CN109447479A - One kind being based on three-dimensional visualization project management system - Google Patents

One kind being based on three-dimensional visualization project management system Download PDF

Info

Publication number
CN109447479A
CN109447479A CN201811291495.2A CN201811291495A CN109447479A CN 109447479 A CN109447479 A CN 109447479A CN 201811291495 A CN201811291495 A CN 201811291495A CN 109447479 A CN109447479 A CN 109447479A
Authority
CN
China
Prior art keywords
module
engineering
dimensional
information
staff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811291495.2A
Other languages
Chinese (zh)
Other versions
CN109447479B (en
Inventor
林广泰
王建军
冯春萌
解威威
池浩
孙辉
陈孝强
李雍友
陆进
欧晨丰
陈旺平
梁承斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Road and Bridge Engineering Group Co Ltd
Original Assignee
Guangxi Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Road and Bridge Engineering Group Co Ltd filed Critical Guangxi Road and Bridge Engineering Group Co Ltd
Priority to CN201811291495.2A priority Critical patent/CN109447479B/en
Publication of CN109447479A publication Critical patent/CN109447479A/en
Application granted granted Critical
Publication of CN109447479B publication Critical patent/CN109447479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to project management technique fields, especially a kind of to be based on three-dimensional visualization project management system.Including BIM three-dimension modeling module;GIS three-dimensional land map establishes module;Very three-dimensional engineering model establishes module and generates very three-dimensional engineering model for establishing in conjunction with module the BIM three-dimension modeling module with the GIS three-dimensional land map;Construction information recording module, the typing recorded for construction speed and work progress;Engineering management platform, for passing through the management in administrative staff's terminal to engineering project;Three-dimensional engineering model display module establishes the combination of module for the construction information recording module data and the engineering management platform data and the very three-dimensional engineering model, and realizes the shared of the engineering component information;Database server, storage and transmission for data.The present invention can be convenient for management and planning of the administrative staff to engineering, and staff is facilitated to report engineering construction situation information.

Description

One kind being based on three-dimensional visualization project management system
Technical field
The present invention relates to project management technique fields, especially a kind of to be based on three-dimensional visualization project management system.
Background technique
The construction project time management of engineering project is the important link of project management, and traditional progress control method information is stagnant Afterwards, the features such as level of informatization is lower, the development of engineering constraint progress control level.And the technology of conventional items management has very It is more, but they are based on two-dimensional plane drawing mostly, and the complicated construction drawing provided understands for general staff Carry out more difficulty, is provided not as good as threedimensional model intuitive effective.
It can be raised the management level at present by Building Information Model, Building Information Model abbreviation BIM (building Information modeling), be a complete information model, can by engineering project in Life cycle it is each not With the engineering information in stage, process and resources integration in a model, easily used by each participant of engineering.Pass through three-dimensional Real information possessed by simulation with digital technique building provides mutually coordinated, internally consistent letter for engineering design and construction Model is ceased, the model is made to reach the integration of design and construction, each profession cooperates, to reduce engineering production cost, protects Barrier engineering presses matter completion on time.Although having much about the APP of project management, each has the range of each self-application, cannot The content of all items management is included, so manager needs to open not when carrying out project management to different business Same APP, this also results in the triviality of operation.Operating personnel oneself must After Hours fill in debriefing, progress report daily Table causes to misrepresent deliberately the problem of failing to report sometimes because filling in not in time.
Summary of the invention
To solve the above-mentioned problems, the present invention provides a kind of based on three-dimensional visualization project management system, can be convenient for pipe Management and planning of the reason personnel to engineering, and staff is facilitated to report engineering construction situation information.
One kind being based on three-dimensional visualization project management system, including very three-dimensional engineering model establishes module, BIM threedimensional model Establish module, GIS three-dimensional land map establishes module, construction information recording module, engineering management platform, three-dimensional engineering model displaying Module, supplementary information module and database server,
The BIM three-dimension modeling module is used to establish by BIM threedimensional model of the software to engineering, and will BIM threedimensional model is divided into multiple engineering components, the engineering component and Practical Project position relative to and be able to carry out component Name, material, belonging positions, project amount, cost data input;
The GIS three-dimensional land map establishes module for site contour data by Smart3D software, to be carried out sky three and added Close calculating generates point cloud data, passes through the actual landform figure in point cloud data fabrication place;
The very three-dimensional engineering model establish module for by the data of the BIM three-dimension modeling module with it is described The data that GIS three-dimensional land map establishes module combine, and generate very three-dimensional engineering model;
The construction information recording module is used for by remembering in real time to construction speed and work progress in staff's terminal The typing of record;
The engineering management platform is used for through the management in administrative staff's terminal to engineering project, and including progress control Module, device management module, component management module, personal management module and on-site supervision module;
The three-dimensional engineering model display module is flat for the construction information recording module data and the engineering management Number of units evidence and the very three-dimensional engineering model establish the combination of module, and staff's terminal and administrative staff's terminal are logical Cross the Real-Time Sharing that the three-dimensional engineering model display module carries out each engineering component information;
The supplementary information module is used to obtain position and the construction member of construction member according to the engineering management platform Project under construction pass through appliances for labor protection and tool needed for machine learning algorithm obtains the points for attention and construction of work progress Its information is transmitted to the three-dimensional engineering model display module by information, and staff's terminal passes through the three-dimensional engineering Model display module obtains the information of the supplementary information module;
The database server is for the engineering management platform, the three-dimensional engineering model display module and described auxiliary The storage and transmission of supplementary information module data.
It further, further include supervision module, the supervision module includes video acquisition submodule and the first identification Submodule, the video acquisition submodule is for shooting construction personnel's appliances for labor protection wearing information before setting out and construction tool letter Breath;The first identification submodule is used to extract the characteristic image of the video acquisition submodule, by the video acquisition The characteristic image of submodule is made comparisons with the information of the supplementary information module, and comparison result is fed back to staff.
Further, the GIS three-dimensional land map establishes module and obtains site contour data by unmanned plane technology.
Further, the very three-dimensional engineering model establishes module by the way that the GIS three-dimensional land map is established module Terrain information is imported in Lumion software and is combined with the threedimensional model of the BIM three-dimension modeling module, is generated very three-dimensional Engineering model.
Further, the three-dimensional engineering model display module is by receiving the progress control module and personnel pipe The information of module is managed, and is shown in true threedimensional model in each engineering component, staff passes through the staff Terminal is constructed in the target advance information and personnel depaly information of the three-dimensional engineering model display module acquisition;Administrator Member obtains practice of construction in the component of the three-dimensional engineering model display module constructed according to administrative staff's terminal Progress and work progress record data, by the progress control module and the personal management module and according to big data into The adjustment of traveling degree and the arrangement of personnel.
Further, the construction information recording module will be in work progress the case where equipment and use information is sent to institute Three-dimensional engineering model display module is stated, staff obtains setting in the device management module by administrative staff's terminal Standby account of the history and history use information.
Further, the component management module is used to provide each institute by administrative staff's terminal for staff State component name, material, belonging positions, project amount, the information of cost of engineering component.
Further, the case where on-site supervision module is for remotely monitoring construction site, and taken the photograph including on-site supervision As head and monitoring control submodule, in on-site supervision camera installing at the construction field (site) and with each engineering component phase It is corresponding;The monitoring control submodule is for the control to the monitoring camera;By clicking the three-dimensional engineering model exhibition Show that the on-site supervision module of engineering component described in module can obtain the site operation feelings of the engineering component in real time Condition.
Further, the on-site supervision module further includes the second identification module, the second identification module For extracting the characteristic image of video captured by the on-site supervision camera, by video captured by the on-site supervision camera Characteristic image make comparisons with the information of the supplementary information module, and the undesirable staff of live dressing is marked And it feeds back and arrives staff's terminal.
Further, included the following steps using the project management of this system,
S1. BIM threedimensional model is established in the BIM three-dimension modeling module according to Practical Project, by BIM threedimensional model Be divided into multiple engineering components according to Practical Project position, and to the engineering component carry out component name, material, belonging positions, The data input of project amount, cost;
S2. site contour data are obtained by unmanned plane technology, are established in module in the GIS three-dimensional land map, By site contour data by Smart3D software, carries out empty three computations and generate point cloud data, work is made by point cloud data The actual landform figure in journey place;
S3. by terrain information import threedimensional model phase with the BIM three-dimension modeling module in Lumion software In conjunction with, and the three-dimensional engineering model display module generates very three-dimensional engineering model;
S4. administrative staff are carrying out Design of Construction Organization according to big data by administrative staff's terminal, and to described Progress control module described in three-dimensional engineering model display module, the device management module, the component management module and institute It states the relevant data of personal management module and carries out typing;
S5. staff obtains the scheme of construction in the three-dimensional engineering model display module, and is held according to arrangement and method for construction Row work, staff upload to the construction information to construction speed and work progress record in real time in staff's terminal and record Enter module;
S6. staff carries out the wearing of appliances for labor protection and the standard of tool according to the information that the supplementary information module provides It is standby, staff by appliances for labor protection wearing finish and tool it is ready after by the video acquisition submodule shoot, it is described The information of the characteristic image of the video acquisition submodule and the supplementary information module is made ratio by the first identification submodule Compared with when the first identification submodule mismatches, the first identification submodule prompt appliances for labor protection wearing is not Satisfactory information and tool lack or the information of mistake, and prompts again to shoot unmatched place;
S7. administrative staff are by clicking the on-site supervision module in the three-dimensional engineering model display module and selecting The construction member of required monitoring can obtain the site operation situation of the engineering component in real time;Second identification The information of the characteristic image of video captured by the on-site supervision camera and the supplementary information module is made ratio by comparison module Compared with, and the undesirable staff of live dressing is marked and feeds back staff's terminal;
S8. administrative staff according to administrative staff's terminal the three-dimensional engineering model display module the structure constructed The data that practice of construction progress and work progress record are obtained in part, pass through the progress control module and the personal management mould Block simultaneously carries out the adjustment of progress and the arrangement of personnel according to big data.
Advantageous effect of the invention is:
BIM threedimensional model is divided into multiple engineering components, engineering component and practical work by 1.BIM three-dimension modeling module Journey position relative to and be able to carry out the data input of component name, material, belonging positions, project amount, cost, by module to engineering Component is decomposed, and each module has the label of oneself, facilitates the statistics of 0# account;It is logical that GIS three-dimensional land map establishes module It crosses unmanned plane technology and obtains site contour data, and place graphic data is subjected to three encryption of sky by Smart3D software and is counted It calculates and generates point cloud data, pass through the actual landform figure in point cloud data fabrication place.Very three-dimensional engineering model establishes module will It is both above-mentioned that staff and the visual information of administrative staff's offer are provided, convenient for the acquisition of information.
2. three-dimensional engineering model display module by by construction information recording module data and engineering management platform data with Very three-dimensional engineering model establishes the combination of module, realizes that WBS and BIM model mutually maps, so that staff's terminal and management Staff terminal carries out the Real-Time Sharing of each engineering component information by three-dimensional engineering model display module, is convenient for staff The requirement of construction is solved, and administrative staff is made preferably to carry out progress pipe, equipment management, component management and personal management.
3. supplementary information module is used to obtain the position of construction member and the construction of construction member according to engineering management platform The information of appliances for labor protection needed for project obtains the points for attention and construction of work progress by machine learning algorithm and tool, and It is exercised supervision by supervision module to staff's preparative work before construction, ensure that the peace of construction personnel in the construction process Entirely, and it can be avoided the delay for leading to the progress of engineering because lacking tool.
4. in the installing at the construction field (site) of on-site supervision camera and corresponding with each engineering component;Monitor control submodule For the control to monitoring camera;Administrative staff are by monitoring control submodule to on-site supervision camera to the engineering structure of construction Part carries out implementing monitoring, can provide technical support in time when accident or abnormal conditions occur;Second identification module can mention The characteristic image of video captured by the monitoring camera of enchashment field, by the characteristic image of video captured by on-site supervision camera with it is auxiliary The information of supplementary information module is made comparisons, and the undesirable staff of live dressing is marked and feeds back the work people Member's terminal realizes that the realization to site operation personnel monitors, avoids the staff because of site operation because dressing does not meet specification And occur surprisingly, being further ensured that the construction safety of staff.
Detailed description of the invention
Fig. 1 is system structure diagram of the invention.
In figure, the very three-dimensional engineering module of 1- establishes module, 11-BIM three-dimension modeling module, and 12-GIS threedimensional model is built Formwork erection block, 2- construction information recording module, 21- staff's terminal, 3- engineering management platform, 31- progress control module, 32- Device management module, 33- component management module, 34- personal management module, 35- on-site supervision module, 351- on-site supervision camera shooting Head, 352- monitor control submodule, 353- the second identification module, 4- three-dimensional engineering model display module, 5- auxiliary information Module, 51- supervision module, 511- video acquisition submodule, 512- the first identification submodule, 6- database server mould Block, 7- administrative staff's terminal.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more phases Any and all combinations of the listed item of pass.
One kind being based on three-dimensional visualization project management system, including very three-dimensional engineering model establishes module 1, BIM three-dimensional mould Type establishes module 11, GIS three-dimensional land map establishes module 12, construction information recording module 2, engineering management platform 3, three-dimensional engineering Model display module 4, supplementary information module 5 and database server 6.
BIM three-dimension modeling module 11 by BIM threedimensional model of the software to engineering for being established, and by BIM Threedimensional model is divided into multiple engineering components, engineering component and Practical Project position relative to and be able to carry out component name, material, The data input of belonging positions, project amount, cost.In the present embodiment, BIM three-dimension modeling module 11 by Revit or Person's CATIA software establishes the BIM threedimensional model of engineering.
GIS three-dimensional land map establishes module 12 for site contour data by Smart3D software, to be carried out sky three and encrypted It calculates and generates point cloud data, pass through the actual landform figure in point cloud data fabrication place.In the present embodiment, GIS is dimensionally Shape figure establishes module 12 and obtains site contour data by unmanned plane technology.
Very three-dimensional engineering model is established module 1 and is used for the data of BIM three-dimension modeling module 11 and GIS dimensional topography The data that figure establishes module 12 combine, and generate very three-dimensional engineering model.In the present embodiment, very three-dimensional engineering model establishes mould Block 1 by GIS three-dimensional land map is established module 12 terrain information import Lumion software in BIM three-dimension modeling The threedimensional model of module 11 combines, and generates very three-dimensional engineering model.
BIM threedimensional model is divided into multiple engineering components, engineering component and practical work by BIM three-dimension modeling module 11 Journey position relative to and be able to carry out the data input of component name, material, belonging positions, project amount, cost;GIS dimensional topography Figure establishes module 12 and obtains site contour data by unmanned plane technology, and place graphic data is passed through Smart3D software It carries out empty three computations and generates point cloud data, pass through the actual landform figure in point cloud data fabrication place.Very three-dimensional engineering Above-mentioned the two is integrated as staff to model building module 1 and administrative staff provide visual information, convenient for information It obtains.
Construction information recording module 2 is used for by recording in real time to construction speed and work progress in staff's terminal 21 Typing.Tradition can be saved by the system by 2 staff of construction information recording module and do task report, and kept a record Work, work can be photographed to record by platform in real time, also avoid in the course of work because record not in time due to cause to malfunction The case where.
Engineering management platform 3 is used for through the management in administrative staff's terminal 7 to engineering project, and including progress control mould Block 31, device management module 32, component management module 33, personal management module 34 and on-site supervision module 35.
Three-dimensional engineering model display module 4 is for 2 data of construction information recording module and 3 data of engineering management platform and very Three-dimensional engineering model establishes the combination of module 1, and staff's terminal 21 and administrative staff's terminal 7 pass through three-dimensional engineering model and show Module 4 carries out the Real-Time Sharing of each engineering component information.
Three-dimensional engineering model display module 4 passes through the information for receiving progress control module 31 and personal management module 34, and It is shown in true threedimensional model in each engineering component, staff is shown by staff's terminal 21 in three-dimensional engineering model The target advance information and personnel depaly information that module 4 obtains are constructed;Administrative staff are according to administrative staff's terminal 7 three The data for obtaining practice of construction progress and work progress record in the component of engineering model display module 4 constructed are tieed up, are passed through Progress control module 31 and personal management module 34 simultaneously carry out the adjustment of progress and the arrangement of personnel according to big data.
Construction information recording module 2 will be in work progress the case where equipment and use information is sent to three-dimensional engineering model exhibition Show module 4, staff obtains the account of the history and history of the equipment in device management module 32 by administrative staff's terminal 7 Use information.
Component management module 33 is used to provide the component of each engineering component by administrative staff's terminal 7 for staff Name, material, belonging positions, project amount, the information of cost.
In the present embodiment, three-dimensional engineering model display module logical 4 is crossed 2 data of construction information recording module and engineering pipe 3 data of platform and very three-dimensional engineering model establish the combination of module 1, so that staff's terminal 21 and administrative staff's terminal 7 The Real-Time Sharing of each engineering component information is carried out by three-dimensional engineering model display module 4, understands construction convenient for staff Requirement, and administrative staff is made preferably to carry out progress pipe, equipment management, component management and personal management.
Supplementary information module 5 is used to obtain the position of construction member and the construction of construction member according to engineering management platform 3 The information of appliances for labor protection needed for project obtains the points for attention and construction of work progress by machine learning algorithm and tool, will Its information is transmitted to three-dimensional engineering model display module 4, and staff's terminal 21 passes through three-dimensional engineering model display module 4 and obtains The information of supplementary information module 5.
In the present embodiment, supervision module 51, supervision module 51 include video acquisition submodule 511 and the first identification Submodule 512, video acquisition submodule 511 is for shooting construction personnel's appliances for labor protection wearing information and construction tool before setting out Information;First identification submodule 512 is used to extract the characteristic image of video acquisition submodule 511, by video acquisition submodule The characteristic image of block 511 is made comparisons with the information of supplementary information module 5, and comparison result is fed back to staff.Pass through prison It superintends and directs module 51 to exercise supervision to staff's preparative work before construction, ensure that the safety of construction personnel in the construction process, and And it can be avoided the delay for leading to the progress of engineering because lacking tool.
Database server 6 is for engineering management platform 3, three-dimensional engineering model display module 4 and the number of supplementary information module 5 According to storage and transmission.
The case where on-site supervision module 35 is for remotely monitoring construction site, and including on-site supervision camera 351 and prison Control submodule 352 is controlled, on-site supervision camera 351 is installed at the construction field (site) and corresponding with each engineering component;Monitoring Control submodule 352 is for the control to monitoring camera 351;By clicking engineering structure in three-dimensional engineering model display module 4 The on-site supervision module 35 of part can obtain the site operation situation of the engineering component in real time.Administrative staff pass through monitoring control Mould 352 controls on-site supervision camera 351, and carries out implementing monitoring to the engineering component of construction, unexpected or abnormal Situation can provide technical support when occurring in time;
On-site supervision module 35 further includes the second identification module 353, and the second identification module 353 is existing for extracting The characteristic image of video captured by monitoring camera 351, by the characteristic image of video captured by on-site supervision camera 351 with The information of supplementary information module 5 is made comparisons, and the undesirable staff of live dressing is marked and feeds back work people Member's terminal 21.The monitoring of the realization to site operation personnel is realized, avoids the staff because of site operation because dressing is not met It standardizes and occurs surprisingly, being further ensured that the construction safety of staff.
When needing to construct to a certain component, administrative staff are according to administrative staff's terminal 7 in three-dimensional engineering model exhibition Show the data for obtaining practice of construction progress and work progress record in the component of module 4 constructed, passes through progress control module 31 and personal management module 34 carry out progress setting and personnel arrangement.Staff is by staff's terminal 21 in three-dimensional The target advance information and personnel depaly information that engineering model display module 4 obtains are constructed.During construction, work Personnel according to the construction speed information of real-time update on three-dimensional engineering model display module 4, by progress control module 31 and Personal management module 34 carries out the arrangement of the adjustment and personnel of progress again, and staff shows according in three-dimensional engineering model The up-to-date information that module 4 obtains is constructed.
Included the following steps using the project management of this system,
S1. BIM threedimensional model is established in BIM three-dimension modeling module 11 according to Practical Project, by BIM threedimensional model root Factually engineering position in border is divided into multiple engineering components, and to engineering component carry out component name, material, belonging positions, project amount, The data input of cost;
S2. site contour data are obtained by unmanned plane technology, is established in module 12 in GIS three-dimensional land map, it will Site contour data carry out empty three computations and generate point cloud data, pass through point cloud data fabrication by Smart3D software The actual landform figure in place;
S3. by terrain information import in Lumion software and mutually tied with the threedimensional model of BIM three-dimension modeling module 11 It closes, and three-dimensional engineering model display module 4 generates very three-dimensional engineering model;
S4. administrative staff are carrying out Design of Construction Organization according to big data by administrative staff's terminal 7, and to three-dimensional engineering Progress control module 31,34 phase of device management module 32, component management module 33 and personal management module in model display module 4 The data of pass carry out typing;
S5. staff obtains the scheme of construction in three-dimensional engineering model display module 4, and executes work according to arrangement and method for construction Make, staff uploads to construction information recording module to construction speed and work progress record in real time in staff's terminal 21 2;
S6. staff carries out the preparation of the wearing and tool of appliances for labor protection according to the information that supplementary information module 5 provides, Staff by appliances for labor protection wearing finish and tool it is ready after shoot by video acquisition submodule 511, the first identification Comparative sub-module 512 makes comparisons the characteristic image of video acquisition submodule 511 with the information of supplementary information module 5, when first When identification submodule 512 mismatches, the first identification submodule 512 prompts appliances for labor protection to dress undesirable letter Breath and tool lack or the information of mistake, and prompts again to shoot unmatched place;
S7. needed for administrative staff in three-dimensional engineering model display module 4 by clicking on-site supervision module 35 and selecting The construction member of monitoring can obtain the site operation situation of the engineering component in real time;Second identification module 353 will be live The characteristic image of video captured by monitoring camera 351 is made comparisons with the information of supplementary information module 5, and live dressing is not inconsistent Desired staff is closed to mark and feed back staff's terminal 21;
S8. administrative staff obtain in the component of three-dimensional engineering model display module 4 constructed according to administrative staff's terminal 7 The data for taking practice of construction progress and work progress to record, by progress control module 31 and personal management module 34 and according to big Data carry out the adjustment of progress and the arrangement of personnel.
The present invention can carry out at any time entire Engineering Digital, informationization more according to the actual conditions of engineering project Change, eliminates the complicated process that tradition is changed plan.
The system integration content of all items management, project manager can understand the detailed of entire engineering by the system Details condition avoids because the major function emphasis of software platform is different, to use multiple APP simultaneously, and cause information weight The situation of compound unrest.

Claims (10)

1. one kind is based on three-dimensional visualization project management system, which is characterized in that establish module including very three-dimensional engineering model (1), BIM three-dimension modeling module (11), GIS three-dimensional land map establish module (12), construction information recording module (2), work Thread management platform (3), three-dimensional engineering model display module (4), supplementary information module (5) and database server (6),
The BIM three-dimension modeling module (11) is used to establish by BIM threedimensional model of the software to engineering, and will BIM threedimensional model is divided into multiple engineering components, the engineering component and Practical Project position relative to and be able to carry out component Name, material, belonging positions, project amount, cost data input;
The GIS three-dimensional land map establishes module (12) for site contour data by Smart3D software, to be carried out sky three and added Close calculating generates point cloud data, passes through the actual landform figure in point cloud data fabrication place;
The very three-dimensional engineering model is established module (1) and is used for the data of the BIM three-dimension modeling module (11) and institute It states GIS three-dimensional land map and establishes the data combination of module (12), and generate very three-dimensional engineering model;
The construction information recording module (2) be used for by staff's terminal (21) in real time to construction speed and work progress The typing of record;
The engineering management platform (3) is used for through the management in administrative staff's terminal (7) to engineering project, and including progress pipe Manage module (31), device management module (32), component management module (33), personal management module (34) and on-site supervision module (35);
The three-dimensional engineering model display module (4) is used for construction information recording module (2) data and the engineering management Platform (3) data and the very three-dimensional engineering model establish the combination of module (1), staff's terminal (21) and the pipe It manages staff terminal (7) and the real-time total of each engineering component information is carried out by the three-dimensional engineering model display module (4) It enjoys;
The supplementary information module (5) is used to obtain position and the construction structure of construction member according to the engineering management platform (3) Appliances for labor protection and tool needed for the project under construction of part obtains the points for attention and construction of work progress by machine learning algorithm Information, its information is transmitted to the three-dimensional engineering model display module (4), staff's terminal (21) passes through described Three-dimensional engineering model display module (4) obtains the information of the supplementary information module (5);
The database server (6) for the engineering management platform (3), the three-dimensional engineering model display module (4) and The storage and transmission of supplementary information module (5) data.
2. according to claim 1 a kind of based on three-dimensional visualization project management system, it is characterised in that: further include supervision Module (51), the supervision module (51) include video acquisition submodule (511) and the first identification submodule (512), institute Video acquisition submodule (511) are stated for shooting construction personnel's appliances for labor protection wearing information before setting out and construction tool information; The first identification submodule (512) is used to extract the characteristic image of the video acquisition submodule (511), by the view The characteristic image of frequency acquisition submodule (511) is made comparisons with the information of the supplementary information module (5), and comparison result is fed back To staff.
3. according to claim 1 a kind of based on three-dimensional visualization project management system, it is characterised in that: the GIS tri- Dimension topographic map establishes module (12) and obtains site contour data by unmanned plane technology.
4. according to claim 1 a kind of based on three-dimensional visualization project management system, it is characterised in that: described very three-dimensional It is soft by the terrain information importing Lumion that the GIS three-dimensional land map is established to module (12) that engineering model establishes module (1) It is combined in part with the threedimensional model of the BIM three-dimension modeling module (11), generates very three-dimensional engineering model.
5. according to claim 1 a kind of based on three-dimensional visualization project management system, it is characterised in that: the three-dimensional work Journey model display module (4) passes through the information for receiving the progress control module (31) and the personal management module (34), and It is shown in true threedimensional model in each engineering component, staff is by staff's terminal (21) described three The target advance information and personnel depaly information that dimension engineering model display module (4) obtains are constructed;Administrative staff are according to institute State administrative staff's terminal (7) obtained in the component of the three-dimensional engineering model display module (4) constructed practice of construction into The data of degree and work progress record, by the progress control module (31) and the personal management module (34) and according to big Data carry out the adjustment of progress and the arrangement of personnel.
6. according to claim 1 a kind of based on three-dimensional visualization project management system, it is characterised in that: the construction letter Breath recording module (2) will be in work progress the case where equipment and use information is sent to the three-dimensional engineering model display module (4), staff obtains the account of the history of the equipment in the device management module (32) by administrative staff's terminal (7) And history use information.
7. according to claim 1 a kind of based on three-dimensional visualization project management system, it is characterised in that: the member tube Reason module (33) be used for by administrative staff's terminal (7) for staff provide each engineering component component name, Material, belonging positions, project amount, the information of cost.
8. according to claim 1 a kind of based on three-dimensional visualization project management system, it is characterised in that: the scene prison The case where module (35) are for remotely monitoring construction site is controlled, and including on-site supervision camera (351) and monitoring control submodule Block (352), the on-site supervision camera (351) are installed at the construction field (site) and corresponding with each engineering component;Institute Monitoring control submodule (352) is stated for the control to the monitoring camera (351);By clicking the three-dimensional engineering model The on-site supervision module (35) of engineering component described in display module (4) can obtain showing for the engineering component in real time Field condition of construction.
9. one kind according to claim 1 or 8 is based on three-dimensional visualization project management system, it is characterised in that: described existing Field monitoring module (35) further includes the second identification module (353), and the second identification module (353) is for extracting institute The characteristic image for stating video captured by on-site supervision camera (351), by video captured by the on-site supervision camera (351) Characteristic image make comparisons with the information of the supplementary information module (5), and by the undesirable staff of live dressing It marks and feeds back staff's terminal (21).
10. one kind described in -9 is based on three-dimensional visualization project management system according to claim 1, it is characterised in that: using this The project management of system includes the following steps,
S1. BIM threedimensional model is established in the BIM three-dimension modeling module (11) according to Practical Project, by BIM threedimensional model Be divided into multiple engineering components according to Practical Project position, and to the engineering component carry out component name, material, belonging positions, The data input of project amount, cost;
S2. site contour data are obtained by unmanned plane technology, are established in module (12) in the GIS three-dimensional land map, By site contour data by Smart3D software, carries out empty three computations and generate point cloud data, work is made by point cloud data The actual landform figure in journey place;
S3. by terrain information import threedimensional model phase with the BIM three-dimension modeling module (11) in Lumion software In conjunction with, and the three-dimensional engineering model display module (4) generates very three-dimensional engineering model;
S4. administrative staff are carrying out Design of Construction Organization according to big data by administrative staff's terminal (7), and to described three Tie up progress control module (31), the device management module (32), the component management described in engineering model display module (4) Module (33) and the relevant data of the personal management module (34) carry out typing;
S5. staff obtains the scheme of construction in the three-dimensional engineering model display module (4), and is executed according to arrangement and method for construction Work, staff upload to the construction information to construction speed and work progress record in real time in staff's terminal (21) Recording module (2);
S6. staff carries out the wearing of appliances for labor protection and the standard of tool according to the information that the supplementary information module (5) provides It is standby, staff by appliances for labor protection wearing finish and tool it is ready after by the video acquisition submodule (511) shoot, The first identification submodule (512) is by the characteristic image of the video acquisition submodule (511) and the auxiliary information The information of module (5) is made comparisons, when the first identification submodule (512) mismatches, the first identification Module (512) prompt appliances for labor protection dress undesirable information and tool lacks or the information of mistake, and prompt is again right Unmatched place is shot;
S7. administrative staff are by clicking the on-site supervision module (35) simultaneously in the three-dimensional engineering model display module (4) The construction member monitored needed for selection, can obtain the site operation situation of the engineering component in real time;Described second Identification module (353) is by the characteristic image of video captured by the on-site supervision camera (351) and the auxiliary information The information of module (5) is made comparisons, and the undesirable staff of live dressing is marked and feeds back the staff Terminal (21);
S8. administrative staff according to administrative staff's terminal (7) being constructed in the three-dimensional engineering model display module (4) The data that practice of construction progress and work progress record are obtained in component, pass through the progress control module (31) and the personnel Management module (34) simultaneously carries out the adjustment of progress and the arrangement of personnel according to big data.
CN201811291495.2A 2018-10-31 2018-10-31 Project management system based on three-dimensional visualization Active CN109447479B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811291495.2A CN109447479B (en) 2018-10-31 2018-10-31 Project management system based on three-dimensional visualization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811291495.2A CN109447479B (en) 2018-10-31 2018-10-31 Project management system based on three-dimensional visualization

Publications (2)

Publication Number Publication Date
CN109447479A true CN109447479A (en) 2019-03-08
CN109447479B CN109447479B (en) 2021-12-21

Family

ID=65549500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811291495.2A Active CN109447479B (en) 2018-10-31 2018-10-31 Project management system based on three-dimensional visualization

Country Status (1)

Country Link
CN (1) CN109447479B (en)

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109917708A (en) * 2019-03-13 2019-06-21 武汉零点视觉数字科技有限公司 A kind of three-dimensional scenic display systems of engineering informationization construction
CN109949018A (en) * 2019-04-17 2019-06-28 河北方舟工程项目管理有限公司 Construction-engineering project management overall process tracing system
CN110070307A (en) * 2019-05-05 2019-07-30 广西路桥工程集团有限公司 A kind of Information Visualization Management System based on WBS
CN110084527A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of digitlization construction management system based on BIM model
CN110084526A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of visualization project management monitoring system based on BIM+WBS
CN110096814A (en) * 2019-05-05 2019-08-06 广西路桥工程集团有限公司 A kind of digitlization bridge construction system based on BIM model
CN110158607A (en) * 2019-04-25 2019-08-23 广东景源建设工程有限公司 Supporting pile construction method and system
CN110232558A (en) * 2019-05-10 2019-09-13 林同棪国际工程咨询(中国)有限公司 Engineering project progress msg monitoring method
CN110398982A (en) * 2019-06-21 2019-11-01 万翼科技有限公司 A kind of method for inspecting and system of unmanned plane
CN110457759A (en) * 2019-07-17 2019-11-15 北京朗道新科智能科技有限公司 A kind of road construction management method, system and computer storage medium
CN110457410A (en) * 2019-06-28 2019-11-15 杭州鲁尔物联科技有限公司 A kind of construction method and system of three-dimensional GIS platform
CN110472375A (en) * 2019-09-18 2019-11-19 中国十七冶集团有限公司 A kind of asymmetric suspension bridge construction management-control method based on BIM
CN110490415A (en) * 2019-07-15 2019-11-22 同济大学 A kind of building progress appraisal procedure of multiple no-manned plane vision collaboration
CN110580397A (en) * 2019-09-23 2019-12-17 重庆渝高科技产业(集团)股份有限公司 display system for engineering project centralized display platform
CN110751725A (en) * 2019-10-18 2020-02-04 青岛理工大学 Disaster occurrence tracing method based on BIM + GIS fusion technology
CN110991982A (en) * 2019-10-28 2020-04-10 中船重工海鑫工程管理(北京)有限公司 Construction project building information management method and system
CN111008237A (en) * 2019-09-27 2020-04-14 重庆渝高科技产业(集团)股份有限公司 Big data platform command center
CN111062686A (en) * 2019-12-10 2020-04-24 广州电力工程监理有限公司 Mobile intelligent supervision and control method and system based on digital model
CN111105323A (en) * 2019-12-20 2020-05-05 广西路桥工程集团有限公司 Engineering management system based on WBS
CN111246083A (en) * 2020-01-03 2020-06-05 广西路桥工程集团有限公司 Real-time live broadcast system is patrolled and examined in 5G unmanned aerial vehicle building site
CN111401765A (en) * 2020-03-24 2020-07-10 重庆德生鼎盛实业发展有限公司 Engineering progress supervisory systems based on big data
CN111445219A (en) * 2020-05-14 2020-07-24 河北建设集团股份有限公司 RTK technology-based field plane arrangement system and arrangement method
CN111445218A (en) * 2020-04-22 2020-07-24 中铁二十一局集团电务电化工程有限公司 BIM-based project progress management method, device, equipment and storage medium
CN111625891A (en) * 2020-05-27 2020-09-04 广东金盛世生态环境有限公司 Information acquisition equipment based on BIM technology and virtual garden landscape digital modeling method
CN112132543A (en) * 2020-09-25 2020-12-25 广西路桥工程集团有限公司 Engineering project progress management system
CN112149212A (en) * 2020-09-22 2020-12-29 广西路桥工程集团有限公司 Visual construction management platform for engineering project
CN112348473A (en) * 2020-11-10 2021-02-09 湖北福泰建筑装饰工程有限公司 Engineering management information visualization software
CN112465967A (en) * 2020-11-25 2021-03-09 上海久隆电力(集团)有限公司 Electronic sand table system for power grid project construction management
CN112488547A (en) * 2020-12-09 2021-03-12 黑龙江建筑职业技术学院 Distribution management system based on engineering project management
CN112766883A (en) * 2021-01-06 2021-05-07 苏州隶匠科技有限公司 Construction project supervision method
CN112884444A (en) * 2021-03-10 2021-06-01 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN112907211A (en) * 2021-03-02 2021-06-04 惠州城际工程咨询有限公司 BIM-based project progress supervision method, device, equipment and storage medium
CN112926841A (en) * 2021-02-05 2021-06-08 国家电网有限公司 Engineering construction quality process data integration monitoring method and system
CN113409462A (en) * 2021-05-28 2021-09-17 湖北中金匠建设工程有限公司 Municipal engineering construction safety control method and system based on 3DGIS and BIM technology
CN113536071A (en) * 2021-09-15 2021-10-22 国能大渡河大数据服务有限公司 System for comprehensive management of hydropower engineering
CN113723786A (en) * 2021-08-20 2021-11-30 寰球孪生空间设计(云南)有限公司 Visual planning auxiliary system based on three-dimensional GIS
CN113935859A (en) * 2021-09-10 2022-01-14 中建三局集团有限公司 Intelligent construction site system based on BIM model
CN116645069A (en) * 2023-07-26 2023-08-25 东莞市鹏锦机械科技有限公司 Engineering project management system based on machine vision
CN116957291A (en) * 2023-08-10 2023-10-27 浙江明达工程造价咨询有限公司 Intelligent management system and method for engineering management data

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107037881A (en) * 2017-03-24 2017-08-11 广西七三科技有限公司 The interactive demonstration method and system of GIS and BIM augmented realities in piping lane, subway work
CN107680220A (en) * 2017-09-28 2018-02-09 朱明增 A kind of operation unlawful practice intelligent identification Method based on machine vision technique
CN107729609A (en) * 2017-09-14 2018-02-23 北京致臻智造科技有限公司 The display methods and system that a kind of building decoration technology is told somebody what one's real intentions are
CN108319926A (en) * 2018-02-12 2018-07-24 安徽金禾软件股份有限公司 A kind of the safety cap wearing detecting system and detection method of building-site
CN108549963A (en) * 2018-02-22 2018-09-18 北京中建建筑设计院有限公司 A kind of novel execution management method therefor based on BIM information flow standards
CN108596423A (en) * 2018-03-02 2018-09-28 重庆机电装备技术研究院有限公司 A kind of trackways engineering construction progress msg management method based on BIM

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107037881A (en) * 2017-03-24 2017-08-11 广西七三科技有限公司 The interactive demonstration method and system of GIS and BIM augmented realities in piping lane, subway work
CN107729609A (en) * 2017-09-14 2018-02-23 北京致臻智造科技有限公司 The display methods and system that a kind of building decoration technology is told somebody what one's real intentions are
CN107680220A (en) * 2017-09-28 2018-02-09 朱明增 A kind of operation unlawful practice intelligent identification Method based on machine vision technique
CN108319926A (en) * 2018-02-12 2018-07-24 安徽金禾软件股份有限公司 A kind of the safety cap wearing detecting system and detection method of building-site
CN108549963A (en) * 2018-02-22 2018-09-18 北京中建建筑设计院有限公司 A kind of novel execution management method therefor based on BIM information flow standards
CN108596423A (en) * 2018-03-02 2018-09-28 重庆机电装备技术研究院有限公司 A kind of trackways engineering construction progress msg management method based on BIM

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
喻静敏等: "无人机遥感在地面目标变化监测中的应用研究", 《电子测量技术》 *

Cited By (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109917708A (en) * 2019-03-13 2019-06-21 武汉零点视觉数字科技有限公司 A kind of three-dimensional scenic display systems of engineering informationization construction
CN109949018A (en) * 2019-04-17 2019-06-28 河北方舟工程项目管理有限公司 Construction-engineering project management overall process tracing system
CN110158607A (en) * 2019-04-25 2019-08-23 广东景源建设工程有限公司 Supporting pile construction method and system
CN110070307A (en) * 2019-05-05 2019-07-30 广西路桥工程集团有限公司 A kind of Information Visualization Management System based on WBS
CN110084527A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of digitlization construction management system based on BIM model
CN110084526A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of visualization project management monitoring system based on BIM+WBS
CN110096814A (en) * 2019-05-05 2019-08-06 广西路桥工程集团有限公司 A kind of digitlization bridge construction system based on BIM model
CN110084526B (en) * 2019-05-05 2022-05-31 广西路桥工程集团有限公司 BIM + WBS-based visual project management monitoring system
CN110084527B (en) * 2019-05-05 2022-05-31 广西路桥工程集团有限公司 Digital construction management system based on BIM model
CN110070307B (en) * 2019-05-05 2022-07-05 广西路桥工程集团有限公司 Information visualization management system based on WBS
CN110096814B (en) * 2019-05-05 2022-08-16 广西路桥工程集团有限公司 Digital bridge construction system based on BIM model
CN110232558A (en) * 2019-05-10 2019-09-13 林同棪国际工程咨询(中国)有限公司 Engineering project progress msg monitoring method
CN110398982A (en) * 2019-06-21 2019-11-01 万翼科技有限公司 A kind of method for inspecting and system of unmanned plane
CN110457410A (en) * 2019-06-28 2019-11-15 杭州鲁尔物联科技有限公司 A kind of construction method and system of three-dimensional GIS platform
CN110490415A (en) * 2019-07-15 2019-11-22 同济大学 A kind of building progress appraisal procedure of multiple no-manned plane vision collaboration
CN110457759A (en) * 2019-07-17 2019-11-15 北京朗道新科智能科技有限公司 A kind of road construction management method, system and computer storage medium
CN110472375A (en) * 2019-09-18 2019-11-19 中国十七冶集团有限公司 A kind of asymmetric suspension bridge construction management-control method based on BIM
CN110580397A (en) * 2019-09-23 2019-12-17 重庆渝高科技产业(集团)股份有限公司 display system for engineering project centralized display platform
CN111008237A (en) * 2019-09-27 2020-04-14 重庆渝高科技产业(集团)股份有限公司 Big data platform command center
CN110751725B (en) * 2019-10-18 2022-10-28 青岛理工大学 Disaster occurrence tracing method based on BIM + GIS fusion technology
CN110751725A (en) * 2019-10-18 2020-02-04 青岛理工大学 Disaster occurrence tracing method based on BIM + GIS fusion technology
WO2021072921A1 (en) * 2019-10-18 2021-04-22 青岛理工大学 Disaster occurrence backtracing method based on bim + gis fusion technology
CN110991982A (en) * 2019-10-28 2020-04-10 中船重工海鑫工程管理(北京)有限公司 Construction project building information management method and system
CN111062686A (en) * 2019-12-10 2020-04-24 广州电力工程监理有限公司 Mobile intelligent supervision and control method and system based on digital model
CN111105323B (en) * 2019-12-20 2022-06-24 广西路桥工程集团有限公司 Engineering management system based on WBS
CN111105323A (en) * 2019-12-20 2020-05-05 广西路桥工程集团有限公司 Engineering management system based on WBS
CN111246083A (en) * 2020-01-03 2020-06-05 广西路桥工程集团有限公司 Real-time live broadcast system is patrolled and examined in 5G unmanned aerial vehicle building site
CN111246083B (en) * 2020-01-03 2022-03-15 广西路桥工程集团有限公司 Real-time live broadcast system is patrolled and examined in 5G unmanned aerial vehicle building site
CN111401765A (en) * 2020-03-24 2020-07-10 重庆德生鼎盛实业发展有限公司 Engineering progress supervisory systems based on big data
CN111401765B (en) * 2020-03-24 2024-01-16 重庆德生鼎盛实业发展有限公司 Engineering progress supervision system based on big data
CN111445218A (en) * 2020-04-22 2020-07-24 中铁二十一局集团电务电化工程有限公司 BIM-based project progress management method, device, equipment and storage medium
CN111445219A (en) * 2020-05-14 2020-07-24 河北建设集团股份有限公司 RTK technology-based field plane arrangement system and arrangement method
CN111625891A (en) * 2020-05-27 2020-09-04 广东金盛世生态环境有限公司 Information acquisition equipment based on BIM technology and virtual garden landscape digital modeling method
CN112149212B (en) * 2020-09-22 2022-08-05 广西路桥工程集团有限公司 Visual construction management platform for engineering project
CN112149212A (en) * 2020-09-22 2020-12-29 广西路桥工程集团有限公司 Visual construction management platform for engineering project
CN112132543A (en) * 2020-09-25 2020-12-25 广西路桥工程集团有限公司 Engineering project progress management system
CN112348473A (en) * 2020-11-10 2021-02-09 湖北福泰建筑装饰工程有限公司 Engineering management information visualization software
CN112465967A (en) * 2020-11-25 2021-03-09 上海久隆电力(集团)有限公司 Electronic sand table system for power grid project construction management
CN112488547A (en) * 2020-12-09 2021-03-12 黑龙江建筑职业技术学院 Distribution management system based on engineering project management
CN112766883A (en) * 2021-01-06 2021-05-07 苏州隶匠科技有限公司 Construction project supervision method
CN112926841A (en) * 2021-02-05 2021-06-08 国家电网有限公司 Engineering construction quality process data integration monitoring method and system
CN112907211B (en) * 2021-03-02 2024-06-04 惠州城际工程咨询有限公司 BIM-based engineering progress supervision method, device, equipment and storage medium
CN112907211A (en) * 2021-03-02 2021-06-04 惠州城际工程咨询有限公司 BIM-based project progress supervision method, device, equipment and storage medium
CN112884444B (en) * 2021-03-10 2023-07-18 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN112884444A (en) * 2021-03-10 2021-06-01 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN113409462A (en) * 2021-05-28 2021-09-17 湖北中金匠建设工程有限公司 Municipal engineering construction safety control method and system based on 3DGIS and BIM technology
CN113723786A (en) * 2021-08-20 2021-11-30 寰球孪生空间设计(云南)有限公司 Visual planning auxiliary system based on three-dimensional GIS
CN113723786B (en) * 2021-08-20 2024-02-02 寰球孪生空间设计(云南)有限公司 Visual planning auxiliary system based on three-dimensional GIS
CN113935859A (en) * 2021-09-10 2022-01-14 中建三局集团有限公司 Intelligent construction site system based on BIM model
CN113536071A (en) * 2021-09-15 2021-10-22 国能大渡河大数据服务有限公司 System for comprehensive management of hydropower engineering
CN116645069A (en) * 2023-07-26 2023-08-25 东莞市鹏锦机械科技有限公司 Engineering project management system based on machine vision
CN116645069B (en) * 2023-07-26 2023-12-22 东莞市鹏锦机械科技有限公司 Engineering project management system based on machine vision
CN116957291A (en) * 2023-08-10 2023-10-27 浙江明达工程造价咨询有限公司 Intelligent management system and method for engineering management data
CN116957291B (en) * 2023-08-10 2024-05-07 湛江市广厦施工图审查服务中心 Intelligent management system and method for engineering management data

Also Published As

Publication number Publication date
CN109447479B (en) 2021-12-21

Similar Documents

Publication Publication Date Title
CN109447479A (en) One kind being based on three-dimensional visualization project management system
CN109446664A (en) A kind of scene progress control display device system
CN109377065A (en) One kind being based on three-dimensional visualization engineering construction progress control and cost control system
CN109408981A (en) A kind of information management system of road and bridge highway engineering construction
CN108596423A (en) A kind of trackways engineering construction progress msg management method based on BIM
CN110084526A (en) A kind of visualization project management monitoring system based on BIM+WBS
CN110008588A (en) Multidimensional integrated highway engineering construction progress msg management system and method
Ghadirian et al. Integration of augmented reality and GIS: A new approach to realistic landscape visualisation
CN107679310A (en) The real-time progress 3 D stereo methods of exhibiting of engineering based on BIM and image congruencing technology
CN104765905A (en) (Building Information Modeling) BIM based plan graph and first view-angle split-screen synchronous display method and system
CN109472483A (en) A kind of building-site modeling method and system based on BIM model and technology of taking photo by plane
CN109345626B (en) Be used for cubic metre of earth and stone to measure and construction system
CN108842782A (en) Based on BIM technology deep pit digging and construction method for supporting
KR100836535B1 (en) 3-dimensional system and method for construction progression managing based gis
WO2021227469A1 (en) Three-dimensional simulation display system for nuclear power plant
CN105955463A (en) BIM (Building Information Modeling)-based VR (Virtual Reality) virtual feeling system
CN106611441B (en) The treating method and apparatus of three-dimensional map
CN111104473B (en) Visual information management system, method and server
CN104537573A (en) Power grid operation information panoramic visualized display system
CN110704556B (en) Geographic information acquisition method based on GIS technology
CN104134121A (en) Method for achieving visualization of power grid information system business data
CN107396046A (en) A kind of stereoscopic monitoring system and method based on the true threedimensional model of oblique photograph
CN101208698A (en) System and method for designing landscape architecture based on real image
CN109710696A (en) The System and method for the mobile operation of unusual fluctuation is verified for power equipment
Lin et al. A real-time 4D augmented reality system for modular construction progress monitoring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant