CN107437167A - Construction-engineering project data handling system - Google Patents
Construction-engineering project data handling system Download PDFInfo
- Publication number
- CN107437167A CN107437167A CN201710589431.XA CN201710589431A CN107437167A CN 107437167 A CN107437167 A CN 107437167A CN 201710589431 A CN201710589431 A CN 201710589431A CN 107437167 A CN107437167 A CN 107437167A
- Authority
- CN
- China
- Prior art keywords
- project
- module
- management
- cost
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 claims abstract description 19
- 239000000463 material Substances 0.000 claims description 18
- 238000012545 processing Methods 0.000 claims description 10
- 238000010276 construction Methods 0.000 claims description 7
- 238000012423 maintenance Methods 0.000 claims description 6
- 238000004220 aggregation Methods 0.000 claims description 3
- 230000002776 aggregation Effects 0.000 claims description 3
- 238000010327 methods by industry Methods 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims 1
- 239000010931 gold Substances 0.000 claims 1
- 229910052737 gold Inorganic materials 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 238000013459 approach Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
- G06Q40/125—Finance or payroll
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Accounting & Taxation (AREA)
- Tourism & Hospitality (AREA)
- Finance (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Educational Administration (AREA)
- Biodiversity & Conservation Biology (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Technology Law (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses construction-engineering project data handling system, the user service terminal to be conducted interviews including data server and to the data server, the data server includes bid for a project budget database and project management database, and the bid for a project budget database includes:Project plan module;Estimated cost management module;Bidding management module;The project management database includes:Supplier management module;Purchasing system module;Cost changes module;Project cost control module;Labor management module;Financial process module;Visa Bill Management module;Final account of project module;Module after sale.The present invention is actually comprehensive, careful to construction-engineering project implementation status accurately to be grasped and controls, effectively raise operating efficiency and work quality, mitigate working strength, make Project Management System more ripe, it is complete that means of information transmission of the project in management is smoothly, information consults simplicity, data.
Description
Technical field
The present invention relates to information data process field, more particularly to construction-engineering project data handling system.
Background technology
Construction-engineering project data processing is a complicated system sex work, particularly with scale project, including is made
Valence mumber evidence, process data, personal information data, appropriation budget data, output value data etc..Traditional artificial treatment data pattern
The needs of technology in modern construction can not have been met, and the manager that construction-engineering project data handling system is project should
With the data processing system software of concrete management project, i.e., under limited resource constraints, with systematic point of view, method and theory,
Project whole operational data is effectively managed.Terminate the complete of final acceptance of construction to project since the investment decision of project
Process is planned, is organized, is commanded, is coordinated, controlled and evaluated, effectively to realize project objective.During project supervision,
Engineering construction had both been related to the relevant units such as civil engineering contractor, material supply unit, owner, also related to each dependent part of government
Door, mutual contact, letters, form, the quantity of file are surprising;Therefore effective information management tissue, journey are established
Sequence and method, the relevant information of relevant item is held in time, it is ensured that the authenticity that information material is collected, means of information transmission are smooth
It is suitable, consult easy, data is complete etc., owner is obtained various management informations in time during the progress of whole project, it is right
Project implementation situation is actually comprehensive, it is careful accurately grasp and control, can just effectively improve the operating efficiency of each side, mitigate work
Make intensity, improve work quality.
The content of the invention
It is an object of the invention to overcome problem above existing for prior art, there is provided construction-engineering project data processing system
System, the present invention effectively raise work to actually comprehensive, the careful accurately grasp and control of construction-engineering project implementation status
Efficiency and work quality, mitigate working strength, make Project Management System more ripe, information transmission of the project in management
It is complete that approach is smoothly, information consults simplicity, data.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved through the following technical solutions:
Construction-engineering project data handling system, including data server and the user that is conducted interviews to the data server
Service terminal, the data server include bid for a project budget database and project management database, and the user service is whole
End includes pc user end and/or mobile device end;The bid for a project budget database includes:Project plan module, for depositing
Storage or change or established project, the essential information of established project, Xiang Mingda are exported to estimated cost management module;It is counted as in advance
This management module, the pre- cost of engineering project is generated based on the project plan;Bidding management module, based on the estimated cost pipe
Reason generation supplier bidding system;The project management database includes:Supplier management module, all kinds of suppliers of the book of final entry
Financially account, money, the situation of tax and all kinds of supplier's material information states;Purchasing system module, based on supplier management storehouse
In many ways, more ground procurement price, the multinomial selection competition system in the cycle of generation quality of materials, price and accounts payable;Cost becomes
More module, based on the cost of supplier obtained by bidding management, store the pre- cost of change, by pre- cost change output to project into
This management module, while update visa menu manager module data;Project cost control module, store the actual cost of engineering project
And Change cost;Labor management module, financially account, money, the situation of tax and all kinds of artificial letters of all kinds of workers of the book of final entry
Breath situation;Financial process module, based on the project cost control module, by artificial, the material in project cost control module
By accounting processing, pending accounts processing is carried out by supplier, worker's type;Visa Bill Management module, store the cost change
Project signature caused by pre- cost change in module, all engineering documents;Final account of project module, pass through aggregation process engineering
The cost of project, and the corresponding engineering contract final accounts amount of money of contract visa that visa change tape comes, record engineering are receivable
Fund, and the engineering bill and account receivable is exported to user service terminal;Module after sale, the management and control that passes budgets, flow management and control, record
In engineering quality guarantee period, all maintenance records and maintenance cost or issuable receivable engineering funds.
Further, the project plan module also includes the project essential information of setting, described project essential information
Including project name, Project Unit, project management department, the host type of project, project subdivision type, project funds source, item
Mesh place, project investment estimation, project status, project manager, project leader, the progress process of project and with project phase
The other information of association.
Further, the estimated cost management module includes construction budget administration fee, material budget administration fee, people
Member's budget overhead.
Further, the supplier management module, purchasing system module, cost change module, project cost control mould
Block, labor management module, financial process module, visa Bill Management module, final account of project module, after sale between each module of module
Interconnect, and pass through wireless network and/or cable network mail message to user service terminal, above-mentioned each module data
Form can be generated, and is exported in a manner of form.
Further, the bid for a project budget database and project management database are additionally provided with and automatically update module,
Information in the bid for a project budget database and project management database is dynamically updated in real time by automatically updating module.
Further, the bid for a project budget database and project management database are additionally provided with user authority management mould
Block, the user authority management module provide different operating rights for operator, and these authorities are included to bid for a project budget
Information in database and project management database it is global or it is partial browse, operate and change, and the user couple for passing through mandate
The operation that data message is increased, changed and deleted or edited.
Further, the bid for a project budget database and project management database pass through wireless network and/or wired
Network push is to user service terminal.
The beneficial effects of the invention are as follows:
1. a pair project whole operational data is effectively managed;
2. actually comprehensive to construction-engineering project implementation status, careful accurately grasp and control, work effect is effectively raised
Rate and work quality, working strength is alleviated, make Project Management System more ripe, information transmission of the project in management
It is complete that approach is smoothly, information consults simplicity, data.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention,
And can be practiced according to the content of specification, with presently preferred embodiments of the present invention and coordinate accompanying drawing to describe in detail below.This hair
Bright embodiment is shown in detail by following examples and its accompanying drawing.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair
Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is construction-engineering project data handling system structural representation of the present invention;
Label declaration in figure:Data server 1, user service terminal 2, bid for a project budget database 3, project management database
4, project plan module 5, estimated cost management module 6, bidding management module 7, supplier management module 8, purchasing system module
9, cost change module 10, project cost control module 11, labor management module 12, financial process module 13, visa document pipe
Manage module 14, after sale final account of project module 15, module 16.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings:
Shown in reference picture 1, construction-engineering project data handling system, including data server 1 and to the data server
The user service terminal 2 to conduct interviews, the data server 1 include bid for a project budget database 3 and Project Management Data
Storehouse 4, the user service terminal 2 include pc user end and/or mobile device end;The bid for a project budget database 3 includes:
Project plan module 5, for storing or changing or established project, the essential information of established project, Xiang Mingda is exported to pre-
It is counted as this management module;Estimated cost management module 6, the pre- cost of engineering project is generated based on the project plan;Bidding management
Module 7, based on estimated cost management generation supplier bidding system;The project management database 5 includes;Supplier manages
Manage module 8, all kinds of suppliers of the book of final entry financially account, money, the situation of tax and all kinds of supplier's material information states;Buying
System module 9, based on supplier management storehouse is multi-party, more ground procurement price, the cycle of generation quality of materials, price and accounts payable
Multinomial selection competition system;Cost changes module 10, based on the cost of supplier obtained by bidding management, store change it is pre- into
This, by the change output of pre- cost to project cost control module, while updates visa menu manager module data;Project cost control
Module 11, store the actual cost and Change cost of engineering project;Labor management module 12, the finance of all kinds of workers of the book of final entry
Upper account, money, the situation of tax and all kinds of artificial information's situations;Financial process module 13, based on the project cost control module,
By the artificial, material in project cost control module by accounting processing, pending accounts processing is carried out by supplier, worker's type;Label
Bill Management module 14 is demonstrate,proved, stores project signature caused by the pre- cost change in the cost change module, all engineerings
Document;Final account of project module 15, by the cost of aggregation process engineering project, and the contract visa that visa change tape comes is therewith
The corresponding engineering contract final accounts amount of money, engineering bill and account receivable is recorded, and the engineering bill and account receivable is exported to user service terminal;
Module 16 after sale, the management and control that passes budgets, flow management and control, record in engineering quality guarantee period, all maintenance records and maintenance cost or
Issuable receivable engineering funds.
Further, the project plan module 4 also includes the project essential information of setting, described project essential information
Including project name, Project Unit, project management department, the host type of project, project subdivision type, project funds source, item
Mesh place, project investment estimation, project status, project manager, project leader, the progress process of project and with project phase
The other information of association.
Further, the estimated cost management module 5 includes construction budget administration fee, material budget administration fee,
Personnel's budget overhead.
Further, the supplier management module 8, purchasing system module 9, cost change module 10, project cost pipe
Manage module 11, labor management module 12, financial process module 13, visa Bill Management module 14, final account of project module 15, after sale
Interconnected between 16 each module of module, and by wireless network and/or cable network mail message to user service terminal 2,
Above-mentioned each module data can generate form, and be exported in a manner of form.
Further, the bid for a project budget database 3 and project management database 4 are additionally provided with and automatically update mould
Block, dynamic is more in real time by automatically updating module for information in the bid for a project budget database 3 and project management database 4
Newly.
Further, the bid for a project budget database 3 and project management database 4 are additionally provided with user authority management
Module, the user authority management module provide different operating rights for operator, and these authorities include pre- to bid for a project
Calculate the information in database 3 and project management database 4 it is global or it is partial browse, operate and change, and the use for passing through mandate
The operation that family is increased data message, changed and deleted or edited.
Further, the bid for a project budget database 3 and project management database 4 by wireless network and/or have
Gauze network pushes to user service terminal 2.
Specific embodiment:
User is using the system of the present invention, and first, the essential information of the established project of project plan module 5, user stores project
And the typing system, at the same time, it is right to estimated cost management module 6, estimated cost management module 6 that the established project is exported
The project carries out cost budgeting, and cost budgeting includes personnel, purchases, material, construction budget, and provides budget message, pipe of submitting a tender
Manage module 7 and supplier's bidding system is generated according to estimated cost management module, filter out qualified supplier.
Secondly, all kinds of suppliers of the book of final entry of supplier management module 8 financially account, money, the situation of tax and all kinds of confessions
Business's material information situation is answered, purchasing system module 9 carries out multi-party, more ground procurement price and assessed, generate material to supplier management
The multinomial selection competition system in the cycle of quality, price and accounts payable, cost change module 10, to being supplied obtained by bidding management
The cost of business, the pre- cost of change is stored, by the change output of pre- cost to project cost control module, while update visa document
Management module data;Project cost control module 11, the actual cost and Change cost of engineering project are stored, is also invented
This, labor management module 12, financially account, money, the situation of tax and all kinds of artificial information's situations of all kinds of workers of the book of final entry;
Financial process module 13, to project cost control module, by the artificial, material in project cost control module by account at
Reason, carry out pending accounts processing by supplier, worker's type, and carry out examination & verification accounting, visa Bill Management module 14, storage it is described into
Project signature caused by pre- cost change in this change module, all engineering documents;Final account of project module 15, by collecting
The corresponding engineering contract final accounts amount of money of contract visa that the cost of engineering project, and visa change tape are come is handled, record
Engineering bill and account receivable, and the engineering bill and account receivable is exported to user service terminal.User can be according to project cost control module
11, labor management module 12, financial process module 13, the bills data that visa Bill Management module 14 automatically generates carries out in real time
Compare, check, meanwhile, because bid for a project budget database 3 and project management database 4 are additionally provided with user authority management mould
Block, so the user authorized can be increased data message, changed and be deleted or edit operation.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained
Cover within protection scope of the present invention.Therefore, protection scope of the present invention described should be defined by scope of the claims.
Claims (8)
1. construction-engineering project data handling system, it is characterised in that:Including data server(1)And to the data, services
The user service terminal that device conducts interviews(2), the data server(1)Including bid for a project budget database(3)And project
Manage database(4), the user service terminal(2)Including pc user end and/or mobile device end;The bid for a project budget
Database(3)Including:Project plan module(5), for storing or changing or established project, the essential information of established project will
Xiang Mingda is exported to estimated cost management module;Estimated cost management module(6), engineering item is generated based on the project plan
The pre- cost of mesh;Bidding management module(7), based on estimated cost management generation supplier bidding system;The project management
Database(5)Including:Supplier management module(8), all kinds of suppliers of the book of final entry financially account, money, the situation of tax and each
Class supplier's material information state;Purchasing system module(9), based on supplier management, and to supplier is multi-party, more ground purchasing price
Lattice are assessed, the multinomial selection competition system in the cycle of generation quality of materials, price and accounts payable;Cost changes module(10),
Based on the cost of supplier obtained by bidding management, the pre- cost of change is stored, the change of pre- cost is exported to project cost control
Module, while update visa menu manager module data;Project cost control module(11), store engineering project actual cost and
Change cost;Labor management module(12), the financially account of all kinds of workers of the book of final entry, money, the situation of tax and all kinds of artificial
Information state;Financial process module(13), based on the project cost control module, by the people in project cost control module
Work, material carry out pending accounts processing by accounting processing by supplier, worker's type;Visa Bill Management module(14), storage institute
State project signature caused by the pre- cost change in cost change module, all engineering documents;Final account of project module(15), lead to
Cross the corresponding engineering contract final accounts gold of contract visa that the cost of aggregation process engineering project, and visa change tape are come
Volume, engineering bill and account receivable is recorded, and the engineering bill and account receivable is exported to user service terminal;Module after sale(16), by pre-
Management and control, flow management and control are calculated, is recorded in engineering quality guarantee period, all maintenance records and maintenance cost or issuable receivable engineering
Money.
2. construction-engineering project data handling system according to claim 1, it is characterised in that:The project plan module
(4)Also include the project essential information of setting, described project essential information includes project name, Project Unit, project management
Department, the host type of project, project subdivision type, project funds source, project place, project investment estimation, project status, item
Mesh custodian, project leader, the progress process and the other information associated with project of project.
3. construction-engineering project data handling system according to claim 1, it is characterised in that:The estimated cost management
Module(5)Including construction budget administration fee, material budget administration fee, personnel's budget overhead.
4. construction-engineering project data handling system according to claim 1, it is characterised in that:The supplier management mould
Block(8), purchasing system module(9), cost change module(10), project cost control module(11), labor management module(12)、
Financial process module(13), visa Bill Management module(14), final account of project module(15), module after sale(16)Between each module
Interconnect, and pass through wireless network and/or cable network mail message to user service terminal(2), above-mentioned each module
Data can generate form, and be exported in a manner of form.
5. construction-engineering project data handling system according to claim 1, it is characterised in that:The bid for a project budget
Database(3)And project management database(4)It is additionally provided with and automatically updates module, the bid for a project budget database(3)With
Project management database(4)Interior information is dynamically updated in real time by automatically updating module.
6. construction-engineering project data handling system according to claim 1, it is characterised in that:The bid for a project budget
Database(3)And project management database(4)All users are opened with look facility, but it sets user authority management mould
Block.
7. construction-engineering project data handling system according to claim 6, it is characterised in that:The user authority management
Module provides different operating rights for operator, and these authorities are included to bid for a project budget database(3)And project management
Database(4)Interior information it is global or it is partial browse, operate and change, and data message is increased by the user of mandate
The operation for adding, changing and deleting or edit.
8. construction-engineering project data handling system according to claim 1, it is characterised in that:The bid for a project budget
Database(3)And project management database(4)User service terminal is pushed to by wireless network and/or cable network(2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710589431.XA CN107437167A (en) | 2017-07-19 | 2017-07-19 | Construction-engineering project data handling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710589431.XA CN107437167A (en) | 2017-07-19 | 2017-07-19 | Construction-engineering project data handling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107437167A true CN107437167A (en) | 2017-12-05 |
Family
ID=60459679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710589431.XA Pending CN107437167A (en) | 2017-07-19 | 2017-07-19 | Construction-engineering project data handling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107437167A (en) |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108446895A (en) * | 2018-03-26 | 2018-08-24 | 郑州大学 | A kind of engineering construction project intelligent management system |
CN108510206A (en) * | 2018-04-10 | 2018-09-07 | 北京曜世科技有限公司 | A kind of free house decoration management system and method |
CN108764846A (en) * | 2018-05-30 | 2018-11-06 | 福泽润森(武汉)科技股份有限公司 | A kind of team's grade Project Management System |
CN108765200A (en) * | 2018-05-30 | 2018-11-06 | 福泽润森(武汉)科技股份有限公司 | A kind of entry level Project Management System |
CN108805529A (en) * | 2018-05-30 | 2018-11-13 | 福泽润森(武汉)科技股份有限公司 | A kind of construction management platform |
CN108846740A (en) * | 2018-06-19 | 2018-11-20 | 中威戎安科技有限公司 | A kind of financial data system |
CN109559145A (en) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | The cost method for early warning and device of assembled architecture |
CN109800982A (en) * | 2019-01-16 | 2019-05-24 | 武汉市九晖通讯技术有限公司 | A kind of broadcasting and TV OTN extending capacity reformation project system |
WO2020010720A1 (en) * | 2018-07-10 | 2020-01-16 | 平安科技(深圳)有限公司 | Method and device for processing budget data |
CN111582728A (en) * | 2020-05-08 | 2020-08-25 | 无锡商业职业技术学院 | Multichannel complex building engineering dynamic management system |
CN111813844A (en) * | 2020-05-22 | 2020-10-23 | 北京合力信工程投资咨询有限公司 | Visual management system of engineering |
CN111898853A (en) * | 2020-06-18 | 2020-11-06 | 深圳瑞和建筑装饰股份有限公司 | Engineering construction fine management system |
CN112085481A (en) * | 2020-09-22 | 2020-12-15 | 国网山东省电力公司烟台供电公司 | Whole-process tracking system for electric power engineering project management |
CN112085361A (en) * | 2020-08-28 | 2020-12-15 | 上海谊逅信息技术有限公司 | Construction engineering overall process management method |
CN112784126A (en) * | 2021-01-30 | 2021-05-11 | 日照职业技术学院 | Building material management method with classified rapid query function |
CN113393212A (en) * | 2021-06-16 | 2021-09-14 | 筑橙科技(深圳)有限公司 | Outer wall spraying engineering project management platform and management method |
CN113706087A (en) * | 2020-05-22 | 2021-11-26 | 浙江建连智信科技有限公司 | Project management method and device based on block chain and electronic equipment |
CN113902413A (en) * | 2021-10-13 | 2022-01-07 | 国网安徽省电力有限公司 | Intelligent management platform for project investment budget and capital budget |
CN115827805A (en) * | 2022-10-27 | 2023-03-21 | 卓信通信股份有限公司 | Smart city communication infrastructure planning platform |
CN116109091A (en) * | 2023-02-07 | 2023-05-12 | 四川省蜀顺工程建设咨询有限公司 | Engineering supervision information management system |
CN116843489A (en) * | 2023-07-12 | 2023-10-03 | 华腾建信科技有限公司 | Engineering financial accounting method and system based on multi-system linkage |
-
2017
- 2017-07-19 CN CN201710589431.XA patent/CN107437167A/en active Pending
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108446895A (en) * | 2018-03-26 | 2018-08-24 | 郑州大学 | A kind of engineering construction project intelligent management system |
CN108510206A (en) * | 2018-04-10 | 2018-09-07 | 北京曜世科技有限公司 | A kind of free house decoration management system and method |
CN108764846A (en) * | 2018-05-30 | 2018-11-06 | 福泽润森(武汉)科技股份有限公司 | A kind of team's grade Project Management System |
CN108765200A (en) * | 2018-05-30 | 2018-11-06 | 福泽润森(武汉)科技股份有限公司 | A kind of entry level Project Management System |
CN108805529A (en) * | 2018-05-30 | 2018-11-13 | 福泽润森(武汉)科技股份有限公司 | A kind of construction management platform |
CN108846740A (en) * | 2018-06-19 | 2018-11-20 | 中威戎安科技有限公司 | A kind of financial data system |
WO2020010720A1 (en) * | 2018-07-10 | 2020-01-16 | 平安科技(深圳)有限公司 | Method and device for processing budget data |
CN109559145A (en) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | The cost method for early warning and device of assembled architecture |
CN109800982A (en) * | 2019-01-16 | 2019-05-24 | 武汉市九晖通讯技术有限公司 | A kind of broadcasting and TV OTN extending capacity reformation project system |
CN111582728B (en) * | 2020-05-08 | 2024-05-17 | 无锡商业职业技术学院 | Multichannel complex building engineering dynamic management system |
CN111582728A (en) * | 2020-05-08 | 2020-08-25 | 无锡商业职业技术学院 | Multichannel complex building engineering dynamic management system |
CN111813844A (en) * | 2020-05-22 | 2020-10-23 | 北京合力信工程投资咨询有限公司 | Visual management system of engineering |
CN113706087A (en) * | 2020-05-22 | 2021-11-26 | 浙江建连智信科技有限公司 | Project management method and device based on block chain and electronic equipment |
CN111898853A (en) * | 2020-06-18 | 2020-11-06 | 深圳瑞和建筑装饰股份有限公司 | Engineering construction fine management system |
CN112085361A (en) * | 2020-08-28 | 2020-12-15 | 上海谊逅信息技术有限公司 | Construction engineering overall process management method |
CN112085481A (en) * | 2020-09-22 | 2020-12-15 | 国网山东省电力公司烟台供电公司 | Whole-process tracking system for electric power engineering project management |
CN112784126A (en) * | 2021-01-30 | 2021-05-11 | 日照职业技术学院 | Building material management method with classified rapid query function |
CN113393212A (en) * | 2021-06-16 | 2021-09-14 | 筑橙科技(深圳)有限公司 | Outer wall spraying engineering project management platform and management method |
CN113902413A (en) * | 2021-10-13 | 2022-01-07 | 国网安徽省电力有限公司 | Intelligent management platform for project investment budget and capital budget |
CN115827805A (en) * | 2022-10-27 | 2023-03-21 | 卓信通信股份有限公司 | Smart city communication infrastructure planning platform |
CN116109091A (en) * | 2023-02-07 | 2023-05-12 | 四川省蜀顺工程建设咨询有限公司 | Engineering supervision information management system |
CN116843489A (en) * | 2023-07-12 | 2023-10-03 | 华腾建信科技有限公司 | Engineering financial accounting method and system based on multi-system linkage |
CN116843489B (en) * | 2023-07-12 | 2023-12-19 | 华腾建信科技有限公司 | Engineering financial accounting method and system based on multi-system linkage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107437167A (en) | Construction-engineering project data handling system | |
CN104408559B (en) | A kind of engineering information management system | |
CN203165006U (en) | Engineering project management system | |
CN107358340A (en) | A kind of project management system based on list of engineering | |
CN106796673A (en) | For the improved system and method for charging | |
CN103136626A (en) | On-line management method for engineering project | |
CN104123604A (en) | Engineering management information processing system | |
CN105225051A (en) | Project management system | |
CN106408351A (en) | WeChat based CRM system for small and medium enterprises | |
CN107292589A (en) | A kind of information-based cloud service platform of full industrial chain | |
MXPA04001075A (en) | System and method for the payment and accounting of petty disbursements. | |
JP6247737B1 (en) | Data structure, information processing apparatus, program, information processing method, and transaction system | |
CN115170090A (en) | Project management method and device, electronic equipment and readable storage medium | |
CN108765200B (en) | Entrance-level building engineering management system | |
CN107993118A (en) | A kind of method based on shared system association user information | |
CN207008692U (en) | A kind of full industrial chain informationization cloud service platform | |
JP2018088281A (en) | Data structure, information processing apparatus, program, information processing method, and transaction system | |
CN108805529B (en) | Building engineering management platform | |
CN114971893B (en) | Loan deduction mode flexible configuration method and system | |
CN109377155A (en) | The loan information measures and procedures for the examination and approval and device | |
JP6298517B1 (en) | Data structure, information processing apparatus, program, information processing method, and transaction system | |
CN108764846B (en) | Team-level building engineering management system | |
CN111813844A (en) | Visual management system of engineering | |
KR102614554B1 (en) | Digital money managing method and system based on value exchange algorithm | |
CN108846627A (en) | A kind of enterprise management system and its implementation based on sales management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171205 |