CN108510206A - A kind of free house decoration management system and method - Google Patents
A kind of free house decoration management system and method Download PDFInfo
- Publication number
- CN108510206A CN108510206A CN201810317347.7A CN201810317347A CN108510206A CN 108510206 A CN108510206 A CN 108510206A CN 201810317347 A CN201810317347 A CN 201810317347A CN 108510206 A CN108510206 A CN 108510206A
- Authority
- CN
- China
- Prior art keywords
- engineering
- unit
- cost
- fitting
- group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005034 decoration Methods 0.000 title claims abstract description 66
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 43
- 230000005611 electricity Effects 0.000 claims description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 15
- 230000001186 cumulative effect Effects 0.000 claims description 6
- 238000001514 detection method Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 6
- 230000007812 deficiency Effects 0.000 claims description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000000739 chaotic effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Finance (AREA)
- Game Theory and Decision Science (AREA)
- Accounting & Taxation (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The free house decoration of the present invention manages system, includes the gathering module of the fund for calculating the cost module of total decoration cost, for collecting part of having completed according to finishing progress, profit module, for calculating profit summarizing module that fitting-out work gets a profit, returning to the return module of client and statistical module for all fitting-out works to be counted and numbered for taking out the cost of specified engineering from the profit of this group of engineering after one group of engineering;The house ornamentation method of the present invention includes step:Cost budgeting is carried out to single engineering;Decoration construction is carried out to single engineering;The construction speed of the fitting-out work is monitored and carries out interim gathering according to progress;After completing one group of engineering, the total earnings of this group of engineering is calculated;The cost of specified engineering is returned out of the one group of engineering currently completed total earnings to corresponding client, if to fulfil the free house ornamentation held to client, realizes the scientific management to fitment process.
Description
Technical field
The present invention relates to house decoration technical fields, and in particular to a kind of free house decoration management system and method.
Background technology
It is typically to be recommended by acquaintance or find some dresses by some finishing platforms that current people, which carry out house finishing,
Company is repaiied, the service then provided each decoration company is compared to select the highest decoration company of cost performance.It is existing
If decoration company is generally only to hold some relatively good services, or promises to undertake and gives a discount to service, but a set of due to lacking
The service that complete house decoration management system causes decoration company to promise to undertake all is merely resting in word, it is difficult to effective
It executes, it cannot be guaranteed that the interests of client;If discounting that client holds in decoration company or it is free be also all difficult scientific and reasonable convert
It is existing;More chaotic, the ununified standard of current repairs profession, lacks scientific and reasonable Managed Solution and management system.
Accordingly, it is desirable to provide a kind of free house decoration manages system, specification home improvement industries, science can be very good
If rational decoration company of fulfilling holds client preferential, the benefit of client is ensured conscientiously.
Invention content
The purpose of the present invention is to provide a kind of free house decorations to manage system and method, public to solve existing finishing
Department lacks a set of scientific and reasonable free house decoration and manages system, cannot fulfil the preferential problem promised to undertake to client.
To achieve the above object, the technical scheme is that
A kind of free house decoration manages system, including cost module, gathering module, profit module, profit summarizing module,
Return module and statistical module;
The cost module is for calculating the total decoration cost of fitting-out work;
The gathering module is used to collect the fund for part of having completed according to finishing progress during finishing, it is ensured that
Its whole account due is collected at the end of a fitting-out work;
The profit module is used to calculate the profit of corresponding fitting-out work according to total decoration cost and whole account dues;
The statistical module is used to all fitting-out works being divided into one group according to every n, and the fitting-out work in every group is from 1
It is numbered to n, the n is more than or equal to 10;
The profit summarizing module is used for according to the quantity n of engineering is calculated in the profit and the group of single engineering in one group
The total earnings of all engineerings in the group;
The cost returned module and be used to take out specified engineering from the profit of this group of engineering after one group of engineering
Return to the client of the specified engineering;The specified engineering is that first engineering from first group in the statistical module is opened
Begin the engineering that sequence is specified backward.
Wherein, the cost module includes labour cost unit, Master Cost unit, cost of equipment unit, administration fee
Unit, expenses of taxation unit, charges for water and electricity unit, conceptual design expense unit, construction progress control unit and decoration budget unit;
The labour cost unit is for calculating the total labour cost paid in single fitting-out work;
The Master Cost unit is used to calculate the expense of the finishing material consumed in single fitting-out work;
The cost of equipment unit is for calculating rent of machine and equipment depreciation expense in single fitting-out work;
The administration fee unit is for calculating the administration fee generated in single fitting-out work;
The expenses of taxation unit is used to calculate single fitting-out work and needs the Sales Tax paid;
The charges for water and electricity unit is for calculating the charges for water and electricity generated in single fitting-out work;
The conceptual design expense unit is used to be calculated as this decorating scheme and pays the design cost of Chevron Research Company (CRC);
The construction progress control unit is used to preset project progress node before fitting-out work starts, in work progress
Middle management construction speed, and remind construction direction client to collect corresponding construction money when completing preset construction task;
The decoration budget unit is used to carry out primary Calculation to the cost of fitting-out work before finishing.
Wherein, the gathering module includes construction speed reminding unit, fee to be charged computing unit and gathering unit;
The construction speed reminding unit is used to remind construction direction client to collect when fitting-out work reaches default progress
Engineering funds;
The fee to be charged computing unit is used to calculate the engineering funds amount of money for needing to collect to client according to project progress;
The gathering unit is used to collect corresponding engineering funds to client in preset project progress node.
Wherein, the profit summarizing module includes single engineering profit record unit and grouping profit computing unit;
The single engineering profit record unit is used to obtain the profit of single engineering from the profit module;
The grouping profit computing unit is used for institute in one group of engineering of the single engineering profit record unit record
There is the profit of single engineering to carry out cumulative and then obtains the total earnings of this group of engineering.
Wherein, the statistical module includes classified statistic unit, returns marking unit and return reminding unit;
Quantity of the classified statistic unit for the fitting-out work to being completed in one group counts;It is completed when in one group
Fitting-out work quantity be less than n when, the classified statistic unit prompts this group of engineering quantity deficiency;
When the quantity for the fitting-out work completed in one group is equal to n, the classified statistic unit prompt meets return condition,
And the engineering in rear set is started counting up from 1;
The return marking unit is used for when one group of engineering meets return condition, the specified work for needing to return decoration cost
It journey and is marked;
Return marking unit sequence detection since first group of first engineering is not returned until finding first
Also the engineering of cost then stops the detection to subsequent engineering, and is the engineering for currently needing to return cost by the engineered marks;
It is described return reminding unit be used for remind construction party to it is described return marking unit label current needs return at
This engineering returns decoration cost.
Wherein, the return module includes returning money amount of money retrieval unit, returning money unit and re-flag unit;
It is described return money amount of money retrieval unit for according to the statistical module to currently need return cost engineering volume
Number and it is described gathering module to currently need return cost engineering gathering determination return the money amount of money;
The money unit that returns is used for the client for returning the money amount of money and returning to the current engineering for needing to return cost;
It is described re-flag unit for the client that decoration cost is returned to the current engineering for needing to return cost it
Afterwards, it is to have returned cost by the current engineered marks for needing to return cost.
A kind of house ornamentation method manages system, including step for the free house decoration:
Step 1:Cost budgeting is carried out to single engineering;
Step 2:Decoration construction is carried out to single engineering;
Step 3:The construction speed of the fitting-out work is monitored and carries out interim gathering according to progress;
Step 4:After completing one group of engineering, the total earnings of this group of engineering is calculated;
Step 5:The cost of specified engineering is returned out of the one group of engineering currently completed total earnings to corresponding client.
Wherein, the construction speed of the described pair of fitting-out work is monitored and carries out interim gathering packet according to progress
It includes:
Judge whether fitting-out work reaches default progress node;
If not reaching the default progress node, continue to construct;
If reaching the default progress node, to having completed, part is collected money;
After gathering terminates, judge whether current fitting-out work has completed;
If current fitting-out work does not complete, continue current fitting-out work;
If current fitting-out work has completed, judge whether be fully completed when n fitting-out work of previous group;
If the n fitting-out work when previous group is not fully completed, start a new upfitter back to step 1
Journey.
Wherein, after one group of engineering of the completion, the total earnings for calculating this group of engineering includes:
The single engineering profit record unit obtains the profit of single engineering from the profit module;
Grouping profit computing unit is by all lists in one group of engineering of the single engineering profit record unit record
The profit of a engineering carries out cumulative and then obtains the total earnings of this group of engineering.
Wherein, the cost that specified engineering is returned out of currently complete one group of engineering total earnings is to corresponding client
Including:
It is described return money amount of money retrieval unit according to the statistical module to currently need return cost engineering number and
The gathering module returns the money amount of money to the gathering determination for currently needing to return the engineering of cost;
The money unit that returns is by the client for returning the money amount of money and returning to the current engineering for needing to return cost;
The unit that re-flags, will after the client that decoration cost is returned to the current engineering for needing to return cost
The engineered marks are to have returned cost.
Wherein, described to include to the progress cost budgeting of single engineering:
The labour cost unit calculates the total labour cost paid in single fitting-out work;
The Master Cost unit calculates the expense of the finishing material consumed in single fitting-out work;
The cost of equipment unit calculates rent of machine and equipment depreciation expense in single fitting-out work;
The administration fee unit calculates the administration fee generated in single fitting-out work;
The expenses of taxation unit calculates single fitting-out work and needs the Sales Tax paid;
The charges for water and electricity unit calculates the charges for water and electricity generated in single fitting-out work;
The conceptual design expense unit is calculated as this decorating scheme and pays the design cost of Chevron Research Company (CRC);
The decoration budget unit carries out primary Calculation to the cost of fitting-out work.
The invention has the advantages that:
The free house decoration of the present invention manages system, including cost module, gathering module, profit module, profit summarize
Module returns module and statistical module;
The cost module is for calculating the total decoration cost of fitting-out work;
The gathering module is used to collect the fund for part of having completed according to finishing progress during finishing, it is ensured that
Its whole account due is collected at the end of a fitting-out work;
The profit module is used to calculate the profit of corresponding fitting-out work according to total decoration cost and whole account dues;
The statistical module is used to all fitting-out works being divided into one group according to every n, and the fitting-out work in every group is from 1
It is numbered to n, the n is more than or equal to 10;
The profit summarizing module is used for according to the quantity n of engineering is calculated in the profit and the group of single engineering in one group
The total earnings of all engineerings in the group;
The cost returned module and be used to take out specified engineering from the profit of this group of engineering after one group of engineering
Return to the client of the specified engineering;The specified engineering is that first engineering from first group in the statistical module is opened
Begin the engineering that sequence is specified backward;
The house ornamentation method of the present invention manages system, including step for the free house decoration:
Step 1:Cost budgeting is carried out to single engineering;
Step 2:Decoration construction is carried out to single engineering;
Step 3:The construction speed of the fitting-out work is monitored and carries out interim gathering according to progress;
Step 4:After completing one group of engineering, the total earnings of this group of engineering is calculated;
Step 5:The cost of specified engineering is returned out of the one group of engineering currently completed total earnings to corresponding client;
The present invention can calculate the cost of fitting-out work by the cost module, can be to all by statistical module
Fitting-out work carry out scientific and effective management, by collecting money, module may be implemented rationally to collect money to fitting-out work, pass through
Profit module and summarizing module of getting a profit can calculate the gross profit of one group of engineering, can be by one of profit by returning module
Divide and return to given client, if to fulfil the free house ornamentation held to client;The given client is according to the invention free
House decoration manages the rule ordering determination of system.
Description of the drawings
Fig. 1 is the functional block diagram of the free house decoration management system of the present invention.
1- cost modules;2- gathering modules;3- profit modules;4- profit summarizing modules;5- returns module;6- counts mould
Block.
Specific implementation mode
The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention..
Embodiment 1
The free house decoration of the present invention manages system, including cost module 1, gathering module 2, profit module 3, profit are converged
Total module 4 returns module 5 and statistical module 6;
The cost module 1 is for calculating the total decoration cost of fitting-out work;
The gathering module 2 is used to collect the fund for part of having completed according to finishing progress during finishing, really
Guarantor collects its whole account due at the end of a fitting-out work;
The profit module 3 is used to calculate being full of for corresponding fitting-out work according to total decoration cost and whole account dues
Profit;
The statistical module 6 is used to all fitting-out works being divided into one group according to every n, the fitting-out work in every group from
1 to n is numbered, and the n is more than or equal to 10;N is 15 in the present embodiment, i.e., continuous 15 fitting-out works are as one group;When even
After 15 fitting-out works of continuous completion, a part is taken out out of 15 fitting-out works gross profit and returns money to given client;It should
Given client is to sort always to obtain according to preset sequence;For example, being carried out from 1 to 15 since first group of first project
Number;If carried out returning money to first group of first client before, first group of second client returns money not yet, then
When one group of current project terminates, it should return money to first group second from a branch is taken out when the profit of previous group project
A client;
The profit summarizing module 4 is used for according to the quantity n of engineering is calculated in the profit and the group of single engineering in one group
Go out the total earnings of all engineerings in the group;
The cost returned module 5 and be used to take out specified engineering from the profit of this group of engineering after one group of engineering
Return to the client of the specified engineering;The specified engineering is first engineering from first group in the statistical module 6
Start the engineering that sequence is specified backward.
The present invention can calculate the cost of fitting-out work by the cost module 1, can be to institute by statistical module 6
Some fitting-out works carry out scientific and effective management, and by collecting money, module 2 may be implemented rationally to collect money to fitting-out work, lead to
The gross profit of one group of engineering can be calculated by crossing profit module 3 and profit summarizing module 4, can will be got a profit by returning module 5
A part return to given client, if to fulfil the free house ornamentation held to client;The given client is according to the present invention
Free house decoration management system rule ordering determine.
Embodiment 2
Further, on the basis of embodiment 1:
The cost module 1 include labour cost unit, Master Cost unit, cost of equipment unit, administration fee unit,
Expenses of taxation unit, charges for water and electricity unit, conceptual design expense unit, construction progress control unit and decoration budget unit;
The labour cost unit is for calculating the total labour cost paid in single fitting-out work;
The Master Cost unit is used to calculate the expense of the finishing material consumed in single fitting-out work;
The cost of equipment unit is for calculating rent of machine and equipment depreciation expense in single fitting-out work;
The administration fee unit is for calculating the administration fee generated in single fitting-out work;
The expenses of taxation unit is used to calculate single fitting-out work and needs the Sales Tax paid;
The charges for water and electricity unit is for calculating the charges for water and electricity generated in single fitting-out work;
The conceptual design expense unit is used to be calculated as this decorating scheme and pays the design cost of Chevron Research Company (CRC);
The construction progress control unit is used to preset project progress node before fitting-out work starts, in work progress
Middle management construction speed, and remind construction direction client to collect corresponding construction money when completing preset construction task;
The decoration budget unit is used to carry out primary Calculation to the cost of fitting-out work before finishing.
The gathering module 2 includes construction speed reminding unit, fee to be charged computing unit and gathering unit;
The construction speed reminding unit is used to remind construction direction client to collect when fitting-out work reaches default progress
Engineering funds;
The fee to be charged computing unit is used to calculate the engineering funds amount of money for needing to collect to client according to project progress;
The gathering unit is used to collect corresponding engineering funds to client in preset project progress node.
The profit summarizing module 4 includes single engineering profit record unit and grouping profit computing unit;
The single engineering profit record unit is used to obtain the profit of single engineering from the profit module 3;
The grouping profit computing unit is used for institute in one group of engineering of the single engineering profit record unit record
There is the profit of single engineering to carry out cumulative and then obtains the total earnings of this group of engineering.
The statistical module 6 includes classified statistic unit, returns marking unit and return reminding unit;
Quantity of the classified statistic unit for the fitting-out work to being completed in one group counts;It is completed when in one group
Fitting-out work quantity be less than n when, the classified statistic unit prompts this group of engineering quantity deficiency;
When the quantity for the fitting-out work completed in one group is equal to n, the classified statistic unit prompt meets return condition,
And the engineering in rear set is started counting up from 1;
The return marking unit is used for when one group of engineering meets return condition, the specified work for needing to return decoration cost
It journey and is marked;
Return marking unit sequence detection since first group of first engineering is not returned until finding first
Also the engineering of cost then stops the detection to subsequent engineering, and is the engineering for currently needing to return cost by the engineered marks;
It is described return reminding unit be used for remind construction party to it is described return marking unit label current needs return at
This engineering returns decoration cost.
The return module 5 includes returning money amount of money retrieval unit, returning money unit and re-flag unit;
It is described return money amount of money retrieval unit for according to the statistical module 6 to currently need return cost engineering volume
Number and it is described gathering module 2 to currently need return cost engineering gathering determination return the money amount of money;
The money unit that returns is used for the client for returning the money amount of money and returning to the current engineering for needing to return cost;
It is described re-flag unit for the client that decoration cost is returned to the current engineering for needing to return cost it
Afterwards, it is to have returned cost by the current engineered marks for needing to return cost.
Embodiment 3
The house ornamentation method of the present embodiment 3 manages system, including step for the free house decoration:
Step 1:Cost budgeting is carried out to single engineering;
Step 2:Decoration construction is carried out to single engineering;
Step 3:The construction speed of the fitting-out work is monitored and carries out interim gathering according to progress;
Step 4:After completing one group of engineering, the total earnings of this group of engineering is calculated;
Step 5:The cost of specified engineering is returned out of the one group of engineering currently completed total earnings to corresponding client.
The construction speed of the described pair of fitting-out work is monitored and carries out interim gathering according to progress:
Judge whether fitting-out work reaches default progress node;
If not reaching the default progress node, continue to construct;
If reaching the default progress node, to having completed, part is collected money;
After gathering terminates, judge whether current fitting-out work has completed;
If current fitting-out work does not complete, continue current fitting-out work;
If current fitting-out work has completed, judge whether be fully completed when n fitting-out work of previous group;
If the n fitting-out work when previous group is not fully completed, start a new upfitter back to step 1
Journey.
After one group of engineering of the completion, the total earnings for calculating this group of engineering includes:
The single engineering profit record unit obtains the profit of single engineering from the profit module 3;
Grouping profit computing unit is by all lists in one group of engineering of the single engineering profit record unit record
The profit of a engineering carries out cumulative and then obtains the total earnings of this group of engineering.
It is described out of currently complete one group of engineering total earnings return specify engineering cost include to corresponding client:
It is described return money amount of money retrieval unit according to the statistical module 6 to currently need return cost engineering number and
The gathering module 2 returns the money amount of money to the gathering determination for currently needing to return the engineering of cost;
The money unit that returns is by the client for returning the money amount of money and returning to the current engineering for needing to return cost;
The unit that re-flags, will after the client that decoration cost is returned to the current engineering for needing to return cost
The engineered marks are to have returned cost.
It is described to include to the progress cost budgeting of single engineering:
The labour cost unit calculates the total labour cost paid in single fitting-out work;
The Master Cost unit calculates the expense of the finishing material consumed in single fitting-out work;
The cost of equipment unit calculates rent of machine and equipment depreciation expense in single fitting-out work;
The administration fee unit calculates the administration fee generated in single fitting-out work;
The expenses of taxation unit calculates single fitting-out work and needs the Sales Tax paid;
The charges for water and electricity unit calculates the charges for water and electricity generated in single fitting-out work;
The conceptual design expense unit is calculated as this decorating scheme and pays the design cost of Chevron Research Company (CRC);
The decoration budget unit carries out primary Calculation to the cost of fitting-out work.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this
On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore,
These modifications or improvements without departing from theon the basis of the spirit of the present invention belong to the scope of protection of present invention.
Claims (10)
1. a kind of free house decoration manages system, which is characterized in that including cost module (1), gathering module (2), profit mould
Block (3), returns module (5) and statistical module (6) at profit summarizing module (4);
The cost module (1) is for calculating the total decoration cost of fitting-out work;
The gathering module (2) is used to collect the fund for part of having completed according to finishing progress during finishing, it is ensured that
Its whole account due is collected at the end of a fitting-out work;
The profit module (3) is used to calculate the profit of corresponding fitting-out work according to total decoration cost and whole account dues;
The statistical module (6) is used to all fitting-out works being divided into one group according to every n, and the fitting-out work in every group is from 1
It is numbered to n, the n is more than or equal to 10;
The profit summarizing module (4) is used for according to the quantity n of engineering is calculated in the profit and the group of single engineering in one group
The total earnings of all engineerings in the group;
The cost that the return module (5) is used to take out specified engineering from the profit of this group of engineering after one group of engineering is returned
Return the client of the specified engineering;The specified engineering is first engineering from first group in the statistical module (6)
Start the engineering that sequence is specified backward.
2. free house decoration manages system according to claim 1, which is characterized in that the cost module (1) includes people
Expenses of labour unit, Master Cost unit, cost of equipment unit, administration fee unit, expenses of taxation unit, charges for water and electricity unit, scheme are set
Charging unit, construction progress control unit and decoration budget unit;
The labour cost unit is for calculating the total labour cost paid in single fitting-out work;
The Master Cost unit is used to calculate the expense of the finishing material consumed in single fitting-out work;
The cost of equipment unit is for calculating rent of machine and equipment depreciation expense in single fitting-out work;
The administration fee unit is for calculating the administration fee generated in single fitting-out work;
The expenses of taxation unit is used to calculate single fitting-out work and needs the Sales Tax paid;
The charges for water and electricity unit is for calculating the charges for water and electricity generated in single fitting-out work;
The conceptual design expense unit is used to be calculated as this decorating scheme and pays the design cost of Chevron Research Company (CRC);
The construction progress control unit is used to preset project progress node before fitting-out work starts, and manages in the construction process
Construction speed is managed, and reminds construction direction client to collect corresponding construction money when completing preset construction task;
The decoration budget unit is used to carry out primary Calculation to the cost of fitting-out work before finishing.
3. free house decoration manages system according to claim 2, which is characterized in that the gathering module (2) includes applying
Work progress reminding unit, fee to be charged computing unit and gathering unit;
The construction speed reminding unit is used to remind construction direction client to collect engineering when fitting-out work reaches default progress
Money;
The fee to be charged computing unit is used to calculate the engineering funds amount of money for needing to collect to client according to project progress;
The gathering unit is used to collect corresponding engineering funds to client in preset project progress node.
4. free house decoration manages system according to claim 3, which is characterized in that profit summarizing module (4) packet
Include single engineering profit record unit and grouping profit computing unit;
The single engineering profit record unit is used to obtain the profit of single engineering from the profit module (3);
The grouping profit computing unit is used for all lists in one group of engineering of the single engineering profit record unit record
The profit of a engineering carries out cumulative and then obtains the total earnings of this group of engineering.
5. free house decoration manages system according to claim 4, which is characterized in that the statistical module (6) includes point
Group statistic unit returns marking unit and returns reminding unit;
Quantity of the classified statistic unit for the fitting-out work to being completed in one group counts;When the dress completed in one group
When repairing the quantity of engineering less than n, the classified statistic unit prompts this group of engineering quantity deficiency;
When the quantity for the fitting-out work completed in one group is equal to n, classified statistic unit prompt meets return condition, and after
Engineering in one group of face is started counting up from 1;
The return marking unit is used for when one group of engineering meets return condition, the specified engineering for needing to return decoration cost and
It is marked;
Return marking unit sequence detection since first group of first engineering, until find first without return at
This engineering then stops the detection to subsequent engineering, and is the engineering for currently needing to return cost by the engineered marks;
The reminding unit of returning is used to remind construction party to need to return cost to the current of the return marking unit label
Engineering returns decoration cost.
6. free house decoration manages system according to claim 5, which is characterized in that the return module (5) includes returning
Money amount of money retrieval unit returns money unit and re-flags unit;
It is described return money amount of money retrieval unit for according to the statistical module (6) to currently need return cost engineering number
The money amount of money is returned to the gathering determination for currently needing to return the engineering of cost with the gathering module (2);
The money unit that returns is used for the client for returning the money amount of money and returning to the current engineering for needing to return cost;
The unit that re-flags is used for after the client that decoration cost is returned to the current engineering for needing to return cost, will
The current engineered marks for needing to return cost are to have returned cost.
7. a kind of house ornamentation method manages system, which is characterized in that including step for free house decoration described in claim 6:
Step 1:Cost budgeting is carried out to single engineering;
Step 2:Decoration construction is carried out to single engineering;
Step 3:The construction speed of the fitting-out work is monitored and carries out interim gathering according to progress;
Step 4:After completing one group of engineering, the total earnings of this group of engineering is calculated;
Step 5:The cost of specified engineering is returned out of the one group of engineering currently completed total earnings to corresponding client.
8. house ornamentation method according to claim 7, which is characterized in that the construction speed of the described pair of fitting-out work is monitored
And it carries out interim gathering according to progress and includes:
Judge whether fitting-out work reaches default progress node;
If not reaching the default progress node, continue to construct;
If reaching the default progress node, to having completed, part is collected money;
After gathering terminates, judge whether current fitting-out work has completed;
If current fitting-out work does not complete, continue current fitting-out work;
If current fitting-out work has completed, judge whether be fully completed when n fitting-out work of previous group;
If the n fitting-out work when previous group is not fully completed, start a new fitting-out work back to step 1.
9. house ornamentation method according to claim 8, which is characterized in that after one group of engineering of the completion, calculate this group of engineering
Total earnings include:
The single engineering profit record unit obtains the profit of single engineering from the profit module (3);
Grouping profit computing unit is by all single works in one group of engineering of the single engineering profit record unit record
The profit of journey carries out cumulative and then obtains the total earnings of this group of engineering.
10. house ornamentation method according to claim 9, which is characterized in that the total earnings from currently complete one group of engineering
It is interior return specify engineering cost include to corresponding client:
It is described return money amount of money retrieval unit according to the statistical module (6) to currently need return cost engineering number and institute
It states gathering module (2) and the money amount of money is returned to the gathering determination for currently needing to return the engineering of cost;
The money unit that returns is by the client for returning the money amount of money and returning to the current engineering for needing to return cost;
The unit that re-flags, will be described after the client that decoration cost is returned to the current engineering for needing to return cost
Engineered marks are to have returned cost;
It is described to include to the progress cost budgeting of single engineering:
The labour cost unit calculates the total labour cost paid in single fitting-out work;
The Master Cost unit calculates the expense of the finishing material consumed in single fitting-out work;
The cost of equipment unit calculates rent of machine and equipment depreciation expense in single fitting-out work;
The administration fee unit calculates the administration fee generated in single fitting-out work;
The expenses of taxation unit calculates single fitting-out work and needs the Sales Tax paid;
The charges for water and electricity unit calculates the charges for water and electricity generated in single fitting-out work;
The conceptual design expense unit is calculated as this decorating scheme and pays the design cost of Chevron Research Company (CRC);
The decoration budget unit carries out primary Calculation to the cost of fitting-out work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810317347.7A CN108510206A (en) | 2018-04-10 | 2018-04-10 | A kind of free house decoration management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810317347.7A CN108510206A (en) | 2018-04-10 | 2018-04-10 | A kind of free house decoration management system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108510206A true CN108510206A (en) | 2018-09-07 |
Family
ID=63381437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810317347.7A Pending CN108510206A (en) | 2018-04-10 | 2018-04-10 | A kind of free house decoration management system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108510206A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110674540A (en) * | 2019-09-06 | 2020-01-10 | 北京创艺汇文化传播有限公司 | Restaurant design scheme quotation method and system |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101256647A (en) * | 2008-03-31 | 2008-09-03 | 上海星露信息科技有限公司 | Item management system being suitable for garden engineering |
CN102637283A (en) * | 2012-01-17 | 2012-08-15 | 云南悦倪科技有限公司 | Wireless shopping rebate system based on mobile terminal and realization method |
CN103177310A (en) * | 2011-12-20 | 2013-06-26 | 中工国际工程股份有限公司 | Data processing system for cost control |
CN104123604A (en) * | 2014-06-09 | 2014-10-29 | 湖北福泰建筑装饰工程有限公司 | Engineering management information processing system |
CN104408559A (en) * | 2014-11-19 | 2015-03-11 | 湖北福泰建筑装饰工程有限公司 | Engineering information management system |
CN104715381A (en) * | 2015-03-17 | 2015-06-17 | 北京淘家家电子商务有限公司 | Home decoration network service platform |
CN105160534A (en) * | 2015-08-19 | 2015-12-16 | 河南鑫山信息科技有限公司 | Home decoration network platform system and use method |
CN105184601A (en) * | 2015-07-28 | 2015-12-23 | 朱寿会 | Non-toxic decoration system and method |
CN105488703A (en) * | 2015-11-18 | 2016-04-13 | 邓明晖 | Geographic position locating based home decoration internet supervision service bidirectional matching and trading system |
CN107437167A (en) * | 2017-07-19 | 2017-12-05 | 中诚工程建设管理(苏州)股份有限公司 | Construction-engineering project data handling system |
CN107679722A (en) * | 2017-09-22 | 2018-02-09 | 周正高 | Decoration construction intelligent monitoring management platform |
-
2018
- 2018-04-10 CN CN201810317347.7A patent/CN108510206A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101256647A (en) * | 2008-03-31 | 2008-09-03 | 上海星露信息科技有限公司 | Item management system being suitable for garden engineering |
CN103177310A (en) * | 2011-12-20 | 2013-06-26 | 中工国际工程股份有限公司 | Data processing system for cost control |
CN102637283A (en) * | 2012-01-17 | 2012-08-15 | 云南悦倪科技有限公司 | Wireless shopping rebate system based on mobile terminal and realization method |
CN104123604A (en) * | 2014-06-09 | 2014-10-29 | 湖北福泰建筑装饰工程有限公司 | Engineering management information processing system |
CN104408559A (en) * | 2014-11-19 | 2015-03-11 | 湖北福泰建筑装饰工程有限公司 | Engineering information management system |
CN104715381A (en) * | 2015-03-17 | 2015-06-17 | 北京淘家家电子商务有限公司 | Home decoration network service platform |
CN105184601A (en) * | 2015-07-28 | 2015-12-23 | 朱寿会 | Non-toxic decoration system and method |
CN105160534A (en) * | 2015-08-19 | 2015-12-16 | 河南鑫山信息科技有限公司 | Home decoration network platform system and use method |
CN105488703A (en) * | 2015-11-18 | 2016-04-13 | 邓明晖 | Geographic position locating based home decoration internet supervision service bidirectional matching and trading system |
CN107437167A (en) * | 2017-07-19 | 2017-12-05 | 中诚工程建设管理(苏州)股份有限公司 | Construction-engineering project data handling system |
CN107679722A (en) * | 2017-09-22 | 2018-02-09 | 周正高 | Decoration construction intelligent monitoring management platform |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110674540A (en) * | 2019-09-06 | 2020-01-10 | 北京创艺汇文化传播有限公司 | Restaurant design scheme quotation method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106503959B (en) | The monitoring early-warning system of project information | |
CN111192004A (en) | Method for displaying current to-do task and subsequent to-do workflow | |
CN109360135B (en) | Server, public service data processing method based on block chain and storage medium | |
CN106204931A (en) | A kind of keyholed back plate that takes the most in real time manages system and method | |
CN109951302A (en) | A kind of cloud computing charge system and method based on the customized product of data dictionary | |
CN106485555A (en) | A kind of advertising resource distribution method and device | |
CN107730398A (en) | The recommendation method, apparatus and storage medium of electricity consumption charging mode | |
CN108564311A (en) | A kind of supervision of Project Cost and remind management method and system | |
CN104408831B (en) | Monitoring method and device for state of bank self-service equipment | |
CN108510206A (en) | A kind of free house decoration management system and method | |
US20180211292A1 (en) | Tracking the state of billing records in a metered billing system for resolving billing disputes | |
CN114782089A (en) | Data processing method, system and equipment for enterprise cost management | |
CN108647952B (en) | Electronic payment reconciliation method and device | |
CN110188255A (en) | Power consumer Behavior mining method and system based on the shared fusion of business datum | |
CN104700291A (en) | Express cloud quotation system | |
CN110348983A (en) | Transaction Information management method and device, electronic equipment and non-transient storage media | |
CN109345053A (en) | A kind of electricity power engineering credit requirement methodology | |
CN113034150B (en) | Refund method for unmanned retail terminal | |
CN114924871A (en) | Data processing method and device based on resource pool structure and computer equipment | |
CN108428106A (en) | A kind of intelligent application method, system and terminal device of financing | |
CN104424590A (en) | House-leasing contract cost calculation method based on multi-Agent collaborative technology | |
CN102346935A (en) | Payment control method capable of reserving balances for tap water system | |
CN110570169A (en) | Information generation method, computer equipment and readable storage medium | |
CN112464113B (en) | Customer information accurate search management system and method | |
US20190026797A1 (en) | Method and Billing Platform for Building Real Time Charge Aggregations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180907 |