- CN103942658A CN103942658A CN201410190387.1A CN201410190387A CN103942658A CN 103942658 A CN103942658 A CN 103942658A CN 201410190387 A CN201410190387 A CN 201410190387A CN 103942658 A CN103942658 A CN 103942658A
- Authority
- CN
- China
- Prior art keywords
- module
- engineering
- user
- power engineering
- flow process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a design flow management system for electric power engineering. The system mainly comprises a project category partition module, a flow user-defined module, a user assigned module and a data management module, wherein the project category partition module is used for partitioning the categories of engineering according to the property of the engineering; due to the different flows of the different categories of engineering, the specific flow of the engineering can be set by the flow user-defined module according to the categories of the engineering; furthermore, the user assigned module assigns the corresponding executive agencies or executive staffs to operate the different flows. After the executive agencies or the executive staffs execute the flows, the related data is uploaded to the system through the data management module, and the completed flows can be determined. The design flow management system provided by the invention is capable of acquiring various date generated in an engineering construction, so that the omission of data can not be generated, and the information management efficiency can be improved.
Description
Technical field
The present invention relates to field of power, relate in particular a kind of power engineering design flow management system.
Background technology
Along with the development of China's electric utility, the input amount of power engineering design also continues to increase.The work that the management of the engineering construction project of power industry and control are complexity, loaded down with trivial details and intensity is very large.How effectively to utilize power engineering construction signal, to guarantee project progress, raising construction quality, control engineering investment, become a problem needing solution in power engineering construction badly.
The management of information is manually carried out in the common employing of current power engineering construction, and levels large due to workload and managerial personnel are limited, cause information management efficiency low.
Summary of the invention
In view of this, the invention provides a kind of power engineering design flow management system, to improve the information management efficiency of power engineering.
For achieving the above object, the invention provides following technical scheme:
A power engineering design flow management system, comprising:
Works category is divided module, and described works category module is for carrying out the division of works category according to the difference of the concrete business of power engineering;
Divide with described works category the user-defined flow module that module is connected, described user-defined flow module, for according to the classification of power engineering, is carried out self-defined to the flow process of described power engineering;
With user's designated module that described user-defined flow module is connected, described user's designated module is for specifying relevant executive arm or operational staff according to the flow process of described power engineering;
With the data management module that described user's designated module is connected, the data producing when carrying out each flow process that described data management module is uploaded for collecting described executive arm or described operational staff.
Preferably, also comprise: with the timing node setting module that described user-defined flow module is connected, described timing node setting module is for process settings timing node that need to be to power engineering according to user.
Preferably, also comprise: be connected with described timing node setting module, when the flow process of power engineering has exceeded default timing node, carry out the alarm module of early warning.
Preferably, also comprise: the authority management module being connected with described data management module with described user's designated module, described managing entitlement module is used for according to executive arm or the operational staff of the appointment of user instruction module, setting operation authority, and when determining that logging in personnel meets operating right, allow the personnel that log in to carry out uploading or transferring of data.
Preferably, also comprise: with the flow process progress control module that place data management module is connected with described timing node setting module, described flow process progress control module is used for showing current flow process progress, and overtime flow process number is added up.
Preferably, also comprise: with the engineering cost administration module that described data management module is connected, described engineering cost administration module is for adjusting and remind engineering cost according to the flow process progress of engineering.
Preferably, also comprise: the engineering that described power engineering is nullified is nullified module.
Preferably, also comprise: the engineering that described power engineering is freezed is freezed module.
Preferably, described system be take EPA as technical support.
Preferably, described system adopts C/S structural framing.
Known via above-mentioned technical scheme, compared with prior art, the present invention openly provides a kind of power engineering design flow management system.This system mainly comprises: works category is divided module, user-defined flow module, user's designated module and data management module.Wherein, works category is divided module for the classification of engineering being divided according to the character of engineering.Because the flow process of dissimilar engineering is different, and then user-defined flow module is according to the idiographic flow of category setting this project of engineering.Further, user's designated module specifies corresponding executive arm or operational staff to operate different flow processs.After executive arm or operational staff execute this flow process, relevant data are uploaded to this system by data management module, determine that this flow process completes.The various data that the present invention produces in can Real-time Collection engineering construction, there will not be the omission of data, have improved information management efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skills, do not paying under the prerequisite of creative work, other accompanying drawing can also be provided according to the accompanying drawing providing.
Fig. 1 shows the structural representation of an embodiment of a kind of power engineering design flow management system of the present invention;
Fig. 2 shows the structural representation of another embodiment of a kind of power engineering design flow management system of the present invention;
Fig. 3 shows the structural representation of another embodiment of a kind of power engineering design flow management system of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, rather than whole embodiment.Embodiment based in the present invention, those of ordinary skills, not making the every other embodiment obtaining under creative work prerequisite, belong to the scope of protection of the invention.
Embodiment (one)
Referring to Fig. 1, show the structural representation of an embodiment of a kind of power engineering design flow management system of the present invention.
As shown in Figure 1, this power engineering design flow management system comprises:
Works category is divided module 1, and described works category module 1 is for carry out the division of works category according to the difference of the concrete business of power engineering, as: industry expands engineering, fragmentary engineering etc.
Divide with described works category the user-defined flow module 2 that module 1 is connected, described user-defined flow module 2, for according to the classification of power engineering, is carried out self-defined to the flow process of described power engineering.Different classes of engineering can customize different flow processs, i.e. different operation stepss.Such as this flow process comprises: engineering builds that card, project are sent work, in-site measurement, engineering design, drawing check, drawing examination, upload drawing, estimating, budget check, budget auditing, signed a contract, collection of charges, drawing are published, drawing is paid, drawing is told somebody what one's real intentions are is site technology service etc.
With user's designated module 3 that described user-defined flow module 2 is connected, described user's designated module 3 is for specifying relevant executive arm or operational staff according to the flow process of described power engineering.
With the data management module 4 that described user's designated module 3 is connected, the data producing when carrying out each flow process that described data management module 4 is uploaded for collecting described executive arm or described operational staff, to guarantee the integrality of whole power engineering data.When executive arm or operational staff have uploaded the data producing when carrying out corresponding flow process, system determines that this flow process is complete, and then enters next operating process.
From above technical scheme, this system can be to each flow process monitoring in power engineering, and the data that produces when processing each flow process of Real-time Obtaining, thereby guarantees there will not be the omission of data, has improved information management efficiency.
Embodiment (two)
Referring to Fig. 2, show the structural representation of another embodiment of a kind of power engineering design flow management system of the present invention.
As shown in Figure 2, this system comprises: works category is divided module 1, and described works category module 1 is for carrying out the division of works category according to the difference of the concrete business of power engineering.
Divide with described works category the user-defined flow module 2 that module 1 is connected, described user-defined flow module 2, for according to the classification of power engineering, is carried out self-defined to the flow process of described power engineering.
With user's designated module 3 that described user-defined flow module 2 is connected, described user's designated module 3 is for specifying relevant executive arm or operational staff according to the flow process of described power engineering.
With the data management module 4 that described user's designated module 3 is connected, the data producing when carrying out each flow process that described data management module 4 is uploaded for collecting described executive arm or described operational staff.
With the timing node setting module 5 that described user-defined flow module 2 is connected, described timing node setting module 5 is for process settings timing node that need to be to power engineering according to user.
Be connected with described timing node setting module 5, when the flow process of power engineering has exceeded default timing node, carry out the alarm module 6 of early warning.
Operating personnel can according to power engineering construction need to carry out to different flow processs the setting of time, than figure: engineering is built card flow time node and is set as on March 5th, 2014.Be more than when the time of the executive arm of this flow process or this flow process of execution of operational staff predefined timing node time, 6 pairs of flow processs that are more than timing node of alarm module are reported to the police, thereby remind engineering staff to speed up the work.
Embodiment (three)
Referring to Fig. 3, show the structural representation of another embodiment of a kind of power engineering design flow management system of the present invention.
As shown in Figure 3, this system comprises: works category is divided module 1, and described works category module 1 is for carrying out the division of works category according to the difference of the concrete business of power engineering.
Divide with described works category the user-defined flow module 2 that module 1 is connected, described user-defined flow module 2, for according to the classification of power engineering, is carried out self-defined to the flow process of described power engineering.
With user's designated module 3 that described user-defined flow module 2 is connected, described user's designated module 3 is for specifying relevant executive arm or operational staff according to the flow process of described power engineering.
With the data management module 4 that described user's designated module 3 is connected, the data producing when carrying out each flow process that described data management module 4 is uploaded for collecting described executive arm or described operational staff.
With the timing node setting module 5 that described user-defined flow module 2 is connected, described timing node setting module 5 is for process settings timing node that need to be to power engineering according to user.
Be connected with described timing node setting module 5, when the flow process of power engineering has exceeded default timing node, carry out the alarm module 6 of early warning.
The authority management module 7 being connected with described data management module 4 with described user's designated module 3, described managing entitlement module 7 is for according to executive arm or the operational staff of 3 appointments of user instruction module, setting operation authority, and when determining that logging in personnel meets operating right, allow the personnel that log in to carry out uploading or transferring of data.For fear of non-engineering staff, this system is carried out to maloperation, the user that 7 pairs of authority management modules log in this system carries out authority setting.When authority management module 7 determines that login user is the specified executive arm of user's designated module or operational staff, allow just now user to operate.Optionally, 7 of this authority management modules, give the authority that executive arm or operational staff operate corresponding flow process, and allow executive arms or operational staff to read operation for 7 of other flow process managing entitlement modules.
With the flow process progress control module 8 that place data management module 4 is connected with described timing node setting module 5, described flow process progress control module 8 is for showing current flow process progress, and overtime flow process number is added up.Such as: flow process manages module 5 for completed flow process, appears dimmed; For the flow process of well afoot, shown in red; Flow process for to be completed, is shown as white.Like this, engineering staff can intuitively understand the current progress of engineering.
With the engineering cost administration module 9 that described data management module 4 is connected, described engineering cost administration module 9 is adjusted engineering cost for the flow process progress according to engineering.
It should be noted that, in the present embodiment, this system, also comprises: the engineering cancellation module that described power engineering is nullified and the engineering that described power engineering is freezed are freezed module.
Optionally, it is technical support that this system be take EPA (Ethernet for Plant Automation), adopts C/S structure (client-server structure) framework.
Finally, also it should be noted that, in this article, relational terms such as the first and second grades is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply and between these entities or operation, have the relation of any this reality or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thereby the process, method, article or the equipment that make to comprise a series of key elements not only comprise those key elements, but also comprise other key elements of clearly not listing, or be also included as the intrinsic key element of this process, method, article or equipment.The in the situation that of more restrictions not, the key element being limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment that comprises described key element and also have other identical element.
In this instructions, each embodiment adopts the mode of going forward one by one to describe, and each embodiment stresses is the difference with other embodiment, between each embodiment identical similar part mutually referring to.
Above-mentioned explanation to the disclosed embodiments, makes professional and technical personnel in the field can realize or use the application.To the multiple modification of these embodiment, will be apparent for those skilled in the art, General Principle as defined herein can be in the situation that do not depart from the application's spirit or scope, realization in other embodiments.Therefore, the application will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.
Claims (10)
1. a power engineering design flow management system, is characterized in that, comprising:
Works category is divided module, and described works category module is for carrying out the division of works category according to the difference of the concrete business of power engineering;
Divide with described works category the user-defined flow module that module is connected, described user-defined flow module, for according to the classification of power engineering, is carried out self-defined to the flow process of described power engineering;
With user's designated module that described user-defined flow module is connected, described user's designated module is for specifying relevant executive arm or operational staff according to the flow process of described power engineering;
With the data management module that described user's designated module is connected, the data producing when carrying out each flow process that described data management module is uploaded for collecting described executive arm or described operational staff.
2. system according to claim 1, is characterized in that, also comprises: with the timing node setting module that described user-defined flow module is connected, described timing node setting module is for process settings timing node that need to be to power engineering according to user.
3. system according to claim 2, is characterized in that, also comprises: be connected with described timing node setting module, when the flow process of power engineering has exceeded default timing node, carry out the alarm module of early warning.
4. system according to claim 1, it is characterized in that, also comprise: the authority management module being connected with described data management module with described user's designated module, described managing entitlement module is used for according to executive arm or the operational staff of the appointment of user instruction module, setting operation authority, and when determining that logging in personnel meets operating right, allow the personnel that log in to carry out uploading or transferring of data.
5. system according to claim 2, it is characterized in that, also comprise: with the flow process progress control module that place data management module is connected with described timing node setting module, described flow process progress control module is used for showing current flow process progress, and overtime flow process number is added up.
6. system according to claim 1, is characterized in that, also comprises: with the engineering cost administration module that described data management module is connected, described engineering cost administration module is for adjusting and remind engineering cost according to the flow process progress of engineering.
7. system according to claim 1, is characterized in that, also comprises: the engineering that described power engineering is nullified is nullified module.
8. system according to claim 1, is characterized in that, also comprises: the engineering that described power engineering is freezed is freezed module.
9. system according to claim 1, is characterized in that, described system be take EPA as technical support.
10. system according to claim 1, is characterized in that, described system adopts C/S structural framing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410190387.1A CN103942658A (en) | 2014-05-07 | 2014-05-07 | Design flow management system for electric power engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410190387.1A CN103942658A (en) | 2014-05-07 | 2014-05-07 | Design flow management system for electric power engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103942658A true CN103942658A (en) | 2014-07-23 |
Family
ID=51190319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410190387.1A Pending CN103942658A (en) | 2014-05-07 | 2014-05-07 | Design flow management system for electric power engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103942658A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104376431A (en) * | 2014-12-02 | 2015-02-25 | 国网浙江余姚市供电公司 | Engineering project management method and system |
CN105373896A (en) * | 2015-11-24 | 2016-03-02 | 杭州构家网络科技有限公司 | Project management system |
CN106779325A (en) * | 2016-11-29 | 2017-05-31 | 河北建筑工程学院 | A kind of engineering management monitoring system and method |
CN109598409A (en) * | 2018-10-30 | 2019-04-09 | 平安科技(深圳)有限公司 | A kind of computer room installation and deployment method, system and readable storage medium storing program for executing |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
US20130173081A1 (en) * | 2010-11-29 | 2013-07-04 | Nec System Technologies, Ltd. | Electric power management system, electric power management device, electric power management method, and computer readable recording medium |
CN103745303A (en) * | 2013-12-19 | 2014-04-23 | 镇江锐捷信息科技有限公司 | Engineering project management method based on cloud end |
-
2014
- 2014-05-07 CN CN201410190387.1A patent/CN103942658A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130173081A1 (en) * | 2010-11-29 | 2013-07-04 | Nec System Technologies, Ltd. | Electric power management system, electric power management device, electric power management method, and computer readable recording medium |
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN103745303A (en) * | 2013-12-19 | 2014-04-23 | 镇江锐捷信息科技有限公司 | Engineering project management method based on cloud end |
Non-Patent Citations (2)
Title |
---|
王勇: "鞍矿公司配电工程项目管理系统设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑(月刊)》 * |
金坚: "电力设计项目管理系统构建研究", 《中国优秀硕士学位论文全文数据库 信息科技辑(月刊)》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104376431A (en) * | 2014-12-02 | 2015-02-25 | 国网浙江余姚市供电公司 | Engineering project management method and system |
CN105373896A (en) * | 2015-11-24 | 2016-03-02 | 杭州构家网络科技有限公司 | Project management system |
CN106779325A (en) * | 2016-11-29 | 2017-05-31 | 河北建筑工程学院 | A kind of engineering management monitoring system and method |
CN109598409A (en) * | 2018-10-30 | 2019-04-09 | 平安科技(深圳)有限公司 | A kind of computer room installation and deployment method, system and readable storage medium storing program for executing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105786912B (en) | Data collecting conversion method and device | |
KR101953014B1 (en) | System and method for managing energy og building | |
CN102540133B (en) | Automatic detecting system and method for intelligent grid data collecting terminal | |
CN103942658A (en) | Design flow management system for electric power engineering | |
CN103220500B (en) | Grid equipment monitoring image superposes methods of exhibiting with business diagnosis image | |
CN203535696U (en) | Full-automatic intelligent working condition monitoring device | |
CN105719103A (en) | Statistical process control system and management and control method thereof | |
CN203869727U (en) | Real-time monitoring system for crop growth environment data | |
CN106925864A (en) | Welding sequencer parts and statistics restriction analysis device | |
CN106233212A (en) | Intelligent function unit and programmable logic controller system | |
CN113962405A (en) | Intelligent submerged arc furnace remote operation and maintenance system | |
CN208521175U (en) | A kind of creation data monitoring analysis system | |
CN101950476A (en) | Multiway voltage signal monitoring device | |
CN104317267A (en) | ARM-based multichannel real-time data acquisition monitoring system | |
CN103279265A (en) | Terminal and system for displaying network information interface and interface generating method | |
CN112506155A (en) | PC component production simulation and intelligent control system | |
CN202167216U (en) | Modular test platform system for small and medium-sized liquid crystal display screens | |
CN102411329A (en) | Environment monitoring device based on RS-485 bus | |
CN206057731U (en) | A kind of lcd panel test and lcd touch burning device | |
CN104637173A (en) | Water meter management system based on wireless network | |
CN115345455A (en) | Product production data processing method and system applied to flexible production line | |
CN104052160A (en) | Collecting device and method of electrical equipment data | |
CN103499969A (en) | Control system common-mode and series-mode rejection ratio testing method | |
RU128361U1 (en) | MANAGEMENT SYSTEM OF THE AUTOMATED COMPLEX OF ENGINEERING AND TECHNICAL SUPPORT | |
CN105631606A (en) | Energy data management system and energy data management method based on energy metering network diagram |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140723 |
|
RJ01 | Rejection of invention patent application after publication |