situation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811218029.1A
Other languages
Chinese (zh)
Inventor
赵芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OneConnect Smart Technology Co Ltd
Original Assignee
OneConnect Smart Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OneConnect Smart Technology Co Ltd filed Critical OneConnect Smart Technology Co Ltd
Priority to CN201811218029.1A priority Critical patent/CN109559088A/en
Publication of CN109559088A publication Critical patent/CN109559088A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of task management method, which comprises when receiving project task batch operation instruction, split the project task;The project task after fractionation is allocated according to program member role, and the task definition of each program member's distribution of visualization display;The project task after distributing is sent to each program member;Reception project processing progress information, and analyze according to the project processing progress information intelligent completion situation of each program member;And the completion situation of each program member obtained according to intellectual analysis automatically generates working condition and reports file.Can reasonable distribution project task, and show by carrying out data visualization to project task come the real-time project processing progress that records.The present invention also provides a kind of task management device, electronic equipment and storage mediums.

Description

Task management method, device, electronic equipment and storage medium
Technical field
The present invention relates to computer application fields, and in particular to a kind of task management method, device, electronic equipment and storage Medium.
Background technique
In software project R&D process of today, the scale of project is increasing, and subtask is more and more, and the division of labor is increasingly Carefully, the relationship between each subtask also becomes increasingly complex.Associated role is numerous in mega project, each own respectively assigned Task, cooperate the case where there are different role task conflicts during system over all Integration.
In addition, when being managed to project, it is main by staff to the work of the relevant links of project into Concrete condition in the link, is informed the staff of next link by row tracking again after the completion of some part, thus It is set to start the work of next link.Job schedule and task reasonable arrangement of the project leader to numerous staff There are bottlenecks, it may be desirable to which it is for statistical analysis additionally to collect various data, just facilitates responsible person's accurately amount of sharing out the work.
Summary of the invention
In view of the foregoing, it is necessary to propose a kind of task management method, device, electronic equipment and storage medium, it can Reasonable distribution project task, and project processing progress is recorded in real time.
The first aspect of the present invention provides a kind of task management method, which comprises
When receiving project task batch operation instruction, the project task is split;
The project task after fractionation is allocated according to program member role, and each program member of visualization display point The task definition matched;
The project task after distributing is sent to each program member;
Reception project processing progress information, and analyze each program member's according to the project processing progress information intelligent Completion situation;And
The completion situation of each program member obtained according to intellectual analysis automatically generates working condition and reports file, In, it includes that the completion situation of program member and project are performed integrally situation that the working condition, which reports file,.
Preferably, the project task includes task allocation information and task definition information, and the task definition information is logical The form for crossing task block is split.
Preferably, the project task after fractionation is allocated according to task allocation information according to program member role, institute State the mode that task allocation information includes level distribution.
Preferably, the project task after fractionation is allocated according to task reference information according to program member role, institute The task reference information of stating includes completing situation with the task of the project task same type and its corresponding program member and task.
Preferably, the working condition of each program member obtained according to intellectual analysis automatically generates working condition remittance Message part includes:
The work log for acquiring each program member in real time summarizes the completion situation of project task automatically;
Periodically the completion situation of the project task track and summarizes and automatically generate the working condition report text Part.
Preferably, the work log of the program member is according to the working report content of program member, in conjunction with project at The task content of member generates auto-building model using preset log.
Preferably, it includes video working report file, phonological working report file and text that the working condition, which reports file, Word working report file.
The second aspect of the present invention provides a kind of task management device, and described device includes:
Module is split, for splitting the project task when receiving project task batch operation instruction;
Distribution module, for the project task after fractionation to be allocated according to program member role, and visualization display The task definition of each program member's distribution;
Sending module, for sending the project task after distributing to each program member;
Receiving module is analyzed for receiving project processing progress information, and according to the project processing progress information intelligent The completion situation of each program member;And
The completion situation of generation module, each program member for being obtained according to intellectual analysis automatically generates working condition Report file, wherein it includes that the completion situation of program member and project are performed integrally situation that the working condition, which reports file,.
The third aspect of the present invention provides a kind of electronic equipment, and the electronic equipment includes processor and memory, described Processor realizes the task management method when being used to execute the computer program stored in the memory.
The fourth aspect of the present invention provides a kind of computer readable storage medium, deposits on the computer readable storage medium Computer program is contained, the computer program realizes the task management method when being executed by processor.
Task management method, device, electronic equipment and storage medium of the present invention, the method is according to program member Project task after fractionation is allocated by role, and the task definition of the distribution of each program member of visualization display, and After the task processing progress information for receiving each program member, the working condition for each program member that intellectual analysis obtains is certainly The dynamic working condition that generates reports file.To realize that each role handles the effect of visualization of task in raising project, and reduce each The workload of role's progress report data allows project leader that can more really understand current project progress data.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the flow chart for the task management method that the embodiment of the present invention one provides.
Fig. 2 is the functional block diagram of task management device provided by Embodiment 2 of the present invention.
Fig. 3 is the schematic diagram for the electronic equipment that the embodiment of the present invention three provides.
The present invention that the following detailed description will be further explained with reference to the above drawings.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real Applying example, the present invention will be described in detail.It should be noted that in the absence of conflict, the embodiment of the present invention and embodiment In feature can be combined with each other.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, described embodiment is only It is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.
Description and claims of this specification and term " first " in above-mentioned attached drawing, " second " and " third " etc. are For distinguishing different objects, not for description particular order.In addition, term " includes " and their any deformations, it is intended that Non-exclusive include in covering.Such as the process, method, system, product or equipment for containing a series of steps or units do not have It is defined in listed step or unit, but optionally further comprising the step of not listing or unit, or optionally further comprising For the intrinsic other step or units of these process, methods, product or equipment.
The task management method of the embodiment of the present invention is applied in one or more electronic equipment.The task management side Method also can be applied to by electronic equipment and the hardware being made up of the server that network and the electronic equipment are attached In environment.Network includes but is not limited to: wide area network, Metropolitan Area Network (MAN) or local area network.The task management method of the embodiment of the present invention can be with It is executed, can also be executed by electronic equipment by server;It can also be and executed jointly by server and electronic equipment.
The electronic equipment for needing to carry out task management method can directly integrate the present invention on an electronic device Method provided by task management functions, or installation for realizing method of the invention client.For another example, institute of the present invention The method of offer can also operate in clothes in the form of Software Development Kit (Software Development Kit, SDK) It is engaged in the equipment such as device, the interface of task management functions, electronic equipment or other equipment is provided in the form of SDK and are connect by what is provided Task management can be realized in mouth.
Embodiment one
Fig. 1 is the flow chart for the task management method that the embodiment of the present invention one provides.The process according to different requirements, Execution sequence in figure can change, and certain steps can be omitted.
In the present embodiment, the task management method, for distributing, inquiring and showing task disposition.It is described Task management method can be applied in many general or dedicated electronic equipment, and the electronic equipment includes, but are not limited to take Business device, personal desktop computer, laptop, tablet computer, smart phone etc..
Step S1 splits the project task when receiving project task batch operation instruction.
In the present embodiment, the project task includes task allocation information and task definition information.In the task Holding information can be the specific tasks content that project task includes, and the task allocation information can be for determining how to item The information that mesh task is allocated for example, which program member project task is distributed to, and at what time appoints project Each program member is distributed in business.
Preferably, the task definition in the project task can be split by way of task block.
Project task after fractionation is allocated by step S2 according to program member role, and each item of visualization display The task definition of mesh member distribution.
In one embodiment, can according to program member role by the project task after fractionation according to task allocation information It is allocated.
The task allocation information can be the mode of level distribution, for example, according to project task importance difference by item Mesh task is divided into level-one or second level, is then again further drawn being divided into second level of the task according to project task importance difference It is divided into second level or three-level, and so on, the project task is divided toward lower layer, until not needing the item of further division Mesh task.This nested mode divided is taken to have more reasonability and flexibility.
In the present embodiment, the program member role includes, but are not limited to project manager, demand personnel, exploit person Member, tester, configuration management personnel etc..
Preferably, the program member role can also be divided by level.It specifically, can be according to professional level difference by project Member role divides.For example, the project manager is divided into level-one, the developer is divided into second level, with such It pushes away.
Preferably, the program member role of each level can divide again according to work post difference.For example, can incite somebody to action Developer positioned at second level is divided into again: interface personnel, business realizing personnel and database designer.Interface people The work of member is exactly then information is submitted to operation layer by picture program interface, without the concern for the logical relation of operation layer;Business The work of realization personnel is to handle the request of data that interface is submitted to complete logic flow, in conjunction with data access layer, does not have to consider The pattern of interface, style, without the format for considering database;Database designer be exactly design, planning database.
The task management method can by the project task according to the task allocation information and layering after layering after Program member role carries out corresponding distribution and is placed into everyone suitable so as to which project task is carried out reasonable distribution On post.
Preferably, the permission of program member role level corresponding to the program member role is related.It can manage Solution, the corresponding permission of the higher program member role of level are bigger.For example, level is the corresponding power of project manager of level-one Limit is maximum.
In another embodiment, the method can also according to program member role by the project task after fractionation according to Task reference information is allocated.
The task reference information includes and the task of the project task same type and its corresponding program member and Ren Business completion situation, the task reference information are obtained according to the big data that history item is completed.It specifically, can be in allocated items Automatically show that the task reference information is referred to for user (such as project leadership) when task.For example, distributing task in project leadership Personnel's executive condition before the task that Shi Zidong shows the project task same type, it is for reference.
Preferably, the priority of project member role can also be arranged in the method, so that it is corresponding conveniently to give priority in arranging for Program member role handles task.For example, the priority of the developer after setting layering, sets database designer to First priority, sets the second priority for business realizing personnel, sets third priority for interface personnel.
Step S3 sends the project task after distributing to each program member.
For example, sending the terminal device of the project task after distribution to each program member, referred to for program member.It is described Terminal device includes, but are not limited to computer, desktop computer or smart phone etc..
Preferably, after sending terminal device of the project task after distribution to each program member, the terminal device Specific tasks content can be shown by mission bit stream unit form.When the specific tasks content that can be shown includes: task start-stop Between, task names, task owner, task definition, task object, task deliver the information such as object, facilitate program member to check simultaneously Processing.It is understood that the mission bit stream unit can be shown in the aobvious of the terminal device by user interface form Show in unit.
The mission bit stream unit can also record the task status of each program member and calculate each program member's Task Progress.Ratio of the Task Progress of each program member between current task performance and overall tasks amount.
Preferably, before according to program member role's allocated items task, the task management method further includes creation The step of project task.
Step S4 receives project processing progress information, and analyzes each item according to the project processing progress information intelligent The completion situation of mesh member.
In the present embodiment, each program member can recorde respective project processing progress, wherein record project processing The method of progress includes milestone progress method, artificial settings activity schedules method, working cell progress method, Earned Value etc.. The milestone progress method is mainly used for tracking project overall progress, especially to item delivery date persistently with Track.The artificial settings activity schedules method assigns progress percentage estimated value to the milestone point in the software project stage, with Progress inside measurement and tracking phase.The working cell progress method is mainly used for the internal engineering task to the project stage The tracking of completion status.The Earned Value is mainly used for internal engineering Task Progress and cost completion status to the project stage Tracking.
In the present embodiment, the mission bit stream unit in the terminal device of the program member can recorde each project The situation of the daily finished item progress of member, and the project process situation of record is sent to electronic equipment.It is understood that every A program member can be believed the task of the work log and each member by the terminal device records work log Breath compares, and the Task Progress of program member can be confirmed.
Preferably, the task that the method can also be triggered according to program member completes instruction, updates task status information And the timing node of the state is recorded, so that recording project task completes situation.
The working condition of step S5, each program member obtained according to intellectual analysis automatically generate working condition report text Part, wherein it includes that the completion situation of program member and project are performed integrally situation that the working condition, which reports file,.
In the present embodiment, the work log that each program member can be acquired in real time, to the completion shape of project task Condition is summarized automatically, is tracked;And periodically the problem of executive condition of project, project, track and summarize and automatically generate work Make situation and reports file.The working condition, which reports file, can be the form of report, be also possible to the form of document.
In the present embodiment, the work log of the program member is according to the working report content of program member, then ties The task content for closing program member generates auto-building model using preset log.The working report file includes Video working report file, phonological working report file or paperwork reports file.It should be noted that the program member Working report content can take video, audio or text input form.Program member can pass through the camera shooting on terminal device Head carries out video report, carries out voice report by the Audio Input Modules (such as microphone) on terminal device and pass through text The mode of input is reported.The mission bit stream unit provides working report interface for program member and receives working report letter Breath, the mode that program member can choose video input, audio input or text input carry out working report.
Preferably, the method can also generate working condition according to different departments or project task and report file.
Preferably, the method can currently execute the data such as Task Progress with each program member of timed collection, thus Realize that periodically carrying out tracking to the problem of executive condition of project, project summarizes simultaneously automatic report generation.It supports user by week, press It is in progress by milestone with different grain size tracking project the moon;It realizes the tracking of schedule, and reports without delay.
In addition, the method can also be more than the customized threshold value of user to workload according to user or progress is more than progress The planning the time of definition of the task is alerted.
In conclusion task management method provided by the invention includes, when receiving project task batch operation instruction, Split the project task;The project task after fractionation is allocated according to program member role, and visualization display is each The task definition of program member's distribution;The project task after distributing is sent to each program member;Reception project processing progress letter It ceases, and analyzes the working condition of each program member according to the project processing progress information intelligent;And it is obtained according to intellectual analysis The working condition of each program member out automatically generates working condition and reports file, wherein the working condition reports file Working condition and project including program member are performed integrally situation.So as to role each in raising project handle task can Depending on changing effect;Reference data when leader's distribution task is supported by intellectual analysis;Reduce the work of each role's progress report data It measures, allows project leader that can more really understand current project progress data.
The above is only a specific embodiment of the invention, but scope of protection of the present invention is not limited thereto, for For those skilled in the art, without departing from the concept of the premise of the invention, improvement, but these can also be made It all belongs to the scope of protection of the present invention.
Below with reference to Fig. 2 and Fig. 3, respectively to the functional module and hardware of the electronic equipment of the above-mentioned task management method of realization Structure is introduced.
Embodiment two
Fig. 2 is the functional block diagram in task management device preferred embodiment of the present invention.
In some embodiments, the task management device 20 is run in electronic equipment.The task management device 20 It may include multiple functional modules as composed by program code segments.Each program segment in the task management device 20 Program code can store in memory, and as performed by least one processor, (is detailed in Fig. 1 with execution and its correlation is retouched State) task management functions.
In the present embodiment, function of the task management device 20 according to performed by it can be divided into multiple functions Module.The functional module may include: to split module 201, distribution module 202, sending module 203, receiving module 204 and life At module 205.The so-called module of the present invention refers to that one kind performed by least one processor and can be completed to fix The series of computation machine program segment of function, storage is in memory.It in some embodiments, will be about the function of each module It is described in detail in subsequent embodiment.
The fractionation module 201 is used to split the project task when receiving project task batch operation instruction.
In the present embodiment, the project task includes task allocation information and task definition information.In the task Holding information can be the specific tasks content that project task includes, and the task allocation information can be for determining how to item The information that mesh task is allocated for example, which program member project task is distributed to, and at what time appoints project Each program member is distributed in business.
Preferably, the task definition in the project task can be split by way of task block.
The distribution module 202 is used to be allocated the project task after fractionation according to program member role, and visual Change the task definition for showing each program member's distribution.
In one embodiment, can according to program member role by the project task after fractionation according to task allocation information It is allocated.
The task allocation information can be the mode of level distribution, for example, according to project task importance difference by item Mesh task is divided into level-one or second level, is then again further drawn being divided into second level of the task according to project task importance difference It is divided into second level or three-level, and so on, the project task is divided toward lower layer, until not needing the item of further division Mesh task.This nested mode divided is taken to have more reasonability and flexibility.
In the present embodiment, the program member role includes, but are not limited to project manager, demand personnel, exploit person Member, tester, configuration management personnel etc..
Preferably, the program member role can also be divided by level.It specifically, can be according to professional level difference by project Member role divides.For example, the project manager is divided into level-one, the developer is divided into second level, with such It pushes away.
Preferably, the program member role of each level can divide again according to work post difference.For example, can incite somebody to action Developer positioned at second level is divided into again: interface personnel, business realizing personnel and database designer.Interface people The work of member is exactly then information is submitted to operation layer by picture program interface, without the concern for the logical relation of operation layer;Business The work of realization personnel is to handle the request of data that interface is submitted to complete logic flow, in conjunction with data access layer, does not have to consider The pattern of interface, style, without the format for considering database;Database designer be exactly design, planning database.
The task management device 20 can by the project task according to the task allocation information and layering after layering after Program member role carry out corresponding distribution and be placed into everyone suitable so as to which project task is carried out reasonable distribution Post on.
Preferably, the permission of program member role level corresponding to the program member role is related.It can manage Solution, the corresponding permission of the higher program member role of level are bigger.For example, level is the corresponding power of project manager of level-one Limit is maximum.
In another embodiment, the task management device 20 can also be according to program member role by the item after fractionation Mesh task is allocated according to task reference information.
The task reference information includes and the task of the project task same type and its corresponding program member and Ren Business completion situation, the task reference information are obtained according to the big data that history item is completed.It specifically, can be in allocated items Automatically show that the task reference information is referred to for user (such as project leadership) when task.For example, distributing task in project leadership Personnel's executive condition before the task that Shi Zidong shows the project task same type, it is for reference.
Preferably, the priority of project member role can also be arranged in the task management device 20, thus convenient preferential Corresponding program member role is arranged to handle task.For example, the priority of the developer after setting layering, database is designed Personnel are set as the first priority, set the second priority for business realizing personnel, set third for interface personnel Priority.
The sending module 203 sends the project task after distribution to each program member.
For example, sending the terminal device of the project task after distribution to each program member, referred to for program member.It is described Terminal device includes, but are not limited to computer, desktop computer or smart phone etc..
Preferably, after sending terminal device of the project task after distribution to each program member, the terminal device Specific tasks content can be shown by mission bit stream unit form.When the specific tasks content that can be shown includes: task start-stop Between, task names, task owner, task definition, task object, task deliver the information such as object, facilitate program member to check simultaneously Processing.It is understood that the mission bit stream unit can be shown in the aobvious of the terminal device by user interface form Show in unit.
The mission bit stream unit can also record the task status of each program member and calculate each program member's Task Progress.Ratio of the Task Progress of each program member between current task performance and overall tasks amount.
Preferably, before according to program member role's allocated items task, the task management device 20 can also be created Build the project task.
The receiving module 204 is used to receive project processing progress information, and according to the project processing progress information intelligence The working condition of each program member can be analyzed.
In the present embodiment, each program member can recorde respective project processing progress, wherein record project processing The method of progress includes milestone progress method, artificial settings activity schedules method, working cell progress method, Earned Value etc.. The milestone progress method is mainly used for tracking project overall progress, especially to item delivery date persistently with Track.The artificial settings activity schedules method assigns progress percentage estimated value to the milestone point in the software project stage, with Progress inside measurement and tracking phase.The working cell progress method is mainly used for the internal engineering task to the project stage The tracking of completion status.The Earned Value is mainly used for internal engineering Task Progress and cost completion status to the project stage Tracking.
In the present embodiment, the mission bit stream unit in the terminal device of the program member can recorde each project The situation of the daily finished item progress of member, and the project process situation of record is sent to electronic equipment.It is understood that every A program member can be believed the task of the work log and each member by the terminal device records work log Breath compares, and the Task Progress of program member can be confirmed.
Preferably, the task that the task management device 20 can also be triggered according to program member completes instruction, more newly appointed Business status information and the timing node for recording the state, so that recording project task completes situation.
The working condition for each program member that generation module 205 is used to be obtained according to intellectual analysis automatically generates work shape Condition reports file, wherein it includes that the completion situation of program member and project are performed integrally situation that the working condition, which reports file,.
In the present embodiment, the work log that each program member can be acquired in real time, to the completion shape of project task Condition is summarized automatically, is tracked;And periodically the problem of executive condition of project, project, track and summarize and automatically generate work Make situation and reports file.The working condition, which reports file, can be the form of report, be also possible to the form of document.
In the present embodiment, the work log of the program member is according to the working report content of program member, then ties The task content for closing program member generates auto-building model using preset log.The working report file includes Video working report file, phonological working report file or paperwork reports file.It should be noted that the program member Working report content can take video, audio or text input form.Program member can pass through the camera shooting on terminal device Head carries out video report, carries out voice report by the Audio Input Modules (such as microphone) on terminal device and pass through text The mode of input is reported.The mission bit stream unit provides working report interface for program member and receives working report letter Breath, the mode that program member can choose video input, audio input or text input carry out working report.
Preferably, the task management device 20 can also generate working condition according to different departments or project task and converge Message part.
Preferably, the task management device 20 can currently execute Task Progress etc. with each program member of timed collection Data summarize simultaneously automatic report generation to realize and periodically carry out tracking to the problem of executive condition of project, project.It supports to use Family is in progress by week, monthly, by milestone with different grain size tracking project;It realizes the tracking of schedule, and reports without delay.
In addition, the task management device 20 can also be more than the customized threshold value of user to workload according to user, or into Degree is more than that the task for the time that schedule defines is alerted.
In conclusion task management device 20 of the present invention, including split module 201, distribution module 202, send Module 203, receiving module 204 and generation module 205.The fractionation module 201, which is used to work as, receives project task batch operation When instruction, the project task is split;The distribution module 202 is used to be appointed the project after fractionation according to program member role Business is allocated, and the task definition of each program member's distribution of visualization display;The sending module 203 is for sending distribution Project task afterwards is to each program member;The receiving module 204 is used to receive project processing progress information, and according to described Project processing progress information intelligent analyzes the working condition of each program member;The generation module 205 is used for according to intelligence point The working condition for analysing each program member obtained automatically generates working condition and reports file, wherein the working condition is reported File includes that the working condition of program member and project are performed integrally situation.Task is handled so as to role each in raising project Effect of visualization, by intellectual analysis support leader distribution task when reference data, reduce each role's progress report data Workload, allow project leader that can more really understand current project progress data.
The above-mentioned integrated unit realized in the form of software function module, can store and computer-readable deposit at one In storage media.Above-mentioned software function module is stored in a storage medium, including some instructions are used so that a computer It is each that equipment (can be personal computer, double screen equipment or the network equipment etc.) or processor (processor) execute the present invention The part of a embodiment the method.
Embodiment three
Fig. 3 is the schematic diagram for the electronic equipment that the embodiment of the present invention three provides.
The electronic equipment 3 includes: memory 31, at least one processor 32, is stored in the memory 31 and can The computer program 33 and at least one communication bus 34 run at least one described processor 32.
At least one described processor 32 realizes above-mentioned task management method embodiment when executing the computer program 33 In step.
Illustratively, the computer program 33 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 31, and are executed by least one described processor 32, to complete this hair It is bright.One or more of module/units can be the series of computation machine program instruction section that can complete specific function, described Instruction segment is for describing implementation procedure of the computer program 33 in the electronic equipment 3.
The electronic equipment 3 can be mobile phone, tablet computer, personal digital assistant (Personal Digital Assistant, PDA) etc. application program is installed equipment.It will be understood by those skilled in the art that the schematic diagram 3 is only The example of electronic equipment 3 does not constitute the restriction to electronic equipment 3, may include components more more or fewer than diagram, or Certain components or different components are combined, such as the electronic equipment 3 can also include input-output equipment, network insertion Equipment, bus etc..
At least one described processor 32 can be central processing unit (Central Processing Unit, CPU), It can also be other general processors, digital signal processor (Digital Signal Processor, DSP), dedicated integrated Circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..The processor 32 can be microprocessor or the processor 32 be also possible to it is any conventional Processor etc., the processor 32 are the control centres of the electronic equipment 3, utilize various interfaces and the entire electronics of connection The various pieces of equipment 3.
The memory 31 can be used for storing the computer program 33 and/or module/unit, and the processor 32 passes through Operation executes the computer program and/or module/unit being stored in the memory 31, and calls and be stored in memory Data in 31 realize the various functions of the electronic equipment 3.The memory 31 can mainly include storing program area and storage Data field, wherein storing program area can application program needed for storage program area, at least one function (for example sound plays Function, image player function etc.) etc.;Storage data area, which can be stored, uses created data (such as sound according to electronic equipment 3 Frequency evidence, phone directory etc.) etc..In addition, memory 31 may include high-speed random access memory, it can also include non-volatile Memory, such as hard disk, memory, plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card), at least one disk memory, flush memory device or other Volatile solid-state part.
If the integrated module/unit of the electronic equipment 3 is realized in the form of SFU software functional unit and as independent Product when selling or using, can store in a computer readable storage medium.Based on this understanding, the present invention is real All or part of the process in existing above-described embodiment method, can also instruct relevant hardware come complete by computer program At the computer program can be stored in a computer readable storage medium, and the computer program is held by processor When row, it can be achieved that the step of above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code, institute Stating computer program code can be source code form, object identification code form, executable file or certain intermediate forms etc..It is described Computer-readable medium may include: any entity or device, recording medium, U that can carry the computer program code Disk, mobile hard disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), arbitrary access Memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It needs It is bright, the content that the computer-readable medium includes can according in jurisdiction make laws and patent practice requirement into Row increase and decrease appropriate, such as do not include electric load according to legislation and patent practice, computer-readable medium in certain jurisdictions Wave signal and telecommunication signal.
In several embodiments provided by the present invention, it should be understood that arriving, disclosed electronic equipment and method can be with It realizes by another way.For example, electronic equipment embodiment described above is only schematical, for example, the list The division of member, only a kind of logical function partition, there may be another division manner in actual implementation.
It, can also be in addition, each functional unit in each embodiment of the present invention can integrate in same treatment unit It is that each unit physically exists alone, can also be integrated in same unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of hardware adds software function module.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included in the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.This Outside, it is clear that one word of " comprising " is not excluded for other units or, odd number is not excluded for plural number.The multiple units stated in system claims Or device can also be implemented through software or hardware by a unit or device.The first, the second equal words are used to indicate name Claim, and does not indicate any particular order.
Finally it should be noted that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although reference Preferred embodiment describes the invention in detail, those skilled in the art should understand that, it can be to of the invention Technical solution is modified or equivalent replacement, without departing from the spirit of the technical scheme of the invention range.

Claims (10)

1. a kind of task management method, which is characterized in that the described method includes:
When receiving project task batch operation instruction, the project task is split;
The project task after fractionation is allocated according to program member role, and each program member's distribution of visualization display Task definition;
The project task after distributing is sent to each program member;
Reception project processing progress information, and analyze according to the project processing progress information intelligent completion of each program member Situation;And
The completion situation of each program member obtained according to intellectual analysis automatically generates working condition and reports file, wherein institute Stating working condition and reporting file includes that the completion situation of program member and project are performed integrally situation.
2. task management method as described in claim 1, which is characterized in that the project task include task allocation information and Task definition information, the task definition information are split by way of task block.
3. task management method as claimed in claim 2, which is characterized in that according to program member role by the project after fractionation Task is allocated according to task allocation information, and the task allocation information includes the mode of level distribution.
4. task management method as claimed in claim 2, which is characterized in that according to program member role by the project after fractionation Task is allocated according to task reference information, the task reference information include with the task of the project task same type and Its corresponding program member and task complete situation.
5. task management method as described in claim 1, which is characterized in that each project obtained according to intellectual analysis The working condition of member automatically generates working condition report file
The work log for acquiring each program member in real time summarizes the completion situation of project task automatically;
Periodically the completion situation of the project task track and summarizes and automatically generate the working condition report file.
6. task management method as claimed in claim 5, which is characterized in that the work log of the program member is according to project The working report content of member generates model using preset log and gives birth to automatically in conjunction with the task content of program member At.
7. task management method as claimed in claim 5, which is characterized in that it includes video work that the working condition, which reports file, Make report file, phonological working reports file and paperwork reports file.
8. a kind of task management device, which is characterized in that described device includes:
Module is split, for splitting the project task when receiving project task batch operation instruction;
Distribution module, for being allocated the project task after fractionation according to program member role, and visualization display is each The task definition of program member's distribution;
Sending module, for sending the project task after distributing to each program member;
Receiving module is analyzed each for receiving project processing progress information, and according to the project processing progress information intelligent The completion situation of program member;And
Generation module, the completion situation of each program member for being obtained according to intellectual analysis automatically generate working condition report File, wherein it includes that the completion situation of program member and project are performed integrally situation that the working condition, which reports file,.
9. a kind of electronic equipment, which is characterized in that the electronic equipment includes processor and memory, and the processor is for holding Task management side as claimed in any of claims 1 to 7 in one of claims is realized when the computer program stored in the row memory Method.
10. a kind of computer readable storage medium, computer program, feature are stored on the computer readable storage medium It is, the computer program realizes task management side as claimed in any of claims 1 to 7 in one of claims when being executed by processor Method.
CN201811218029.1A 2018-10-18 2018-10-18 Task management method, device, electronic equipment and storage medium Pending CN109559088A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811218029.1A CN109559088A (en) 2018-10-18 2018-10-18 Task management method, device, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811218029.1A CN109559088A (en) 2018-10-18 2018-10-18 Task management method, device, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN109559088A true CN109559088A (en) 2019-04-02

Family

ID=65864969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811218029.1A Pending CN109559088A (en) 2018-10-18 2018-10-18 Task management method, device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN109559088A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110264156A (en) * 2019-05-31 2019-09-20 深圳市元征科技股份有限公司 A kind of project management method, device, electronic equipment and storage medium
CN110264039A (en) * 2019-05-22 2019-09-20 深圳壹账通智能科技有限公司 A kind of generation method and equipment of working report
CN110276515A (en) * 2019-05-08 2019-09-24 平安科技(深圳)有限公司 Method for allocating tasks, device, terminal and storage medium
CN110428171A (en) * 2019-08-01 2019-11-08 上海麦克风文化传媒有限公司 A kind of R & D of complex management system
CN110443491A (en) * 2019-08-01 2019-11-12 上海麦克风文化传媒有限公司 A kind of Product development process management method
CN110796342A (en) * 2019-10-09 2020-02-14 武汉光庭信息技术股份有限公司 Automatic management method and device based on typical maintenance project
CN110930056A (en) * 2019-12-06 2020-03-27 厦门市美亚柏科信息股份有限公司 Thinking-guidance-graph-based task management method, terminal device and storage medium
CN110991801A (en) * 2019-11-01 2020-04-10 深圳市彬讯科技有限公司 Decoration quality inspection report generation method and system
CN111784186A (en) * 2020-07-14 2020-10-16 武汉空心科技有限公司 Task allocation method for multi-role user of working platform
CN111784288A (en) * 2020-06-29 2020-10-16 广州华多网络科技有限公司 Task management method, device, system, storage medium and equipment
CN111899000A (en) * 2020-08-26 2020-11-06 广州茗软信息技术有限公司 Engineering data management method, device, computer equipment and storage medium
CN112085471A (en) * 2020-09-10 2020-12-15 北京百度网讯科技有限公司 Task distribution method and device, electronic equipment and storage medium
CN112101748A (en) * 2020-08-28 2020-12-18 湖南三湘银行股份有限公司 Operation and maintenance task management method and device
CN112818182A (en) * 2021-01-27 2021-05-18 意潜建筑科技(上海)有限公司 Gantt chart-based working density calculation display method
CN113487224A (en) * 2021-07-23 2021-10-08 中国工商银行股份有限公司 Content processing method, apparatus, device, medium, and program product
CN113500605A (en) * 2021-09-13 2021-10-15 中科开创(广州)智能科技发展有限公司 Inspection task visualization method and device, computer equipment and storage medium
CN116109115A (en) * 2023-04-13 2023-05-12 深圳昊通技术有限公司 Intelligent science and technology project management method, system and storage medium
CN116523263A (en) * 2023-06-06 2023-08-01 深圳明辉智能技术有限公司 Intelligent data processing method, system and storage medium
CN117635044A (en) * 2023-11-29 2024-03-01 武汉荆楚点石数码设计有限公司 Efficient game research and development project management method, system and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106096905A (en) * 2016-05-31 2016-11-09 北京诚公通信工程监理股份有限公司 A kind of project management method and system
CN106529770A (en) * 2016-10-18 2017-03-22 深圳市喜悦智慧数据有限公司 System and method for tracking state of work tasks
CN107680003A (en) * 2016-08-01 2018-02-09 北京地厚云图科技有限公司 The node tree generation method and device of project supervision task
CN107679832A (en) * 2017-10-09 2018-02-09 广州四三九九信息科技有限公司 Task management method, device and server
CN107705020A (en) * 2017-10-12 2018-02-16 山东联诚工程建设监理有限公司 A kind of overall process intelligence engineering supervisory information managing and control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106096905A (en) * 2016-05-31 2016-11-09 北京诚公通信工程监理股份有限公司 A kind of project management method and system
CN107680003A (en) * 2016-08-01 2018-02-09 北京地厚云图科技有限公司 The node tree generation method and device of project supervision task
CN106529770A (en) * 2016-10-18 2017-03-22 深圳市喜悦智慧数据有限公司 System and method for tracking state of work tasks
CN107679832A (en) * 2017-10-09 2018-02-09 广州四三九九信息科技有限公司 Task management method, device and server
CN107705020A (en) * 2017-10-12 2018-02-16 山东联诚工程建设监理有限公司 A kind of overall process intelligence engineering supervisory information managing and control system

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110276515A (en) * 2019-05-08 2019-09-24 平安科技(深圳)有限公司 Method for allocating tasks, device, terminal and storage medium
CN110264039A (en) * 2019-05-22 2019-09-20 深圳壹账通智能科技有限公司 A kind of generation method and equipment of working report
CN110264156B (en) * 2019-05-31 2023-05-30 深圳市元征科技股份有限公司 Project management method and device, electronic equipment and storage medium
CN110264156A (en) * 2019-05-31 2019-09-20 深圳市元征科技股份有限公司 A kind of project management method, device, electronic equipment and storage medium
CN110428171A (en) * 2019-08-01 2019-11-08 上海麦克风文化传媒有限公司 A kind of R & D of complex management system
CN110443491A (en) * 2019-08-01 2019-11-12 上海麦克风文化传媒有限公司 A kind of Product development process management method
CN110796342A (en) * 2019-10-09 2020-02-14 武汉光庭信息技术股份有限公司 Automatic management method and device based on typical maintenance project
CN110991801A (en) * 2019-11-01 2020-04-10 深圳市彬讯科技有限公司 Decoration quality inspection report generation method and system
CN110930056A (en) * 2019-12-06 2020-03-27 厦门市美亚柏科信息股份有限公司 Thinking-guidance-graph-based task management method, terminal device and storage medium
CN111784288A (en) * 2020-06-29 2020-10-16 广州华多网络科技有限公司 Task management method, device, system, storage medium and equipment
CN111784186A (en) * 2020-07-14 2020-10-16 武汉空心科技有限公司 Task allocation method for multi-role user of working platform
CN111899000A (en) * 2020-08-26 2020-11-06 广州茗软信息技术有限公司 Engineering data management method, device, computer equipment and storage medium
CN112101748A (en) * 2020-08-28 2020-12-18 湖南三湘银行股份有限公司 Operation and maintenance task management method and device
CN112101748B (en) * 2020-08-28 2023-04-18 湖南三湘银行股份有限公司 Operation and maintenance task management method and device
CN112085471A (en) * 2020-09-10 2020-12-15 北京百度网讯科技有限公司 Task distribution method and device, electronic equipment and storage medium
CN112818182A (en) * 2021-01-27 2021-05-18 意潜建筑科技(上海)有限公司 Gantt chart-based working density calculation display method
CN113487224A (en) * 2021-07-23 2021-10-08 中国工商银行股份有限公司 Content processing method, apparatus, device, medium, and program product
CN113500605A (en) * 2021-09-13 2021-10-15 中科开创(广州)智能科技发展有限公司 Inspection task visualization method and device, computer equipment and storage medium
CN116109115A (en) * 2023-04-13 2023-05-12 深圳昊通技术有限公司 Intelligent science and technology project management method, system and storage medium
CN116523263A (en) * 2023-06-06 2023-08-01 深圳明辉智能技术有限公司 Intelligent data processing method, system and storage medium
CN117635044A (en) * 2023-11-29 2024-03-01 武汉荆楚点石数码设计有限公司 Efficient game research and development project management method, system and storage medium

Similar Documents

Publication Publication Date Title
CN109559088A (en) Task management method, device, electronic equipment and storage medium
Pérez et al. Stochastic online appointment scheduling of multi-step sequential procedures in nuclear medicine
US20180189743A1 (en) Intelligent scheduling management
JP2020507135A (en) Exclusive agent pool distribution method, electronic device, and computer-readable storage medium
EP1998277A1 (en) System and method for multi-week scheduling
US11610173B2 (en) Intelligent collaborative project management
CN104956330A (en) Workload distribution with resource awareness
CN109508344A (en) Business datum querying method, device, electronic equipment and storage medium
Nguyen et al. A network flow approach for tactical resource planning in outpatient clinics
CN105988879A (en) Method and system for optimizing allocation of multi-tasking servers
US20150278736A1 (en) Framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints
US7580766B1 (en) Manufacturing resource planning by entity
CN116719518A (en) Manufacturing service intelligent arrangement method based on micro-service architecture
CN116151582A (en) Automatic version scheduling method and device based on resource identification and storage medium
CN109656693A (en) Method for scheduling task, device, server and storage medium
US20220229692A1 (en) Method and device for data task scheduling, storage medium, and scheduling tool
CN115719207A (en) Super-automation platform system
Grum et al. A decision maxim for efficient task realization within analytical network infrastructures
Ullah et al. Towards comprehensive release planning for software product lines
Ajmi et al. Impact of the Automation of Inpatient Bed Management to Reduce the Emergency Service Waiting Time.
Huang et al. Order confirmation mechanism for collaborative production networks
Alsharari et al. A Review of Agile Methods for Requirement Change Management in Web Engineering
US20230306375A1 (en) Automatic notification generation
CN117196530A (en) Digital intelligent scheduling method and system for software project set and human resource pool
CN111798148B (en) Project allocation method, apparatus, computer device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination