CN109215470A - A kind of goods electronic sand map system and its construction method based on BIM+GIS - Google Patents

A kind of goods electronic sand map system and its construction method based on BIM+GIS Download PDF

Info

Publication number
CN109215470A
CN109215470A CN201811290126.1A CN201811290126A CN109215470A CN 109215470 A CN109215470 A CN 109215470A CN 201811290126 A CN201811290126 A CN 201811290126A CN 109215470 A CN109215470 A CN 109215470A
Authority
CN
China
Prior art keywords
bim
gis
data
project
electronic sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811290126.1A
Other languages
Chinese (zh)
Inventor
孙辉
王建军
林广泰
陈孝强
李雍友
陆进
黄升
黄文聪
韦曼怡
蔡孟龙
孟金
杨文达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Road and Bridge Engineering Group Co Ltd
Original Assignee
Guangxi Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Road and Bridge Engineering Group Co Ltd filed Critical Guangxi Road and Bridge Engineering Group Co Ltd
Priority to CN201811290126.1A priority Critical patent/CN109215470A/en
Publication of CN109215470A publication Critical patent/CN109215470A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Geometry (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Computer Hardware Design (AREA)
  • Structural Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Educational Technology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Computational Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Processing Or Creating Images (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to digital management technical fields.A kind of goods electronic sand map system based on BIM+GIS, including BIM three-dimensional module, unmanned plane mapping module, GIS data module and goods electronic sand map system;BIM three-dimensional module is used to establish visual BIM model according to two-dimensional design drawing;Unmanned plane mapping module is used to obtain the three dimensional topographic data and the image data of construction stage in construction area;GIS data module is used for stored GIS data;Goods electronic sand map system is used to establish the electronic sand table based on three-dimension GIS according to BIM model, the three dimensional topographic data in construction area, the image data and GIS data of construction stage.Highway project management information platform is used to generate the operation interface of the electronic sand table based on three-dimension GIS.The present invention is for realizing from the angle of the overall situation, and in three-dimensional geographic information space, the whole landforms to construction area carry out visualization display, has the characteristics that digitlization, visualizes, is intelligentized.

Description

A kind of goods electronic sand map system and its construction method based on BIM+GIS
Technical field
The invention belongs to digital management technical fields, and in particular to a kind of goods electronic sand map system based on BIM+GIS and Construction method.
Background technique
With the development of the times with the progress of science and technology, the ideas and appreciation level of people also greatly improves therewith, electric Three-dimensional, interactive, diversification the form of showing of sub- sand table, allows electronic sand table to become the favorite of Project Exhibition, and electronic sand table will Position shows that traditional two-dimentional exhibition method and three-dimensional static model approach upgrade to Three-Dimensional Dynamic digital virtual mode, either From the ornamental value of vision, or the solid level true to nature presented, it all brings the interactive experience that people's one kind is completely newly changed and feels.In work In engineering construction item, the application of electronic sand table is also more and more extensive, but at this stage, the combination and essence of electronic sand table and actual landform Also in the desk study stage in terms of the displaying of refined model, at the same management function of the electronic sand table except showing in addition to apply also compared with It is few.
Summary of the invention
The invention aims to solve above-mentioned technical problem, provide a kind of goods electronic sand map system based on BIM+GIS and Construction method, the system for realizing from global angle, three-dimensional geographic information space to the whole landforms in construction area into Row visualization display has the characteristics that digitlization, visualizes, is intelligentized, daily wisdom management can be carried out to project under construction, The integrated management of raising project is horizontal.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of goods electronic sand map system based on BIM+GIS: including BIM three-dimensional module, unmanned plane mapping module, GIS data Module, goods electronic sand map system and highway project management information platform;The BIM three-dimensional module and unmanned plane mapping module respectively with GIS data module connection, the GIS data module and highway project management information platform respectively with the electronic sand table system System connection;
The BIM three-dimensional module, for establishing visual BIM model according to two-dimensional design drawing, to the money of BIM model Source optimizes, the automatic real-time calculating for carrying out multistage LOD, and will be uploaded to Cloud Server after BIM model light-weight technologg;
The unmanned plane mapping module, for obtaining the three dimensional topographic data and the picture number of construction stage in construction area According to;
The GIS data module is used for stored GIS data, and the GIS data includes electronic map and geography information number According to;
The goods electronic sand map system, for three dimensional topographic data, the figure of construction stage according to BIM model, construction area As data and GIS data, the electronic sand table based on three-dimension GIS is established.
Highway project management information platform for generating the operation interface of the electronic sand table based on three-dimension GIS, and is opened up Show the electronic sand table based on three-dimension GIS.
Further, the goods electronic sand map system further include project office administrative unit, and respectively with the project office Progress control unit, the quality management unit, security managing unit, modern-style construction unit, document of public administrative unit connection Administrative unit, investment plan unit, labor service evaluation unit, video monitor unit and operation management;
The project office administrative unit is configured to the acquisition and upload of project routine office work information, the figure of engineered locations The process of deformation displaying and the acquisition of project progress message, intra-company's document management and management and quality safety Control;
The progress control unit is used to show the engineering effort figure, project schedule plan gunter drawing and item of key project Mesh actual progress gunter drawing;
The quality management unit shows engineering for showing quality management and control measures in a flowchart in the form of pie chart Project total quality acceptance rate and sampling observation frequency data summarization, projects entity qualification rate is shown in the form of histogram, is used in combination In display scene standard construction photo;
The security managing unit is for showing that safe monthly magazine weekly of quality management and control measures, project etc., project are drilled safely It shows;
The modern-style construction unit is used for display scene civilized construction photo;
The document management unit is used to show the management method and management method that transportation department, headquarter and department issue Performance;
The investment plan unit is used to show year, season, MIP monthly investment plan and actual investment with bar graph form Comparison;
The labor service evaluation unit is for showing labor service team examination score detail and each labor service teams and groups composition of personnel;
The video monitor unit is used to show the real time monitoring state in each monitoring point, the three-dimensional monitoring of realization.
Further, in the BIM model comprising the spatial datas such as spatial position data, appearance data, shape data and The attribute datas such as design parameter, construction parameter and O&M parameter.
The present invention also provides a kind of construction method of goods electronic sand map system based on BIM+GIS, this method includes following step It is rapid:
(1) visual BIM model is established according to two-dimensional design drawing, and will be uploaded to after BIM model light-weight technologg Cloud Server;
(2) aerial photographing is carried out to construction area using unmanned plane mapping module, obtains the dimensionally figurate number in construction area According to the image data with the construction stage, by the three dimensional topographic data and the image data smart3D of construction stage in construction area Software processing, generates intensive point cloud data, the file that empty three computations generate OSGB format is then carried out, by the OSGB lattice The file of formula is imported in goods electronic sand map system and is combined with GIS data module and BIM model, accurately shows current landform and project Effect picture after building up.
Further, BIM model light-weight technologg is referred into the application direction according to model, to invalid and superfluous in model Remaining parameter is simplified, compact model size.
Further, the foundation of BIM model includes manually being modeled using the BIM modeling tool of Revit and CATIA.
Compared with prior art, the invention has the following advantages:
1. the present invention provides the completely new digitlization of one kind, visualization, quantifiable management tool for engineering management, while Engineering management is pushed to stride forward from traditional micromanagement mode to modernization, intelligence, macroscopic viewization way to manage, it can be great The efficiency of management is promoted, specific aim, the validity of engineering management, BIM model and each data correlation are improved, convenient for internal control data Management.BIM model is established by BIM three-dimensional module, BIM model is imported into the goods electronic sand map system based on three-dimension GIS, together When will be handled with the collected terrain data of unmanned plane after imported into goods electronic sand map system, formed one it is comprehensive fine Change model, light-weight technologg is carried out to model, is easy to use, full side finally is carried out to engineering project on the basis of refining model Position management.
2. the present invention can accurately reflect the overall picture of engineering, construction progress, the 3D simulation of project progress, remaining workload, With the major projects information such as the difference of engineering project, visualization, digitlization, instant progress pipe can be provided for project manager Manage cooperative system.
3. carrying out light-weight technologg to BIM model by powerful cloud service ability, it can be achieved that allowing the model of BIM O&M Web browsing, sharing and cooperation are simpler.
Detailed description of the invention
Fig. 1 is a kind of system block diagram of the goods electronic sand map system based on BIM+GIS of the present invention.
Wherein, attached in the figure, it is marked as 1-BIM three-dimensional module;2- unmanned plane mapping module;3-GIS data module;4- electronics Sand table system;5- highway project management information platform.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.It should be noted that specific reality of the invention It applies example and is intended merely to the clearer description technique scheme of energy, and cannot function as a kind of limitation of the scope of the present invention.
Referring to Fig. 1, a kind of goods electronic sand map system 4 based on BIM+GIS, including the mapping of BIM three-dimensional module 1, unmanned plane Module 2, GIS data module 3, goods electronic sand map system 4 and highway project management information platform 5;BIM three-dimensional module 1 and unmanned plane Mapping module 2 is connect with GIS data module 3 respectively, GIS data module 3 and highway project management information platform 5 respectively with electronics Sand table system 4 connects;
BIM three-dimensional module 1, for establishing visual BIM model according to two-dimensional design drawing, to the resource of BIM model It optimizes, the automatic real-time calculating for carrying out multistage LOD, and Cloud Server will be uploaded to after BIM model light-weight technologg;BIM Include the spatial datas such as spatial position data, appearance data, shape data and design parameter, construction parameter and O&M ginseng in model The attribute datas such as number;
Unmanned plane mapping module 2, for obtaining the three dimensional topographic data and the image data of construction stage in construction area;
GIS data module 3 is used for stored GIS data, and GIS data includes electronic map and geographic information data;
Goods electronic sand map system 4, for according to BIM model, the three dimensional topographic data in construction area, the picture number of construction stage According to and GIS data, establish the electronic sand table based on three-dimension GIS.
Highway project management information platform 5 for generating the operation interface of the electronic sand table based on three-dimension GIS, and is shown Electronic sand table based on three-dimension GIS.
For the technical solution of the present embodiment, core is to construct visual electronic sand table system using BIM and GIS technology System 4, initially sets up BIM model, BIM model is imported into the goods electronic sand map system 4 based on three-dimension GIS, while will use nobody The collected terrain data of machine is imported into goods electronic sand map system 4 after being handled, and forms a comprehensive fining model, right Model carries out light-weight technologg, is easy to use.The present invention is for realizing from global angle, in three-dimensional geographic information space to applying The whole landforms in building site area carry out visualization display, have the characteristics that digitlization, visualize, is intelligentized, can to project under construction into The daily wisdom management of row, the integrated management for improving project are horizontal.
In the present embodiment, for the ease of on the basis of refining model to engineering project carry out omnibearing management, electronics Sand table system 4 further include project office administrative unit, and respectively with project office administrative unit connect progress control unit, Quality management unit, security managing unit, modern-style construction unit, document management unit, investment plan unit, labor service evaluation Unit, video monitor unit and operation management;
Project office administrative unit is configured to the acquisition and upload of project routine office work information, and the figure of engineered locations becomes Change the flow management and control of displaying and the acquisition of project progress message, intra-company's document management and management and quality safety;
The engineering effort figure, project schedule plan gunter drawing and project that progress control unit is used to show key project are real Border progress gunter drawing;Specifically, progress control unit, for working out construction schedule, progress control unit and BIM three-dimensional mould Block 1 is associated with, and three-dimensional visualization technique can be utilized, by the image data of schedule and construction stage in goods electronic sand map system 4 Middle visual presentation, and work progress tracking can be carried out, analyze the comparison of construction schedule and actual progress.
Quality management unit shows engineering project for showing quality management and control measures in a flowchart in the form of pie chart Total quality acceptance rate and sampling observation frequency data summarization, show projects entity qualification rate, and for opening up in the form of histogram Show live standard construction photo;
Security managing unit is for showing that rehearsal is shown safely for safe monthly magazine weekly of quality management and control measures, project etc., project;
Modern-style construction unit is used for display scene civilized construction photo;
The reality of management method and management method that document management unit is used to show that transportation department, headquarter and department issue Apply situation;
Investment plan unit is used to show year, season, MIP monthly investment plan and actual investment comparison with bar graph form;
Labor service evaluation unit is for showing labor service team examination score detail and each labor service teams and groups composition of personnel;
Video monitor unit is used to show the real time monitoring state in each monitoring point, the three-dimensional monitoring of realization.
The construction method of the present invention also provides a kind of goods electronic sand map system 4 based on BIM+GIS, this method include following step It is rapid:
(1) visual BIM model is established according to two-dimensional design drawing, and will be uploaded to after BIM model light-weight technologg Cloud Server;
(2) aerial photographing is carried out using 2 pairs of construction areas of unmanned plane mapping module, obtains the dimensionally figurate number in construction area According to the image data with the construction stage, by the three dimensional topographic data and the image data smart3D of construction stage in construction area Software processing, generates intensive point cloud data, the file that empty three computations generate OSGB format is then carried out, by OSGB format File is imported in goods electronic sand map system 4 and is combined with GIS data module 3 and BIM model, accurately shows that current landform is built with project Effect picture after.
Wherein, BIM model light-weight technologg is referred into the application direction according to model, the invalid and redundancy in model is joined Number is simplified, compact model size.
Wherein, the foundation of BIM model includes manually being modeled using the BIM modeling tool of Revit and CATIA.
The embodiment of the present invention breaches the browsing performance bottleneck of high density model: LOD using LOD structure and instance technology Technology can select to show the model of different fine degrees according to distance, greatly alleviate video card and render pressure;Using example Change technology realizes multiplexing model, significantly improves rendering efficiency.
The embodiment of the present invention for BIM provide attribute query statistics, flux-vector splitting, Sunlight Analysis, indoor roaming, etc. it is general GIS function;Realize simulant building thing building course, designated floor/component BIM special function displayed separately;Provide BIM The accurate matched ability of coordinate conversion, BIM and other spatial datas can meet large scene and indoor finely scene perfect combination Application demand.These functions of integrated use in practical applications, play the location-based service and spatial analysis speciality of GIS, and BIM will be produced It gives birth to actually and wide application value.
Above description is the detailed description for the present invention preferably possible embodiments, but embodiment is not limited to this hair Bright patent claim, it is all the present invention suggested by technical spirit under completed same changes or modifications change, should all belong to In the covered the scope of the patents of the present invention.

Claims (6)

1. a kind of goods electronic sand map system based on BIM+GIS, it is characterised in that: survey and draw mould including BIM three-dimensional module, unmanned plane Block, GIS data module, goods electronic sand map system and highway project management information platform;The BIM three-dimensional module and unmanned plane mapping Module is connect with the GIS data module respectively, the GIS data module and highway project management information platform respectively with it is described Goods electronic sand map system connection;
The BIM three-dimensional module, for establishing visual BIM model according to two-dimensional design drawing, to the resource of BIM model into Row optimization, the automatic real-time calculating for carrying out multistage LOD, and Cloud Server will be uploaded to after BIM model light-weight technologg;
The unmanned plane mapping module, for obtaining the three dimensional topographic data and the image data of construction stage in construction area;
The GIS data module is used for stored GIS data, and the GIS data includes electronic map and geographic information data;
The goods electronic sand map system, for according to BIM model, the three dimensional topographic data in construction area, the picture number of construction stage According to and GIS data, establish the electronic sand table based on three-dimension GIS;
The highway project management information platform for generating the operation interface of the electronic sand table based on three-dimension GIS, and is opened up Show the electronic sand table based on three-dimension GIS.
2. a kind of goods electronic sand map system based on BIM+GIS according to claim 1, it is characterised in that: the electronics is husky Disc system further includes project office administrative unit, and the progress control list connecting respectively with project office administrative unit Member, quality management unit, security managing unit, modern-style construction unit, document management unit, investment plan unit, labor service Evaluation unit, video monitor unit and operation management;
The project office administrative unit is configured to the acquisition and upload of project routine office work information, and the figure of engineered locations becomes Change the flow management and control of displaying and the acquisition of project progress message, intra-company's document management and management and quality safety;
The engineering effort figure, project schedule plan gunter drawing and project that the progress control unit is used to show key project are real Border progress gunter drawing;
The quality management unit shows engineering project for showing quality management and control measures in a flowchart in the form of pie chart Total quality acceptance rate and sampling observation frequency data summarization, show projects entity qualification rate, and for opening up in the form of histogram Show live standard construction photo;
The security managing unit is for showing that rehearsal is shown safely for safe monthly magazine weekly of quality management and control measures, project etc., project;
The modern-style construction unit is used for display scene civilized construction photo;
The reality of management method and management method that the document management unit is used to show that transportation department, headquarter and department issue Apply situation;
The investment plan unit is used to show year, season, MIP monthly investment plan and actual investment comparison with bar graph form;
The labor service evaluation unit is for showing labor service team examination score detail and each labor service teams and groups composition of personnel;
The video monitor unit is used to show the real time monitoring state in each monitoring point, the three-dimensional monitoring of realization.
3. a kind of goods electronic sand map system based on BIM+GIS according to claim 1, it is characterised in that: the BIM model In include spatial position data, appearance data, shape data, design parameter, construction parameter and O&M parameter.
4. a kind of construction method of the goods electronic sand map system a method according to any one of claims 1-3 based on BIM+GIS, feature exist In: include the following steps:
(1) visual BIM model is established according to two-dimensional design drawing, and cloud clothes will be uploaded to after BIM model light-weight technologg Business device;
(2) using unmanned plane mapping module to construction area carry out aerial photographing, obtain construction area three dimensional topographic data and The image data of construction stage, by the three dimensional topographic data and the image data of construction stage smart3D software in construction area Processing, generates intensive point cloud data, the file that empty three computations generate OSGB format is then carried out, by the OSGB format File is imported in goods electronic sand map system and is combined with GIS data module and BIM model, accurately shows that current landform is built up with project Effect picture afterwards.
5. the construction method of the goods electronic sand map system according to claim 4 based on BIM+GIS, it is characterised in that: by BIM Model light-weight technologg refers to the application direction according to model, simplifies to the invalid and nuisance parameter in model, compresses mould Type size.
6. the construction method of the goods electronic sand map system according to claim 4 based on BIM+GIS, it is characterised in that: BIM mould The foundation of type includes manually being modeled using the BIM modeling tool of Revit and CATIA.
CN201811290126.1A 2018-10-31 2018-10-31 A kind of goods electronic sand map system and its construction method based on BIM+GIS Pending CN109215470A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811290126.1A CN109215470A (en) 2018-10-31 2018-10-31 A kind of goods electronic sand map system and its construction method based on BIM+GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811290126.1A CN109215470A (en) 2018-10-31 2018-10-31 A kind of goods electronic sand map system and its construction method based on BIM+GIS

Publications (1)

Publication Number Publication Date
CN109215470A true CN109215470A (en) 2019-01-15

Family

ID=64998276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811290126.1A Pending CN109215470A (en) 2018-10-31 2018-10-31 A kind of goods electronic sand map system and its construction method based on BIM+GIS

Country Status (1)

Country Link
CN (1) CN109215470A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109933567A (en) * 2019-03-26 2019-06-25 贵州图智信息技术有限公司 Archive of surveying and mapping spatialization processing application system and method based on GIS modelling technique
CN110428716A (en) * 2019-06-28 2019-11-08 中国一冶集团有限公司 A kind of sand table system based on BIM
CN110610540A (en) * 2019-09-05 2019-12-24 广州图测智能科技有限公司 BIM and GIS-based rapid rendering plotting method for three-dimensional model of urban real scene
CN110853487A (en) * 2019-11-25 2020-02-28 西安工业大学 Digital sand table system for urban design
CN110889157A (en) * 2019-11-18 2020-03-17 深圳智润新能源电力勘测设计院有限公司 Wind power plant layout visualization display method and related device
CN111145628A (en) * 2020-03-20 2020-05-12 珠海欣邦科技有限公司 AI-based sand table simulation teaching system and use method thereof
CN111445218A (en) * 2020-04-22 2020-07-24 中铁二十一局集团电务电化工程有限公司 BIM-based project progress management method, device, equipment and storage medium
CN111597605A (en) * 2020-04-02 2020-08-28 中国国家铁路集团有限公司 Railway dynamic simulation cockpit system
CN112149212A (en) * 2020-09-22 2020-12-29 广西路桥工程集团有限公司 Visual construction management platform for engineering project
CN112256818A (en) * 2020-11-13 2021-01-22 珠海大横琴科技发展有限公司 Display method and device of electronic sand table, electronic equipment and storage medium
CN112330495A (en) * 2020-09-18 2021-02-05 华航环境发展有限公司 Underground drainage construction monitoring system and method based on BIM and GIS
CN112445883A (en) * 2020-11-25 2021-03-05 马鞍山学院 BIM and GIS integration-based subway protection area management data storage method
CN113723786A (en) * 2021-08-20 2021-11-30 寰球孪生空间设计(云南)有限公司 Visual planning auxiliary system based on three-dimensional GIS
CN113867407A (en) * 2021-11-10 2021-12-31 广东电网能源发展有限公司 Construction assisting method and system based on unmanned aerial vehicle, intelligent equipment and storage medium
CN113919035A (en) * 2021-08-04 2022-01-11 中铁九局集团第七工程有限公司 BIM and GIS-based electronic sand table construction method and system
CN115187200A (en) * 2022-07-11 2022-10-14 山西省安装集团股份有限公司 Assembly type machine room construction management system based on BIM digital-analog separation
CN115375864A (en) * 2022-08-26 2022-11-22 中国铁道科学研究院集团有限公司铁道建筑研究所 Unmanned aerial vehicle-based completion acceptance method for high-speed railway
CN117874898A (en) * 2024-03-11 2024-04-12 云南省交通规划设计研究院股份有限公司 Road three-dimensional slope intersection design method and system based on BIM and GIS

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065361A (en) * 2012-12-27 2013-04-24 国家海洋信息中心 Three-dimensional (3d) island sandbox achieving method
KR101465487B1 (en) * 2013-12-23 2014-11-26 한국건설기술연구원 Bim data processing system for extracting surface object of building
CN105679169A (en) * 2015-12-31 2016-06-15 中国神华能源股份有限公司 Railway electronic sand table system
CN106874436A (en) * 2017-01-31 2017-06-20 杭州市公安局上城区分局 The Multi-Source Image Data Fusion imaging system of three-dimensional police geographical information platform
CN106934092A (en) * 2017-01-10 2017-07-07 中铁四局集团第四工程有限公司 The modeling method of the high speed railway prefabricating Liang Chang based on BIM
CN107132912A (en) * 2017-03-24 2017-09-05 广西七三科技有限公司 A kind of interactive demonstration method and system of GIS and BIM augmented realities in building plans
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN107705020A (en) * 2017-10-12 2018-02-16 山东联诚工程建设监理有限公司 A kind of overall process intelligence engineering supervisory information managing and control system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065361A (en) * 2012-12-27 2013-04-24 国家海洋信息中心 Three-dimensional (3d) island sandbox achieving method
KR101465487B1 (en) * 2013-12-23 2014-11-26 한국건설기술연구원 Bim data processing system for extracting surface object of building
CN105679169A (en) * 2015-12-31 2016-06-15 中国神华能源股份有限公司 Railway electronic sand table system
CN106934092A (en) * 2017-01-10 2017-07-07 中铁四局集团第四工程有限公司 The modeling method of the high speed railway prefabricating Liang Chang based on BIM
CN106874436A (en) * 2017-01-31 2017-06-20 杭州市公安局上城区分局 The Multi-Source Image Data Fusion imaging system of three-dimensional police geographical information platform
CN107132912A (en) * 2017-03-24 2017-09-05 广西七三科技有限公司 A kind of interactive demonstration method and system of GIS and BIM augmented realities in building plans
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN107705020A (en) * 2017-10-12 2018-02-16 山东联诚工程建设监理有限公司 A kind of overall process intelligence engineering supervisory information managing and control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张昆: "《专业学位研究生实验课程 荟萃篇》", 30 November 2017, 武汉:华中科技大学出版社 *

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109933567B (en) * 2019-03-26 2021-07-02 贵州图智信息技术有限公司 Mapping file spatialization processing application system and method based on GIS model technology
CN109933567A (en) * 2019-03-26 2019-06-25 贵州图智信息技术有限公司 Archive of surveying and mapping spatialization processing application system and method based on GIS modelling technique
CN110428716A (en) * 2019-06-28 2019-11-08 中国一冶集团有限公司 A kind of sand table system based on BIM
CN110610540A (en) * 2019-09-05 2019-12-24 广州图测智能科技有限公司 BIM and GIS-based rapid rendering plotting method for three-dimensional model of urban real scene
CN110610540B (en) * 2019-09-05 2023-05-02 广州图测智能科技有限公司 Quick rendering and plotting method of urban live-action three-dimensional model based on BIM and GIS
CN110889157A (en) * 2019-11-18 2020-03-17 深圳智润新能源电力勘测设计院有限公司 Wind power plant layout visualization display method and related device
CN110853487A (en) * 2019-11-25 2020-02-28 西安工业大学 Digital sand table system for urban design
CN111145628A (en) * 2020-03-20 2020-05-12 珠海欣邦科技有限公司 AI-based sand table simulation teaching system and use method thereof
CN111597605A (en) * 2020-04-02 2020-08-28 中国国家铁路集团有限公司 Railway dynamic simulation cockpit system
CN111597605B (en) * 2020-04-02 2024-05-31 中国国家铁路集团有限公司 Railway dynamic simulation cockpit system
CN111445218A (en) * 2020-04-22 2020-07-24 中铁二十一局集团电务电化工程有限公司 BIM-based project progress management method, device, equipment and storage medium
CN112330495A (en) * 2020-09-18 2021-02-05 华航环境发展有限公司 Underground drainage construction monitoring system and method based on BIM and GIS
CN112149212B (en) * 2020-09-22 2022-08-05 广西路桥工程集团有限公司 Visual construction management platform for engineering project
CN112149212A (en) * 2020-09-22 2020-12-29 广西路桥工程集团有限公司 Visual construction management platform for engineering project
CN112256818A (en) * 2020-11-13 2021-01-22 珠海大横琴科技发展有限公司 Display method and device of electronic sand table, electronic equipment and storage medium
CN112445883A (en) * 2020-11-25 2021-03-05 马鞍山学院 BIM and GIS integration-based subway protection area management data storage method
CN113919035A (en) * 2021-08-04 2022-01-11 中铁九局集团第七工程有限公司 BIM and GIS-based electronic sand table construction method and system
CN113723786A (en) * 2021-08-20 2021-11-30 寰球孪生空间设计(云南)有限公司 Visual planning auxiliary system based on three-dimensional GIS
CN113723786B (en) * 2021-08-20 2024-02-02 寰球孪生空间设计(云南)有限公司 Visual planning auxiliary system based on three-dimensional GIS
CN113867407A (en) * 2021-11-10 2021-12-31 广东电网能源发展有限公司 Construction assisting method and system based on unmanned aerial vehicle, intelligent equipment and storage medium
CN113867407B (en) * 2021-11-10 2024-04-09 广东电网能源发展有限公司 Unmanned plane-based construction auxiliary method, unmanned plane-based construction auxiliary system, intelligent equipment and storage medium
CN115187200A (en) * 2022-07-11 2022-10-14 山西省安装集团股份有限公司 Assembly type machine room construction management system based on BIM digital-analog separation
CN115375864B (en) * 2022-08-26 2023-03-10 中国铁道科学研究院集团有限公司铁道建筑研究所 Unmanned aerial vehicle-based high-speed railway completion acceptance method
CN115375864A (en) * 2022-08-26 2022-11-22 中国铁道科学研究院集团有限公司铁道建筑研究所 Unmanned aerial vehicle-based completion acceptance method for high-speed railway
CN117874898A (en) * 2024-03-11 2024-04-12 云南省交通规划设计研究院股份有限公司 Road three-dimensional slope intersection design method and system based on BIM and GIS
CN117874898B (en) * 2024-03-11 2024-05-24 云南省交通规划设计研究院股份有限公司 Road three-dimensional slope intersection design method and system based on BIM and GIS

Similar Documents

Publication Publication Date Title
CN109215470A (en) A kind of goods electronic sand map system and its construction method based on BIM+GIS
CN109934914B (en) Embedded city design scene simulation method and system
Dell'Unto et al. 4D recording at the trowel's edge: using three-dimensional simulation platforms to support field interpretation
CN102054289B (en) 3D virtual community construction method based on panoramic and real image and geographic information
Liu Three-dimensional visualized urban landscape planning and design based on virtual reality technology
Shan et al. Research on 3D urban landscape design and evaluation based on geographic information system
CN105701103A (en) Geographic information based three-dimensional application system
Richards-Rissetto An iterative 3D GIS analysis of the role of visibility in ancient Maya landscapes: A case study from Copan, Honduras
de Kleijn et al. A 3D spatial data infrastructure for Mapping the Via Appia
Ishikawa et al. Interactive 3-D indoor modeler for virtualizing service fields
Bertacchi et al. Chiuro laboratory: integration of workflows from digital survey to optimised 3D urban models for interactive exploration
CN114490907A (en) Method and device for constructing famous city management database and storage medium
CN112487539A (en) Intelligent building model generation method, electronic equipment and storage medium
von Schwerin et al. The MayaArch3D Project; Digital Technologies for Research in Maya Archaeology
Li et al. Research on Landscape Architecture Modeling Simulation System Based on Computer Virtual Reality Technology
Lee Case study on emerging trends in geospatial technologies for study of urban form
Duran et al. Web-based multimedia GIS for historical sites
Kim et al. Using 3D GIS simulation for urban design
Jiang et al. Application Research of Virtual Reality Landscape Information Model based on CAD
CN116310093B (en) Virtual three-dimensional urban geographic scene sand table model construction system and method thereof
CN110866971B (en) Method for producing true square orthographic image
Xiao et al. A 3D Multimedia Ecological Landscape Environment and Teaching Mode Based on Digital Interactive Experience
Kim Three-dimensional urban simulation for collaborative urban design
Andújar Gran et al. The ViRVIG Institute
Liu et al. Research on the Application of Computer Big Data Technology and 3D Simulation Design System in Landscape Architecture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190115