CN107680003A - The node tree generation method and device of project supervision task - Google Patents

The node tree generation method and device of project supervision task Download PDF

Info

Publication number
CN107680003A
CN107680003A CN201610621660.0A CN201610621660A CN107680003A CN 107680003 A CN107680003 A CN 107680003A CN 201610621660 A CN201610621660 A CN 201610621660A CN 107680003 A CN107680003 A CN 107680003A
Authority
CN
China
Prior art keywords
node
task
data
tree
father
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610621660.0A
Other languages
Chinese (zh)
Inventor
谢远玉
薛奇辉
单立新
肖发权
卢平
卢一平
徐福兵
陈小东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Thick Cloud Technology Co Ltd
Original Assignee
Beijing Thick Cloud Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Thick Cloud Technology Co Ltd filed Critical Beijing Thick Cloud Technology Co Ltd
Priority to CN201610621660.0A priority Critical patent/CN107680003A/en
Publication of CN107680003A publication Critical patent/CN107680003A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present application provides a kind of the node tree generation method and device of project supervision task, wherein, methods described includes:Define the stage node of project supervision, the father node using the task node as the node tree;Definition is subordinated to the task of the stage node, and it is belonged into different father nodes according to the incidence relation of task, and the child node and leaf of the node tree of the father node are subordinated to generation;The data of father node, the child node and the leaf described in typing;The structure of the node tree and the file of data are recorded in storage.The node tree generation method and device of the project supervision task of the embodiment of the present application, by the stage node and task that define project supervision, and stage node and task are correspondingly formed on the father and son's node and leaf of node tree structure, form the clear view of project supervision flow and the data structure of systematization, it is easy to control of the project supervision personnel to whole supervision process, has ensured that whole management smooth can perform in an orderly manner.

Description

The node tree generation method and device of project supervision task
Technical field
The application is related to data processing field, more particularly to the node tree generation method and dress of a kind of project supervision task Put.
Background technology
Project supervision is the important component of Construction Quality control, along with the work in every of construction, example Such as civil engineering, electrically, hot-water heating is safe, metering etc., and project supervision can correspond to and produce every supervision task.Construction Supervision Work conduct Ensure the important of construction, it will usually with all processes of construction.
Currently, project supervision portion is when doing construction engineering test and checking and accepting, because daily work is numerous and jumbled and unordered, together When, the inspection of each procedure of project supervision or technique needs in the prior art, detection and checking and accepting for task do not have systematization. Therefore, management administrative staff can not quickly determine which task has been done according to current supervision task, which task Also need to improve, the progress of work of management can not be grasped rapidly;Meanwhile management administrative staff also can not be quick and convenient Ground browses the data file of correlation engineering management.
The content of the invention
The first aspect of the application is to provide a kind of node tree generation method of project supervision task, including:Define work The stage node of journey management, the father node using the task node as the node tree;Definition is subordinated to the stage node Task, it is belonged into different father nodes according to the incidence relation of task, with generation be subordinated to described in the father node The child node and leaf of node tree;The data of father node, child node and the leaf described in typing;The knot of the node tree is recorded in storage The file of structure and data.
Preferably, the file of structure and data that the node tree is recorded in the storage includes:The node tree will be recorded Structure and the files of data be stored in cloud storage system.
Preferably, methods described also includes:Deposited when the file of the structure and data of recording the node tree is stored in cloud After storage system, the data of the node tree are proofreaded.
Preferably, the incidence relation of the task includes following at least one:The rank of task, the level of task and The attribute of task.
Preferably, each father node of the node tree, the child node and the definition of leaf and the association between it are closed System meets national project inspection of quality specification.
The application's further aspect is that provides a kind of node tree generating means of project supervision task, including:Father node Definition module, for defining the stage node of project supervision, the father node using the task node as the node tree;Son section Point and leaf definition module, the task of the stage node is subordinated to for defining, it is belonged to according to the incidence relation of task Different father nodes, the child node and leaf of the node tree of the father node are subordinated to generation;Data import modul, it is used for The data of father node, child node and the leaf described in typing;Memory module, the structure sum of the node tree is recorded for storing According to file.
Preferably, the memory module is additionally operable to:The file of the structure and data of recording the node tree is stored in cloud In storage system.
Preferably, described device also includes:Checking module, for when the structure and the file of data of recording the node tree After being stored in cloud storage system, the data of the node tree are proofreaded.
Preferably, the incidence relation of the task includes following at least one:The rank of task, the level of task and The attribute of task.
Preferably, each father node of the node tree, the child node and the definition of leaf and the association between it are closed System meets national project inspection of quality specification.
The node tree generation method and device of the project supervision task provided according to the embodiment of the present application, by defining engineering The stage node and task of management, and stage node and task are correspondingly formed on the father and son's node and leaf of node tree structure, The clear view of project supervision flow and the data structure of systematization are formd, is easy to project supervision personnel to whole supervision process Control, ensured that whole management smooth can perform in an orderly manner.
Brief description of the drawings
Fig. 1 is the flow chart for the node tree generation method for showing the project supervision task according to the embodiment of the present application one;
Fig. 2 is the node tree for showing the project supervision task according to the embodiment of the present application one;
Fig. 3 is the logic diagram for the node tree generating means for showing the project supervision task according to the embodiment of the present application two;
Fig. 4 is to show the logic for being used to generate the equipment of the node tree of project supervision task according to the embodiment of the present application three Block diagram;
Embodiment
The basic conception of the embodiment of the present application is to provide a kind of technical scheme of the node tree generation of project supervision task. Specifically, first, the stage node of project supervision is defined, the father node using the task node as the node tree;Its Secondary, definition is subordinated to the task of the stage node, it is belonged into different father nodes according to the incidence relation of task, with life Into the child node and leaf of the node tree for being subordinated to the father node;Then, father node, child node and the leaf described in typing Data;Finally, the structure of the node tree and the file of data are recorded in storage.Technical scheme provided in an embodiment of the present invention is led to The stage node and task for defining project supervision are crossed, and stage node and task are correspondingly formed to father and son's section of node tree structure On point and leaf, the clear view of project supervision flow and the data structure of systematization are formd, is easy to project supervision personnel to whole The control of individual supervision process, ensure that whole management smooth can perform in an orderly manner.
The node tree generation method and device of the exemplary work supervision task of the application are described in detail below in conjunction with the accompanying drawings.
Embodiment one
Fig. 1 is the flow chart for the node tree generation method for showing the project supervision task according to the embodiment of the present application one.
Reference picture 1, in step S110, the stage node of project supervision is defined, using the task node as the node The father node of tree.
Here, the stage node of project supervision, including meet each stage of national project inspection of quality specification, for example, Preparatory stage before going into operation, soil shield drop, ground and basis, underground waterproof, agent structure etc., the stage node are generally supervised by engineering Reason portion expert is defined according to national project inspection of quality specification, and can be increased according to the complexity of engineering project Subtract.In the node tree of the embodiment of the present application, each stage node for defining, as the father node of the node tree, i.e. accompanying drawing 2 The first order node of the leftmost side in shown figure.
In step S120, definition is subordinated to the task of the stage node, it is belonged to according to the incidence relation of task Different father nodes, the child node and leaf of the node tree of the father node are subordinated to generation.
Specifically, being subordinated to stage node of the task is also the expert for having project supervision portion according to national project inspection of quality Specification is defined.For example, reference can be made in figure shown in accompanying drawing 2, by taking agent structure as an example, preparation, implementation can be divided into, check and accept three Individual child node, implementing child node can further refine comprising cast-in-place concrete structure-wall column reinforcing bar-implementation, be saved in implementation Point is lower can further to define all inter-related tasks, to ultimately form the leaf of node tree.It is described to form child node and the task of leaf After expert defines, according to the specification of engineering construction and practice, different father nodes is belonged to by its incidence relation, with final The node tree of project supervision is formed, wherein, described incidence relation can include rank, the level and task of task of task Attribute.
It is worth noting that, each task can include more attribute, for example, can include:Type, if deposit Shelves, if can be crawled, if having template, the priority of task etc..
In step S130, the data of father node, the child node and the leaf described in typing.
Here, after the structure of node tree is generated, the data with existing of each node and leaf will be logged, to cause engineering Supervisor has completed in which clearly current in stage.
Meanwhile acquiescently, unfinished project supervision task is defaulted as sky.When the visual node tree interface of generation When, different symbols can also be used to show that different task progress finds currently outstanding task with fast and easy.Such as Shown in Fig. 2, it can represent that current task has been completed using the gesture for holding up thumb, by showing different area in circle Green represents the completeness of current task.
In step S140, the structure of the node tree and the file of data are recorded in storage.
After structure and the data generation of the node tree, the file of the mechanism and data that record the node tree is carried out Storage.In alternatively embodiment, the file can be saved in cloud storage system, and cloud access interface is provided, so that Obtaining project supervision personnel can be by the mobile terminal of carrying at any time by project supervision feedback of the information into cloud storage system, with reality The real time implementation renewal of existing management data.
Alternatively, after the file is stored in cloud storage system, expert or project supervision personnel can be to generations Data carry out check and correction examination & verification, to ensure the uniformity of Supervision engineering.
The node tree generation method for the project supervision task that the embodiment of the present application provides, by defining project supervision first Stage node, the father node using the task node as the node tree;Secondly, definition is subordinated to appointing for the stage node Business, different father nodes is belonged to according to the incidence relation of task by it, and the node of the father node is subordinated to generation The child node and leaf of tree;Then, the data of father node, child node and the leaf described in typing;Finally, the node is recorded in storage The structure of tree and the file of data, the node tree of the representative project supervision task formed by above-mentioned steps, can be intuitively System ground is realized to the flow of whole project supervision and the clear view of data, and can be pushed project supervision task according to progress Into different project supervision personnel.Correspondingly, project supervision personnel can at any time be received by way of distributed access and be pushed away The node tasks sent are at any time fed back node data after the completion of task with performing task, have ensured that whole management can Performed in an orderly manner with smoothness.
The node tree generation method for the project supervision task that the embodiment of the present application provides, has the following technical effect that:
On the one hand, using each step node and task of tree structure organizational project Management Process, can with systematization and The various task nodes done and acted on behalf intuitively are shown, ensure the efficient process of whole project supervision engineering;
On the other hand, using the node tree on expansible ground, it is ensured that according to the complex situations of different engineering projects, customization The node tree of disparity items, so as to quickly adapt to different engineering projects.
Embodiment two
Based on identical technical concept, Fig. 3 is the node tree for showing the project supervision task according to the embodiment of the present application two The logic diagram of generating means.It can be used to perform the stream of the node tree generation method of the project supervision task as described in embodiment one Journey.
Reference picture 3, the node tree generating means of project supervision task include:Father node definition module 310, child node and leaf Definition module 320, data import modul 330 and memory module 340.
Father node definition module, for defining the stage node of project supervision, using the task node as the node The father node of tree;
Child node and leaf definition module, the task of the stage node, the pass by it according to task are subordinated to for defining Connection relation belongs to different father nodes, and the child node and leaf of the node tree of the father node are subordinated to generation;
Data import modul, the data for father node, the child node and the leaf described in typing;
Memory module, for storing the file of the structure and data of recording the node tree.
Alternatively, the file of structure and data that the memory module is additionally operable to that the node tree will be recorded is stored in cloud and deposited In storage system.
Alternatively, described device can also include checking module, and the checking module is used for when the record node tree After the file of structure and data is stored in cloud storage system, the data of the node tree are proofreaded.
Alternatively, the incidence relation of the task includes following at least one:The rank of task, the level of task and The attribute of task.
Alternatively, each father node, child node and the definition of leaf of the node tree and the incidence relation symbol between it Close national project inspection of quality specification.
The node tree generating means for the project supervision task that the embodiment of the present application provides, by the stage for defining project supervision Node and task, and stage node and task are correspondingly formed on the father and son's node and leaf of node tree structure, form engineering The clear view of Management Process and the data structure of systematization, it is easy to control of the project supervision personnel to whole supervision process, protects Hinder whole management smooth to perform in an orderly manner.
Embodiment three
Fig. 4 is the structural representation for showing the equipment according to the embodiment of the present application three, and the application specific embodiment is not right The specific implementation of equipment 400 limits.As shown in figure 4, the equipment 400 can include:
Processor (processor) 410, communication interface (Communications Interface) 420, memory (memory) 430 and communication bus 440.Wherein:
Processor 410, communication interface 420 and memory 430 complete mutual communication by communication bus 440.
Communication interface 420, for being communicated with the network element of such as client etc..
Processor 410, for configuration processor 432, it can specifically perform the correlation step in above method embodiment.
Specifically, program 432 can include program code, and described program code includes computer-managed instruction.
Processor 410 is probably a central processor CPU, or specific integrated circuit ASIC (Application Specific Integrated Circuit), or it is arranged to implement the integrated electricity of one or more of the embodiment of the present application Road.
Memory 430, for depositing program 432.Memory 430 may include high-speed RAM memory, it is also possible to also include Nonvolatile memory (non-volatile memory), for example, at least a magnetic disk storage.Program 432 can specifically be used Following operation is performed in causing the equipment 400:
Define the stage node of project supervision, the father node using the task node as the node tree;Define subordinate In the task of the stage node, it is belonged into different father nodes according to the incidence relation of task, institute is subordinated to generation State the child node and leaf of the node tree of father node;The data of father node, the child node and the leaf described in typing;Storage Record the structure of the node tree and the file of data.
Corresponding to the specific implementation of each step may refer in corresponding steps and the unit in above-described embodiment in program 432 Description, will not be described here.
It is apparent to those skilled in the art that for convenience and simplicity of description, the equipment of foregoing description With the specific work process of module, the corresponding process description in preceding method embodiment is may be referred to, will not be repeated here.
It may be noted that according to the needs of implementation, all parts/step described in this application can be split as more multi-section Part/step, the part operation of two or more components/steps or components/steps can be also combined into new components/steps, To realize the purpose of the application.
Each embodiment in specification is described by the way of progressive, what each embodiment stressed be and its The difference of his embodiment, between each embodiment identical similar part mutually referring to.
It should be understood by those skilled in the art that, the embodiment of the embodiment of the present invention can be provided as method, apparatus or calculate Machine program product.Therefore, the embodiment of the present invention can use complete hardware embodiment, complete software embodiment or combine software and The form of the embodiment of hardware aspect.Moreover, the embodiment of the present invention can use one or more wherein include computer can With in the computer-usable storage medium (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) of program code The form of the computer program product of implementation.
The embodiment of the present invention is with reference to method according to embodiments of the present invention, terminal device (system) and computer program The flow chart and/or block diagram of product describes.It should be understood that can be by computer program instructions implementation process figure and/or block diagram In each flow and/or square frame and the flow in flow chart and/or block diagram and/or the combination of square frame.These can be provided Computer program instructions are set to all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing terminals Standby processor is to produce a machine so that is held by the processor of computer or other programmable data processing terminal equipments Capable instruction is produced for realizing in one flow of flow chart or multiple flows and/or one square frame of block diagram or multiple square frames The device for the function of specifying.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing terminal equipments In the computer-readable memory to work in a specific way so that the instruction being stored in the computer-readable memory produces bag The manufacture of command device is included, the command device is realized in one flow of flow chart or multiple flows and/or one side of block diagram The function of being specified in frame or multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing terminal equipments so that Series of operation steps is performed on computer or other programmable terminal equipments to produce computer implemented processing, so that The instruction performed on computer or other programmable terminal equipments is provided for realizing in one flow of flow chart or multiple flows And/or specified in one square frame of block diagram or multiple square frames function the step of.
Although having been described for the preferred embodiment of the embodiment of the present invention, those skilled in the art once know base This creative concept, then other change and modification can be made to these embodiments.So appended claims are intended to be construed to Including preferred embodiment and fall into having altered and changing for range of embodiment of the invention.
It should also be noted that, herein, such as first and second or the like relational terms are used merely to one Entity or operation make a distinction with another entity or operation, and not necessarily require or imply between these entities or operation Any this actual relation or order be present.Moreover, term " comprising ", "comprising" or its any other variant are intended to contain Lid nonexcludability includes, so that process, method, article or terminal device including a series of elements not only include that A little key elements, but also the other element including being not expressly set out, or also include for this process, method, article or The intrinsic key element of terminal device.In the absence of more restrictions, the key element limited by sentence "including a ...", and It is not precluded within the process including the key element, method, article or terminal device and other identical element is also present.
Described above, the only embodiment of the application, but the protection domain of the application is not limited thereto is any Those familiar with the art can readily occur in change or replacement in the technical scope that the application discloses, and should all contain Cover within the protection domain of the application.Therefore, the protection domain of the application should be based on the protection scope of the described claims.

Claims (10)

1. a kind of node tree generation method of project supervision task, it is characterised in that methods described includes:
Define the stage node of project supervision, the father node using the task node as the node tree;
Definition is subordinated to the task of the stage node, and it is belonged into different father nodes according to the incidence relation of task, with Generation is subordinated to the child node and leaf of the node tree of the father node;
The data of father node, the child node and the leaf described in typing;
The structure of the node tree and the file of data are recorded in storage.
2. according to the method for claim 1, it is characterised in that the structure for storing the record node tree and data File includes:
The file of the structure and data of recording the node tree is stored in cloud storage system.
3. according to the method for claim 2, it is characterised in that methods described also includes:
After the file of the structure and data of recording the node tree is stored in cloud storage system, to the data of the node tree Proofreaded.
4. according to the method described in claim 1, it is characterised in that the incidence relation of the task includes following at least one Kind:
The attribute of the rank of task, the level of task and task.
5. according to the method described in claim any one of 1-4, it is characterised in that each father node, the sub- section of the node tree Point and the definition of leaf and the incidence relation between it meet national project inspection of quality specification.
6. a kind of node tree generating means of project supervision task, it is characterised in that described device includes:
Father node definition module, for defining the stage node of project supervision, using the task node as the node tree Father node;
Child node and leaf definition module, the task of the stage node is subordinated to for defining, it is closed according to the association of task System belongs to different father nodes, and the child node and leaf of the node tree of the father node are subordinated to generation;
Data import modul, the data for father node, the child node and the leaf described in typing;
Memory module, for storing the file of the structure and data of recording the node tree.
7. device according to claim 6, it is characterised in that the memory module is additionally operable to:
The file of the structure and data of recording the node tree is stored in cloud storage system.
8. device according to claim 7, it is characterised in that described device also includes:
Checking module, for after the file for the structure and data for recording the node tree is stored in cloud storage system, to institute The data for stating node tree are proofreaded.
9. according to the device described in claim 6, it is characterised in that the incidence relation of the task includes following at least one Kind:
The attribute of the rank of task, the level of task and task.
10. according to the device described in claim any one of 6-9, it is characterised in that each father node, the sub- section of the node tree Point and the definition of leaf and the incidence relation between it meet national project inspection of quality specification.
CN201610621660.0A 2016-08-01 2016-08-01 The node tree generation method and device of project supervision task Pending CN107680003A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610621660.0A CN107680003A (en) 2016-08-01 2016-08-01 The node tree generation method and device of project supervision task

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610621660.0A CN107680003A (en) 2016-08-01 2016-08-01 The node tree generation method and device of project supervision task

Publications (1)

Publication Number Publication Date
CN107680003A true CN107680003A (en) 2018-02-09

Family

ID=61133712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610621660.0A Pending CN107680003A (en) 2016-08-01 2016-08-01 The node tree generation method and device of project supervision task

Country Status (1)

Country Link
CN (1) CN107680003A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108520361A (en) * 2018-04-10 2018-09-11 万翼科技有限公司 Process task management method, device and computer readable storage medium
CN109101308A (en) * 2018-07-20 2018-12-28 广州农村商业银行股份有限公司 A kind of transmitting of task and method for tracking and displaying and device
CN109559088A (en) * 2018-10-18 2019-04-02 深圳壹账通智能科技有限公司 Task management method, device, electronic equipment and storage medium
CN110244941A (en) * 2019-06-17 2019-09-17 三角兽(北京)科技有限公司 Task development approach, device, electronic equipment and computer readable storage medium
CN110443477A (en) * 2019-07-24 2019-11-12 广联达科技股份有限公司 Double-Code Network Diagram bulk stream water generates method, apparatus and electronic equipment
CN111274316A (en) * 2020-01-15 2020-06-12 北京明略软件系统有限公司 Execution method and device of multi-level data flow task, electronic equipment and storage medium
CN111459942A (en) * 2020-04-03 2020-07-28 北京四维智联科技有限公司 Engineering information processing method and system based on application tree
CN111694833A (en) * 2019-03-12 2020-09-22 北京字节跳动网络技术有限公司 Data processing method and device, electronic equipment and computer readable storage medium
WO2024060857A1 (en) * 2022-09-20 2024-03-28 华为云计算技术有限公司 Work item management method and apparatus, and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103136618A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress plan
CN103646315A (en) * 2013-12-16 2014-03-19 国家电网公司 Method and device for data processing in electricity bureau engineering project workflow
CN103714436A (en) * 2014-01-09 2014-04-09 国家电网公司 Electric power engineering construction progress tracking system
CN105677620A (en) * 2014-11-21 2016-06-15 高德软件有限公司 Generation method and device for project management documents

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103136618A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress plan
CN103646315A (en) * 2013-12-16 2014-03-19 国家电网公司 Method and device for data processing in electricity bureau engineering project workflow
CN103714436A (en) * 2014-01-09 2014-04-09 国家电网公司 Electric power engineering construction progress tracking system
CN105677620A (en) * 2014-11-21 2016-06-15 高德软件有限公司 Generation method and device for project management documents

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108520361A (en) * 2018-04-10 2018-09-11 万翼科技有限公司 Process task management method, device and computer readable storage medium
CN109101308A (en) * 2018-07-20 2018-12-28 广州农村商业银行股份有限公司 A kind of transmitting of task and method for tracking and displaying and device
CN109101308B (en) * 2018-07-20 2021-12-03 广州农村商业银行股份有限公司 Task transmission and tracking display method and device
CN109559088A (en) * 2018-10-18 2019-04-02 深圳壹账通智能科技有限公司 Task management method, device, electronic equipment and storage medium
CN111694833A (en) * 2019-03-12 2020-09-22 北京字节跳动网络技术有限公司 Data processing method and device, electronic equipment and computer readable storage medium
CN111694833B (en) * 2019-03-12 2023-07-25 北京字节跳动网络技术有限公司 Data processing method, device, electronic equipment and computer readable storage medium
CN110244941A (en) * 2019-06-17 2019-09-17 三角兽(北京)科技有限公司 Task development approach, device, electronic equipment and computer readable storage medium
CN110244941B (en) * 2019-06-17 2021-11-02 腾讯科技(深圳)有限公司 Task development method and device, electronic equipment and computer readable storage medium
CN110443477A (en) * 2019-07-24 2019-11-12 广联达科技股份有限公司 Double-Code Network Diagram bulk stream water generates method, apparatus and electronic equipment
CN111274316A (en) * 2020-01-15 2020-06-12 北京明略软件系统有限公司 Execution method and device of multi-level data flow task, electronic equipment and storage medium
CN111459942A (en) * 2020-04-03 2020-07-28 北京四维智联科技有限公司 Engineering information processing method and system based on application tree
WO2024060857A1 (en) * 2022-09-20 2024-03-28 华为云计算技术有限公司 Work item management method and apparatus, and storage medium

Similar Documents

Publication Publication Date Title
CN107680003A (en) The node tree generation method and device of project supervision task
CN108600272A (en) A kind of block chain data processing method, device, processing equipment and system
CN107196900A (en) A kind of method and device for verification of knowing together
CN103488952B (en) File integrity verification method and file processor
CN112184177B (en) Project supervision method, equipment and storage medium
CN104573185B (en) The processing method and processing device of High-sped Trains index
CN105404507A (en) Process template construction method and system
CN104572831A (en) Processing method and processing device of demand data of high speed train
CN109032720A (en) Folder icon display methods, system, readable storage medium storing program for executing and terminal
CN107688922A (en) Project supervision task processing method and device based on node tree
CN106843820A (en) Code process method and apparatus
CN106873957A (en) The processing method and equipment of a kind of operation flow
CN108459792A (en) A kind of flow switching method, device and computer equipment
CN106155769A (en) A kind of workflow processing method, device and workflow engine
CN105956921A (en) Method and device for selecting bankcard number by user himself/herself
CN109242288A (en) Performance data matching process and system
EP3427163B1 (en) Node-centric analysis of dynamic networks
CN107634989A (en) A kind of cloud wallet construction method and server
CN113852204A (en) Three-dimensional panoramic monitoring system and method for transformer substation with digital twin
CN109491646A (en) A kind of message input method, device, electronic equipment and readable medium
CN103942739A (en) Method for construction of construction project risk knowledge base
CN104346669A (en) Business logic modeling system based on 6W
CN116305895A (en) Product model generation method, device, computer equipment and storage medium
CN107590189A (en) Intelligent contract performs method, apparatus, equipment and storage medium
CN104239212B (en) Query method and device of test case and establishment method and device of test case

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication