CN109886644A - Engineering project based on BIM commands managing and control system - Google Patents
Engineering project based on BIM commands managing and control system Download PDFInfo
- Publication number
- CN109886644A CN109886644A CN201910084997.6A CN201910084997A CN109886644A CN 109886644 A CN109886644 A CN 109886644A CN 201910084997 A CN201910084997 A CN 201910084997A CN 109886644 A CN109886644 A CN 109886644A
- Authority
- CN
- China
- Prior art keywords
- chart
- project
- plate
- module
- bim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of, and the engineering project based on BIM commands managing and control system, including the project drawing board based on BIM, the project drawing board includes project information plate, bid section accounting chart plate, monthly completion chart plate, single payment chart plate, BIM model display plate, quality problems chart plate, personal management chart plate, security risk chart plate, drawing change diagram board block, project Dynamically Announce plate, Project Cost chart plate, trend prediction chart module, vivid progress chart module and overall objective chart module;It further include a data recording module.The present invention carries out classification display and typing by combining project management techniques with BIM technology come Various types of data information such as engineering information, project progress, project quality and BIM models to project, the efficiency of management for increasing substantially engineering project realizes the movable coordinating and unifying of project management and Efficient Operation.
Description
Technical field
The present invention relates to engineering management field, in particular to a kind of engineering project based on BIM commands managing and control system.
Background technique
The management of engineering project is a complexity, arduous system engineering, is related to progress, quality, investment, contract, people
Various work such as member, risk, Drawings and documents, numerous participating departments and unit, so that operational difficulties that are common and coordinating,
A large amount of information needs effective management, and especially domestic three universal side engineerings increase the difficulty of engineering management.With interconnection
The development of network technology and wireless communication technique, modern society stepped into the information age, traditional project management system,
Seem more and more painstaking, has needed to find new Method and kit for.The full name in English of architecture information model (BIM) is
Building Information Modeling is a complete information model, can be by engineering project in Life cycle
In each different phase engineering information, process and resources integration in a model, easily used by each participant of engineering.
By real information possessed by 3-dimensional digital technical modelling building, provided for engineering design and construction mutually coordinated, internal
Consistent information model makes the model reach the integration of design and construction, and each profession cooperates, to reduce engineering production
Cost ensures that engineering presses matter completion on time.BIM technology can be applied to each ranks such as engineering project prospecting, design, construction, O&M
Section is realized data sharing of the building each participant of full lifetime on the basis of same multidimensional Building Information Model, is passed through for industrial chain
Logical, industrialization is built and booming architectural creation provides technical guarantee;It supports to engineering-environment, economy, quality, safety etc.
Analysis checks, provides foundation for the scheme optimization and science decision of project overall process;Each profession is supported to cooperate, project
Virtual construction and fine-grained management create conditions for the upgrading synergy of construction industry, energy conservation and environmental protection.At present in the construction of building operation
In the process, due to not making full use of information technology, BIM technology, traditional Project design management system is relied solely on, has been shown
It is more and more painstaking to obtain, and effective, comprehensively can not carry out typing acquisition to the construction information in construction project.
Summary of the invention
The object of the present invention is to provide a kind of, and the engineering project based on BIM commands managing and control system.The present invention is by by item
It is each that mesh administrative skill combines the engineering information to project, project progress, project quality and BIM model etc. with BIM technology
Class data information carries out classification display and typing, increases substantially the efficiency of management of engineering project, realizes project management
The movable coordinating and unifying and Efficient Operation.
Technical solution of the present invention: a kind of engineering project commander's managing and control system based on BIM, including the project based on BIM
Drawing board, the project drawing board include project information plate, bid section accounting chart plate, monthly completion chart plate, Dan Dongzhi
Pay chart plate, BIM model display plate, quality problems chart plate, personal management chart plate, security risk diagram board
Block, drawing change diagram board block, project Dynamically Announce plate, Project Cost chart plate, trend prediction chart module, image into
Spend chart module and overall objective chart module;
The project information plate is for showing project profile information;
The bid section accounting chart plate is for showing the chart containing bid section title, bid section contract price and bid section accounting
Information;
The monthly completion chart plate is for showing the figure containing construction time information, planned cost and actual cost
Table information;
For showing projects month, this month has paid believes the single payment chart plate with the chart of contract price
Breath;
The BIM model display plate is for showing project BIM model;
The quality problems chart plate with display the chart-information containing defective in quality type and quantity;
The personal management chart plate is used to show the figure of the newly-increased number of each bid section, distancing number and current persons count
Table information;
The security risk chart plate is for showing security risk type, editing safety hidden danger entry and whole safety
Hidden danger changes the chart-information of entry;
The drawing change diagram board block contains relevant unit for display, proposition problem, rectification problem, goes out figure again
The practicable chart-information with scene;
The project Dynamically Announce plate is for showing project multidate information;
The Project Cost chart plate is used to show the chart of the title containing projects and operating expenses;
The trend prediction chart plate is used to show the chart-information in construction month and investment amount;
The vivid progress diagram board block is used to show the texts and pictures information of whole bid section progress and each bid section progress;
The overall objective chart is for showing total construction period, overall floorage, overall investment and placement amount chart letter
Breath;
It further include a data recording module, data inputting module includes project information module, bid section setup module, monthly
Complete module, single payment module, project BIM model module, quality problems module, personal management module, security risk artwork
Block, drawing change module, project dynamic module;Project Cost plate, trend prediction module and vivid progress module;
The project information module includes project brief information, is shown in project information plate;
The bid section setup module includes bid section title, bid section contract price and bid section accounting, and bid section accounting is generated and is schemed
Sheet form is shown in bid section accounting chart plate;
The monthly completion module includes construction time information, planned cost and actual cost, with construction time information
For abscissa, using planned cost and actual cost as ordinate, generate monthly completion chart, be shown in monthly completion chart plate
In;
The single payment module includes building, of that month payment and contract price, using Lou Dong as abscissa, to work as monthly expenses
It pays and contract price is as ordinate, generate single payment chart, be shown in single month payment diagram board block;
Project BIM model module establishes BIM buildings model based on BIM, and project BIM model module is shown in BIM mould
Type is shown in plate;
The quality problems module includes quality problems type, edits issue entry and has rectified and improved issue entry, generates
Rectification rate accounting chart, is shown in quality problems chart plate;
The personal management module includes the newly-increased number, distancing number and current persons count of each bid section, generates personnel's pipe
Chart is managed, is shown in personal management chart plate;
The security risk module includes security risk type, security risk entry and whole security risk changes entry,
Security risk chart and rectification rate percentage chart are generated, is shown in security risk chart plate;
The drawing change module includes relevant unit, proposition problem, rectification problem, figure and scene are implemented out again,
It generates drawing and changes chart, be shown in security risk chart plate;
The project dynamic module includes publisher, issuing time and multidate information, is shown in project dynamic display panels
In block;
The Project Cost module includes project name and operating expenses, using project name as abscissa, with operating expenses
Project cost graph is generated for ordinate, is shown in Project Cost chart plate;
The trend prediction module includes construction month and investment amount, using month of constructing as abscissa, to invest gold
Volume is ordinate, generates trend prediction chart, is shown in trend prediction chart plate;
The vivid progress module includes overall progress and each bid section progress, by verbal description and picture presentation come into
Row is shown;
The overall objective module includes total construction period, overall floorage, overall investment and placement amount, generates apply respectively
Work duration accounting chart is completed construction area accounting chart, has invested accounting chart and has disposed amount accounting chart, total
Body index diagram board block is shown.
In above-mentioned engineering project commander's managing and control system based on BIM, the project brief information include project name,
Item address, project category, construction unit, general contracting unit, BIM always seek advice from, designing unit, supervisor, audit unit, project
The scale of construction, house amount, motor-driven parking stall, plot ratio, site coverage.
Quality problems type described in engineering project commander's managing and control system above-mentioned based on BIM includes that construction quality lacks
Sunken, construction quality common fault and accident resulting from poor quality of projects.
In engineering project commander's managing and control system above-mentioned based on BIM, the security risk entry includes tower crane, foot hand
The problem of frame, four mouthfuls of Triratna, power supply for construction, hoisting machinery, construction machinery, materials elevator and external elevator entry.
In engineering project commander's managing and control system above-mentioned based on BIM, the multidate information includes disobeying for construction personnel
The damage of chapter operation and Work machine.
In engineering project commander's managing and control system above-mentioned based on BIM, the relevant unit includes construction unit, Zong Bao
Unit, BIM always seek advice from, designing unit, supervisor and audit unit.
Compared with prior art, the invention has the following advantages:
The present invention combines project management techniques with BIM technology, and the present invention is by by project management techniques and BIM technology
Combine that carry out classification come Various types of data information such as engineering information, project progress, project quality and BIM models to project aobvious
Show and typing, increase substantially the efficiency of management of engineering project, realizes the movable coordinating and unifying of project management and efficiently
Running.Project BIM model module is arranged in the present invention, establishes BIM buildings model based on BIM, and project BIM model module is shown
In BIM model display plate, preview is carried out to buildings model.The present invention passes through setting project information board block, bid section accounting
Chart plate, monthly completion chart plate, single payment chart plate, project process chart plate, BIM model display plate,
Quality problems chart plate, personal management chart plate, security risk chart plate, drawing change diagram board block, project dynamic
Show plate, Project Cost chart plate, trend prediction chart module, vivid progress chart module and overall objective chart mould
Block;Come various information in the engineering information to project, project progress, project quality and project cost etc. projects into
Row is classified into and summarizes, and forms report so that data acquisition becomes directization and facilitation, promotion manage data validity,
Authenticity and timeliness carry out depth excavation to data various in project management, flexibly generate various reports, and auxiliary carries out
Analysis and prediction, while the business cooperation of engineering construction project is strengthened, communication efficiency is improved, communication cost is reduced, it is real
Effective accumulation of project management experience and data is showed, has really realized and brought benefits by advanced management, be conducive to project
It is managed and monitors in building course.
Detailed description of the invention
Fig. 1 is system framework schematic diagram of the invention;
Fig. 2 is the display interface figure of project drawing board;
Fig. 3 is the display interface figure of project information chart plate
Fig. 4 is the display interface figure of bid section accounting chart plate;
Fig. 5 is the monthly display interface figure for completing chart plate;
Fig. 6 is the display interface figure of separate payment chart plate;
Fig. 7 is the display interface figure of project dynamic chart plate;
Fig. 8 is the display interface figure of quality problems chart plate;
Fig. 9 is the display interface figure of security risk chart plate;
Figure 10 is the display interface figure of personal management chart plate;
Figure 11 is the display interface figure of drawing change diagram board block;
Figure 12 is the display interface figure of Project Cost chart plate;
Figure 13 is the display interface figure of trend prediction chart plate;
Figure 14 is the display interface figure of vivid progress diagram board block;
Figure 15 is the display interface figure of overall objective chart plate.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, but be not intended as to the present invention limit according to
According to.
Embodiment: a kind of engineering project commander's managing and control system based on BIM, as shown in attached drawing 1-15, including based on BIM's
Project drawing board, the project drawing board include project information plate, bid section accounting chart plate, monthly completion chart plate, list
Payment chart plate, BIM model display plate, quality problems chart plate, personal management chart plate, security risk chart
Plate, drawing change diagram board block, project Dynamically Announce plate, Project Cost chart plate, trend prediction chart module, image
Progress chart module and overall objective chart module;
As shown in figure 3, the project information plate is for showing project profile information;The project brief packet
Project name, item address, project category, construction unit, general contracting unit, BIM is included always to seek advice from, designing unit, supervisor, examine
Count unit, the project scale of construction, house amount, motor-driven parking stall, plot ratio, site coverage;
As shown in figure 4, the bid section accounting chart plate contains bid section title, bid section contract price and bid section for showing
The chart-information of accounting;
As shown in figure 5, the monthly completion chart plate contains construction time information, planned cost and reality for showing
The chart-information of border expense;
As shown in fig. 6, the single payment chart plate is for showing projects month, this month has paid and contract
The chart-information of valence;
The BIM model display plate is for showing project BIM model;
As shown in figure 8, the quality problems chart plate is believed with display containing the chart of defective in quality type and quantity
Breath;The quality problems type includes engineering quality defects, construction quality common fault and accident resulting from poor quality of projects;
As shown in Figure 10, the personal management chart plate be used to show the newly-increased number of each bid section, distancing number and
The chart-information of current persons count;
As shown in figure 9, the security risk chart plate is for showing security risk type, editing safety hidden danger entry
Whole security risk changes the chart-information of entry;The security risk entry includes tower crane, scaffold, four mouthfuls of Triratna, applies
The problem of work electricity consumption, hoisting machinery, construction machinery, materials elevator and external elevator entry;
As shown in figure 11, drawing change diagram board block is asked for showing containing relevant unit, proposition problem, rectification
Topic goes out figure and live practicable chart-information again;The relevant unit includes that construction unit, general contracting unit, BIM are always consulted
Inquiry, designing unit, supervisor and audit unit;
As shown in fig. 7, the project Dynamically Announce plate is for showing project multidate information;The multidate information packet
Include the operation against rules of construction personnel and the damage of Work machine;
As shown in figure 12, the Project Cost chart plate is for showing title and operating expenses containing projects
Chart;
As shown in figure 13, the trend prediction chart plate is used to show the chart letter of construction month and investment amount
Breath;
As shown in figure 14, the vivid progress diagram board block is used to show the text of whole bid section progress and each bid section progress
Figure information;
As shown in figure 15, the overall objective chart is for showing total construction period, overall floorage, overall investment and placement
Amount chart-information;
It further include a data recording module, data inputting module includes project information module, bid section setup module, monthly
Complete module, single payment module, project BIM model module, quality problems module, personal management module, security risk artwork
Block, drawing change module, project dynamic module;Project Cost plate, trend prediction module and vivid progress module;
The project information module includes project brief information, is shown in project information plate;
The bid section setup module includes bid section title, bid section contract price and bid section accounting, and bid section accounting is generated and is schemed
Sheet form is shown in bid section accounting chart plate;
The monthly completion module includes construction time information, planned cost and actual cost, with construction time information
For abscissa, using planned cost and actual cost as ordinate, generate monthly completion chart, be shown in monthly completion chart plate
In;
The single payment module includes building, of that month payment and contract price, using Lou Dong as abscissa, to work as monthly expenses
It pays and contract price is as ordinate, generate single payment chart, be shown in single month payment diagram board block;
The project BIM model module establishes BIM buildings model based on BIM, and project BIM model module is shown
In BIM model display plate;
The quality problems module includes quality problems type, edits issue entry and has rectified and improved issue entry, generates
Rectification rate accounting chart, is shown in quality problems chart plate;
The personal management module includes the newly-increased number, distancing number and current persons count of each bid section, generates personnel's pipe
Chart is managed, is shown in personal management chart plate;
The security risk module includes security risk type, security risk entry and whole security risk changes entry,
Security risk chart and rectification rate percentage chart are generated, is shown in security risk chart plate;
The drawing change module includes relevant unit, proposition problem, rectification problem, figure and scene are implemented out again,
It generates drawing and changes chart, be shown in security risk chart plate;
The project dynamic module includes publisher, issuing time and multidate information, is shown in project dynamic display panels
In block;
The Project Cost module includes project name and operating expenses, using project name as abscissa, with operating expenses
Project cost graph is generated for ordinate, is shown in Project Cost chart plate;
The trend prediction module includes construction month and investment amount, using month of constructing as abscissa, to invest gold
Volume is ordinate, generates trend prediction chart, is shown in trend prediction chart plate;
The vivid progress module includes overall progress and each bid section progress, by verbal description and picture presentation come into
Row is shown;
The overall objective module includes total construction period, overall floorage, overall investment and placement amount, generates apply respectively
Work duration accounting chart is completed construction area accounting chart, has invested accounting chart and has disposed amount accounting chart, total
Body index diagram board block is shown.
The present invention with BIM technology by combining project management techniques come engineering information, project progress, the item to project
The Various types of data such as mesh quality and BIM model information carries out classification display and typing, increases substantially the management effect of engineering project
Rate, realizes the movable coordinating and unifying of project management and Efficient Operation, and the present invention is arranged project BIM model module, is based on
BIM establishes BIM buildings model, and project BIM model module is shown in BIM model display plate, to buildings model into
Row preview.The present invention passes through setting project information board block, bid section accounting chart plate, monthly completion chart plate, single payment
Chart plate, project process chart plate, BIM model display plate, quality problems chart plate, personal management chart plate,
Security risk chart plate, drawing change diagram board block, project Dynamically Announce plate, Project Cost chart plate, trend prediction
Chart module, vivid progress chart module and overall objective chart module;Come the engineering information to project, project progress, project
Various information in quality and project cost etc. projects be classified into summarizing, and forms report, so that data obtain
Taking becomes directization and facilitation, validity, authenticity and the timeliness of management data is promoted, to various in project management
Data carry out depth excavation, flexibly generate various reports, auxiliary is analyzed and predicted, while strengthening engineering construction project
Business cooperation improves communication efficiency, reduces communication cost, realizes effective accumulation of project management experience and data, very
Positive realize is brought benefits by advanced management, is conducive to be managed and monitor in project building course.
Claims (6)
1. the engineering project based on BIM commands managing and control system, it is characterised in that: including the project drawing board based on BIM, the item
Mesh drawing board includes project information plate, bid section accounting chart plate, monthly completion chart plate, single payment chart plate, BIM
Model display plate, quality problems chart plate, personal management chart plate, security risk chart plate, drawing change chart
Plate, project Dynamically Announce plate, Project Cost chart plate, trend prediction chart module, vivid progress chart module and total
Body index chart module;
The project information plate is for showing project profile information;
The bid section accounting chart plate is used to show the chart letter containing bid section title, bid section contract price and bid section accounting
Breath;
The monthly completion chart plate is used to show the chart letter containing construction time information, planned cost and actual cost
Breath;
The single payment chart plate is for showing that projects month, this month have paid the chart-information with contract price;
The BIM model display plate is for showing project BIM model;
The quality problems chart plate with display the chart-information containing defective in quality type and quantity;
The personal management chart plate is used to show newly-increased number, distancing number and the chart of the current persons count letter of each bid section
Breath;
The security risk chart plate is for showing security risk type, editing safety hidden danger entry and whole security risk
Change the chart-information of entry;
The described drawing change diagram board block is for showing containing relevant unit, proposing problem, rectification problem, again go out to scheme and existing
The practicable chart-information in field;
The project Dynamically Announce plate is for showing project multidate information;
The Project Cost chart plate is used to show the chart of the title containing projects and operating expenses;
The trend prediction chart plate is used to show the chart-information in construction month and investment amount;
The vivid progress diagram board block is used to show the texts and pictures information of whole bid section progress and each bid section progress;
The overall objective chart is for showing total construction period, overall floorage, overall investment and placement amount chart-information;
It further include a data recording module, data inputting module includes project information module, bid section setup module, monthly completion
Module, single payment module, project BIM model module, quality problems module, personal management module, security risk module, figure
Paper changes module, project dynamic module;Project Cost plate, trend prediction module and vivid progress module;
The project information module includes project brief information, is shown in project information plate;
The bid section setup module includes bid section title, bid section contract price and bid section accounting, and bid section accounting is generated chart shape
Formula is shown in bid section accounting chart plate;
The monthly completion module includes construction time information, planned cost and actual cost, is cross with construction time information
Coordinate, using planned cost and actual cost as ordinate, generate monthly completion chart, be shown in monthly completion chart plate;
The single payment module includes building, of that month payment and contract price, paid using Lou Dong as abscissa, with of that month and
Contract price generates single payment chart, is shown in single month payment diagram board block as ordinate;
The project BIM model module establishes BIM buildings model based on BIM, and project BIM model module is shown in BIM
In model display plate;
The quality problems module includes quality problems type, edits issue entry and has rectified and improved issue entry, generates rectification
Rate accounting chart is shown in quality problems chart plate;
The personal management module includes the newly-increased number, distancing number and current persons count of each bid section, generates personal management figure
Table is shown in personal management chart plate;
The security risk module includes security risk type, security risk entry and whole security risk changes entry, is generated
Security risk chart and rectification rate percentage chart, are shown in security risk chart plate;
The drawing change module includes relevant unit, proposition problem, rectification problem, figure and scene are implemented out again, is generated
Drawing changes chart, is shown in security risk chart plate;
The project dynamic module includes publisher, issuing time and multidate information, is shown in project Dynamically Announce plate;
The Project Cost module includes project name and operating expenses, is vertical using project name as abscissa, with operating expenses
Coordinate generation Project Cost chart is shown in Project Cost chart plate;
The trend prediction module includes construction month and investment amount, is to construct month as abscissa, with investment amount
Ordinate generates trend prediction chart, is shown in trend prediction chart plate;
The vivid progress module includes overall progress and each bid section progress, is opened up by verbal description and picture presentation
Show;
The overall objective module includes total construction period, overall floorage, overall investment and placement amount, generates construction work respectively
Phase accounting chart is completed construction area accounting chart, has invested accounting chart and has disposed amount accounting chart, is referring generally to
It marks on a map table panel displays.
2. the engineering project according to claim 1 based on BIM commands managing and control system, it is characterised in that: the item
Mesh profile information includes that project name, item address, project category, construction unit, general contracting unit, BIM are always seeked advice from, designed list
Position, supervisor, audit unit, the project scale of construction, house amount, motor-driven parking stall, plot ratio, site coverage.
3. the engineering project according to claim 1 based on BIM commands managing and control system, it is characterised in that: the matter
Measuring problem types includes engineering quality defects, construction quality common fault and accident resulting from poor quality of projects.
4. the engineering project according to claim 1 based on BIM commands managing and control system, it is characterised in that: the peace
Full hidden danger entry includes tower crane, scaffold, four mouthfuls of Triratna, power supply for construction, hoisting machinery, construction machinery, materials elevator and outer
With entry the problem of elevator.
5. the engineering project according to claim 1 based on BIM commands managing and control system, it is characterised in that: described is dynamic
State information includes the operation against rules of construction personnel and the damage of Work machine.
6. the engineering project according to claim 1 based on BIM commands managing and control system, it is characterised in that: the phase
Close unit include construction unit, general contracting unit, BIM always seek advice from, designing unit, supervisor and audit unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910084997.6A CN109886644A (en) | 2019-01-29 | 2019-01-29 | Engineering project based on BIM commands managing and control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910084997.6A CN109886644A (en) | 2019-01-29 | 2019-01-29 | Engineering project based on BIM commands managing and control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109886644A true CN109886644A (en) | 2019-06-14 |
Family
ID=66927187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910084997.6A Pending CN109886644A (en) | 2019-01-29 | 2019-01-29 | Engineering project based on BIM commands managing and control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109886644A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112070482A (en) * | 2020-09-10 | 2020-12-11 | 广州市第二装修有限公司 | Engineering project integrated management method and device, computer equipment and storage medium |
CN113961998A (en) * | 2021-10-21 | 2022-01-21 | 黑龙江省求索科技信息技术有限公司 | Building construction management system and management method for BIM |
CN114519626A (en) * | 2022-01-10 | 2022-05-20 | 湖北国际物流机场有限公司 | Salary management method and system based on BIM model |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
US20170336630A1 (en) * | 2015-03-31 | 2017-11-23 | Timothy A. Cummings | System for virtual display and method of use |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN108416701A (en) * | 2018-03-06 | 2018-08-17 | 湖南建工集团有限公司 | A kind of processing method of the Engineering Project Construction real data based on BIM |
-
2019
- 2019-01-29 CN CN201910084997.6A patent/CN109886644A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170336630A1 (en) * | 2015-03-31 | 2017-11-23 | Timothy A. Cummings | System for virtual display and method of use |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN108416701A (en) * | 2018-03-06 | 2018-08-17 | 湖南建工集团有限公司 | A kind of processing method of the Engineering Project Construction real data based on BIM |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112070482A (en) * | 2020-09-10 | 2020-12-11 | 广州市第二装修有限公司 | Engineering project integrated management method and device, computer equipment and storage medium |
CN113961998A (en) * | 2021-10-21 | 2022-01-21 | 黑龙江省求索科技信息技术有限公司 | Building construction management system and management method for BIM |
CN114519626A (en) * | 2022-01-10 | 2022-05-20 | 湖北国际物流机场有限公司 | Salary management method and system based on BIM model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Naghshbandi | BIM for facility management: challenges and research gaps | |
CN109886644A (en) | Engineering project based on BIM commands managing and control system | |
CN104573892A (en) | Whole process visual project management system for engineering construction | |
CN109035060A (en) | A kind of structured processes management system and management method | |
CN109886563A (en) | Wisdom based on BIM builds control platform | |
CN109726513A (en) | Project big data analysis system based on BIM | |
CN109801040A (en) | Multidimensional mould based on BIM examines design collaboration platform | |
Pena-Mora et al. | Information technology planning framework for Japanese general contractors | |
CN109886645A (en) | Multidimensional mould based on BIM examines platform | |
Li | Research on Financial Management Algorithm Based on Machine Learning in Big Data Era | |
Wu et al. | Development trend of green residential buildings in China under the guidance of the low-carbon concept: A policy review and analysis | |
Wang et al. | Promoting additive construction in fast-developing areas: An analysis of policies and stakeholder perspectives | |
Ya et al. | The influence of stakeholders on technology innovation: a case study from China | |
Ge | Exploring the application of BIM engineering in multi-project main body collaborative management platform | |
RU103014U1 (en) | HARDWARE AND SOFTWARE COMPLEX OF THE AUTOMATED SYSTEM FOR THE DEVELOPMENT OF TECHNOLOGICAL PROCESSES | |
McAuley et al. | Advancing the facilities management process in Ireland through the implementation of building information modelling within the public sector | |
CN110503386A (en) | A kind of data processing system for market-oriented project | |
Wu et al. | Research on Design Management Process Based on BIM-Taking the New Phnom Penh Airport Project in Cambodia as an Example | |
Wang et al. | Research on Design Quality Management Based on PDCA Quality Cycle Theory | |
Yang et al. | Smart Construction Engineering and Management | |
Yu et al. | Application of BIM Technology in Construction Project Cost Compilation | |
Jing | Application of Bim Technology in Project Management and Construction Cost Control | |
Liu et al. | Analysis of Budget and Cost Control of New Green Building Projects | |
Shen et al. | Study on the Whole Process Supervision Technology of Digital Intelligent Enabling for Building Safety and Quality Appraisal Institutions | |
Xianhe | Construction Management Characteristics and Quality Control Strategies for Higher Education Infrastructure Projects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190614 |
|