CN107437167A - Construction-engineering project data handling system - Google Patents

Construction-engineering project data handling system Download PDF

Info

Publication number
CN107437167A
CN107437167A CN201710589431.XA CN201710589431A CN107437167A CN 107437167 A CN107437167 A CN 107437167A CN 201710589431 A CN201710589431 A CN 201710589431A CN 107437167 A CN107437167 A CN 107437167A
Authority
CN
China
Prior art keywords
project
module
management
cost
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710589431.XA
Other languages
Chinese (zh)
Inventor
居全明
华锴
汤仁和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongcheng Construction Management (suzhou) Ltd By Share Ltd
Original Assignee
Zhongcheng Construction Management (suzhou) Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongcheng Construction Management (suzhou) Ltd By Share Ltd filed Critical Zhongcheng Construction Management (suzhou) Ltd By Share Ltd
Priority to CN201710589431.XA priority Critical patent/CN107437167A/en
Publication of CN107437167A publication Critical patent/CN107437167A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Accounting & Taxation (AREA)
  • Tourism & Hospitality (AREA)
  • Finance (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Educational Administration (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Technology Law (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses construction-engineering project data handling system, the user service terminal to be conducted interviews including data server and to the data server, the data server includes bid for a project budget database and project management database, and the bid for a project budget database includes:Project plan module;Estimated cost management module;Bidding management module;The project management database includes:Supplier management module;Purchasing system module;Cost changes module;Project cost control module;Labor management module;Financial process module;Visa Bill Management module;Final account of project module;Module after sale.The present invention is actually comprehensive, careful to construction-engineering project implementation status accurately to be grasped and controls, effectively raise operating efficiency and work quality, mitigate working strength, make Project Management System more ripe, it is complete that means of information transmission of the project in management is smoothly, information consults simplicity, data.

Description

Construction-engineering project data handling system
Technical field
The present invention relates to information data process field, more particularly to construction-engineering project data handling system.
Background technology
Construction-engineering project data processing is a complicated system sex work, particularly with scale project, including is made Valence mumber evidence, process data, personal information data, appropriation budget data, output value data etc..Traditional artificial treatment data pattern The needs of technology in modern construction can not have been met, and the manager that construction-engineering project data handling system is project should With the data processing system software of concrete management project, i.e., under limited resource constraints, with systematic point of view, method and theory, Project whole operational data is effectively managed.Terminate the complete of final acceptance of construction to project since the investment decision of project Process is planned, is organized, is commanded, is coordinated, controlled and evaluated, effectively to realize project objective.During project supervision, Engineering construction had both been related to the relevant units such as civil engineering contractor, material supply unit, owner, also related to each dependent part of government Door, mutual contact, letters, form, the quantity of file are surprising;Therefore effective information management tissue, journey are established Sequence and method, the relevant information of relevant item is held in time, it is ensured that the authenticity that information material is collected, means of information transmission are smooth It is suitable, consult easy, data is complete etc., owner is obtained various management informations in time during the progress of whole project, it is right Project implementation situation is actually comprehensive, it is careful accurately grasp and control, can just effectively improve the operating efficiency of each side, mitigate work Make intensity, improve work quality.
The content of the invention
It is an object of the invention to overcome problem above existing for prior art, there is provided construction-engineering project data processing system System, the present invention effectively raise work to actually comprehensive, the careful accurately grasp and control of construction-engineering project implementation status Efficiency and work quality, mitigate working strength, make Project Management System more ripe, information transmission of the project in management It is complete that approach is smoothly, information consults simplicity, data.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved through the following technical solutions:
Construction-engineering project data handling system, including data server and the user that is conducted interviews to the data server Service terminal, the data server include bid for a project budget database and project management database, and the user service is whole End includes pc user end and/or mobile device end;The bid for a project budget database includes:Project plan module, for depositing Storage or change or established project, the essential information of established project, Xiang Mingda are exported to estimated cost management module;It is counted as in advance This management module, the pre- cost of engineering project is generated based on the project plan;Bidding management module, based on the estimated cost pipe Reason generation supplier bidding system;The project management database includes:Supplier management module, all kinds of suppliers of the book of final entry Financially account, money, the situation of tax and all kinds of supplier's material information states;Purchasing system module, based on supplier management storehouse In many ways, more ground procurement price, the multinomial selection competition system in the cycle of generation quality of materials, price and accounts payable;Cost becomes More module, based on the cost of supplier obtained by bidding management, store the pre- cost of change, by pre- cost change output to project into This management module, while update visa menu manager module data;Project cost control module, store the actual cost of engineering project And Change cost;Labor management module, financially account, money, the situation of tax and all kinds of artificial letters of all kinds of workers of the book of final entry Breath situation;Financial process module, based on the project cost control module, by artificial, the material in project cost control module By accounting processing, pending accounts processing is carried out by supplier, worker's type;Visa Bill Management module, store the cost change Project signature caused by pre- cost change in module, all engineering documents;Final account of project module, pass through aggregation process engineering The cost of project, and the corresponding engineering contract final accounts amount of money of contract visa that visa change tape comes, record engineering are receivable Fund, and the engineering bill and account receivable is exported to user service terminal;Module after sale, the management and control that passes budgets, flow management and control, record In engineering quality guarantee period, all maintenance records and maintenance cost or issuable receivable engineering funds.
Further, the project plan module also includes the project essential information of setting, described project essential information Including project name, Project Unit, project management department, the host type of project, project subdivision type, project funds source, item Mesh place, project investment estimation, project status, project manager, project leader, the progress process of project and with project phase The other information of association.
Further, the estimated cost management module includes construction budget administration fee, material budget administration fee, people Member's budget overhead.
Further, the supplier management module, purchasing system module, cost change module, project cost control mould Block, labor management module, financial process module, visa Bill Management module, final account of project module, after sale between each module of module Interconnect, and pass through wireless network and/or cable network mail message to user service terminal, above-mentioned each module data Form can be generated, and is exported in a manner of form.
Further, the bid for a project budget database and project management database are additionally provided with and automatically update module, Information in the bid for a project budget database and project management database is dynamically updated in real time by automatically updating module.
Further, the bid for a project budget database and project management database are additionally provided with user authority management mould Block, the user authority management module provide different operating rights for operator, and these authorities are included to bid for a project budget Information in database and project management database it is global or it is partial browse, operate and change, and the user couple for passing through mandate The operation that data message is increased, changed and deleted or edited.
Further, the bid for a project budget database and project management database pass through wireless network and/or wired Network push is to user service terminal.
The beneficial effects of the invention are as follows:
1. a pair project whole operational data is effectively managed;
2. actually comprehensive to construction-engineering project implementation status, careful accurately grasp and control, work effect is effectively raised Rate and work quality, working strength is alleviated, make Project Management System more ripe, information transmission of the project in management It is complete that approach is smoothly, information consults simplicity, data.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, with presently preferred embodiments of the present invention and coordinate accompanying drawing to describe in detail below.This hair Bright embodiment is shown in detail by following examples and its accompanying drawing.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is construction-engineering project data handling system structural representation of the present invention;
Label declaration in figure:Data server 1, user service terminal 2, bid for a project budget database 3, project management database 4, project plan module 5, estimated cost management module 6, bidding management module 7, supplier management module 8, purchasing system module 9, cost change module 10, project cost control module 11, labor management module 12, financial process module 13, visa document pipe Manage module 14, after sale final account of project module 15, module 16.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings:
Shown in reference picture 1, construction-engineering project data handling system, including data server 1 and to the data server The user service terminal 2 to conduct interviews, the data server 1 include bid for a project budget database 3 and Project Management Data Storehouse 4, the user service terminal 2 include pc user end and/or mobile device end;The bid for a project budget database 3 includes: Project plan module 5, for storing or changing or established project, the essential information of established project, Xiang Mingda is exported to pre- It is counted as this management module;Estimated cost management module 6, the pre- cost of engineering project is generated based on the project plan;Bidding management Module 7, based on estimated cost management generation supplier bidding system;The project management database 5 includes;Supplier manages Manage module 8, all kinds of suppliers of the book of final entry financially account, money, the situation of tax and all kinds of supplier's material information states;Buying System module 9, based on supplier management storehouse is multi-party, more ground procurement price, the cycle of generation quality of materials, price and accounts payable Multinomial selection competition system;Cost changes module 10, based on the cost of supplier obtained by bidding management, store change it is pre- into This, by the change output of pre- cost to project cost control module, while updates visa menu manager module data;Project cost control Module 11, store the actual cost and Change cost of engineering project;Labor management module 12, the finance of all kinds of workers of the book of final entry Upper account, money, the situation of tax and all kinds of artificial information's situations;Financial process module 13, based on the project cost control module, By the artificial, material in project cost control module by accounting processing, pending accounts processing is carried out by supplier, worker's type;Label Bill Management module 14 is demonstrate,proved, stores project signature caused by the pre- cost change in the cost change module, all engineerings Document;Final account of project module 15, by the cost of aggregation process engineering project, and the contract visa that visa change tape comes is therewith The corresponding engineering contract final accounts amount of money, engineering bill and account receivable is recorded, and the engineering bill and account receivable is exported to user service terminal; Module 16 after sale, the management and control that passes budgets, flow management and control, record in engineering quality guarantee period, all maintenance records and maintenance cost or Issuable receivable engineering funds.
Further, the project plan module 4 also includes the project essential information of setting, described project essential information Including project name, Project Unit, project management department, the host type of project, project subdivision type, project funds source, item Mesh place, project investment estimation, project status, project manager, project leader, the progress process of project and with project phase The other information of association.
Further, the estimated cost management module 5 includes construction budget administration fee, material budget administration fee, Personnel's budget overhead.
Further, the supplier management module 8, purchasing system module 9, cost change module 10, project cost pipe Manage module 11, labor management module 12, financial process module 13, visa Bill Management module 14, final account of project module 15, after sale Interconnected between 16 each module of module, and by wireless network and/or cable network mail message to user service terminal 2, Above-mentioned each module data can generate form, and be exported in a manner of form.
Further, the bid for a project budget database 3 and project management database 4 are additionally provided with and automatically update mould Block, dynamic is more in real time by automatically updating module for information in the bid for a project budget database 3 and project management database 4 Newly.
Further, the bid for a project budget database 3 and project management database 4 are additionally provided with user authority management Module, the user authority management module provide different operating rights for operator, and these authorities include pre- to bid for a project Calculate the information in database 3 and project management database 4 it is global or it is partial browse, operate and change, and the use for passing through mandate The operation that family is increased data message, changed and deleted or edited.
Further, the bid for a project budget database 3 and project management database 4 by wireless network and/or have Gauze network pushes to user service terminal 2.
Specific embodiment:
User is using the system of the present invention, and first, the essential information of the established project of project plan module 5, user stores project And the typing system, at the same time, it is right to estimated cost management module 6, estimated cost management module 6 that the established project is exported The project carries out cost budgeting, and cost budgeting includes personnel, purchases, material, construction budget, and provides budget message, pipe of submitting a tender Manage module 7 and supplier's bidding system is generated according to estimated cost management module, filter out qualified supplier.
Secondly, all kinds of suppliers of the book of final entry of supplier management module 8 financially account, money, the situation of tax and all kinds of confessions Business's material information situation is answered, purchasing system module 9 carries out multi-party, more ground procurement price and assessed, generate material to supplier management The multinomial selection competition system in the cycle of quality, price and accounts payable, cost change module 10, to being supplied obtained by bidding management The cost of business, the pre- cost of change is stored, by the change output of pre- cost to project cost control module, while update visa document Management module data;Project cost control module 11, the actual cost and Change cost of engineering project are stored, is also invented This, labor management module 12, financially account, money, the situation of tax and all kinds of artificial information's situations of all kinds of workers of the book of final entry; Financial process module 13, to project cost control module, by the artificial, material in project cost control module by account at Reason, carry out pending accounts processing by supplier, worker's type, and carry out examination & verification accounting, visa Bill Management module 14, storage it is described into Project signature caused by pre- cost change in this change module, all engineering documents;Final account of project module 15, by collecting The corresponding engineering contract final accounts amount of money of contract visa that the cost of engineering project, and visa change tape are come is handled, record Engineering bill and account receivable, and the engineering bill and account receivable is exported to user service terminal.User can be according to project cost control module 11, labor management module 12, financial process module 13, the bills data that visa Bill Management module 14 automatically generates carries out in real time Compare, check, meanwhile, because bid for a project budget database 3 and project management database 4 are additionally provided with user authority management mould Block, so the user authorized can be increased data message, changed and be deleted or edit operation.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained Cover within protection scope of the present invention.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (8)

1. construction-engineering project data handling system, it is characterised in that:Including data server(1)And to the data, services The user service terminal that device conducts interviews(2), the data server(1)Including bid for a project budget database(3)And project Manage database(4), the user service terminal(2)Including pc user end and/or mobile device end;The bid for a project budget Database(3)Including:Project plan module(5), for storing or changing or established project, the essential information of established project will Xiang Mingda is exported to estimated cost management module;Estimated cost management module(6), engineering item is generated based on the project plan The pre- cost of mesh;Bidding management module(7), based on estimated cost management generation supplier bidding system;The project management Database(5)Including:Supplier management module(8), all kinds of suppliers of the book of final entry financially account, money, the situation of tax and each Class supplier's material information state;Purchasing system module(9), based on supplier management, and to supplier is multi-party, more ground purchasing price Lattice are assessed, the multinomial selection competition system in the cycle of generation quality of materials, price and accounts payable;Cost changes module(10), Based on the cost of supplier obtained by bidding management, the pre- cost of change is stored, the change of pre- cost is exported to project cost control Module, while update visa menu manager module data;Project cost control module(11), store engineering project actual cost and Change cost;Labor management module(12), the financially account of all kinds of workers of the book of final entry, money, the situation of tax and all kinds of artificial Information state;Financial process module(13), based on the project cost control module, by the people in project cost control module Work, material carry out pending accounts processing by accounting processing by supplier, worker's type;Visa Bill Management module(14), storage institute State project signature caused by the pre- cost change in cost change module, all engineering documents;Final account of project module(15), lead to Cross the corresponding engineering contract final accounts gold of contract visa that the cost of aggregation process engineering project, and visa change tape are come Volume, engineering bill and account receivable is recorded, and the engineering bill and account receivable is exported to user service terminal;Module after sale(16), by pre- Management and control, flow management and control are calculated, is recorded in engineering quality guarantee period, all maintenance records and maintenance cost or issuable receivable engineering Money.
2. construction-engineering project data handling system according to claim 1, it is characterised in that:The project plan module (4)Also include the project essential information of setting, described project essential information includes project name, Project Unit, project management Department, the host type of project, project subdivision type, project funds source, project place, project investment estimation, project status, item Mesh custodian, project leader, the progress process and the other information associated with project of project.
3. construction-engineering project data handling system according to claim 1, it is characterised in that:The estimated cost management Module(5)Including construction budget administration fee, material budget administration fee, personnel's budget overhead.
4. construction-engineering project data handling system according to claim 1, it is characterised in that:The supplier management mould Block(8), purchasing system module(9), cost change module(10), project cost control module(11), labor management module(12)、 Financial process module(13), visa Bill Management module(14), final account of project module(15), module after sale(16)Between each module Interconnect, and pass through wireless network and/or cable network mail message to user service terminal(2), above-mentioned each module Data can generate form, and be exported in a manner of form.
5. construction-engineering project data handling system according to claim 1, it is characterised in that:The bid for a project budget Database(3)And project management database(4)It is additionally provided with and automatically updates module, the bid for a project budget database(3)With Project management database(4)Interior information is dynamically updated in real time by automatically updating module.
6. construction-engineering project data handling system according to claim 1, it is characterised in that:The bid for a project budget Database(3)And project management database(4)All users are opened with look facility, but it sets user authority management mould Block.
7. construction-engineering project data handling system according to claim 6, it is characterised in that:The user authority management Module provides different operating rights for operator, and these authorities are included to bid for a project budget database(3)And project management Database(4)Interior information it is global or it is partial browse, operate and change, and data message is increased by the user of mandate The operation for adding, changing and deleting or edit.
8. construction-engineering project data handling system according to claim 1, it is characterised in that:The bid for a project budget Database(3)And project management database(4)User service terminal is pushed to by wireless network and/or cable network(2).
CN201710589431.XA 2017-07-19 2017-07-19 Construction-engineering project data handling system Pending CN107437167A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710589431.XA CN107437167A (en) 2017-07-19 2017-07-19 Construction-engineering project data handling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710589431.XA CN107437167A (en) 2017-07-19 2017-07-19 Construction-engineering project data handling system

Publications (1)

Publication Number Publication Date
CN107437167A true CN107437167A (en) 2017-12-05

Family

ID=60459679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710589431.XA Pending CN107437167A (en) 2017-07-19 2017-07-19 Construction-engineering project data handling system

Country Status (1)

Country Link
CN (1) CN107437167A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108446895A (en) * 2018-03-26 2018-08-24 郑州大学 A kind of engineering construction project intelligent management system
CN108510206A (en) * 2018-04-10 2018-09-07 北京曜世科技有限公司 A kind of free house decoration management system and method
CN108764846A (en) * 2018-05-30 2018-11-06 福泽润森(武汉)科技股份有限公司 A kind of team's grade Project Management System
CN108765200A (en) * 2018-05-30 2018-11-06 福泽润森(武汉)科技股份有限公司 A kind of entry level Project Management System
CN108805529A (en) * 2018-05-30 2018-11-13 福泽润森(武汉)科技股份有限公司 A kind of construction management platform
CN108846740A (en) * 2018-06-19 2018-11-20 中威戎安科技有限公司 A kind of financial data system
CN109559145A (en) * 2018-09-20 2019-04-02 中建科技有限公司深圳分公司 The cost method for early warning and device of assembled architecture
CN109800982A (en) * 2019-01-16 2019-05-24 武汉市九晖通讯技术有限公司 A kind of broadcasting and TV OTN extending capacity reformation project system
WO2020010720A1 (en) * 2018-07-10 2020-01-16 平安科技(深圳)有限公司 Method and device for processing budget data
CN111582728A (en) * 2020-05-08 2020-08-25 无锡商业职业技术学院 Multichannel complex building engineering dynamic management system
CN111813844A (en) * 2020-05-22 2020-10-23 北京合力信工程投资咨询有限公司 Visual management system of engineering
CN111898853A (en) * 2020-06-18 2020-11-06 深圳瑞和建筑装饰股份有限公司 Engineering construction fine management system
CN112085481A (en) * 2020-09-22 2020-12-15 国网山东省电力公司烟台供电公司 Whole-process tracking system for electric power engineering project management
CN112085361A (en) * 2020-08-28 2020-12-15 上海谊逅信息技术有限公司 Construction engineering overall process management method
CN112784126A (en) * 2021-01-30 2021-05-11 日照职业技术学院 Building material management method with classified rapid query function
CN113393212A (en) * 2021-06-16 2021-09-14 筑橙科技(深圳)有限公司 Outer wall spraying engineering project management platform and management method
CN113706087A (en) * 2020-05-22 2021-11-26 浙江建连智信科技有限公司 Project management method and device based on block chain and electronic equipment
CN113902413A (en) * 2021-10-13 2022-01-07 国网安徽省电力有限公司 Intelligent management platform for project investment budget and capital budget
CN115827805A (en) * 2022-10-27 2023-03-21 卓信通信股份有限公司 Smart city communication infrastructure planning platform
CN116109091A (en) * 2023-02-07 2023-05-12 四川省蜀顺工程建设咨询有限公司 Engineering supervision information management system
CN116843489A (en) * 2023-07-12 2023-10-03 华腾建信科技有限公司 Engineering financial accounting method and system based on multi-system linkage

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108446895A (en) * 2018-03-26 2018-08-24 郑州大学 A kind of engineering construction project intelligent management system
CN108510206A (en) * 2018-04-10 2018-09-07 北京曜世科技有限公司 A kind of free house decoration management system and method
CN108764846A (en) * 2018-05-30 2018-11-06 福泽润森(武汉)科技股份有限公司 A kind of team's grade Project Management System
CN108765200A (en) * 2018-05-30 2018-11-06 福泽润森(武汉)科技股份有限公司 A kind of entry level Project Management System
CN108805529A (en) * 2018-05-30 2018-11-13 福泽润森(武汉)科技股份有限公司 A kind of construction management platform
CN108846740A (en) * 2018-06-19 2018-11-20 中威戎安科技有限公司 A kind of financial data system
WO2020010720A1 (en) * 2018-07-10 2020-01-16 平安科技(深圳)有限公司 Method and device for processing budget data
CN109559145A (en) * 2018-09-20 2019-04-02 中建科技有限公司深圳分公司 The cost method for early warning and device of assembled architecture
CN109800982A (en) * 2019-01-16 2019-05-24 武汉市九晖通讯技术有限公司 A kind of broadcasting and TV OTN extending capacity reformation project system
CN111582728B (en) * 2020-05-08 2024-05-17 无锡商业职业技术学院 Multichannel complex building engineering dynamic management system
CN111582728A (en) * 2020-05-08 2020-08-25 无锡商业职业技术学院 Multichannel complex building engineering dynamic management system
CN111813844A (en) * 2020-05-22 2020-10-23 北京合力信工程投资咨询有限公司 Visual management system of engineering
CN113706087A (en) * 2020-05-22 2021-11-26 浙江建连智信科技有限公司 Project management method and device based on block chain and electronic equipment
CN111898853A (en) * 2020-06-18 2020-11-06 深圳瑞和建筑装饰股份有限公司 Engineering construction fine management system
CN112085361A (en) * 2020-08-28 2020-12-15 上海谊逅信息技术有限公司 Construction engineering overall process management method
CN112085481A (en) * 2020-09-22 2020-12-15 国网山东省电力公司烟台供电公司 Whole-process tracking system for electric power engineering project management
CN112784126A (en) * 2021-01-30 2021-05-11 日照职业技术学院 Building material management method with classified rapid query function
CN113393212A (en) * 2021-06-16 2021-09-14 筑橙科技(深圳)有限公司 Outer wall spraying engineering project management platform and management method
CN113902413A (en) * 2021-10-13 2022-01-07 国网安徽省电力有限公司 Intelligent management platform for project investment budget and capital budget
CN115827805A (en) * 2022-10-27 2023-03-21 卓信通信股份有限公司 Smart city communication infrastructure planning platform
CN116109091A (en) * 2023-02-07 2023-05-12 四川省蜀顺工程建设咨询有限公司 Engineering supervision information management system
CN116843489A (en) * 2023-07-12 2023-10-03 华腾建信科技有限公司 Engineering financial accounting method and system based on multi-system linkage
CN116843489B (en) * 2023-07-12 2023-12-19 华腾建信科技有限公司 Engineering financial accounting method and system based on multi-system linkage

Similar Documents

Publication Publication Date Title
CN107437167A (en) Construction-engineering project data handling system
CN104408559B (en) A kind of engineering information management system
CN203165006U (en) Engineering project management system
CN107358340A (en) A kind of project management system based on list of engineering
CN106796673A (en) For the improved system and method for charging
CN103136626A (en) On-line management method for engineering project
CN104123604A (en) Engineering management information processing system
CN105225051A (en) Project management system
CN106408351A (en) WeChat based CRM system for small and medium enterprises
CN107292589A (en) A kind of information-based cloud service platform of full industrial chain
MXPA04001075A (en) System and method for the payment and accounting of petty disbursements.
JP6247737B1 (en) Data structure, information processing apparatus, program, information processing method, and transaction system
CN115170090A (en) Project management method and device, electronic equipment and readable storage medium
CN108765200B (en) Entrance-level building engineering management system
CN107993118A (en) A kind of method based on shared system association user information
CN207008692U (en) A kind of full industrial chain informationization cloud service platform
JP2018088281A (en) Data structure, information processing apparatus, program, information processing method, and transaction system
CN108805529B (en) Building engineering management platform
CN114971893B (en) Loan deduction mode flexible configuration method and system
CN109377155A (en) The loan information measures and procedures for the examination and approval and device
JP6298517B1 (en) Data structure, information processing apparatus, program, information processing method, and transaction system
CN108764846B (en) Team-level building engineering management system
CN111813844A (en) Visual management system of engineering
KR102614554B1 (en) Digital money managing method and system based on value exchange algorithm
CN108846627A (en) A kind of enterprise management system and its implementation based on sales management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171205