CN106897861A - A kind of project management system - Google Patents

A kind of project management system Download PDF

Info

Publication number
CN106897861A
CN106897861A CN201710095246.5A CN201710095246A CN106897861A CN 106897861 A CN106897861 A CN 106897861A CN 201710095246 A CN201710095246 A CN 201710095246A CN 106897861 A CN106897861 A CN 106897861A
Authority
CN
China
Prior art keywords
module
project
data
management
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710095246.5A
Other languages
Chinese (zh)
Inventor
江庆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longyan University
Original Assignee
Longyan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longyan University filed Critical Longyan University
Priority to CN201710095246.5A priority Critical patent/CN106897861A/en
Publication of CN106897861A publication Critical patent/CN106897861A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06395Quality analysis or management

Abstract

Confirm module, holographic projection system, project finance management module, general management of projects assessment of scenario module and central processing unit the invention discloses a kind of project management system, including human-machine operation module, human resource management module, data acquisition module, every project planning scheme output module, human expert module, Mathematical Models module, virtual actuator, virtual parameter module, every project planning scheme optimization module, transfering node module, programme recommending module, project performance.The present invention with ripe information-based, networking technology be means, by the pattern of computerized information platform for the management of engineering project provides perfect total solution, reach to project people, material, machine detailed management, comprehensive system administration is formed to every business, project management level is greatly improved, project management cost and construction cost are saved by a relatively large margin, prevent practising fraud for some posies so that construction quality obtains effective guarantee.

Description

A kind of project management system
Technical field
The present invention relates to engineering management field, and in particular to a kind of project management system.
Background technology
Currently, the information technology with cloud computing, big data, Internet of Things as representative is at an unprecedented rate and scale Penetrate into the various aspects of social life, and subtle the mode of thinking for influenceing this people, behavioural habits and value judgement, It is subversive to change original business operation model and Socialized Reading track.
And in building trade, software never lacks.All kinds of budget software, all for the cost of engineering has made place mat.But How software overall process management and control to engineering construction is used, it is also unknown by the people in industry.Being no lack of on the market has in each intermediate item Software systems, but most of is all interim or statistical software afterwards, it is impossible to forewarning management, process are carried out before project starts Carry out flow management and control.
The content of the invention
To solve the above problems, the invention provides a kind of project management system, with ripe information-based, networking technology It is means, by the pattern of computerized information platform for the management of engineering project provides perfect total solution, it is right to reach Project people, material, the detailed management of machine, comprehensive system administration is formed to every business, and project management level is greatly improved, larger Amplitude saves project management cost and construction cost, prevents practising fraud for some posies so that construction quality is effectively protected Barrier.
To achieve the above object, the technical scheme taken of the present invention is:
A kind of project management system, including
Human-machine operation module, for the login of user, the basic condition of cuit, project basic demand, Project design Title and the requirement of figure and project material requested, and by these data is activations to items project planning scheme output module;With In cuit performance, and these data is activations are stored to the database specified;Life is called for input data Order;
Human resource management module, distributes for each employee's essential information, staff attendant, daily task, appoints daily The management of performance of being engaged in;
Data acquisition module, the side that member's basic condition and each staff for gathering each crew are good at To data and it is stored in database;
Every project planning scheme output module, for the number being input into according to human-machine operation module by default algorithm According to this and the data that are collected of data acquisition module carry out the output of every project planning scheme, and just every work of gained Journey programme is exported to human expert module;
Human expert module, for carrying out manual examination and verification and artificial tune to the programme of every engineering by human expert Whole optimization, and last optimum results are sent to display screen by project planning output module are shown;
Mathematical Models module, the foundation of project Mathematical Modeling is carried out by Flac3D according to the data for receiving;
Virtual actuator, for driving Parameters variation, with Mathematical Models module in each element opening relationships after, Parameter can be changed in specified scope, such that it is able to drive every project planning scheme optimization module for difference Parameter carry out calculating solution;
Virtual parameter module, be inserted in Mathematical Models module reach the corresponding result of direct access or letter The logic unit of the target of breath;
Every project planning scheme optimization module, for by different simulating analysis and simulation analysis algorithm to institute The project Mathematical Modeling of foundation carries out performance test;The virtual actuator will by circulating execution simulation analysis algorithm or method Result feeds back to every project planning scheme optimization module, every project planning scheme optimization module automatically extract data to Virtual parameter module, the automatic dependence test display result of virtual parameter module;
Transfering node module, is connected with each element in Mathematical Models module, by change transfering node position, Direction is set, and project Mathematical Modeling is produced corresponding motion;
Business management module includes
Human-machine operation module, in user's registration, generating the biological characteristic model of correspondence user's registration identity, And the biological characteristic model is saved in user registry database;It is additionally operable to be input into various relevant cost data, and will be defeated The related data for entering is sent to data processing module;For being input into certificate data;It is additionally operable to be input into control command;
Authentication module, certificate data and the data in user registry database for that will receive carry out phase Authentication is completed like degree contrast, and the certificate data being verified that will receive and the result of authentication send To central processing unit;
Module is planned in cost management, for determining current year project budget situation;
Material cost computing module, the valency for gathering related material in major shopping network base stations by reptile module Lattice data, and the calculating of product cost is carried out according to the material composition data and sized data for being received, and by result of calculation Display screen is sent to be shown;
Budget estimate making module, for according to the current year project budget situation, establishment determine current year project all into This budget;
Module is formulated in cost budgeting, for according to the determination current year project complete cost budget generation current year project Budget information;
Actual cost adjusts module, in project management process, the relevant financial that human-machine operation module is input into Data are made a report on, examine, collecting generation actual cost value;
Analysis contrast module, for contrasting default internal control index and actual cost value, output-index completeness, and Comparing result is sent to financial decision module and Risk-warning evaluation module;
Risk-warning evaluation module, for receiving the result after analysis contrast module analysis, completes risk assessment, and will comment Estimate result and be sent to display screen and shown;
Financial decision module, for the result after the analysis for receiving analysis contrast module, is given for the result after analysis Expert decision-making;
Financial management central processing unit, is operated for coordinating above-mentioned module;Enter for the result according to authentication The setting of row data base authority, so as to the data call order according to input and data base authority carry out calling for related data, And the data is activation that will be called is to display screen.
4th, a kind of project management system according to claim 3, it is characterised in that the biological characteristic model is used Vena metacarpea data, after vena metacarpea data are scanned by infrared vena metacarpea scanning recognition device.Imaging input, the planning side Case recommending module is mutually recommended by short message editing sending module or mail editor's sending module.
5th, a kind of project management system according to claim 3, it is characterised in that the actual cost adjusts module Including:
