CN108470049A - A kind of construction project management system based on instrument board - Google Patents
A kind of construction project management system based on instrument board Download PDFInfo
- Publication number
- CN108470049A CN108470049A CN201810192858.0A CN201810192858A CN108470049A CN 108470049 A CN108470049 A CN 108470049A CN 201810192858 A CN201810192858 A CN 201810192858A CN 108470049 A CN108470049 A CN 108470049A
- Authority
- CN
- China
- Prior art keywords
- construction
- database
- project
- team
- goods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/248—Presentation of query results
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/22—Indexing; Data structures therefor; Storage structures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a kind of, and the construction project based on instrument board manages system, including database server and smart mobile phone and PC machine;It is equipped in database server:Goods and materials order database, financial situation database, construction plan database, construction speed database and construction team's slip condition database;It is had in goods and materials order database, financial situation database, construction plan database, construction speed database and construction team's slip condition database using the engineering account of construction project as the record of keyword;PC machine is equipped with data display systems, which includes:With the project schedule plan node instrument board of construction plan database association, status panel disk of receiving with construction speed database and the associated construction team's status panel disk of construction team's slip condition database, with goods and materials order database and the associated goods and materials of construction team's slip condition database, and spend money status panel disk with the finance of financial situation database association.
Description
Technical field
The present invention relates to a kind of, and the construction project based on instrument board manages system.
Background technology
Current construction project management is all that dialogue, which is linked up, carrys out synchronizing information by safeguarding electrical form by hand.Construction
Person and manager be not usually in the same physical space, therefore the construction party of construction project is equally slapped in real time without image of Buddha manager
Hold goods and materials order data, while manager can not also grasp the state of construction team, the data of construction party and manager can not be same
Step arranges construction plan, construction party to execute construction speed and bring difficulty to manager.
Simultaneously in construction project management process, the structural understaffing of management is faced, project is increasing, and upper management requires day
The ternary contradiction that benefit improves.How to promote the efficiency of management by technological means is problem urgently to be resolved hurrily.
Construction project includes feasibility study, approval, preliminary design reply, bidding, project construction, settles accounts a turn money main points link,
It is related to the relevant departments such as design, construction, management, fortune inspection, scheduling, planning, construction.Operation flow data scatter difference department is different
Between system, barrier between system how is got through, plays data value, realizes tissue flattening, the efficiency of management is promoted, is urgently
The another problem solved.
With the application of B/S and popularizing for O2O concepts, traditional text has added the dynamic method of displaying construction project of table
Through that cannot meet the needs of people, optimization interface when construction project data are shown and for display data real-time update at
Important technological problems to be solved are managed also for construction project.
Invention content
The purpose of the invention is to overcome the deficiencies of the prior art and provide a kind of construction project management based on instrument board
System, interface optimization when realizing capital construction item Dynamic Display and real-time update for display data, ensure construction project mistake
Safety, quality is being controlled, can controlled in journey, is ensured that construction project settles accounts a turn money on time, goods and materials are received in time, is ensured that construction project is constructed
Troop is linked up in time with manager, makes construction project advance to perfect order.
Realizing a kind of technical solution of above-mentioned purpose is:A kind of construction project management system based on instrument board, including number
According to library server, WEB management servers, mobile application server, and an at least smart mobile phone and a PC machine;
The database server, the WEB management servers and the mobile application server are respectively positioned on the same cloud
On server, the smart mobile phone connects the Cloud Server with the PC machine by internet;
Database in the database server includes at least:Goods and materials order database, financial situation database, construction
Plan database, construction speed database and construction team's slip condition database;Goods and materials order database, financial situation database,
The engineering account with construction project is had in construction plan database, construction speed database and construction team's slip condition database
For the record of keyword;
The PC machine is equipped with data display systems, which includes:
With the project schedule plan node instrument board of the construction plan database association and the construction speed database
With the associated construction team's status panel disk of construction team's slip condition database, with the goods and materials order database and described apply
The associated goods and materials of 5 slip condition database of crew are received status panel disk, and the wealth with the financial situation database association
Business is spent money status panel disk.
Further, the project schedule plan node instrument board is equipped with corresponding with the real-time status of each construction project
Construction plan progress bar;
Each construction plan progress bar is equipped with for identifying construction project feasibility study, approval, preliminary design reply, bidding, item
Mesh construction, clearing turn the node scale module of money main points node;
For transferring respective record from construction plan database, the real-time status of construction project and construction plan are carried out
The node comparison module compared;
For transferring respective record from construction plan database, and construction project is shown in the node scale module
Real-time status target advance display module;
When the real-time status of corresponding construction project lags behind construction plan, the node comparison module passes through the plan
Progress display module makes the construction plan progress bar change colour or flicker.
Further, each construction team's status panel disk corresponds to a troop, and corresponding base is shown by construction speed item
The construction speed of project is built, and transfers respective record from construction team's slip condition database, shows corresponding construction team
Construction team's status data;The same day admission that construction team's status data includes at least the construction team is withdrawn from the arena information, personnel's number
Mesh, responsible person's telephone number and working site photo.
Further, the construction speed item includes:
Construction speed scale module for the construction Start Date and expired date for identifying construction project;
For transferring respective record from construction speed database, and corresponding capital construction is shown in construction speed scale module
The construction speed display module of the realtime construction progress of project.
Further, construction team's status panel disk further includes for from the goods and materials order database and described
It transfers respective record in construction team's slip condition database, reminds construction team to report and receive and receive receiving for data packet time and carry
Show module.
Further, goods and materials status panel disk of receiving summarizes each construction project in the goods and materials order database
After data of receiving in real time, for transferring respective record from the goods and materials order database, show corresponding to each construction project
Whether construction team completes to receive and receive data packet, and completes to receive and receive the time of data packet.
Further, each finance status panel disk of spending money corresponds to a construction project, and the finance are spent money status panel
Disk includes:
Instrument board display module includes the circular scale and use of the contract signing amount of money for showing corresponding construction project
In the pointer for the progressive payment amount of money and the arrearage amount of money for indicating corresponding construction project on the circular scale;
Pointer control module controls the pointer and points to for transferring respective record from the financial situation database
The corresponding position of the circular scale.
Further, each smart mobile phone is bound is equipped with sign-out mould of registering with a construction team, the smart mobile phone
Block, the GPS positioning module with the sign-out module binding of registering, and it is micro- for being triggered when the sign-out module of registering starts
Believe that the wechat group trigger module of group, construction team upload the work ticket in work progress, the work after construction by wechat group
Make ticket, class meeting of standing, tell somebody what one's real intentions are into construction team's slip condition database safely.
Further, the smart mobile phone is additionally provided with goods and materials order data editor module, and construction team passes through the object
Order data editor module is provided, material of having received is chosen, and shoot receiving note photo, uploads to the goods and materials order database
In, the uplink time of every receiving note photo is recorded in the money order database.
Further, the PC machine receives the project schedule plan node instrument board and the goods and materials status panel
Disk is mapped on the project process billboard of display screen, and finance status panel disk of spending money is mapped to the financial progress of display screen
On billboard, construction team's status panel disk is mapped on the construction site management and control billboard of display screen, it will be in wechat group
Appearance is mapped on the quasi real time exchange billboard of display screen.
Use a kind of technical solution of construction project management system based on instrument board of the present invention, including database clothes
Business device, WEB management servers, mobile application server, and an at least smart mobile phone and a PC machine;The database clothes
Business device, the WEB management servers and the mobile application server are respectively positioned on the same Cloud Server, the smart mobile phone
The Cloud Server is connected by internet with the PC machine;Database in the database server includes at least:Object
Provide order database, financial situation database, construction plan database, construction speed database and construction team's status data
Library;Goods and materials order database, financial situation database, construction plan database, construction speed database and construction team's state
It is had in database using the engineering account of construction project as the record of keyword;The PC machine is equipped with data display systems,
The data display systems include:It is applied with the project schedule plan node instrument board of the construction plan database association, with described
Work progress data library and the associated construction team's status panel disk of construction team's slip condition database and the goods and materials order numbers
Receive status panel disk according to library and the associated goods and materials of construction team's slip condition database, and with the financial situation database
The associated finance are spent money status panel disk.It has the technical effect that:Realize capital construction item Dynamic Display when interface optimization and
For the real-time update of display data, safety, quality is being controlled, can controlled during ensureing construction project, ensures construction project on time
Clearing turn money, goods and materials are received in time, ensure that construction project construction team is linked up in time with manager, construction project is made orderly to push away
Into.
Description of the drawings
Fig. 1 is that a kind of construction project based on instrument board of the present invention manages the network architecture diagram of system.
Fig. 2 be the present invention a kind of construction project management system based on instrument board in smart mobile phone schematic diagram.
Fig. 3 be the present invention a kind of construction project management system based on instrument board in PC machine schematic diagram.
Fig. 4 is the schematic diagram that a kind of construction project based on instrument board of the present invention manages the data display systems of system.
Fig. 5 be a kind of construction project based on instrument board of the present invention manage project in the data display systems of system into
The schematic diagram of degree plan node instrument board.
Fig. 6 is the construction team in a kind of data display systems of construction project management system based on instrument board of the present invention
The schematic diagram of 5 state body surface disks.
Fig. 7 is that the finance in a kind of data display systems of construction project management system based on instrument board of the present invention are used
The schematic diagram of money status panel disk.
Specific implementation mode
Please refer to Fig.1 to Fig. 7, the present inventor in order to preferably understand technical scheme of the present invention,
It is described in detail below by specifically embodiment, and in conjunction with attached drawing:
Referring to Fig. 1, the present invention it is a kind of based on instrument board construction project management system include database server 12,
WEB management servers 13, mobile application server 14, and an at least smart mobile phone 2 and a PC machine 3.
Database server 12, WEB management servers 13, mobile application server 14 are respectively positioned on Cloud Server 1, intelligence
Mobile phone 2 connects Cloud Server 1 with PC machine 3 by internet.Cloud Server 1 is to rent, and to reduce cost, and can guarantee system
The stabilization of system.Smart mobile phone 2 can access Cloud Server 1 by wireless router or mobile network.PC machine 3 is accessed by router
Cloud Server 1.
Wherein database server 12 is located at the data Layer on basis, and smart mobile phone 2 and PC machine 3 are respectively positioned on five-star business
Layer, WEB management servers 13 and mobile application server 14 are respectively positioned on intermediate Business Logic.
Database in database server 12 includes at least:Goods and materials order database, financial situation database, construction meter
Draw database, construction speed database and construction team's slip condition database.Goods and materials order database, is applied financial situation database
Data in work plan database, construction speed database and construction team's slip condition database are all made of Excel file importing, object
Provide order database, financial situation database, construction plan database, construction speed database and construction team's slip condition database
It is MySOL databases.
It is using the reason of MySOL databases:MySQL database is increased income freely, and safety is stablized, and excellent performance occupies hard
Part is few.
According to 110kV, the main points of construction project construction plan are arranged in 35kV, 10kV project year milestone plan
The date of node, i.e. plan reach feasibility study, approval, preliminary design reply, bidding, project construction, clearing turn money main points node
Date, and established in construction plan database and have record using the engineering account of construction project as keyword, every is remembered
Record all has real-time status and construction plan with each construction project, i.e. plan reaches the date of main points node.
Smart mobile phone 2 binds construction team, i.e., each smart mobile phone 2 corresponds to a construction team, and smart mobile phone 2 is equipped with label
To sign-out module 21, the GPS positioning module 22 with the binding of sign-out module 21 of registering, mobile application server 14 is fixed by GPS
After position module 22 confirms that construction team is located at the job location of corresponding construction project, sign-out module 21 of registering is to database server
12 construction team's slip condition database imports construction team's status data.Construction team's status data includes at least the construction team
Same day admission withdraw from the arena information, personnel's number, responsible person's telephone number, working site photo.Smart mobile phone 2 is equipped with wechat group
Trigger module 23 triggers wechat group after sign-out module 21 of registering startup by wechat group trigger module 23, and wechat group members are at least
Including construction team, design, management, construction team can dynamically be uploaded in the construction process, after construction by wechat group
Work ticket, class meeting of standing, safety such as are told somebody what one's real intentions are at the secure administration procedures data, can also wechat group linked up with design, management, it is above-mentioned
Data are stored in construction team's slip condition database.
The goods and materials order data that smart mobile phone 2 is additionally provided with advanced authentication module 24 and is bound with advanced authentication module 24 is compiled
Volume module 25 can move after the user of smart mobile phone 2 obtains the verification of mobile application server 14 by advanced authentication module 24
Under the support of dynamic application server 14, by goods and materials order data editor module 25, derived from ERP system bridging and sawing sheet
Excel tables and the scene state of receiving choose material of having received, and shoot receiving note photo, upload to goods and materials order data
In library, goods and materials order database automatically records the uplink time of every receiving note photo.
Financial situation database root according to monthly cash flow pay status, count each construction project the progressive payment amount of money and
The arrearage amount of money.
PC machine 3 is equipped with data and imports editor module 31, and data import editor module 31 and are used in WEB management servers 13
Support under, to the goods and materials order database of database server 12, financial situation database, construction plan database, construction
Progress data library and construction team's slip condition database import data, while can also be to having been introduced into goods and materials order database, finance
Slip condition database, construction plan database, construction speed database and construction team's slip condition database data into edlin, such as
It deletes, increases, modification record, increase or delete a certain field, or the specific data of modification, to ensure manager and construction party
The synchronization of data.
Construction project turns money since hair plan portion application for developing, to clearing and terminates, and all construction projects pass through engineering
Account number is as keyword, in goods and materials order database, financial situation database, construction plan database, construction speed database
With corresponding record, the entire management cycle process for construction project of having connected, Ke Yicong are established in construction team slip condition database
Full view angle carries out quantization and observation analysis to the operation flow of construction project.
PC machine 3 is equipped with data display systems 5, and data display systems 5 include:
Project schedule plan node instrument board 51, construction team's status panel disk 52, goods and materials are received 53 and of status panel disk
Finance are spent money status panel disk 54.
Project schedule plan node instrument board 51 is equipped with construction plan corresponding with the real-time status of each construction project
Progress bar.
Each construction plan progress bar is equipped with:
The node scale module 511 of the main points node of construction plan for identifying construction project;
For transferring respective record from construction plan database, the real-time status of construction project and construction plan are carried out
The node comparison module 512 compared;
For transferring respective record from construction plan database, and construction project is shown in node scale module 511
Real-time status target advance display module 513;
When the real-time status of corresponding construction project lags behind construction plan, i.e., non-scheduled time enters corresponding crucial
When node, node comparison module 512 makes the construction plan progress bar change colour or flicker by target advance display module 513,
Play the warning functions such as setting concern, prompting, extension.
Each construction team corresponds to construction team's status panel disk 52, plans according to having a power failure, the Dynamic Announce construction
Troop's this month construction project work plan, i.e. construction project corresponding to construction team's this month, and shown with construction speed item
The construction speed of corresponding construction project.Meanwhile construction team's status panel disk 52 transfers phase from construction team's slip condition database
It should record, show construction team's status data of construction team.
Each construction speed item includes:
Construction speed scale module 521 for the construction Start Date and expired date for identifying construction project;
For transferring respective record from construction speed database, and correspondence is shown in construction speed scale module 521
The construction speed display module 522 of the realtime construction progress of construction project;
Construction team's status panel disk 52 further includes for from goods and materials order database and construction team's slip condition database
Respective record is transferred, construction team is reminded to report the reminding module 523 of receiving for the time for receiving and receiving data packet.
Goods and materials are received status panel disk 53:Summarize the data of receiving in real time of each construction project in goods and materials order database
Afterwards, for transferring respective record from goods and materials order database, show the construction team of each construction project whether complete to receive and
Reception data packet, and complete to receive and receive the time of data packet.
Each construction project corresponds to a finance and spends money status panel disk 54:Each finance are spent money status panel Pan54Bao
It includes:
Instrument board display module 541 includes the circular scale of the contract signing amount of money for showing corresponding construction project with
And it is used to indicate the progressive payment amount of money of corresponding construction project and the pointer of the arrearage amount of money;
Pointer control module 542 controls the pointer and points to institute for transferring respective record from financial situation database
State the corresponding position of circular scale.
A kind of construction project based on instrument board of the present invention manages system, and by smart mobile phone 2, scene carries out data and adopts
Collection, Cloud Server 1 carry out data storage and analysis, then by the project schedule plan node instrument board 51 in PC machine 3, construction team
Status panel disk 52, goods and materials receive status panel disk 53 and finance are spent money, and status panel disk 54 carries out data displaying, and structure utilizes
Internet adds and big data technology, and the construction project based on instrument board manages system.Manager passes through project schedule plan section
Point instrument board 51, construction team's status panel disk 52, goods and materials receive status panel disk 53 and finance are spent money on status panel disk 54
The data of displaying, to construction team dynamic examine, registered to scene according to construction team, report receive, the data packet time, carry out
Resultant awards are punished.
Project schedule plan node instrument board 51 and goods and materials status panel disk 53 of receiving are mapped to the item of display screen by PC machine 3
On mesh progress billboard, financial status panel disk 54 of spending money is mapped on the financial progress billboard of display screen, by construction team's shape
State instrument board 52 is mapped on the construction site management and control billboard of display screen, quasi real time to display screen by the content map of wechat group
It exchanges on billboard.
A kind of construction project based on instrument board of the present invention manages system, by under line-line on-line under industry mutually
Networking O2O management modes realize that the safety, quality of construction project, clearing turn the management objectives such as money on schedule.That is construction project process
Middle safety, quality is being controlled, can controlled;Construction project settles accounts a turn money on time, goods and materials are received in time;Construction project construction team and management
Side is linked up in time ensures construction project advance to perfect order.
A kind of construction project based on instrument board of the present invention manages system, can reduce current project sites management
Workload;Realize the work attendance statistics management of construction team;Realize that engineering site goods and materials status data of receiving timely updates statistics;
Realize project finance spend money state, project process statistic analysis;Project goods and materials are carried out using data analysis technique to receive shape
State, project process state, finance spend money statistic analysis, for construction project, manager provides information service;Fully use net
Network technology realizes online interconnection, information sharing, improves the efficiency and level of work.
A kind of construction project based on instrument board of the present invention manages system from making responsibility, Optimizing Flow, clear system in order
It is the starting point to be notified to examination etc. with optimization, the data that operation flow generates under the line of construction project management is considered as a whole, according to number
According to dimension, be decomposed into quasi real time with non-real-time data (monthly, season) data, by the analysis to data, to Business Stream under line
The implementation effect of journey is assessed, if there is deviation just to carry out feedback control, finally realizes the target being managed to construction project.
PC machine 3 is equipped with safety management module 33, for passing through WEB server 13, to administrator after the login of PC machine 3,
To the goods and materials order database of database server 12, financial situation database, construction plan database, construction speed database
Multilayer setting, safety management mould are carried out with the permission that the data in construction team slip condition database are imported, edited or transferred
Block 33 is additionally operable to, by mobile application server 14, to user after the login of smart mobile phone 2, operate the power for sign-out module 21 of registering
Limit, that is, allow the GPS positioning information registered to be defined, and also obtaining movement by advanced authentication module 24 to smart mobile phone 2 answers
The user verified with server 14 is defined.
A kind of construction project management system based on instrument board of the present invention is passing through PC machine 3, mobile application server 14
It is constructed outside the ability for resisting illegal invasion with WEB management servers 13, is additionally provided with backup server 10, backup server 10 is same
When connection database server 12, mobile application server 14, WEB management servers 13.Backup server 10 can be located at cloud
On server 1, it is independently of Cloud Server 1.
Therefore, physically, a kind of construction project management system based on instrument board of the invention ensures that there is no possibility
Single Point of Faliure, it is possible to provide the backup of data.Database server 12, mobile application server 14, WEB management take the number in 13
Backuped on backup server 10 according to regular automatic or manual, can database server 12, mobile application server 14,
Backup Data is refunded when data corruption, loss in WEB management servers 13, realizes that certain data are restored, is convenient for
The maintenance of system.
Those of ordinary skill in the art it should be appreciated that more than embodiment be intended merely to illustrate the present invention,
And be not used as limitation of the invention, as long as in the spirit of the present invention, the change to embodiment described above
Change, modification will all be fallen within the scope of claims of the present invention.
Claims (10)
1. a kind of construction project based on instrument board manages system, it is characterised in that:
Including database server, WEB management servers, mobile application server, and an at least smart mobile phone and one
PC machine;
The database server, the WEB management servers and the mobile application server are respectively positioned on the same cloud service
On device, the smart mobile phone connects the Cloud Server with the PC machine by internet;
Database in the database server includes at least:Goods and materials order database, financial situation database, construction plan
Database, construction speed database and construction team's slip condition database;Goods and materials order database, financial situation database, construction
It is to close to be had in plan database, construction speed database and construction team's slip condition database with the engineering account of construction project
The record of key word;
The PC machine is equipped with data display systems, which includes:
With the project schedule plan node instrument board of the construction plan database association and the construction speed database and institute
State the associated construction team's status panel disk of construction team's slip condition database and the goods and materials order database and the construction team
The associated goods and materials of 5 slip condition databases are received status panel disk, and are used with the finance of the financial situation database association
Money status panel disk.
2. a kind of construction project based on instrument board according to claim 1 manages system, it is characterised in that:The project
Schedule node instrument board is equipped with construction plan progress bar corresponding with the real-time status of each construction project;
Each construction plan progress bar is equipped with for identifying construction project feasibility study, approval, preliminary design reply, bidding, project are applied
Work, clearing turn the node scale module of money main points node;
For transferring respective record from construction plan database, the real-time status of construction project and construction plan are compared
Node comparison module;
For transferring respective record from construction plan database, and show in the node scale module reality of construction project
When state target advance display module;
When the real-time status of corresponding construction project lags behind construction plan, the node comparison module passes through the target advance
Display module makes the construction plan progress bar change colour or flicker.
3. a kind of construction project based on instrument board according to claim 1 manages system, it is characterised in that:Each construction
Troop status panel disk corresponds to a troop, shows the construction speed of corresponding construction project by construction speed item, and from described
Respective record is transferred in construction team's slip condition database, shows construction team's status data of corresponding construction team;Construction team
The same day admission that status data includes at least the construction team withdraws from the arena information, personnel's number, responsible person's telephone number and work now
Field photo.
4. a kind of construction project based on instrument board according to claim 3 manages system, it is characterised in that:The construction
Progress bar includes:
Construction speed scale module for the construction Start Date and expired date for identifying construction project;
For transferring respective record from construction speed database, and corresponding construction project is shown in construction speed scale module
Realtime construction progress construction speed display module.
5. a kind of construction project based on instrument board according to claim 3 manages system, it is characterised in that:The construction
Troop's status panel disk further includes for transferring phase from the goods and materials order database and construction team's slip condition database
It should record, construction team is reminded to report the reminding module of receiving for receiving and receiving the data packet time.
6. a kind of construction project based on instrument board according to claim 1 manages system, it is characterised in that:The goods and materials
Status panel of receiving disk is used for after the goods and materials order database summarizes the data of receiving in real time of each construction project from described
Goods and materials order database transfers respective record, shows whether the construction team corresponding to each construction project completes to receive and receive
Data packet, and complete to receive and receive the time of data packet.
7. a kind of construction project based on instrument board according to claim 1 manages system, it is characterised in that:Each finance
Status panel of spending money disk corresponds to a construction project, and finance status panel disk of spending money includes:
Instrument board display module includes the circular scale of the contract signing amount of money for showing corresponding construction project and is used for
The progressive payment amount of money of corresponding construction project and the pointer of the arrearage amount of money are indicated on the circular scale;
Pointer control module, for transferring respective record from the financial situation database, control the pointer point to it is described
The corresponding position of circular scale.
8. a kind of construction project based on instrument board according to claim 1 manages system, it is characterised in that:Each intelligence
Mobile phone is bound is equipped with sign-out module of registering with a construction team, the smart mobile phone, is bound with the sign-out module of registering
GPS positioning module, and the wechat group trigger module for triggering wechat group when the sign-out module of registering starts, construction
Troop is told somebody what one's real intentions are by the work ticket in wechat group upload work progress, the work ticket after construction, class meeting of standing, safety to construction
In troop's slip condition database.
9. a kind of construction project based on instrument board according to claim 8 manages system, it is characterised in that:The intelligence
Mobile phone is additionally provided with goods and materials order data editor module, and construction team is chosen and received by the goods and materials order data editor module
Cargo material, and receiving note photo is shot, it uploads in the goods and materials order database, every is recorded in the money order database
The uplink time of receiving note photo.
10. a kind of construction project based on instrument board according to claim 8 manages system, it is characterised in that:The PC
The project schedule plan node instrument board and the goods and materials status panel disk of receiving are mapped to the project process of display screen by machine
On billboard, finance status panel disk of spending money is mapped on the financial progress billboard of display screen, by construction team's shape
State instrument board is mapped on the construction site management and control billboard of display screen, by the quasi real time friendship of the content map of wechat group to display screen
It flows on billboard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810192858.0A CN108470049A (en) | 2018-03-09 | 2018-03-09 | A kind of construction project management system based on instrument board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810192858.0A CN108470049A (en) | 2018-03-09 | 2018-03-09 | A kind of construction project management system based on instrument board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108470049A true CN108470049A (en) | 2018-08-31 |
Family
ID=63265154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810192858.0A Pending CN108470049A (en) | 2018-03-09 | 2018-03-09 | A kind of construction project management system based on instrument board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108470049A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108830515A (en) * | 2018-09-25 | 2018-11-16 | 晋能清洁能源光伏发电有限责任公司 | A kind of photovoltaic plant capital construction information management system |
CN109413161A (en) * | 2018-09-30 | 2019-03-01 | 温州锦丽斯企业有限公司 | A kind of guideboard installation progress monitoring system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102289720A (en) * | 2010-06-18 | 2011-12-21 | 上海络杰软件有限公司 | System for layering and detailing electronic signage |
CN103679373A (en) * | 2013-04-12 | 2014-03-26 | 国家电网公司 | Full chain budget data processing system and method for production infrastructure standard cost system |
WO2016176520A1 (en) * | 2015-04-30 | 2016-11-03 | Microsoft Technology Licensing, Llc | User work attribute surfacing control |
CN106384190A (en) * | 2016-08-31 | 2017-02-08 | 铁道第三勘察设计院集团有限公司 | Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model |
CN106447116A (en) * | 2016-10-10 | 2017-02-22 | 陕西铁路工程职业技术学院 | Application of BIM technology in metro track laying construction |
CN106600231A (en) * | 2016-12-14 | 2017-04-26 | 国网上海市电力公司 | Dynamic management system for infrastructure projects |
CN107067220A (en) * | 2016-06-20 | 2017-08-18 | 杨玉海 | The full-automatic lateral road figure technical method of project management progress |
CN107705020A (en) * | 2017-10-12 | 2018-02-16 | 山东联诚工程建设监理有限公司 | A kind of overall process intelligence engineering supervisory information managing and control system |
-
2018
- 2018-03-09 CN CN201810192858.0A patent/CN108470049A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102289720A (en) * | 2010-06-18 | 2011-12-21 | 上海络杰软件有限公司 | System for layering and detailing electronic signage |
CN103679373A (en) * | 2013-04-12 | 2014-03-26 | 国家电网公司 | Full chain budget data processing system and method for production infrastructure standard cost system |
WO2016176520A1 (en) * | 2015-04-30 | 2016-11-03 | Microsoft Technology Licensing, Llc | User work attribute surfacing control |
CN107067220A (en) * | 2016-06-20 | 2017-08-18 | 杨玉海 | The full-automatic lateral road figure technical method of project management progress |
CN106384190A (en) * | 2016-08-31 | 2017-02-08 | 铁道第三勘察设计院集团有限公司 | Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model |
CN106447116A (en) * | 2016-10-10 | 2017-02-22 | 陕西铁路工程职业技术学院 | Application of BIM technology in metro track laying construction |
CN106600231A (en) * | 2016-12-14 | 2017-04-26 | 国网上海市电力公司 | Dynamic management system for infrastructure projects |
CN107705020A (en) * | 2017-10-12 | 2018-02-16 | 山东联诚工程建设监理有限公司 | A kind of overall process intelligence engineering supervisory information managing and control system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108830515A (en) * | 2018-09-25 | 2018-11-16 | 晋能清洁能源光伏发电有限责任公司 | A kind of photovoltaic plant capital construction information management system |
CN109413161A (en) * | 2018-09-30 | 2019-03-01 | 温州锦丽斯企业有限公司 | A kind of guideboard installation progress monitoring system |
CN109413161B (en) * | 2018-09-30 | 2021-07-27 | 温州锦丽斯企业有限公司 | Guideboard installation progress monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104408559B (en) | A kind of engineering information management system | |
US20210081853A1 (en) | Mobile ticketing | |
CN203165006U (en) | Engineering project management system | |
CN107944834A (en) | A kind of body-building SAAS big data systematic management systems | |
Aiken et al. | Killing the golden goose? Third sector organizations and back‐to‐work programmes in Germany and the UK | |
CN109472605A (en) | A kind of mathematic for business capitalization management method and system based on block chain | |
CN110276530A (en) | A kind of intelligent engineering operation and maintenance supervising method | |
CN106716464A (en) | System and method for allocating value to timekeeper work | |
CN107918848A (en) | A kind of shops's purchase, sales and stock management software systems | |
CN109359125A (en) | A kind of progress fine-grained management method and its system for construction project | |
DE202012100172U1 (en) | Electronic voucher system | |
CN109214784A (en) | A kind of method, client, server and the system of fire-fighting inspection management | |
CN105930981A (en) | Supply chain financing platform capable of risk quantification and real-time automatic processing | |
CN110378816A (en) | A kind of implementation method and its system of education complex | |
CN106845654A (en) | Hotel management and security administration integral system based on cloud communication | |
CN106716459A (en) | System and method for tracking expenses and billing | |
CN113222691A (en) | House renting transaction method, system, device and storage medium based on block chain | |
CN205247458U (en) | Four layers framework system suitable for automatic fare collection | |
CN108470049A (en) | A kind of construction project management system based on instrument board | |
CN106688001A (en) | Improved system and method for timekeeping entry and work in progress reports | |
CN105871954A (en) | Autonomous information release system and autonomous information release method | |
CN110069826A (en) | A kind of project management method based on BIM, system and storage medium | |
CN108062662A (en) | A kind of entertainment intermediate item manages system | |
CN104969512A (en) | System and method for network based account data management and data exchange | |
CN108470048A (en) | A kind of construction project data display systems based on instrument board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180831 |