CN105225051A - Project management system - Google Patents

Project management system Download PDF

Info

Publication number
CN105225051A
CN105225051A CN201510657214.0A CN201510657214A CN105225051A CN 105225051 A CN105225051 A CN 105225051A CN 201510657214 A CN201510657214 A CN 201510657214A CN 105225051 A CN105225051 A CN 105225051A
Authority
CN
China
Prior art keywords
management
module
project
engineering
management module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510657214.0A
Other languages
Chinese (zh)
Inventor
周杰
胡小建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jienuo Software Co Ltd
Original Assignee
Zhejiang Jienuo Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jienuo Software Co Ltd filed Critical Zhejiang Jienuo Software Co Ltd
Priority to CN201510657214.0A priority Critical patent/CN105225051A/en
Publication of CN105225051A publication Critical patent/CN105225051A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of project management system, comprising: system terminal and system server, described system server and described system terminal are connected to realize the storage of data, calculating and transmission by multiple network; Described server comprises engineering module, contract management module, human resources module and statistical analysis module; Above-mentioned module all can send information to a system management module, to show data on system terminal.The present invention proposes a kind of project management system, with the informationization of maturation, networking technology for means, the management being engineering project by the pattern of computerized information platform provides perfect total solution, reach the detailed management to project people, material, machine, the management of comprehensive system is formed to every business, greatly improves project management level, save project management cost and construction cost by a relatively large margin, stop practising fraud of some post, make construction quality obtain effective guarantee.

Description

Project management system
Technical field
The present invention relates to a kind of project management system.
Background technology
In existing project management system, be difficult to the detailed management reaching manpower, machine, material, when it come to major project, when particularly relating to a fairly large number of human and material resources and financial resources management, efficiency will seem very low, not only cannot realize effective management, and cannot production cost be reduced.
Summary of the invention
For solving the problems of the technologies described above, the invention provides a kind of project management system, not only effectively can manage, and improve efficiency, reducing cost.
A kind of project management system, comprising:
System terminal and system server, described system server and described system terminal are connected to realize the storage of data, calculating and transmission by multiple network;
Described server comprises engineering module, contract management module, human resources module and statistical analysis module; Above-mentioned module all can send information to a system management module, to show data on system terminal.
Preferably, described engineering module comprises engineering management module, construction management module, store keeping module, machine management module and Engineering Settlement module.
Preferably, described human resources module comprises salary management module, personnel management module, financial management module and document management module.
Preferably, independently security civilization administration module and enterprise's Amulti-project management information portal is also comprised.
The present invention proposes a kind of project management system, with the informationization of maturation, networking technology for means, the management being engineering project by the pattern of computerized information platform provides perfect total solution, reach the detailed management to project people, material, machine, the management of comprehensive system is formed to every business, greatly improves project management level, save project management cost and construction cost by a relatively large margin, stop practising fraud of some post, make construction quality obtain effective guarantee.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below.
The knot system chart that Fig. 1 is the project management system disclosed in the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described.
As shown in Figure 1, a kind of project management system, comprising:
System terminal and system server, described system server and described system terminal are connected to realize the storage of data, calculating and transmission by multiple network;
Described server comprises engineering module, contract management module, human resources module and statistical analysis module; Above-mentioned module all can send information to a system management module, to show data on system terminal.
Described engineering module comprises engineering management module, construction management module, store keeping module, machine management module and Engineering Settlement module.
Described human resources module comprises salary management module, personnel management module, financial management module and document management module.
Also comprise independently security civilization administration module and enterprise's Amulti-project management information portal.
In above-mentioned module:
Engineering management module:
1) the multiple projects under group company can be managed simultaneously, make functional department's collaborative works such as general headquarters of project-based enterprise group, branch office, project management department.Grasp each project information and personnel's situation.
2) the fund combined data of each project can be checked, can be analyzed multiple destination datas.
3) support that intelligent chart represents each project dynamic cost.
Construction management module:
The application of construction management in project aspect mainly builder's diary reports, and comprises the information such as construction process record, materials'use situation, plant equipment service condition, workmen's work attendance, barometer.
Construction management realizes as follows: builder's diary reports; Builder's diary is examined; Plant equipment turnover management; Own equipment is turned out for work account; The chronicle of events; P.m.entry; Accumulate over a long period; Project management department's Casual Worker Management; Project management department transient worker work attendance;
Store keeping module:
The main practical function of material line is as follows: the materials classification coding that definition enterprise is unified; The material class number that definition enterprise is unified; Material opening inventory manages; After signing material supply contract, stock management can be carried out to material; By reporting materials'use situation at builder's diary, establishment projects materials'use situation; Material warehouse-in is checked; Material goes out library management; Material is transferred management; The material account phase.
Machine management module:
Machine management mainly carries out unified management to project construction plant equipment in the application of project aspect, comprises the record of examination of plant equipment, equipment scrapping, plant equipment license to the information such as project management department.
Machine management realizes as follows: definition project plant equipment classification decomposition texture; Safeguard mechanical Unit account of plant; ; The record of examination of record plant equipment; Equipment leasing manages, and own equipment allots management; The routine use record of construction machinery and tabulate statistics statistical tables and reports.
Contract management module
The Whole Course Management of engineering contract in project construction process is contained in contract management.Comprise the content such as engineering contract (project overall budget, engineering subcontract, material supply, equipment purchase, equipment leasing, labor service etc.), contract price modification management, the management of contract execution condition managing, engineering contract account, the management of contract photo-offset copy.
Engineering Settlement module:
Method and the step of projects clearing is carried out by PMIS
1) sign the contracts such as material supply, equipment purchase, labor service subpackage, engineering subcontract, then by journalist, material, the machine service condition in work progress on builder's diary, automatically generate advice of settlement.
2) utilize Office Of Contract Settlements inventory, statistics and adjust engineering actual settlement cost.
3) multiple batches of clearing can be carried out to the contract of each type.
4) can conutersign Engineering Settlement list, the step such as examination & approval, specification Engineering Settlement flow process.
5) derive and print list of engineering and relevant subcontractor's check settlement expense.
6) material real cost.
7) plant equipment real cost.
8) payment in advance management.
Salary management module:
Salary management completes the calculating of all kinds of personnel's wage and granting and relevant payroll statistics machine account.For the modules such as wage payment, engineering staff's cost provide actual person cost data.
1) according to company's wage system setting wage calculation formula, formula provides function performance.
2) the wage data of all kinds of personnel are automatically calculated according to setting wage project.
3) by personnel, insurance, work attendance and all kinds ofly automatically include wage calculation in wage relevant information
4) all kinds of payroll statistics machine account and form is generated flexibly.
Salary management practical function mainly comprises: wage project management; Wage project computing formula; Monthly to carry down wage; Wage accounting; Wage is examined; Wage cost defines; Wage gathers account.
Personnel management module:
The main application of personnel management is registered for company all personnel, unified management; Set up department of enterprise organization's framework; Set up personal information archives; Manage the information such as all kinds of personnel's essential information, variation, leaving office, be associated with each project by the part-time associate of making, reach flexible organization and divide each project management department's personnel component.Complete all kinds of personal management machine account.The function that personnel management realizes mainly comprises: set up corporate department; Personal management; Leave office and manage; Post change management; Staff attendance manages; Staff attendance is added up.
Financial management module
Financial management is paid the bill to the correlative charges occurred in work progress, can hold comprehensively, provide project funds situation at any time, help enterprise effectively to realize fund balancing, reduce project risk and cost fully funded, an artificial situation.The main application of financial management comprises as follows: payables manages; Receivables manages; Set up Bank Account Number; Worker's financial information is set; Managing bill; There is provided statistics and statistical tables and reports function flexibly to financial information, statistics generates statistical report form by the report form template of definition; Statistical report form is derived and prints.
Security civilization administration module:
Main around engineering safety management expectancy, include safe account, rewards and punishments management, security document unification in management, project under construction is made to enter normalization, standardized management, reach and behavior unsafe in work progress and state are reduced and elimination, not accidents caused, thus ensure the normal operation of project under construction.The major function that security civilization management realizes: safe account; Safe account statistics; Rewards and punishments manage; Security document manages; Safe account rewards and punishments examination & verification.
Document management module:
The document classification filing formed in work progress, form archives, for the final acceptance of construction of project provides support.The application of document management module comprises as follows: definition document classification; File consolidation manages; My document; Document moves; Document recycle bin; The expired destruction of document.
Statement management module:
Support self-defined report template, generate the report style needed according to report form template, derivation is carried out to form and prints.Report Server Management major function: contract form; Clearing form; Construction journal; Equipment enters/field form; Material stock form; The monthly form of material; The material appropriation moon form; The monthly form of plant equipment; Wage consolidated statement; Gathering form; Advice of settlement payment form; Subcontractor's payment in advance form; Electronics reimbursement payment form; Invoice form.
Enterprise's Amulti-project management information gate module:
1. the business module of this project is loaded by priority assignation;
2. the current practice condition of bulleted list display items display, can select corresponding project, completes the switching of each project;
3. check notice information;
4. the examination and approval procedure that process is relevant to oneself;
Statistical analysis module
1) programming count
2) statistical report form
3) inquire about and beat
4) every datagram template of intelligent chart, intellectual analysis setting conventional report print project, is that class raw data table can support that intelligence fund is dynamic.
Above-described is only the preferred implementation of a kind of project management system provided by the present invention; should be understood that; for the person of ordinary skill of the art; without departing from the concept of the premise of the invention; can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (4)

1. a project management system, is characterized in that, comprising:
System terminal and system server, described system server and described system terminal are connected to realize the storage of data, calculating and transmission by multiple network;
Described server comprises engineering module, contract management module, human resources module and statistical analysis module; Above-mentioned module all can send information to a system management module, to show data on system terminal.
2. project management system according to claim 1, is characterized in that, described engineering module comprises engineering management module, construction management module, store keeping module, machine management module and Engineering Settlement module.
3. project management system according to claim 1, is characterized in that, described human resources module comprises salary management module, personnel management module, financial management module and document management module.
4. project management system according to claim 1, is characterized in that, also comprises independently security civilization administration module and enterprise's Amulti-project management information portal.
CN201510657214.0A 2015-10-12 2015-10-12 Project management system Pending CN105225051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510657214.0A CN105225051A (en) 2015-10-12 2015-10-12 Project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510657214.0A CN105225051A (en) 2015-10-12 2015-10-12 Project management system

Publications (1)

Publication Number Publication Date
CN105225051A true CN105225051A (en) 2016-01-06

Family

ID=54994006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510657214.0A Pending CN105225051A (en) 2015-10-12 2015-10-12 Project management system

Country Status (1)

Country Link
CN (1) CN105225051A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106056295A (en) * 2016-06-05 2016-10-26 镇江市亿鑫电气设备有限责任公司 Engineering management system
CN106897861A (en) * 2017-02-16 2017-06-27 龙岩学院 A kind of project management system
CN108764846A (en) * 2018-05-30 2018-11-06 福泽润森(武汉)科技股份有限公司 A kind of team's grade Project Management System
CN108765200A (en) * 2018-05-30 2018-11-06 福泽润森(武汉)科技股份有限公司 A kind of entry level Project Management System
CN108805529A (en) * 2018-05-30 2018-11-13 福泽润森(武汉)科技股份有限公司 A kind of construction management platform
CN109064306A (en) * 2018-08-14 2018-12-21 石榴籽科技有限公司 A kind of financial analysis system Internet-based and method
CN112381494A (en) * 2020-09-29 2021-02-19 深圳市中科新业信息科技发展有限公司 Intelligent monitoring system and method for urban construction
CN113901103A (en) * 2021-08-31 2022-01-07 中核凯利(深圳)餐饮管理有限公司 Financial data processing method and system for digital catering

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106056295A (en) * 2016-06-05 2016-10-26 镇江市亿鑫电气设备有限责任公司 Engineering management system
CN106897861A (en) * 2017-02-16 2017-06-27 龙岩学院 A kind of project management system
CN108764846A (en) * 2018-05-30 2018-11-06 福泽润森(武汉)科技股份有限公司 A kind of team's grade Project Management System
CN108765200A (en) * 2018-05-30 2018-11-06 福泽润森(武汉)科技股份有限公司 A kind of entry level Project Management System
CN108805529A (en) * 2018-05-30 2018-11-13 福泽润森(武汉)科技股份有限公司 A kind of construction management platform
CN109064306A (en) * 2018-08-14 2018-12-21 石榴籽科技有限公司 A kind of financial analysis system Internet-based and method
CN112381494A (en) * 2020-09-29 2021-02-19 深圳市中科新业信息科技发展有限公司 Intelligent monitoring system and method for urban construction
CN112381494B (en) * 2020-09-29 2023-10-13 深圳市中科新业信息科技发展有限公司 Intelligent supervision system and method for urban construction
CN113901103A (en) * 2021-08-31 2022-01-07 中核凯利(深圳)餐饮管理有限公司 Financial data processing method and system for digital catering

Similar Documents

Publication Publication Date Title
CN105225051A (en) Project management system
CN203165006U (en) Engineering project management system
CN104376430A (en) Hidden risk management system based on cloud service platform and implementing method of hidden risk management system
CN105160463A (en) Enterprise management system on basis of project management
CN102622677A (en) Enterprise safety production management method
CN103268531A (en) Secondary energy management platform for energy center
CN102194172A (en) ERP (Enterprise Resource Planning) management system
CN103116861A (en) Enterprise tax job execution and monitoring platform
CN113112233A (en) BIM-based intelligent management method and platform for full life cycle of wind power project
CN106056295A (en) Engineering management system
CN102044044A (en) Group credit granting business processing method based on credit granting business system
CN103390218A (en) Three-chain coupling integrated emergency security system and method for emergencies
CN108846643A (en) A kind of general management of projects system
Cohen et al. Computerized maintenance management systems
CN113947337B (en) Method for cooperatively sharing engineering construction resources
CN115170090A (en) Project management method and device, electronic equipment and readable storage medium
WO2014194582A1 (en) Financial tax integrated resources planning system
CN104915738A (en) Industrial and commercial intelligent comprehensive law enforcement system
CN114677044A (en) Management system and method for intelligent building supervision engineering project
CN108846627A (en) A kind of enterprise management system and its implementation based on sales management
Cao et al. Applied research of activity-based costing under ERP environment
Yujie et al. The Influence of" Golden Tax Third Period" on Enterprise Tax-related Services
Nwankwo Customs Automation: The X-ray and Computerized Risk Management Systems Era
Garcia Project Information Document-Integrated Safeguards Data Sheet-Philippines Customs Modernization Project-P163428
Anh ORGANIZING MANAGEMENT ACCOUNTING INFORMATION SYSTEM FOR SHORT-TERM DECISION-MAKING IN SMALL AND MEDIUM ENTERPRISE IN THAI NGUYEN PROVINCE, VIETNAM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160106