Current year project cost control module, for controlling current year project funds to pay according to plan;Branch including cost Go out Variation control two parts of control and cost;The pay-off control of cost refers to according to budget application cost, control cost payout;Into This Variation control includes the change of cost amount and the change of cost time of origin;The change of cost amount referred to due to the current year The scope or content change of project activity, and change the amount or original current year project activity of cost budgeting according to actual conditions Need to change budget;The change of cost time of origin refers to the expenditure time of current year project funds than original time advance or prolongs Afterwards;
Final accounts module, the situation for being paid according to plan for the control current year project funds generates current year project Final report.
6th, a kind of project management system according to claim 1, it is characterised in that also include
Graphic plotting module, the data for being input into according to human-machine operation module draw various curve maps;
Comparative analysis module, will draw curve and is analyzed and predicts with standard curve, and output analysis predicts the outcome;
Computing module is returned, for carrying out recurrence calculating to the curve drawn by different functions.
7th, a kind of project management system according to claim 1, it is characterised in that the human-machine operation module includes Word input module, voice input module and picture input module.
8th, a kind of project management system according to claim 7, it is characterised in that the word input module is used Keyboard, the voice input module uses microphone.The picture input module imports the pattern of upload and leads to using picture Cross arq mode on camera collection picture.
More;The change of cost amount refers to scope or content change due to current year project activity, and changes cost budgeting Amount or original current year project activity according to actual conditions need change budget;The change of cost time of origin refers to this year Degree project funds the expenditure time is than original time advance or delays;
Final accounts module, the situation for being paid according to plan for the control current year project funds generates current year project Final report.
Preferably, also include
Graphic plotting module, the data for being input into according to human-machine operation module draw various curve maps;
Comparative analysis module, will draw curve and is analyzed and predicts with standard curve, and output analysis predicts the outcome;
Computing module is returned, for carrying out recurrence calculating to the curve drawn by different functions.
Preferably, the human-machine operation module includes word input module, voice input module and picture input module.
Preferably, the word input module uses keyboard, the voice input module to use microphone.The picture is defeated Enter module and the pattern of upload is imported and by arq mode on camera collection picture using picture.
The invention has the advantages that:
It is means with ripe information-based, networking technology, is engineering project by the pattern of computerized information platform Management provides perfect total solution, reach to project people, material, machine detailed management, comprehensive is formed to every business System administration, is greatly improved project management level, and project management cost and construction cost are saved by a relatively large margin, prevents some posies Practise fraud so that construction quality obtains effective guarantee;By customized Mathematical Modeling, virtual actuator and virtual parameter The setting of module, realizes the analogue simulation analysis of each engineering decision, substantially increases the specific aim of administrative decision formulation;Can According to the different project situations project planning scheme different with engine request generation, while possibility maximum to the greatest extent has played each The speciality of individual workman, substantially increases operating efficiency and construction quality;The input of all financial datas carries identity characteristic, real The trackability of data is showed, data encryption has been carried out using biological characteristic, it is ensured that the security of data.
Brief description of the drawings
Fig. 1 is a kind of system block diagram of project management system of the embodiment of the present invention.
Specific embodiment
In order that objects and advantages of the present invention become more apparent, the present invention is carried out further with reference to embodiments Describe in detail.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to limit this hair It is bright.
As shown in figure 1, a kind of project management system is the embodiment of the invention provides, including
Human-machine operation module, for the login of user, the basic condition of cuit, project basic demand, Project design Title and the requirement of figure and project material requested, and by these data is activations to items project planning scheme output module;With In cuit performance, and these data is activations are stored to the database specified;Life is called for input data Order;
Human resource management module, distributes for each employee's essential information, staff attendant, daily task, appoints daily The management of performance of being engaged in;
Data acquisition module, the side that member's basic condition and each staff for gathering each crew are good at To data and it is stored in database;
Every project planning scheme output module, for the number being input into according to human-machine operation module by default algorithm According to this and the data that are collected of data acquisition module carry out the output of every project planning scheme, and just every work of gained Journey programme is exported to human expert module;
Human expert module, for carrying out manual examination and verification and artificial tune to the programme of every engineering by human expert Whole optimization, and last optimum results are sent to display screen by project planning output module are shown;
Mathematical Models module, the foundation of project Mathematical Modeling is carried out by Flac3D according to the data for receiving;
Virtual actuator, for driving Parameters variation, with Mathematical Models module in each element opening relationships after, Parameter can be changed in specified scope, such that it is able to drive every project planning scheme optimization module for difference Parameter carry out calculating solution;
Virtual parameter module, be inserted in Mathematical Models module reach the corresponding result of direct access or letter The logic unit of the target of breath;
Every project planning scheme optimization module, for by different simulating analysis and simulation analysis algorithm to institute The project Mathematical Modeling of foundation carries out performance test;The virtual actuator will by circulating execution simulation analysis algorithm or method Result feeds back to every project planning scheme optimization module, every project planning scheme optimization module automatically extract data to Virtual parameter module, the automatic dependence test display result of virtual parameter module;
Transfering node module, is connected with each element in Mathematical Models module, by change transfering node position, Direction is set, and project Mathematical Modeling is produced corresponding motion;
Programme recommending module, project demand data and specialized engineering for being input into by default algorithm are advised The matching degree for drawing the supplemental characteristic in scheme model database is calculated, if matching degree is higher than 70%, is recommended;
Project performance confirms module, and the hair that project performance inquires short message is carried out to project administrator for timing Send, so as to confirm the process of institute's project;
Holographic projection system, including air screen generation system, some groups of 3D projecting apparatus and materials database, for basis The control command that central processing unit sends calls corresponding data to set up various project BUILDINGS MODELSs from materials database;
Project finance management module, the management for carrying out project finance;
General management of projects assessment of scenario module, for by default algorithm in project management process and project wealth The data actually occurred in business management module carry out comprehensive assessment, and export assessment result;
Central processing unit, for receiving the data stored the need for man-machine operation module is input into, and is stored in database; For receiving the control command of man-machine operation module input and by default authority being sent to the module specified;It is additionally operable to user's Registration, the management of authority and the modification of password;Association's above-mentioned module of bar is additionally operable to be operated.
Also include simulating analysis and algorithm data-base, calculated for storing various simulating analysis and simulation analysis Method, the simulating analysis and algorithm data-base are connected with a update module, for updating simulating analysis and algorithm number According to the data in storehouse.
The finicial administration of enterprise module includes
Human-machine operation module, in user's registration, generating the biological characteristic model of correspondence user's registration identity, And the biological characteristic model is saved in user registry database;It is additionally operable to be input into various relevant cost data, and will be defeated The related data for entering is sent to data processing module;For being input into certificate data;It is additionally operable to be input into control command;
Authentication module, certificate data and the data in user registry database for that will receive carry out phase Authentication is completed like degree contrast, and the certificate data being verified that will receive and the result of authentication send To central processing unit;
Module is planned in cost management, for determining current year project budget situation;
Material cost computing module, the valency for gathering related material in major shopping network base stations by reptile module Lattice data, and the calculating of product cost is carried out according to the material composition data and sized data for being received, and by result of calculation Display screen is sent to be shown;
Budget estimate making module, for according to the current year project budget situation, establishment determine current year project all into This budget;
Module is formulated in cost budgeting, for according to the determination current year project complete cost budget generation current year project Budget information;
Actual cost adjusts module, in project management process, the relevant financial that human-machine operation module is input into Data are made a report on, examine, collecting generation actual cost value;
Analysis contrast module, for contrasting default internal control index and actual cost value, output-index completeness, and Comparing result is sent to financial decision module and Risk-warning evaluation module;
Risk-warning evaluation module, for receiving the result after analysis contrast module analysis, completes risk assessment, and will comment Estimate result and be sent to display screen and shown;
Financial decision module, for the result after the analysis for receiving analysis contrast module, is given for the result after analysis Expert decision-making;
Financial management central processing unit, is operated for coordinating above-mentioned module;Enter for the result according to authentication The setting of row data base authority, so as to the data call order according to input and data base authority carry out calling for related data, And the data is activation that will be called is to display screen.
The biological characteristic model uses vena metacarpea data, vena metacarpea data to enter by infrared vena metacarpea scanning recognition device After row scanning.Imaging input, the programme recommending module passes through short message editing sending module or mail editor's sending module Mutually recommended.
The actual cost adjusts module to be included:
Current year project cost control module, for controlling current year project funds to pay according to plan;Branch including cost Go out Variation control two parts of control and cost;The pay-off control of cost refers to according to budget application cost, control cost payout;Into This Variation control includes the change of cost amount and the change of cost time of origin;The change of cost amount referred to due to the current year The scope or content change of project activity, and change the amount or original current year project activity of cost budgeting according to actual conditions Need to change budget;The change of cost time of origin refers to the expenditure time of current year project funds than original time advance or prolongs Afterwards;
Final accounts module, the situation for being paid according to plan for the control current year project funds generates current year project Final report.
Also include
Graphic plotting module, the data for being input into according to human-machine operation module draw various curve maps;
Comparative analysis module, will draw curve and is analyzed and predicts with standard curve, and output analysis predicts the outcome;
Computing module is returned, for carrying out recurrence calculating to the curve drawn by different functions.
The human-machine operation module includes word input module, voice input module and picture input module.
The word input module uses keyboard, the voice input module to use microphone.The picture input module The pattern of upload is imported and by arq mode on camera collection picture using picture.
Wherein, Element is at least included in the simulating analysis and algorithm data-base:Macroelement is simulation analysis Real object (carrier analyzed), this carrier is mainly the practical structures or part being physically present;Property:Characteristic It is shared attribute information static on some analysis objects, such as material, section;Load:Load is carried to be carried in these analyses External influence factors or condition on lotus, such as stress load, temperature loading, boundary condition;Analysis:Analyze as all kinds of specific Simulating analysis and appraisal procedure;Result:The data and the form based on data processing, cloud atlas, report being calculated Accuse;Variable:Design variable is the mark of variable in model, including structural parameters, characterisitic parameter and load parameter etc.; Target:Design object is eventually for the fine or not or rational index or the result of index for weighing model; Constraint:Design constraint is the rule that system needs to observe when optimization is considered, such as margin of safety needs to meet minimum wanting Ask;OptAlgorithm:Optimization Design is all kinds of specific algorithms for optimizing design;OptResult:Optimum results The optimal value of the design variable being calculated by optimization.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (8)

1. a kind of project management system, it is characterised in that including
Human-machine operation module, for the login of user, the basic condition of cuit, project basic demand, Project design figure with And title and the requirement of project material requested, and by these data is activations to every project planning scheme output module;For defeated Enter project performance, and these data is activations are stored to the database specified;For input data call instruction;
Human resource management module, distributed for each employee's essential information, staff attendant, daily task, daily task it is complete Into the management of situation;
Data acquisition module, the direction number that member's basic condition and each staff for gathering each crew are good at According to and be stored in database;
Every project planning scheme output module, for by default algorithm according to the data that human-machine operation module is input into And the data that are collected of data acquisition module carry out the output of every project planning scheme, and just every engineering rule of gained The scheme of drawing is exported to human expert module;
Human expert module, for carrying out manual examination and verification to the programme of every engineering by human expert and manually adjusting excellent Change, and last optimum results are sent to display screen by project planning output module and shown;
Mathematical Models module, the foundation of project Mathematical Modeling is carried out by Flac3D according to the data for receiving;
Virtual actuator, for driving Parameters variation, with Mathematical Models module in each element opening relationships after, can be with Parameter is changed in specified scope, such that it is able to drive every project planning scheme optimization module to be directed to different ginsengs Number carries out calculating solution;
Virtual parameter module, be inserted in Mathematical Models module reach the corresponding result of direct access or information The logic unit of target;
Every project planning scheme optimization module, for by different simulating analysis and simulation analysis algorithm to being set up Project Mathematical Modeling carry out performance test;The virtual actuator performs simulation analysis algorithm or method by result by circulating Every project planning scheme optimization module is fed back to, every project planning scheme optimization module automatically extracts data to virtual Parameter module, the automatic dependence test display result of virtual parameter module;
Transfering node module, is connected with each element in Mathematical Models module, by the position, the direction that change transfering node Set, project Mathematical Modeling is produced corresponding motion;
Programme recommending module, for the project demand data and the specialized engineering planning side that are input into by default algorithm The matching degree of the supplemental characteristic in case model database is calculated, if matching degree is higher than 70%, is recommended;
Project performance confirms module, and the transmission that project performance inquires short message is carried out to project administrator for timing, The process of project so as to confirm;
Holographic projection system, including air screen generation system, some groups of 3D projecting apparatus and materials database, for according to center The control command that processor sends calls corresponding data to set up various project BUILDINGS MODELSs from materials database;
Project finance management module, the management for carrying out project finance;
General management of projects assessment of scenario module, for by default algorithm in project management process and project finance pipe The data actually occurred in reason module carry out comprehensive assessment, and export assessment result;
Central processing unit, for receiving the data stored the need for man-machine operation module is input into, and is stored in database;For Receive the control command of man-machine operation module input and the module specified is sent to by default authority;It is additionally operable to the note of user Volume, the management of authority and the modification of password;Association's above-mentioned module of bar is additionally operable to be operated.
2. a kind of project management system according to claim 1, it is characterised in that also including simulating analysis and algorithm Database, for storing various simulating analysis and simulation analysis algorithm, the simulating analysis and algorithm data-base connect A update module is connected to, for updating the data in simulating analysis and algorithm data-base.
3. a kind of project management system according to claim 1, it is characterised in that the finicial administration of enterprise module includes
Human-machine operation module, in user's registration, generating the biological characteristic model of correspondence user's registration identity, and will The biological characteristic model is saved in user registry database;It is additionally operable to be input into various relevant cost data, and will be input into Related data is sent to data processing module;For being input into certificate data;It is additionally operable to be input into control command;
Authentication module, certificate data and the data in user registry database for that will receive carry out similarity During contrast completes authentication, and the certificate data being verified that will receive and the result of authentication are sent to Central processor;
Module is planned in cost management, for determining current year project budget situation;
Material cost computing module, the price number for gathering related material in major shopping network base stations by reptile module According to, and the calculating of product cost is carried out according to the material composition data and sized data for being received, and result of calculation is sent Shown to display screen;
Budget estimate making module, for according to the current year project budget situation, establishment to determine that current year project complete cost is pre- Calculate;
Module is formulated in cost budgeting, for according to the determination current year project complete cost budget generation current year project budget Information;
Actual cost adjusts module, for the relevant financial data in project management process, human-machine operation module being input into Make a report on, examine, collecting generation actual cost value;
Analysis contrast module, for contrasting default internal control index and actual cost value, output-index completeness, and will be right Financial decision module and Risk-warning evaluation module are sent to than result;
Risk-warning evaluation module, for receiving the result after analysis contrast module analysis, completes risk assessment, and assessment is tied Fruit is sent to display screen and is shown;
Financial decision module, for the result after the analysis for receiving analysis contrast module, expert is provided for the result after analysis Decision-making;
Financial management central processing unit, is operated for coordinating above-mentioned module;Enter line number for the result according to authentication According to the setting of storehouse authority, so as to the data call order according to input and data base authority carry out calling for related data, and will The data is activation called is to display screen.
4. a kind of project management system according to claim 3, it is characterised in that the biological characteristic model is quiet using the palm Arteries and veins data, after vena metacarpea data are scanned by infrared vena metacarpea scanning recognition device.Imaging input, the programme is pushed away Module is recommended mutually to be recommended by short message editing sending module or mail editor's sending module.
5. a kind of project management system according to claim 3, it is characterised in that the actual cost adjusts module bag Include:
Current year project cost control module, for controlling current year project funds to pay according to plan;Expenditure control including cost Variation control two parts of system and cost;The pay-off control of cost refers to according to budget application cost, control cost payout;Cost Variation control includes the change of cost amount and the change of cost time of origin;The change of cost amount refers to due to current year project The scope or content change of activity, and change the amount or original current year project activity of cost budgeting according to actual conditions needs Change budget;The change of cost time of origin refers to the expenditure time of current year project funds than original time advance or delays;
Final accounts module, the situation for being paid according to plan for the control current year project funds generates current year project final accounting Report.
6. a kind of project management system according to claim 1, it is characterised in that also include
Graphic plotting module, the data for being input into according to human-machine operation module draw various curve maps;
Comparative analysis module, will draw curve and is analyzed and predicts with standard curve, and output analysis predicts the outcome;
Computing module is returned, for carrying out recurrence calculating to the curve drawn by different functions.
7. a kind of project management system according to claim 1, it is characterised in that the human-machine operation module includes word Input module, voice input module and picture input module.
8. a kind of project management system according to claim 7, it is characterised in that the word input module uses key Disk, the voice input module uses microphone.The picture input module imports the pattern of upload and passes through using picture Arq mode on camera collection picture.
CN201710095246.5A 2017-02-16 2017-02-16 A kind of project management system Pending CN106897861A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710095246.5A CN106897861A (en) 2017-02-16 2017-02-16 A kind of project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710095246.5A CN106897861A (en) 2017-02-16 2017-02-16 A kind of project management system

Publications (1)

Publication Number Publication Date
CN106897861A true CN106897861A (en) 2017-06-27

Family

ID=59185358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710095246.5A Pending CN106897861A (en) 2017-02-16 2017-02-16 A kind of project management system

Country Status (1)

Country Link
CN (1) CN106897861A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107403277A (en) * 2017-08-02 2017-11-28 合肥哲诚项目管理有限公司 A kind of construction project construction project time management method and its management system
CN107451797A (en) * 2017-08-16 2017-12-08 上海荷福人工智能科技(集团)有限公司 Based on the labor service big data management system and application method for referring to hand vein recognition
CN108038777A (en) * 2018-01-09 2018-05-15 江西财经职业学院 A kind of accounting system
CN108090655A (en) * 2017-12-01 2018-05-29 杰克缝纫机股份有限公司 For smart allocation process method, module and the system of garment production
CN108345995A (en) * 2018-02-06 2018-07-31 西安航空职业技术学院 A kind of enterprises economic management cost control system
CN108898358A (en) * 2018-06-20 2018-11-27 广州晖恒广告策划有限公司 A kind of management system of landscape design project
CN109299917A (en) * 2018-09-26 2019-02-01 李德柱 A kind of business economic management cost control system
CN110070305A (en) * 2019-05-05 2019-07-30 中国人民解放军国防科技大学 A kind of Bi-objective robust resource allocation methods under resource transfers visual angle
CN110223028A (en) * 2019-04-23 2019-09-10 浙江交工集团股份有限公司 A kind of efficient method and its system for formulating building engineering construction scheme

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105225051A (en) * 2015-10-12 2016-01-06 镇江市杰诺软件有限公司 Project management system
CN105335820A (en) * 2015-10-16 2016-02-17 新乡学院 Economic management system
CN105825331A (en) * 2016-03-08 2016-08-03 河南理工大学 Management system for different projects of civil construction
CN105931093A (en) * 2016-03-26 2016-09-07 景德镇陶瓷学院 Product design internet platform
CN105975826A (en) * 2016-04-20 2016-09-28 中国石油大学(华东) Enterprise economic management information security system
CN106205061A (en) * 2016-08-31 2016-12-07 西安科技大学 A kind of geological hazards prediction system
CN106203940A (en) * 2016-06-17 2016-12-07 乐山师范学院 Business administration overall evaluation system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105225051A (en) * 2015-10-12 2016-01-06 镇江市杰诺软件有限公司 Project management system
CN105335820A (en) * 2015-10-16 2016-02-17 新乡学院 Economic management system
CN105825331A (en) * 2016-03-08 2016-08-03 河南理工大学 Management system for different projects of civil construction
CN105931093A (en) * 2016-03-26 2016-09-07 景德镇陶瓷学院 Product design internet platform
CN105975826A (en) * 2016-04-20 2016-09-28 中国石油大学(华东) Enterprise economic management information security system
CN106203940A (en) * 2016-06-17 2016-12-07 乐山师范学院 Business administration overall evaluation system
CN106205061A (en) * 2016-08-31 2016-12-07 西安科技大学 A kind of geological hazards prediction system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107403277A (en) * 2017-08-02 2017-11-28 合肥哲诚项目管理有限公司 A kind of construction project construction project time management method and its management system
CN107451797A (en) * 2017-08-16 2017-12-08 上海荷福人工智能科技(集团)有限公司 Based on the labor service big data management system and application method for referring to hand vein recognition
CN108090655A (en) * 2017-12-01 2018-05-29 杰克缝纫机股份有限公司 For smart allocation process method, module and the system of garment production
CN108038777A (en) * 2018-01-09 2018-05-15 江西财经职业学院 A kind of accounting system
CN108345995A (en) * 2018-02-06 2018-07-31 西安航空职业技术学院 A kind of enterprises economic management cost control system
CN108898358A (en) * 2018-06-20 2018-11-27 广州晖恒广告策划有限公司 A kind of management system of landscape design project
CN109299917A (en) * 2018-09-26 2019-02-01 李德柱 A kind of business economic management cost control system
CN110223028A (en) * 2019-04-23 2019-09-10 浙江交工集团股份有限公司 A kind of efficient method and its system for formulating building engineering construction scheme
CN110070305A (en) * 2019-05-05 2019-07-30 中国人民解放军国防科技大学 A kind of Bi-objective robust resource allocation methods under resource transfers visual angle

Similar Documents

Publication Publication Date Title
CN106897861A (en) A kind of project management system
CN106203940A (en) Business administration overall evaluation system
CN106096905A (en) A kind of project management method and system
CN105590055A (en) Method and apparatus for identifying trustworthy user behavior in network interaction system
US20030177060A1 (en) System and method for return on investment
CN106570624A (en) Economy management system
CN108537481A (en) A kind of intelligent warehousing system and storage method based on cloud service
Litvinchev et al. Large-scale public R&D portfolio selection by maximizing a biobjective impact measure
CN103226743A (en) TRL-based technical maturity assessment information processing method for aeronautic equipment
CN106096915A (en) A kind of engineering project data handling system
CN106886885A (en) A kind of Enterprise Comprehensive Management System
CN109376909A (en) A kind of agricultural product monitoring and warning model system
CN108021934A (en) The method and device of more key element identifications
Karokola et al. Secure e-government services: Towards a framework for integrating it security services into e-government maturity models
Bolsunovskaya et al. The development and application of non-standard approach to the management of a pilot project
CN108345995A (en) A kind of enterprises economic management cost control system
Digman et al. A framework for evaluating network planning and control techniques
CN107403308B (en) Data management method, system, computer readable storage medium and computer device
CN109491642A (en) A kind of Requirements Modeling system and method based on scene, information data processing terminal
CN109816509A (en) Generation method, terminal device and the medium of scorecard model
CN107862450A (en) Performance appraisal system and method
US20170249568A1 (en) Modeling, simulation, and predictive analysis
Waszkowski et al. Corporate efficiency improvement with business process automation
US20210097495A1 (en) Method and system for assessment and negotiation of compensation
Hou et al. Enhance the Simulation of Architecture and Engineering Design Process: A Data-Driven Based Approach

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627