CN107679832A - Task management method, device and server - Google Patents
Task management method, device and server Download PDFInfo
- Publication number
- CN107679832A CN107679832A CN201710933919.XA CN201710933919A CN107679832A CN 107679832 A CN107679832 A CN 107679832A CN 201710933919 A CN201710933919 A CN 201710933919A CN 107679832 A CN107679832 A CN 107679832A
- Authority
- CN
- China
- Prior art keywords
- task
- project
- project information
- task management
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/252—Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/95—Retrieval from the web
- G06F16/957—Browsing optimisation, e.g. caching or content distillation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/20—Software design
- G06F8/24—Object-oriented
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/30—Creation or generation of source code
- G06F8/38—Creation or generation of source code for implementing user interfaces
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Software Systems (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Data Mining & Analysis (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Human Computer Interaction (AREA)
- Economics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of task management method, device and server, is related to task management technical field, and this method includes:Receive and store the project information of user's input;Project information comprises at least target, crucial achievement and task;When receiving the idsplay order of user, task management interface is shown according to project information;Task management interface comprises at least target, crucial achievement and the task that a project information includes.Above-mentioned task management method, device and server provided in an embodiment of the present invention, applied to task management tool, form of the project information according to target, crucial achievement and task can be stored and shown, add target dimension, the change of project stage can be paid close attention to the angle of manager, and careful fractionation can be carried out with this boot entry purpose developing direction, executor to project by task dimension, user is taken into account the details and overall picture of concern project development.
Description
Technical field
The present invention relates to task management technical field, more particularly, to a kind of task management method, device and server.
Background technology
Task with traditional management tool has following two features:1st, from the angle of the contents of a project, project is divided into multiple tasks
Stage, each task phase include multiple tasks, classified between task according to customized content module, and in use
Encourage to carry out careful fractionation to task;2nd, from the angle of PROJECT TIME, progress of the focus in individual task;Pair in use
The excessive careful fractionation of task, easily ignore the description to project overall condition, cause the manager of non-executing layer to be difficult to understand
Project overall picture.
The problem of being concerned only with project development details for above-mentioned task with traditional management tool, effective solution is not yet proposed at present
Certainly scheme.
The content of the invention
In view of this, it is an object of the invention to provide a kind of task management method, device and server, user can be made
Take into account the details and overall picture of concern project development.
In a first aspect, the embodiments of the invention provide a kind of task management method, applied to task management tool, including:
Receive and store the project information of user's input;Project information comprises at least target, crucial achievement and task;Receiving user
Idsplay order when, according to project information show task management interface;Task management interface comprises at least a project information bag
Target, crucial achievement and the task included.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the first of first aspect, wherein, root
The step of task management interface being shown according to project information, including:Identified project Item version corresponding to information according to project information;
The project billboard according to corresponding to generating Item version.
With reference to the first possible embodiment of first aspect, the embodiments of the invention provide second of first aspect
Possible embodiment, wherein, above-mentioned Item version is software development version.
With reference to the first possible embodiment of first aspect, the embodiments of the invention provide the third of first aspect
Possible embodiment, in addition to:When receiving the switching command of user, project billboard corresponding to switching command is shown.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 4th of first aspect kind, in addition to:
Pre-defined view template, assembly module and controller;The interaction in view template is controlled to respond user's using controller
Input;The API request data provided according to service end, the data model corresponding to storage in assembly module;View template is set
With the corresponding relation of controller to realize that Web page switches.
Second aspect, the embodiment of the present invention also provides a kind of task management device, applied to task management tool, including:
Input module, for receiving and storing the project information of user's input;Project information comprises at least target, crucial achievement and appointed
Business;Display module, for when receiving the idsplay order of user, being generated according to project information and showing task management interface;
Task management interface comprises at least target, crucial achievement and the task that a project information includes.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of the first of second aspect, wherein, show
Show that module is additionally operable to:Identified project Item version corresponding to information according to project information;The item according to corresponding to generating Item version
Mesh billboard.
With reference to the first possible embodiment of second aspect, the embodiments of the invention provide second of second aspect
Possible embodiment, wherein, Item version is software development version.
The third aspect, the embodiment of the present invention also provide a kind of server, including processor, memory, bus and communication connect
Mouthful, processor, communication interface and memory are connected by bus;Memory is used for storage program;Processor, for passing through bus
Call the program of storage in memory, the method for performing any one of first aspect and its possible embodiment.
Fourth aspect, the embodiment of the present invention also provide a kind of computer-readable storage medium, for save as second aspect and its
Computer software instructions used in the device of any one of possible embodiment.
The embodiment of the present invention brings following beneficial effect:
Above-mentioned task management method, device and server provided in an embodiment of the present invention, can applied to task management tool
By to project information according to target, crucial achievement and task in the form of stored and shown, add target dimension, can be with
The change of the angle concern project stage of manager, and can be tieed up with this boot entry purpose developing direction, executor by task
Degree carries out careful fractionation to project, user is taken into account the details and overall picture of concern project development.
Other feature and advantage of the disclosure will illustrate in the following description, or, Partial Feature and advantage can be with
Deduce from specification or unambiguously determine, or the above-mentioned technology by implementing the disclosure can be learnt.
To enable the above-mentioned purpose of the disclosure, feature and advantage to become apparent, preferred embodiment cited below particularly, and coordinate
Appended accompanying drawing, is described in detail below.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art
The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, in describing below
Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of schematic flow sheet of task management method provided in an embodiment of the present invention;
Fig. 2 is project fractionation structural representation provided in an embodiment of the present invention;
Fig. 3 is task management interface schematic diagram provided in an embodiment of the present invention;
Fig. 4 is the detailed maps of task management interface provided in an embodiment of the present invention;
Fig. 5 is the frame diagram of task management system provided in an embodiment of the present invention;
Fig. 6 is data interaction schematic diagram in front and back end provided in an embodiment of the present invention;
Fig. 7 is a kind of structural representation of task management device provided in an embodiment of the present invention;
Fig. 8 is a kind of server provided in an embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention
Technical scheme be clearly and completely described, it is clear that described embodiment is part of the embodiment of the present invention, rather than
Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belongs to the scope of protection of the invention.
Task management tool (software) at present, focus on the careful fractionation to the contents of a project, beneficial to executor, easily ignore
Description to project overall condition, the manager for causing non-executing layer are difficult to understanding project overall picture, based on this, the embodiment of the present invention
A kind of task management method, device and the server provided, user can be made to take into account the details and overall picture of concern project development, made
Manager quickly understands the developing direction and project achievement of project, and executor can continue to according to project management method to project
Careful fractionation is carried out, reduces the contradiction of executor and manager.For ease of understanding the present embodiment, first to of the invention real
A kind of task management method disclosed in example is applied to describe in detail.
Embodiment 1
The embodiments of the invention provide a kind of task management method, applied to task management tool.Fig. 1 is a kind of task pipe
The schematic flow sheet of reason method, comprises the following steps:
Step S102, receive and store the project information of user's input.
Wherein, each project information comprises at least target, crucial achievement and task, and the target is general to the topnotch of project
Include, be the purpose to be realized of project;The key, which is become, realizes that the target needs the phase targets (or milestone) reached;Should
Task is specific implementation detail.With addition of target dimension, i.e., the phased goal dimension of whole project.User can be from
Operational angle is analyzed, such as based on OKR (Objectives and Key Results, target and crucial achievement) management theory,
The OKR management theorys can allow enterprise preferably to focus on strategic objective, more preferable centralized configuration resource, preferably make above and below team
With the management method being intended to, the fractionation of above-mentioned 3 granularities (target, crucial achievement and task) is carried out to project.User can be with office
Business administration interface inputs its project information for splitting or planning, and is stored by the task management tool.
Step S104, when receiving the idsplay order of user, task management interface is shown according to project information.
User can operate to task management tool, check or change the above-mentioned project information stored.In root
When showing task management interface according to project information, the task management interface can include target, the pass that a project information includes
Key is achieved and task, can also show multiple project information and its target, crucial achievement and task.Multiple projects are shown at the same time
, can be according between at the beginning of the project or end time order arranges during information.Target and pass in above-mentioned project information
Key is achieved, and manager can be allowed quickly to understand the developing direction and project achievement of project;Task is according to project management method pair
The more careful fractionation that key achievement is carried out, can allow executor to perform according to schedule.
Above-mentioned task management method provided in an embodiment of the present invention, can be to project information applied to task management tool
Form according to target, crucial achievement and task is stored and shown, adds target dimension, can be with the angle of manager
The change of project stage is paid close attention to, and project can be carried out by task dimension with this boot entry purpose developing direction, executor
Careful fractionation, user is set to take into account the details and overall picture of concern project development.
Specifically, above-mentioned steps S104 includes:Identified project Item version corresponding to information according to project information;According to item
Project billboard corresponding to the generation of mesh version.Wherein, Item version is software development version.When Item version corresponding to project information
When having multiple, multiple corresponding project billboard are also had, when receiving the switching command of user, are shown corresponding to switching command
Project billboard.
Embodiment 2
The embodiments of the invention provide a kind of task management method, illustrated by taking development project as an example.
In view of software project generally use iterative development, a project has multiple versions, thus support be split as it is multiple
Parallel billboard is used to represent each version, and each billboard can be decoupled, and project shown in Figure 2 splits structure and shown
It is intended to, a project is split as multiple targets according to software version, wherein each target corresponds to a parallel billboard;Also illustrate
Target and crucial achievement correspond to that OKR is theoretical, and it is towards management level, task is specific project management, towards execution level.Should
For target to realize the target of the version indicated, the key becomes achievement that the version indicated in advance needs to reach with after an action of the bowels
Continuous to confirm, the task is the specific tasks content of record.
Task management interface schematic diagram shown in Figure 3, including OKR objectives management, and show multiple mesh
Billboard is marked, can be switched over according to the needs of user, and the project of active user's typing and concern can be checked.
The detailed maps of task management interface shown in Figure 4, the one kind that illustrated therein is OKR objectives management are specific
Form, including multiple project information, each project information include several crucial achievements, and user can be pressed by clicking on " checking "
Button checks target billboard, and specific tasks content therein is checked by clicking on crucial achievement.
Above-mentioned task management method can apply to task management system, and the implementation of the task management system can be divided into two
Individual aspect:Front end carries out the web single page application and developments of modularization management and mathematical logic processing, service end based on angularJs
Carrying out API based on the PHP frameworks that MVC pattern is built, (Application Programming Interface, application program are compiled
Journey interface) exploitation.The frame diagram of task management system shown in Figure 5, including front end UI, presentation layer, operation layer, number
According to layer, database and running environment.
Specifically, the structure of front end includes:
(1) view template is defined, modularization fractionation, custom instruction are carried out to the page and general purpose module according to service logic
With reference template file, common segment, and definitions component module and controller are taken out.
(2) interaction data model is input and carried out using the interaction in controller control view template, change response user
Object.
(3) the API request data provided according to service end, store respective data model, and utilize in the module
Service stores public service.
(4) routing configuration, the relation based on ui-router administration views template and controller are carried out, and realizes SPA
(single page web application, single page Web application) single page switches.
Specifically, the structure of service end includes:
(1) front and back end separation architecture, the response structure of uniform data, front and back end data interaction shown in Figure 6 are realized
Schematic diagram, show and interacted between front end Client and service end Server, wherein view is view template, and controller is
Controller, model are data model.
(2) according to delineation of activities API module, so as to define controller class and data model.Traditional task management system,
According to project->Task phase->Task divides, and adds OKR herein, structure become project->The OKR stages gather->Task rank
Section->Task.
Above-mentioned task management method provided in an embodiment of the present invention, can to project information according to target, crucial achievement and
The form of task is stored and shown, adds target dimension, and the change of project stage can be paid close attention to the angle of manager,
And careful fractionation can be carried out with this boot entry purpose developing direction, executor to project by task dimension, allow user
Take into account the details and overall picture of concern project development.
Embodiment 3
The embodiments of the invention provide a kind of task management device, and applied to task management tool, shown in Figure 7 appoints
The structural representation for managing device of being engaged in, including input module 71 and display module 72, the function of above-mentioned each module are as follows:
Input module 71, for receiving and storing the project information of user's input;Project information comprises at least target, key
Achievement and task;
Display module 72, for when receiving the idsplay order of user, being generated according to project information and showing task pipe
Manage interface;Task management interface comprises at least target, crucial achievement and the task that a project information includes.
Wherein, display module 72 is additionally operable to:Identified project Item version corresponding to information according to project information;According to project
Project billboard corresponding to version generation.Above-mentioned Item version is software development version.
It is apparent to those skilled in the art that for convenience and simplicity of description, the device of foregoing description
Specific work process, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
Flow chart and block diagram in accompanying drawing show system, method and the computer journey of multiple embodiments according to the present invention
Architectural framework in the cards, function and the operation of sequence product.At this point, each square frame in flow chart or block diagram can generation
The part of one module of table, program segment or code, a part for the module, program segment or code include one or more use
In the executable instruction of logic function as defined in realization.It should also be noted that marked at some as in the realization replaced in square frame
The function of note can also be with different from the order marked in accompanying drawing generation.For example, two continuous square frames can essentially base
Originally it is performed in parallel, they can also be performed in the opposite order sometimes, and this is depending on involved function.It is also noted that
It is the combination of each square frame and block diagram in block diagram and/or flow chart and/or the square frame in flow chart, can uses and perform rule
Fixed function or the special hardware based system of action are realized, or can use the group of specialized hardware and computer instruction
Close to realize.
Referring to Fig. 8, the embodiment of the present invention also provides a kind of server 100, including:Processor 80, memory 81, bus 82
With communication interface 83, processor 80, communication interface 83 and memory 81 are connected by bus 82;Processor 80 is used to perform storage
The executable module stored in device 81, such as computer program.
Wherein, memory 81 may include high-speed random access memory (RAM, Random AccessMemory), also may be used
Non-labile memory (non-volatile memory), for example, at least a magnetic disk storage can also be included.By at least
One communication interface 83 (can be wired or wireless) realizes the communication between the system network element and at least one other network element
Connection, can use internet, wide area network, LAN, Metropolitan Area Network (MAN) etc..
Bus 82 can be isa bus, pci bus or eisa bus etc..It is total that bus can be divided into address bus, data
Line, controlling bus etc..For ease of represent, scheme XX in only represented with a four-headed arrow, it is not intended that an only bus or
A type of bus.
Wherein, memory 81 is used for storage program, and processor 80 is after execute instruction is received, configuration processor, foregoing
The method performed by device that the stream process that inventive embodiments any embodiment discloses defines can apply in processor 80, or
Person is realized by processor 80.
Processor 80 is probably a kind of IC chip, has the disposal ability of signal.In implementation process, above-mentioned side
Each step of method can be completed by the integrated logic circuit of the hardware in processor 80 or the instruction of software form.Above-mentioned
Processor 80 can be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network
Processor (Network Processor, abbreviation NP) etc.;It can also be digital signal processor (Digital Signal
Processing, abbreviation DSP), application specific integrated circuit (Application Specific Integrated Circuit, referred to as
ASIC), ready-made programmable gate array (Field-Programmable Gate Array, abbreviation FPGA) or other are programmable
Logical device, discrete gate or transistor logic, discrete hardware components.It can realize or perform in the embodiment of the present invention
Disclosed each method, step and logic diagram.General processor can be microprocessor or the processor can also be appointed
What conventional processor etc..The step of method with reference to disclosed in the embodiment of the present invention, can be embodied directly in hardware decoding processing
Device performs completion, or performs completion with the hardware in decoding processor and software module combination.Software module can be located at
Machine memory, flash memory, read-only storage, programmable read only memory or electrically erasable programmable memory, register etc. are originally
In the ripe storage medium in field.The storage medium is located at memory 81, and processor 80 reads the information in memory 81, with reference to
Its hardware completes the step of above method.
The computer program product for the progress task management method that the embodiment of the present invention is provided, including store processor
The computer-readable recording medium of executable non-volatile program code, the instruction that described program code includes can be used for performing
Method described in previous methods embodiment, specific implementation can be found in embodiment of the method, will not be repeated here.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods, can be with
Realize by another way.Device embodiment described above is only schematical, for example, the division of the unit,
Only a kind of division of logic function, can there is other dividing mode when actually realizing, in another example, multiple units or component can
To combine or be desirably integrated into another system, or some features can be ignored, or not perform.It is another, it is shown or beg for
The mutual coupling of opinion or direct-coupling or communication connection can be by some communication interfaces, device or unit it is indirect
Coupling or communication connection, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit
The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs
's.
If the function is realized in the form of SFU software functional unit and is used as independent production marketing or in use, can be with
It is stored in the executable non-volatile computer read/write memory medium of a processor.Based on such understanding, the present invention
The part that is substantially contributed in other words to prior art of technical scheme or the part of the technical scheme can be with software
The form of product is embodied, and the computer software product is stored in a storage medium, including some instructions are causing
One computer equipment (can be personal computer, server, or network equipment etc.) performs each embodiment institute of the present invention
State all or part of step of method.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-
Only Memory), random access memory (RAM, Random AccessMemory), magnetic disc or CD etc. are various to deposit
Store up the medium of program code.
Finally it should be noted that:Embodiment described above, it is only the embodiment of the present invention, to illustrate the present invention
Technical scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair
It is bright to be described in detail, it will be understood by those within the art that:Any one skilled in the art
The invention discloses technical scope in, it can still modify to the technical scheme described in previous embodiment or can be light
Change is readily conceivable that, or equivalent substitution is carried out to which part technical characteristic;And these modifications, change or replacement, do not make
The essence of appropriate technical solution departs from the spirit and scope of technical scheme of the embodiment of the present invention, should all cover the protection in the present invention
Within the scope of.Therefore, protection scope of the present invention described should be defined by scope of the claims.
Claims (10)
- A kind of 1. task management method, it is characterised in that applied to task management tool, including:Receive and store the project information of user's input;The project information comprises at least target, crucial achievement and task;When receiving the idsplay order of the user, task management interface is shown according to the project information;The task pipe Reason interface comprises at least the target, the crucial achievement and the task that a project information includes.
- 2. according to the method for claim 1, it is characterised in that described that task management interface is shown according to the project information The step of, including:The Item version according to corresponding to the project information determines the project information;According to project billboard corresponding to Item version generation.
- 3. according to the method for claim 2, it is characterised in that the Item version is software development version.
- 4. according to the method for claim 2, it is characterised in that methods described also includes:When receiving the switching command of the user, the project billboard corresponding to the switching command is shown.
- 5. according to the method for claim 1, it is characterised in that methods described also includes:Pre-defined view template, assembly module and controller;The interaction in the view template is controlled to respond the input of the user using the controller;The API request data provided according to service end, the data model corresponding to storage in the assembly module;The corresponding relation of the view template and the controller is set to realize that Web page switches.
- A kind of 6. task management device, it is characterised in that applied to task management tool, including:Input module, for receiving and storing the project information of user's input;The project information comprise at least target, it is crucial into Just and task;Display module, for when receiving the idsplay order of the user, being generated according to the project information and showing task Administration interface;The task management interface comprises at least the target, the crucial achievement that a project information includes With the task.
- 7. device according to claim 6, it is characterised in that the display module is additionally operable to:The Item version according to corresponding to the project information determines the project information;According to project billboard corresponding to Item version generation.
- 8. device according to claim 7, it is characterised in that the Item version is software development version.
- 9. a kind of server, it is characterised in that the server includes processor, memory, bus and communication interface, the place Reason device, the communication interface are connected with the memory by the bus;The memory is used for storage program;The processor, for calling the program being stored in the memory by the bus, perform the claim Any one of 1-5 methods describeds.
- 10. a kind of computer-readable storage medium, it is characterised in that for saving as used in any one of claim 6 to 8 described device Computer software instructions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710933919.XA CN107679832A (en) | 2017-10-09 | 2017-10-09 | Task management method, device and server |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710933919.XA CN107679832A (en) | 2017-10-09 | 2017-10-09 | Task management method, device and server |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107679832A true CN107679832A (en) | 2018-02-09 |
Family
ID=61139489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710933919.XA Pending CN107679832A (en) | 2017-10-09 | 2017-10-09 | Task management method, device and server |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107679832A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109344592A (en) * | 2018-09-26 | 2019-02-15 | 深圳壹账通智能科技有限公司 | Project kanban system method and apparatus based on bio-identification |
CN109559088A (en) * | 2018-10-18 | 2019-04-02 | 深圳壹账通智能科技有限公司 | Task management method, device, electronic equipment and storage medium |
CN112416219A (en) * | 2020-10-20 | 2021-02-26 | 北京达佳互联信息技术有限公司 | Target object processing method, device and system, electronic equipment and storage medium |
CN112445562A (en) * | 2020-10-20 | 2021-03-05 | 北京达佳互联信息技术有限公司 | Method and device for commenting target and key result, electronic equipment and storage medium |
CN112560480A (en) * | 2020-12-24 | 2021-03-26 | 北京百度网讯科技有限公司 | Task community discovery method, device, equipment and storage medium |
CN113127198A (en) * | 2021-04-16 | 2021-07-16 | 建信金融科技有限责任公司 | Task processing method, device and equipment |
CN113220772A (en) * | 2021-05-17 | 2021-08-06 | 成都雨萌科技有限公司 | Data processing method, system and related equipment |
CN113435638A (en) * | 2021-06-19 | 2021-09-24 | 森云(天津)科技有限公司 | Enterprise target management method, system, terminal and storage medium based on OKRs-E |
CN113449989A (en) * | 2021-06-29 | 2021-09-28 | 深圳市南睿信息科技有限公司 | Performance management system based on OKR (target and key achievement method) |
CN113450062A (en) * | 2020-09-07 | 2021-09-28 | 北京新氧科技有限公司 | Project information processing method, system, electronic device and storage medium |
CN114301782A (en) * | 2021-12-30 | 2022-04-08 | 南京焦点领动云计算技术有限公司 | Method for optimizing delivery service of website |
WO2023046008A1 (en) * | 2021-09-22 | 2023-03-30 | 北京字跳网络技术有限公司 | Task processing method and apparatus |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104009906A (en) * | 2013-02-22 | 2014-08-27 | 周立斌 | Structuralized theme instant communication system and method |
US8970131B2 (en) * | 2013-02-15 | 2015-03-03 | Cree, Inc. | Solid state lighting apparatuses and related methods |
CN104573991A (en) * | 2015-01-28 | 2015-04-29 | 携程计算机技术(上海)有限公司 | Project process management system |
CN106779474A (en) * | 2017-01-10 | 2017-05-31 | 对松堂电子(苏州)有限公司 | A kind of project management software system and its management method |
-
2017
- 2017-10-09 CN CN201710933919.XA patent/CN107679832A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8970131B2 (en) * | 2013-02-15 | 2015-03-03 | Cree, Inc. | Solid state lighting apparatuses and related methods |
CN104009906A (en) * | 2013-02-22 | 2014-08-27 | 周立斌 | Structuralized theme instant communication system and method |
CN104573991A (en) * | 2015-01-28 | 2015-04-29 | 携程计算机技术(上海)有限公司 | Project process management system |
CN106779474A (en) * | 2017-01-10 | 2017-05-31 | 对松堂电子(苏州)有限公司 | A kind of project management software system and its management method |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109344592A (en) * | 2018-09-26 | 2019-02-15 | 深圳壹账通智能科技有限公司 | Project kanban system method and apparatus based on bio-identification |
CN109559088A (en) * | 2018-10-18 | 2019-04-02 | 深圳壹账通智能科技有限公司 | Task management method, device, electronic equipment and storage medium |
CN113450062A (en) * | 2020-09-07 | 2021-09-28 | 北京新氧科技有限公司 | Project information processing method, system, electronic device and storage medium |
CN112445562A (en) * | 2020-10-20 | 2021-03-05 | 北京达佳互联信息技术有限公司 | Method and device for commenting target and key result, electronic equipment and storage medium |
CN112416219A (en) * | 2020-10-20 | 2021-02-26 | 北京达佳互联信息技术有限公司 | Target object processing method, device and system, electronic equipment and storage medium |
CN112560480A (en) * | 2020-12-24 | 2021-03-26 | 北京百度网讯科技有限公司 | Task community discovery method, device, equipment and storage medium |
CN112560480B (en) * | 2020-12-24 | 2023-08-15 | 北京百度网讯科技有限公司 | Task community discovery method, device, equipment and storage medium |
CN113127198A (en) * | 2021-04-16 | 2021-07-16 | 建信金融科技有限责任公司 | Task processing method, device and equipment |
CN113220772A (en) * | 2021-05-17 | 2021-08-06 | 成都雨萌科技有限公司 | Data processing method, system and related equipment |
CN113435638A (en) * | 2021-06-19 | 2021-09-24 | 森云(天津)科技有限公司 | Enterprise target management method, system, terminal and storage medium based on OKRs-E |
CN113449989A (en) * | 2021-06-29 | 2021-09-28 | 深圳市南睿信息科技有限公司 | Performance management system based on OKR (target and key achievement method) |
WO2023046008A1 (en) * | 2021-09-22 | 2023-03-30 | 北京字跳网络技术有限公司 | Task processing method and apparatus |
CN114301782A (en) * | 2021-12-30 | 2022-04-08 | 南京焦点领动云计算技术有限公司 | Method for optimizing delivery service of website |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107679832A (en) | Task management method, device and server | |
US11263005B2 (en) | Techniques to deploy an application as a cloud computing service | |
US9621428B1 (en) | Multi-tiered cloud application topology modeling tool | |
CN103593236B (en) | Computer equipment, method and device for scheduling service process | |
JP2021012740A (en) | Compound control | |
US20140344123A1 (en) | Dynamically modifying workload patterns in a cloud | |
US8196089B2 (en) | Pattern-based development of computer system solutions | |
US11171825B2 (en) | Context-based resource allocation with extended user concepts | |
CN106796500A (en) | Mapped between the version of distributed file system | |
US10425295B1 (en) | Transformation platform | |
US11245735B1 (en) | Screen-sharing content reconfiguration | |
CN110692037A (en) | Application deployment | |
CN102291445A (en) | Cloud computing management system based on virtual resources | |
US11150957B1 (en) | Application mapping to system resources for instance creation | |
CN112486491A (en) | Page generation method and device, computer equipment and storage medium | |
US9921811B2 (en) | Multiple display environment for software development projects | |
CN115668128A (en) | Automating adoption of cloud services | |
CN112463296B (en) | Method and device for creating virtual machine | |
CN116569141A (en) | Workflow repair | |
US20210184939A1 (en) | Method and apparatus for creating a custom service | |
CN109885580A (en) | A kind of hot spot account batch updating method, apparatus, server and storage medium | |
Ahmed-Nacer et al. | Model-Driven Simulation of Elastic OCCI Cloud Resources | |
US20150378784A1 (en) | Work flow level job input/output | |
WO2015116191A1 (en) | Business process managment | |
CN110908644A (en) | Configuration method and device of state node, computer equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180209 |