CN107705020A - A kind of overall process intelligence engineering supervisory information managing and control system - Google Patents

A kind of overall process intelligence engineering supervisory information managing and control system Download PDF

Info

Publication number
CN107705020A
CN107705020A CN201710949090.2A CN201710949090A CN107705020A CN 107705020 A CN107705020 A CN 107705020A CN 201710949090 A CN201710949090 A CN 201710949090A CN 107705020 A CN107705020 A CN 107705020A
Authority
CN
China
Prior art keywords
management
unit
information
project
examination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710949090.2A
Other languages
Chinese (zh)
Inventor
黄小弦
商志宙
李本浩
王钦
史纪进
刘忠声
姜兆庆
郭峰
段晓明
王永顺
岳伟
景璟
张兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Shandong Liancheng Engineering Construction Supervision Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Shandong Liancheng Engineering Construction Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd, Shandong Liancheng Engineering Construction Supervision Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710949090.2A priority Critical patent/CN107705020A/en
Publication of CN107705020A publication Critical patent/CN107705020A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/107Computer-aided management of electronic mailing [e-mailing]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/30Administration of product recycling or disposal
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/20Education
    • G06Q50/205Education administration or guidance
    • G06Q50/2057Career enhancement or continuing education service
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W90/00Enabling technologies or technologies with a potential or indirect contribution to greenhouse gas [GHG] emissions mitigation

Abstract

The present invention relates to a kind of overall process intelligence engineering supervisory information managing and control system, the system includes:Client, client's device end include individual office unit, integrated management unit, information centre's unit, management unit, safety quality management unit, project management unit, System Management Unit, Training Management unit and file administration unit;Server end, the server end are analyzed and controlled for receiving the next data of client transmissions, and analysis is back into client with the result data controlled, initial data and the result data analyzed and controlled are transmitted to database purchase;Database, the database are used for the data that storage server end transmits.The system realizes project supervision information and perfect, the effective analysis provided fast, accurately and comprehensively, and management and control is carried out to the overall process of project supervision.

Description

A kind of overall process intelligence engineering supervisory information managing and control system
Technical field
The invention belongs to the technical field of project supervision, more particularly to a kind of overall process intelligence engineering supervisory information management and control system System.
Background technology
With nation-building field reform progressively in-depth, building legislation it is gradual perfect, construction supervision system has turned into One legal primary institution of China's engineering construction field, management are with a very important position in engineering construction.It is but existing The management of Project Supervision information, most of is all to fill in various forms manually, manually enters the transmission and management of row information.Adopt With this way to manage, the management of standardization can not be accomplished, the integration of information can not be accomplished and shared entirely, and the efficiency managed is low Under, cost is high.
Chinese patent literature CN105913341A discloses a kind of Project Supervision approaches to IM and system, bag Include:Construction project is decomposed into different critical processes;After the requirements for starting construction of each critical process are reached, according to described Management is carried out in the default management flow of critical process, acceptance specification, working approaches of surveillance and measure, and described in acquisition File needed for critical process work is filed;At the end of the work for detecting all critical processes is equal, described in completion The supervisory information management work of construction project.The efficiency of management can be improved, management cost is reduced, solves and manually carry out letter The problem of transmission and management of breath can not accomplish standardized management.But it is there is also certain deficiency, only to crucial in project supervision The documentation of process is filed and managed, and does not provide overall Engineering Supervision information-based solution, to work The emphasis such as examination & approval link, management link in journey management do not carry out intelligent conversion.
In summary, how to solve the problems, such as to lack project supervision information overall process intellectuality management and control in the prior art, still Lack effective solution.
The content of the invention
The present invention overcomes shortage project supervision information overall process intellectuality management and control in the prior art to solve the above problems The problem of, there is provided a kind of overall process intelligence engineering supervisory information managing and control system.The system can provide fast, accurately and comprehensively Project supervision information and perfect, effective analysis, management and control is carried out to the overall process of project supervision.
The first object of the present invention is to provide a kind of overall process intelligence engineering supervisory information managing and control system.
To achieve these goals, the present invention is using a kind of following technical scheme:
A kind of overall process intelligence engineering supervisory information managing and control system, the system include:
Client, client's device end are WEB terminals, including individual office unit, integrated management unit, information centre are single Member, management unit, safety quality management unit, project management unit, System Management Unit, Training Management unit and archives Administrative unit;
The individual office unit is configured as the acquisition and upload of personal daily Working information, engineered locations it is graphical Displaying and the acquisition of project profile information, the management for mail of handling official business, the management of the copending official document of intra-company's engineering, and manage The flow management and control of management, safety inspection quality, engineering project and integrated information;
The integrated management unit is communicated with the individual office unit, and the integrated management unit is configured as setting Standby management, equipment query, Report Server Management, system administration and low value easily consume the goods and materials account management of article, human resources it is comprehensive Management is closed, the archive of books account, displaying, inquires about, deposit the management borrowed, the management of information of vehicles and lending record, and employee Allotment, the management and control of examination;
Described information center cell is communicated with the individual office unit, and described information center cell is configured as newly Hear and the transmission of notice bulletin, displaying, inquiry, upload issue are deleted with modification;
The management unit is communicated with the individual office unit, and the management unit is configured as closing With management, design alteration, Site visa-an important chain, data clearing and scheduled fun report the Cost Management of examination & verification, and cost statistics and take With the cost management declared;
The safety quality management unit is communicated with the individual office unit, the safety quality management unit quilt Be configured to the displaying and maintenance of safety construction form, rectify and improve advice note check oneself and/or Ministry of State Security issues, security risk report Send reporting for inventory, the generation of management initial survey report, the generation and upload of project integration card;
The project management unit is communicated with the individual office unit, and the project management unit is configured as item Mesh contract checks, the change and displaying of engineering information, the establishment application in Supervision Project portion, member management, construction project Progress control, if engineering project graph visualization data upload management, the displaying of project under construction, and survey control measure money Material, quality appraisal report, management summary, the management of Project Process data and completion information;
The System Management Unit is communicated with the individual office unit, and the System Management Unit is configured as pipe Login user information, management user affiliated function are managed, management user logs in role, management custom menu column menu list, management Login user authority, and management system development use table.
The Training Management unit is communicated with the individual office unit, and the Training Management unit is configured as pin To examination question, paper, exam pool be added, change, delete, check that user independently selects examination question to be practised, and examination test With statistics;
The file administration unit is communicated with the individual office unit, and the file administration unit is configured as pair The management of honor data, Patent data and Contract Document;
Server end, the server end are analyzed and controlled for receiving the data that client transmissions are come, will be analyzed Client is back to the result data of control, the result data of initial data and analysis and control is transmitted to data stock Storage;
Database, the database are used for the data that storage server end transmits.
As further preferred scheme, the individual office unit includes routine office work information unit, engineering map list Member, mail management unit, official document management unit, flow management and control unit and address list unit;
The routine office work information unit is configured as the displaying of current project progress, notice, the displaying of notice information, system The displaying of user's outstanding work situation of meter, share data displaying, user register situation calendar displaying;
The engineering map unit is configured as after receiving engineering information and marking guard station position, and marked region is high with red point Bright display location information and engineering information, the engineering information include title, management department, project leader, area, voltage etc. Level, bid batch, owner's unit, plan beginning and ending time, actual beginning and ending time;
The official document management unit is configured as carrying out examination & verification management to intra-company's official document, specifically includes official document of company level Examination & verification management and department level official document examination & verification management;
The flow management and control unit is configured as the stream of management, safety inspection quality, engineering project and integrated information Journey management and control;The flow management and control unit respectively with the management unit, the safety quality management unit, the project pipe Manage unit and integrated management unit communications, each administrative unit carries out the initiation of corresponding flow, after the completion of enter the official document pipe Reason unit is audited;
The address list unit is configured as the displaying of various pieces personnel and its corresponding essential information, the essential information Including name, sex, post, phone, outer net mailbox.
As further preferred scheme, the displaying of the current project progress specifically includes the displaying of overall progress and divided The displaying of item progress, different rights are set according to user's different role;If Supervision Project portion always for role, then to overall progress Safeguarded with subitem progress;Otherwise, it can only check project progress and obtain project essential information.
As further preferred scheme, the routine office work information unit is additionally configured to monitoring project aggregate scheduling, and Respectively when monitoring project aggregate scheduling 50%, 100%, to management department under all members client send it is " logical Know and (collect cost of superintendence) " prompting message.
As further preferred scheme, the examination & verification management of the official document of company level is objective by it to receive specific responsibility human roles The official document title and font size information that family end is filled in, drafter role are received document information by its client and are made a draft and signed Word, it is described style of writing people role by its client receive drafter signature after official document and signed, it is described check papers people role by Its client receives the official document after style of writing people's signature and is checked papers and signed, and each department is received the people that checks papers by its client and signed Official document after word go forward side by side guild label, and successively by audit role its client receive its subordinate signature official document and signed Word, after the completion of signature by the client of general manager role issue official document to specialize in human roles client, upload style of writing the time, Final official document is issued after issuing time, impression, each departmental staff of company receives official document by its client and checked, And record has read acknowledgement information;
The examination & verification management of the department level official document is that department specific responsibility personnel fill in corresponding notice by its client, informal letter is believed Breath, which is transmitted to department manager, is signed, and the official document signed transmits to the client of departmental manager and is issued to departmental staff's Client, information has been read in the client reception for receiving the personnel of message, and is added the personnel after the notification message and read back Hold message.
As further preferred scheme, the integrated management unit is communicated with the flow management and control unit, described Integrated management unit includes handling of goods and materials unit, human resource management unit, books administrative unit, Vehicle management unit and personnel Control unit;
The handling of goods and materials unit is configured as management equipment storage, equipment outbound, equipment are retracted, the equipment of equipment scrapping Administrative unit, manages the Report Server Management unit of goods and materials report messages, and the low value for the management account that management low value easily consumes article easily consumes Administrative unit, and statistics device management unit, Report Server Management unit and low value easily consume record information and the displaying of administrative unit Statistic unit;
The human resource management unit is configured for personnel's basic information management, recruitment management, releases work pass System, house lease, staff training, personnel's certificate management, the keeping of all kinds of certificates, honor management to company human resource information Management and maintenance function module;
The books administrative unit is configured as the archive of books account, displaying, inquires about, deposits the management borrowed, books account Management include company's books machine account management and project management department's books machine account management;
The Vehicle management unit is configured as carrying out all vehicles on archival of information, classified inquiry, addition modification vehicle Information and the vehicle information management of vehicle application, the lending to vehicle, give back the generation lending record management that record is achieved;
Personnel's control unit is configured as plan off duty, the management of work attendance plan and examination;The plan off duty Manage reporting, show and inquiring about for plan off duty;Management the declaring, show and looking into for work attendance plan of the work attendance plan Ask;The management of the examination includes examination and automatic examination manually.
As further preferred scheme, the management unit is communicated with the flow management and control unit, described Management unit includes contract management unit, Cost Management unit and cost management unit;
The contract management unit is configured as the checking of contract information summary sheet and its annex, downloads and individual event contract The export of information, addition, monitoring project aggregate scheduling respectively when 50%, 100%, to management department under all members Client send the addition of " notice (collecting cost of superintendence) " prompting message;
The Cost Management unit includes displaying, record, the design alteration unit of examination & approval design alteration information, displaying, note Record, the Site visa-an important chain unit of examination & approval Site visa-an important chain information, displaying, record, the construction clearing unit of examination & approval construction settlement information, exhibition Show, record, examining the scheduled fun examination & verification unit of scheduled fun msu message;
Displaying, inquiry, download and the examination & verification that the cost management unit is configured as cost statistics and expense is declared.
As further preferred scheme, the safety quality management unit is communicated with the flow management and control unit, The safety quality management unit includes displaying with safeguarding the safety construction form unit of safety construction form, rectification Advice note check oneself and/or rectification that Ministry of State Security issues notice single unit, report security risk to report and submit the security risk report of inventory Send inventory unit, the management initial survey unit of generation management initial survey report, and project of the generation with uploading project integration card Quality control card unit.
As further preferred scheme, the project management unit is communicated with the flow management and control unit, described Project management unit is including checking, inquiring about, the Project contract unit of download items contract, change and the engineering of displaying engineering information Information unit, the establishment application in Supervision Project portion, the Supervision Project portion administrative unit of member management, reports, changes, checking construction The progress control unit of engineering project weekly, monthly magazine, the graph visualization data of construction project upload the item number of management Code photo unit, show the project under construction guide look table unit of project under construction, and management survey control measure data, quality evaluation report Announcement, management summary, the project data administrative unit of Project Process data and completion information.
As further preferred scheme, the client also includes mobile terminal, and the mobile terminal includes video council View unit, work attendance are registered unit, pending examination & approval unit, project status inquiry unit, news unit, notice bulletin unit, mail Transmit-Receive Unit, circulation of official document unit, flow initiate unit, address list display unit and shared information unit;
The video conference unit carries out real-time video between being configured as realizing site supervision project management department member client Meeting, supports more people Online Video simultaneously, mode of initiating include initiating in group and it is single initiate, other people add, the WEB is whole Support video conference, and WEB terminals and mobile terminal video image synchronous simultaneously in end;
The register entirety that carries out of client of unit including Supervision Project portion total generation of the work attendance is registered and each user visitor The individual at family end registers, and checking registers mode for the live photo taken pictures of acquisition and timestamp while as the authentication of checking Formula.
Beneficial effects of the present invention:
A kind of overall process intelligence engineering supervisory information managing and control system of the present invention, realizes project supervision information overall process Intelligent management and control, the system can provide project supervision information and perfect, effective analysis fast, accurately and comprehensively, to engineering The overall process of management carries out management and control.
Brief description of the drawings
Fig. 1 is the system construction drawing of the present invention;
Fig. 2 is the engineering map cell schematics of the present invention.
Embodiment:
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
In the case where not conflicting, the feature in embodiment and embodiment in the application is mutually combined.With reference to attached The invention will be further described with embodiment for figure.
Embodiment 1:
The present invention overcomes shortage project supervision information overall process intellectuality management and control in the prior art to solve the above problems The problem of, there is provided a kind of overall process intelligence engineering supervisory information managing and control system.The system can provide fast, accurately and comprehensively Project supervision information and perfect, effective analysis, management and control is carried out to the overall process of project supervision.
The first object of the present invention is to provide a kind of overall process intelligence engineering supervisory information managing and control system.
To achieve these goals, the present invention is using a kind of following technical scheme:
A kind of overall process intelligence engineering supervisory information managing and control system, as shown in figure 1, the system includes:
Client, client's device end are WEB terminals, including individual office unit, integrated management unit, information centre are single Member, management unit, safety quality management unit, project management unit, System Management Unit, Training Management unit and archives Administrative unit;
Server end, the server end are analyzed and controlled for receiving the data that client transmissions are come, will be analyzed Client is back to the result data of control, the result data of initial data and analysis and control is transmitted to data stock Storage;
Database, the database are used for the data that storage server end transmits.
1st, individual office unit:
The individual office unit is configured as the acquisition and upload of personal daily Working information, engineered locations it is graphical Displaying and the acquisition of project profile information, the management for mail of handling official business, the management of the copending official document of intra-company's engineering, and manage The flow management and control of management, safety inspection quality, engineering project and integrated information;
The individual office unit includes routine office work information unit, engineering map unit, mail management unit, official document pipe Manage unit, flow management and control unit and address list unit;
1.1 routine office work information units
The routine office work information unit is configured as the displaying of current project progress, notice, the displaying of notice information, system The displaying of user's outstanding work situation of meter, share data displaying, user register situation calendar displaying;
1.1.1 the displaying of current project progress
The displaying of the current project progress of routine office work information unit specifically includes displaying and the subitem of overall progress The displaying of progress, different rights are set according to user's different role;If Supervision Project portion always for role, then to overall progress and Subitem progress is safeguarded;Otherwise, it can only check project progress and obtain project essential information.The displaying tool of current project progress Body shows current engineering progress using Gantt chart, comprising overall progress and subitem progress, intuitively checks, clicks on for user of service Can show the engineering essential information, engineering essential information include title, management department, project leader, area, voltage class, Call for bid batch, owner's unit, plan beginning and ending time, actual beginning and ending time.And it is unified with " project under construction list ", enumerate entirety Progress and subitem progress.
The routine office work information unit is additionally configured to monitoring project aggregate scheduling, and respectively in monitoring project aggregate scheduling 50%th, 100% when, to management department under the client of all members send the prompting of " notice (collecting cost of superintendence) " Information.
Authority distribution:
A. Supervision Project portion safeguards that aggregate scheduling and subitem progress, acquiescence must be safeguarded once daily by hand always for (role), Administrative department can real time inspection progress situation;
B. other roles, check and click to enter and check project essential information;
C. when aggregate scheduling is respectively 50%, 100%, system sends advice of collection to accounting division automatically.
1.1.2 notice bulletin
The notice issued in company, notice information are shown at this:Title, author, issuing time, content Description;
Preferential exhibition method:Significance level, date.
1.1.3 outstanding work
Outstanding work module can count all works at present that the personnel of logging in are related to (in progress, pending), intuitively Check, simplify leader's examination and approval work.
1.1.4 data is shared
A. project supervision portion can carry out upload specification, management system file, train courseware, data masterplate, address list etc. altogether Data is enjoyed, includes the upload of annex, is downloaded, online preview.Learnt by project management department personnel, checked.
B. page presentation title, time, upper successor, annex.Online preview and download can be carried out to annex.
C. function is added:After opening the page, title is filled in, is illustrated, upload annex, preserved, success.
D. project supervision portion (department) supervisor, specific responsibility (role) upload shared data → project supervision portion and project management department entirety Personnel learn
1.1.5 individual people's work attendance
A. calendar is shown, goes out checking-in state, example with color identifying:It is non-work attendance (grey), work attendance (green), late (red Color), ask for leave (white) using different colours mark checking-in state
Calendar model figure:
Work attendance, only registered the same day, after registering, calendar color change.System manager can provide the time of registering, and register and exceed the time limit Afterwards, mark is late;Ask for leave, according to the automatic change work attendance color of application of asking for leave.
1.2 engineering map units
As shown in Fig. 2 the engineering map unit is configured as after receiving engineering information and marking guard station position, mark zone Domain highlights display location information and engineering information with red point, the engineering information include title, management department, project leader, Area, voltage class, bid batch, owner's unit, plan beginning and ending time, actual beginning and ending time.
Acquiescence shows Shandong Province's map, and the regulation to the map progress engineer's scale of display realizes that tune is far and near.
1.3 mail management units
Mail management is the mailing system of internal system, comprising unread mail, writes mail, Inbox, has sent mail Four functions.
A. unread mail:List all Inner emails do not checked.Corresponding mail is clicked on, checks the detailed of the mail Thin information, include sender, outbox time, addressee, mail header, Mail Contents, annex etc..Annex support online preview with And download.
B. mail is write:The new Inner email of an envelope is write with the personnel for sending mail authority, it is necessary to fill in addressee, mark Topic, content, significance level and annex.After mail is sent, message is shown by WEB terminal and App ends homepage, click can check this Mail particular content.
C. Inbox:List all Inner emails received.Click on respective record and check the mail details.
D. sent:List all Inner emails sent.
E. priority assignation:The personnel for sending, receiving mail are configured, significance level rank and appropriate level are set The mail pot-life.
1.4 mail management units
The official document management unit is configured as carrying out examination & verification management to intra-company's official document, specifically includes official document of company level Examination & verification management and department level official document examination & verification management;
A. official document flow of company level:The examination & verification management of the official document of company level specializes in human roles by its client to receive The official document title and font size information filled in, drafter role are received document information by its client and are made a draft and signed, institute State style of writing people role to be received the official document after drafter's signature by its client and signed, the people role that checks papers is by its client Hold the official document after receiving style of writing people's signature and checked papers and signed, after each department is received people's signature of checking papers by its client Official document go forward side by side guild label, and successively by audit role its client receive its subordinate signature official document and signed, sign After the completion of by the client of general manager role issue official document to specialize in human roles client, upload style of writing the time, the when of issuing Between, after impression final official document is issued, each departmental staff of company receives official document by its client and checked, and records Acknowledgement information is read;
Title, the font size of official document are filled in by specific responsibility personnel, transfers to drafter to make a draft and signs, the people that composes a piece of writing signs, check papers people Verification contribution is simultaneously signed, finally via all departments (general management department, accounting division, safety monitor Quality Mgmt Dept, project supervision Portion) countersign, then transfer to assistant manager signature, submit signed by chief engineer, secretary signature, finally signed and issued by general manager, after the completion of by Specific responsibility personnel fill in style of writing time, the time of issuing, impression, finally click on " issuing " button, can issue cause corporate departments.
B. department level official document flow:The examination & verification management of the department level official document is that department specific responsibility personnel are filled in by its client Corresponding notice, informal letter information transfer to department manager are signed, and the official document signed is transmitted to the client of departmental manager End is issued to the client of departmental staff, and the client for receiving the personnel of message receives and read information, and the notification message it After add the personnel and read acknowledgement message.
1.5 flow management and control units
The flow management and control unit is configured as the stream of management, safety inspection quality, engineering project and integrated information Journey management and control;The flow management and control unit respectively with the management unit, the safety quality management unit, the project pipe Manage unit and integrated management unit communications, each administrative unit carries out the initiation of corresponding flow, after the completion of enter the official document pipe Reason unit is audited;
1.6 address list units
The address list unit is configured as the displaying of various pieces personnel and its corresponding essential information, the essential information Including name, sex, post, phone, outer net mailbox.Department and its lower personnel's name are shown using tree.
2. integrated management unit
The integrated management unit is communicated with the individual office unit, and the integrated management unit is configured as setting Standby management, equipment query, Report Server Management, system administration and low value easily consume the goods and materials account management of article, human resources it is comprehensive Management is closed, the archive of books account, displaying, inquires about, deposit the management borrowed, the management of information of vehicles and lending record, and employee Allotment, the management and control of examination;
The integrated management unit is communicated with the flow management and control unit, and the integrated management unit includes goods and materials pipe Manage unit, human resource management unit, books administrative unit, Vehicle management unit and personnel's control unit;
2.1 handling of goods and materials
A. handling of goods and materials is the management function module to information such as equipment accounts.
B. handling of goods and materials menu item is easy comprising equipment control, equipment query, Report Server Management, system administration and low value below Consume five functional module.
2.1.1 equipment control
Equipment Management Function is the function of being realized by equipment control account, is moved back comprising equipment storage, equipment outbound, equipment Return, equipment scrapping four.
A. device management pages, equipment stock's information list page, the name of page display device information are shown first The information such as title, unit, model, brand, entry time, supplier, device location, management unit, classification.In menu bar, function Button has " inquiry ", " storage ", " outbound ", " retracting ", " scrapping ", " essential information modification ", " deletion ", " Excel export ", root According to time (start-stop) of equipment, title, model, numbering, initial value, corresponding using keyword queries such as department, user, suppliers Storage, outbound, inventory information list.And can according to storage, outbound, retract, the state such as scrap and check corresponding record list Information.And it can click on and " export Excel " buttons, after selecting corresponding Query Result export attribute column, carry out excel files Export.
B. equipment storage flow:Into " new article storage " page, after having filled in essential information, click on " next step ", The page is filled in into numbering, corresponding numbering has been filled in, has clicked on " storage ", then generation storage record information." existing article storage ", The list of devices information record page is opened, selects corresponding equipment, fills in warehousing quantity, clicks on " next step ", is filled out into numbering The page is write, fills in numbering, is clicked on " storage ", generation storage record information.
C. equipment outbound flow:Department/specific responsibility personnel fill in《Application for materials needed》, report " affiliated function leader " to examine Batch, report " being in charge of department head people " to examine, report " company leader " to examine, after leader's examination & approval pass through, click on selection outbound Application record, click on " outbound ", in popup web page, fill in and receive people, receive the Informations such as department, device coding " outbound ", Generate outbound record information.
D. equipment retracts flow:The page is retracted into equipment, the facility information list for outbound that the page is shown, is pressed Condition query simultaneously selects relevant device information, clicks on " next step ", and returns state is carried out in popup web page and fills in, retract warehouse Position is selected, and clicks on " retracting ", and (if equipment can use, record information is retracted in generation.It is " retracting " to change facility information state, if Equipment scrapping, then walk equipment scrapping flow)
E. equipment scrapping flow is:According to condition inquire about and select the relevant device of outbound to believe that setting state (has been scrapped/treated Scrap) selection transmitting place completion.
2.1.2 Report Server Management
Report Server Management is the management module to the report messages of the goods and materials such as equipment.
1. card management
Card management is that its storage, outbound are combined to every equipment in facility information, retracts, scrap the one of the generations such as information Open the assets card to the equipment.
Into the page, facility information original list is shown first, chooses corresponding equipment, clicks on " assets card ", Then enter the assets card page, show the essential information of the facility information, storage, outbound, the detailed record letter retracted, scrapped Breath.
2. procurement request
Into the page, buying list information, shows buying hour and remark information before being shown first.Click on " addition application ", fills in buying hour, remarks in popup web page, uploads related accessories, click on " addition " button, you can addition is adopted Purchase information.Choose corresponding procurement information to record, click on " checking ", check the details of the procurement information, during comprising buying Between, remarks and annex.(risen, only) according to buying hour, remarks keyword carries out conditional filtering inquiry.
2.1.3 low value easily consumes
A. the existing corresponding function of turnkey console accounts and properties of consumption article easy to low value, and can transverse and longitudinal keyword query.
Into what the page was shown article record information is easily consumed for the low value in current process.The page shows that low value easily consumes article The letter such as the title of information, unit, model, brand, entry time, supplier, device location, management unit, classification, stockpile number Breath.Click on " application ", submit new low value easily to consume article application.After having filled in information needed, directly walk low value and easily consume article pipe Manage flow.
C. low value easily consumes management process:Filed an application by department/project specific responsibility, report and transfer to affiliated function leader to examine, Then it is submitted to and is in charge of department head's examination & approval, finally examined by company leader, clicks on " implementation status ", check the execution of the record Situation and execution time.
2.1.4 statistics
The data for the record information statistics that data statistics module goes out to equipment, is put in storage, retracting, scrapping etc. makees the function of showing Module.According to year, the moon, project management department's inquiry then or of that month " equipment account, low value easily consume " record information.
2.2 human resource management units
The human resource management unit is the management and maintenance function module to company human resource information.It is configured as Enter administrative staff's basic information management, recruitment manage, sever labor relations, house lease, staff training, personnel's certificate management, respectively The keeping of class certificate, the management to company human resource information of honor management and maintenance function module;
2.2.1 personnel's basic information management
Personnel's essential information is increased, deleted, is changed, looks into operation.
A. list, function menu have " inquiry ", " addition ", " modification ", " deletion ", " importing ", " export ".
Click on " inquiry ", according to the name of personnel, ID card No., nationality, political affiliation, academic title, attack time, The information such as department carry out the screening inquiry of personal information.
Click on " addition ", add personnel's essential information.
Corresponding personnel record is chosen, clicks on " modification ", the personal information chosen is modified.
Corresponding personnel record is chosen, clicks on " deletion ", deletes the personal information.
B. " importing " is clicked on, the Column Properties information of selection importing template, is clicked on " export template ", root in the page of appearance Export excel templates are arranged according to selected properties, after filling in corresponding personal information in derived excel templates, are clicked on " importing ", The excel files are chosen, import personal information.
C. " export " is clicked on, the attribute column derived from selection in the page of appearance, all personnel that export current queries go out Correlation attribute information.
Personnel's essential information literary name section includes:ID, name, sex, ID card No., nationality, date of birth, political face Looks, native place, academic title, qualifications of professional technique, contact method login system user name, password, role, affiliated function etc..
2.2.2 labour contract is released
It is the function management module that associate's resignation information is set to release contractual relationship of labour module.
A. releasing labour contract flow is:Personnel Who Left is filled in《Sever labor relations application form》, should there is post friendship thereon Personnel's signature is connect, is submitted to Engineering Supervisor's signature, transfers to the supervisor's signature of safety supervision portion, is submitted to business department's supervisor's signature, all After signature is agreed to, the personnel leave office, modification personnel state information after leaving office successfully.(function is realized using online word)
2.2.3 staff training
Staff training is the functional module being managed to employee skill training.
A. application for training record information list, show staff's name, sex, training species, training organization, the training time, Evidence obtaining situation." newly-increased training " is clicked on, by engineering department or is counted through portion's proposition personnel's certificate demand, taken in conjunction associated mechanisms, via After department head agrees to, establishment officer participates in training.
Training record information should include:Species is trained, sequence number, name, training contents, training cost, is trained the date, training Mechanism, evidence obtaining situation etc..
2.2.4 personnel's certificate management
Personnel's certificate management is the functional module being managed to the corresponding certificate information of associate.
A. certificate information list, it is page presentation personnel name, type of credential, certificate numbering, data of issue, the term of validity, standby Note.
Screening inquiry is carried out according to conditions such as personnel's name, type of credential, personnel departments.
B. " newly-increased " is clicked on, fills in corresponding certificate information, personnel's certificate information is added.
C. choose certificate information to record, click on " modification ", change corresponding certificate information.
D. choose certificate information to record, click on " deletion ", delete corresponding certificate information.
E. transfer, choose certificate information to record, click on " transfer ", the certificate information is handed over to and chooses personnel to carry out pipe Reason is, it is necessary to fill in sequence number, certificate title, the origin of an incident, receives the time, transfers the information such as people's signature, recipient's signature, remarks.
Certificate information literary name section should include:Personnel (can include any field contents of personal information table), type of credential, certificate Numbering, data of issue, the term of validity, remarks etc..
2.3 books management
2.3.1 company's books machine account
A. all books are carried out with file record, including the addition to books, is changed, is deleted, check information.
B. page presentation books title, numbering, total quantity, has issued quantity, surplus.It can number and carry out according to title Classified inquiry.
C. books addition is carried out, it is necessary to fill in the title of books, is numbered, standard No., quantity, entry time, is increased after preservation Add new books.Modification is that books are entered with row information modification.
2.3.2 project management department's books machine account
A. file record is carried out to the apllied books of project management department, books can be applied, return, custodian becomes More, books circulate.
B. page presentation books title, project name, numbering, quantity, director.It can be numbered according to title, director enters Row classified inquiry.
C. books application, operate in the heart on stream, select to fill in number according to company's books progress books after opening the page Amount, Slurry pump are submitted, are responsible for by specific responsibility issuing books after applying successfully.Books are returned:Submit application, application pass through after by Director submits books, completes flow.
D. books application process:Project management department chief inspector/representative (role) application → project supervision portion (department) supervisor (role) Examination & approval → project supervision portion (department) specific responsibility (role) issues books.
2.3.3 deposit debit record
Lending to books, is given back, director's change, and circulation generation record is achieved.In order to use note to books Record carries out checking statistics.
The page shows books title, applicant, application time, state.
According to books title, applicant, application time section is inquired about.
2.4 vehicle management
2.4.1 information of vehicles
A. archival of information is carried out to all vehicles, uniformly to check and to manage.
Page presentation project name, director, director's phone, guard station, brand vehicle, quantity, license plate number, driver's surname Name, driver's phone, affiliated unit.
B. can be inquired by classification according to project name, director, license plate number, Pilot Name, affiliated unit.
C. add, change information of vehicles:Increase new vehicle or modification information of vehicles, include brand vehicle, quantity, car plate Number, Pilot Name, driver's phone, the essential information such as affiliated unit.
D. vehicle application:Operate in the heart on stream, request slip is filled in by project management department chief inspector or representative, submit to engineering prison Reason portion.Need to select vehicle, fill in the time, the origin of an incident.
E. application process:→ project supervision portion (department) specific responsibility (role) examination & verification is filled in project management department chief inspector/representative (role) Confirm.
2.4.2 lending record:Lending to vehicle, give back generation record and achieved.
2.5 personnel's management and control
2.5.1 plan off duty
A. the plan off duty of project personnel, display project management department title, plan title off duty are shown after entering.Time, report People.Export function can be carried out.
B. can be according to project management department's title, plan title off duty, period, inquiry.
C. plan off duty reports:This plan off duty is reported.Operated in the heart on stream.
D. planning procedures off duty:Project management department chief inspector/representative (role) reports → project supervision portion (department) specific responsibility (role) Examination & verification → filing.
2.5.2 work attendance plan
A. the work attendance plan of project personnel is shown after entering, shows project name, time, upper journalist, annex.It can carry out attached Part checks that download function and work attendance are declared.
B. can be according to project name, period, inquiry.
E. work attendance is declared:It is that work attendance of the Project Director to project personnel is declared.Operated in the heart on stream.
C. flow is declared in work attendance:Project management department chief inspector/representative (role) reports → project supervision portion (department) specific responsibility (role) Examination & verification collects → Synthesis Department (department) specific responsibility (role)
2.5.3 appraisal management
A. the score of the examination of list query displaying " year, the moon, department, score (overview) " all departments.As shown in table 1;
B. examination manually, four administrative department roles could fill out score value corresponding to respective department in the list, other departments without Method is changed, score value:
Safety monitor Quality Mgmt Dept 35 divides, and project supervision portion 35 divides, and accounting division 15 divides, and general management department 15 divides.
C. automatic examination, example:Safety monitor Quality Mgmt Dept issues " rectification advice note " to Supervision Project portion, and provides receipt week Phase, when project management department exceeds the time limit to make a report on, can accordingly it be deducted according to the overdue examination score value that safety monitor Quality Mgmt Dept sets herein.
Table 1
3. information centre
3.1 news
A. it is used to transmit news.Personnel can be checked.
B. page presentation has title, author, issuing time, content Description.
C. can be inquired by classification according to title, content, author, issuing time section.
D. there is issue, delete function.During issue, window is opened, title is added, content Description, input content, issues into Work(.Delete, the news out of date not shown can be deleted.
3.2 notice bulletins
A. it is used to send department to notify, bulletin.It can be sent during transmission according to department, different people is carried out acquisition notice Bulletin.
Page presentation has title, author, issuing time, content Description.
B. inquire about, can be inquired by classification according to title, content, author, issuing time section.
C. issue, delete.During issue, open window, add title, content Description, input content, selection receive department or Personnel, issue successfully.Delete, the notice bulletin out of date not shown can be deleted.
4. management
4.1 contract management
A. enter the page, show " contract information summary sheet ", " area, project name, voltage class, bid batch, owner Unit " is used as query option, attached " notice on bid winning, bidding document, supervisory contract " annex after each column contract information, is available for looking into See, download.Click to enter and check detailed " individual event contract information ".List can export
B. increase " individual event contract information " newly, filled in by with lower page.Fill in and finish, " pass notice on bid winning in prompting, recruit and throw Mark file, supervisory contract " (picture or document)
C. authority:Other departments only preview, download, without other functions
D. addition is reminded, and " Gantt chart " project aggregate scheduling gives institute under management department when 50%, 100% There is member to send " notice (collecting cost of superintendence) "
4.2 Cost Management
4.2.1 design alteration
A. page presentation " design alteration " list, with " project name, area, voltage class, name (supervising engineer) " As querying condition.Displaying " examination & verification state, annex " after list.Sorted by " project supervision office engineer " submission date, annex Can preview download
B. clicking on record can examine, and upload " design alteration examination and approval document ", " major design change examination and approval document ", " design alteration Contact is single ", after " project management department chief inspector representative " receives, flow finishes, and audits state change.
4.2.2 Site visa-an important chain
A. page presentation " Site visa-an important chain " list, with " project name " " area " " voltage class " " name (Supervision engineering Teacher) " it is used as querying condition.Displaying " examination & verification state, annex " after list.Sorted by " project supervision office engineer " submission date, Annex can preview download
B. clicking on record can examine, and upload " Site visa-an important chain examination and approval document ", " great Site visa-an important chain examination and approval document ", " project management department is total After prison representative " receives, flow finishes, and audits state change.
4.2.3 settlement information
A. page presentation " construction clearing " list, with " project name " " area " " voltage class " " name (project management department chief inspector Represent) " it is used as querying condition.Displaying " examination & verification state, annex " after list.Sorted by " the project management department chief inspector representative " submission date, Annex can preview download
B. clicking on record can examine, and be carried again after " project management department chief inspector representative " receives and after working out " report of construction Closing Check " The special work examination & verification of friendship accounting division (annotation, modification)-》Feed back again, flow finishes, and audits state change.
4.2.4 scheduled fun reports examination & verification
A. page presentation " scheduled fun examination & verification " list, with " project name " " area " " voltage class ", " name (supervise by project management department Reason engineer) " it is used as querying condition.Displaying " examination & verification state, annex (reporting table, construction contract to a higher authorities for approval) " after list.By " project management department supervises Manage engineer " submission date sequence, annex can preview download
B. clicking on record can examine, and " project management department chief inspector representative " signature confirms that flow finishes, and audits state change
4.3 cost management
4.3.1 cost statistics
When project management department establishes, one " expense detail list " record is automatically generated, comprising information as shown in table 2, the 1-12 months, is closed Meter.
Note:The cost that all items portion occurs is included in detail list automatically, does not give modification authority in theory.
Table 2
A. page presentation " cost statistics " list, using " project name " " date (year) " as querying condition, row displaying:Rent It is fare use, expense of renting a house, travel charge, hotel expense, administrative expenses, total.Below list, the total displaying of transverse and longitudinal expense
B. click on and check detailed cost information
Note:Rent, property fees, water rate, the electricity charge, heating cost, broadband access fee, CATV fee these expenses are sent out inside program Changing, the corresponding change of the expense of renting a house of statistical form
4.3.2 expense is declared
Page presentation " expense is declared " list, inquiry bar is used as using " project name " " name (project management department chief inspector representative) " Part, displaying:Initiate time, examination & verification state, operation.Annex can be downloaded and checked, can be audited in action bar.
5. safety quality management
5.1 safety construction forms
A. page presentation, " safety construction form " list, with " Supervision Project portion " " name (project management department chief inspector generation Table) " " area " " examination & verification state " be used as querying condition, show:Project name, area, whether report and submit, report and submit date, form (attached Part or program are realized), examination & verification state, operation (examination & verification passes through, retracted).Form can annotate
Note:Newly established Supervision Project portion, the list record for additional one automatically, and default conditions are " not reporting and submitting ".According to Engineering type (circuit, power transformation), automatic set is added after list and reports and submits prompt date (acquiescence is reported and submitted once every 2 weeks), can be repaiied by hand Change;It is automatic to send prompting to the Supervision Project portion for not reporting and submitting form and fill in " safety construction form " (Supervision Project portion is pending Displaying), exceed the time limit to be included in examination
B. template is safeguarded, rewritable report form template, after clicking on " issuing ", is automatically matched to Supervision Project portion;Can be attached Add template.
5.2 rectification advice notes
It is divided into 2 kinds:Check oneself, Ministry of State Security issues.It is internal initiation to check oneself, and inside finishes;Ministry of State Security issues, need with Lower flow.
A. list page, " list of having issued a notice " list, with " Supervision Project portion " " date ", " flow state (is not replied, returned In multiple, safety supervision portion examination & verification, the supervisor's approval of safety supervision portion) " be used as querying condition, row are shown:Project name, issue the date, return the latest Multiple date, project management department reply the date and (if empty without if, exceed the time limit to redden), flow state, annex are (if rectification advice note, having replied and chasing after Add reply sheet annex), operation (examination).
B. examine, clicked to enter from list operation column
C. rectification advice note is issued, is clicked to enter, Supervision Project portion, engineering name is selected, replys the date the latest, closes on (number of days) is reminded, annex, is clicked on " issuing ", and " list of having issued a notice " list produces record.
5.3 security risks report and submit inventory
Supervision Project portion reports, " work title, operating risk title, operation grade, plan beginning and ending time, actual start-stop Time, Xu Dao hilllocks supervisor, specific works content " information, the list is only used as statistics to be made for checking and initiating auditing flow With.
Personal work to-be-processed area, prompt.APP is pushed
A. list page, the inventory that each project management department of list automatic data collection reports and submits, as shown in table 3:
Table 3
B. can according to condition (date, engineering name (multiselect), other conditions that need to be added) examination inventory, choose (before list Band check box) button generation " xxx construction safety material risk events in operation statistical form " is clicked on, establishment people is defaulted as currently grasping Work person, addition " establishment date ", selects auditor (supervisor) to submit.Word can be exported
5.4 management initial surveies
Flow:In total generation, fills in initial survey scheme (annex:Initial survey application, initial survey scheme)-》Engineering Quality Control management (role) Examination & verification initial survey scheme, be confirmed whether to satisfy the requirements-》Supervisor's examination & approval-》Engineering Quality Control management (role) sends acceptance criteria (annex)-》Total pickup receive and feed back " initial survey report "-》Complete
Personal work to-be-processed area, prompt.APP is pushed
A. the initial survey list that need to be audited, field " Supervision Project portion " " engineering name " " date of application " " annex (initial survey are shown Application, initial survey scheme) " " flow state (not auditing, quality control is audited, supervisor's approval) " " operation (click on and audit) "
5.5 project integration cards
Role-security distributes:
1. project management department documenter, specially management person, prison, have clicked to enter " addition " function
After 2. list is clicked and entered in chief inspector/representative, add " examination & verification " function
3. other roles enter, audit after passing through, only " checking ", " comment " authority
A. to the increase of quality control card, modification, delete and check operation.It can be carried out according to types such as title, times detailed Go through inquiry.
B. page presentation:Quality card title, upper successor, uplink time, annex.Can be to title, upper successor, uplink time section Inquired by classification.Online preview and download can be carried out to annex.
C. add:After opening the page, title is added, is illustrated, upload annex, preserved.
6. project management
6.1 Project contract
A. enter the page, show " contract information summary sheet ", " area, project name, voltage class, bid batch, owner Unit " is used as query option, attached " notice on bid winning, bidding document, supervisory contract " annex after each column contract information, is available for looking into See, download.Click to enter and check detailed " individual event contract information ".List can export
6.2 engineering information
Role-security distributes:
1. project management department member has " addition, modification " function
2. other roles enter, only " preview, download " authority
A. Supervision Project portion set up after, to total generation send prompting improve engineering information content (comprising project profile, icon Note or other annexes)
B. list is shown, " area, project name, voltage class, bid batch, owner's unit, plan beginning and ending time, reality Border beginning and ending time, annex " is as displaying row and inquiry field.
6.3 Supervision Project portions manage
6.3.1 application is set up
A. according to notice on bid winning, tender documents and supervisory contract, the application of Supervision Project portion is proposed by project supervision portion.
B. list, Supervision Project portion title, application time, applicant, annex.Annex can online preview, download.
C. inquire about, can be inquired by classification according to title, period, applicant.
D. application process:Project supervision portion (department) is responsible for (role) application → company leader's examination & approval → Synthesis Department (department) It is responsible for (role) dispatch.
6.3.2 member management
A. after department's application successfully passes, project management department personnel are set up by project supervision portion.
B. it is new to set up, change personnel:Personnel are added by pulling mode by project supervision portion.The repeatable selection of chief inspector, and Ordinary person is company idle employee (being temporarily not belonging to any project management department personnel).
C. existing project management department is used.Directly carry out selecting present just existing project management department, i.e., be assigned to this project There is project management department.It can not have to carry out personnel assignment to project management department.
D. page presentation project name, project name, operation.In action bar, project management department personnel can be carried out and checked.
6.4 progress control
A. weekly, monthly magazine are uploaded during project construction engineering.Realization is filled in program.
B. monthly magazine, weekly title, time, type, project name, upper journalist, annex are shown after entering the page.It can be looked into See, changing, reporting, annex is downloaded.
C. report, modification is the addition and modification to all monthly magazines.What is passed through can not change.
D. check it is to carry out particulars to this monthly magazine to check.Preview can be carried out to annex.
It can be inquired by classification according to engineering name, time, upper journalist.
E. weekly, monthly magazine report flow:Project management department chief inspector/representative (role) reports → project supervision portion (department) specific responsibility (role) examination & verification → → project supervision portion (department) supervisor (role) examination & verification → company leader.
6.5 project digital photographs
Role-security distributes:
1. project management department documenter, specially management person, prison, have clicked to enter " addition " function
After 2. list is clicked and entered in chief inspector/representative, add " examination & verification " function
3. other roles enter, audit after passing through, only " checking ", " comment " authority
A. list, all engineering digital photographs are shown, and display of classifying.File is automatically generated after engineering foundation, Classification upload is carried out by corresponding project personnel, can be uploaded, change, check, deleted.And associate is opened, and It can carry out checking comment.It can be searched according to title, time, type.
B. under the file of project generation, comprising 4 grades of files, there is detailed photographing request and in detail for photo Thin naming rule, and comprising the actual photographed date, actual photographed quantity, shoot people.Photo should pass to corresponding file Under.
C. annex uploads, and selects correct file, clicks on and uploads, and selects photo, adds name of pictures, reports person approving Member, examination & verification are shown after passing through to associate.
D. flow is uploaded:Project management department documenter, management person, specially prison (role) fills in → project management department chief inspector/representative (role) Examination & verification confirms.
6.6 project under construction lists
A. list, all engineering projects are shown, and to the planned record in detail of institute of project.Looked into by administrative staff See, to strengthen the management to projects construction.
B. page presentation is all in the quantity sheet built, including engineering name, project profile, engineering location, acceptance of the bid batch Secondary, plan on-stream time, actual on-stream time, plan time of completion, engineering progress, chief inspector, post, Field Force and correspondent party The contents such as formula, owner contact person and phone.It can all be checked.List presses geographic classification, each area by voltage class and On-stream time arranges.Show project name, area, get the bid batch, time, engineering progress, owner and owner's contact method.Can root Inquired about according to title, area, period, batch of getting the bid, owner.
C. priority assignation:Project supervision portion house steward can carry out checking all projects under construction, and project management department chief inspector can check institute The project under construction of pipe.The project under construction related to itself is then checked for other staff.
6.7 project data
6.7.1 survey control measure
A. list, into the title of rear page presentation survey control measure, project name, time, upper journalist.Can be to filename Claim, project name, the period, upper journalist is inquired by classification.
B. it can be reported, be checked, be deleted, annex is checked and down operation.
C. report, reported in the heart on stream.The title of survey control measure is filled in, selects project, uploads annex, is carried out Report
A. survey control measure auditing flow:Project management department chief inspector/representative (role) reports → project supervision portion (department) specific responsibility (angle Color) examination & verification → project supervision portion (department) supervisor's (role) examination & verification → professional chief engineer (role) approval.
6.7.2 quality appraisal report
A. the title of rear page presentation quality appraisal report, project name, time, upper journalist are entered.Can be to filename Claim, project name, the period, upper journalist is inquired by classification.
B. it can be reported, be checked, be deleted, annex is checked and down operation.
C. report:Reported in the heart on stream.The title of gap filling macadam assessment report, project is selected, uploads annex, Reported.
D. quality appraisal report auditing flow:Project management department chief inspector/representative (role) reports → and project supervision portion (department) special Blame (role) examination & verification → project supervision portion (department) supervisor's (role) examination & verification → company technique director (role) approval.
6.7.3 management is summarized
A. the title that rear page presentation management is summarized, project name, time, upper journalist are entered.Can be to filename Claim, project name, the period, upper journalist, inquired by classification.
B. it can be reported, be checked, be deleted, annex is checked and down operation.
C. report:Reported in the heart on stream.The title of management summary is filled in, selects project, uploads annex, Reported
D. auditing flow is summarized in management:Project management department chief inspector/representative (role) reports → and project supervision portion (department) special Blame (role) examination & verification → project supervision portion (department) supervisor (role) examination & verification → company leader (role) approval
6.7.4 Project Process data management
Role-security distributes:
1. project management department documenter, specially management person, prison, have clicked to enter " addition " function
After 2. list is clicked and entered in chief inspector/representative, add " examination & verification " function
3. other roles enter, audit after passing through, only " checking ", " comment " authority
A. commencement of works is made, engineering is returned to work makes, engineering moratorium, inspection of documents record, management contact are single, management Advice note, management advice note reply sheet, management report, meeting summary, management side reporting, safe sidegating effect record, management Inspection record, witness sampling statistical form, supervision diary, (construction drawing preliminary examination record sheet, quality safety activation record, transmitting/receiving file Record sheet, rear supplement 3) management, can be reported, change, check, be deleted.And associate is opened, and can enter Row checks comment.
B. page presentation title, time, type, upper successor, annex.Online preview and download can be carried out to annex.
C. function is added:After opening the page, title is filled in, type, is illustrated, uploaded annex, submit to auditor
D. report flow:Project management department documenter, management person, specially prison (role) fills in → project management department chief inspector/representative (role) Examination & verification confirms.
6.7.5 completion data management
A. completion information, project name, time, upper journalist, annex are shown after entering.Can according to project name, period, Upper journalist is inquired by classification.
B. can carry out reporting completion information, the operations such as annex is checked and downloaded.
C. report flow:Project management department chief inspector/representative (role) reports → project supervision portion (department) specific responsibility (role) examination & verification And issue examination record → project management department chief inspector/representative (role) rectification → project supervision portion (department) specific responsibility (role) and check and confirm → Synthesis Department (department) specific responsibility (role) reception → project management department chief inspector/representative (role), which uploads to transfer, proves scanned copy (through grinding institute Archive office's data transfers inventory, the data inventory transferred to owner)
D. opened after reporting and report the page, there is project name, the time, upper journalist, fill substance, upload annex, then Submit to next step person approving.Person approving fills in opinion, judges whether to submit to after in next step, until completing.If no By being reported again after needing upper journalist's modification.All by rear carry out data transfer, uploading to transfer proves, flow finishes.
7. system administration
7.1 user management
User management is the module being managed to login user information.
A. list, shows user profile original list, the address name of page presentation user, login name, password, steps on Record role, affiliated function's information.Function button has " modification ", chooses respective record, clicks on " modification ", can change the login of user The information such as name, password, role, department.
7.2 division management
Division management is the management function module to user affiliated function.
A. list, show department information original list, shown by tree structure.
B. function button has " addition ", " modification ", " deletion ".Record is chosen, is clicked on " addition ", inputs department name, then Subdivision can be created in department is chosen, chooses record, clicks on " modification ", the department name for choosing department can be changed.Choose Department, click on " deletion ", if the department is without personal information, the department can be deleted.
7.3 Role Management
Role is the module being managed that Role Information is logged in user.
A. list, character list information is shown first into the page.Function button have " addition ", " modification ", " delete Except ", click on " addition ", after input role name is referred to as, a new role can be added, choose role in list, click " is repaiied Change ", the title of role can be changed, chooses role, is clicked on " deletion ", if the not user profile of the role, can delete choosing Middle role.
7.4 menu management
Menu management is the functional module being managed to custom menu column menu list.Show first into the page Menu list information, by tree-like displaying.Function button has " addition ", " modification ", " deletion ".Click on " addition ", in input menu After title, menu links character string, root node menu can be added, if choosing existing menu, clicks on " addition ", then can choose Menu item adds child node menu below.Existing menu is chosen, is clicked on " modification ", the title selected choices from menus, connection etc. can be changed Information.Select choices from menus, click on " deletion ", can delete and select choices from menus.
7.5 rights management
Rights management is the functional module being managed to login user authority.
A. list, the permissions list information of the affiliated role of currently logged on user is shown.List information is by tree structure Check box displaying in front.The character list combobox of click function button area, chooses role, can check the power for choosing role List is limited, and can be modified in functional module list area.
7.6 dictionary management
System development uses table.
The Training Management unit is communicated with the individual office unit, and the Training Management unit is configured as pin To examination question, paper, exam pool be added, change, delete, check that user independently selects examination question to be practised, and examination test With statistics;
8. Training Management
Examination system:In terms of examination system is divided into test questions management and in terms of student's examination.
8.1 test questions management
It is mainly that keeper is added to examination question, paper, exam pool in terms of test questions management, changes, delete, check.
8.1.1 test questions management
A. test questions management is divided into test questions management, adds examination question, imports three functions of examination question.
B. test questions management:The examination question of all additions of page presentation, it is divided into examination question title, examination question type, specialty, knowledge class.
C. check, can carry out selection according to examination question type, knowledge classification, exam pool and check.
D. change, all can be to carrying out examination question type, specialty, the modification of knowledge class to every one of examination question.
8.1.2 examination question is added
Addition examination question be add one of new examination question into test item bank, it is necessary to select examination question type (single choice, multiselect, judgement, The type such as simple), knowledge point.According to different examination question types, different fill substances, answer are carried out to this examination question.Finally carry out Preserve.
8.1.3 examination question imports
Test item bank can be introduced directly into from excel files.
A. first download masterplate (masterplate only could fill out, and can not change)
B. according to masterplate, corresponding examination question related content is added in excel masterplate files.
C. exam pool is selected, uploads the examination question filled.
8.2 managing test paper
Managing test paper is mainly to manage the paper required for examination, can create new paper, check paper.
8.2.1 managing test paper
A. the paper of all additions, including paper title, duration, classification, founder, state are listed.
B. state, which is divided into, has reached the standard grade and offline, and to have reached the standard grade when just creating, after offline, student can not take an exam again.
C. paper is checked, paper is clicked on, the content of paper can be checked in detail.
8.2.2 create new paper
A. it is used for adding a new paper.
, it is necessary to fill in paper title during establishment, selection group volume mode, paper type, passing score, duration of taking an examination.
B. group volume mode is divided into automatic volume group and group is rolled up manually.
1. automatic volume group:Need according to examination question type selecting quantity and fraction.Then knowledge class is selected, can multiselect.Then Addition, can automatically generate a paper according to condition.
2. group volume manually:Selection is manually after group volume, it is necessary to keeper manually selects every examination question composition paper, examination question be by Chosen in test item bank.
8.3 data management
Data are that examination question, the essential information of paper are added, and are changed, and are deleted.Including item bank management, knowledge point pipe Reason, examination question type management etc..
8.3.1 item bank management
A. exam pool can be added, deleted, modification.
Addition:Increase new exam pool, it is necessary to fill in exam pool title, describe.
Delete, modification:Exam pool is deleted and changed, modification can change Name and Description.
8.3.2 knowledge classification
Page presentation, knowledge point title, affiliated exam pool, description.It can be inquired about according to exam pool.
Knowledge point can be added, deleted.
, it is necessary to select exam pool type when adding knowledge classification, Name and Description is then added.
8.3.3 tag class
Can be sky to the label of paper addition.
Label is managed, can be increased, is deleted, modification.
8.4 examination questions are practised
8.4.1 strengthened exercises
Strengthened exercises are mainly used in student and carry out specific exercises, independently select specific examination point, defeat in detail.Open to strengthen and practice After habit, exam pool type is selected, selects examination question type., can be according to selected exam pool type and examination question class into the strengthened exercises page Type lists all examination questions, so that student is learnt, exercise.
8.4.2 mistake topic exercise
After opening wrong topic exercise, continuous page is inscribed into mistake.The wrong topic of institute done is included in mistake topic exercise.To learn pin Study to property.
8.4.3 random exercise
Intelligently set a question according to your Grasping level to examination point, lift integration capability., will be random into after the random exercise page Selection exam pool pilot scale topic is learnt with student.
8.5 examination tests
A. all examination papers are shown after entering.
B. paper is selected, can be taken an exam.Into the examination page, page presentation test time, all examination questions of this paper.
C. paper, which has been beaten, to be handed in an examination paper, if the time arrives, handed in an examination paper automatically.
8.6 examination statistics:Student's total marks of the examination are shown, to facilitate management statisticses.After keeper can check examination each time, Student's achievement of all examinations, so that specific aim is analyzed.Page presentation paper, all students to take an examination are shown after click With achievement.
9. file administration
9.1 business archive
9.1.1 honor management
Honor management is the functional module being managed to associate's honor.
A. list, show staff's name, prize-winning type, prize-winning time, it the pipe such as can be increased, be deleted, being changed, being looked into honor Reason.
Inquiry can obtain the time according to personnel's name, type (engineering project/enterprise innovation achievement/individual/collective) of winning a prize Carry out screening inquiry.
B. increase can fill in corresponding honor information and be added.
Record is chosen, clicks on " modification ", corresponding honor information can be modified.
Record is chosen, clicks on " deletion ", corresponding honor information can be deleted.
Honor field should include:Personnel's (any field contents of personal information table can be included), obtain time, prize-winning type
9.1.2 patent administration
Patent administration is the functional module being managed to company, the same honor of function.
9.2 Contract Document
The extension of Contract Document is carried out using development interface.
10. mobile terminal
The client also includes mobile terminal, the mobile terminal includes video conference unit, work attendance is registered unit, treats Do examination & approval unit, project status inquiry unit, news unit, notice bulletin unit, mail transmission/reception unit, circulation of official document unit, Flow initiates unit, address list display unit and shared information unit;
Mobile terminal in the present embodiment has 1 to fill in less, more touch-controls;2 is well arranged, function is easily looked for, simple operation;3 All the time provide and clearly navigate;4 automatically save the content of user's input;5 be mostly Supervision Project portion librarian use;6 people from administrative department Member use, mostly check project essential information, news, notice bulletin and it is pending.
10.1 video conferences
The video conference unit carries out real-time video between being configured as realizing site supervision project management department member client Meeting, supports more people Online Video simultaneously, mode of initiating include initiating in group and it is single initiate, other people add, the WEB is whole Support video conference, and WEB terminals and mobile terminal video image synchronous simultaneously in end;
A. more people while Online Video function, mode is initiated:
1. initiated in group
2. single initiate, other people add
B. mobile phone, computer end image synchronous, a side initiate, and computer end can check actual originator with mobile phone terminal, and select Add, image synchronous.
10.2 work attendance is registered
Note:After registering, information of registering is included in program, and adopts current phone positional information automatically and preserve in the lump
1. overall register, in total generation, may be selected to be currently located Supervision Project portion.The page enumerates all project management department members, acquiescence Display is red.Whether in total generation, can click on RED sector, eject " completing to register ", select "Yes" then to register, and judge current time Whether exceed registering the time for administrative staff's setting, " being late " is prompted if time-out.And the information that will register is included in program automatically Preserve
2. a people registers, everyone selects to be currently located project management department, and the page only shows current login people's information, selects and sign Arrive
Verify mode of registering:Scene takes pictures+and timestamp is as checking
10.3 pending examination & approval
Outstanding work module can count all works at present that the personnel of logging in are related to (in progress, pending), intuitively Check, simplify leader's examination and approval work.
10.4 project basic conditions are checked
Function describes:
A. list, all engineering projects are shown, and to the planned record in detail of institute of project.Looked into by administrative staff See, to strengthen the management to projects construction.
B. page presentation is all in the quantity sheet built, including engineering name, project profile, engineering location, acceptance of the bid batch Secondary, plan on-stream time, actual on-stream time, plan time of completion, engineering progress, chief inspector, post, Field Force and correspondent party The contents such as formula, owner contact person and phone.It can all be checked.List presses geographic classification, each area by voltage class and On-stream time arranges.Show project name, area, voltage class, batch of getting the bid, time, engineering progress, owner and owner's contact Mode.Can be according to title, area, the period, batch of getting the bid, owner inquired about.
All-work, project management department's demographic's list are added, intuitively consults all engineerings and on-the-job personnel, and is counted pair Answer quantity.
10.5 news
Function describes:
A. it is used to transmit news.Personnel can be checked.
B. page presentation has title, author, issuing time, content Description.
C. can be inquired by classification according to title, content, author, issuing time section.
D has issue, deletes function.During issue, window is opened, title is added, content Description, input content, uploads and shine Piece, issue successfully.Delete, the news out of date not shown can be deleted.
10.6 notice bulletin
Function describes:
A. it is used to send department to notify, bulletin.It can be sent during transmission according to department, different people is carried out acquisition notice Bulletin.
Page presentation has title, author, issuing time, content Description.
B. inquire about, can be inquired by classification according to title, content, author, issuing time section.
C. issue, delete.During issue, open window, add title, content Description, input content, selection receive department or Personnel, issue successfully.Delete, the notice bulletin out of date not shown can be deleted.
10.7 Inner emails
Mail management is the mailing system of internal system, comprising unread mail, writes mail, Inbox, has sent mail Four functions.
A. unread mail
List all Inner emails do not checked.Corresponding mail is clicked on, the details of the mail can be checked, Include sender, outbox time, addressee, mail header, Mail Contents, annex etc..Annex supports online preview and download.
B. mail is write
The new Inner email of an envelope can be write with the personnel for sending mail authority, it is necessary to fill in addressee, title, interior Appearance, significance level and annex.After mail is sent, message can be shown by WEB terminal and App ends homepage, click can check this Mail particular content.
C. Inbox
List all Inner emails received.The mail details can be checked by clicking on respective record.
D. sent
List all Inner emails sent.
E. priority assignation
The personnel that can send, receive mail can be configured.Significance level rank and corresponding stage can be set Other mail pot-life etc..
10.8 official documents
A. official document flow of company level:Title, the font size of official document are filled in by specific responsibility personnel, transfer to drafter to make a draft and sign, Style of writing people signature, the people that checks papers check contribution and signed, finally via all departments (general management department, accounting division, safety monitor Quality Mgmt Dept, project supervision portion) countersign, then transfer to assistant manager's signature, submission to be signed by chief engineer, secretary's signature, finally by always passing through Reason is signed and issued, after the completion of by specific responsibility personnel fill in style of writing the time, the time of issuing, impression, finally click on " issuing " button, can be following Hair causes corporate departments.
B. department level official document flow:Department specific responsibility personnel fill in corresponding notice, informal letter information, transfer to department manager to sign After batch, it is issued to via departmental manager in departmental staff's hand, the personnel for receiving message click on "read", then in the notice The personnel, which are added, after message has read acknowledgement message.
10.9 flow is initiated
Supervision Project portion uses.Corresponding flow to be clicked on, into the page is initiated, clicks on " submission " button, flow is initiated to complete, And enter examination & verification link.
It is related to flow:Ask for leave, application of leaving office (being supplemented after need to discussing jointly)
It is necessary to determine whether that mobile phone terminal needs start flow, because mobile phone fills in inconvenience, recommends to make when flow is initiated With PC ends
10.10 address lists
Tree shows department and its lower personnel's name, clicks on name, right side show personnel's essential information (name, Sex, post, phone, outer net mailbox)
10.11 Regulations (shared data)
Function is shown, for checking form:Doc, pdf, exl, wait to supplement, other forms are realized according to program to be judged.
In the present embodiment, the system also includes management and control main station system, some engineering site acquisition systems and some movements Terminal;
The management and control main station system includes management and control server, and the management and control server passes through internet passage and the engineering Collection in worksite system connects, for handling the data received;
The engineering site acquisition system is installed on each to be included by management and control engineering site, the engineering site acquisition system Data collecting system and video monitoring system, the data collecting system include temperature sensor, humidity sensor and environment ginseng Number sensors, for gather by management and control engineering site data and and be encrypted, transmit to management and control main station system;The video prison Control system acquisition engineering site video signal transmission to the management and control server and carry out management and control;
The mobile terminal includes control module, personnel positioning apparatus, video monitoring apparatus, communication module and fingerprint collecting Identification module, for gathering the management video signal transmission of supervisor's positional information and supervisor to the management and control server Carry out management and control.
Optional in the present embodiment, the management and control main station system also includes client, server end and database;
Client's device end is WEB terminals, carries out overall process intelligence engineering supervisory information management and control;
The server end is analyzed and controlled for receiving the data that client transmissions are come, and will analyze the knot with control Fruit data are back to client, and the result data of initial data and analysis and control is transmitted to database purchase;
Database, the database are used for the data that storage server end transmits.
Optional in the present embodiment, the engineering site acquisition system includes encryption device, the data collecting system Transmitted after being encrypted by the encryption device to management and control main station system.
Optional in the present embodiment, the control module of the mobile terminal uses microcontroller, the miniature control Device is connected with personnel positioning apparatus, video monitoring apparatus, communication module and fingerprint acquiring and identifying module respectively, the miniature control Device is connected by the communication module with the management and control main station system.
Optional in the present embodiment, the personnel positioning apparatus uses GPS positioning device.
Optional in the present embodiment, the video monitoring apparatus uses high-definition camera.
Optional in the present embodiment, the high-definition camera is connected with three-dimensional processor, and the three-dimensional processor will be adopted Transmitted after collection image three-dimensionalization processing to the microcontroller.
Optional in the present embodiment, the fingerprint acquiring and identifying module includes finger print acquisition module and fingerprint recognition mould Block, the finger print acquisition module gather finger print information, and transmit to the connected fingerprint identification module and carry out fingerprint knowledge Not, and with microcontroller the finger print information obtained by the management and control main station system compares.
Optional in the present embodiment, the mobile terminal also includes touch display screen.
Optional in the present embodiment, the communication module uses 3G/4G wireless communication modules or ZigBee radio communications Module.
Beneficial effects of the present invention:
A kind of overall process intelligence engineering supervisory information managing and control system of the present invention, realizes project supervision information overall process Intelligent management and control, the system can provide project supervision information and perfect, effective analysis fast, accurately and comprehensively, to engineering The overall process of management carries out management and control.
It will be understood by those skilled in the art that above-mentioned each module of the invention or each step can use general computer Device realizes that alternatively, they can be realized with the program code that computing device can perform, it is thus possible to they are deposited Storage performed in the storage device by computing device, either they are fabricated to respectively each integrated circuit modules or by it In multiple modules or step be fabricated to single integrated circuit module to realize.The present invention is not restricted to any specific hardware With the combination of software.
The preferred embodiment of the application is the foregoing is only, is not limited to the application, for the skill of this area For art personnel, the application has various modifications and variations.All any modifications within spirit herein and principle, made, Equivalent substitution, improvement etc., should be included within the protection domain of the application.

Claims (10)

1. a kind of overall process intelligence engineering supervisory information managing and control system, it is characterized in that:The system includes:
Client, client's device end are WEB terminals, including individual office unit, integrated management unit, information centre's unit, Management unit, safety quality management unit, project management unit, System Management Unit, Training Management unit and archives pipe Manage unit;
The individual office unit is configured as the acquisition and upload of personal daily Working information, the graphical representation of engineered locations And the acquisition of project profile information, the management for mail of handling official business, the management of the copending official document of intra-company's engineering, and manage pipe The flow management and control of reason, safety inspection quality, engineering project and integrated information;
The integrated management unit is communicated with the individual office unit, and the integrated management unit is configured as equipment pipe Reason, equipment query, Report Server Management, system administration and low value easily consume the goods and materials account management of article, the integrated pipe of human resources Reason, the archive of books account, displaying, inquire about, deposit the management borrowed, the management of information of vehicles and lending record, and employee's allotment, The management and control of examination;
Described information center cell is communicated with the individual office unit, described information center cell be configured as news and Transmission, displaying, inquiry, the upload issue of bulletin is notified to be deleted with modification;
The management unit is communicated with the individual office unit, and the management unit is configured as contract pipe Reason, design alteration, Site visa-an important chain, data clearing and scheduled fun report the Cost Management of examination & verification, and cost statistics and expense Shen The cost management of report;
The safety quality management unit is communicated with the individual office unit, and the safety quality management unit is configured For the displaying and maintenance of safety construction form, rectify and improve advice note check oneself and/or Ministry of State Security issues, security risk is reported and submitted clearly Single reports, the generation of management initial survey report, the generation and upload of project integration card;
The project management unit is communicated with the individual office unit, and the project management unit is configured as project conjunction Same checks, the change and displaying of engineering information, the establishment application in Supervision Project portion, member management, and construction project is entered Degree management, if the graph visualization data of engineering project upload management, the displaying of project under construction, and survey control measure data, matter Measure the management of assessment report, management summary, Project Process data and completion information;
The System Management Unit is communicated with the individual office unit, and the System Management Unit is configured as management and stepped on User profile, management user affiliated function are recorded, management user logs in role, management custom menu column menu list, administrative login User right, and management system development use table.
The Training Management unit is communicated with the individual office unit, and the Training Management unit is configured as examination Topic, paper, exam pool are added, change, delete, checked that user independently selects examination question to be practised, and examination test and system Meter;
The file administration unit is communicated with the individual office unit, and the file administration unit is configured as to honor The management of data, Patent data and Contract Document;
Server end, the server end are analyzed and controlled for receiving the data that client transmissions are come, will analysis and control The result data of system is back to client, and the result data of initial data and analysis and control is transmitted to database purchase;
Database, the database are used for the data that storage server end transmits.
2. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 1, it is characterized in that:The individual does Public unit includes routine office work information unit, engineering map unit, mail management unit, official document management unit, flow management and control list Member and address list unit;
The routine office work information unit is configured as the displaying of current project progress, notifies, the displaying of notice information, statistics The displaying of user's outstanding work situation, share data displaying, user register situation calendar displaying;
The engineering map unit is configured as after receiving engineering information and marking guard station position, and marked region is with the highlighted exhibition of red point Show positional information and engineering information, the engineering information include title, management department, project leader, area, voltage class, Call for bid batch, owner's unit, plan beginning and ending time, actual beginning and ending time;
The official document management unit is configured as carrying out examination & verification management to intra-company's official document, specifically includes examining for official document of company level Core management and the examination & verification management of department level official document;
The flow management and control unit is configured as the flow pipe of management, safety inspection quality, engineering project and integrated information Control;The flow management and control unit respectively with the management unit, the safety quality management unit, the project management list Member and integrated management unit communications, each administrative unit carry out the initiation of corresponding flow, after the completion of enter the official document management list Member is audited;
The address list unit is configured as the displaying of various pieces personnel and its corresponding essential information, and the essential information includes Name, sex, post, phone, outer net mailbox.
3. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 2, it is characterized in that:The current work Cheng Jindu displaying specifically includes the displaying of overall progress and the displaying for progress of itemizing, and different power are set according to user's different role Limit;If Supervision Project portion always for role, then overall progress and subitem progress are safeguarded;Otherwise, it can only check that engineering is entered Degree and acquisition project essential information.
4. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 31, it is characterized in that:It is described daily Working information unit is additionally configured to monitoring project aggregate scheduling, and respectively when monitoring project aggregate scheduling 50%, 100%, The client of all members sends the prompting message of " notice (collecting cost of superintendence) " under to management department.
5. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 1, it is characterized in that:It is described of company level The examination & verification management of official document specializes in official document title and the font size information that human roles are filled in by its client, drafter role to receive Document information is received by its client and is made a draft and is signed, the style of writing people role receives drafter's signature by its client Rear official document is simultaneously signed, the people role that checks papers the official document after style of writing people's signature is received by its client and check papers and Signature, each department by its client receive check papers people sign after official document go forward side by side guild sign, and successively by audit role at it Client receives the official document of its subordinate signature and signed, and official document is issued extremely by the client of general manager role after the completion of signature The client of human roles is specialized in, is issued final official document after uploading style of writing time, the time of issuing, impression, company is each Departmental staff receives official document by its client and checked, and record has read acknowledgement information;
The examination & verification management of the department level official document is that department specific responsibility personnel fill in corresponding notice by its client, informal letter information passes Transport to department manager to be signed, the official document signed transmits to the client of departmental manager the client for being issued to departmental staff End, information has been read in the client reception for receiving the personnel of message, and is added the personnel after the notification message and read back to hold and disappear Breath.
6. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 1, it is characterized in that:The integrated pipe Reason unit is communicated with the flow management and control unit, and the integrated management unit includes handling of goods and materials unit, human resources pipe Manage unit, books administrative unit, Vehicle management unit and personnel's control unit;
The handling of goods and materials unit is configured as management equipment storage, equipment outbound, equipment are retracted, the equipment control of equipment scrapping Unit, manages the Report Server Management unit of goods and materials report messages, and the low value for the management account that management low value easily consumes article easily consumes management Unit, and the system that statistics device management unit, Report Server Management unit and low value easily consume the record information of administrative unit and shown Count unit;
The human resource management unit is configured for personnel's basic information management, recruitment is managed, severed labor relations, room Room lease, staff training, personnel's certificate management, the keeping of all kinds of certificates, the pipe to company human resource information of honor management Reason and maintenance function module;
The books administrative unit is configured as the archive of books account, displaying, inquires about, deposits the management borrowed, the pipe of books account Reason includes the management of company's books machine account and the management of project management department's books machine account;
The Vehicle management unit is configured as carrying out all vehicles archival of information, classified inquiry, addition modification information of vehicles With the vehicle information management of vehicle application, the lending to vehicle, the generation lending record management that record is achieved is given back;
Personnel's control unit is configured as plan off duty, the management of work attendance plan and examination;The management of the plan off duty Reporting, show and inquiring about for plan off duty;Management the declaring, show and inquiring about for work attendance plan of the work attendance plan;Institute Stating the management of examination includes examination and automatic examination manually.
7. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 1, it is characterized in that:It is described to manage pipe Reason unit is communicated with the flow management and control unit, and the management unit includes contract management unit, Cost Management list Member and cost management unit;
The contract management unit is configured as the checking of contract information summary sheet and its annex, downloads and individual event contract information Export, addition, monitoring project aggregate scheduling respectively when 50%, 100%, to management department under all members visitor Family end sends the addition of " notice (collecting cost of superintendence) " prompting message;
The Cost Management unit includes displaying, record, the design alteration unit of examination & approval design alteration information, displaying, record, examines The Site visa-an important chain unit of Site visa-an important chain information is criticized, displaying, record, the construction clearing unit of examination & approval construction settlement information, is shown, note Record, the scheduled fun examination & verification unit of examination & approval scheduled fun msu message;
Displaying, inquiry, download and the examination & verification that the cost management unit is configured as cost statistics and expense is declared.
8. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 1, it is characterized in that:The safe matter Amount administrative unit is communicated with the flow management and control unit, and the safety quality management unit includes displaying with safeguarding safety text The safety construction form unit of bright construction form, rectify and improve advice note check oneself and/or rectification advice note that Ministry of State Security issues Unit, security risk is reported to report and submit the security risk of inventory to report and submit inventory unit, the management initial survey list of generation management initial survey report Member, and project integration card unit of the generation with uploading project integration card.
9. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 1, it is characterized in that:The project pipe Reason unit is communicated with the flow management and control unit, and the project management unit is including checking, inquiring about, download items contract Project contract unit, change and the engineering information unit of displaying engineering information, the establishment application in Supervision Project portion, member management Supervision Project portion administrative unit, report, change, checking the progress control unit of construction project weekly, monthly magazine, construction project The graph visualization data of project upload the project number photo unit of management, show the project under construction guide look list of project under construction Member, and manage the item of survey control measure data, quality appraisal report, management summary, Project Process data and completion information Mesh data management unit.
10. a kind of overall process intelligence engineering supervisory information managing and control system as claimed in claim 1, it is characterized in that:The client End also includes mobile terminal, the mobile terminal includes video conference unit, work attendance is registered unit, pending examination & approval unit, project Status inquiry unit, news unit, notice bulletin unit, mail transmission/reception unit, circulation of official document unit, flow are initiated unit, led to News record display unit and shared information unit;
The video conference unit carries out real-time video meeting between being configured as realizing site supervision project management department member client, Support more people Online Video simultaneously, mode of initiating include initiating in group and it is single initiate, other people add, the WEB terminals are same When support video conference, and WEB terminals and mobile terminal video image synchronous;
The register entirety that carries out of client of unit including Supervision Project portion total generation of the work attendance is registered and each subscription client Individual register, checking registers mode to obtain the photo taken pictures of scene and timestamp simultaneously as the verification mode verified.
CN201710949090.2A 2017-10-12 2017-10-12 A kind of overall process intelligence engineering supervisory information managing and control system Pending CN107705020A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710949090.2A CN107705020A (en) 2017-10-12 2017-10-12 A kind of overall process intelligence engineering supervisory information managing and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710949090.2A CN107705020A (en) 2017-10-12 2017-10-12 A kind of overall process intelligence engineering supervisory information managing and control system

Publications (1)

Publication Number Publication Date
CN107705020A true CN107705020A (en) 2018-02-16

Family

ID=61183437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710949090.2A Pending CN107705020A (en) 2017-10-12 2017-10-12 A kind of overall process intelligence engineering supervisory information managing and control system

Country Status (1)

Country Link
CN (1) CN107705020A (en)

Cited By (48)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108470049A (en) * 2018-03-09 2018-08-31 国网上海市电力公司 A kind of construction project management system based on instrument board
CN108629514A (en) * 2018-05-07 2018-10-09 襄阳市尚贤信息科技有限公司 A kind of engineering information technical management system
CN108776888A (en) * 2018-05-24 2018-11-09 合肥亿腾工程咨询有限公司 A kind of information management system based on completion information
CN108876190A (en) * 2018-07-09 2018-11-23 杭州溯影信息技术有限公司 A kind of engineering witness management method, system, device and medium
CN109064126A (en) * 2018-07-18 2018-12-21 长江勘测规划设计研究有限责任公司 Hydroelectric project metrical information management method based on quality driving
CN109087064A (en) * 2018-07-25 2018-12-25 河南太龙药业股份有限公司 A kind of traditional Chinese medicine extraction Process information management system
CN109191081A (en) * 2018-09-18 2019-01-11 温州市勘察测绘研究院 A kind of wisdom site supervision examination & approval platform
CN109215470A (en) * 2018-10-31 2019-01-15 广西路桥工程集团有限公司 A kind of goods electronic sand map system and its construction method based on BIM+GIS
CN109272261A (en) * 2018-11-21 2019-01-25 国网经济技术研究院有限公司 A kind of prison makes live real-time management platform
CN109345076A (en) * 2018-09-04 2019-02-15 上海建科工程咨询有限公司 A kind of whole process engineering consulting project risk management method
CN109447560A (en) * 2018-06-27 2019-03-08 国网甘肃省电力公司金昌供电公司 A kind of materials supply chain intelligence managing and control system
CN109472481A (en) * 2018-10-31 2019-03-15 广东电网有限责任公司 A kind of mesolow distribution engineering overall process stream compression method and device
CN109502218A (en) * 2018-07-31 2019-03-22 上海贝壳供应链管理有限公司 Intelligent hopper management method, system, electronic equipment and storage medium
CN109559088A (en) * 2018-10-18 2019-04-02 深圳壹账通智能科技有限公司 Task management method, device, electronic equipment and storage medium
CN109658044A (en) * 2018-10-31 2019-04-19 广州市城市建设投资集团有限公司 The long APP management system in river and method
CN109685452A (en) * 2018-12-04 2019-04-26 国网河北省电力有限公司石家庄供电分公司 A kind of power supply company's item data management platform
CN109784507A (en) * 2018-12-29 2019-05-21 大连海航科技有限公司 Unit portable terminal
CN110163562A (en) * 2019-04-26 2019-08-23 长沙迪迈数码科技股份有限公司 A kind of mine business backlog processing method
CN110264164A (en) * 2019-06-24 2019-09-20 肖雪松 Promotion of item method and system based on visualization inspection
CN110322224A (en) * 2019-07-03 2019-10-11 福建广电网络集团股份有限公司 A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd
CN110580397A (en) * 2019-09-23 2019-12-17 重庆渝高科技产业(集团)股份有限公司 display system for engineering project centralized display platform
CN110599007A (en) * 2019-08-28 2019-12-20 西安市创新人才研究院 Project progress management system
CN110705960A (en) * 2019-09-16 2020-01-17 深圳供电局有限公司 Paperless construction cost auditing management method and system, client and medium thereof
CN110852578A (en) * 2019-10-25 2020-02-28 国网新源控股有限公司 Mobile operation system for maintenance management
CN111445102A (en) * 2020-02-19 2020-07-24 北京航天智造科技发展有限公司 Cloud service platform on enterprise
CN111444141A (en) * 2020-03-26 2020-07-24 长沙中交京纬工程技术有限公司 Data archive storage method based on BIM
CN111460078A (en) * 2020-03-02 2020-07-28 广州高新工程顾问有限公司 Engineering supervision enterprise knowledge base management system based on flow
CN111553596A (en) * 2020-04-29 2020-08-18 安徽靓马信息科技有限公司 Physical education industry supervision system based on geographic information technology
CN111652454A (en) * 2019-09-24 2020-09-11 云南城市建设工程咨询有限公司 Supervision quality and safety production management evaluation management system
CN111667224A (en) * 2019-03-05 2020-09-15 王民峰 APP for dynamically managing engineering construction based on project division at multiple terminals
CN111709707A (en) * 2020-06-10 2020-09-25 中邮建技术有限公司 Management and control system and method applied to project delivery construction site
CN111767247A (en) * 2020-06-28 2020-10-13 杭州远大档案技术有限公司 File specification and synchronous forming control platform for real-time supervision of engineering data
CN111815283A (en) * 2020-07-09 2020-10-23 北京中百信信息技术股份有限公司 Information system engineering supervision enterprise business management system
CN111932198A (en) * 2020-07-22 2020-11-13 万翼科技有限公司 File auditing method and related product
CN112070465A (en) * 2020-08-26 2020-12-11 中铁济南工程建设监理有限公司 OA cooperative office system for supervision
CN112258374A (en) * 2020-10-15 2021-01-22 湖北省水利水电规划勘测设计院 Engineering general contract expropriation and land movement migrant project management system and method
CN112348473A (en) * 2020-11-10 2021-02-09 湖北福泰建筑装饰工程有限公司 Engineering management information visualization software
CN112633686A (en) * 2020-12-22 2021-04-09 华中科技大学同济医学院附属协和医院 Medical system labor dispatch management system and working method thereof
CN112785250A (en) * 2020-12-31 2021-05-11 思达客教育科技(苏州)有限公司 Medical system labor dispatch management statistical system
CN112907200A (en) * 2021-01-27 2021-06-04 中信国安建工集团有限公司 Pouring order monitoring system and method
CN113011827A (en) * 2019-12-21 2021-06-22 梁先锋 Production process management system based on internet
CN113206847A (en) * 2021-04-29 2021-08-03 广州朗国电子科技有限公司 Conference summary tracking method, device, medium and product based on electronic whiteboard
CN113344519A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Monthly report management method and device of project management system
CN113435687A (en) * 2021-05-12 2021-09-24 中核工程咨询有限公司 Nuclear power supervision analysis system based on big data
CN115600816A (en) * 2022-10-26 2023-01-13 广州市汇源通信建设监理有限公司(Cn) Job site personnel safety identification monitoring system
CN116384667A (en) * 2023-03-18 2023-07-04 江苏嘉裕工程管理咨询有限公司 Engineering supervision monitoring system
CN117408648A (en) * 2023-12-13 2024-01-16 徐州徐工汽车制造有限公司 Information processing method, device, management platform and storage medium
CN117709695A (en) * 2024-02-06 2024-03-15 建发合诚工程咨询股份有限公司 Engineering supervision three-stage technology management and control platform system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
CN103021219A (en) * 2012-11-27 2013-04-03 四川省电力公司技术技能培训中心 Intelligent simulation system for power ERP service
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN104573949A (en) * 2014-12-30 2015-04-29 青岛新华友建工集团股份有限公司 Intelligent construction decision support system
CN104660692A (en) * 2015-02-06 2015-05-27 唐绪文 Engineering information checking system with positioning information
CN105913341A (en) * 2016-04-11 2016-08-31 广州市城市建设工程监理公司 Construction project supervision information management method and system
CN106408254A (en) * 2016-09-06 2017-02-15 江苏智通交通科技有限公司 Highway engineering project supervision system
CN106934852A (en) * 2017-02-16 2017-07-07 西安科技大学 A kind of Project Management System platform based on BIM network technologies

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
CN103021219A (en) * 2012-11-27 2013-04-03 四川省电力公司技术技能培训中心 Intelligent simulation system for power ERP service
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN104573949A (en) * 2014-12-30 2015-04-29 青岛新华友建工集团股份有限公司 Intelligent construction decision support system
CN104660692A (en) * 2015-02-06 2015-05-27 唐绪文 Engineering information checking system with positioning information
CN105913341A (en) * 2016-04-11 2016-08-31 广州市城市建设工程监理公司 Construction project supervision information management method and system
CN106408254A (en) * 2016-09-06 2017-02-15 江苏智通交通科技有限公司 Highway engineering project supervision system
CN106934852A (en) * 2017-02-16 2017-07-07 西安科技大学 A kind of Project Management System platform based on BIM network technologies

Cited By (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108470049A (en) * 2018-03-09 2018-08-31 国网上海市电力公司 A kind of construction project management system based on instrument board
CN108629514A (en) * 2018-05-07 2018-10-09 襄阳市尚贤信息科技有限公司 A kind of engineering information technical management system
CN108776888A (en) * 2018-05-24 2018-11-09 合肥亿腾工程咨询有限公司 A kind of information management system based on completion information
CN109447560A (en) * 2018-06-27 2019-03-08 国网甘肃省电力公司金昌供电公司 A kind of materials supply chain intelligence managing and control system
CN108876190A (en) * 2018-07-09 2018-11-23 杭州溯影信息技术有限公司 A kind of engineering witness management method, system, device and medium
CN109064126A (en) * 2018-07-18 2018-12-21 长江勘测规划设计研究有限责任公司 Hydroelectric project metrical information management method based on quality driving
CN109064126B (en) * 2018-07-18 2021-03-26 长江勘测规划设计研究有限责任公司 Hydropower engineering metering information management method based on quality driving
CN109087064A (en) * 2018-07-25 2018-12-25 河南太龙药业股份有限公司 A kind of traditional Chinese medicine extraction Process information management system
CN109502218A (en) * 2018-07-31 2019-03-22 上海贝壳供应链管理有限公司 Intelligent hopper management method, system, electronic equipment and storage medium
CN109345076A (en) * 2018-09-04 2019-02-15 上海建科工程咨询有限公司 A kind of whole process engineering consulting project risk management method
CN109191081A (en) * 2018-09-18 2019-01-11 温州市勘察测绘研究院 A kind of wisdom site supervision examination & approval platform
CN109559088A (en) * 2018-10-18 2019-04-02 深圳壹账通智能科技有限公司 Task management method, device, electronic equipment and storage medium
CN109658044A (en) * 2018-10-31 2019-04-19 广州市城市建设投资集团有限公司 The long APP management system in river and method
CN109215470A (en) * 2018-10-31 2019-01-15 广西路桥工程集团有限公司 A kind of goods electronic sand map system and its construction method based on BIM+GIS
CN109472481A (en) * 2018-10-31 2019-03-15 广东电网有限责任公司 A kind of mesolow distribution engineering overall process stream compression method and device
CN109272261A (en) * 2018-11-21 2019-01-25 国网经济技术研究院有限公司 A kind of prison makes live real-time management platform
CN109685452A (en) * 2018-12-04 2019-04-26 国网河北省电力有限公司石家庄供电分公司 A kind of power supply company's item data management platform
CN109784507A (en) * 2018-12-29 2019-05-21 大连海航科技有限公司 Unit portable terminal
CN111667224A (en) * 2019-03-05 2020-09-15 王民峰 APP for dynamically managing engineering construction based on project division at multiple terminals
CN110163562A (en) * 2019-04-26 2019-08-23 长沙迪迈数码科技股份有限公司 A kind of mine business backlog processing method
CN110264164A (en) * 2019-06-24 2019-09-20 肖雪松 Promotion of item method and system based on visualization inspection
CN110322224A (en) * 2019-07-03 2019-10-11 福建广电网络集团股份有限公司 A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd
CN110599007A (en) * 2019-08-28 2019-12-20 西安市创新人才研究院 Project progress management system
CN110705960A (en) * 2019-09-16 2020-01-17 深圳供电局有限公司 Paperless construction cost auditing management method and system, client and medium thereof
CN110580397A (en) * 2019-09-23 2019-12-17 重庆渝高科技产业(集团)股份有限公司 display system for engineering project centralized display platform
CN111652454A (en) * 2019-09-24 2020-09-11 云南城市建设工程咨询有限公司 Supervision quality and safety production management evaluation management system
CN110852578A (en) * 2019-10-25 2020-02-28 国网新源控股有限公司 Mobile operation system for maintenance management
CN113011827A (en) * 2019-12-21 2021-06-22 梁先锋 Production process management system based on internet
CN111445102A (en) * 2020-02-19 2020-07-24 北京航天智造科技发展有限公司 Cloud service platform on enterprise
CN111460078A (en) * 2020-03-02 2020-07-28 广州高新工程顾问有限公司 Engineering supervision enterprise knowledge base management system based on flow
CN111444141A (en) * 2020-03-26 2020-07-24 长沙中交京纬工程技术有限公司 Data archive storage method based on BIM
CN111444141B (en) * 2020-03-26 2022-12-02 北京中交京纬公路造价技术有限公司 Data archive storage method based on BIM
CN111553596A (en) * 2020-04-29 2020-08-18 安徽靓马信息科技有限公司 Physical education industry supervision system based on geographic information technology
CN111709707A (en) * 2020-06-10 2020-09-25 中邮建技术有限公司 Management and control system and method applied to project delivery construction site
CN111767247A (en) * 2020-06-28 2020-10-13 杭州远大档案技术有限公司 File specification and synchronous forming control platform for real-time supervision of engineering data
CN111815283A (en) * 2020-07-09 2020-10-23 北京中百信信息技术股份有限公司 Information system engineering supervision enterprise business management system
CN111815283B (en) * 2020-07-09 2021-03-26 北京中百信信息技术股份有限公司 Information system engineering supervision enterprise business management system
CN111932198A (en) * 2020-07-22 2020-11-13 万翼科技有限公司 File auditing method and related product
CN111932198B (en) * 2020-07-22 2024-04-12 万翼科技有限公司 File auditing method and related products
CN112070465A (en) * 2020-08-26 2020-12-11 中铁济南工程建设监理有限公司 OA cooperative office system for supervision
CN112258374A (en) * 2020-10-15 2021-01-22 湖北省水利水电规划勘测设计院 Engineering general contract expropriation and land movement migrant project management system and method
CN112348473A (en) * 2020-11-10 2021-02-09 湖北福泰建筑装饰工程有限公司 Engineering management information visualization software
CN112633686A (en) * 2020-12-22 2021-04-09 华中科技大学同济医学院附属协和医院 Medical system labor dispatch management system and working method thereof
CN112785250A (en) * 2020-12-31 2021-05-11 思达客教育科技(苏州)有限公司 Medical system labor dispatch management statistical system
CN112907200A (en) * 2021-01-27 2021-06-04 中信国安建工集团有限公司 Pouring order monitoring system and method
CN112907200B (en) * 2021-01-27 2024-02-09 中信国安建工集团有限公司 Pouring order monitoring system and method
CN113206847A (en) * 2021-04-29 2021-08-03 广州朗国电子科技有限公司 Conference summary tracking method, device, medium and product based on electronic whiteboard
CN113435687A (en) * 2021-05-12 2021-09-24 中核工程咨询有限公司 Nuclear power supervision analysis system based on big data
CN113344519A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Monthly report management method and device of project management system
CN115600816A (en) * 2022-10-26 2023-01-13 广州市汇源通信建设监理有限公司(Cn) Job site personnel safety identification monitoring system
CN116384667A (en) * 2023-03-18 2023-07-04 江苏嘉裕工程管理咨询有限公司 Engineering supervision monitoring system
CN117408648A (en) * 2023-12-13 2024-01-16 徐州徐工汽车制造有限公司 Information processing method, device, management platform and storage medium
CN117408648B (en) * 2023-12-13 2024-04-09 徐州徐工汽车制造有限公司 Information processing method, device, management platform and storage medium
CN117709695A (en) * 2024-02-06 2024-03-15 建发合诚工程咨询股份有限公司 Engineering supervision three-stage technology management and control platform system

Similar Documents

Publication Publication Date Title
CN107705020A (en) A kind of overall process intelligence engineering supervisory information managing and control system
CN112950162B (en) Information system engineering supervision work distribution management information system
CN111815283B (en) Information system engineering supervision enterprise business management system
CN111008809B (en) Scientific research project application intelligent matching pushing method based on scientific research capability data
US8341089B2 (en) Real estate management system and method
CN110245915B (en) B/S architecture-based job title review management system
CN108009801A (en) Management information system
CN108399531A (en) With no paper on-site recruiting system good at managing
CN108416701A (en) A kind of processing method of the Engineering Project Construction real data based on BIM
CN106796674A (en) For the system and method that business debt is collected money automatically
CN108133299A (en) A kind of smart items manage system
CN105139128A (en) Remote accounting processing method and system
CN106485459A (en) Arbitration case office administration information system platform
CN106716459A (en) System and method for tracking expenses and billing
CN106651679A (en) Property management system
CN107705095A (en) A kind of distributed talent's archive management system
AU2019309314A1 (en) Talent and work experience-centered credit recognition academic management system and method, and system for providing talent contribution bank service using same
CN113449957A (en) Intelligent working system based on PAGEOFFLICE control
Relling Technology in courts in Europe: Opinions, practices and innovations
CN109784271A (en) Video conference air control method and computer readable storage medium
CN113011794B (en) Science and technology project collaborative management system
CN108806005A (en) Freeway toll station standardized platform and construction method
KR102285541B1 (en) Pre-advisory brokerage platform service system for providing experts in related fields of construction deliberation online
CN110070276A (en) A kind of prison prisoner reform through labour total management system and method
Xu et al. Construction Needs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination