CN108805529A - A kind of construction management platform - Google Patents

A kind of construction management platform Download PDF

Info

Publication number
CN108805529A
CN108805529A CN201810539278.4A CN201810539278A CN108805529A CN 108805529 A CN108805529 A CN 108805529A CN 201810539278 A CN201810539278 A CN 201810539278A CN 108805529 A CN108805529 A CN 108805529A
Authority
CN
China
Prior art keywords
management
module
management module
project
contract
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810539278.4A
Other languages
Chinese (zh)
Other versions
CN108805529B (en
Inventor
陈丽君
陈丽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuze Run Sen (wuhan) Polytron Technologies Inc
Original Assignee
Fuze Run Sen (wuhan) Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuze Run Sen (wuhan) Polytron Technologies Inc filed Critical Fuze Run Sen (wuhan) Polytron Technologies Inc
Priority to CN201810539278.4A priority Critical patent/CN108805529B/en
Publication of CN108805529A publication Critical patent/CN108805529A/en
Application granted granted Critical
Publication of CN108805529B publication Critical patent/CN108805529B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The present invention proposes a kind of construction management platform, supplier management system, branch company's management system, office management system, resources of human talents management system, contract management system, engineering management project system, engineering financing management system and business management system, supplier management system including relevant connection are adopted for building trade material supplier for management platform;Branch company manages the full platform management of each branch company that system is used for characteristic;Operation management system system is used for the daily operation management of company;Resources of human talents manages management and evaluation system of the system for engineering talent;Contract management system is used for the management of all engineering contracts;Project management system is used for the Whole Course Management of each project;Engineering financing manages system integration project and manages system, realizes the integrated management of project finance project;Business management system is used for the management system of project operation form.The present invention, which solves the problem of that project management system has a single function in the prior art, can not be applicable in a large amount of engineering.

Description

A kind of construction management platform
Technical field
The present invention relates to a kind of construction management platforms.
Background technology
In today of system universalness, software becomes the important carrier of information exchange for engineering management, also at our days Often indispensable window in life.Currently, using cloud computing, big data, Internet of Things as the information technology of representative before institute The speed and scale that do not have penetrate into the various aspects of social life, and subtle the mode of thinking for influencing this people, row It is subversive to change original business operation model and Socialized Reading track for custom and value judgement.And in building trade, Software never lacks.All kinds of budget software, purchasing management software, financial management software, have all made place mat for the cost of engineering, But how to break the isolated island information between modules, and can be effectively combined, multifarious engineering management is taken, The single project overall process management and control of individual character;How on this platform, by company's whole building engineering management platform, by company With upstream and downstream, company and each branch company, company and each project management department, project management department and each supplier, company and each supply Quotient gets through business chain, runs through the entire engineering management ecosystem, is not also finding.
Exactly under this environment and background, according to project management experience combination actual conditions since 20 years, by being up to Thinking in 10 years is conceived, and construction industry construction management platform is established into continuous research and development in 8 years.It is intended to through long-term accumulation Experience, in this architectural control platform, by the management user data of dispersion, is built into while improving self-management maturity Originally, profit calculation/mode of doing business integrates, and improves the efficiency of each the group's business and management work of industrial chain, solves The certainly contradiction of management control and efficiency realizes operation one, global Internet of Things, intelligence supply, shared buying, it can enjoy flat Platform is brought convenient and practical.
Invention content
The present invention proposes a kind of construction management platform, solves that modules system is single, and system barrier can not unite One, isolated island information can not combine together and engineering management/project management mode is single, cannot be satisfied the actual implementation of project Function, the problem of project management system has a single function problem, can not be applicable in a large amount of engineering in the prior art.
The technical proposal of the invention is realized in this way:
A kind of construction management platform, including the supplier management system 1 of relevant connection, branch company's management system 2, fortune Seek management system 3, resources of human talents management system 4, contract management system 5, project management system 6, engineering financing management system System 7 and business management system 8, the supplier management system 1 are adopted for building trade material supplier for management platform;Institute State the full platform management of each branch company that branch company's management system 2 is used for characteristic;The operation management system 3 is used for the daily fortune of company Battalion's management;Management and evaluation system of the resources of human talents management system 4 for engineering talent;The contract management system 5 are used for the management of all engineering contracts;The project management system 6 is used for the Whole Course Management of each project;The work Journey financial management system 7 manages system for integration project, realizes the integrated management of project finance project;The service management System 8 is used for the management system of project operation form.
Preferably, the supplier management system 1 includes supplier management module 1.1, supplier products management module 1.2, supplier's quote module 1.3, the online product of supplier, which place an order, buys module 1.4, supplier's financial management module 1.5 and supplies Answer quotient's evaluation and integration module 1.6;
Branch company's management system 2 includes branch company's period of service and service charge management module 2.1, branch company's routine office work System 2.2, branch company's project management system 2.4, branch company's financial management system 2.5, is divided at branch company's contract management system 2.3 Company's Bidding Management System 2.6, branch company user and Rights Management System 2.7, branch company's supplier management module 2.8 and point public affairs Take charge of revenue control module;
The operation management system 3 include routine office work module 3.1, bidding management module 3.2, certificate management module 3.3, Budget management module 3.4 and work execute management module 3.5;
The resources of human talents management system 4 includes project Total Management Module 4.1, the long management module 4.2 of construction, project manager Management module 4.3, management through accounting module 4.4, site administrator's module 4.5 and documenter's module 4.6;
The contract management system 5 includes level-one contract management module 5.1, two level contract management module 5.2, three-level contract Management module 5.3, level-one complementary agreement management module 5.4, the sub- contract management module 5.5 of level-one, void contract management module 5.6, contract filing management module 5.7, contract analysis management module 5.8, contract statement management module 5.9, contract progress control Module 5.10;
The project management system 6 includes contract management module 6.1, single project management module 6.2, project progress Data supervision system 6.3, project cost analysis and management system 6.4 and engineering after-sale management system 6.5;The single project management Module 6.2 includes at least model of project management module 6.2.1, project management department configuration module 6.2.2, project management department's cost configuration module 6.2.3, estimated cost import modul 6.2.4, objective cost database management module 6.2.5, cost change module 6.2.6, project management department Cost library module 6.2.7, project three-level contract work management module 6.2.8, project three-level contract Financial project management module 6.2.9, progress management and control module 6.2.10, project workflow management module 6.2.11, actual cost database management module 6.2.12, cost Management module 6.2.13, final accounts module 6.2.14, visa menu manager module 6.2.15, expenses module 6.2.16, Gu Dongkai early period Formwork 6.2.17, project management department cost management module 6.2.18, fire-fighting put on record module 6.2.19, complementary agreement management module 6.2.20, sub- contract management module 6.2.21, material apply to purchase management module 6.2.22, material pays out management module 6.2.23 and matter Measure management module 6.2.24;The objective cost database management module 6.2.5 and actual cost database management module 6.2.12 include It is material cost management module 6.2.5.1, subitem branch management module 6.2.5.2, professional subpackage management module 6.2.5.3, artificial Management module 6.2.5.4 and project management department overall cost management module 6.2.5.5;The final accounts module 6.2.14 includes audited accounts Even if module 6.2.14.1 and internal module 6.2.14.2;
It includes contract financial data module 7.1, contract financial statement and analysis module 7.2, item that engineering financing, which manages system 7, Mesh cost analysis module 7.3, outer channel syndrome management module 7.4 are made out an invoice and returned money management module 7.5, tax management module 7.6, income Tax deduction module 7.7, service charge management module 7.8, guarantee fund's management module 7.9, cash flow management module 7.10, project management department borrow Branch management module 7.11, project management department's financial management module 7.12 and workflow management module 7.13;The tax management module 7.6 is at least Including the management module 7.6.1 that pays taxes, refund management module 7.6.2, output tax management module 7.6.3, input tax management module 7.6.4, refund module 7.6.5 and burden of taxation balance sheet module 7.6.6;The contract financial data module includes at least level-one contract Financial management module 7.1.1, two level contract financial management module 7.1.2, three-level contract financial management module 7.1.3, level-one are mended Fill contract financial management module 7.1.4, sub- contract financial management module 7.1.5;
The business management system 8 includes business model management module 8.1, the side's of affixing one's seal management module 8.2 and operation square tube Manage module 8.3.
Preferably, the model of project management module 6.2.1 provides two patterns and is independently selected for user, i.e.,:Individually Project management module 6.2 is divided for entry level and team's grade both of which operation.
Preferably, when the single project management module 6.2 is team's grade, 6.2.1 is according to one for model of project management module The personnel of configuration project management department of grade 5.1 allocation project project of contract management module and the cost of role, project configure, and lead to Estimated cost import modul 6.2.4 is crossed, according to default cost pool, objective cost database management module 6.2.5 is formed in conjunction with flow;
Objective cost database management module 6.2.5 is divided into material cost management module 6.2.5.1, subitem branch management mould simultaneously Block 6.2.5.2, professional subpackage management module 6.2.5.3, labor management module 6.2.5.4 and project management department's overall cost management module 6.2.5.5 each subitem is carried out that management is respectively configured;Project management department cost library module 6.2.7 is connected to project management department's overall cost pipe Manage module 6.2.5.5;The material cost management module 6.2.5.1 is connected to material and applies to purchase management module 6.2.22, while material Material applies to purchase management module 6.2.22 and is connected to actual cost database management module 6.2.12;The quality management module 6.2.24 connections Apply to purchase management module 6.2.22 to material;The labor management module 6.2.5.4 passes through three-level contract financial management module 7.1.3 It is connected to cost management module 6.2.13, project management department's overall cost management module 6.2.5.5 and is connected to cost management module 6.2.13, the three-level contract financial management module 7.1.3 connection three-level contract management modules 6.2.5.3;The material is applied to purchase Management module 6.2.22 is additionally coupled to professional subpackage management module 6.2.5.3;The material cost management module 6.2.5.1 is successively Interlocking item workflow management module 6.2.11, material pay out management module 6.2.23 and three-level contract financial management module 7.1.3;
The objective cost database management module 6.2.5 link costs change module 6.2.6, the cost change module 6.2.6 visa menu manager module 6.2.15 and audited accounts module 6.2.14.1 are sequentially connected;Level-one complementary agreement management module It 5.4 is separately connected cost management module 6.2.13, tax management module 7.6, makes out an invoice and returned money management module 7.5, level-one contract wealth Be engaged in management module 7.1.1 and audited accounts module 6.2.14.1;The level-one contract financial management module 7.1.1 connections audit is determined It calculates module 6.2.14.1, the audited accounts module 6.2.14.1 and is connected to management module after sale, management module after sale is connected to Engineering after-sale management system 6.5;The tax management module 7.6 is respectively connected to cost management module 6.2.13, makes out an invoice and returned money Management module 7.5, level-one contract management module 5.1, which is connected to, makes out an invoice and returned money management module 7.5, described to make out an invoice and returned money management Module 7.5 connects the sub- contract management module of level-one 5.5;The sub- contract management module 5.5 of the level-one, level-one contract financial management mould Block 7.1.1, cost management module 6.2.13 and three-level contract financial management module 7.1.3 are connected to cash flow management module 7.10;Two level contract management module 5.2 is separately connected service charge management module 7.8 and guarantee fund's management module 7.9, the two level Contract management module 5.2 and guarantee fund's management module 7.9 are connected to two level contract financial management module 7.1.2, the service Expense management module 7.8 is connected to cost management module 6.2.13;
Early period, expenses module 6.2.16 and shareholder's expenses module 6.2.17 were connected to cost management module 6.2.13, it is described at Even if this management module 6.2.13 is separately connected project cost analysis and management system 6.4 and internal module 6.2.14.2, described interior Even if portion module 6.2.14.2 is connected to management module after sale.
Preferably, it is standby to be sequentially connected project workflow management module 6.2.11, fire-fighting by project management department's cost library module 6.2.7 Case module 6.2.19, progress management and control module 6.2.10;The objective cost database management module 6.2.5 and project consultant firm It is connected to progress management and control module 6.2.10, progress management and control module 6.2.10 is connected to management module after sale;The fire-fighting is put on record pipe Reason module 6.2.19 selects the alleviation constructed in fire-fighting project, is write, and forms flow;The pipe of management module after sale Reason configuration opinion after sale.
Preferably, when the single project management module 6.2 is entry level, 6.2.1 is according to three for model of project management module Grade contract management module 5.3 passes through material cost management module 6.2.5.1, profession subpackage management module 6.2.5.3 and people respectively Work management module 6.2.5.4 carries out each subitem management is respectively configured;
The material cost management module 6.2.5.1, profession subpackage management module 6.2.5.3 and labor management module 6.2.5.4 it is connected to project management department cost library module 6.2.7 and three-level contract financial management module 7.1.3 respectively;Material is applied to purchase Management module 6.2.22 is respectively connected to project management department cost library module 6.2.7 and material cost management module 6.2.5.1, the material Material cost management module 6.2.5.1 is respectively connected to tax management module 7.6 and material pays out management module 6.2.23;The project Portion cost library module 6.2.7 is connected to project management department overall cost management module 6.2.5.5;The material pays out management module 6.2.23 three-level contract financial management module 7.1.3, the three-level contract financial management module are connected to tax management module 7.6 7.1.3 it is connected to cost management module 6.2.13;
The three-level contract financial management module 7.1.3, visa menu manager module 6.2.15, expenses module early period 6.2.16, shareholder's expenses module 6.2.17, tax management module 7.6 are connected to cost management module 6.2.13;The tax manages mould Block 7.6 is connected to three-level contract financial management module 7.1.3 and makes out an invoice and returned money management module 7.5, level-one contract management module 5.1 are connected to and make out an invoice and returned money management module 7.5, make out an invoice and returned money management module 7.5, level-one complementary agreement management module 5.4 It is respectively connected to level-one contract financial management module 7.1.1 with the sub- contract management module of level-one 5.5, level-one complementary agreement manages mould Block 5.4 is respectively connected to tax management module 7.6 and audited accounts module 6.2.14.1, the audited accounts module 6.2.14.1 companies It is connected to management module after sale, management module after sale is connected to after-sale management system 6.5;
Two level contract management module 5.2 is respectively connected to service charge management module 7.8, guarantee fund's management module 7.9 and two Grade contract financial management module 7.1.2, guarantee fund's management module 7.9 are connected to two level contract financial management module 7.1.2; The cost management module 6.2.13 is respectively connected to internal final accounts module 6.2.14.2 and project cost analysis and management system 6.4;Internal final accounts module 6.2.14.2 connections management module after sale.
Preferably, project workflow management module 6.2.11 is sequentially connected fire-fighting and puts on record module 6.2.19 and progress management and control module 6.2.10, the progress management and control module 6.2.10 is connected to management module after sale;The fire-fighting is put on record 6.2.19 pairs of management module The alleviation constructed in fire-fighting project is selected, is write, and forms flow;The management configuration of management module after sale is anticipated after sale See.
What the present invention generated has the beneficial effect that:Project contract management and control of the present invention, process management and control, budget management and control, flow management and control, The engineerings whole process supervisions such as financial management and control, buying management and control, are extracted by the cross one another data of each data module, for management All kinds of correction datas are presented in person, facilitate management and examination & approval.The support of system is managed by unified operation management system and branch company, Contract management system is concluded a treaty the responsibility-power-benefit of clear both sides, by project management, makes engineering management targeted, process tracking with Controllably, data constantly are provided for manager.Under the guiding of business management system, system is managed by engineering financing, realizes industry Flow/finance cash flow/management process of being engaged in is integrated, and the place of the integrated information of finance is driven under the event-driven of system Reason.It is engineering management better choice and implementation to manage system by supplier management system and resources of human talents.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the frame diagram of the construction management platform of the present invention.
Fig. 2 is the frame diagram of this tax management module.
Fig. 3 is the frame diagram of single project management module.
Fig. 4 is the frame diagram of objective cost database management module and actual cost database management module.
Fig. 5 is the frame diagram of contract financial data module.
Fig. 6 is the frame diagram of final accounts module.
Fig. 7 is the control flow chart of the single project management module of entry level.
Fig. 8 is the control flow chart of the single project management module of team's grade.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
A kind of construction management platform as shown in figures 1-8, including the supplier management system 1 of relevant connection, branch company Management system 2, operation management system 3, resources of human talents management system 4, contract management system 5, project management system 6, work Journey financial management system 7 and business management system 8, the supplier management system 1 are adopted for building trade material supplier For management platform;Branch company's management system 2 is used for the full platform management of each branch company of characteristic;The operation management system 3 For the daily operation management of company;Management and evaluation system of the resources of human talents management system 4 for engineering talent;Institute State management of the contract management system 5 for all engineering contracts;The project management system 6 is used for the full mistake of each project Thread management;The engineering financing management system 7 manages system for integration project, realizes the integrated pipe of project finance project Reason;The business management system 8 is used for the management systematic building engineering management platform of project operation form.
The supplier management system 1 includes supplier management module 1.1, supplier products management module 1.2, supplier Quote module 1.3, the online product of supplier place an order purchase module 1.4, supplier's financial management module 1.5 and supplier evaluation and Integration module 1.6;
Branch company's management system 2 includes branch company's period of service and service charge management module 2.1, branch company's routine office work System 2.2, branch company's project management system 2.4, branch company's financial management system 2.5, is divided at branch company's contract management system 2.3 Company's Bidding Management System 2.6, branch company user and Rights Management System 2.7, branch company's supplier management module 2.8 and point public affairs Take charge of revenue control module;
The operation management system 3 include routine office work module 3.1, bidding management module 3.2, certificate management module 3.3, Budget management module 3.4 and work execute management module 3.5;
The resources of human talents management system 4 includes project Total Management Module 4.1, the long management module 4.2 of construction, project manager Management module 4.3, management through accounting module 4.4, site administrator's module 4.5 and documenter's module 4.6;
The contract management system 5 includes level-one contract management module 5.1, two level contract management module 5.2, three-level contract Management module 5.3, level-one complementary agreement management module 5.4, the sub- contract management module 5.5 of level-one, void contract management module 5.6, contract filing management module 5.7, contract analysis management module 5.8, contract statement management module 5.9, contract progress control Module 5.10;
The project management system 6 includes contract management module 6.1, single project management module 6.2, project progress Data supervision system 6.3, project cost analysis and management system 6.4 and engineering after-sale management system 6.5;The single project management Module 6.2 includes at least model of project management module 6.2.1, project management department configuration module 6.2.2, project management department's cost configuration module 6.2.3, estimated cost import modul 6.2.4, objective cost database management module 6.2.5, cost change module 6.2.6, project management department Cost library module 6.2.7, project three-level contract work management module 6.2.8, project three-level contract Financial project management module 6.2.9, progress management and control module 6.2.10, project workflow management module 6.2.11, actual cost database management module 6.2.12, cost Management module 6.2.13, final accounts module 6.2.14, visa menu manager module 6.2.15, expenses module 6.2.16, Gu Dongkai early period Formwork 6.2.17, project management department cost management module 6.2.18, fire-fighting put on record module 6.2.19, complementary agreement management module 6.2.20, sub- contract management module 6.2.21, material apply to purchase management module 6.2.22, material pays out management module 6.2.23 and matter Measure management module 6.2.24;The objective cost database management module 6.2.5 and actual cost database management module 6.2.12 include It is material cost management module 6.2.5.1, subitem branch management module 6.2.5.2, professional subpackage management module 6.2.5.3, artificial Management module 6.2.5.4 and project management department overall cost management module 6.2.5.5;The final accounts module 6.2.14 includes audited accounts Even if module 6.2.14.1 and internal module 6.2.14.2;
It includes contract financial data module 7.1, contract financial statement and analysis module 7.2, item that engineering financing, which manages system 7, Mesh cost analysis module 7.3, outer channel syndrome management module 7.4 are made out an invoice and returned money management module 7.5, tax management module 7.6, income Tax deduction module 7.7, service charge management module 7.8, guarantee fund's management module 7.9, cash flow management module 7.10, project management department borrow Branch management module 7.11, project management department's financial management module 7.12 and workflow management module 7.13;The tax management module 7.6 is at least Including the management module 7.6.1 that pays taxes, refund management module 7.6.2, output tax management module 7.6.3, input tax management module 7.6.4, refund module 7.6.5 and burden of taxation balance sheet module 7.6.6;The contract financial data module includes at least level-one contract Financial management module 7.1.1, two level contract financial management module 7.1.2, three-level contract financial management module 7.1.3, level-one are mended Fill contract financial management module 7.1.4, sub- contract financial management module 7.1.5;
The business management system 8 includes business model management module 8.1, the side's of affixing one's seal management module 8.2 and operation square tube Manage module 8.3.
Supplier management system includes in the present invention:Supplier management module 1.1, for managing all kinds of confessions for entering platform Quotient, including interim supplier and contract supplier are answered, contract/classification/qualification of supplier and other essential informations are managed;Supply Type/brand/specifications and models/price of the product of supplier is managed Classification Management by quotient's product administration module 1.2;For Bidding module 1.3 is answered, can be associated with material subscription system, product report can be carried out to each project management department of each unit in system Valence management;Single purchase system 1.4 under the online product of supplier, each project management department of each unit in system, can be right on platform Supplier products directly place an order purchase, and cost is included in corresponding engineering project;Supplier's financial management module 1.5, to supplying Account phase/funds on account/invoice of quotient and each company/each project management department is answered to carry out unified financial management;Supplier evaluation and integral mould Block 1.6, is managed supplier and classifies, and chooses high-quality supplier and carries out correlation recommendation.
Operation management system 3:Building trade management of enterprise operation platform helps enterprise's normal operation to need to use.It is daily Office system 3.1:The daily cooperative office system of conglomerate.Bidding Management System 3.2:Bid certificate contract resources bank is established, Help the development of business of submitting a tender;/ distributing/and is registered to write/record in/each bid for a project the situation of tracing management, and bid The management system of situation is marked, bid result is analyzed in help.Certificate management system 3.3:It is responsible for inquiry/all kinds of original papers of record company Service condition is called the certificate of neutral gear phase, is associated with Bidding Management System, can carry out opening for better business activities Exhibition.Budget management module 3.4:All kinds of company costs are subjected to budget management, carry out default and routine office work system relationship, management Operation expenses in corporation plan.Work executes management module 3.5:All kinds of work distribute with/appointment/to plan simultaneously constantly to examine It looks into, tracks the work management module of its performance.
Resources of human talents manages system 4:All kinds of project managers are managed and are evaluated.Project Total Management Module 4.1: Project management and evaluation integrating system are always responsible for over the years to project.It constructs long management module 4.2:To each system of each project Construction length management and evaluation integrating system.Management of project manager module 4.3:Management of project manager to each project and evaluation Integrating system.Management through accounting module 4.4:Management to each Project Accountant personnel and evaluation integrating system.Site administrator manages Manage module 4.5:Management to each project site administrator and evaluation integrating system.Documenter's management module 4.6:To each item The management of mesh documenter and evaluation integrating system.
Contract management system 5 includes:Level-one contract management module 5.1, the management to level-one engineering contract;Two level contract pipe Manage module 5.2, the management to the total responsibility system contract of secondary items;Three-level contract management module 5.3 closes the three-level of engineering construction Same management;Level-one complementary agreement management module 5.4, the management to level-one engineering contract later stage supplemental contract;The sub- contract of level-one Management module 5.5 is managed multiple sub- contracts in the sub- contract or same system in framework agreement;Void contract management Module 5.6 is managed the contract of calcellation;Contract filing management module 5.7 has returned what shelves finished to crossing quality guarantee period/fund Project carries out filing management;Whether contract analysis management module 5.8 is normally carried out analysis to the contract status in all kinds of progress The module of management;Contract statement management module 5.9 analyzes each contract financial situation;Contract progress control module 5.10, the state recording management to each compact implementation.
Project management system 6 includes:Contract management module 6.1 is connected with big contract management system module, main bright The really contract signing situation of single project;Single project management module 6.2:The single project management module of engineering, passes through difference Project implementation mode, so that all administrative staff for participating in construction is apparent from the resource consumption feelings of project different times Condition, to realize controllableization of engineering management;Can by the governing plan that sets objectives, process of trace and control, be intended into Degree combines;Also performance can be directly recorded, feeds back to administrative staff to form project report;Project progress data pipe Reason system 6.3 by the progress situation of each engineering, and supports the management file of progress to carry out concluding the management system for achieving inquiry System;Project cost analysis management 6.4, for each project, all kinds of costs constantly occurred in statistical item are carried out with former target It compares, carries out cost analysis, confirm why whether each material or each single item quantities have altered increases, increase, increase How much, if there are visa, fund to adjust the project cost analysis and management system of situation etc.;Engineering after-sale management system 6.5:For The management system being managed into the project in stage after sale.Such as after-sales service, after sale returned money, quality guarantee gold etc..
Engineering financing manages system 7:Contract financial data module 7.1, to one or two three-level contracts and complementary agreement The executive condition of the contracts such as contract, i.e. financial data, which are held, to be managed;Contract financial statement and analysis module 7.2 are closed from single Same situation of actually honouring an agreement is analyzed and is summarized, and the statement management module in entire year is formed;Project cost analysis module 7.3, it is analyzed from single project cost, the cost analysis to entire annual project summarizes management module;Outer channel syndrome management module 7.4, it is managed to needing the project for issuing outer channel syndrome to be managed, and for the time of outer channel syndrome/place/handler etc.; It makes out an invoice and returned money management module 7.5, the case where to monthly issuing invoice and the case where returned money is inquired and managed;Tax management Module 7.6 to the tax rate of each engineering output tax, pays ground and pays the tax rate of mode and input tax, the amount of money that can be deducted Etc. being managed, management and control is carried out to the burden of taxation of single project;Input tax deduction module 7.7 receives input tax hair to each project Ticket is managed, including the tax category, the amount of money that can be deducted;Service charge management module 7.8 is charged to the service charge of each project and is carried out Management;Guarantee fund's management module 7.9 manages the guarantee fund of each project;Cash flow management module 7.10 goes the fund of project To progress detail and centralized management.Such as Party A and company, company and projects portion, projects portion and supplier;Project management department asks for an advance on one's pay Management module 7.11, the management module borrowed money for project management department;Project management department's financial management module 7.12, project inside final accounts pipe Reason, is managed and confirms to the accounts payable in project;Workflow management module 7.13 summarizes point the setting of all flow definitions The management module of class.
Business management system 8 includes:Business model management module 8.1 carries out the pattern of business the module of Classification Management; The side's of affixing one's seal management module 8.2 is carried out the module of Classification Management by the side of affixing one's seal of group;Operation side's management module 8.3, by group's reality Operation side carries out the module of Classification Management.
Branch company manages system 2:Branch company's period of service and service charge management module 2.1 carry out expense to branch company And the management of viability;Branch company's routine office work system 2.2, the daily operation management of branch company, with general headquarters' operation management system Association;Branch company's contract management system 2.3 covers the contract management Home System of each branch company's seal;Branch company's engineering management System 2.4 covers the engineering contract management system of each branch company's seal.With group's project management system;Branch company's financial management System 2.5, the interconnected system for the contract that each branch company manages, the engineering financing with group manage system relationship;Branch company throws Mark management system 2.6, the Bidding Management System of each branch company.Bidding Management System with group is associated with;Branch company user and Rights Management System 2.7, the user be managed to each branch company of group and permission system;Branch company's supplier management mould The management system of block 2.8 and the account money tax of related each supplier of general headquarters.Branch company's revenue control module 2.9, to managing Different types of project, service charge revenue control module.In the present solution, model of project management module 6.2.1 provides two patterns It is independently selected for user, i.e.,:Single project management module 6.2 is divided for entry level and team's grade both of which operation.
As shown in fig. 7, when single project management module 6.2 is entry level, 6.2.1 is according to three-level for model of project management module Contract management module 5.3 is respectively by material cost management module 6.2.5.1, profession subpackage management module 6.2.5.3 and artificial Management module 6.2.5.4 carries out each subitem management is respectively configured;
The material cost management module 6.2.5.1, profession subpackage management module 6.2.5.3 and labor management module 6.2.5.4 it is connected to project management department cost library module 6.2.7 and three-level contract financial management module 7.1.3 respectively;Material is applied to purchase Management module 6.2.22 is respectively connected to project management department cost library module 6.2.7 and material cost management module 6.2.5.1, the material Material cost management module 6.2.5.1 is respectively connected to tax management module 7.6 and material pays out management module 6.2.23;The project Portion cost library module 6.2.7 is connected to project management department overall cost management module 6.2.5.5;The material pays out management module 6.2.23 three-level contract financial management module 7.1.3, the three-level contract financial management module are connected to tax management module 7.6 7.1.3 it is connected to cost management module 6.2.13;
The three-level contract financial management module 7.1.3, visa menu manager module 6.2.15, expenses module early period 6.2.16, shareholder's expenses module 6.2.17, tax management module 7.6 are connected to cost management module 6.2.13;The tax manages mould Block 7.6 is connected to three-level contract financial management module 7.1.3 and makes out an invoice and returned money management module 7.5, level-one contract management module 5.1 are connected to and make out an invoice and returned money management module 7.5, make out an invoice and returned money management module 7.5, level-one complementary agreement management module 5.4 It is respectively connected to level-one contract financial management module 7.1.1 with the sub- contract management module of level-one 5.5, level-one complementary agreement manages mould Block 5.4 is respectively connected to tax management module 7.6 and audited accounts module 6.2.14.1, the audited accounts module 6.2.14.1 companies It is connected to management module after sale, management module after sale is connected to after-sale management system 6.5;
Two level contract management module 5.2 is respectively connected to service charge management module 7.8, guarantee fund's management module 7.9 and two Grade contract financial management module 7.1.2, guarantee fund's management module 7.9 are connected to two level contract financial management module 7.1.2; The cost management module 6.2.13 is respectively connected to internal final accounts module 6.2.14.2 and project cost analysis and management system 6.4;Internal final accounts module 6.2.14.2 connections management module after sale.
Project workflow management module 6.2.11, which is sequentially connected fire-fighting, to be put on record module 6.2.19 and progress management and control module 6.2.10, The progress management and control module 6.2.10 is connected to management module after sale;The fire-fighting puts management module 6.2.19 on record to fire-fighting project The alleviation of middle construction is selected, is write, and forms flow;The management configuration of management module after sale opinion after sale.
User selects entry level pattern, three-level contract management module 5.3 to be closed according to the three-level of engineering construction in this programme Same content is respectively managed for configuration material/artificial/professional subpackage etc., pipe is carried out by project management department cost library module 6.2.7 Reason, material apply to purchase management module 6.2.22 and are respectively connected to material cost management module 6.2.5.1 and project management department's cost library module 6.2.7 adjustment is associated to material cost and project management department's cost.Material is paid out management module 6.2.23 and is associated with to three-level simultaneously Contract financial management module 7.1.3, to relevant material cost in material cost management module 6.2.5.1 when paying out money three Grade contract financial management module 7.1.3 carries out the management of financial data execution.
Cost management module 6.2.13 is to project management department's overall cost, spending early period, shareholder's spending, service charge and project Consumption expenditures such as material/artificial/professional subpackage etc. are managed.According to the data cases in level-one contract management module 5.1, open Ticket and returned money management module 7.5 are made out an invoice and the pool of returned money follows up, reminds and be associated with to level-one contract financial management module 7.1.1 data management is carried out.Pipe of the level-one complementary agreement management module 5.4 to level-one engineering contract later stage supplemental contract simultaneously Reason, is managed multiple sub- contracts in the sub- contract or same system in framework agreement, and adjusts level-one according to content and close With the data in financial management module 7.1.1.7.6 relevant cost management module 6.2.13 of tax management module and three-level contract finance Management module 7.1.3 to the tax rate of each engineering output tax, pays ground and pays the tax rate of mode and input tax, can deduct The amount of money etc. be managed, management and control is carried out to the burden of taxation of single project;Simultaneously according to making out an invoice and returned money management module 7.5 and level-one 5.4 timely regulatory tax negative data of complementary agreement management module.Level-one complementary agreement management module 5.4 is associated with to audited accounts module 6.2.14.1, audited accounts module 6.2.14.1 carries out final accounts to project, can be according to project implementation situation, even if the project of generation gold Volume, and fight to the finish and count report situation in into line trace and management, eventually form auditing amount.
Visa menu manager module 6.2.15 is mainly responsible for for agreeing to change and can generate visa list with the change of visa, And to the signature of visa list, affix one's seal and recycle and supervise, the cost data being related to be associated with to cost management module 6.2.13 into Row data execute management.
The service charge of each project is received in management of the two level contract management module 5.2 to the total responsibility system contract of secondary items Expense is managed in service charge management module 7.8 to be included in cost management module data.According to two level contract management module 5.2 In content and be associated with to two level contract financial management module 7.1.2 and carry out data management, be directed to passing through to guarantee fund After the adjustment of guarantee fund's management module 7.9 data point reuse management is carried out in two level contract financial management module 7.1.2.
As shown in figure 8, when single project management module 6.2 is team's grade, 6.2.1 is according to level-one for model of project management module The personnel of configuration project management department of 5.1 allocation project project of contract management module and the cost of role, project configure, and pass through Estimated cost import modul 6.2.4 forms objective cost database management module 6.2.5 according to default cost pool in conjunction with flow;
Objective cost database management module 6.2.5 is divided into material cost management module 6.2.5.1, subitem branch management mould simultaneously Block 6.2.5.2, professional subpackage management module 6.2.5.3, labor management module 6.2.5.4 and project management department's overall cost management module 6.2.5.5 each subitem is carried out that management is respectively configured;Project management department cost library module 6.2.7 is connected to project management department's overall cost pipe Manage module 6.2.5.5;The material cost management module 6.2.5.1 is connected to material and applies to purchase management module 6.2.22, while material Material applies to purchase management module 6.2.22 and is connected to actual cost database management module 6.2.12;The quality management module 6.2.24 connections Apply to purchase management module 6.2.22 to material;The labor management module 6.2.5.4 passes through three-level contract financial management module 7.1.3 It is connected to cost management module 6.2.13, project management department's overall cost management module 6.2.5.5 and is connected to cost management module 6.2.13, the three-level contract financial management module 7.1.3 connection three-level contract management modules 6.2.5.3;The material is applied to purchase Management module 6.2.22 is additionally coupled to professional subpackage management module 6.2.5.3;The material cost management module 6.2.5.1 is successively Interlocking item workflow management module 6.2.11, material pay out management module 6.2.23 and three-level contract financial management module 7.1.3;
The objective cost database management module 6.2.5 link costs change module 6.2.6, the cost change module 6.2.6 visa menu manager module 6.2.15 and audited accounts module 6.2.14.1 are sequentially connected;Level-one complementary agreement management module It 5.4 is separately connected cost management module 6.2.13, tax management module 7.6, makes out an invoice and returned money management module 7.5, level-one contract wealth Be engaged in management module 7.1.1 and audited accounts module 6.2.14.1;The level-one contract financial management module 7.1.1 connections audit is determined It calculates module 6.2.14.1, the audited accounts module 6.2.14.1 and is connected to management module after sale, management module after sale is connected to Engineering after-sale management system 6.5;The tax management module 7.6 is respectively connected to cost management module 6.2.13, makes out an invoice and returned money Management module 7.5, level-one contract management module 5.1, which is connected to, makes out an invoice and returned money management module 7.5, described to make out an invoice and returned money management Module 7.5 connects the sub- contract management module of level-one 5.5;The sub- contract management module 5.5 of the level-one, level-one contract financial management mould Block 7.1.1, cost management module 6.2.13 and three-level contract financial management module 7.1.3 are connected to cash flow management module 7.10;Two level contract management module 5.2 is separately connected service charge management module 7.8 and guarantee fund's management module 7.9, the two level Contract management module 5.2 and guarantee fund's management module 7.9 are connected to two level contract financial management module 7.1.2, the service Expense management module 7.8 is connected to cost management module 6.2.13;
Early period, expenses module 6.2.16 and shareholder's expenses module 6.2.17 were connected to cost management module 6.2.13, it is described at Even if this management module 6.2.13 is separately connected project cost analysis and management system 6.4 and internal module 6.2.14.2, described interior Even if portion module 6.2.14.2 is connected to management module after sale.
Module that project management department cost library module 6.2.7 is sequentially connected project workflow management module 6.2.11, fire-fighting is put on record 6.2.19, progress management and control module 6.2.10;The objective cost database management module 6.2.5 and project consultant firm are connected to Progress management and control module 6.2.10, progress management and control module 6.2.10 are connected to management module after sale;The fire-fighting is put on record management module 6.2.19 the alleviation constructed in fire-fighting project selected, write, and form flow;The management configuration of management module after sale Opinion after sale.
User selects team's grade pattern, level-one contract management module 5.1 to manage level-one contract in this programme, and project management department matches Module 6.2.2 is set to configure project correlation constituent element according to level-one contract and manage in objective cost database management module 6.2.5. Objective cost database management module 6.2.5 to material/artificial/professional subpackage etc. respectively in material cost management module 6.2.5.1, specially It is carried out in industry subpackage management module 6.2.5.3, labor management module 6.2.5.4, project management department overall cost management module 6.2.5.5 Data management, wherein material is applied to purchase management module 6.2.22 and is managed to applying to purchase for material, and passes through quality management module 6.2.24 it is controlled, is respectively associated to material cost management module 6.2.5.1 and profession subpackage management module 6.2.5.3 to it In material cost factor be managed.Target cost management module 6.2.5 bond materials apply to purchase management module 6.2.22 to material Actual cost database management module 6.2.12 is formed after the adjustment of material, to be changed to wherein cost, then by being associated with visa After menu manager module 6.2.15 processing, final visa menu manager module 6.2.15 are changed in cost change module 6.2.6 Association to audited accounts module 6.2.14.1 to project carry out final accounts, can according to project implementation situation, even if generate the project amount of money, And fight to the finish and count report situation in into line trace and management, eventually form auditing amount.
Management of the three-level contract management module 5.3 to the three-level contract of engineering construction, and be associated with to three-level contract finance pipe It manages module 7.1.3 and carries out data management, be related to the data in labor management module 6.2.5.4 and management mould is paid out for material To the data of paying out of material cost in block 6.2.23, it is associated with carries out wealth into three-level contract financial management module 7.1.3 together Business data management, final association to cost management module 6.2.13.Two level contract management module 5.2 is to the total responsibility system of secondary items The management of contract is managed the service charge charge of each project in service charge management module 7.8 and is included in cost management mould In block 6.2.13 data.According to the content in two level contract management module 5.2 and it is associated with to two level contract financial management module 7.1.2 data management is carried out, is directed to after being adjusted by guarantee fund's management module 7.9 of guarantee fund in two level contract finance Management module 7.1.2 carries out data point reuse management.
Cost management module 6.2.13 is to project management department's overall cost, spending early period, shareholder's spending, service charge and project Consumption expenditures such as material/artificial/professional subpackage etc. are managed.According to the data cases in level-one contract management module 5.1, open Ticket and returned money management module 7.5 are made out an invoice and the pool of returned money follows up, reminds and be associated with to level-one contract financial management module 7.1.1 data management is carried out.Pipe of the level-one complementary agreement management module 5.4 to level-one engineering contract later stage supplemental contract simultaneously Reason, is managed multiple sub- contracts in the sub- contract or same system in framework agreement, and adjusts level-one according to content and close With the data in financial management module 7.1.1.7.6 relevant cost management module 6.2.13 of tax management module and three-level contract finance Management module 7.1.3 to the tax rate of each engineering output tax, pays ground and pays the tax rate of mode and input tax, can deduct The amount of money etc. be managed, management and control is carried out to the burden of taxation of single project;Simultaneously according to making out an invoice and returned money management module 7.5 and level-one 5.4 timely regulatory tax negative data of complementary agreement management module.The sub- contract management module 5.5 of level-one closes the son in framework agreement Multiple sub- contracts in same or same system are managed, in conjunction with level-one contract financial management module 5.5, three-level contract finance pipe It manages module 7.1.3 and detailed and centralized management is carried out to the fund whereabouts of project.
Above two pattern, internal final accounts module 6.2.14.2 can be carried out according to the data of cost management module 6.2.13 Internal final accounts, can be by project cost analysis and management system, all kinds of costs constantly occurred in statistical item, with former target into Row compares, and carries out cost analysis, confirms why whether each material or each single item quantities have altered increases, increase, increasing It adds few, if having situations such as visa, fund adjusts situation.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (7)

1. a kind of construction management platform, which is characterized in that supplier management system 1, branch company's pipe including relevant connection Reason system 2, operation management system 3, resources of human talents management system 4, contract management system 5, project management system 6, engineering Financial management system 7 and business management system 8, the supplier management system 1 adopt confession for building trade material supplier Management platform;Branch company's management system 2 is used for the full platform management of each branch company of characteristic;The operation management system 3 is used The daily operation management of Yu companies;Management and evaluation system of the resources of human talents management system 4 for engineering talent;It is described Contract management system 5 is used for the management of all engineering contracts;The project management system 6 is used for the overall process of each project Management;The engineering financing management system 7 manages system for integration project, realizes the integrated management of project finance project; The business management system 8 is used for the management system of project operation form.
2. a kind of construction management platform as described in claim 1, which is characterized in that the supplier management system 1 is wrapped It includes under supplier management module 1.1, supplier products management module 1.2, supplier's quote module 1.3, the online product of supplier Single purchase module 1.4, supplier's financial management module 1.5 and supplier evaluation and integration module 1.6;
Branch company's management system 2 includes branch company's period of service and service charge management module 2.1, branch company's routine office work system 2.2, branch company's contract management system 2.3, branch company's project management system 2.4, branch company's financial management system 2.5, branch company Bidding Management System 2.6, branch company user and Rights Management System 2.7, branch company's supplier management module 2.8 and branch company receive Enter management module;
The operation management system 3 includes routine office work module 3.1, bidding management module 3.2, certificate management module 3.3, budget Management module 3.4 and work execute management module 3.5;
The resources of human talents management system 4 includes project Total Management Module 4.1, the long management module 4.2 of construction, management of project manager Module 4.3, management through accounting module 4.4, site administrator's module 4.5 and documenter's module 4.6;
The contract management system 5 includes level-one contract management module 5.1, two level contract management module 5.2, three-level contract management Module 5.3, the sub- contract management module 5.5 of level-one, void contract management module 5.6, is closed at level-one complementary agreement management module 5.4 With filing management module 5.7, contract analysis management module 5.8, contract statement management module 5.9, contract progress control module 5.10;
The project management system 6 includes contract management module 6.1, single project management module 6.2, project progress data Management system 6.3, project cost analysis and management system 6.4 and engineering after-sale management system 6.5;The single project management module 6.2 include at least model of project management module 6.2.1, project management department configuration module 6.2.2, project management department cost configuration module 6.2.3, Estimated cost import modul 6.2.4, objective cost database management module 6.2.5, cost change module 6.2.6, project management department's cost pool Module 6.2.7, project three-level contract work management module 6.2.8, project three-level contract Financial project management module 6.2.9, into Spend management and control module 6.2.10, project workflow management module 6.2.11, actual cost database management module 6.2.12, cost management module 6.2.13, final accounts module 6.2.14, visa menu manager module 6.2.15, expenses module 6.2.16 early period, shareholder's expenses module 6.2.17, project management department's cost management module 6.2.18, fire-fighting is put on record module 6.2.19, complementary agreement management module 6.2.20, son Contract management module 6.2.21, material apply to purchase management module 6.2.22, material pays out management module 6.2.23 and quality management mould Block 6.2.24;The objective cost database management module 6.2.5 and actual cost database management module 6.2.12 includes material cost Management module 6.2.5.1, subitem branch management module 6.2.5.2, professional subpackage management module 6.2.5.3, labor management module 6.2.5.4 with project management department overall cost management module 6.2.5.5;The final accounts module 6.2.14 includes audited accounts module Even if 6.2.14.1 with inside module 6.2.14.2;
Engineering financing manage system 7 include contract financial data module 7.1, contract financial statement and analysis module 7.2, project at This analysis module 7.3, outer channel syndrome management module 7.4 are made out an invoice and returned money management module 7.5, tax management module 7.6, input tax are supported Buckling die block 7.7, service charge management module 7.8, guarantee fund's management module 7.9, cash flow management module 7.10, project management department are asked for an advance on one's pay pipe Manage module 7.11, project management department's financial management module 7.12 and workflow management module 7.13;The tax management module 7.6 includes at least Management module of paying taxes 7.6.1, refund management module 7.6.2, output tax management module 7.6.3, input tax management module 7.6.4, Refund module 7.6.5 and burden of taxation balance sheet module 7.6.6;The contract financial data module includes at least level-one contract finance pipe Manage module 7.1.1, two level contract financial management module 7.1.2, three-level contract financial management module 7.1.3, level-one supplementary contract Financial management module 7.1.4, sub- contract financial management module 7.1.5;
The business management system 8 includes that business model management module 8.1, the side's of affixing one's seal management module 8.2 and operation square tube manage mould Block 8.3.
3. a kind of construction management platform as claimed in claim 2, which is characterized in that the model of project management module 6.2.1 it provides two patterns independently to select for user, i.e.,:Single project management module 6.2 is divided for entry level and team's grade Both of which is run.
4. a kind of construction management platform as claimed in claim 3, which is characterized in that the single project management module 6.2 for team's grade when, model of project management module 6.2.1 is according to the configuration of 5.1 allocation project project of level-one contract management module The personnel and role of project management department, the cost of project configure, and the cost import modul 6.2.4 that passes budgets, according to being preset to This library forms objective cost database management module 6.2.5 in conjunction with flow;
Objective cost database management module 6.2.5 is divided into material cost management module 6.2.5.1, subitem branch management module simultaneously 6.2.5.2, professional subpackage management module 6.2.5.3, labor management module 6.2.5.4 and project management department's overall cost management module 6.2.5.5 each subitem is carried out that management is respectively configured;Project management department cost library module 6.2.7 is connected to project management department's overall cost pipe Manage module 6.2.5.5;The material cost management module 6.2.5.1 is connected to material and applies to purchase management module 6.2.22, while material Material applies to purchase management module 6.2.22 and is connected to actual cost database management module 6.2.12;The quality management module 6.2.24 connections Apply to purchase management module 6.2.22 to material;The labor management module 6.2.5.4 passes through three-level contract financial management module 7.1.3 It is connected to cost management module 6.2.13, project management department's overall cost management module 6.2.5.5 and is connected to cost management module 6.2.13, the three-level contract financial management module 7.1.3 connection three-level contract management modules 6.2.5.3;The material is applied to purchase Management module 6.2.22 is additionally coupled to professional subpackage management module 6.2.5.3;The material cost management module 6.2.5.1 is successively Interlocking item workflow management module 6.2.11, material pay out management module 6.2.23 and three-level contract financial management module 7.1.3;
The objective cost database management module 6.2.5 link costs change module 6.2.6, the cost change module 6.2.6 according to Secondary connection visa menu manager module 6.2.15 and audited accounts module 6.2.14.1;Level-one complementary agreement management module 5.4 is distinguished Link cost management module 6.2.13, tax management module 7.6 are made out an invoice and returned money management module 7.5, level-one contract financial management mould Block 7.1.1 and audited accounts module 6.2.14.1;The level-one contract financial management module 7.1.1 connection audited accounts modules 6.2.14.1, the audited accounts module 6.2.14.1 is connected to management module after sale, and management module after sale is connected to engineering and sells System 6.5 is managed afterwards;The tax management module 7.6 is respectively connected to cost management module 6.2.13, makes out an invoice and returned money management mould Block 7.5, level-one contract management module 5.1, which is connected to, makes out an invoice and returned money management module 7.5, described to make out an invoice and returned money management module The 7.5 sub- contract management modules of connection level-ones 5.5;The sub- contract management module 5.5 of the level-one, level-one contract financial management module 7.1.1, cost management module 6.2.13 and three-level contract financial management module 7.1.3 are connected to cash flow management module 7.10; Two level contract management module 5.2 is separately connected service charge management module 7.8 and guarantee fund's management module 7.9, the two level contract Management module 5.2 and guarantee fund's management module 7.9 are connected to two level contract financial management module 7.1.2, the service charge pipe Reason module 7.8 is connected to cost management module 6.2.13;
Early period, expenses module 6.2.16 and shareholder's expenses module 6.2.17 were connected to cost management module 6.2.13, the cost pipe Even if reason module 6.2.13 is separately connected project cost analysis and management system 6.4 and internal module 6.2.14.2, the inside is just It calculates module 6.2.14.2 and is connected to management module after sale.
5. a kind of construction management platform as claimed in claim 4, which is characterized in that project management department's cost library module 6.2.7 it is sequentially connected project workflow management module 6.2.11, fire-fighting is put on record module 6.2.19, progress management and control module 6.2.10;Institute It states objective cost database management module 6.2.5 and project consultant firm is connected to progress management and control module 6.2.10, progress management and control Module 6.2.10 is connected to management module after sale;The fire-fighting is put on record alleviations of the management module 6.2.19 to constructing in fire-fighting project It selected, write, and form flow;The management configuration of management module after sale opinion after sale.
6. a kind of construction management platform as claimed in claim 3, which is characterized in that the single project management module 6.2 be entry level when, model of project management module 6.2.1 passes through material cost pipe respectively according to three-level contract management module 5.3 Reason module 6.2.5.1, profession subpackage management module 6.2.5.3 and labor management module 6.2.5.4 distinguish each subitem Configuration management;
The material cost management module 6.2.5.1, profession subpackage management module 6.2.5.3 and labor management module 6.2.5.4 It is connected to project management department cost library module 6.2.7 and three-level contract financial management module 7.1.3 respectively;Material applies to purchase management module 6.2.22 project management department cost library module 6.2.7 and material cost management module 6.2.5.1, the material cost pipe are respectively connected to Reason module 6.2.5.1 is respectively connected to tax management module 7.6 and material pays out management module 6.2.23;Project management department's cost pool Module 6.2.7 is connected to project management department overall cost management module 6.2.5.5;The material pays out management module 6.2.23 and tax pipe Reason module 7.6 is connected to three-level contract financial management module 7.1.3, and the three-level contract financial management module 7.1.3 is connected to Cost management module 6.2.13;
The three-level contract financial management module 7.1.3, visa menu manager module 6.2.15, expenses module 6.2.16 early period, stock Eastern expenses module 6.2.17, tax management module 7.6 are connected to cost management module 6.2.13;The tax management module 7.6 connects To three-level contract financial management module 7.1.3 and make out an invoice and returned money management module 7.5, level-one contract management module 5.1 are connected to It makes out an invoice and returned money management module 7.5, makes out an invoice and returned money management module 7.5, level-one complementary agreement management module 5.4 and level-one close It is respectively connected to level-one contract financial management module 7.1.1 with management module 5.5, level-one complementary agreement management module 5.4 is distinguished It is connected to tax management module 7.6 and audited accounts module 6.2.14.1, the audited accounts module 6.2.14.1 is connected to after sale Management module, after sale management module are connected to after-sale management system 6.5;
Two level contract management module 5.2 is respectively connected to service charge management module 7.8, guarantee fund's management module 7.9 and two level and closes With financial management module 7.1.2, guarantee fund's management module 7.9 is connected to two level contract financial management module 7.1.2;It is described Cost management module 6.2.13 is respectively connected to internal final accounts module 6.2.14.2 and project cost analysis and management system 6.4;Institute State internal final accounts module 6.2.14.2 connections management module after sale.
7. a kind of construction management platform as claimed in claim 6, which is characterized in that project workflow management module 6.2.11 It is sequentially connected fire-fighting to put on record module 6.2.19 and progress management and control module 6.2.10, the progress management and control module 6.2.10, which is connected to, to be sold Backend Administration Module;The fire-fighting management module 6.2.19 that puts on record selects the alleviation constructed in fire-fighting project, is write, and shape At flow;The management configuration of management module after sale opinion after sale.
CN201810539278.4A 2018-05-30 2018-05-30 Building engineering management platform Active CN108805529B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810539278.4A CN108805529B (en) 2018-05-30 2018-05-30 Building engineering management platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810539278.4A CN108805529B (en) 2018-05-30 2018-05-30 Building engineering management platform

Publications (2)

Publication Number Publication Date
CN108805529A true CN108805529A (en) 2018-11-13
CN108805529B CN108805529B (en) 2021-11-09

Family

ID=64089474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810539278.4A Active CN108805529B (en) 2018-05-30 2018-05-30 Building engineering management platform

Country Status (1)

Country Link
CN (1) CN108805529B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109800982A (en) * 2019-01-16 2019-05-24 武汉市九晖通讯技术有限公司 A kind of broadcasting and TV OTN extending capacity reformation project system
CN112085361A (en) * 2020-08-28 2020-12-15 上海谊逅信息技术有限公司 Construction engineering overall process management method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020091536A1 (en) * 2001-01-08 2002-07-11 Seaman E. Weston Method and system for facilitating parts procurement and production planning across an extended supply chain
CN104123604A (en) * 2014-06-09 2014-10-29 湖北福泰建筑装饰工程有限公司 Engineering management information processing system
CN104408559A (en) * 2014-11-19 2015-03-11 湖北福泰建筑装饰工程有限公司 Engineering information management system
CN104850940A (en) * 2015-04-29 2015-08-19 国网辽宁省电力有限公司鞍山供电公司 Completion settlement making method and completion settlement making system based on project whole-process management
CN105225051A (en) * 2015-10-12 2016-01-06 镇江市杰诺软件有限公司 Project management system
US20160094414A1 (en) * 2013-05-15 2016-03-31 Client Lifecycle Solutions LLC System, method and computer-implemented algorithm for client lifecycle exchange management
CN106503959A (en) * 2016-09-29 2017-03-15 中工国际工程股份有限公司 The monitoring early-warning system of project information
CN107437167A (en) * 2017-07-19 2017-12-05 中诚工程建设管理(苏州)股份有限公司 Construction-engineering project data handling system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020091536A1 (en) * 2001-01-08 2002-07-11 Seaman E. Weston Method and system for facilitating parts procurement and production planning across an extended supply chain
US20160094414A1 (en) * 2013-05-15 2016-03-31 Client Lifecycle Solutions LLC System, method and computer-implemented algorithm for client lifecycle exchange management
CN104123604A (en) * 2014-06-09 2014-10-29 湖北福泰建筑装饰工程有限公司 Engineering management information processing system
CN104408559A (en) * 2014-11-19 2015-03-11 湖北福泰建筑装饰工程有限公司 Engineering information management system
CN104850940A (en) * 2015-04-29 2015-08-19 国网辽宁省电力有限公司鞍山供电公司 Completion settlement making method and completion settlement making system based on project whole-process management
CN105225051A (en) * 2015-10-12 2016-01-06 镇江市杰诺软件有限公司 Project management system
CN106503959A (en) * 2016-09-29 2017-03-15 中工国际工程股份有限公司 The monitoring early-warning system of project information
CN107437167A (en) * 2017-07-19 2017-12-05 中诚工程建设管理(苏州)股份有限公司 Construction-engineering project data handling system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈丽华等: "建筑施工总承包管理现状及改进", 《建筑工程技术与设计》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109800982A (en) * 2019-01-16 2019-05-24 武汉市九晖通讯技术有限公司 A kind of broadcasting and TV OTN extending capacity reformation project system
CN112085361A (en) * 2020-08-28 2020-12-15 上海谊逅信息技术有限公司 Construction engineering overall process management method

Also Published As

Publication number Publication date
CN108805529B (en) 2021-11-09

Similar Documents

Publication Publication Date Title
Nair et al. Rural banking: The case of rural and community banks in Ghana
Barton The use and abuse of accounting in the public sector financial management reform program in Australia
Scott et al. Reform of the core public sector: The New Zealand experience
JP6506303B2 (en) Dialogue method and system for controlling investment data including demographic benefit
US20040162771A1 (en) Method and system for evaluating individual group constituting organization
CN108765200A (en) A kind of entry level Project Management System
Hashim et al. Treasury reference model
CN108805529A (en) A kind of construction management platform
CN108764846A (en) A kind of team's grade Project Management System
Oyalowo An Assessment of Cooperative Societies and Housing Supply in Lagos State
Rola et al. Assessing the resurgent irrigation development program of the Philippines: Institutional arrangements for irrigation governance
Kangethe et al. Legal Regulatory Framework and the Performance of Women Owned Enterprises in Kenya A Study of Embu County
Van Der Hoog et al. Production and Finance in EURACE
Koh Reforming the fiscal management system in Korea
Mir et al. Development of construction industry: a literature review
Gergely The cotton sector of Cote d'Ivoire
Bhanumurthy et al. Unspent Balances and Fund Flow Mechanism under Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS)
Higgins Implications of Book Versus Tax Based Patronage in Agricultural Cooperatives
Silvestri IT Audit Consulting in Deloitte Risk Advisory. The relevance of advertising revenues in a media company.
Mahbub Determinants
Bezpartochnyi Organization of accounting of assets, liabilities and results of the enterprise activities
Krokhina IMPROVING THE EFFICIENCY OF CONTROL OVER TRANSFER PRICING IN THE RUSSIAN FEDERATION
Pravdiuk et al. Organization of accounting of assets, liabilities and results of the enterprise activities: monograph
SORCI et al. DESIGNING DYNAMIC PERFORMANCE MANAGEMENT SYSTEMS TO IMPROVE THE COMPETITIVENESS, ECONOMIC AND SOCIAL CAPITAL OF ITALY
Nair et al. Rural banking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant