CN113947337B - Method for cooperatively sharing engineering construction resources - Google Patents

Method for cooperatively sharing engineering construction resources Download PDF

Info

Publication number
CN113947337B
CN113947337B CN202111559074.5A CN202111559074A CN113947337B CN 113947337 B CN113947337 B CN 113947337B CN 202111559074 A CN202111559074 A CN 202111559074A CN 113947337 B CN113947337 B CN 113947337B
Authority
CN
China
Prior art keywords
construction
city
level
project
establishing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111559074.5A
Other languages
Chinese (zh)
Other versions
CN113947337A (en
Inventor
区奕宁
连作雄
区旸
陈孚
洪练灼
刘艺彬
张诗友
姚伟良
李宗蔚
刘洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ComService Construction Co Ltd
Original Assignee
China ComService Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ComService Construction Co Ltd filed Critical China ComService Construction Co Ltd
Priority to CN202111559074.5A priority Critical patent/CN113947337B/en
Publication of CN113947337A publication Critical patent/CN113947337A/en
Application granted granted Critical
Publication of CN113947337B publication Critical patent/CN113947337B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/08Auctions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method for collaborative sharing of engineering construction resources, belonging to the technical field of building construction resource sharing, and the specific method comprises the following steps: the method comprises the following steps: dividing city grades, including a first-level city, a second-level city and a third-level city, integrating construction resources of the first-level city, establishing a shared database, stamping a time stamp and a position stamp on the integrated construction resources, and sending the integrated construction resources to the shared database for storage; step two: establishing a quick communication channel between a second-level city construction project and a second-level storage unit in a shared database; step three: establishing an external data uploading module of a third-level city, wherein the uploading module is used for uploading the working information of a company related to construction in the corresponding third-level city; step four: and arranging a bidding unit in the shared database, collecting construction bidding data in the first-level city, the second-level city and the third-level city in real time, screening the collected construction bidding data, and storing the screened construction bidding data into the bidding unit.

Description

Method for cooperatively sharing engineering construction resources
Technical Field
The invention belongs to the technical field of building construction resource sharing, and particularly relates to a method for cooperatively sharing engineering construction resources.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and can also be said to be the process of changing various lines on the design drawing into a real object in a designated place; construction such as building construction, road construction, bridge construction, tunnel construction and the like requires a large amount of information integration and construction management from the beginning of bidding to the following completion delivery; especially for a large construction enterprise, a plurality of construction project parts are administered, each project part knows own construction resource information, such as how the construction team is powerful and what the material purchasing channel is, but each project part is isolated mutually, the construction resources are not public and transparent enough, support and help cannot be provided for the next project part in the same city, and the made mistakes are easily made; therefore, a method for collaborative sharing of engineering construction resources is needed to be provided at present, and the method is used for solving the problems that construction resources in enterprises are opaque and cannot be shared.
Disclosure of Invention
In order to solve the problems existing in the scheme, the invention provides a method for cooperatively sharing engineering construction resources.
The purpose of the invention can be realized by the following technical scheme:
a method for collaborative sharing of engineering construction resources comprises the following steps:
the method comprises the following steps: dividing city grades, including a first-level city, a second-level city and a third-level city, integrating construction resources of the first-level city, establishing a shared database, stamping a time stamp and a position stamp on the integrated construction resources, and sending the integrated construction resources to the shared database for storage;
step two: establishing a quick communication channel between a second-level city construction project and a second-level storage unit in a shared database;
step three: establishing an external data uploading module of a third-level city, wherein the uploading module is used for uploading the working information of a construction company in the corresponding third-level city; when the third-level city is changed into a second-level city or a first-level city, stopping uploading new construction company working information, and registering that the company has the authority of uploading bidding data;
step four: setting a bidding unit in a shared database, collecting construction bidding data in a first-level city, a second-level city and a third-level city in real time, screening the collected construction bidding data, and storing the screened construction bidding data in the bidding unit;
step five: and establishing a sharing platform according to the sharing database, wherein an urban model is arranged in the sharing platform, and the sharing construction information is consulted through the urban model.
Further, the method for grading cities comprises the following steps:
acquiring a city distribution diagram, identifying city boundaries in the city distribution diagram, establishing a city region diagram according to the identified city boundaries, setting the region values of all cities in the city region diagram, identifying the region boundaries in the city region diagram, setting the boundary values corresponding to the region boundaries, and marking the set boundary values and the region values at corresponding positions in the city region diagram;
acquiring construction project data of a current company, accumulating current finished production values of construction projects of all companies in the same city to obtain an urban project production value, marking the urban project production value as Pi, marking the urban development degree as Li, removing dimensions of Li and Pi, taking the numerical value for calculation, and calculating according to a formula
Figure 997473DEST_PATH_IMAGE001
i, calculating the city radius, wherein c1 and c2 are both proportional coefficients and have the value range of 0<c1≤1,1<c2 is less than or equal to 2, area frames of all cities are established in the city zone map, and the area frames are merged according to the city radius to obtain a radiation area; and setting a judgment model, and analyzing the city region bitmap through the judgment model to obtain the city grade of each city.
Further, the method for setting the judgment model comprises the following steps:
the method comprises the steps of setting a city grade table, obtaining a mathematical statistic model, inputting the city grade table into the mathematical statistic model as a statistic interval, setting a data identification unit, integrating the data identification unit and the mathematical statistic model into a judgment model, identifying a radiation area and a city radius in the city zone bit map through the data identification unit when the city zone bit map needs to be analyzed, and matching the radiation area and the city radius with the statistic interval according to the identified radiation area and the city radius to obtain the city grade of a corresponding city.
Further, the method for integrating the construction resources of the first-level city comprises the following steps:
performing construction resource integration, wherein the integrated construction resources comprise construction team resources, material resources and audit resources, evaluating the built construction teams, and establishing an evaluation problem table, wherein the evaluation problem table comprises scores, construction team names, corresponding deduction problems and reuse cautionary matters;
and establishing a construction project material resource source table, wherein the construction project material resource source table comprises project comments, identifying the construction project category, adjusting the original plastering construction scheme when the construction project is the building construction direction, and updating a new process used in the construction process into the original plastering construction scheme.
Further, the working method of the uploading module comprises the following steps:
acquiring construction related companies in a current city which meet the construction requirements of enterprises, sending invitation information to the acquired construction related companies, and inviting the construction related companies to register the working information; auditing the uploaded practical information in real time, judging whether the uploaded practical information meets the construction requirements of enterprises or not, and sending the practical information meeting the construction requirements of the enterprises to a three-level storage unit for storage; marking the construction related companies which successfully upload the working information as registration companies; the registration company uploads construction bid and tender information known in the city according to the requirement, and rewards are provided for the corresponding registration company according to the benefit degree of the uploaded construction bid and tender information; and after the construction project is completed and delivered, disconnecting the quick communication channel between the second-level city construction project and the second-level storage unit in the shared database.
Further, the method for establishing the quick communication channel between the second-level city construction project and the second-level storage unit comprises the following steps:
acquiring the current construction progress of a second-level city construction project, establishing a second-level city construction cooperation list, sending the second-level city construction cooperation list to a second-level storage unit for storage, setting a communication unit of the second-level city construction project, and establishing a quick communication channel between the communication unit and the second-level storage unit; and when the internal or authorized external cooperation enterprises know the secondary city construction cooperation list and need to further know the cooperation units in the secondary city construction cooperation list, directly contacting the communication unit corresponding to the secondary city construction project through the established quick communication channel.
Further, the method for screening the collected construction bidding data comprises the following steps:
identifying construction bidding data uploaded by a registered company, and directly storing the construction bidding data uploaded by the registered company into a bidding unit; marking the rest construction bidding data as initial bidding data, establishing a deletion model, inputting the initial bidding data into the establishment of the deletion model to obtain screening labels, wherein the screening labels comprise 01 and 02, and when the screening label is 01, indicating normal bidding; when the screening label is 02, the corresponding bid is removed; and sending the initial bidding data with the filtering label of 01 to the bidding unit for storage.
Further, the method for setting the city model comprises the following steps:
acquiring all first-level cities, second-level cities and third-level cities, establishing a city grade name table, dividing storage nodes corresponding to the number of the cities in a shared database, arranging retrieval units in the storage nodes, performing data retrieval through the retrieval units, and moving the data of the corresponding cities to the corresponding storage nodes; and establishing a connecting channel between the city in the city grade name table and the corresponding storage node.
Furthermore, the sharing platform is provided with a payment module, and the payment module is used for paying the reward;
the payment module comprises a conventional payment unit and a labor service payment unit, the conventional payment unit is used for directly distributing rewards to corresponding collaborators, the labor service payment unit is used for establishing a direct payment channel with each worker in a construction team and directly distributing the reward of the worker to the worker, and the specific method comprises the following steps:
when a worker enters a field, the personal payment account of the worker is handled, a wage channel between a project account and the personal payment account of the worker is established, the corresponding construction unit verifies the wage of the worker in the current month, a wage table is established and sent to a project finance department for verification, the wage is distributed to the worker according to the verified wage table, and the wage is deducted from the project money of the corresponding construction unit.
Compared with the prior art, the invention has the beneficial effects that: the admission of relevant personnel (including various part-time personnel, construction teams and the like) of the external cooperative engineering service is realized, the transparent sharing and unified management of the existing external engineering resources of a company in the whole company range are ensured, more social cooperative resources are absorbed, and better engineering service delivery is provided for clients; after the sharing platform is further matured, the sharing platform can be developed into a sharing platform facing the whole social external engineering service resources, and the integration capability of the whole company on the social resources is changed.
By dividing the city grade, the construction resources of which cities are integrated by an enterprise at present and which are being integrated can be intuitively known, and when the integrated construction resources are enough, an external channel can be opened to provide construction resource service for other enterprises; by updating the original plastering construction scheme, the direction can be provided for subsequent projects, large-area hollowing is prevented, and large-area reworking is avoided; by establishing the rapid communication channel, the experience of the existing second-level city construction project in progress can be fully utilized, and the construction efficiency of the construction project in the current city is improved; by arranging the registration company in the third-level city, a foundation is laid for the entry of enterprises in the future, and meanwhile, the resources of the registration company can be fully utilized to bid and attract projects, so that the maximum utilization of the resources is realized; by screening the collected construction bidding data, the probability of the accompanied bidding is reduced, and the energy waste is avoided; by establishing the city model, shared construction information is convenient to look up; by arranging the labor payment unit, the phenomenon of defaulting the wages of workers is avoided.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a flow chart of the method of the present invention.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, a method for collaborative sharing of engineering construction resources specifically includes:
the method comprises the following steps: dividing city grades, including a first-level city, a second-level city and a third-level city, integrating construction resources of the first-level city, and establishing a shared database, wherein the shared database comprises a first-level storage unit, a second-level storage unit and a third-level storage unit, and the first-level storage unit, the second-level storage unit and the third-level storage unit are respectively used for storing data corresponding to the first-level city, the second-level city and the third-level city; the integrated construction resources are printed with time stamps and position stamps and then sent to a shared database for storage;
the method for classifying the city comprises the following steps:
acquiring a city distribution diagram, identifying city boundaries in the city distribution diagram, establishing a city region diagram according to the identified city boundaries, wherein the city region diagram is a diagram comprising the city boundaries and corresponding city names, setting the region values of all cities in the city region diagram, setting the city region values by an expert group according to the development level of the current city, identifying the region boundaries in the city region diagram, wherein the region boundaries refer to administrative region boundaries, such as city level boundaries, provincial level boundaries and the like, setting the boundary values of the corresponding region boundaries, and marking the set boundary values and the region values at the corresponding positions in the city region diagram;
acquiring construction project data of a current company, wherein the construction project data comprises data such as project positions, project current finished output values, development degrees of current cities and the like, the development degrees of the current cities are set by corresponding project responsible persons, and the development degrees set by a plurality of projects in the same city are the same; accumulating the current finished production values of all company construction projects of the same city to obtain a city project production value, marking the city project production value as Pi, wherein i represents a city in a city region diagram, i =1, 2, … … and n is a positive integer; marking the city development degree as Li, removing dimensions of Li and Pi, taking the numerical value thereof for calculation, and calculating according to a formula
Figure 313441DEST_PATH_IMAGE001
i, calculating the city radius, wherein c1 and c2 are both proportional coefficients and have the value range of 0<c1≤1,1<c2 is less than or equal to 2, area frames of all cities are established in the city zone map, namely the area frames established by taking the boundary of all cities in the city zone map as the boundary, and the area frames are merged according to the radius of the cities to obtain a radiation area; and setting a judgment model, and analyzing the city region bitmap through the judgment model to obtain the city grade of each city.
The method for combining the region frames comprises the following steps:
identifying the city radius and the location value of the current city, subtracting the location value from the city radius of the current city to obtain the radiation value of the current city, and identifying the city radius and the location value of the adjacent city of the current city;
when the radiation value of the current city is not less than the area value of the adjacent city, combining the area frames of the current city with the area frames of the adjacent cities, and when an area boundary exists between the two adjacent cities, combining the area frames only when the radiation value is not less than the sum of the area value and the boundary value of the adjacent cities; until all the region frames are combined; marking the combined area frame as a radiation area; when the radiation value of the current city is smaller than the district value of the adjacent city, no operation is performed.
The method for setting the judgment model comprises the following steps:
the method comprises the steps of setting a city grade table, obtaining a mathematical statistic model, wherein the mathematical statistic model is used for counting the interval in which data is located, the mathematical statistic model is the existing data statistic model, the city grade table is input into the mathematical statistic model to serve as a statistic interval, a data identification unit is arranged and used for identifying the data in a graph, the existing data identification algorithm or model can be used, the data identification unit and the mathematical statistic model are integrated into a judgment model, when the city region graph needs to be analyzed, a radiation area and a city radius in the city region graph are identified through the data identification unit, the radiation area and the city radius are matched with the statistic interval according to the identified radiation area and the city radius, and the city grade corresponding to a city is obtained.
The city grade table is set by an expert group and mainly comprises city grades to which corresponding city radiuses in the radiation area belong and city grades to which corresponding city radiuses not in the radiation area belong; for example, the radius R of a city in the radiation area is larger than a threshold value X1, namely a first-class city, a city corresponding to the threshold value X1, R >0 is a second-class city, and a city corresponding to the threshold value R =0 is a third-class city; the R > threshold X2 outside the radiating area is a second-level city, and the rest are third-level cities.
The method for integrating the construction resources of the first-level city comprises the following steps:
the construction resources are integrated, the integrated construction resources comprise construction team resources, material resources and audit resources, the audit resources are information of relevant detection and audit departments, the audit resources are integrated by project responsible persons, the built construction teams are evaluated, an evaluation problem table is established, the evaluation problem table comprises scores, construction team names, corresponding deduction problems and reuse notices, the deduction problems are problems which are not good in the construction process of the construction team, and the reuse notices are notices and processing methods when the construction team is reused; by making an evaluation problem table by the project, the performance of a construction team in the construction project can be more truly commented, and a deduction problem and a reuse notice are set, so that a management direction is provided and the management efficiency is improved when the construction team needs to be reused in the future, and because of some reasons, when the construction team needs to be reused in the city, great help can be provided for the next project of an enterprise;
establishing a construction project material resource source table, wherein the material resource source table comprises information such as material types, prices, purchasing channels, contacts, project comments, selling places and the like, the information comprises the project comments, the project comments are comments of materials used or investigated by the construction project department, and the cost management of the next enterprise construction project can be well facilitated through the existing project comments; the construction project category is identified, namely which category belongs to the building direction, the road and bridge direction, the tunnel direction and the like, when the construction project is the building direction, the original plastering construction scheme is adjusted, a new process used in the construction process is updated to the original plastering construction scheme, if no new plastering process is available, the new process is not updated, because the plastering process is extremely important for the building project, the structural engineering of a house basically has no problem, plastering in a room is a key concern object in the house handing process for owners, because river sand is forbidden to be mined at present, sand used for plastering is changed, if commodity mortar or sand used in cities is not known enough, direct plastering is directly carried out according to the original plastering process, a large-area empty drum is likely to be generated, the reworking is carried out, so that great cost waste is caused; because the problems are real cases, if the mortar or sand used in the current city is known to have problems when a construction scheme is compiled, measures such as mesh cloth can be added in the plastering process, and large-area hollowing is effectively prevented.
Step two: establishing a quick communication channel between a second-level city construction project and a second-level storage unit in a shared database; and after the construction project is completed and delivered, disconnecting a quick communication channel between the second-level city construction project and a second-level storage unit in the shared database;
acquiring the current construction progress of a second-level city construction project, and establishing a second-level city construction cooperation list, wherein the second-level city construction cooperation list comprises names of cooperative units such as construction teams and material parties signed up contracts in the current construction progress; sending the second-level city construction cooperation name list to a second-level storage unit for storage, and setting a communication unit of a second-level city construction project, wherein the communication unit is arranged in the second-level city construction project department and is operated by a manager in the construction project department to establish a quick communication channel between the communication unit and the second-level storage unit; when an enterprise inside or an authorized external cooperative enterprise knows a secondary city construction cooperative list and needs to further know cooperative units in the secondary city construction cooperative list, the enterprise directly contacts a communication unit corresponding to a secondary city construction project through an established quick communication channel, and a manager in the secondary city construction project replies according to the knowledge of the corresponding cooperative units in the current construction process; by establishing the quick communication channel, the experience of the existing ongoing second-level city construction project can be fully utilized, and the construction efficiency of the construction project which is expected to be carried out in the current city is improved.
Step three: the method comprises the steps that an external data uploading module of a third-level city is established, the uploading module is used for uploading working information of a company related to construction in the corresponding third-level city, the working information comprises qualification, company types and project experiences, the company related to construction can be abbreviated as a construction company, the company types refer to construction related work of which aspects the company is engaged in, such as material suppliers, civil engineering construction teams, pile foundation construction teams and the like, and the project experiences are construction projects which are involved in the construction; when the third-level city is changed into a second-level city or a first-level city, uploading of new construction-related company working information is stopped, but the registered company can still upload bidding data; the bidding data or construction bidding data is common knowledge in the art, and therefore the specific data type is not described in the present application;
the working method of the uploading module comprises the following steps:
acquiring construction related companies in a current city which meet the construction requirements of enterprises, wherein the construction requirements of the enterprises are set by the enterprises according to the requirements of construction cooperative companies, mainly comprise types, scales and the like, and sending invitation information to the acquired construction related companies to invite the construction related companies to register the working information; the uploaded working information is audited in real time, whether the uploaded working information meets the construction requirements of enterprises is judged, and because the uploaded working information not only has construction related companies which are invited, but also has working information uploaded by other companies, and can be distinguished by companies which forge qualification, the working information can be audited through the existing auditing method, for example, auditing is carried out based on a CNN network or a DNN network; transmitting the working information meeting the construction requirements of the enterprise to a third-level storage unit for storage; marking the construction related companies which successfully upload the working information as registration companies; the registration company can upload construction bid information known in the city, and provide rewards, such as cash rewards and rewards for using the corresponding registration company after successful project bid, for the corresponding registration company according to the benefit degree of the uploaded construction bid information; because some construction bid items are brought under the local registration company, the probability of winning a bid can be increased because the registration company needs to be provided with a corresponding reward by introduction and help from the registration company.
Step four: setting a bidding unit in a shared database, wherein the bidding unit is used for storing bidding data, acquiring construction bidding data in a first-level city, a second-level city and a third-level city in real time, screening the acquired construction bidding data, and storing the screened construction bidding data into the bidding unit;
the method for screening the collected construction bidding data comprises the following steps:
identifying construction bidding data uploaded by a registered company, and directly storing the construction bidding data uploaded by the registered company into a bidding unit; marking the rest construction bidding data as initial bidding data, establishing a deletion model, wherein the deletion model is established based on a CNN network or a DNN network, and is trained and established by acquiring a large amount of bidding data and screening labels correspondingly set as training sets, and the screening labels can be set through historical bidding data; inputting initial bidding data into a deletion model to obtain screening labels, wherein the screening labels comprise 01 and 02, and when the screening labels are 01, normal bidding is represented; when the screening label is 02, the corresponding bid is removed; sending the initial bidding data with the screening label of 01 to a bidding unit for storage; through the construction bid data to gathering screening, reduce the probability of accompanying the tender, avoid extravagant energy.
Step five: establishing a sharing platform according to the sharing database, namely moving the sharing database and the modules in the first to fourth steps into the sharing platform; an urban model is arranged in the sharing platform, and shared construction information is consulted through the urban model;
the method for setting the city model comprises the following steps:
acquiring all first-level cities, second-level cities and third-level cities, and establishing a city grade name table, namely that the cities of the same grade are in the same column; dividing storage nodes corresponding to the number of cities in a shared database, wherein the storage nodes are internally provided with retrieval units, and performing data retrieval through the retrieval units, wherein the specific retrieval mode can use the existing retrieval method; moving the data of the corresponding city to the corresponding storage node; and establishing a connecting channel between the city in the city grade name table and the corresponding storage node, and directly jumping to the corresponding storage node when clicking the city in the grade name table.
The sharing platform is provided with a payment module, and payment is carried out through the payment module;
the payment module comprises a conventional payment unit and a labor service payment unit, wherein the conventional payment unit is used for directly issuing the payment to corresponding collaborators, such as expert judges, material suppliers and the like, and the payment is not basically carried out by the conventional payment unit belonging to the labor service payment unit;
for example: and (3) meeting the requirements of external experts, inviting the external experts to provide XX project solution compiling service by the enterprise, and paying the agreed labor service reward to the experts by the enterprise through a conventional payment unit after the service is completed.
Because the debt of the agricultural and civil wages is not only the responsibility of the general contractor of the construction at present, but a large part of the reason is that the general contractor directly issues the engineering money to the subcontracting unit according to the contract proportion and the construction progress, and the subcontracting unit does not issue the wages to the workers, so that the wage debt is caused, the trouble is caused, the construction progress is greatly influenced, and in order to solve the problem, the wages are preferably directly issued to the workers.
The labor payment unit is used for establishing a direct payment channel with each worker in a construction team and directly distributing worker rewards to the workers, and the specific method comprises the following steps:
when a worker enters a field, the field is that the worker works on a construction site for the first time, which is equivalent to a new worker on the construction site, transacting a personal payment account of the worker, and establishing a wage channel between a project account and the personal payment account of the worker, wherein the project account can be a project department account or other accounts; and checking the payroll of the worker in the current month by the corresponding construction unit, establishing a payroll table, sending the payroll table to a project financial department for checking, issuing the payroll to the worker according to the checked payroll table, and deducting the payroll from the project money of the corresponding construction unit.
Illustratively, the construction team needs to be docked, a business accepts an XX project in a certain place, finds out construction teams with local implementation capacity through a sharing platform, achieves cooperative intention on the sharing platform, and pays a labor service reward through a payment module after the project is delivered.
The construction resources of the target area can be retrieved through the shared platform; experts, constructors or construction teams can be intelligently recommended according to project conditions.
Although the present invention has been described in detail with reference to the preferred embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the spirit and scope of the present invention.

Claims (7)

1. A method for collaborative sharing of engineering construction resources is characterized by comprising the following steps:
the method comprises the following steps: dividing city grades, including a first-level city, a second-level city and a third-level city, integrating construction resources of the first-level city, establishing a shared database, stamping a time stamp and a position stamp on the integrated construction resources, and sending the integrated construction resources to the shared database for storage;
step two: establishing a quick communication channel between a second-level city construction project and a second-level storage unit in a shared database;
step three: establishing an external data uploading module of a third-level city, wherein the uploading module is used for uploading the working information of a construction company in the corresponding third-level city; when the third-level city is changed into a second-level city or a first-level city, stopping uploading new construction company working information, and registering that the company has the authority of uploading bidding data;
step four: setting a bidding unit in a shared database, collecting construction bidding data in a first-level city, a second-level city and a third-level city in real time, screening the collected construction bidding data, and storing the screened construction bidding data in the bidding unit;
step five: establishing a sharing platform according to a sharing database, wherein an urban model is arranged in the sharing platform, and shared construction information is consulted through the urban model;
the method for classifying the city comprises the following steps:
acquiring a city distribution diagram, identifying city boundaries in the city distribution diagram, establishing a city region diagram according to the identified city boundaries, setting the region values of all cities in the city region diagram, identifying the region boundaries in the city region diagram, setting the boundary values corresponding to the region boundaries, and marking the set boundary values and the region values at corresponding positions in the city region diagram;
acquiring construction project data of a current company, accumulating current finished production values of construction projects of all companies in the same city to obtain an urban project production value, marking the urban project production value as Pi, marking the urban development degree as Li, removing dimensions of Li and Pi, taking the numerical value for calculation, and calculating according to a formula
Figure DEST_PATH_IMAGE002
i, calculating the city radius, wherein c1 and c2 are both proportional coefficients and have the value range of 0<c1≤1,1<c2 is less than or equal to 2, area frames of all cities are established in the city zone map, and the area frames are merged according to the city radius to obtain a radiation area; setting a judgment model, and analyzing the city region bitmap through the judgment model to obtain the city grade of each city;
the method for setting the judgment model comprises the following steps:
the method comprises the steps of setting a city grade table, obtaining a mathematical statistic model, inputting the city grade table into the mathematical statistic model as a statistic interval, setting a data identification unit, integrating the data identification unit and the mathematical statistic model into a judgment model, identifying a radiation area and a city radius in the city zone bit map through the data identification unit when the city zone bit map needs to be analyzed, and matching the radiation area and the city radius with the statistic interval according to the identified radiation area and the city radius to obtain the city grade of a corresponding city.
2. The method for collaborative sharing of engineering construction resources according to claim 1, wherein the method for integrating construction resources of a first-class city comprises:
performing construction resource integration, wherein the integrated construction resources comprise construction team resources, material resources and audit resources, evaluating the built construction teams, and establishing an evaluation problem table, wherein the evaluation problem table comprises scores, construction team names, corresponding deduction problems and reuse cautionary matters;
and establishing a construction project material resource source table, wherein the construction project material resource source table comprises project comments, identifying the construction project category, adjusting the original plastering construction scheme when the construction project is the building construction direction, and updating a new process used in the construction process into the original plastering construction scheme.
3. The method for collaborative sharing of engineering construction resources according to claim 1, wherein the working method of the uploading module comprises:
acquiring construction related companies in a current city which meet the construction requirements of enterprises, sending invitation information to the acquired construction related companies, and inviting the construction related companies to register the working information; auditing the uploaded practical information in real time, judging whether the uploaded practical information meets the construction requirements of enterprises or not, and sending the practical information meeting the construction requirements of the enterprises to a three-level storage unit for storage; marking the construction related companies which successfully upload the working information as registration companies; the registration company uploads construction bid and tender information known in the city according to the requirement, and rewards are provided for the corresponding registration company according to the benefit degree of the uploaded construction bid and tender information; and after the construction project is completed and delivered, disconnecting the quick communication channel between the second-level city construction project and the second-level storage unit in the shared database.
4. The method as claimed in claim 1, wherein the method for establishing the fast communication channel between the second-level city construction project and the second-level storage unit comprises:
acquiring the current construction progress of a second-level city construction project, establishing a second-level city construction cooperation list, sending the second-level city construction cooperation list to a second-level storage unit for storage, setting a communication unit of the second-level city construction project, and establishing a quick communication channel between the communication unit and the second-level storage unit; and when the internal or authorized external cooperation enterprises know the secondary city construction cooperation list and need to further know the cooperation units in the secondary city construction cooperation list, directly contacting the communication unit corresponding to the secondary city construction project through the established quick communication channel.
5. The method for collaborative sharing of engineering construction resources according to claim 1, wherein the method for screening the collected construction bidding data comprises:
identifying construction bidding data uploaded by a registered company, and directly storing the construction bidding data uploaded by the registered company into a bidding unit; marking the rest construction bidding data as initial bidding data, establishing a deletion model, inputting the initial bidding data into the establishment of the deletion model to obtain screening labels, wherein the screening labels comprise 01 and 02, and when the screening label is 01, indicating normal bidding; when the screening label is 02, the corresponding bid is removed; and sending the initial bidding data with the filtering label of 01 to the bidding unit for storage.
6. The method for collaborative sharing of engineering construction resources according to claim 1, wherein the method for setting up the city model comprises:
acquiring all first-level cities, second-level cities and third-level cities, establishing a city grade name table, dividing storage nodes corresponding to the number of the cities in a shared database, arranging retrieval units in the storage nodes, performing data retrieval through the retrieval units, and moving the data of the corresponding cities to the corresponding storage nodes; and establishing a connecting channel between the city in the city grade name table and the corresponding storage node.
7. The method for collaborative sharing of engineering construction resources according to claim 1, wherein the sharing platform is provided with a payment module, and the payment module is used for payment of consideration;
the payment module comprises a conventional payment unit and a labor service payment unit, the conventional payment unit is used for directly distributing rewards to corresponding collaborators, the labor service payment unit is used for establishing a direct payment channel with each worker in a construction team and directly distributing the reward of the worker to the worker, and the specific method comprises the following steps:
when a worker enters a field, the personal payment account of the worker is handled, a wage channel between a project account and the personal payment account of the worker is established, the corresponding construction unit verifies the wage of the worker in the current month, a wage table is established and sent to a project finance department for verification, the wage is distributed to the worker according to the verified wage table, and the wage is deducted from the project money of the corresponding construction unit.
CN202111559074.5A 2021-12-20 2021-12-20 Method for cooperatively sharing engineering construction resources Active CN113947337B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111559074.5A CN113947337B (en) 2021-12-20 2021-12-20 Method for cooperatively sharing engineering construction resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111559074.5A CN113947337B (en) 2021-12-20 2021-12-20 Method for cooperatively sharing engineering construction resources

Publications (2)

Publication Number Publication Date
CN113947337A CN113947337A (en) 2022-01-18
CN113947337B true CN113947337B (en) 2022-03-08

Family

ID=79339339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111559074.5A Active CN113947337B (en) 2021-12-20 2021-12-20 Method for cooperatively sharing engineering construction resources

Country Status (1)

Country Link
CN (1) CN113947337B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116384948B (en) * 2023-06-02 2023-08-25 北京拓普丰联信息科技股份有限公司 Method, device, equipment and medium for extracting location of mark information item
CN116485283B (en) * 2023-06-19 2023-09-26 鼎信数智技术集团股份有限公司 Digitalized management platform based on big data bid-inviting data

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110580266A (en) * 2019-09-23 2019-12-17 重庆渝高科技产业(集团)股份有限公司 large-scale project display method of urban project management platform
CN110930044A (en) * 2019-11-29 2020-03-27 伍知行 Construction organization resource rapid configuration method and system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101847111B1 (en) * 2016-11-29 2018-05-28 서울시립대학교 산학협력단 Management Apparatus and Management Method using BPS based E-Mmanual Module, and General Construction Project Management information System
CN109978409B (en) * 2019-04-10 2021-07-13 国网浙江省电力有限公司建设分公司 Multi-engineering enterprise-level intelligent construction site block chain management method
CN111144836A (en) * 2019-12-12 2020-05-12 中建八局第二建设有限公司 Smart building integrated collaborative big data platform
CN113434487B (en) * 2021-08-25 2022-09-02 北京能科瑞元数字技术有限公司 Data asset unified management system based on enterprise data

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110580266A (en) * 2019-09-23 2019-12-17 重庆渝高科技产业(集团)股份有限公司 large-scale project display method of urban project management platform
CN110930044A (en) * 2019-11-29 2020-03-27 伍知行 Construction organization resource rapid configuration method and system

Also Published As

Publication number Publication date
CN113947337A (en) 2022-01-18

Similar Documents

Publication Publication Date Title
CN113947337B (en) Method for cooperatively sharing engineering construction resources
Dey Integrated project evaluation and selection using multiple-attribute decision-making technique
CN203165006U (en) Engineering project management system
Cheng et al. Integrating data mining with KJ method to classify bridge construction defects
CN109376210A (en) A kind of intelligence pollution sources dynamic management system and method
CN107977789A (en) Based on the audit work method under big data information
CN113656505B (en) Digitization of distributed project management system and method for synchronizing data thereof
CN105005836A (en) Site integrated there-dimensional system and site integrated three-dimensional management platform
CN108846643A (en) A kind of general management of projects system
CN112991127A (en) Integrated information management platform for territorial resources and funds and management method thereof
Khodabakhshian et al. Residential real estate valuation framework based on life cycle cost by building information modeling
CN106056295A (en) Engineering management system
De Marco et al. Factors of schedule and cost performance of tunnel construction megaprojects
Curran-Groome et al. Assessing the full costs of floodplain buyouts
CN109858876A (en) A kind of auditing system for agent-construction organization
Yu et al. Risk evaluation of mega infrastructure construction supply chain in engineering-procurement-construction projects: an integrated fuzzy AHP and fuzzy DEMATEL approach
CN110298562A (en) A kind of distribution network construction audit grid-based management method
Nasir et al. Asset Management in Malaysia: Current Status
CN114781901A (en) Method for analyzing economic operation monitoring index
CN114693424A (en) Building industry asset big data collection and application
Younes A framework for invoice management in construction
Moorhouse Asset management of irrigation infrastructure–the approach of Goulburn-Murray Water, Australia
Popov et al. Audit as an element of public governance
CN104036368A (en) Method and device for asset collection
Nkosi et al. A Critical Analysis of the Integrated Industry Waste Tyre Management Plan of South Africa

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant