CN110991801A CN201911061716.1A CN201911061716A CN110991801A CN 110991801 A CN110991801 A CN 110991801A CN 201911061716 A CN201911061716 A CN 201911061716A CN 110991801 A CN110991801 A CN 110991801A
Authority
CN
China
Prior art keywords
quality inspection
quality
house
information
team
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911061716.1A
Other languages
Chinese (zh)
Inventor
王国彬
叶强
张培铭
胡鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Bincent Technology Co Ltd
Original Assignee
Shenzhen Bincent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Bincent Technology Co Ltd filed Critical Shenzhen Bincent Technology Co Ltd
Priority to CN201911061716.1A priority Critical patent/CN110991801A/en
Publication of CN110991801A publication Critical patent/CN110991801A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a decoration quality inspection report generation method and a decoration quality inspection report generation system. The method comprises the following steps: acquiring geographical information of a house to be inspected and overall decoration information of the house; acquiring team information of all quality inspection teams, and determining quality inspection teams and a first quality inspection completion period for the house to be inspected according to the house overall decoration information, the house geographic information and the team information; according to the overall house decoration information, distributing quality inspection items of the house to be quality inspected for quality inspection personnel of a quality inspection team in the first card punching record, converting first quality inspection data of the uploaded quality inspection items into record data and recording the quality inspection progress; and when the quality inspection progress is finished, acquiring the finishing time point and all recorded data of each finished quality inspection project, acquiring the owner self-inspection method of the quality inspection project from the data map relation, and generating a target quality inspection report according to the finishing time point, the recorded data and the owner self-inspection method. The quality inspection efficiency and the quality inspection period of quality inspection personnel can be effectively supervised by the method.

Description

Decoration quality inspection report generation method and system
Technical Field
The invention relates to the field of decoration quality inspection, in particular to a method and a system for generating a decoration quality inspection report.
Background
The present house decoration quality inspection field, the owner directly requests the quality inspection personnel from the outside to perform the quality inspection to the house which is just finished by the owner or the owner automatically performs the quality inspection to the house which is just finished, but under the condition that the owner is not professional quality inspection personnel, the owner is difficult to judge whether the quality inspection project made by the quality inspection personnel has comprehensiveness to the house which is just finished, and is also difficult to effectively supervise the working condition and the construction period of the quality inspection project made by the quality inspection personnel, and the owner performs the process of self quality inspection.
Disclosure of Invention
Therefore, it is necessary to provide a decoration quality inspection report generation method and system for generating a comprehensive quality inspection item according to the real situation (the whole decoration information of the house) of the house to be inspected, and effectively supervising the quality inspection efficiency and the quality inspection period of the house to be inspected by the quality inspection personnel.
A decoration quality inspection report generation method comprises the following steps:
after a quality inspection application instruction of a house to be subjected to quality inspection sent by an owner client is received, acquiring geographical information of the house and overall decoration information of the house, corresponding to the house to be subjected to quality inspection, from the quality inspection application instruction;
acquiring team information of all quality control teams, and determining the quality control teams and a first quality control completion period for the house to be subjected to quality control according to the house overall decoration information, the house geographic information and the team information of the quality control teams;
when a first card punching record of the quality testing team on the geographical information of the house is received, distributing a quality testing project of the house to be subjected to quality testing for quality testing personnel of the quality testing team in the first card punching record according to the overall decoration information of the house, converting first quality testing data of the quality testing project uploaded by the quality testing personnel into recording data of the quality testing project and recording the quality testing progress of the quality testing project; the house to be inspected comprises at least one quality inspection item;
and when the quality inspection progress of all the quality inspection projects is finished, acquiring the finishing time point of each finished quality inspection project and all the recorded data, acquiring the owner self-inspection method of the quality inspection projects from the data map relation, and generating a target quality inspection report according to the finishing time point, the recorded data and the owner self-inspection method.
A decoration quality inspection report generation system comprising:
the system comprises a first acquisition module, a second acquisition module and a third acquisition module, wherein the first acquisition module is used for acquiring the house geographic information and the house integral decoration information of a house to be subjected to quality inspection corresponding to an owner client from a quality inspection application instruction after receiving the quality inspection application instruction of the house to be subjected to quality inspection sent by the owner client;
the first determining module is used for acquiring team information of all quality inspection teams, and determining the quality inspection teams and a first quality inspection completion period for the house to be subjected to quality inspection according to the house overall decoration information, the house geographic information and the team information of the quality inspection teams;
the conversion module is used for distributing a quality inspection project of the house to be quality inspected for quality inspection personnel of the quality inspection team in the first card punching record according to the overall house decoration information when the first card punching record of the quality inspection team on the house geographic information is received, converting the first quality inspection data of the quality inspection project uploaded by the quality inspection personnel into the record data of the quality inspection project and recording the quality inspection progress of the quality inspection project; the house to be inspected comprises at least one quality inspection item;
and the first generation module is used for acquiring the completion time point of each finished quality inspection project and all the recorded data when the quality inspection progress of all the quality inspection projects is finished, acquiring the owner self-inspection method of the quality inspection projects from a data map relation, and generating a target quality inspection report according to the completion time point, the recorded data and the owner self-inspection method.
According to the decoration quality inspection report generation method and the decoration quality inspection report generation system, a most suitable quality inspection team can be determined after analyzing the overall decoration information of a house, the geographic information of the house and the team information of a quality inspection team, the quality inspection efficiency of the house to be inspected is improved (the suitable quality inspection team reduces waiting time of an owner and quality inspection time of the quality inspection team), a first quality inspection completion construction period is determined for the quality inspection team, namely a reference construction period is provided for the quality inspection team in advance, and therefore the quality inspection efficiency of quality inspection projects made by the quality inspection team can be better supervised; the quality inspection items of the houses to be inspected are distributed for the quality inspection personnel of the first card punching record quality inspection team, on one hand, the arranged quality inspection items are guaranteed to be accurate to the quality inspection personnel reaching the houses to be inspected, and the quality inspection personnel arranged to the quality inspection items can be effectively supervised in the future (including quality inspection efficiency and quality inspection period), on the other hand, the arranged quality inspection items can be well adapted to the houses to be inspected (the house integral decoration information of the houses to be inspected is taken as a basis), namely, the arranged quality inspection items have the comprehensive characteristic for the houses to be inspected, unfinished quality inspection items are recorded in the form of quality inspection progress, on the one hand, the quality inspection items can be arranged for the quality inspection personnel of the quality inspection team in the next card punching record according to the quality inspection progress (reasonable work) to guarantee the sequence of the quality inspection work, on the other hand, the quality inspection work of the quality inspection personnel of the quality inspection team in the next card punching record is also stipulated, thereby ensuring the quality inspection efficiency; the generated target quality inspection report can provide detailed quality inspection data and a reference self-inspection method for the owner, so that the experience effect of the owner on quality inspection can be improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the description of the embodiments of the present invention will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without inventive labor.
FIG. 1 is a flowchart of a method for generating a decoration quality inspection report according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a decoration quality inspection report generation system according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In an embodiment, as shown in fig. 1, a method for generating a decoration quality inspection report is provided, which is described by taking the method as an example applied to the server in fig. 1, and includes the following steps:
s10, after receiving a quality inspection application instruction of a house to be quality inspected sent by an owner client, acquiring geographical information of the house and overall decoration information of the house corresponding to the quality inspection house from the quality inspection application instruction;
understandably, the owner information uploaded by the owner exists in the owner client, and the owner information includes the house geographic information (such as a certain cell of a certain street in a certain grade city), and the house overall decoration information obtained by analyzing a target design case (a decoration design scheme selected by the owner) selected by the owner also exists (such as what kind of overall decoration the enterprise corresponding to the enterprise client has undergone in the owner's house, the parlor lays the wood board, the doors and windows of each room, the lays of various lines, and the like); the owner client can send a quality inspection application instruction of the house to be inspected through the owner client after receiving the decoration finished information sent by the enterprise installing client.
S20, acquiring team information of all quality control teams, and determining the quality control teams and a first quality control completion period for the house to be subjected to quality control according to the house overall decoration information, the house geographic information and the team information of the quality control teams;
understandably, the team information may include quality inspection duty of the quality inspection personnel in the quality inspection team, specifically, the quality inspection duty refers to a project in which the quality inspection personnel is mainly responsible for quality inspection, and idle period information, specifically, whether the current quality inspection personnel is in a working state or an idle state, wherein the team information also includes geographical location information of the quality inspection team.
In this embodiment, a most suitable quality inspection team can be determined by analyzing the overall house decoration information, the house geographic information and the team information of the quality inspection team, the quality inspection efficiency of the house to be subjected to quality inspection is improved (the suitable quality inspection team reduces waiting time of an owner for quality inspection, quality inspection time of the quality inspection team and the like), and the first quality inspection completion period is determined for the quality inspection team, that is, a reference period is provided for the quality inspection team in advance, so that the quality inspection efficiency of the quality inspection team can be better supervised.
S30, when a first card punching record of the quality testing team on the geographical information of the house is received, distributing a quality testing project of the house to be quality tested for quality testing personnel of the quality testing team in the first card punching record according to the overall decoration information of the house, converting first quality testing data of the quality testing project uploaded by the quality testing personnel into recording data of the quality testing project and recording the quality testing progress of the quality testing project; the house to be inspected comprises at least one quality inspection item;
understandably, the first card-punching record is the identity information which can determine the identity information of the quality testing personnel in the geographic information of the house reached by the quality testing team in reality (the identity information is also used as one part of the team information in the quality testing team), so that the server can judge whether the face information or voiceprint information of each quality testing personnel is recognized or not to determine the identity information of the quality testing personnel after positioning the geographic information of the house; the quality inspection items are generated by quality inspectors of the geographical information of the house (the identity information corresponding to the quality inspectors recorded in the first card punching record is used for determining the quality inspection items); the recorded data is actually the conversion of the quality inspection data, the uploaded quality inspection data is obtained from the input module corresponding to each quality inspection item, the type of the quality inspection data can comprise alphanumerics, pictures and videos, but the quality inspection data at the moment is not subjected to a data processing process, so that the quality inspection data (including but not limited to various types, redundancy, no need of recording and quality inspection data needing important recording) under various conditions of one quality inspection item can be converted into a data form (including other forms such as charts, graphs and graphics) convenient for subsequent obvious observation after the conditions of the quality inspection items are sorted, filtered and connected in series by the server at the moment; the quality inspection progress refers to the quality inspection workload of quality inspection personnel in a quality inspection team reaching the geographic information of the house, which is left by all quality inspection projects after the quality inspection is long, and when the house to be inspected is related to a plurality of quality inspection projects, the quality inspection personnel cannot finish all the quality inspection projects in the same day, so that the quality inspection progress of each quality inspection project can be recorded (the quality inspection progress can be determined by percentage, and when the quality inspection progress is finished, the quality inspection progress can be one hundred percent).
In the embodiment, quality inspection items of the house to be subjected to quality inspection are distributed to quality inspection personnel of the first card-punching recording quality inspection team, on one hand, the arranged quality inspection items are guaranteed to be subject to the quality inspection personnel reaching the house to be subjected to quality inspection, and on the other hand, the arranged quality inspection items can be well adapted to the house to be subjected to quality inspection (the whole house decoration information of the house to be subjected to quality inspection is taken as a basis), namely the arranged quality inspection items have the comprehensive characteristic on the house to be subjected to quality inspection; the uncompleted quality inspection projects are recorded in the form of quality inspection progress, on one hand, quality inspection projects (reasonable work) can be arranged for quality inspection personnel of a quality inspection team in the next time of card punching record according to the quality inspection progress, the sequence of the quality inspection work is ensured, on the other hand, the quality inspection work of the quality inspection personnel of the quality inspection team in the next time of card punching record is also regulated, and therefore the quality inspection efficiency can be ensured.
And S40, when the quality inspection progress of all the quality inspection projects is finished, acquiring the finishing time point of each finished quality inspection project and all the recorded data, acquiring the owner self-inspection method of the quality inspection projects from the data map relation, and generating a target quality inspection report according to the finishing time point, the recorded data and the owner self-inspection method.
Specifically, firstly, when the quality inspection progress of all quality inspection projects is recognized to be one hundred percent, the quality inspection progress of all quality inspection projects is determined to be completed; then, acquiring a finishing time point of a quality inspection project (each time a quality inspection person finishes one quality inspection project, a finishing instruction of the quality inspection project can be triggered on a quality inspection platform related to the quality inspection project) and all recorded data (the recorded data is converted from the quality inspection data, and the converted recorded data can also comprise data related to the recorded data by query analysis, such as formaldehyde index content obtained by a certain material to query and analyze harm result data to a human body, and also comprise recorded data converted from uploaded quality inspection data, such as data of an empty drum phenomenon occurring in a specific floor position, and the like); then, a self-checking method of the owner, such as a self-quality checking method of a hollowing phenomenon, a self-quality checking method of a material installation condition and the like, can be determined by inquiring the relation of the data map; and finally, generating a target quality inspection report according to the completion time point, the recorded data and the owner self-inspection method (the target quality inspection report is displayed in the form of an electronic report, so that the completion time point, the recorded data and the self-inspection method of each quality inspection item can be displayed according to the dimension relation, and once one quality inspection item corresponds to one owner self-inspection method, the completion time point and the recorded data of the owner self-inspection and the quality inspection items are displayed in a way of being associated with the corresponding dimension of the target quality inspection report).
The embodiment can automatically generate a detailed target quality inspection report, namely, the uploaded quality inspection data can be recorded in the target quality inspection report in the form of recorded data, and the recorded data, the completion time point and the corresponding owner self-inspection method of each quality inspection item are displayed in the target quality inspection report, so that a detailed quality inspection data and a reference self-inspection method can be provided for an owner, and the experience effect of the owner on quality inspection can be improved.
Further, the determining the quality inspection team and the first quality inspection completion period for the house to be inspected according to the house overall decoration information, the house geographic information and the team information of the quality inspection team comprises:
generating all quality inspection items of the house to be quality inspected and the finishing work duration corresponding to each quality inspection item according to the integral house decoration information;
acquiring geographic position information in team information of all quality control teams, determining a preset service range of the house to be subjected to quality control according to the house geographic information, and determining all quality control teams belonging to the preset service range according to the geographic position information;
obtaining quality inspection duty and idle period information of each quality inspection worker in team information of all quality inspection teams in the preset service range, determining the quality inspection worker who completes the quality inspection of each quality inspection project earliest in the quality inspection teams in the preset service range according to the quality inspection duty and idle period information of each quality inspection worker and the completion working time length corresponding to each quality inspection project, and simultaneously recording the earliest quality inspection working period for the quality inspection worker to complete the quality inspection of each quality inspection project earliest in each quality inspection team;
according to the earliest quality inspection construction period for the quality inspection personnel of each quality inspection team in the preset service range to finish the quality inspection of each quality inspection project earliest, determining a quality inspection team for finishing the quality inspection of the house to be inspected earliest and a first quality inspection finishing construction period for finishing the quality inspection of the house to be inspected by the quality inspection team.
Specifically, because the decoration design conditions corresponding to each house to be quality-inspected are inconsistent, a part of inconsistent quality inspection items can exist in each house to be quality-inspected with different decoration design conditions, all quality inspection items (such as electric wire decoration designs, wiring of quality-inspectable electric wires and other quality inspection items) needing quality inspection of the house to be quality-inspected can be analyzed and generated according to a selected target design case (a decoration design scheme selected by an owner), and the completion working duration corresponding to each quality inspection item needing quality inspection is inquired in a preset quality inspection item time table (determined by the working duration needed by the quality inspection items with the same historical quality inspection); because each quality control team is located in different areas, and the house to be quality controlled has different preset service ranges due to different geographical information of the house (i.e., the quality control teams in the preset service ranges are convenient for quality control of the house to be quality controlled), each quality control team may not always exist in the preset service range, so that the quality control team in the preset service range needs to be determined, the geographic position information in the team information of each quality control team can be acquired, and determines the preset service range of the house to be inspected according to the geographical information of the house to be inspected, determining quality testing teams capable of providing quality testing service according to the relation between the geographical position information and a preset service range (for example, the preset service range is within 5 kilometers of a house to be tested, and at the moment, the geographical position information in the team information of each quality testing team is within 5 kilometers of the house to be tested); then, the quality inspection duty and idle period information of all persons in each quality inspection team are obtained from the quality inspection team which is determined to provide the quality inspection service (namely, the quality inspection team in the preset service range), the quality inspection personnel which can complete the quality inspection of each quality inspection project earliest in each quality inspection team is determined according to the quality inspection duty and idle period information of each quality inspection personnel and the completion working time length corresponding to each quality inspection project (the number of the idle quality inspection personnel in each quality inspection team, the quality inspection duty of the quality inspection personnel and the idle period information of each quality inspection personnel are different, so that the quality inspection teams complete the same quality inspection project possibly with the difference in the quality inspection period), the earliest quality inspection period for each quality inspection team to complete each quality inspection project is recorded (a house to be inspected can correspond to at least one quality inspection project, the quality inspection team capable of completing the quality inspection project within the earliest quality inspection project period means that the time point of the quality inspection team predicting to finally complete the quality inspection project is the earliest in all the quality inspection teams, namely, the earliest quality inspection project period of one quality inspection project is the period corresponding to the time point of completing the quality inspection project; and finally, according to the determined earliest quality inspection construction period, determining one quality inspection team, taking the earliest quality inspection construction period as a first quality inspection completion construction period of quality inspection of the house to be inspected (firstly, obtaining the time points of quality inspection of all quality inspection teams completing all quality inspection projects of the house to be inspected within a preset service range, taking the maximum value of the time points of completing the quality inspection projects corresponding to all the quality inspection projects, finally, taking the minimum value of the maximum values corresponding to all the houses to be inspected, wherein the quality inspection team corresponding to the minimum value is the quality inspection team completing the quality inspection of the house to be inspected earliest, the construction period of completing the quality inspection of all the quality inspection projects of the house to be inspected by the quality inspection team corresponding to the minimum value is the first quality inspection completion construction period, the predicted completion time point of the first quality inspection completion construction period is the minimum value, for example, one house to be inspected has two quality inspection projects A and B, and only two corresponding quality inspection teams are provided, namely a quality inspection team A and a quality inspection team B. The time point when the A quality inspection team finishes the A quality inspection project is 12 points and 10 points, the time point when the B quality inspection project is finished is 12 points and 30 points, the maximum value is 12 points and 30 points, the time point when the B quality inspection team finishes the B quality inspection project is 12 points and 40 points, the minimum value is 12 points and 30 points, the A quality inspection team is the quality inspection team which finishes the quality inspection of the house to be inspected at the earliest, and the first quality inspection finishing period is 12 points and 30 points.
Further, the step of distributing quality inspection items of the house to be subjected to quality inspection personnel of the quality inspection team in the first card-punching record according to the overall house decoration information comprises the following steps:
determining the number and identity information of quality testing personnel of the quality testing team reaching the geographical information of the house from the first card punching record, and determining the quality testing responsibility of the quality testing personnel according to the identity information;
and distributing the quality inspection items of the house to be inspected to quality inspection personnel of the quality inspection team by combining the house overall decoration information, the number of the quality inspection personnel and the quality inspection responsibility of the quality inspection personnel.
Understandably, the first card punching records the quantity and the identity information of quality inspection personnel capable of identifying geographical information of the house, the identity information can determine the inspection duty of each quality inspection personnel, and finally, quality inspection items of the house to be inspected are distributed to the quality inspection personnel of the quality inspection team by combining the information of the whole house decoration information, the quantity of the quality inspection personnel and the quality inspection duty of the quality inspection personnel, and the distributed quality inspection items can be based on the quality inspection personnel arriving at the site and the whole house decoration information, so that the distributed quality inspection items have the characteristics of high reasonability and high comprehensiveness.
Further, after the converting the first quality inspection data of the quality inspection item uploaded by the quality inspection personnel into the record data of the quality inspection item and recording the quality inspection progress of the quality inspection item, the method further comprises:
when the quality inspection progress of all the quality inspection projects is incomplete, acquiring a progress value corresponding to the quality inspection progress of the quality inspection projects;
when a second card-punching record of the quality inspection team on the geographical information of the house is received, the quality inspection projects of the house to be quality inspected are distributed to quality inspection personnel of the quality inspection team in the second card-punching record according to the progress values of all the quality inspection projects, second quality inspection data of the distributed quality inspection projects uploaded by the quality inspection personnel are converted into record data of the quality inspection projects, and meanwhile, the quality inspection progress of the quality inspection projects is updated.
In this embodiment, when the quality inspection progress of the quality inspection project is incomplete, the incomplete quality inspection project can be distributed by the quality inspection personnel of the quality inspection team in the second card-punching record, so that the embodiment can ensure the continuous quality inspection effect of the incomplete quality inspection project and ensure that each quality inspection project requiring quality inspection can be successfully completed.
Further, the converting the first quality inspection data of the quality inspection item uploaded by the quality inspection personnel into the record data of the quality inspection item includes:
and acquiring the first quality inspection data uploaded by the quality inspection personnel according to the quality inspection projects, filtering various types of the first quality inspection data in each quality inspection project, and connecting the filtered first quality inspection data in series into the recording data.
In this embodiment, since the uploaded first quality inspection data is the most initial data, which may include invalid first quality inspection data, the embodiment may filter the first quality inspection data, and serially connect the filtered data into the recording data that is valid and can be obviously observed in the target quality inspection report, so as to improve the experience effect of the owner when viewing the target quality inspection report.
Further, after the acquiring the completion time point of each completed quality inspection item, the method further includes:
when the completion time points of all the quality inspection projects are within the first quality inspection completion construction period, determining that the house to be inspected completes quality inspection on time;
and when the completion time point of at least one quality inspection project exceeds the first quality inspection completion construction period, determining that the house to be inspected is overdue to complete quality inspection, and sending a preset warning prompt to the quality inspection team corresponding to the house to be inspected.
Understandably, each quality inspection project has a completion time point, and if the completion time points of all the quality inspection projects are within the first quality inspection completion construction period, the quality inspection of the house to be inspected can be completed on time; if the completion time point of at least one quality inspection project exceeds the first quality inspection completion time period, it can be stated that the house to be inspected is overdue to complete quality inspection (for example, the first quality inspection completion time period is required to be completed before 10, month 2 and 24 points, if the completion time point of each quality inspection project is completed before 10, month 2 and 24 points, the house does not belong to the overdue quality inspection project, and if the completion time point of one quality inspection project exceeds 10, month 2 and 24 points, the house does not belong to the overdue quality inspection project).
Further, after the generating the target quality inspection report, the method further includes:
sending the target quality inspection report to the owner client and the enterprise client simultaneously through an instant messaging platform;
after receiving an assistance application instruction sent by the owner client, judging whether the enterprise client reads the target quality inspection report within a preset reading duration;
and if the enterprise client reads the target quality inspection report within a preset reading time, establishing communication connection between the owner client and the enterprise client through the instant communication platform.
Understandably, the instant messaging platform is a communication platform which can be used for quickly transmitting information between an owner client and an enterprise client.
In this embodiment, after the owner views the target quality inspection report, an application instruction for assisting in answering questions can be sent to the client corresponding to the installation enterprise in the house where the owner is located (received by the installation enterprise client corresponding to the installation enterprise) through the owner client where the owner is located, and finally, communication connection between the owner client and the installation enterprise client can be established, so that questions caused by decoration can be reduced as much as possible through communication between the two parties.
In another embodiment, if the enterprise client does not read the target quality inspection report within a preset reading duration, both the enterprise client and the enterprise client are prompted, and the enterprise client is enabled to actively establish communication connection with the owner client after reading the target quality inspection report.
Further, after the communication connection between the owner client and the enterprise client is established through the instant messaging platform, the method further includes:
regenerating a second quality inspection completion period according to the quality inspection condition of the unqualified quality inspection item displayed in the target quality inspection report;
if the refitting information which is fed back by the assembling client and aims at the unqualified quality inspection items is received within the second quality inspection completion construction period, a secondary quality inspection report is generated after secondary quality inspection is carried out on the unqualified quality inspection items which are refitted; if the secondary unqualified quality inspection condition of the quality inspection item which is unqualified again appears in the secondary quality inspection report, the recommendation score of the loading enterprise corresponding to the loading enterprise client is recommended to the owner client; the higher the recommendation score is, the higher the recommended priority of the entrepreneur corresponding to the entrepreneur client is;
and if the refitting information fed back by the enterprise installing client aiming at the unqualified quality inspection items cannot be received within the second quality inspection completion construction period, directly reducing the recommendation score of the enterprise corresponding to the enterprise installing client to the owner client.
In this embodiment, the secondary decoration condition of the installation enterprise corresponding to the installation enterprise client (corresponding decoration of the unqualified quality inspection item) can be supervised in secondary quality inspection (judging whether the secondary unqualified quality inspection condition of the unqualified quality inspection item still exists in the regenerated secondary quality inspection report) and time supervision (judging whether the installation enterprise corresponding to the installation enterprise client can complete secondary decoration within the second quality inspection completion period).
In conclusion, the decoration quality inspection report generation method provided by the invention can determine a most suitable quality inspection team according to analysis of overall house decoration information, house geographic information and team information of a quality inspection team, so that the quality inspection efficiency of a house to be subjected to quality inspection is improved (the suitable quality inspection team reduces waiting time of a proprietor and quality inspection time of the quality inspection team), and the first quality inspection completion period is determined for the quality inspection team, namely a reference period is provided for the quality inspection team in advance, so that the quality inspection efficiency of quality inspection projects made by the quality inspection team can be better supervised; the quality inspection items of the houses to be inspected are distributed for the quality inspection personnel of the first card punching record quality inspection team, on one hand, the arranged quality inspection items are guaranteed to be accurate to the quality inspection personnel reaching the houses to be inspected, and the quality inspection personnel arranged to the quality inspection items can be effectively supervised in the future (including quality inspection efficiency and quality inspection period), on the other hand, the arranged quality inspection items can be well adapted to the houses to be inspected (the house integral decoration information of the houses to be inspected is taken as a basis), namely, the arranged quality inspection items have the comprehensive characteristic for the houses to be inspected, unfinished quality inspection items are recorded in the form of quality inspection progress, on the one hand, the quality inspection items can be arranged for the quality inspection personnel of the quality inspection team in the next card punching record according to the quality inspection progress (reasonable work) to guarantee the sequence of the quality inspection work, on the other hand, the quality inspection work of the quality inspection personnel of the quality inspection team in the next card punching record is also stipulated, thereby ensuring the quality inspection efficiency; the generated target quality inspection report can provide detailed quality inspection data and a reference self-inspection method for the owner, so that the experience effect of the owner on quality inspection can be improved.
It should be understood that, the sequence numbers of the steps in the foregoing embodiments do not imply an execution sequence, and the execution sequence of each process should be determined by its function and inherent logic, and should not constitute any limitation to the implementation process of the embodiments of the present invention.
In an embodiment, a decoration quality inspection report generation system is provided, and the decoration quality inspection report generation system corresponds to the decoration quality inspection report generation methods in the above embodiments one to one. As shown in fig. 2, the finishing quality inspection report generating system includes a first obtaining module 11, a first determining module 12, a converting module 13, and a first generating module 14. The functional modules are explained in detail as follows:
the system comprises a first acquisition module 11, a quality inspection application module and a second acquisition module, wherein the first acquisition module is used for acquiring the house geographic information and the house integral decoration information of a house to be subjected to quality inspection, which correspond to an owner client, from the quality inspection application instruction after receiving the quality inspection application instruction of the house to be subjected to quality inspection, which is sent by the owner client;
a first determining module 12, configured to determine, according to the overall house decoration information, the geographical information of the house, and team information of a quality inspection team, the quality inspection team and a first quality inspection completion period for the house to be quality inspected;
the conversion module 13 is configured to, when receiving a first card punching record of the quality inspection team on the geographical information of the house, allocate a quality inspection project of the house to be quality inspected to a quality inspection worker of the quality inspection team in the first card punching record according to the overall house decoration information, convert first quality inspection data of the quality inspection project uploaded by the quality inspection worker into record data of the quality inspection project, and record a quality inspection progress of the quality inspection project; the house to be inspected comprises at least one quality inspection item;
the first generating module 14 is configured to, when the quality inspection progress of all the quality inspection projects is completed, obtain a completion time point of each completed quality inspection project and all the recorded data, obtain an owner self-inspection method for the quality inspection project from a data map relationship, and generate a target quality inspection report according to the completion time point, the recorded data, and the owner self-inspection method.
Further, the first determining module comprises:
the generation submodule is used for generating all quality inspection items of the house to be inspected according to the integral decoration information of the house and finishing working duration corresponding to each quality inspection item;
the first determining submodule is used for acquiring geographic position information in team information of all the quality control teams, determining a preset service range of the house to be subjected to quality control according to the house geographic information, and determining all the quality control teams in the preset service range according to the geographic position information;
the recording submodule is used for acquiring the quality inspection duty and idle period information of each quality inspection worker in the team information of all the quality inspection teams in the preset service range, determining the quality inspection worker which completes the quality inspection of each quality inspection project earliest in each quality inspection team in the preset service range according to the quality inspection duty and idle period information of each quality inspection worker and the completion working time corresponding to each quality inspection project, and simultaneously recording the earliest quality inspection period for the quality inspection worker to complete the quality inspection of each quality inspection project earliest in each quality inspection team;
and the second determining submodule is used for determining a quality inspection team which completes the quality inspection of the house to be inspected earliest according to the earliest quality inspection construction period for completing the quality inspection of each quality inspection project earliest by quality inspection personnel of each quality inspection team in the preset service range, and determining a first quality inspection completion construction period for completing the quality inspection of the house to be inspected by the quality inspection team.
Further, the conversion module includes:
the third determining submodule is used for determining the number and identity information of quality testing personnel of the quality testing team reaching the house geographic information from the first card punching record and determining the quality testing responsibility of the quality testing personnel according to the identity information;
and the distribution submodule is used for distributing the quality inspection items of the house to be inspected for the quality inspection personnel of the quality inspection team by combining the house overall decoration information, the number of the quality inspection personnel and the quality inspection responsibility of the quality inspection personnel.
Further, the decoration quality inspection report generation system further includes:
the second acquisition module is used for acquiring a progress value corresponding to the quality inspection progress of the quality inspection project when the quality inspection progress of all the quality inspection projects is incomplete;
and the updating module is used for distributing the quality inspection items of the house to be subjected to quality inspection for the quality inspection personnel of the quality inspection team in the second card punching record according to the progress values of all the quality inspection items when receiving the second card punching record of the geographical information of the house of the quality inspection team, converting the distributed second quality inspection data of the quality inspection items uploaded by the quality inspection personnel into the record data of the quality inspection items, and updating the quality inspection progress of the quality inspection items.
Further, the conversion module includes:
the series submodule is used for acquiring the first quality inspection data uploaded by the quality inspection personnel according to the quality inspection projects, filtering various types of the first quality inspection data in each quality inspection project, and then serially connecting the filtered first quality inspection data into the record data.
Further, the decoration quality inspection report generation system further includes:
the second determination module is used for determining that the house to be inspected completes quality inspection on time when the completion time points of all the quality inspection projects are within the first quality inspection completion construction period;
and the sending module is used for determining that the house to be subjected to quality inspection is subjected to the overdue quality inspection when the completion time point of at least one quality inspection project exceeds the first quality inspection completion construction period, and sending a preset warning prompt to the quality inspection team corresponding to the house to be subjected to quality inspection.
Further, the decoration quality inspection report generation system further includes:
the sending module is used for sending the target quality inspection report to the owner client and the enterprise client simultaneously through the instant messaging platform;
the judging module is used for judging whether the enterprise client side reads the target quality inspection report within a preset reading duration or not after receiving an assistance application instruction sent by the owner client side;
and the establishing module is used for establishing communication connection between the owner client and the enterprise client through the instant communication platform if the enterprise client reads the target quality inspection report within a preset reading duration.
Further, the decoration quality inspection report generation system further includes:
the second generation module is used for regenerating a second quality inspection completion period according to the quality inspection condition of the unqualified quality inspection item displayed in the target quality inspection report;
the first reducing module is used for generating a secondary quality inspection report after performing secondary quality inspection on the unqualified quality inspection items which are newly assembled and repaired if the refitting information which is fed back by the assembling client and aims at the unqualified quality inspection items is received within the second quality inspection completion construction period; if the secondary unqualified quality inspection condition of the quality inspection item which is unqualified again appears in the secondary quality inspection report, the recommendation score of the loading enterprise corresponding to the loading enterprise client is recommended to the owner client; the higher the recommendation score is, the higher the recommended priority of the entrepreneur corresponding to the entrepreneur client is;
and the second reducing module is used for directly reducing the recommendation score of the assembly enterprise corresponding to the assembly enterprise client to the owner client if the refitting information which is fed back by the assembly enterprise client and aims at the unqualified quality inspection item cannot be received within the second quality inspection completion period.
For specific limitations of the decoration quality inspection report generation system, reference may be made to the above limitations of the decoration quality inspection report generation method, which will not be described herein again. All or part of the modules in the decoration quality inspection report generation system can be realized by software, hardware and a combination thereof. The modules can be embedded in a hardware form or independent from a processor in the computer device, and can also be stored in a memory in the computer device in a software form, so that the processor can call and execute operations corresponding to the modules.
It will be clear to those skilled in the art that, for convenience and simplicity of description, the foregoing division of the functional modules is merely illustrated, and in practical applications, the above function distribution may be performed by different functional units and modules as needed, that is, the internal structure of the system is divided into different functional units or modules to perform all or part of the above described functions.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention.

Claims (10)

1. A method for generating a decoration quality inspection report is characterized by comprising the following steps:
after a quality inspection application instruction of a house to be subjected to quality inspection sent by an owner client is received, acquiring geographical information of the house and overall decoration information of the house, corresponding to the house to be subjected to quality inspection, from the quality inspection application instruction;
acquiring team information of all quality control teams, and determining the quality control teams and a first quality control completion period for the house to be subjected to quality control according to the house overall decoration information, the house geographic information and the team information of the quality control teams;
when a first card punching record of the quality testing team on the geographical information of the house is received, distributing a quality testing project of the house to be subjected to quality testing for quality testing personnel of the quality testing team in the first card punching record according to the overall decoration information of the house, converting first quality testing data of the quality testing project uploaded by the quality testing personnel into recording data of the quality testing project and recording the quality testing progress of the quality testing project; the house to be inspected comprises at least one quality inspection item;
and when the quality inspection progress of all the quality inspection projects is finished, acquiring the finishing time point of each finished quality inspection project and all the recorded data, acquiring the owner self-inspection method of the quality inspection projects from the data map relation, and generating a target quality inspection report according to the finishing time point, the recorded data and the owner self-inspection method.
2. The method as claimed in claim 1, wherein the determining the quality inspection team and the first quality inspection completion period for the house to be inspected according to the house overall decoration information, the house geographic information and team information of the quality inspection team comprises:
generating all quality inspection items of the house to be quality inspected and the finishing work duration corresponding to each quality inspection item according to the integral house decoration information;
acquiring geographic position information in team information of all quality control teams, determining a preset service range of the house to be subjected to quality control according to the house geographic information, and determining all quality control teams belonging to the preset service range according to the geographic position information;
obtaining quality inspection duty and idle period information of each quality inspection worker in team information of all quality inspection teams in the preset service range, determining the quality inspection worker who completes the quality inspection of each quality inspection project earliest in the quality inspection teams in the preset service range according to the quality inspection duty and idle period information of each quality inspection worker and the completion working time length corresponding to each quality inspection project, and simultaneously recording the earliest quality inspection working period for the quality inspection worker to complete the quality inspection of each quality inspection project earliest in each quality inspection team;
according to the earliest quality inspection construction period for the quality inspection personnel of each quality inspection team in the preset service range to finish the quality inspection of each quality inspection project earliest, determining a quality inspection team for finishing the quality inspection of the house to be inspected earliest and a first quality inspection finishing construction period for finishing the quality inspection of the house to be inspected by the quality inspection team.
3. The method as claimed in claim 1, wherein the step of assigning quality control items of the house to be quality-controlled to quality control personnel of the quality control team in the first card-punching record comprises:
determining the number and identity information of quality testing personnel of the quality testing team reaching the geographical information of the house from the first card punching record, and determining the quality testing responsibility of the quality testing personnel according to the identity information;
and distributing the quality inspection items of the house to be inspected to quality inspection personnel of the quality inspection team by combining the house overall decoration information, the number of the quality inspection personnel and the quality inspection responsibility of the quality inspection personnel.
4. The method as claimed in claim 1, further comprising, after converting the first quality inspection data of the quality inspection item uploaded by the quality inspector into the record data of the quality inspection item and recording the quality inspection progress of the quality inspection item:
when the quality inspection progress of all the quality inspection projects is incomplete, acquiring a progress value corresponding to the quality inspection progress of the quality inspection projects;
when a second card-punching record of the quality inspection team on the geographical information of the house is received, the quality inspection projects of the house to be quality inspected are distributed to quality inspection personnel of the quality inspection team in the second card-punching record according to the progress values of all the quality inspection projects, second quality inspection data of the distributed quality inspection projects uploaded by the quality inspection personnel are converted into record data of the quality inspection projects, and meanwhile, the quality inspection progress of the quality inspection projects is updated.
5. The method as claimed in claim 1, wherein the step of converting the first quality inspection data of the quality inspection item uploaded by the quality inspector into the record data of the quality inspection item comprises:
and acquiring the first quality inspection data uploaded by the quality inspection personnel according to the quality inspection projects, filtering various types of the first quality inspection data in each quality inspection project, and connecting the filtered first quality inspection data in series into the recording data.
6. The method as claimed in claim 1, further comprising, after the time point of completion of each quality control item that has been completed, the step of:
when the completion time points of all the quality inspection projects are within the first quality inspection completion construction period, determining that the house to be inspected completes quality inspection on time;
and when the completion time point of at least one quality inspection project exceeds the first quality inspection completion construction period, determining that the house to be inspected is overdue to complete quality inspection, and sending a preset warning prompt to the quality inspection team corresponding to the house to be inspected.
7. The method of claim 1, further comprising, after generating the target quality inspection report:
sending the target quality inspection report to the owner client and the enterprise client simultaneously through an instant messaging platform;
after receiving an assistance application instruction sent by the owner client, judging whether the enterprise client reads the target quality inspection report within a preset reading duration;
and if the enterprise client reads the target quality inspection report within a preset reading time, establishing communication connection between the owner client and the enterprise client through the instant communication platform.
8. The method as claimed in claim 7, further comprising, after the establishing of the communication connection between the owner client and the installation and enterprise client through the instant messaging platform, the steps of:
regenerating a second quality inspection completion period according to the quality inspection condition of the unqualified quality inspection item displayed in the target quality inspection report;
if the refitting information which is fed back by the assembling client and aims at the unqualified quality inspection items is received within the second quality inspection completion construction period, a secondary quality inspection report is generated after secondary quality inspection is carried out on the unqualified quality inspection items which are refitted; if the secondary unqualified quality inspection condition of the quality inspection item which is unqualified again appears in the secondary quality inspection report, the recommendation score of the loading enterprise corresponding to the loading enterprise client is recommended to the owner client; the higher the recommendation score is, the higher the recommended priority of the entrepreneur corresponding to the entrepreneur client is;
and if the refitting information fed back by the enterprise installing client aiming at the unqualified quality inspection items cannot be received within the second quality inspection completion construction period, directly reducing the recommendation score of the enterprise corresponding to the enterprise installing client to the owner client.
9. A decoration quality inspection report generation system is characterized by comprising the following modules:
the system comprises a first acquisition module, a second acquisition module and a third acquisition module, wherein the first acquisition module is used for acquiring the house geographic information and the house integral decoration information of a house to be subjected to quality inspection corresponding to an owner client from a quality inspection application instruction after receiving the quality inspection application instruction of the house to be subjected to quality inspection sent by the owner client;
the first determining module is used for acquiring team information of all quality inspection teams, and determining the quality inspection teams and a first quality inspection completion period for the house to be subjected to quality inspection according to the house overall decoration information, the house geographic information and the team information of the quality inspection teams;
the conversion module is used for distributing a quality inspection project of the house to be quality inspected for quality inspection personnel of the quality inspection team in the first card punching record according to the overall house decoration information when the first card punching record of the quality inspection team on the house geographic information is received, converting the first quality inspection data of the quality inspection project uploaded by the quality inspection personnel into the record data of the quality inspection project and recording the quality inspection progress of the quality inspection project; the house to be inspected comprises at least one quality inspection item;
and the first generation module is used for acquiring the completion time point of each finished quality inspection project and all the recorded data when the quality inspection progress of all the quality inspection projects is finished, acquiring the owner self-inspection method of the quality inspection projects from a data map relation, and generating a target quality inspection report according to the completion time point, the recorded data and the owner self-inspection method.
10. The system of claim 9, wherein the first determining module comprises:
the generation submodule is used for generating all quality inspection items of the house to be inspected according to the integral decoration information of the house and finishing working duration corresponding to each quality inspection item;
the first determining submodule is used for acquiring geographic position information in team information of all the quality control teams, determining a preset service range of the house to be subjected to quality control according to the house geographic information, and determining all the quality control teams in the preset service range according to the geographic position information;
the recording submodule is used for acquiring the quality inspection duty and idle period information of each quality inspection worker in the team information of all the quality inspection teams in the preset service range, determining the quality inspection worker which completes the quality inspection of each quality inspection project earliest in each quality inspection team in the preset service range according to the quality inspection duty and idle period information of each quality inspection worker and the completion working time corresponding to each quality inspection project, and simultaneously recording the earliest quality inspection period for the quality inspection worker to complete the quality inspection of each quality inspection project earliest in each quality inspection team;
and the second determining submodule is used for determining a quality inspection team which completes the quality inspection of the house to be inspected earliest according to the earliest quality inspection construction period for completing the quality inspection of each quality inspection project earliest by quality inspection personnel of each quality inspection team in the preset service range, and determining a first quality inspection completion construction period for completing the quality inspection of the house to be inspected by the quality inspection team.
CN201911061716.1A 2019-11-01 2019-11-01 Decoration quality inspection report generation method and system Pending CN110991801A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911061716.1A CN110991801A (en) 2019-11-01 2019-11-01 Decoration quality inspection report generation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911061716.1A CN110991801A (en) 2019-11-01 2019-11-01 Decoration quality inspection report generation method and system

Publications (1)

Publication Number Publication Date
CN110991801A true CN110991801A (en) 2020-04-10

Family

ID=70083070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911061716.1A Pending CN110991801A (en) 2019-11-01 2019-11-01 Decoration quality inspection report generation method and system

Country Status (1)

Country Link
CN (1) CN110991801A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106355526A (en) * 2016-09-22 2017-01-25 成都快乐家网络技术有限公司 Order-sending processing device, system and method
CN106651678A (en) * 2016-12-16 2017-05-10 北京家装云网络科技有限公司 Novel home decoration supervision process management method and system
CN107977781A (en) * 2017-11-21 2018-05-01 上海筑想信息科技股份有限公司 Residence development project decoration construction quality inspection man-machine interactive system based on mobile terminal
CN109559088A (en) * 2018-10-18 2019-04-02 深圳壹账通智能科技有限公司 Task management method, device, electronic equipment and storage medium

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106355526A (en) * 2016-09-22 2017-01-25 成都快乐家网络技术有限公司 Order-sending processing device, system and method
CN106651678A (en) * 2016-12-16 2017-05-10 北京家装云网络科技有限公司 Novel home decoration supervision process management method and system
CN107977781A (en) * 2017-11-21 2018-05-01 上海筑想信息科技股份有限公司 Residence development project decoration construction quality inspection man-machine interactive system based on mobile terminal
CN109559088A (en) * 2018-10-18 2019-04-02 深圳壹账通智能科技有限公司 Task management method, device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN108399114A (en) A kind of system performance testing method, apparatus and storage medium
JP2017009599A (en) System and method for non-destructive test involving expert in remote place
CN108763009B (en) Server stress test method, system, equipment and computer readable storage medium
CN111522728A (en) Method for generating automatic test case, electronic device and readable storage medium
CN110838190B (en) Vehicle inspection method, apparatus, computer device and storage medium
CN114140999B (en) Project supervision system based on communication of Internet of things
CN111985789A (en) Vehicle-mounted terminal information security threat analysis and risk assessment system and method
CN108038667B (en) Policy generation method, device and equipment
CN114201346A (en) HIL (hardware-in-the-loop) testing method and device of CAN (controller area network) communication interface and electronic equipment
CN111835583B (en) Attribute inspection method and device for products of Internet of things and computer equipment
CN111651342A (en) HTTP interface automation testing framework based on Charles recording session
CN110991801A (en) Decoration quality inspection report generation method and system
CN115481941B (en) Multifunctional area combined intelligent security management method and system
CN109583685B (en) Terminal evaluation method, device, computer equipment and storage medium
CN106650953A (en) Method for achieving automobile diagnosis and work project determination in network questionnaire mode
CN109460001B (en) Method and device for associating fault code with accessory
US11461711B2 (en) Lanyap visual pro
CN110610350A (en) Project management method, device and equipment
CN206505440U (en) Test assignment dispatching system
KR101808953B1 (en) Quality assurance server through plurality of end user and method of application program
CN116187715B (en) Method and device for scheduling execution of test tasks
CN116466683B (en) Method and device for controlling test tasks
JPH086783A (en) Software quality guarantee supporting device
CN109508368B (en) Data processing method and device for rephrasing corpus
CN116860585A (en) Impulse testing method, impulse testing device, and readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination