which is not inconsistent, then not to be entered, after meeting such as user information, by organize profiling module adhere to separately designing unit in construction project,
It in construction unit or reviewing authority, and jumps and logs on to corresponding BIM project drawing board, by editor module to BIM project drawing board
In each plate edited.
2. the project big data analysis system according to claim 1 based on BIM, it is characterised in that: the construction
Project information includes project name, item address, project manager, contact method, construction unit, designing unit, unit in charge of construction, surveys
Examine unit, supervisor, audit unit and project picture.
3. the project big data analysis system according to claim 1 based on BIM, it is characterised in that: the unit
Information includes organization, unit address, unit registered capital, in-service employee's number and unit property.
4. the project big data analysis system according to claim 1 based on BIM, it is characterised in that: the work people
Member's information includes account, account user, affiliated unit, position, contact method and E-mail address.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910084954.8A CN109726513A (en) | 2019-01-29 | 2019-01-29 | Project big data analysis system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910084954.8A CN109726513A (en) | 2019-01-29 | 2019-01-29 | Project big data analysis system based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109726513A true CN109726513A (en) | 2019-05-07 |
Family
ID=66301106
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910084954.8A Pending CN109726513A (en) | 2019-01-29 | 2019-01-29 | Project big data analysis system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109726513A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110163581A (en) * | 2019-05-31 | 2019-08-23 | 黄亮清 | A kind of intelligentized project management method and system |
CN111598477A (en) * | 2020-05-22 | 2020-08-28 | 河北省北斗导航位置服务有限公司 | Building quality is traceed back and deformation monitoring platform |
CN111861360A (en) * | 2020-01-20 | 2020-10-30 | 凯诺(青岛)新型建材有限公司 | Customer visit tracking big data analysis and management system |
CN115204838A (en) * | 2022-07-15 | 2022-10-18 | 广州高新工程顾问有限公司 | BIM-based whole process engineering consultation integrated management method and system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104091215A (en) * | 2014-07-22 | 2014-10-08 | 上海建科工程咨询有限公司 | Project planning management system based on building information model |
CN105426572A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | BIM based multidimensional data and P6 database interaction method and system |
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN108446895A (en) * | 2018-03-26 | 2018-08-24 | 郑州大学 | A kind of engineering construction project intelligent management system |
-
2019
- 2019-01-29 CN CN201910084954.8A patent/CN109726513A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104091215A (en) * | 2014-07-22 | 2014-10-08 | 上海建科工程咨询有限公司 | Project planning management system based on building information model |
CN105426572A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | BIM based multidimensional data and P6 database interaction method and system |
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN108446895A (en) * | 2018-03-26 | 2018-08-24 | 郑州大学 | A kind of engineering construction project intelligent management system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110163581A (en) * | 2019-05-31 | 2019-08-23 | 黄亮清 | A kind of intelligentized project management method and system |
CN111861360A (en) * | 2020-01-20 | 2020-10-30 | 凯诺(青岛)新型建材有限公司 | Customer visit tracking big data analysis and management system |
CN111598477A (en) * | 2020-05-22 | 2020-08-28 | 河北省北斗导航位置服务有限公司 | Building quality is traceed back and deformation monitoring platform |
CN115204838A (en) * | 2022-07-15 | 2022-10-18 | 广州高新工程顾问有限公司 | BIM-based whole process engineering consultation integrated management method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109726513A (en) | Project big data analysis system based on BIM | |
Hannele et al. | Expanding uses of building information modeling in life-cycle construction projects | |
Aoyama | Agile software process and its experience | |
CN114386774B (en) | CPIM-based three-dimensional visual full-life-cycle management platform for coal preparation plant | |
CN105976109A (en) | Intelligent auditing method and system based on big data | |
CN109035060A (en) | A kind of structured processes management system and management method | |
CN105335814A (en) | Online big data intelligent cloud auditing method and system | |
CN109558393A (en) | A kind of data model construction method, device, equipment and storage medium | |
CN109726247A (en) | A kind of data visualization analysis system and method | |
CN109886643A (en) | BIM multidimensional mould based on IOS examines platform | |
Wang et al. | A MULTIDIMENSIONAL INFORMATION MODEL FOR MANAGING CONSTRUCTION INFORMATION. | |
CN109886563A (en) | Wisdom based on BIM builds control platform | |
CN110942280A (en) | Interaction method for collaborative participation of designers | |
Zan et al. | Managing Cultural Heritage in China: A View from the Outside | |
CN116739535B (en) | Method for building accurate digital twin planning display platform for quotients | |
Christiansson et al. | User driven innovation in the building process | |
CN109886645A (en) | Multidimensional mould based on BIM examines platform | |
Cheng et al. | BIM's content and its application in contemporary architectural design | |
CN109886644A (en) | Engineering project based on BIM commands managing and control system | |
CN115577971A (en) | Staff ability dynamic value evaluation system based on algorithm model | |
CN109784868A (en) | BIM multidimensional mould based on Android examines platform | |
Zancul | PLM reference model: a preliminary proposal for reference model evolution | |
CN111860895A (en) | BIM-based bridge auxiliary facility operation maintenance management system | |
Eom | Transnational management systems: An emerging tool for glob | |
CN110503386A (en) | A kind of data processing system for market-oriented project |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190507 |
|
WD01 | Invention patent application deemed withdrawn after publication |