CN107679832A CN201710933919.XA CN201710933919A CN107679832A CN 107679832 A CN107679832 A CN 107679832A CN 201710933919 A CN201710933919 A CN 201710933919A CN 107679832 A CN107679832 A CN 107679832A
Authority
CN
China
Prior art keywords
task
project
project information
task management
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710933919.XA
Other languages
Chinese (zh)
Inventor
余彦佐
卢亮
欧阳逸滨
陈洁萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Sisanjiujiu Information Technology Co Ltd
Original Assignee
Guangzhou Sisanjiujiu Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Sisanjiujiu Information Technology Co Ltd filed Critical Guangzhou Sisanjiujiu Information Technology Co Ltd
Priority to CN201710933919.XA priority Critical patent/CN107679832A/en
Publication of CN107679832A publication Critical patent/CN107679832A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/252Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/957Browsing optimisation, e.g. caching or content distillation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/20Software design
    • G06F8/24Object-oriented
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • G06F8/38Creation or generation of source code for implementing user interfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Software Systems (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Data Mining & Analysis (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Human Computer Interaction (AREA)
  • Economics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of task management method, device and server, is related to task management technical field, and this method includes:Receive and store the project information of user's input;Project information comprises at least target, crucial achievement and task;When receiving the idsplay order of user, task management interface is shown according to project information;Task management interface comprises at least target, crucial achievement and the task that a project information includes.Above-mentioned task management method, device and server provided in an embodiment of the present invention, applied to task management tool, form of the project information according to target, crucial achievement and task can be stored and shown, add target dimension, the change of project stage can be paid close attention to the angle of manager, and careful fractionation can be carried out with this boot entry purpose developing direction, executor to project by task dimension, user is taken into account the details and overall picture of concern project development.

Description

Task management method, device and server
Technical field
The present invention relates to task management technical field, more particularly, to a kind of task management method, device and server.
Background technology
Task with traditional management tool has following two features:1st, from the angle of the contents of a project, project is divided into multiple tasks Stage, each task phase include multiple tasks, classified between task according to customized content module, and in use Encourage to carry out careful fractionation to task;2nd, from the angle of PROJECT TIME, progress of the focus in individual task;Pair in use The excessive careful fractionation of task, easily ignore the description to project overall condition, cause the manager of non-executing layer to be difficult to understand Project overall picture.
The problem of being concerned only with project development details for above-mentioned task with traditional management tool, effective solution is not yet proposed at present Certainly scheme.
The content of the invention
In view of this, it is an object of the invention to provide a kind of task management method, device and server, user can be made Take into account the details and overall picture of concern project development.
In a first aspect, the embodiments of the invention provide a kind of task management method, applied to task management tool, including: Receive and store the project information of user's input;Project information comprises at least target, crucial achievement and task;Receiving user Idsplay order when, according to project information show task management interface;Task management interface comprises at least a project information bag Target, crucial achievement and the task included.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the first of first aspect, wherein, root The step of task management interface being shown according to project information, including:Identified project Item version corresponding to information according to project information; The project billboard according to corresponding to generating Item version.
With reference to the first possible embodiment of first aspect, the embodiments of the invention provide second of first aspect Possible embodiment, wherein, above-mentioned Item version is software development version.
With reference to the first possible embodiment of first aspect, the embodiments of the invention provide the third of first aspect Possible embodiment, in addition to:When receiving the switching command of user, project billboard corresponding to switching command is shown.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 4th of first aspect kind, in addition to: Pre-defined view template, assembly module and controller;The interaction in view template is controlled to respond user's using controller Input;The API request data provided according to service end, the data model corresponding to storage in assembly module;View template is set With the corresponding relation of controller to realize that Web page switches.
Second aspect, the embodiment of the present invention also provides a kind of task management device, applied to task management tool, including: Input module, for receiving and storing the project information of user's input;Project information comprises at least target, crucial achievement and appointed Business;Display module, for when receiving the idsplay order of user, being generated according to project information and showing task management interface; Task management interface comprises at least target, crucial achievement and the task that a project information includes.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of the first of second aspect, wherein, show Show that module is additionally operable to:Identified project Item version corresponding to information according to project information;The item according to corresponding to generating Item version Mesh billboard.
With reference to the first possible embodiment of second aspect, the embodiments of the invention provide second of second aspect Possible embodiment, wherein, Item version is software development version.
The third aspect, the embodiment of the present invention also provide a kind of server, including processor, memory, bus and communication connect Mouthful, processor, communication interface and memory are connected by bus;Memory is used for storage program;Processor, for passing through bus Call the program of storage in memory, the method for performing any one of first aspect and its possible embodiment.
Fourth aspect, the embodiment of the present invention also provide a kind of computer-readable storage medium, for save as second aspect and its Computer software instructions used in the device of any one of possible embodiment.
The embodiment of the present invention brings following beneficial effect:
Above-mentioned task management method, device and server provided in an embodiment of the present invention, can applied to task management tool By to project information according to target, crucial achievement and task in the form of stored and shown, add target dimension, can be with The change of the angle concern project stage of manager, and can be tieed up with this boot entry purpose developing direction, executor by task Degree carries out careful fractionation to project, user is taken into account the details and overall picture of concern project development.
Other feature and advantage of the disclosure will illustrate in the following description, or, Partial Feature and advantage can be with Deduce from specification or unambiguously determine, or the above-mentioned technology by implementing the disclosure can be learnt.
To enable the above-mentioned purpose of the disclosure, feature and advantage to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of schematic flow sheet of task management method provided in an embodiment of the present invention;
Fig. 2 is project fractionation structural representation provided in an embodiment of the present invention;
Fig. 3 is task management interface schematic diagram provided in an embodiment of the present invention;
Fig. 4 is the detailed maps of task management interface provided in an embodiment of the present invention;
Fig. 5 is the frame diagram of task management system provided in an embodiment of the present invention;
Fig. 6 is data interaction schematic diagram in front and back end provided in an embodiment of the present invention;
Fig. 7 is a kind of structural representation of task management device provided in an embodiment of the present invention;
Fig. 8 is a kind of server provided in an embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention Technical scheme be clearly and completely described, it is clear that described embodiment is part of the embodiment of the present invention, rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of protection of the invention.
Task management tool (software) at present, focus on the careful fractionation to the contents of a project, beneficial to executor, easily ignore Description to project overall condition, the manager for causing non-executing layer are difficult to understanding project overall picture, based on this, the embodiment of the present invention A kind of task management method, device and the server provided, user can be made to take into account the details and overall picture of concern project development, made Manager quickly understands the developing direction and project achievement of project, and executor can continue to according to project management method to project Careful fractionation is carried out, reduces the contradiction of executor and manager.For ease of understanding the present embodiment, first to of the invention real A kind of task management method disclosed in example is applied to describe in detail.
Embodiment 1
The embodiments of the invention provide a kind of task management method, applied to task management tool.Fig. 1 is a kind of task pipe The schematic flow sheet of reason method, comprises the following steps:
Step S102, receive and store the project information of user's input.
Wherein, each project information comprises at least target, crucial achievement and task, and the target is general to the topnotch of project Include, be the purpose to be realized of project;The key, which is become, realizes that the target needs the phase targets (or milestone) reached;Should Task is specific implementation detail.With addition of target dimension, i.e., the phased goal dimension of whole project.User can be from Operational angle is analyzed, such as based on OKR (Objectives and Key Results, target and crucial achievement) management theory, The OKR management theorys can allow enterprise preferably to focus on strategic objective, more preferable centralized configuration resource, preferably make above and below team With the management method being intended to, the fractionation of above-mentioned 3 granularities (target, crucial achievement and task) is carried out to project.User can be with office Business administration interface inputs its project information for splitting or planning, and is stored by the task management tool.
Step S104, when receiving the idsplay order of user, task management interface is shown according to project information.
User can operate to task management tool, check or change the above-mentioned project information stored.In root When showing task management interface according to project information, the task management interface can include target, the pass that a project information includes Key is achieved and task, can also show multiple project information and its target, crucial achievement and task.Multiple projects are shown at the same time , can be according between at the beginning of the project or end time order arranges during information.Target and pass in above-mentioned project information Key is achieved, and manager can be allowed quickly to understand the developing direction and project achievement of project;Task is according to project management method pair The more careful fractionation that key achievement is carried out, can allow executor to perform according to schedule.
Above-mentioned task management method provided in an embodiment of the present invention, can be to project information applied to task management tool Form according to target, crucial achievement and task is stored and shown, adds target dimension, can be with the angle of manager The change of project stage is paid close attention to, and project can be carried out by task dimension with this boot entry purpose developing direction, executor Careful fractionation, user is set to take into account the details and overall picture of concern project development.
Specifically, above-mentioned steps S104 includes:Identified project Item version corresponding to information according to project information;According to item Project billboard corresponding to the generation of mesh version.Wherein, Item version is software development version.When Item version corresponding to project information When having multiple, multiple corresponding project billboard are also had, when receiving the switching command of user, are shown corresponding to switching command Project billboard.
Embodiment 2
The embodiments of the invention provide a kind of task management method, illustrated by taking development project as an example.
In view of software project generally use iterative development, a project has multiple versions, thus support be split as it is multiple Parallel billboard is used to represent each version, and each billboard can be decoupled, and project shown in Figure 2 splits structure and shown It is intended to, a project is split as multiple targets according to software version, wherein each target corresponds to a parallel billboard;Also illustrate Target and crucial achievement correspond to that OKR is theoretical, and it is towards management level, task is specific project management, towards execution level.Should For target to realize the target of the version indicated, the key becomes achievement that the version indicated in advance needs to reach with after an action of the bowels Continuous to confirm, the task is the specific tasks content of record.
Task management interface schematic diagram shown in Figure 3, including OKR objectives management, and show multiple mesh Billboard is marked, can be switched over according to the needs of user, and the project of active user's typing and concern can be checked.
The detailed maps of task management interface shown in Figure 4, the one kind that illustrated therein is OKR objectives management are specific Form, including multiple project information, each project information include several crucial achievements, and user can be pressed by clicking on " checking " Button checks target billboard, and specific tasks content therein is checked by clicking on crucial achievement.
Above-mentioned task management method can apply to task management system, and the implementation of the task management system can be divided into two Individual aspect:Front end carries out the web single page application and developments of modularization management and mathematical logic processing, service end based on angularJs Carrying out API based on the PHP frameworks that MVC pattern is built, (Application Programming Interface, application program are compiled Journey interface) exploitation.The frame diagram of task management system shown in Figure 5, including front end UI, presentation layer, operation layer, number According to layer, database and running environment.
Specifically, the structure of front end includes:
(1) view template is defined, modularization fractionation, custom instruction are carried out to the page and general purpose module according to service logic With reference template file, common segment, and definitions component module and controller are taken out.
(2) interaction data model is input and carried out using the interaction in controller control view template, change response user Object.
(3) the API request data provided according to service end, store respective data model, and utilize in the module Service stores public service.
(4) routing configuration, the relation based on ui-router administration views template and controller are carried out, and realizes SPA (single page web application, single page Web application) single page switches.
Specifically, the structure of service end includes:
(1) front and back end separation architecture, the response structure of uniform data, front and back end data interaction shown in Figure 6 are realized Schematic diagram, show and interacted between front end Client and service end Server, wherein view is view template, and controller is Controller, model are data model.
(2) according to delineation of activities API module, so as to define controller class and data model.Traditional task management system, According to project->Task phase->Task divides, and adds OKR herein, structure become project->The OKR stages gather->Task rank Section->Task.
Above-mentioned task management method provided in an embodiment of the present invention, can to project information according to target, crucial achievement and The form of task is stored and shown, adds target dimension, and the change of project stage can be paid close attention to the angle of manager, And careful fractionation can be carried out with this boot entry purpose developing direction, executor to project by task dimension, allow user Take into account the details and overall picture of concern project development.
Embodiment 3
The embodiments of the invention provide a kind of task management device, and applied to task management tool, shown in Figure 7 appoints The structural representation for managing device of being engaged in, including input module 71 and display module 72, the function of above-mentioned each module are as follows:
Input module 71, for receiving and storing the project information of user's input;Project information comprises at least target, key Achievement and task;
Display module 72, for when receiving the idsplay order of user, being generated according to project information and showing task pipe Manage interface;Task management interface comprises at least target, crucial achievement and the task that a project information includes.
Wherein, display module 72 is additionally operable to:Identified project Item version corresponding to information according to project information;According to project Project billboard corresponding to version generation.Above-mentioned Item version is software development version.
It is apparent to those skilled in the art that for convenience and simplicity of description, the device of foregoing description Specific work process, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
Flow chart and block diagram in accompanying drawing show system, method and the computer journey of multiple embodiments according to the present invention Architectural framework in the cards, function and the operation of sequence product.At this point, each square frame in flow chart or block diagram can generation The part of one module of table, program segment or code, a part for the module, program segment or code include one or more use In the executable instruction of logic function as defined in realization.It should also be noted that marked at some as in the realization replaced in square frame The function of note can also be with different from the order marked in accompanying drawing generation.For example, two continuous square frames can essentially base Originally it is performed in parallel, they can also be performed in the opposite order sometimes, and this is depending on involved function.It is also noted that It is the combination of each square frame and block diagram in block diagram and/or flow chart and/or the square frame in flow chart, can uses and perform rule Fixed function or the special hardware based system of action are realized, or can use the group of specialized hardware and computer instruction Close to realize.
Referring to Fig. 8, the embodiment of the present invention also provides a kind of server 100, including:Processor 80, memory 81, bus 82 With communication interface 83, processor 80, communication interface 83 and memory 81 are connected by bus 82;Processor 80 is used to perform storage The executable module stored in device 81, such as computer program.
Wherein, memory 81 may include high-speed random access memory (RAM, Random AccessMemory), also may be used Non-labile memory (non-volatile memory), for example, at least a magnetic disk storage can also be included.By at least One communication interface 83 (can be wired or wireless) realizes the communication between the system network element and at least one other network element Connection, can use internet, wide area network, LAN, Metropolitan Area Network (MAN) etc..
Bus 82 can be isa bus, pci bus or eisa bus etc..It is total that bus can be divided into address bus, data Line, controlling bus etc..For ease of represent, scheme XX in only represented with a four-headed arrow, it is not intended that an only bus or A type of bus.
Wherein, memory 81 is used for storage program, and processor 80 is after execute instruction is received, configuration processor, foregoing The method performed by device that the stream process that inventive embodiments any embodiment discloses defines can apply in processor 80, or Person is realized by processor 80.
Processor 80 is probably a kind of IC chip, has the disposal ability of signal.In implementation process, above-mentioned side Each step of method can be completed by the integrated logic circuit of the hardware in processor 80 or the instruction of software form.Above-mentioned Processor 80 can be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network Processor (Network Processor, abbreviation NP) etc.;It can also be digital signal processor (Digital Signal Processing, abbreviation DSP), application specific integrated circuit (Application Specific Integrated Circuit, referred to as ASIC), ready-made programmable gate array (Field-Programmable Gate Array, abbreviation FPGA) or other are programmable Logical device, discrete gate or transistor logic, discrete hardware components.It can realize or perform in the embodiment of the present invention Disclosed each method, step and logic diagram.General processor can be microprocessor or the processor can also be appointed What conventional processor etc..The step of method with reference to disclosed in the embodiment of the present invention, can be embodied directly in hardware decoding processing Device performs completion, or performs completion with the hardware in decoding processor and software module combination.Software module can be located at Machine memory, flash memory, read-only storage, programmable read only memory or electrically erasable programmable memory, register etc. are originally In the ripe storage medium in field.The storage medium is located at memory 81, and processor 80 reads the information in memory 81, with reference to Its hardware completes the step of above method.
The computer program product for the progress task management method that the embodiment of the present invention is provided, including store processor The computer-readable recording medium of executable non-volatile program code, the instruction that described program code includes can be used for performing Method described in previous methods embodiment, specific implementation can be found in embodiment of the method, will not be repeated here.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods, can be with Realize by another way.Device embodiment described above is only schematical, for example, the division of the unit, Only a kind of division of logic function, can there is other dividing mode when actually realizing, in another example, multiple units or component can To combine or be desirably integrated into another system, or some features can be ignored, or not perform.It is another, it is shown or beg for The mutual coupling of opinion or direct-coupling or communication connection can be by some communication interfaces, device or unit it is indirect Coupling or communication connection, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
If the function is realized in the form of SFU software functional unit and is used as independent production marketing or in use, can be with It is stored in the executable non-volatile computer read/write memory medium of a processor.Based on such understanding, the present invention The part that is substantially contributed in other words to prior art of technical scheme or the part of the technical scheme can be with software The form of product is embodied, and the computer software product is stored in a storage medium, including some instructions are causing One computer equipment (can be personal computer, server, or network equipment etc.) performs each embodiment institute of the present invention State all or part of step of method.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read- Only Memory), random access memory (RAM, Random AccessMemory), magnetic disc or CD etc. are various to deposit Store up the medium of program code.
Finally it should be noted that:Embodiment described above, it is only the embodiment of the present invention, to illustrate the present invention Technical scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, it will be understood by those within the art that:Any one skilled in the art The invention discloses technical scope in, it can still modify to the technical scheme described in previous embodiment or can be light Change is readily conceivable that, or equivalent substitution is carried out to which part technical characteristic;And these modifications, change or replacement, do not make The essence of appropriate technical solution departs from the spirit and scope of technical scheme of the embodiment of the present invention, should all cover the protection in the present invention Within the scope of.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (10)

  1. A kind of 1. task management method, it is characterised in that applied to task management tool, including:
    Receive and store the project information of user's input;The project information comprises at least target, crucial achievement and task;
    When receiving the idsplay order of the user, task management interface is shown according to the project information;The task pipe Reason interface comprises at least the target, the crucial achievement and the task that a project information includes.
  2. 2. according to the method for claim 1, it is characterised in that described that task management interface is shown according to the project information The step of, including:
    The Item version according to corresponding to the project information determines the project information;
    According to project billboard corresponding to Item version generation.
  3. 3. according to the method for claim 2, it is characterised in that the Item version is software development version.
  4. 4. according to the method for claim 2, it is characterised in that methods described also includes:
    When receiving the switching command of the user, the project billboard corresponding to the switching command is shown.
  5. 5. according to the method for claim 1, it is characterised in that methods described also includes:
    Pre-defined view template, assembly module and controller;
    The interaction in the view template is controlled to respond the input of the user using the controller;
    The API request data provided according to service end, the data model corresponding to storage in the assembly module;
    The corresponding relation of the view template and the controller is set to realize that Web page switches.
  6. A kind of 6. task management device, it is characterised in that applied to task management tool, including:
    Input module, for receiving and storing the project information of user's input;The project information comprise at least target, it is crucial into Just and task;
    Display module, for when receiving the idsplay order of the user, being generated according to the project information and showing task Administration interface;The task management interface comprises at least the target, the crucial achievement that a project information includes With the task.
  7. 7. device according to claim 6, it is characterised in that the display module is additionally operable to:
    The Item version according to corresponding to the project information determines the project information;
    According to project billboard corresponding to Item version generation.
  8. 8. device according to claim 7, it is characterised in that the Item version is software development version.
  9. 9. a kind of server, it is characterised in that the server includes processor, memory, bus and communication interface, the place Reason device, the communication interface are connected with the memory by the bus;
    The memory is used for storage program;
    The processor, for calling the program being stored in the memory by the bus, perform the claim Any one of 1-5 methods describeds.
  10. 10. a kind of computer-readable storage medium, it is characterised in that for saving as used in any one of claim 6 to 8 described device Computer software instructions.
CN201710933919.XA 2017-10-09 2017-10-09 Task management method, device and server Pending CN107679832A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710933919.XA CN107679832A (en) 2017-10-09 2017-10-09 Task management method, device and server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710933919.XA CN107679832A (en) 2017-10-09 2017-10-09 Task management method, device and server

Publications (1)

Publication Number Publication Date
CN107679832A true CN107679832A (en) 2018-02-09

Family

ID=61139489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710933919.XA Pending CN107679832A (en) 2017-10-09 2017-10-09 Task management method, device and server

Country Status (1)

Country Link
CN (1) CN107679832A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109344592A (en) * 2018-09-26 2019-02-15 深圳壹账通智能科技有限公司 Project kanban system method and apparatus based on bio-identification
CN109559088A (en) * 2018-10-18 2019-04-02 深圳壹账通智能科技有限公司 Task management method, device, electronic equipment and storage medium
CN112416219A (en) * 2020-10-20 2021-02-26 北京达佳互联信息技术有限公司 Target object processing method, device and system, electronic equipment and storage medium
CN112445562A (en) * 2020-10-20 2021-03-05 北京达佳互联信息技术有限公司 Method and device for commenting target and key result, electronic equipment and storage medium
CN112560480A (en) * 2020-12-24 2021-03-26 北京百度网讯科技有限公司 Task community discovery method, device, equipment and storage medium
CN113127198A (en) * 2021-04-16 2021-07-16 建信金融科技有限责任公司 Task processing method, device and equipment
CN113220772A (en) * 2021-05-17 2021-08-06 成都雨萌科技有限公司 Data processing method, system and related equipment
CN113435638A (en) * 2021-06-19 2021-09-24 森云(天津)科技有限公司 Enterprise target management method, system, terminal and storage medium based on OKRs-E
CN113449989A (en) * 2021-06-29 2021-09-28 深圳市南睿信息科技有限公司 Performance management system based on OKR (target and key achievement method)
CN113450062A (en) * 2020-09-07 2021-09-28 北京新氧科技有限公司 Project information processing method, system, electronic device and storage medium
CN114301782A (en) * 2021-12-30 2022-04-08 南京焦点领动云计算技术有限公司 Method for optimizing delivery service of website
WO2023046008A1 (en) * 2021-09-22 2023-03-30 北京字跳网络技术有限公司 Task processing method and apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104009906A (en) * 2013-02-22 2014-08-27 周立斌 Structuralized theme instant communication system and method
US8970131B2 (en) * 2013-02-15 2015-03-03 Cree, Inc. Solid state lighting apparatuses and related methods
CN104573991A (en) * 2015-01-28 2015-04-29 携程计算机技术(上海)有限公司 Project process management system
CN106779474A (en) * 2017-01-10 2017-05-31 对松堂电子(苏州)有限公司 A kind of project management software system and its management method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8970131B2 (en) * 2013-02-15 2015-03-03 Cree, Inc. Solid state lighting apparatuses and related methods
CN104009906A (en) * 2013-02-22 2014-08-27 周立斌 Structuralized theme instant communication system and method
CN104573991A (en) * 2015-01-28 2015-04-29 携程计算机技术(上海)有限公司 Project process management system
CN106779474A (en) * 2017-01-10 2017-05-31 对松堂电子(苏州)有限公司 A kind of project management software system and its management method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109344592A (en) * 2018-09-26 2019-02-15 深圳壹账通智能科技有限公司 Project kanban system method and apparatus based on bio-identification
CN109559088A (en) * 2018-10-18 2019-04-02 深圳壹账通智能科技有限公司 Task management method, device, electronic equipment and storage medium
CN113450062A (en) * 2020-09-07 2021-09-28 北京新氧科技有限公司 Project information processing method, system, electronic device and storage medium
CN112445562A (en) * 2020-10-20 2021-03-05 北京达佳互联信息技术有限公司 Method and device for commenting target and key result, electronic equipment and storage medium
CN112416219A (en) * 2020-10-20 2021-02-26 北京达佳互联信息技术有限公司 Target object processing method, device and system, electronic equipment and storage medium
CN112560480A (en) * 2020-12-24 2021-03-26 北京百度网讯科技有限公司 Task community discovery method, device, equipment and storage medium
CN112560480B (en) * 2020-12-24 2023-08-15 北京百度网讯科技有限公司 Task community discovery method, device, equipment and storage medium
CN113127198A (en) * 2021-04-16 2021-07-16 建信金融科技有限责任公司 Task processing method, device and equipment
CN113220772A (en) * 2021-05-17 2021-08-06 成都雨萌科技有限公司 Data processing method, system and related equipment
CN113435638A (en) * 2021-06-19 2021-09-24 森云(天津)科技有限公司 Enterprise target management method, system, terminal and storage medium based on OKRs-E
CN113449989A (en) * 2021-06-29 2021-09-28 深圳市南睿信息科技有限公司 Performance management system based on OKR (target and key achievement method)
WO2023046008A1 (en) * 2021-09-22 2023-03-30 北京字跳网络技术有限公司 Task processing method and apparatus
CN114301782A (en) * 2021-12-30 2022-04-08 南京焦点领动云计算技术有限公司 Method for optimizing delivery service of website

Similar Documents

Publication Publication Date Title
CN107679832A (en) Task management method, device and server
US11263005B2 (en) Techniques to deploy an application as a cloud computing service
US9621428B1 (en) Multi-tiered cloud application topology modeling tool
CN103593236B (en) Computer equipment, method and device for scheduling service process
JP2021012740A (en) Compound control
US20140344123A1 (en) Dynamically modifying workload patterns in a cloud
US8196089B2 (en) Pattern-based development of computer system solutions
US11171825B2 (en) Context-based resource allocation with extended user concepts
CN106796500A (en) Mapped between the version of distributed file system
US10425295B1 (en) Transformation platform
US11245735B1 (en) Screen-sharing content reconfiguration
CN110692037A (en) Application deployment
CN102291445A (en) Cloud computing management system based on virtual resources
US11150957B1 (en) Application mapping to system resources for instance creation
CN112486491A (en) Page generation method and device, computer equipment and storage medium
US9921811B2 (en) Multiple display environment for software development projects
CN115668128A (en) Automating adoption of cloud services
CN112463296B (en) Method and device for creating virtual machine
CN116569141A (en) Workflow repair
US20210184939A1 (en) Method and apparatus for creating a custom service
CN109885580A (en) A kind of hot spot account batch updating method, apparatus, server and storage medium
Ahmed-Nacer et al. Model-Driven Simulation of Elastic OCCI Cloud Resources
US20150378784A1 (en) Work flow level job input/output
WO2015116191A1 (en) Business process managment
CN110908644A (en) Configuration method and device of state node, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209