CN112348473A - Engineering management information visualization software - Google Patents

Engineering management information visualization software Download PDF

Info

Publication number
CN112348473A
CN112348473A CN202011246986.2A CN202011246986A CN112348473A CN 112348473 A CN112348473 A CN 112348473A CN 202011246986 A CN202011246986 A CN 202011246986A CN 112348473 A CN112348473 A CN 112348473A
Authority
CN
China
Prior art keywords
module
information
engineering
control system
central control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011246986.2A
Other languages
Chinese (zh)
Inventor
陈贤庭
陈丽君
陈丽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Futai Building Decoration Engineering Co ltd
Original Assignee
Hubei Futai Building Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Futai Building Decoration Engineering Co ltd filed Critical Hubei Futai Building Decoration Engineering Co ltd
Priority to CN202011246986.2A priority Critical patent/CN112348473A/en
Publication of CN112348473A publication Critical patent/CN112348473A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models

Abstract

The invention discloses engineering management information visualization software which comprises a central control system and a user login unit, wherein the input end of the central control system is electrically connected with the output end of the user login unit, and the invention relates to the technical field of engineering management. This visual software of engineering management information, three-dimensional model establishes the BIM three-dimensional model according to actual engineering by the three-dimensional model establishment module, then establish the actual topography map of job site through GPS topography map establishment module, the information fusion module combines actual topography map and BIM three-dimensional model, generate three-dimensional engineering model, the on-the-spot monitoring module carries out real time monitoring to the condition and the progress of job site simultaneously, type in the information of engineering through construction information type-in module, the position, the material etc. make things convenient for managers can in time know the information of construction, and can more directly perceived understanding the construction situation, the convenience is handled the problem that appears in time, the management effect is better.

Description

Engineering management information visualization software
Technical Field
The invention relates to the technical field of engineering management, in particular to engineering management information visualization software.
Background
The project management is that the enterprise engaged in project management is entrusted by owner, according to contract agreement, representative owner carries out management and service of whole process or several stages to project organization, project management enterprise does not directly contract with the general contract enterprise or investigation, design, supply, construction and other enterprises of the project, but can contract according to contract to assist owner in contracting with the general contract enterprise or investigation, design, supply, construction and other enterprises of project, and the owner entrusts to supervise contract fulfillment, specific mode of project management and service content, authority, charge and responsibility and so on, the owner and project management enterprise contract in contract, the work flow of the building project enterprise in actual operation includes: and (3) for the early development of the project, if the development is successful, the project contract is signed with the first party, the second party carries out cost budgeting according to the signed project contract, then material purchasing is carried out according to a pre-formed cost, a purchasing contract is signed, a manual provider for construction is selected, a manual contract is signed with the manual provider for construction, and then construction is carried out.
At present, in the process of engineering project management, information of an engineering project is usually represented through a plane drawing, information such as project progress needs to be recorded by personnel on site every day and is displayed in a construction report mode, and the management mode is backward, so that managers cannot know construction information in time and cannot visually know construction conditions.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides engineering management information visualization software, and solves the problems that management modes are relatively backward, so that managers cannot know construction information in time and cannot know construction conditions intuitively.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a visual software of engineering management information, includes central control system and user login unit, central control system's input and the output electric connection of visual information display unit, visual information display unit includes that three-dimensional model establishes module, GPS topographic map and establishes module, on-the-spot monitoring module, construction information input module, information fusion module and three-dimensional model display module, central control system's input and engineering cost management unit's output electric connection, central control system's input and engineering information management unit's output electric connection, central control system's input and project inquiry unit's output electric connection.
Preferably, the central control system is in bidirectional connection with the data processing unit through wireless, and the central control system is in bidirectional connection with the wireless communication module through wireless.
Preferably, the output end of the wireless communication module is electrically connected with the input end of the visualization platform, and the project query unit comprises a project name query module, a project address query module, a contract construction period query module and a basic information entry module.
Preferably, the project information management unit includes a constructor management module, a construction progress management module and an equipment management module, and the project cost management unit includes a budget database, a pre-cost recording module, an actual use cost recording module and a cost change module.
Preferably, the data processing unit comprises a database, an input end of the database is electrically connected with an output end of the classification module, and an input end of the database is electrically connected with an output end of the statistics module.
Preferably, the input end of the database is electrically connected with the output end of the deleting module, and the database is in bidirectional connection with the safety protection module through wireless.
Preferably, the user login unit comprises an account login module, and an output end of the account login module is electrically connected with an input end of the login module.
Preferably, the input end of the login module is electrically connected with the output end of the password change module, and the password change module is in bidirectional connection with the account login module through wireless.
(III) advantageous effects
The invention provides engineering management information visualization software. Compared with the prior art, the method has the following beneficial effects:
(1) the engineering management information visualization software is electrically connected with the output end of a visualization information display unit through the input end of a central control system, the visualization information display unit comprises a three-dimensional model establishing module, a GPS topographic map establishing module, an on-site monitoring module, a construction information input module, an information fusion module and a three-dimensional model display module, the three-dimensional model establishing module establishes a BIM three-dimensional model according to the actual engineering, then the actual topographic map of a construction site is established through the GPS topographic map establishing module, the information fusion module combines the actual topographic map with the BIM three-dimensional model to generate a three-dimensional engineering model, meanwhile, the on-site monitoring module monitors the condition and progress of the construction site in real time, and the construction information, the position, the material and the like of the engineering are input through the construction information input module, so that managers can know the construction information in time, moreover, the construction condition can be known more visually, the problems can be handled in time conveniently, and the management effect is better.
(2) This visual software of engineering management information, input through central control system and engineering cost administrative unit's output electric connection, engineering cost administrative unit includes the budget database, pre-form this record module, actual use cost record module and cost change module, record the whole budget of engineering through pre-form this record module, record the cost of engineering actual use through actual use cost record module, according to the budget information of storing in the budget database, cost change module revises the cost of engineering, make things convenient for managers to know and handle the financial affairs of engineering, the reasonable purchase that carries out, make the engineering budget more and more accurate.
(3) The visual software of this engineering management information, input through central control system and engineering information management unit's output electric connection, engineering information management unit includes constructor management module, construction progress management module and equipment management module, can look over personnel's quantity and the basic information who participates in the construction through constructor management module, construction progress management module acquires the construction progress of reality, equipment management module acquires the equipment utilization information in the work progress, conveniently arrange the personnel of construction and the adjustment of construction progress according to the information of above-mentioned understanding.
Drawings
FIG. 1 is a schematic block diagram of the architecture of the system of the present invention;
FIG. 2 is a schematic block diagram of the structure of the visual information display unit according to the present invention;
FIG. 3 is a schematic block diagram of the structure of the item query unit of the present invention;
FIG. 4 is a schematic block diagram of the structure of a user login unit according to the present invention;
FIG. 5 is a schematic block diagram of the structure of the engineering information management unit according to the present invention;
FIG. 6 is a schematic block diagram of the construction of an engineering cost management unit according to the present invention;
fig. 7 is a schematic block diagram of the structure of a data processing unit according to the present invention.
In the figure, 1 a central control system, 2 a user login unit, 21 an account login module, 22 a login module, 23 a password change module, 3 a visual information display unit, 31 a three-dimensional model creation module, 32 a GPS topographic map creation module, 33 a field monitoring module, 34 a construction information entry module, 35 an information fusion module, 36 a three-dimensional model display module, 4 an engineering cost management unit, 41 a budget database, 42 a pre-form recording module, 43 an actual use cost recording module, 44 a cost change module, 5 an engineering information management unit, 51 a constructor management module, 52 a construction progress management module, 53 an equipment management module, 6 an item query unit, 61 an item name query module, 62 an item address query module, 63 a contract construction period query module, 64 a basic information entry module, 7 a data processing unit, 71 a database, 72 a classification module, The system comprises a 73 counting module, a 74 deleting module, a 75 safety protection module, an 8 wireless communication module and a 9 visualization platform.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, an embodiment of the present invention provides a technical solution: a kind of project management information visualization software, including central control system 1 and user's login unit 2, the input end of the central control system 1 is electrically connected with output end of the visualization information display unit 3, the visualization information display unit 3 includes three-dimensional model creation module 31, GPS topographic map creation module 32, on-site monitoring module 33, construction information input module 34, information fusion module 35 and three-dimensional model display module 36, the three-dimensional model creation module 31 creates BIM three-dimensional model according to the actual project, then the GPS topographic map creation module 32 acquires topographic data according to GPS positioning system, and creates the actual topographic map of the construction site, the information fusion module 35 combines the actual topographic map and BIM three-dimensional model to generate three-dimensional project model, the three-dimensional model display module 36 displays the generated three-dimensional engineering model, the input end of the central control system 1 is electrically connected with the output end of the engineering cost management unit 4, the input end of the central control system 1 is electrically connected with the output end of the engineering information management unit 5, and the input end of the central control system 1 is electrically connected with the output end of the project query unit 6.
In the embodiment of the invention, the central control system 1 is in bidirectional connection with the data processing unit 7 through wireless, and the central control system 1 is in bidirectional connection with the wireless communication module 8 through wireless.
In the embodiment of the present invention, the output end of the wireless communication module 8 is electrically connected to the input end of the visualization platform 9, the visualization platform 9 may be a mobile terminal or a computer, and the project query unit 6 includes a project name query module 61, a project address query module 62, a contract construction period query module 63, and a basic information entry module 64.
In the embodiment of the invention, the project information management unit 5 comprises a constructor management module 51, a construction progress management module 52 and an equipment management module 53, the project cost management unit 4 comprises a budget database 41, a pre-cost recording module 42, an actual use cost recording module 43 and a cost changing module 44, the pre-cost recording module 42 records the whole budget of the project, the actual use cost recording module 43 records the actual use cost of the project, and the cost changing module 44 modifies the cost of the project according to the budget information stored in the budget database 41, so that the manager can conveniently and reasonably purchase according to the project finance, and the project budget is more and more accurate.
In the embodiment of the present invention, the data processing unit 7 includes a database 71, an input end of the database 71 is electrically connected to an output end of the classification module 72, an input end of the database 71 is electrically connected to an output end of the statistics module 73, and information stored in the system is stored in the database 71 of the data processing unit 7, so as to facilitate subsequent tracing and checking.
In the embodiment of the present invention, the input end of the database 71 is electrically connected to the output end of the deleting module 74, the database 71 is bidirectionally connected to the security module 75 through wireless, and the security module 75 performs security protection on the information in the database 71.
In the embodiment of the present invention, the user login unit 2 includes an account login module 21, and an output end of the account login module 21 is electrically connected to an input end of the login module 22.
In the embodiment of the present invention, the input end of the login module 22 is electrically connected to the output end of the password change module 23, and the password change module 23 is in bidirectional connection with the account login module 21 through wireless.
When the visual information display unit works, a user name and a password are input through the account login module 21, login can be performed after the login module 22 successfully verifies, when the password is forgotten during login, the password is modified through the password modification module 23, login verification is performed through the login module 22 again, the name, the address, the construction period and the like of a project are input through the basic information input module 64 by the project inquiry unit 6, the name of the managed project is inquired through the project name inquiry module 61, the address of the project can be inquired through the project address inquiry module 62, the construction period signed by the project is inquired through the contract construction period inquiry module 63, so that a manager can know basic project information, the three-dimensional model creation module 31 in the visual information display unit 3 creates a BIM three-dimensional model according to actual projects, then the GPS topographic map creation module 32 acquires topographic data according to a GPS positioning system, the method comprises the steps of establishing an actual topographic map of a construction site, combining the actual topographic map with a BIM three-dimensional model by an information fusion module 35 to generate a three-dimensional engineering model, displaying the generated three-dimensional engineering model by a three-dimensional model display module 36, enabling managers to visually know engineering information, monitoring the construction condition and progress of the construction site by an on-site monitoring module 33 in real time, inputting engineering information, positions, materials and the like by a construction information input module 34, combining the input information with the three-dimensional engineering model by the information fusion module 35, transmitting the information of a visual information display unit 3 to a central control system 1, transmitting the central control system 1 to a visual platform 9 by a wireless communication module 8, enabling the managers to more visually know the construction condition, timely processing problems, and simultaneously enabling the managers to enter an engineering cost management unit 4, the whole budget of the project is recorded by a pre-forming recording module 42, the cost of the project is recorded by an actual use cost recording module 43, the cost of the project is modified by a cost changing module 44 according to the budget information stored in a budget database 41, so that managers can conveniently purchase according to the project finance, the project budget is more and more accurate, the number and the basic information of the personnel participating in construction can be checked by the managers through a constructor management module 51, the actual construction progress is acquired by a construction progress management module 52, the equipment use information in the construction process is acquired by an equipment management module 53, the construction personnel, equipment and the construction progress can be conveniently arranged and adjusted according to the known information, the information stored by the system is stored through a database 71 in a data processing unit 7, and the follow-up tracing check is facilitated, the classification module 72 classifies the information in the database 71 according to the content, the statistics module 73 performs detailed statistics on the information in the database 71, the deletion module 74 performs screening and deletion on the information in the database 71, and the security module 75 performs security protection on the information in the database 71.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a visual software of engineering management information, includes central control system (1) and user login unit (2), the input of central control system (1) and the output electric connection of user login unit (2), its characterized in that: the input of central control system (1) and the output electric connection of visual information display unit (3), visual information display unit (3) include that three-dimensional model establishes module (31), GPS topography and establishes module (32), on-the-spot monitoring module (33), construction information input module (34), information fusion module (35) and three-dimensional model display module (36), the input of central control system (1) and the output electric connection of engineering cost administrative unit (4), the input of central control system (1) and the output electric connection of engineering information management unit (5), the input of central control system (1) and the output electric connection of project query unit (6).
2. The engineering management information visualization software according to claim 1, wherein: the central control system (1) is in bidirectional connection with the data processing unit (7) through wireless, and the central control system (1) is in bidirectional connection with the wireless communication module (8) through wireless.
3. The engineering management information visualization software according to claim 2, wherein: the output end of the wireless communication module (8) is electrically connected with the input end of the visual platform (9), and the project query unit (6) comprises a project name query module (61), a project address query module (62), a contract construction period query module (63) and a basic information entry module (64).
4. The engineering management information visualization software according to claim 1, wherein: the project information management unit (5) comprises a constructor management module (51), a construction progress management module (52) and an equipment management module (53), and the project cost management unit (4) comprises a budget database (41), a pre-form recording module (42), an actual use cost recording module (43) and a cost changing module (44).
5. The engineering management information visualization software according to claim 2, wherein: the data processing unit (7) comprises a database (71), the input end of the database (71) is electrically connected with the output end of the classification module (72), and the input end of the database (71) is electrically connected with the output end of the statistic module (73).
6. The engineering management information visualization software according to claim 5, wherein: the input end of the database (71) is electrically connected with the output end of the deleting module (74), and the database (71) is in bidirectional connection with the safety protection module (75) in a wireless mode.
7. The engineering management information visualization software according to claim 1, wherein: the user login unit (2) comprises an account login module (21), and the output end of the account login module (21) is electrically connected with the input end of the login module (22).
8. The engineering management information visualization software according to claim 7, wherein: the input end of the login module (22) is electrically connected with the output end of the password change module (23), and the password change module (23) is in bidirectional connection with the account login module (21) in a wireless mode.
CN202011246986.2A 2020-11-10 2020-11-10 Engineering management information visualization software Pending CN112348473A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011246986.2A CN112348473A (en) 2020-11-10 2020-11-10 Engineering management information visualization software

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011246986.2A CN112348473A (en) 2020-11-10 2020-11-10 Engineering management information visualization software

Publications (1)

Publication Number Publication Date
CN112348473A true CN112348473A (en) 2021-02-09

Family

ID=74362423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011246986.2A Pending CN112348473A (en) 2020-11-10 2020-11-10 Engineering management information visualization software

Country Status (1)

Country Link
CN (1) CN112348473A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113077229A (en) * 2021-03-30 2021-07-06 贵州数智联云工程科技有限公司 Multi-party information interaction system and method based on BIM
CN113269529A (en) * 2021-05-31 2021-08-17 重庆创新工程咨询有限公司 Building engineering cost's control system based on BIM model

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107705020A (en) * 2017-10-12 2018-02-16 山东联诚工程建设监理有限公司 A kind of overall process intelligence engineering supervisory information managing and control system
CN109447479A (en) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 One kind being based on three-dimensional visualization project management system
CN111784310A (en) * 2020-08-04 2020-10-16 国网江苏省电力有限公司南通供电分公司 Management system for informatization electric power engineering administration project and working method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107705020A (en) * 2017-10-12 2018-02-16 山东联诚工程建设监理有限公司 A kind of overall process intelligence engineering supervisory information managing and control system
CN109447479A (en) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 One kind being based on three-dimensional visualization project management system
CN111784310A (en) * 2020-08-04 2020-10-16 国网江苏省电力有限公司南通供电分公司 Management system for informatization electric power engineering administration project and working method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113077229A (en) * 2021-03-30 2021-07-06 贵州数智联云工程科技有限公司 Multi-party information interaction system and method based on BIM
CN113077229B (en) * 2021-03-30 2024-04-30 贵州数智联云工程科技有限公司 Multiparty information interaction system and method based on BIM
CN113269529A (en) * 2021-05-31 2021-08-17 重庆创新工程咨询有限公司 Building engineering cost's control system based on BIM model

Similar Documents

Publication Publication Date Title
CN111598379B (en) Project management method, platform, device, computer equipment and storage medium
US8381189B2 (en) Bug clearing house
US20220261734A1 (en) System and interfaces for managing temporary workers
JP2021061058A (en) Methods and systems for providing and receiving information for risk management in field
US11755970B2 (en) Systems and methods for generating construction assignment schedules having multi-task construction projects
CN115375146B (en) Digital construction integrated platform
CN112348473A (en) Engineering management information visualization software
CN101777168A (en) Credit island service platform-based enterprise financing service system and method
CN111709707A (en) Management and control system and method applied to project delivery construction site
US11941560B2 (en) Systems and methods for generating construction models for construction projects
CN113592680A (en) Service platform based on regional education big data
KR102328876B1 (en) Internet business method of interior execution
US11748367B2 (en) Entity selection tool system and method
CN111062686A (en) Mobile intelligent supervision and control method and system based on digital model
JP2020501233A (en) Method and system for providing and receiving information for on-site risk management
CN114677044A (en) Management system and method for intelligent building supervision engineering project
CN110599368A (en) DBM intelligent building management tool
CN115660567A (en) GIS-based intelligent engineering management system and method
CN114860962A (en) Intellectual property business consultation system based on big data
CN113807797A (en) Underground engineering construction management and monitoring system integrated with BIM and intelligent algorithm
CN112766678A (en) Wisdom fire control big data supervise platform
CN116402407B (en) Construction detection data management system and method based on Internet of things
CN110543834B (en) Water well monitoring system and method based on water certificate picture recognition
CN117557239A (en) Digital collaborative management method and collaborative management system for railway construction business
CN116405240A (en) Industrial information network security test evaluation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210209