CN106779474A - A kind of project management software system and its management method - Google Patents
A kind of project management software system and its management method Download PDFInfo
- Publication number
- CN106779474A CN106779474A CN201710015890.7A CN201710015890A CN106779474A CN 106779474 A CN106779474 A CN 106779474A CN 201710015890 A CN201710015890 A CN 201710015890A CN 106779474 A CN106779474 A CN 106779474A
- Authority
- CN
- China
- Prior art keywords
- bar code
- module
- management unit
- management
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Stored Programmes (AREA)
Abstract
The invention discloses a kind of project management software system and its management method, including control centre and server, control centre includes the manufacturing management unit, bar code management unit, quality management unit and the data capture management unit that are connected with each other, manufacturing management unit includes completing see plate module into library module and production, and complete to include completing into library module is transferred into library inquiry and completion scanning;Bar code management unit includes bar code management module, complete and see that plate module and bar code management module are inquired about using bar code into library module, production, data capture management unit includes the completion of many connecting plates, veneer completion, send and repair, scrap module, mobile terminal or data acquisition end are accessed to server by control centre, carry out the collection of data, and reflection manufacturing schedule and product repairing situation.The present invention improves its operating efficiency, makes the progress of its reflection production in time and the repair of product, quickly reviews production and maintenance process.
Description
Technical field
The present invention relates to software systems application field, more particularly to a kind of project management software system and its management method.
Background technology
At present, during production process, the maintenance of progress and product still needs by manually being counted, so not only
Substantial amounts of cost of labor can be wasted, also makes it because of the low progress situation and product without can in time reflect production of operating efficiency
Repair, causes product back-tracing difficult or can not review.
The content of the invention
To overcome disadvantages mentioned above, it is an object of the invention to provide a kind of project management software system and its management method,
Its operating efficiency is improved to reach, makes the progress of its reflection production in time and the repair of product, quickly review production
With the purpose of maintenance process.
In order to solve the above-mentioned technical problem, the present invention provides a kind of project management software system, including control centre's kimonos
Business device, the control centre includes the manufacturing management unit, bar code management unit, quality management unit and the data that are connected with each other
Acquisition management unit, the manufacturing management unit includes completing see plate module into library module and production, described to complete into library module
It is transferred into library inquiry and completion scanning including completing, the production sees that plate module is tracked including manufacturing schedule;The bar code pipe
Reason unit includes bar code management module, and the bar code management module includes that bar code inquiry and bar code are logged in, described complete
Work enters library module, production and sees that plate module and bar code management module are inquired about using bar code, the data capture management
Unit includes the completion of many connecting plates, veneer completion, send and repair, scrap module, and mobile terminal or data acquisition end are by the control
The heart accesses the collection that data are carried out to the server, and reflection manufacturing schedule and product repairing situation.Can by the system
Artificial statistics is substituted, the substantial amounts of cost of labor not only saved also improves the efficiency of its work, makes it timely and effectively anti-
The progress of production and the repair of product are reflected, and can quickly review the whole process of production and maintenance.
Further, it is described to complete also include into library module scrap inquiry and scrap scanning and be transferred to, it is described to scrap inquiry and adopt
Inquired about with bar code, realized the scanning management to scrap products.
Further, the system uses B/S frameworks, C/S frameworks and Mobile solution, flat using DOTNET and JAVA technologies
Platform.
Further, the control centre also includes database, and the database side uses ORACLE databases, data
Storehouse can be preserved system information, to check.
Further, the mobile terminal is designed out using the Andriod platforms of Internet of Things using JAVA technologies
Hair, simple, open, cost is relatively low.
A kind of management method of project management software system, comprises the following steps:
1)First the demand of company investigated, analyzed, confirmed feasibility;
2)The various pieces of Comprehensive Designing planning whole system and mutual communication, set up a factory model(Factory
Model), propose project alternative;
3)The WBS and work distribution, date of enterprise of work in every are set up;
4)Integration testing is carried out;
5)User test is carried out;
6)Parallel running;
7)Independent operating.
The management method can more effectively carry out the investigation of system, analysis, finally determine feasible scheme, and then realize more
Plus efficient management, and closer to the company's actual demand using the software, the purpose of customization is reached, solve each different public
The different problems of department, make it play bigger effect in use.
Brief description of the drawings
Fig. 1 is the software systems block diagram of the present embodiment.
Specific embodiment
Presently preferred embodiments of the present invention is described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy
It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to protection scope of the present invention.
Referring to shown in accompanying drawing 1, a kind of project management software system, including control centre and server, the control centre
Including the manufacturing management unit, bar code management unit and quality management unit and the data capture management unit that are connected with each other, institute
State manufacturing management unit and see plate module into library module and production including completing, described completion include that completion storage is looked into library module
Ask, completion scanning is transferred to, scrap inquiry and scrap scanning and be transferred to, the production sees that plate module includes manufacturing schedule tracking;It is described
Bar code management unit includes bar code management module, and the bar code management module includes that bar code inquiry and bar code are stepped on
Land, described completion see that plate module and bar code management module are inquired about using bar code into library module, production, the data
Acquisition management unit includes the completion of many connecting plates, veneer completion, send and repair, scrap module, and mobile terminal or data acquisition end pass through institute
State control centre and access the collection that data are carried out to the server, and reflection manufacturing schedule and product repairing situation, it is described
Quality management unit is monitored to the quality and its repair status of product.
The system uses B/S frameworks, C/S frameworks and Mobile solution, using DOTNET technologies and JAVA technology platforms, institute
State control centre and also include database, the database side uses ORACLE databases, the mobile terminal to use Internet of Things
Andriod platforms, be designed exploitation using JAVA technologies.
A kind of management method of project management software system, comprises the following steps:
1)First the demand of company investigated, analyzed, confirmed feasibility;
2)The various pieces of Comprehensive Designing planning whole system and mutual communication, set up a factory model(Factory
Model), propose project alternative;
3)The WBS and work distribution, date of enterprise of work in every are set up;
4)Integration testing is carried out;
5)User test is carried out;
6)Parallel running;
7)Independent operating.
Embodiment of above technology design and feature only to illustrate the invention, technique is familiar with its object is to allow
People understands present disclosure and is carried out, and it is not intended to limit the scope of the present invention, all according to spirit of the invention
The equivalent change or modification that essence is done, should all cover within the scope of the present invention.
Claims (6)
1. a kind of project management software system, it is characterised in that:Including control centre and server, the control centre includes phase
Manufacturing management unit, bar code management unit, quality management unit and the data capture management unit for connecting, the manufacture pipe
Reason unit includes completing see plate module into library module and production, and described completion includes completing being swept into library inquiry and completion into library module
Retouch and be transferred to, the production sees that plate module is tracked including manufacturing schedule;The bar code management unit includes bar code management module,
The bar code management module include bar code inquiry and bar code log in, it is described complete into library module, production see plate module and
Bar code management module is inquired about using bar code, and the data capture management unit includes that the completion of many connecting plates, veneer are complete
Work, send and repair, scrap module, mobile terminal or data acquisition end are accessed to the server by the control centre, enter line number
According to collection, and reflection manufacturing schedule and product repairing situation.
2. a kind of project management software system according to claim 1, it is characterised in that described completion is also wrapped into library module
Include and scrap inquiry and scrap scanning and be transferred to, it is described to scrap inquiry and inquired about using bar code.
3. a kind of project management software system according to claim 1, its characteristic is, the system be have B/S frameworks,
C/S frameworks and Mobile solution, using DOTNET and JAVA technology platforms.
4. a kind of project management software system according to claim 1, it is characterised in that the control centre also includes
Database, the database side uses ORACLE databases.
5. a kind of project management software system according to claim 1, it is characterised in that the mobile terminal uses Internet of Things
The Andriod platforms of net, exploitation is designed using JAVA technologies.
6. a kind of management method of project management software system, it is characterised in that comprise the following steps:
1)First the demand of company investigated, analyzed, confirmed feasibility;
2)The various pieces of Comprehensive Designing planning whole system and mutual communication, set up a factory model, proposes project side
Case;
3)The WBS and work distribution, date of enterprise of work in every are set up;
4)Integration testing is carried out;
5)User test is carried out;
6)Parallel running;
7)Independent operating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710015890.7A CN106779474A (en) | 2017-01-10 | 2017-01-10 | A kind of project management software system and its management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710015890.7A CN106779474A (en) | 2017-01-10 | 2017-01-10 | A kind of project management software system and its management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106779474A true CN106779474A (en) | 2017-05-31 |
Family
ID=58948739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710015890.7A Pending CN106779474A (en) | 2017-01-10 | 2017-01-10 | A kind of project management software system and its management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106779474A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107679832A (en) * | 2017-10-09 | 2018-02-09 | 广州四三九九信息科技有限公司 | Task management method, device and server |
CN108883532A (en) * | 2017-07-31 | 2018-11-23 | 深圳市大疆创新科技有限公司 | Schedule tracking method, device, system and robot |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002215866A (en) * | 2001-01-15 | 2002-08-02 | Nec Corp | Management analysis system |
CN104463452A (en) * | 2014-11-29 | 2015-03-25 | 中山市铧禧电子科技有限公司 | Management method of production management system |
-
2017
- 2017-01-10 CN CN201710015890.7A patent/CN106779474A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002215866A (en) * | 2001-01-15 | 2002-08-02 | Nec Corp | Management analysis system |
CN104463452A (en) * | 2014-11-29 | 2015-03-25 | 中山市铧禧电子科技有限公司 | Management method of production management system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108883532A (en) * | 2017-07-31 | 2018-11-23 | 深圳市大疆创新科技有限公司 | Schedule tracking method, device, system and robot |
CN107679832A (en) * | 2017-10-09 | 2018-02-09 | 广州四三九九信息科技有限公司 | Task management method, device and server |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109146090B (en) | Component life cycle management method based on equipment digital twin management platform | |
CN103646149B (en) | The scheme of KBE generates automatically, evaluating system and method | |
CN104200334B (en) | A kind of mass-rent project management control system and method based on SaaS patterns | |
CN105373901A (en) | Grid fault worksheet handling method, apparatus, and system | |
CN105260841A (en) | Auditing system for power distribution network fault emergency repair receipt | |
CN105118012A (en) | Urban management intelligent terminal service platform and usage method thereof | |
CN110189102A (en) | A kind of business policy redemption system based on cloud database | |
CN105631612A (en) | System and method of evaluating individual performance and capability of public servant based on big data | |
CN111260194A (en) | Accurate material supply method and system based on block chain | |
CN110390404A (en) | A kind of RCM in knowledge based library and data management | |
CN104461708A (en) | Method and system for processing task information | |
CN106779474A (en) | A kind of project management software system and its management method | |
CN109840704A (en) | A kind of wisdom control of stamping system | |
CN114091703A (en) | Electric automobile ordered charging management platform and operation and maintenance method thereof | |
Cheng et al. | The strategic research on integrating service model for SMEs cloud supply chain in Taiwan | |
Kumar et al. | IT adaptation in sugar supply chain: a study at milling level | |
CN102456175A (en) | Software development process management method | |
Eccleston et al. | Integrating Environmental Impact Assessment with Environmental Management Systems. | |
CN110149399A (en) | Intelligent device management system and method | |
CN110570109A (en) | Data center full life cycle integrated service test process supervision system | |
CN104680355A (en) | Novel-technology cloud computing enterprise information movement management system | |
CN111105333B (en) | Intelligent traffic professional operation service management system and method | |
CN202033796U (en) | Credit investigation assistance system for credit cards | |
CN103258259A (en) | Staff coordinated management method based on positional information technology | |
CN109960231A (en) | A kind of production management system and its method based on Internet of Things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 215000 66-69 Mu Xu Road, Mu Du Town, Wuzhong District, Suzhou, Jiangsu Applicant after: Taishodo Electronics (Suzhou) Co., Ltd. Address before: 215000 Huayuan East Road, Mu Du Town, Wuzhong District, Suzhou, Jiangsu 299 Applicant before: Taishodo Electronics (Suzhou) Co., Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |