CN104573991A - Project process management system - Google Patents
Project process management system Download PDFInfo
- Publication number
- CN104573991A CN104573991A CN201510044137.1A CN201510044137A CN104573991A CN 104573991 A CN104573991 A CN 104573991A CN 201510044137 A CN201510044137 A CN 201510044137A CN 104573991 A CN104573991 A CN 104573991A
- Authority
- CN
- China
- Prior art keywords
- project
- module
- management system
- information
- process management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
Abstract
The invention discloses a project process management system comprising a project initializing module, a project tracing module, a project combination module, a calendar module and a sensitive module. The project initializing module is used for determining information of a project, storing the information into a database and creating progress plans and resource plans for the project; the project tracing module is used for recording and updating an operation log of the project, statuses of tasks in the project and information of project maintenance; the project combination module is used for looking up the project, exporting lookup results and acquiring related statistical results according to the lookup results; the calendar module is used for screening the information, progress plans and resource plans of the project, matching with user information, and displaying screening results; the sensitive module is used for providing a board to display statuses and versions of the tasks in the project according to classified information. The project process management system integrates a complete development process and specifies the project management process, the project development phase is modularized, resource allocation is timely and visualized, and management is facilitated.
Description
Technical field
The present invention relates to a kind of project process management system.
Background technology
Jira is the B/S Bug Tracking management system based on Java framework popular at present, but its can only single bug follow the tracks of, cannot the whole development process of unified integration, do not contain the relevant Jira plug-in unit of project management flow process on the market yet.
Summary of the invention
The technical problem to be solved in the present invention is cannot the defect of the complete development process of unified integration in order to overcome project process management system of the prior art, proposes a kind of project process management system.
The present invention solves above-mentioned technical matters by following technical proposals:
The invention provides a kind of project process management system, its feature is, comprises project initialization module, project tracking module, projects combo module, calendaring module and quick module.
Wherein, described project initialization module is for the information of identifying project and by described information stored in database, and create schedule and the MRP of project, wherein, schedule comprises start time in each stage in the task and task that project comprises, deadline and/or workload, and MRP comprises workload and the working time of each task of personnel shared by project.
Described project tracking module is for recording and the state of each task in the Operation Log of renewal item and project, and the information of Maintenance Significant Items.
Described projects combo module is for carrying out the inquiry of project, the derivation of Query Result and obtaining the statistics relevant to schedule and/or MRP according to Query Result.
Described calendaring module for obtaining the user profile of input, and the information of screening and the project that matches of described user profile, schedule, MRP, and show with the form of calendar the result that screening obtains.
Described quick module is used for providing some billboard, and each billboard corresponds to a classified information, and each billboard is used for according to the state of the task in the classified information displaying project of correspondence and affiliated version.
Preferably, described project tracking module is also for providing the schedule of the project presented with Gantt chart form and receiving the hyperlink of input and show the content of pages of hyperlink link.
Preferably, described project process management system also comprises panel tools module, and described panel tools module is used for providing project filtration, project statistics, two-dimentional project filtering statistical and project grouping.
Preferably, described project process management system also comprises Reports module, and for report customization, described form comprises at least one item in following several: project report, concluding a research item form, Workload Account form, asset report, payment form.
Preferably, described project process management system is based on Jira developing plug.
On the basis meeting this area general knowledge, above-mentioned each optimum condition, can combination in any, obtains the preferred embodiments of the invention.
Positive progressive effect of the present invention is:
Stream of items thread management systematic unity of the present invention incorporates complete development process, can specification item management process, makes project development phase templates, and resource allocation real-time, visual, is convenient to management.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the project process management system of a preferred embodiment of the present invention.
Embodiment
Provide present pre-ferred embodiments below in conjunction with accompanying drawing, to describe technical scheme of the present invention in detail, but therefore do not limit the present invention among described scope of embodiments.
Shown in figure 1, the project process management system of the present embodiment is based on Jira developing plug, and it comprises project initialization module 1, project tracking module 2, projects combo module 3, calendaring module 4, quick module 5, panel tools module 6 and Reports module 7.
Wherein, described project initialization module 1 is for the information of identifying project and by described information stored in database, and create schedule and the MRP of project, wherein, schedule comprises start time in each stage in the task and task that project comprises, deadline and/or workload, and MRP comprises workload and the working time of each task of personnel shared by project.
Described project tracking module 2 is for recording and the state of each task, the information of Maintenance Significant Items and provide the schedule of the project presented with Gantt chart form and receive the hyperlink of input and show the content of pages of hyperlink link in the Operation Log of renewal item and project.
Described projects combo module 3 is for carrying out the inquiry of project, the derivation of Query Result and obtaining the statistics relevant to schedule and/or MRP according to Query Result.
Described calendaring module 4 for obtaining the user profile of input, and the information of screening and the project that matches of described user profile, schedule, MRP, and show with the form of calendar the result that screening obtains.
Described quick module 5 is for providing some billboard, and each billboard corresponds to a classified information, and each billboard is used for according to the state of the task in the classified information displaying project of correspondence and affiliated version.
Described panel tools module 6 for providing, filter by project, project statistics, two-dimentional project filtering statistical and project are divided into groups.
Described Reports module 7 is for report customization, and described form comprises at least one item in following several: project report, concluding a research item form, Workload Account form, asset report, payment form.
Below the stream of items thread management systematic difference example of the present embodiment is more specifically introduced, so that better understand the present invention.
In this application example, on the basis that described stream of items thread management Account Dept is deployed in linux operating system, database adopts MYSQL, to support the browser of most of main flow.
The function that described project initialization module 1 is born comprise approve and initiate a project, project planning.Required information of approving and initiate a project comprises project essential information, ROI, shareholder, supplementary etc., and giving project pool value when setting up the project is " purpose ".In project verification examination & approval by rear, project pool value becomes " in planning ", does not pass through then project pool value and becomes " deleting ".In the application of project planning function, mainly comprise following flow process, create project schedule plan, in schedule, plug-in unit can by system manager's configuration phase template, select suitable template during establishing stage, whether system creates a whole set of stage, version and task by task choosing in module automatically.Wherein, version and task are the functions of jira self, utilize the incidence relation in version and the stage of leaving to make task and item association in systems in which
The function that described project tracking module 2 can realize in the application comprises the following aspects:
A) schedule function can the information such as task status and handler directly in Maintenance Significant Items; Directly can see the workload difference that MRP and task arrange, and by the MRP result in the workload coverage planning stage of task;
B) version+bug function, provides quick and creates bug function, not only have this function in the project; This page function embeds in the Project homepage of Jira simultaneously, can directly find project in the product and create bug;
C) Gantt chart function, provides user to check project schedule plan with Gantt chart form;
D) document function, provides user to fill in hyperlink, directly shows the content of pages of link;
E) change function, plan in Project Process, resource, change of product time, use and change function and submit modification application to, the relevant changed content of amendment, and examined;
F) submit planning function to, after schedule and MRP complete, submit to planning namely to confirm project baseline, project Pool value becomes " planning to be confirmed "; Need change baseline then by submitting to alter mode to carry out;
G) confirm planning function: the user with authority can become " planning to be confirmed " project to project Pool value is examined, examination & approval agree to that project Pool value becomes " in carrying out " afterwards;
H) concluding a research item function: user can submit project concluding a research item application and examination & approval to, and when submit applications or examination & approval all versions and task in closedown project; After submitting concluding a research item application to, project Pool value becomes " treating concluding a research item "; After concluding a research item examination & approval refusal, project Pool can be changed into other Pool value; Agreement concluding a research item then project Pool value becomes " concluding a research item ";
I) journal function: record entry Operation Log;
J) note function: can comment on project;
K) pouring functions is closed: the project that can be adds concern people, or initiatively pays close attention to project; Project change is known by notifications mail;
L) project billboard function: the state of all issue and all versions under displaying project directly perceived, different path represents different issue state, issue appears in path with card form, can drag to change issue state between path, also directly can be dragged to version and change version belonging to issue; This function interface also can directly create issue and Item version.
The function that described projects combo module 3 can realize in the application comprises the following aspects:
A) query function of project and Item Sets, mainly provides inquiry and the derivation of project and Item Sets, can save as filtrator for Query Result; Query Result provides gunter view, list view, detail view, schedule view;
B) project block functions, provides user to create grouping, and the project or Item Sets that do not have similar querying condition are put into grouping; The grouping dividing into groups and inquire about other people can be shared simultaneously;
C) organizational resources planning function, provides user directly by tissue products team role or by HR group polling, and with the MRP situation of calendar form show staff; Can direct control by personnel placement to tissue in any planning unconfirmed project in;
D) organizational resources monitoring function, provides user to inquire about by tissue products team or by HR group resource utilization statistics;
E) tissue and product role definition function, sets up system inner tissue and HR fabric anomaly, product line and Jira product classification manage, product and JiraProject relation, and provides user's maintenance items role personnel, or the product role function of maintainer.
The function that described calendaring module 4 can realize in the application comprises following two aspects:
A) individual calendar function, with calendar form show the MRP result of certain employee month, task scheduling, participation project and safeguard individual item;
B) HR calendar function, shows the MRP result of certain HR group personnel month, task scheduling, the project of participation and individual item with calendar form;
The function that described quick module 5 can realize in the application comprises following many aspects:
A) project billboard function, the state of all issue and all versions under displaying project directly perceived, different path represents different issue state, issue appears in path with card form, can drag to change issue state between path, also directly can be dragged to version and change version belonging to issue; This function interface also can directly create issue and Item version;
B) HR billboard, the state of the lower all issue of displaying HR group directly perceived and all versions, different path represents different issue state, and issue appears in path with card form, can drag to change issue state between path, also directly can be dragged to version and change version belonging to issue;
C) Sprint billboard, the state of all issue and all versions under exhibiting product directly perceived, wherein,
The i.Plan page, product Sprint needs the issue done to provide user to plan, safeguards sprint state;
The ii.work page, safeguard the state of issue in certain sprint, different path represents different issue state, and issue appears in path with card form, can drag to change issue state between path, also directly can be dragged to version and change version belonging to issue.
The function that described panel tools module 6 can realize in the application comprises following many aspects:
A) two-dimentional project filtering statistical, utilizes project filtrator, selects x-axis and y-axis to need the field being used for adding up voluntarily for user
B) project grouping, tabular form shows project information in project grouping, and display field can be configured voluntarily by user;
C) project statistics, bar graph form is shown, based on project filtrator, the configurable field being used for calculating of user;
D) project is filtered, and list form shows project information in project filtrator, and display field can be configured voluntarily by user;
Although the foregoing describe the specific embodiment of the present invention, it will be understood by those of skill in the art that these only illustrate, protection scope of the present invention is defined by the appended claims.Those skilled in the art, under the prerequisite not deviating from principle of the present invention and essence, can make various changes or modifications to these embodiments, but these change and amendment all falls into protection scope of the present invention.
Claims (5)
1. a project process management system, is characterized in that, comprises project initialization module, project tracking module, projects combo module, calendaring module and quick module;
Described project initialization module is for the information of identifying project and by described information stored in database, and create schedule and the MRP of project, wherein, schedule comprises start time in each stage in the task and task that project comprises, deadline and/or workload, and MRP comprises workload and the working time of each task of personnel shared by project;
Described project tracking module is for recording and the state of each task in the Operation Log of renewal item and project, and the information of Maintenance Significant Items;
Described projects combo module is for carrying out the inquiry of project, the derivation of Query Result and obtaining the statistics relevant to schedule and/or MRP according to Query Result;
Described calendaring module for obtaining the user profile of input, and the information of screening and the project that matches of described user profile, schedule, MRP, and show with the form of calendar the result that screening obtains;
Described quick module is used for providing some billboard, and each billboard corresponds to a classified information, and each billboard is used for according to the state of the task in the classified information displaying project of correspondence and affiliated version.
2. project process management system as claimed in claim 1, is characterized in that, described project tracking module is also for providing the schedule of the project presented with Gantt chart form and receiving the hyperlink of input and show the content of pages of hyperlink link.
3. project process management system as claimed in claim 1, it is characterized in that, described project process management system also comprises panel tools module, and described panel tools module is used for providing project filtration, project statistics, two-dimentional project filtering statistical and project grouping.
4. project process management system as claimed in claim 1, it is characterized in that, described project process management system also comprises Reports module, for report customization, described form comprises at least one item in following several: project report, concluding a research item form, Workload Account form, asset report, payment form.
5. as the project process management system in claim 1-4 as described in any one, it is characterized in that, described project process management system is based on Jira developing plug.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510044137.1A CN104573991A (en) | 2015-01-28 | 2015-01-28 | Project process management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510044137.1A CN104573991A (en) | 2015-01-28 | 2015-01-28 | Project process management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104573991A true CN104573991A (en) | 2015-04-29 |
Family
ID=53090000
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510044137.1A Pending CN104573991A (en) | 2015-01-28 | 2015-01-28 | Project process management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104573991A (en) |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104899693A (en) * | 2015-06-10 | 2015-09-09 | 高涵 | Office information work plan analyzing and processing method |
CN105184462A (en) * | 2015-08-25 | 2015-12-23 | 长沙市麓智信息科技有限公司 | Patent flow management system |
CN105240745A (en) * | 2015-10-31 | 2016-01-13 | 移康智能科技(上海)有限公司 | Work plan wall |
CN105303280A (en) * | 2014-06-19 | 2016-02-03 | 林淑贞 | Method and system for managing real estate information by using house calendar |
CN105389675A (en) * | 2015-12-23 | 2016-03-09 | 北京安托软件技术有限公司 | Business process management system |
CN106447161A (en) * | 2016-08-29 | 2017-02-22 | 上海青睐商务咨询有限公司 | Project management system |
CN106651115A (en) * | 2016-11-02 | 2017-05-10 | 神州数码系统集成服务有限公司 | Service cooperation mode based research and development (R&D) management method and system |
CN107016530A (en) * | 2017-04-24 | 2017-08-04 | 广西民族师范学院 | A kind of Venture projects intelligent management system |
CN107016510A (en) * | 2017-04-14 | 2017-08-04 | 广州智萃电子科技有限公司 | One kind research and development intermediate item life cycle management system |
CN107122188A (en) * | 2017-04-26 | 2017-09-01 | 网易(杭州)网络有限公司 | The method and device of project process bar image generation |
CN107291461A (en) * | 2017-06-13 | 2017-10-24 | 中国五冶集团有限公司 | For the intelligentized Software Development Platform of building field |
CN107316137A (en) * | 2017-06-20 | 2017-11-03 | 广东小天才科技有限公司 | A kind of quick research and development management method and device, user equipment |
CN107330676A (en) * | 2017-07-17 | 2017-11-07 | 北京洪泰同创信息技术有限公司 | A kind of design of the development reviewing method and estimating and examining system of hardware intermediate item |
CN107679832A (en) * | 2017-10-09 | 2018-02-09 | 广州四三九九信息科技有限公司 | Task management method, device and server |
CN107833013A (en) * | 2017-10-27 | 2018-03-23 | 链家网(北京)科技有限公司 | The workload of software development estimates the automation statistical method and device of accuracy |
CN107909356A (en) * | 2017-12-27 | 2018-04-13 | 哈工大机器人集团重庆普耀信息产业发展有限公司 | Project management system and its method |
CN108428114A (en) * | 2018-03-20 | 2018-08-21 | 网易(杭州)网络有限公司 | Information processing method and device, storage medium, the electronic device of project |
CN109344592A (en) * | 2018-09-26 | 2019-02-15 | 深圳壹账通智能科技有限公司 | Project kanban system method and apparatus based on bio-identification |
CN109718547A (en) * | 2018-12-26 | 2019-05-07 | 网易(杭州)网络有限公司 | A kind of game fine arts resource progress display method and apparatus |
CN110163524A (en) * | 2019-05-29 | 2019-08-23 | 四川长虹电器股份有限公司 | A kind of work cooperating management platform based on agile development management |
CN110310100A (en) * | 2019-07-09 | 2019-10-08 | 西安点告网络科技有限公司 | Project management method, device, electronic equipment and storage medium |
CN110751452A (en) * | 2019-09-18 | 2020-02-04 | 九江明阳电路科技有限公司 | Workflow management system, method and storage medium |
CN110807720A (en) * | 2019-10-31 | 2020-02-18 | 广州市润心教育咨询有限公司 | Training project management method, system and terminal |
CN111125560A (en) * | 2018-10-31 | 2020-05-08 | 阿里巴巴集团控股有限公司 | Data visualization processing method and device and computer system |
CN112184177A (en) * | 2020-10-13 | 2021-01-05 | 广东天衡工程建设咨询管理有限公司 | Project supervision method, device and storage medium |
CN112416451A (en) * | 2020-10-15 | 2021-02-26 | 福建升腾资讯有限公司 | Method, device and medium for automatically converting issue state based on JIRA system |
CN112581085A (en) * | 2020-12-15 | 2021-03-30 | 北京动力机械研究所 | Engine design visual process management method and device |
CN113159470A (en) * | 2020-03-18 | 2021-07-23 | 江苏普麦信息科技有限公司 | Project management system based on process driving |
CN113487291A (en) * | 2021-07-23 | 2021-10-08 | 成都航盛智行科技有限公司 | Automatic project quality monitoring system |
CN113516455A (en) * | 2021-08-06 | 2021-10-19 | 上海中通吉网络技术有限公司 | Project developer resource monitoring and management method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005267284A (en) * | 2004-03-18 | 2005-09-29 | Nec Corp | Automatic collection support system for project management information and automatic collection support program for project management information |
CN102073927A (en) * | 2010-12-30 | 2011-05-25 | 浪潮集团山东通用软件有限公司 | Cooperative office-based project type working plan management system |
-
2015
- 2015-01-28 CN CN201510044137.1A patent/CN104573991A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005267284A (en) * | 2004-03-18 | 2005-09-29 | Nec Corp | Automatic collection support system for project management information and automatic collection support program for project management information |
CN102073927A (en) * | 2010-12-30 | 2011-05-25 | 浪潮集团山东通用软件有限公司 | Cooperative office-based project type working plan management system |
Non-Patent Citations (1)
Title |
---|
梁冰: "J银行全球贸易系统增值税项目进度计划及控制研究", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 * |
Cited By (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105303280A (en) * | 2014-06-19 | 2016-02-03 | 林淑贞 | Method and system for managing real estate information by using house calendar |
CN104899693A (en) * | 2015-06-10 | 2015-09-09 | 高涵 | Office information work plan analyzing and processing method |
CN105184462A (en) * | 2015-08-25 | 2015-12-23 | 长沙市麓智信息科技有限公司 | Patent flow management system |
CN105240745A (en) * | 2015-10-31 | 2016-01-13 | 移康智能科技(上海)有限公司 | Work plan wall |
CN105389675A (en) * | 2015-12-23 | 2016-03-09 | 北京安托软件技术有限公司 | Business process management system |
CN106447161A (en) * | 2016-08-29 | 2017-02-22 | 上海青睐商务咨询有限公司 | Project management system |
CN106651115A (en) * | 2016-11-02 | 2017-05-10 | 神州数码系统集成服务有限公司 | Service cooperation mode based research and development (R&D) management method and system |
CN107016510A (en) * | 2017-04-14 | 2017-08-04 | 广州智萃电子科技有限公司 | One kind research and development intermediate item life cycle management system |
CN107016530A (en) * | 2017-04-24 | 2017-08-04 | 广西民族师范学院 | A kind of Venture projects intelligent management system |
CN107122188A (en) * | 2017-04-26 | 2017-09-01 | 网易(杭州)网络有限公司 | The method and device of project process bar image generation |
CN107122188B (en) * | 2017-04-26 | 2021-05-11 | 网易(杭州)网络有限公司 | Method and device for generating project progress bar image |
CN107291461A (en) * | 2017-06-13 | 2017-10-24 | 中国五冶集团有限公司 | For the intelligentized Software Development Platform of building field |
CN107316137A (en) * | 2017-06-20 | 2017-11-03 | 广东小天才科技有限公司 | A kind of quick research and development management method and device, user equipment |
CN107330676A (en) * | 2017-07-17 | 2017-11-07 | 北京洪泰同创信息技术有限公司 | A kind of design of the development reviewing method and estimating and examining system of hardware intermediate item |
CN107679832A (en) * | 2017-10-09 | 2018-02-09 | 广州四三九九信息科技有限公司 | Task management method, device and server |
CN107833013A (en) * | 2017-10-27 | 2018-03-23 | 链家网(北京)科技有限公司 | The workload of software development estimates the automation statistical method and device of accuracy |
CN107833013B (en) * | 2017-10-27 | 2020-11-13 | 贝壳找房(北京)科技有限公司 | Automatic statistical method and device for workload prediction accuracy of software development |
CN107909356A (en) * | 2017-12-27 | 2018-04-13 | 哈工大机器人集团重庆普耀信息产业发展有限公司 | Project management system and its method |
CN108428114A (en) * | 2018-03-20 | 2018-08-21 | 网易(杭州)网络有限公司 | Information processing method and device, storage medium, the electronic device of project |
CN109344592A (en) * | 2018-09-26 | 2019-02-15 | 深圳壹账通智能科技有限公司 | Project kanban system method and apparatus based on bio-identification |
CN111125560B (en) * | 2018-10-31 | 2023-06-02 | 阿里巴巴集团控股有限公司 | Data visualization processing method, device and computer system |
CN111125560A (en) * | 2018-10-31 | 2020-05-08 | 阿里巴巴集团控股有限公司 | Data visualization processing method and device and computer system |
CN109718547A (en) * | 2018-12-26 | 2019-05-07 | 网易(杭州)网络有限公司 | A kind of game fine arts resource progress display method and apparatus |
CN110163524A (en) * | 2019-05-29 | 2019-08-23 | 四川长虹电器股份有限公司 | A kind of work cooperating management platform based on agile development management |
CN110310100A (en) * | 2019-07-09 | 2019-10-08 | 西安点告网络科技有限公司 | Project management method, device, electronic equipment and storage medium |
CN110751452A (en) * | 2019-09-18 | 2020-02-04 | 九江明阳电路科技有限公司 | Workflow management system, method and storage medium |
CN110751452B (en) * | 2019-09-18 | 2023-11-10 | 九江明阳电路科技有限公司 | Workflow management system, method and storage medium |
CN110807720A (en) * | 2019-10-31 | 2020-02-18 | 广州市润心教育咨询有限公司 | Training project management method, system and terminal |
CN113159470A (en) * | 2020-03-18 | 2021-07-23 | 江苏普麦信息科技有限公司 | Project management system based on process driving |
CN112184177A (en) * | 2020-10-13 | 2021-01-05 | 广东天衡工程建设咨询管理有限公司 | Project supervision method, device and storage medium |
CN112184177B (en) * | 2020-10-13 | 2023-11-24 | 广东天衡工程建设咨询管理有限公司 | Project supervision method, equipment and storage medium |
CN112416451A (en) * | 2020-10-15 | 2021-02-26 | 福建升腾资讯有限公司 | Method, device and medium for automatically converting issue state based on JIRA system |
CN112581085A (en) * | 2020-12-15 | 2021-03-30 | 北京动力机械研究所 | Engine design visual process management method and device |
CN112581085B (en) * | 2020-12-15 | 2024-01-05 | 北京动力机械研究所 | Visual flow management method and device for engine design |
CN113487291A (en) * | 2021-07-23 | 2021-10-08 | 成都航盛智行科技有限公司 | Automatic project quality monitoring system |
CN113516455A (en) * | 2021-08-06 | 2021-10-19 | 上海中通吉网络技术有限公司 | Project developer resource monitoring and management method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104573991A (en) | Project process management system | |
US11361156B2 (en) | Digital processing systems and methods for real-time status aggregation in collaborative work systems | |
US7168045B2 (en) | Modeling business objects | |
US7519539B1 (en) | Assisted profiling of skills in an enterprise management system | |
US20110145284A1 (en) | Presenting skills distribution data for a business enterprise | |
WO2014167555A2 (en) | A computer implemented system and method for project controls | |
Gries et al. | KPI measurement in engineering design–A case study | |
CN103177307A (en) | Workflow control system | |
US20220084044A1 (en) | Contract management, compliance and financial reporting system and method | |
US20070239587A1 (en) | System and Method For Dynamically Utilizing and Managing Financial, Operational, and Compliance Data | |
JP2016062342A (en) | Project management system and integrated process management system | |
Fallon et al. | REA analysis of SAP HCM; some initial findings | |
Bumba et al. | KPI tree-a hierarchical relationship structure of key performance indicators for value streams | |
Zancul | PLM reference model: a preliminary proposal for reference model evolution | |
CN109903009A (en) | Data flow tracking propulsion method and system based on substep driving | |
Wexler et al. | Time Is Precious, So Are Your Models. SAS provides solutions to streamline deployment | |
CN109784595A (en) | One kind serving enterprises software development quality management system | |
WO2007046728A1 (en) | Planning, monitoring and recording system for operating projects and economic activity | |
Yusof et al. | Operational dashboard: Accelerator for shop floor workers | |
vom Brocke et al. | Process management and accounting-an overdue take on measuring the economic value of business processes | |
Chung et al. | An ANN‐based DSS system for quality assurance in production network | |
Chandraju et al. | Implementation of system application product (SAP) materials management (MM-Module) for material requirement planning (MRP) in sugar industry | |
CN110659815A (en) | ERP system intelligent design method based on business logic and 5G rail connection | |
CN112241858A (en) | Equipment material management system | |
Noerlina et al. | Analysis and Design: Accounting Information System in Purchasing and Supplying |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160205 Address after: 200335 Shanghai city Changning District Admiralty Road No. 968 Building No. 16 10 floor Applicant after: SHANGHAI XIECHENG BUSINESS CO., LTD. Address before: 200335 Shanghai City, Changning District Fuquan Road No. 99, Ctrip network technology building Applicant before: Ctrip computer technology (Shanghai) Co., Ltd. |
|
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150429 |
|
RJ01 | Rejection of invention patent application after publication |