CN108520361A - Process task management method, device and computer readable storage medium - Google Patents
Process task management method, device and computer readable storage medium Download PDFInfo
- Publication number
- CN108520361A CN108520361A CN201810323817.0A CN201810323817A CN108520361A CN 108520361 A CN108520361 A CN 108520361A CN 201810323817 A CN201810323817 A CN 201810323817A CN 108520361 A CN108520361 A CN 108520361A
- Authority
- CN
- China
- Prior art keywords
- process task
- node
- engineering
- planned time
- procedure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Abstract
The invention discloses a kind of methods of process task management, including:Engineering project is established according to process template, includes multistage node in the engineering project, and includes procedure-node in the multistage node;Project data is received, and according to the procedure-node generation process task in the project data and the engineering project;The planned time of the process task is obtained, and the planned time of the multistage node is set according to the planned time of the process task;The process task provided with planned time is associated with preset person liable, the process task is managed for the person liable.The invention also discloses a kind of process task management device and computer readable storage mediums.The present invention includes the process task scheduling of multistage node, the planned time of setting process task by formulating, and generation process task is simultaneously assigned to related personnel, provides the high management method of structuring degree, to ensure the smooth development of project under construction and orderly carry out.
Description
Technical field
The present invention relates to field of engineering technology more particularly to a kind of process task management method, process task management devices
And computer readable storage medium.
Background technology
In the technical field of the project management of engineering, there are some Project Management Softwares from the formulation project plan, prison
Control and item controlled progress, to show project risk etc. many-sided to ensure the overall progress of project and the information of project management process
Change.
The building engineering field segmented under engineering project, the building structure complexity that is related to due to architectural engineering is various, relates to
And items it is various, work progress link is numerous and it is more to check and accept object type, need a set of structuring degree compared with
The process task scheduling that actual architectural engineering plan can be split into clear layer and be easily managed by high management method, and show
Some Project Management Softwares can not meet the needs of such management process task well.
The above is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that the above is existing skill
Art.
Invention content
The main purpose of the present invention is to provide a kind of management method of process task, process task management device and calculating
Machine readable storage medium storing program for executing, it is intended to solve in the prior art that can not actual engineering project to be split into level clear for Project Management Software
It is clear and be easily managed process task scheduling the technical issues of.
To achieve the above object, the present invention provides a kind of management method of process task, the manager of the process task
Method includes the following steps:
Engineering project is established according to process template, comprising multistage node in the engineering project, and the multistage node
In include procedure-node;
Project data is received, and is appointed according to the procedure-node generation process in the project data and the engineering project
Business;
The planned time of the process task is obtained, and according to the planned time of the process task setting multistage section
The planned time of point;
The process task provided with planned time is associated with preset person liable, for the person liable to institute
Process task is stated to be managed.
Preferably, described established before engineering project step according to process template and project data includes:
Obtain the hierarchical relationship between multistage node and each node;
Obtain the examination object of the procedure-node;
According to the examination object generation process template of the hierarchical relationship and the procedure-node between each node.
Preferably, the reception project data, and according to the procedure-node in the project data and the engineering project
Generation process task step includes:
Obtain the examination object of the procedure-node;
According to the process task of the procedure-node checked and accepted object and generate corresponding types.
Preferably, include after the examination object step for obtaining the procedure-node:
Obtain the acceptance criteria of the procedure-node;
Work is generated according to the examination object of hierarchical relationship, the procedure-node between each node and acceptance criteria
Sequence template.
Preferably, the reception project data, and according to the procedure-node in the project data and the engineering project
Include after generation process task step:
It receives Engineering Planning Document and generates instruction;
Instruction is generated according to the Engineering Planning Document and generates Engineering Planning Document to be edited, for editing the process
The planned time of task.
Preferably, described to obtain the planned time of the process task, and set according to the planned time of the process task
The planned time step for setting the multistage node includes:
The Engineering Planning Document edited is obtained, the Engineering Planning Document edited includes the process task
Planned time information;
The planned time of the multistage node is set according to the planned time information of the process task.
Preferably, which is characterized in that the planned time for obtaining the process task, and according to the process task
Planned time includes after the planned time step of the multistage node is arranged:
Receive the instruction of uniform delay process task scheduling time;
The number of days of uniform delay is obtained from the instruction of the uniform delay process task scheduling time;
Postpone the planned time of the process task according to the number of days of the uniform delay.
In addition, to achieve the above object, the present invention also provides the process task management device, which includes:It deposits
Reservoir, processor and it is stored in the process task management program that can be run on the memory and on the processor, it is described
Process task management program realizes the step of management method of process task as described above when being executed by the processor.
In addition, to achieve the above object, the present invention also proposes a kind of computer readable storage medium, which is characterized in that institute
The management program that process task is stored on computer readable storage medium is stated, the management program of the process task is by processor
The step of management method of process task as described above is realized when execution.
Management method, device and the computer readable storage medium for a kind of process task that the embodiment of the present invention proposes, root
Engineering project is established according to process template, includes multistage node in the engineering project, and includes process in the multistage node
Node;Project data is received, and according to the procedure-node generation process task in the project data and the engineering project;It obtains
When taking the planned time of the process task, and the plan of the multistage node being set according to the planned time of the process task
Between;The process task provided with planned time is associated with preset person liable, for the person liable to the work
Sequence task is managed.
The present invention based on process template by formulating the process task scheduling for including multiple hierarchy nodes, setting process task
Planned time in the works is based on complete process task scheduling generation process task, and process task assignment is blamed to related
The person of leting people provides the management method that a kind of structuring degree is high and feedback is closed and assists construction responsible person's management project construction
The process task at scene, to ensure the smooth development of project under construction and orderly carry out.
Description of the drawings
Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of process task management method first embodiment of the present invention;
Fig. 3 is the flow diagram of process task management method second embodiment of the present invention;
Fig. 4 is the flow diagram of process task management method 3rd embodiment of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:Engineering project is established according to process template, in the engineering project
Including multistage node, and include procedure-node in the multistage node;Receive project data, and according to the project data and
Procedure-node generation process task in the engineering project;The planned time of the process task is obtained, and according to the work
The planned time of the multistage node is arranged in the planned time of sequence task;By provided with planned time the process task with it is pre-
If person liable association, the process task is managed for the person liable.
Since in the prior art, the Project Management Software structuring degree of building field is low, not to miscellaneous special
Industry and construction link carry out orderly classification and rational fractionation, can not be suitable for the pipe of different types of construction projects
Reason.
The present invention provides a solution, by formulating the process task for including multiple hierarchy nodes based on process template
Plan, the planned time in setting process task scheduling are based on complete process task scheduling generation process task, and by process
Task assignment gives related responsibility personnel, provides the management method that a kind of structuring degree is high and feedback is closed and construction is assisted to be responsible for
The process task at personal management project construction scene, to ensure the smooth development of project under construction and orderly carry out.
As shown in Figure 1, the terminal structure schematic diagram for the hardware running environment that Fig. 1, which is the embodiment of the present invention, to be related to.
Terminal of the embodiment of the present invention is the device of process task management.
As shown in Figure 1, the device may include:Processor 1001, such as CPU, communication bus 1002, memory 1003.
Wherein, communication bus 1002 is for realizing the connection communication between these components.Memory 1003 can be high-speed RAM storage
Device can also be stable memory (non-volatile memory), such as magnetic disk storage.Memory 1003 is optional
It can also be the storage device independently of aforementioned processor 1001.
It will be understood by those skilled in the art that the restriction of the not structure paired terminal of terminal structure shown in Fig. 1, can wrap
It includes than illustrating more or fewer components, either combines certain components or different components arrangement.
As shown in Figure 1, as may include operating system and process in a kind of memory 1003 of computer storage media
Task management program.
In device shown in Fig. 1, processor 1001 can be used for calling the process task pipe stored in memory 1003
Program is managed, and executes following operation:
Engineering project is established according to process template, comprising multistage node in the engineering project, and the multistage node
In include procedure-node;
Project data is received, and is appointed according to the procedure-node generation process in the project data and the engineering project
Business;
The planned time of the process task is obtained, and according to the planned time of the process task setting multistage section
The planned time of point;
The process task provided with planned time is associated with preset person liable, for the person liable to institute
Process task is stated to be managed.
Further, processor 1001 can call the process task management program stored in memory 1003, also execute
It operates below:
Obtain the hierarchical relationship between multistage node and each node;
Obtain the examination object of the procedure-node;
According to the examination object generation process template of the hierarchical relationship and the procedure-node between each node.
Further, processor 1001 can call the process task management program stored in memory 1003, also execute
It operates below:
Obtain the examination object of the procedure-node;
According to the process task of the procedure-node checked and accepted object and generate corresponding types.
Further, processor 1001 can call the process task management program stored in memory 1003, also execute
It operates below:
Obtain the acceptance criteria of the procedure-node;
Work is generated according to the examination object of hierarchical relationship, the procedure-node between each node and acceptance criteria
Sequence template.
Further, processor 1001 can call the process task management program stored in memory 1003, also execute
It operates below:
It receives Engineering Planning Document and generates instruction;
Instruction is generated according to the Engineering Planning Document and generates Engineering Planning Document to be edited, for editing the process
The planned time of task.
Further, processor 1001 can call the process task management program stored in memory 1003, also execute
It operates below:
The Engineering Planning Document edited is obtained, the Engineering Planning Document edited includes the process task
Planned time information;
The planned time of the multistage node is set according to the planned time information of the process task.
Further, processor 1001 can call the process task management program stored in memory 1003, also execute
It operates below:
Receive the instruction of uniform delay process task scheduling time;
The number of days of uniform delay is obtained from the instruction of the uniform delay process task scheduling time;
Postpone the planned time of the process task according to the number of days of the uniform delay.
With reference to Fig. 2, first embodiment of the invention provides a kind of method of process task management, the method includes:
Step S10 establishes engineering project according to process template, includes multistage node in the engineering project, and described
It include procedure-node in multistage node.
Process type in engineering project is various, and the profession and examination object type involved by process are also very much, process mould
The tissue and displaying that a kind of mode of structuring classifies to numerous processes are provided in plate.
By taking the process template of architectural engineering as an example, which includes level-one profession node, two-level node, three-level work
Sequence node is father and son's hierarchical relationship between adjacent level, such as the father node that level-one profession node is two-level node, two-level node
For the father node of three-level procedure-node.Level-one profession node be electromechanics, civil engineering, finishing, garden build with this five, milestone, wherein in
Journey upright stone tablet only has two-level node, does not have three-level procedure-node.The particular content for being included further according to profession based on level-one profession node
Carry out thinner classification obtain the two-level node under two-level node, such as milestone node include basis goes into operation, admission card obtains,
Engineering reaches presell condition, milestone node 1, milestone node 2 and actual handing over.Include under two-level node is three-level process
Node, procedure-node are the minimum construction cell for having in construction work independent construction condition and complete construction object.Such as
Two-level node under level-one electromechanical speciality node includes pipeline set aside pre-embedded engineering, dispatch from foreign news agency and high-low pressure power engineering and forceful electric power work
Journey, the procedure-node under two-level node heavy current engineering include obtaining dispatch from foreign news agency power supply plan.
Engineering project is established according to above-mentioned operation template, is just contained in entire engineering project in obtained engineering project
The engineering duty type to be completed specifically carries out tissue and the exhibition of all engineering duties in a manner of multistage father and son's node
Show wherein including procedure-node in multistage node, i.e., have the minimum task unit of independent carry out condition and examination in engineering.
Step S20 receives project data, and is generated according to the procedure-node in the project data and the engineering project
Process task.
Project data includes the related data of the scale and specification for the objective for implementation for illustrating engineering project.Such as it builds
Project data includes number by stages, building information, gardens information, fire compartment information for including by stages each etc..According to work
It is only needed into one comprising the engineering duty type to be completed in entire engineering project in the engineering project that sequence template is established
Step according in engineering project procedure-node and engineering project data determine which specific process is completed in engineering project
Task.
It illustrates how to be generated according to the procedure-node of architectural engineering data and architectural engineering in the works by taking architectural engineering as an example
Process task.For example the project data of certain architectural engineering shows that the engineering included one to three phase, first stage of the project includes three buildings, often
Building includes 32 floor.Include secondary body work in the engineering project established according to process template, under level-one Civil Specialities node
Cheng Jiedian is total to three process under the secondary body engineering node comprising A, B, the C checked and accepted by layer.According to a phase in the project data
Data, the process task of the first stage of the project ultimately generated includes:32 A processes in total of 32 floor of one phase the first building are appointed
Business, 32 B processes tasks, 32 C process tasks;32 A processes tasks, the 32 B works in total of 32 floor in one building of phase second
Sequence task, 32 C process tasks;32 A processes tasks in total of 32 floor in one phase third building, 32 B processes tasks, 32
C process tasks.The second phase of the engineering generates with rule of the process task of three phases also as.
Step S30 obtains the planned time of the process task, and institute is arranged according to the planned time of the process task
State the planned time of multistage node.
In the present embodiment, the various functions of process task management are realized in a complete software systems, including aforementioned
Engineering project is established according to process template, receives project data and according to the work in the project data and the engineering project
Sequence node generation process task.
There are many modes for obtaining the process task scheduling time for software systems;Setting interface can be provided, used by obtaining
The setting process task scheduling time command that family is sent obtains the process task scheduling time;It can also will be established according to process template
Preliminary project plan preserve and at editable file and export, when Engineering Planning Document editor's completion plan after, then will compile
The Engineering Planning Document input system collected is to obtain the process task scheduling time.
It is that engineering project is more since process task is the construction task unit that can not continue segmentation minimum in engineering project
The node of lowest hierarchical level in grade node, under the direct upper layer node for obtaining process task when the plan of each process task
Between after, the planned time of the direct upper layer node is the union of section of each process task time, more than the direct upper layer node
The planned time of node is calculated with identical rule.
The process task provided with planned time is associated with, for the responsibility by step S40 with preset person liable
Personnel are managed the process task.
In the whole life cycle existing for engineering project, process task experience generates, implements, checks and accepts and terminates four ranks
Section, corresponding related responsibility personnel are administrative staff, construction personnel, inspector and administrative staff respectively.Process task is by pipe
After reason personnel generate according to above-mentioned steps, be assigned to construction personnel, inspector and other need to be concerned about the process task
The administrative staff of progress.Construction personnel understands the specific location of construction, condition by the relevant information for the process task being assigned
And task definition, set process task status to when completing process task " construction is completed " state so that inspector and
When be notified and carry out an acceptance inspection to the process task;Inspector is after the examination for completing the process task by process task status
It is set as " check and accept and complete " state, so that administrative staff are notified and set " " end " the process task status in time
State.
In the present embodiment, by formulating the process task scheduling for including multiple hierarchy nodes, setting based on process template
Planned time in process task scheduling is based on complete process task scheduling generation process task, and by process task assignment
Related responsibility personnel are given, the management method that a kind of structuring degree is high and feedback is closed is provided and assists construction responsible person's management
The process task at project construction scene, to ensure the smooth development of project under construction and orderly carry out.
Further, with reference to Fig. 3, second embodiment of the invention provides a kind of process task management based on first embodiment
Method, the present embodiment include before step S10:
Step S50 obtains the hierarchical relationship between multistage node and each node.
For engineering, the need that all process steps classification of task hierarchical is shown could be met by needing multistage node is arranged
It asks.Such as the setting of level-one profession node, two-level node and three-level procedure-node can meet the classification of most of architectural engineering
Layering manifestation demand.It is arranged if some engineerings also include the node of more father and son's levels under professional node, needs to set
The node of more levels is set, needs to obtain the hierarchical relationship comprising between all hierarchy nodes and node at different levels at this time.
Step S60 obtains the examination object of the procedure-node.
According to the examination object type of the setting instruction setting process node of user.It is common such as in building engineering field
Examination object type include by stages, Lou Dong, anti-windburn area and garden zoning etc..Interface, which can also be provided, allows user according to project
The acceptance criteria of codes and standards setting process node.
Further, it is also possible to according to the demand of project management, provide interface allow user setting plan node, vivid node and its
The distribution of weight, the setting of these nodes will directly affect the statistics of vivid progress report and plan image;This can be arranged respectively
The control node of process cannot be deleted as the node of a pressure management and control for Project Manager.
Step S70 generates work according to the examination object of hierarchical relationship and the procedure-node between each node
Sequence template.
The profession and process for including due to different types of engineering are all distinct, can be different types of engineering subcontract
Different process templates is established for reference.Even same type of engineering, not according to the scene condition of engineering concrete application
Together, it or due to occurring newly-increased process based on the new market demand, is required for based on the fixed process template provided to it
In nodes at different levels carry out necessary adjustment.A node pool can be established, including first nodes, two-level node, three-level process
The nodes at different levels such as node and examination item.According to the variation of engineer application scene and the market demand, constantly to the node in node pool
Increased and is deleted.After tentatively establishing engineering project according to fixed process template, based on the node pool to engineering
Node in drawing is adjusted.
After establishing preliminary engineering project by reference above-mentioned operation template, the examination object of procedure-node is obtained,
And according to the process task of procedure-node checked and accepted object and generate corresponding types.It is introduced according to procedure-node by taking architectural engineering as an example
Check and accept object generate corresponding types process task detailed process.
1) procedure-node that object is checked and accepted with Lou Dongwei obtains the building plan of current process, according to building building in the works
Number generate the process task of equal number of building type;
2) it is the procedure-node for checking and accepting object with floor, the building plan of current process is obtained, according to building building in the works
Number, the floor number in every building, generate the process task of the identical floor type of sum;
3) it is the procedure-node for checking and accepting object with room, the building plan of current process is obtained, according to building building in the works
Number, the room number in every building, generate the process task of the identical room type of sum;
4) it is the procedure-node for checking and accepting object with facade, the building plan of current process is obtained, according to building building in the works
Number, the number of every building facade, generate the process task of the identical facade type of sum;
5) with by stages, fire compartment, garden zoning or pile foundation number be to check and accept the procedure-node of object, obtain current process
By stages or subregion plan, according to by stages or the plan of subregion, generating equal number of type by stages, divisional type or stake in the works
The process task of base type.
In the present embodiment, hierarchical relationship between multistage node and each node is obtained, procedure-node is tested
It receives the information such as object and establishes process template according to these information, provide the high process template of structuring degree for engineering
The formulation drawn improves the efficiency for formulating operationpiston.
Further, with reference to Fig. 4, third embodiment of the invention is based on first or second embodiments and provides a kind of process task
The method of management, the present embodiment include after step S20:
Step S80 receives Engineering Planning Document and generates instruction.
Step S90 generates instruction according to the Engineering Planning Document and generates Engineering Planning Document to be edited, for editor
The planned time of the process task.
After establishing preliminary engineering project according to process template, it is also necessary to obtain the plan of process task in engineering project
Time can just ultimately generate the process task that can assign implementation and tracking.Due to some engineering projects especially construction project scale
It is very big, cause the number of the process task in engineering project very huge, each process is appointed manually if relying only on user
The planned time of business is configured, and workload is very big and error-prone.It, can be with so system is needed to provide a kind of interface
Engineering project is exported in a manner of file, is realized to engineering by third-party software program or software tool by user
The planned time of process task carries out the setting of batch in drawing.Such as it can be by Engineering Planning Document with the format of EXCEL file
Output, user can use the process task time in the function batch editorial project project documentation that EXCEL softwares carry.
Simultaneity factor provides interface, so that user imports edited Engineering Planning Document.System imports text by user
The operation of part obtains the Engineering Planning Document edited, when the Engineering Planning Document edited includes the plan of the process task
Between information, the planned time of multistage node is arranged according to the planned time information of process task system.
With the progress of engineering, it is often necessary to be adjusted to the planned time of the process portion task in engineering project.
User can select directly to change in turn manually in systems according to the size of process task number scale to be adjusted, or
Selection output Engineering Planning Document is simultaneously edited, edits the mode imported again after the completion.Process for having generated business datum
The planned time of task is then restricted to change.
In order to simplify operation, when to carry out uniform delay to the planned time of process task, system passes through user interface
The instruction for receiving the uniform delay process task scheduling time obtains unified from the instruction of uniform delay process task scheduling time
The number of days of delay, and postpone according to the number of days of uniform delay the planned time of the process task.
In the present embodiment, engineering project text to be edited is generated by generating instruction according to the Engineering Planning Document
Part, for editing the planned time of the process task, the mode for compatibility a variety of setting process task scheduling times provides
Unified interface keeps the setting of engineering project time more flexible efficiently.
The present invention also provides a kind of process task management device, which includes:It memory, processor and is stored in described
On memory and the process task management program that can run on the processor, the process task management program is by the place
Manage the step of realizing the process task management method when device executes.
In addition, the embodiment of the present invention also proposes a kind of computer readable storage medium, the computer readable storage medium
On be stored with process task management program, the process task is realized when the process task management program is executed by processor
The step of management method.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that process, method, article or system including a series of elements include not only those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this
There is also other identical elements in the process of element, method, article or system.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art
Going out the part of contribution can be expressed in the form of software products, which is stored in one as described above
In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions use so that a station terminal equipment (can be mobile phone,
Computer, server, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (9)
1. a kind of management method of process task, which is characterized in that the management method of the process task includes the following steps:
Engineering project is established according to process template, includes multistage node in the engineering project, and wrapped in the multistage node
Containing procedure-node;
Project data is received, and according to the procedure-node generation process task in the project data and the engineering project;
The planned time of the process task is obtained, and the multistage node is arranged according to the planned time of the process task
Planned time;
The process task provided with planned time is associated with preset person liable, for the person liable to the work
Sequence task is managed.
2. the management method of process task as described in claim 1, which is characterized in that described according to process template and engineering number
Include according to before establishing engineering project step:
Obtain the hierarchical relationship between multistage node and each node;
Obtain the examination object of the procedure-node;
According to the examination object generation process template of the hierarchical relationship and the procedure-node between each node.
3. the management method of process task as claimed in claim 2, which is characterized in that the reception project data, and according to
Procedure-node generation process task step in the project data and the engineering project includes:
Obtain the examination object of the procedure-node;
According to the process task of the procedure-node checked and accepted object and generate corresponding types.
4. the management method of process task as claimed in claim 2, which is characterized in that described to obtain testing for the procedure-node
Receiving object step includes later:
Obtain the acceptance criteria of the procedure-node;
According to the examination object and acceptance criteria generation process mould of hierarchical relationship, the procedure-node between each node
Plate.
5. the management method of process task as described in claim 1, which is characterized in that the reception project data, and according to
Include after procedure-node generation process task step in the project data and the engineering project:
It receives Engineering Planning Document and generates instruction;
Instruction is generated according to the Engineering Planning Document and generates Engineering Planning Document to be edited, for editing the process task
Planned time.
6. the management method of process task as claimed in claim 5, which is characterized in that the meter for obtaining the process task
It draws the time, and the planned time step that the multistage node is arranged according to the planned time of the process task includes:
The Engineering Planning Document edited is obtained, the Engineering Planning Document edited includes the meter of the process task
Draw temporal information;
The planned time of the multistage node is set according to the planned time information of the process task.
7. such as the management method of claim 1 to 6 any one of them process task, which is characterized in that described to obtain the work
The planned time of sequence task, and according to the planned time of the process task be arranged the multistage node planned time step it
After include:
Receive the instruction of uniform delay process task scheduling time;
The number of days of uniform delay is obtained from the instruction of the uniform delay process task scheduling time;
Postpone the planned time of the process task according to the number of days of the uniform delay.
8. a kind of managing device of process task, which is characterized in that described device includes:Memory, processor and it is stored in institute
State the management program for the process task that can be run on memory and on the processor, the management program quilt of the process task
The step of management method of the process task as described in any one of claim 1 to 7 is realized when the processor executes.
9. a kind of computer readable storage medium, which is characterized in that be stored with process on the computer readable storage medium and appoint
It is realized such as any one of claim 1 to 7 institute when the management program of the management program of business, the process task is executed by processor
The step of process task management method stated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810323817.0A CN108520361A (en) | 2018-04-10 | 2018-04-10 | Process task management method, device and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810323817.0A CN108520361A (en) | 2018-04-10 | 2018-04-10 | Process task management method, device and computer readable storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108520361A true CN108520361A (en) | 2018-09-11 |
Family
ID=63431113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810323817.0A Pending CN108520361A (en) | 2018-04-10 | 2018-04-10 | Process task management method, device and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108520361A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109345103A (en) * | 2018-09-25 | 2019-02-15 | 北京地厚云图科技有限公司 | Process receipt control method and storage medium |
CN109615252A (en) * | 2018-12-14 | 2019-04-12 | 万翼科技有限公司 | The monitoring method and device of project |
CN109858870A (en) * | 2018-12-24 | 2019-06-07 | 万翼科技有限公司 | A kind of event management method, system and a kind of storage device |
CN109886576A (en) * | 2019-02-20 | 2019-06-14 | 司空科技股份有限公司 | Task management method, device and storage medium are delivered in digitlization |
CN111242457A (en) * | 2020-01-07 | 2020-06-05 | 中国建筑第八工程局有限公司 | Construction technology management system and method |
CN111340320A (en) * | 2018-12-18 | 2020-06-26 | 西安海平方网络科技有限公司 | Work plan determination method and device, computer equipment and storage medium |
CN111626531A (en) * | 2019-02-28 | 2020-09-04 | 贵阳海信网络科技有限公司 | Risk control method, device, system and storage medium |
CN112884455A (en) * | 2021-03-26 | 2021-06-01 | 中车青岛四方机车车辆股份有限公司 | Task plan processing system, method and device |
CN113344477A (en) * | 2021-08-05 | 2021-09-03 | 捷尔杰(天津)设备有限公司 | Task synchronization control method and device, electronic equipment and computer storage medium |
CN113807730A (en) * | 2021-09-28 | 2021-12-17 | 重庆允成互联网科技有限公司 | Work order generation method, system, equipment and storage medium based on discrete management |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101266669A (en) * | 2008-05-06 | 2008-09-17 | 广州市中联创通电脑有限公司 | Project process workflow based on plan template and its implementation method |
CN102096849A (en) * | 2009-12-15 | 2011-06-15 | 苏州铭星软件科技有限公司 | Flow management design method based on network program |
CN107680003A (en) * | 2016-08-01 | 2018-02-09 | 北京地厚云图科技有限公司 | The node tree generation method and device of project supervision task |
CN107688922A (en) * | 2016-08-04 | 2018-02-13 | 北京地厚云图科技有限公司 | Project supervision task processing method and device based on node tree |
CN107784447A (en) * | 2017-11-06 | 2018-03-09 | 国家电网公司 | A kind of overall process prison based on triple early warning makes closed loop management system and method |
-
2018
- 2018-04-10 CN CN201810323817.0A patent/CN108520361A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101266669A (en) * | 2008-05-06 | 2008-09-17 | 广州市中联创通电脑有限公司 | Project process workflow based on plan template and its implementation method |
CN102096849A (en) * | 2009-12-15 | 2011-06-15 | 苏州铭星软件科技有限公司 | Flow management design method based on network program |
CN107680003A (en) * | 2016-08-01 | 2018-02-09 | 北京地厚云图科技有限公司 | The node tree generation method and device of project supervision task |
CN107688922A (en) * | 2016-08-04 | 2018-02-13 | 北京地厚云图科技有限公司 | Project supervision task processing method and device based on node tree |
CN107784447A (en) * | 2017-11-06 | 2018-03-09 | 国家电网公司 | A kind of overall process prison based on triple early warning makes closed loop management system and method |
Non-Patent Citations (1)
Title |
---|
乔非编著: "《钢铁企业能源管理模型与系统节能技术》", 31 December 2016, 同济大学出版社 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109345103A (en) * | 2018-09-25 | 2019-02-15 | 北京地厚云图科技有限公司 | Process receipt control method and storage medium |
CN109615252A (en) * | 2018-12-14 | 2019-04-12 | 万翼科技有限公司 | The monitoring method and device of project |
CN111340320B (en) * | 2018-12-18 | 2023-09-22 | 西安海平方网络科技有限公司 | Work plan determining method, apparatus, computer device, and storage medium |
CN111340320A (en) * | 2018-12-18 | 2020-06-26 | 西安海平方网络科技有限公司 | Work plan determination method and device, computer equipment and storage medium |
CN109858870A (en) * | 2018-12-24 | 2019-06-07 | 万翼科技有限公司 | A kind of event management method, system and a kind of storage device |
CN109886576B (en) * | 2019-02-20 | 2023-04-07 | 司空定制家居科技有限公司 | Digital delivery task management method, device and storage medium |
CN109886576A (en) * | 2019-02-20 | 2019-06-14 | 司空科技股份有限公司 | Task management method, device and storage medium are delivered in digitlization |
CN111626531A (en) * | 2019-02-28 | 2020-09-04 | 贵阳海信网络科技有限公司 | Risk control method, device, system and storage medium |
CN111626531B (en) * | 2019-02-28 | 2023-09-05 | 贵阳海信网络科技有限公司 | Risk control method, apparatus, system and storage medium |
CN111242457A (en) * | 2020-01-07 | 2020-06-05 | 中国建筑第八工程局有限公司 | Construction technology management system and method |
CN112884455A (en) * | 2021-03-26 | 2021-06-01 | 中车青岛四方机车车辆股份有限公司 | Task plan processing system, method and device |
CN113344477A (en) * | 2021-08-05 | 2021-09-03 | 捷尔杰(天津)设备有限公司 | Task synchronization control method and device, electronic equipment and computer storage medium |
CN113807730A (en) * | 2021-09-28 | 2021-12-17 | 重庆允成互联网科技有限公司 | Work order generation method, system, equipment and storage medium based on discrete management |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108520361A (en) | Process task management method, device and computer readable storage medium | |
KR102184182B1 (en) | Project/Task Intelligent Goal Management Method and Platform based on Super Tree | |
Zhang et al. | Process-oriented framework to improve modular and offsite construction manufacturing performance | |
Son et al. | Simulation-based shop floor control: formal model, model generation and control interface | |
KR101860276B1 (en) | 3D piping design support program device applied to smart plant collaboration system | |
Liu et al. | Restoration of power distribution systems with multiple data centers as critical loads | |
CN102096849A (en) | Flow management design method based on network program | |
Ayinla et al. | Process waste analysis for offsite production methods for house construction: A case study of factory wall panel production | |
Laipple et al. | Generic data model for semiconductor manufacturing supply chains | |
CN107169180A (en) | A kind of power grid regulation model center system of two-stage deployment | |
CN110401556A (en) | A kind of method and apparatus of IDC computer room cable visualization Automatic dispatching | |
Ham et al. | BIM based construction project case analysis for facility life cycle management from the perspective of the client | |
CN112434978A (en) | Efficient office room allocation method and system | |
Hobbs et al. | Harnessing the power of virtual reality–the potential for VR as a virtual integrated environment for project development in construction | |
Gupta et al. | Levelling resources of a construction project by various softwarebasedleveling tool | |
Sanvido | Towards a process based information architecture for construction | |
Hazeyama et al. | Workload management facilities for software project management | |
Zhang et al. | 4D visualization of construction site management | |
CN115965207B (en) | Resource allocation method, system and storage medium | |
Wang et al. | CIM modeling for market management systems | |
JP3695410B2 (en) | Production technology management method and apparatus therefor | |
Sweat et al. | Multi-factory capacity planning in semiconductor assembly and test manufacturing with multiple-chip products | |
KR100217234B1 (en) | Working management method using cad | |
KR20240016734A (en) | System and method for managing modular construction project schedule | |
Dawood et al. | The virtual construction site (VIRCON): a decision support system for construction planning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180911 |