CN108549963A - A kind of novel execution management method therefor based on BIM information flow standards - Google Patents
A kind of novel execution management method therefor based on BIM information flow standards Download PDFInfo
- Publication number
- CN108549963A CN108549963A CN201810153362.2A CN201810153362A CN108549963A CN 108549963 A CN108549963 A CN 108549963A CN 201810153362 A CN201810153362 A CN 201810153362A CN 108549963 A CN108549963 A CN 108549963A
- Authority
- CN
- China
- Prior art keywords
- information
- bim
- construction
- model
- input model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 34
- 238000010276 construction Methods 0.000 claims abstract description 63
- 238000013461 design Methods 0.000 claims abstract description 32
- 239000000463 material Substances 0.000 claims abstract description 27
- 238000009430 construction management Methods 0.000 claims abstract description 19
- 238000007689 inspection Methods 0.000 claims abstract description 13
- 238000005516 engineering process Methods 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 238000005034 decoration Methods 0.000 claims description 3
- 230000005662 electromechanics Effects 0.000 claims description 3
- 238000004378 air conditioning Methods 0.000 claims description 2
- 238000012544 monitoring process Methods 0.000 claims description 2
- 239000000779 smoke Substances 0.000 claims description 2
- 230000005764 inhibitory process Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000012372 quality testing Methods 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 210000001520 comb Anatomy 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Biodiversity & Conservation Biology (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of novel execution management method therefors based on BIM information flow standards, include the following steps:Step 1:It makes standardization project BIM and models model;For the design drawing material and equipment choosing situation of detailed programs, makes standardization project BIM and model model, be loaded into basic race and component;Step 2:Establishing criteria project BIM modeling models establish design BIM models;Step 3:Information input model is made, inputting model by described information makes correlation engineering project data regularly be transmitted in the design BIM models;Step 4:Typing information and construction management;Projects technical staff carries out quality inspection, the typing of quotient pipe and construction information using quality inspection, quotient's pipe and construction information input model, and described information is associated in construction BIM models, extract the data content of store keeping list, quality inspection management list, construction management list when needing respectively from construction BIM models.The present invention has economic consumption few, and linkage collaboration feature department is more, the high advantage of the efficiency of management.
Description
Technical field
The present invention relates to a kind of execution management method therefor, more particularly to a kind of novel building based on BIM information flow standards
Engineering Construction Management method.
Background technology
Currently, the BIM technology application in construction management field, key content are information flows in Building Information Model
And application.Information flow standard construction management technology, is exactly standardized classification, then assignment by the information of component in model
In a model, and by information flow in model construction management is carried out.The novel construction management of BIM information flow standards will pass through
Wear the project management whole story, the model for forming information completely simultaneously, pass through information flow in model and link each engineering technology
Department BIM coordinated management operations.
Existing BIM technology content side is extensive, but there is no BIM engineering management solutions that form complete set, negotiable
Certainly scheme, sum up be primarily present it is following some apply drawback:First, BIM technology is till now, there is no in building work
Application is landed in journey project management, engineers and technicians are difficult to total involvement operation;Second is that designing institute's model fails effectively to transmit
To construction party, project management need to re-establish a new BIM model;Third, model information content is imperfect, classification is mixed
Disorderly, it is difficult to carry out rational construction management using model information.
Invention content
In view of this, the present invention provides, a kind of economic consumption is few, and linkage collaboration feature department is more, and the efficiency of management is high, can really from
The novel building Engineering Construction Management method based on BIM information flow standards of BIM technology is implemented in landing on technological layer.
The present invention is solved the above problems by following technological means:
A kind of novel execution management method therefor based on BIM information flow standards, includes the following steps:
Step 1:It makes standardization project BIM and models model;For the design drawing material and equipment choosing situation of detailed programs,
Race's library component information flow standardization design is carried out, project reality is complied with, the precondition of standard is then modeled in enterprise B IM
Under, it makes standardization project BIM and models model, be loaded into basic race and component;
Step 2:Establishing criteria project BIM modeling models establish design BIM models;Modeling personnel, which establish BIM and cooperate, to be collected,
The professions such as design BIM models, including building, structure, electromechanics, decoration are established in collaboration;
Step 3:Information input model is made, described information input model is divided into quality information input model, quotient's pipe information input
Model and construction information input model, and described information input model can make correlation engineering project data regularly be transmitted to institute
It states in design BIM models;It will be present in quality information, quotient's pipe information and the construction letter on race's library component during designing a model
Breath is integrated to quality information by design and assignment and inputs on model, quotient's pipe information input model and construction information input model;
Step 4:Typing information and construction management;After project construction starts, quality safety departmental staff, quotient pipe portion gate technique personnel
Quality information input model, quotient's pipe information input model and construction information is used to input model typing phase respectively with technology department personnel
Information data is closed, and described information is associated in construction BIM models, when needing, material is extracted respectively from construction BIM models
Manage the data content of list, quality inspection management list, construction management list.
Preferably, the previous step of step 1 is to carry out Construction Engineering Major genealogical classification, to the system of classification from design
Four model information, quality information, quotient's pipe information and construction information aspects arrange, and form the building work with certain rule
Journey professional system information bank.
Preferably, according to the finish message situation that designs a model described in information bank, collect and make standardized race, structure
Part forms race's library component of enterprise-level.
In step 3, preferably, the quality information input model, quotient's pipe information input model and construction information input
Each information input model in model includes elevator device, air-conditioning system, power supply-distribution system, supply and drain water system, illumination system
System, BA systems, fire fighting water system, fire-fighting electric system, smoke control system, alarm system, monitoring system, electronic patrol system, door
Access control system, parking lot guidance system, managing system of car parking, information issuing system, integrates civil engineering system at background music system
Information input model.
Preferably, the quality information input model includes quality inspection typing list, and the quality information includes material and structure
The design geometric parameter of part, property parameters, subsidiary parameter etc..
Preferably, quotient's pipe information input model includes quotient's pipe typing list, and quotient's pipe information includes material and structure
Property parameters, quantity, buying hour, supplier, price of part etc..
Preferably, the construction information input model includes construction information typing list, and the construction information includes material
And component location information, construct into field time, on-stream time, completion date, cost, artificial etc..
Preferably, race library component includes System Families, outer tribe and built-in race.
By adopting the above-described technical solution, the beneficial effects of the invention are as follows:
1. the present invention since race, component, combs proprietary information, material information and satellite information, utilizes such race, component system
It is made corresponding project model, then builds design BIM models, and add in designing BIM models using certain Method means
Add all kinds of regular information, is gradually completing construction BIM models, finally carries out construction management.
2. it provides a kind of completely new BIM application technologies, substantial in content abundant, logical construction is rigorous, has very strong
Generalization is the result for fully in depth using BIM software functions.
3. the economic consumption involved in the present invention arrived is few, linkage collaboration feature department is more, and the efficiency of management is high, can be really from skill
BIM technology is implemented in landing in art level.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, the attached drawing of embodiment will be briefly described below, it is right
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings
His attached drawing.
Fig. 1 is the elevator device information classification situation table of the present invention;
Fig. 2 is the information flow procedure chart of the present invention.
Specific implementation mode
In order to keep the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction in the embodiment of the present invention
Attached drawing, technical solution in the embodiment of the present invention is explicitly described.
As shown in Figure 1, 2, embodiments of the present invention are as follows:
1)Carry out Construction Engineering Major genealogical classification first, to the system of point good class carry out from the information that designs a model, quality information,
Four aspects of quotient's pipe information and construction information arrange, and form the Construction Engineering Major system information library with certain rule (see attached
Fig. 1).Information taxonomic revision is the premise of this technology, there is standardized information content, this technology could be promoted to fail to be sold at auction along information
Carry out follow-up work in standardization direction.
2)It makes standardization project and models model.According to the finish message situation that designs a model in previous step information bank, receive
Collect and make standardized race, component, form race's library file of enterprise-level, for the design drawing material and equipment of detailed programs
Situation is selected, race's library component information flow standardization design is carried out, complies with project reality, then model standard in enterprise B IM
Precondition under, make project BIM and model model, basic race and component are loaded into wherein, and set Project browser
Tissue, component material, color, filter and certain drawing convention.Construction-engineering project all uses uniform model text
Part carries out BIM models and builds, this is to ensure model correctly and the precondition that is consistent of model information classification.
3) design BIM models are established according to project level modeling model.The units such as Project Technical portion or designing institute, BIM consultings
Modeling personnel, which establish BIM and cooperate, to be collected, and the professions such as design BIM models, including building, structure, electromechanics, decoration are established in collaboration.
4) information input model is made.Information input model is the breach of deeply thorough research information Flow Technique, related
Engineering project data can be regularly transmitted in design BIM models, and operation is managed so that engineering staff carries out subsequent construction.
Design information is the content that construction party or designing institute are added to when model buildings in model, has geometry in main information
The contents such as parameter, component proprietary information, material information and satellite information, these information itself are present on the component of general race library
, during revit Software Design Models, so that it may with design and assignment.It is substantially material information that quality information, which inputs model, only
But this is to be planned to by quality testing personnel on the basis of existing equipment material in order to which whether the equipment for checking buying meets
The information record work asked and done.Quotient's pipe information input model is really equipment purchase information, that is to say that resources area buying is set
Standby information, this type of information can trace equipment specific object parameter, manufacturer, service provider and buying hour etc..Establish quotient
These procurement informations are integrated in input model, the information input tool of standard are made by pipe information input model.Construction information
Input model is that equipment is marched into the arena the data content of construction, the installation site of detailed entry purpose equipment, plan into field time,
The construction informations content such as on-stream time, completion date and human cost, it is consistent with above-mentioned input information content, these are believed in advance
Breath is integrated in construction information input model, and the information input tool of standard is made.
5) typing and construction management of information.After project construction starts, quality safety departmental staff is defeated using quality information
Enter the information datas such as material and the attribute of model typing charging, and by information association to construction BIM models, needs to check material
When, list can be managed by extraction material quotient's pipe information check from construction BIM models, quality testing personnel utilize this list one by one
Live material context is verified, it is incongruent to be marked in table, it is handled in time with administrative staff's verification;Quotient pipe portion gate technique people
Member carries out material price, producer, service provider, buying hour etc. using the procurement information of quotient's pipe information input model typing charging
Information, and by information association to construction BIM models, when needing to carry out live material list dispensing, can be extracted from construction BIM models
Material list data content, commercial affairs and resources area personnel carry out the work of project matching management;Technology department personnel coordinate live labor service point
Packet personnel carry out the construction informations typing such as material properties, construction time, cost, artificial using construction information input model, and will
It, can be from construction when needing to form construction logout and cost of building projects list in information association to construction BIM models
Construction management list is extracted in BIM models, each department administrative staff, which sign, to be confirmed.
During project carries out, projects technical staff uses all kinds of in quality inspection, quotient's pipe and construction information input model
Data input detail list carries out quality inspection, the typing of quotient pipe and construction information, and name classification and the typing number of equipment are carried out before typing
According to time service, the data of recording device use the transmission item of revit softwares then in the BIM models built up item by item
The function of target standard, chooses browser tissue, item argument and project information, and the good three classes information table of typing is transferred to
In BIM models, by race's function selected member in Project browser, and by component, shape selected by the good data correlation of typing
At the one-to-one logical relation of component data, with project construction progress, using identical method, gradually extremely by information association
BIM models.
Construction management is carried out using production operation list.Production operation list is formed in information management procedure, when
When a certain department of engineering needs list to carry out generation work, corresponding management table can be directly extracted from the model for added information
Single, quality inspection management can form quality inspection management list, and the management of quotient's pipe can form quotient's pipe management list, and construction management can form construction pipe
Manage list.These lists are good according to the customization in advance of construction party production operation standard, and table content form meets construction party and returns
Shelves require.
Information flow construction management process is completed with project process until project is completed.
In attached drawing 2 in the present embodiment as can be seen that can be understood as from information flow procedure chart construction-engineering project not
The same stage adds upper different information, the information content of gradual perfection BIM models into BIM models, and each department is not
The same stage can extract the detailed list such as material, quality inspection and construction from the BIM models for added information and carry out engineering project
Management.
Specifically, technical scheme of the present invention is applied in Silk Road trade industry center projects, at present this
Mesh has been constructed.
Compared with prior art, advantage of the invention is that:Since race, component, comb proprietary information, material information and
Satellite information is fabricated to corresponding project model using such race, component, then builds design BIM models, and using centainly
Method means add all kinds of regular information in designing BIM models, be gradually completing construction BIM models, finally applied
Work management.It provides a kind of completely new BIM application technologies, and substantial in content abundant, logical construction is rigorous, has very strong popularization
Property, it is the result for fully in depth using BIM software functions.The economic consumption involved in the present invention arrived is few, and link collaboration feature
Department is more, and the efficiency of management is high, can really be landed from technological layer and implement BIM technology.
Finally illustrate, the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although with reference to compared with
Good embodiment describes the invention in detail, it will be understood by those of ordinary skill in the art that, it can be to the skill of the present invention
Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this
In the right of invention.
Claims (8)
1. a kind of novel execution management method therefor based on BIM information flow standards, includes the following steps:
Step 1:It makes standardization project BIM and models model;For the design drawing material and equipment choosing situation of detailed programs,
Race's library component information flow standardization design is carried out, project reality is complied with, the precondition of standard is then modeled in enterprise B IM
Under, it makes standardization project BIM and models model, be loaded into basic race and component;
Step 2:Establishing criteria project BIM modeling models establish design BIM models;Modeling personnel, which establish BIM and cooperate, to be collected,
The professions such as design BIM models, including building, structure, electromechanics, decoration are established in collaboration;
Step 3:Information input model is made, described information input model is divided into quality information input model, quotient's pipe information input
Model and construction information input model, and described information input model can make correlation engineering project data regularly be transmitted to institute
It states in design BIM models;It will be present in quality information, quotient's pipe information and the construction letter on race's library component during designing a model
Breath is integrated to quality information by design and assignment and inputs on model, quotient's pipe information input model and construction information input model;
Step 4:Typing information and construction management;After project construction starts, quality safety departmental staff, quotient pipe portion gate technique personnel
Quality information input model, quotient's pipe information input model and construction information is used to input model typing phase respectively with technology department personnel
Information data is closed, and described information is associated in construction BIM models, when needing, material is extracted respectively from construction BIM models
Manage the data content of list, quality inspection management list, construction management list.
2. a kind of novel execution management method therefor based on BIM information flow standards according to claim 1, feature exist
In:The previous step of step 1 is to carry out Construction Engineering Major genealogical classification, to the system of classification from the information that designs a model, quality inspection
Four information, quotient's pipe information and construction information aspects arrange, and form the Construction Engineering Major system with certain rule and believe
Cease library.
3. a kind of novel execution management method therefor based on BIM information flow standards according to claim 2, feature exist
In:According to the finish message situation that designs a model described in information bank, standardized race, component are collected and made, forms enterprise
Race's library component of grade.
4. a kind of novel execution management method therefor based on BIM information flow standards according to any one of claim 1-3,
It is characterized in that:In step 3, the quality information input model, quotient's pipe information input model and construction information input model
In each information input model include elevator device, air-conditioning system, power supply-distribution system, supply and drain water system, lighting system, BA
System, fire fighting water system, fire-fighting electric system, smoke control system, alarm system, monitoring system, electronic patrol system, gate inhibition system
The information of system, background music system, parking lot guidance system, managing system of car parking, information issuing system, comprehensive civil engineering system
Input model.
5. a kind of novel execution management method therefor based on BIM information flow standards according to claim 4, feature exist
In:The quality information input model includes quality inspection typing list, and the quality information includes the design geometry of material and component
Parameter, property parameters, subsidiary parameter etc..
6. a kind of novel execution management method therefor based on BIM information flow standards according to claim 4, feature exist
In:Quotient's pipe information input model include quotient's pipe typing list, quotient's pipe information include material and component property parameters,
Quantity, buying hour, supplier, price etc..
7. a kind of novel execution management method therefor based on BIM information flow standards according to claim 4, feature exist
In:The construction information input model includes construction information typing list, and the construction information includes the position of material and component
Information is constructed into field time, on-stream time, completion date, cost, artificial etc..
8. a kind of novel execution management method therefor based on BIM information flow standards according to claim 3, feature exist
In:Race library component includes System Families, outer tribe and built-in race.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810153362.2A CN108549963A (en) | 2018-02-22 | 2018-02-22 | A kind of novel execution management method therefor based on BIM information flow standards |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810153362.2A CN108549963A (en) | 2018-02-22 | 2018-02-22 | A kind of novel execution management method therefor based on BIM information flow standards |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108549963A true CN108549963A (en) | 2018-09-18 |
Family
ID=63516031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810153362.2A Pending CN108549963A (en) | 2018-02-22 | 2018-02-22 | A kind of novel execution management method therefor based on BIM information flow standards |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108549963A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109377065A (en) * | 2018-10-31 | 2019-02-22 | 广西路桥工程集团有限公司 | One kind being based on three-dimensional visualization engineering construction progress control and cost control system |
CN109408979A (en) * | 2018-10-31 | 2019-03-01 | 广西路桥工程集团有限公司 | A kind of engineering construction internal control data management system |
CN109447479A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | One kind being based on three-dimensional visualization project management system |
CN109472483A (en) * | 2018-11-01 | 2019-03-15 | 广西路桥工程集团有限公司 | A kind of building-site modeling method and system based on BIM model and technology of taking photo by plane |
CN109815350A (en) * | 2019-01-28 | 2019-05-28 | 河北工业大学 | Model data base system based on Revit |
CN110083592A (en) * | 2019-05-08 | 2019-08-02 | 中国建筑第八工程局有限公司 | Architectural engineering sample managing method based on BIM |
CN111291233A (en) * | 2020-03-11 | 2020-06-16 | 中国十七冶集团有限公司 | BIM technology-based electronic construction log entry method |
CN111444141A (en) * | 2020-03-26 | 2020-07-24 | 长沙中交京纬工程技术有限公司 | Data archive storage method based on BIM |
CN111724016A (en) * | 2019-03-21 | 2020-09-29 | 上海易智链智能科技发展有限公司 | BIM-based material dynamic management method and system |
CN111737801A (en) * | 2020-06-24 | 2020-10-02 | 中建八局第一建设有限公司 | Home decoration design and construction system based on BIM |
CN113077229A (en) * | 2021-03-30 | 2021-07-06 | 贵州数智联云工程科技有限公司 | Multi-party information interaction system and method based on BIM |
CN113360995A (en) * | 2021-07-01 | 2021-09-07 | 苏州苏明装饰股份有限公司 | BIM model-based method and system for calling interchange decoration materials |
CN116108522A (en) * | 2022-12-20 | 2023-05-12 | 中国建筑第二工程局有限公司 | BIM model-based data processing method and system in nuclear power construction |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120226513A1 (en) * | 2011-03-01 | 2012-09-06 | Kay Steeve Teong Sin | Project management system |
KR20150088022A (en) * | 2014-01-23 | 2015-07-31 | 주식회사 글로텍 | Quantity calculated automation system using a BIM tool |
CN105023201A (en) * | 2015-07-24 | 2015-11-04 | 中建三局第一建设工程有限责任公司 | Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data |
CN105046432A (en) * | 2015-07-20 | 2015-11-11 | 重庆建工第十一建筑工程有限责任公司 | Building dimensional guide construction method |
CN106202723A (en) * | 2016-07-10 | 2016-12-07 | 北京工业大学 | A kind of BIM subway work method |
CN106384200A (en) * | 2016-09-27 | 2017-02-08 | 朱海涛 | BIM (Building Information Modeling) technology-based management and application method of construction multidimensional model |
CN107016625A (en) * | 2017-03-13 | 2017-08-04 | 同济大学 | A kind of total bag enterprise B IM authorizing standard methods of architectural engineering |
CN107145619A (en) * | 2017-03-10 | 2017-09-08 | 宁波诺丁汉大学 | Function plate design system based on the comprehensive integrated cloud platforms of BIM |
CN107527155A (en) * | 2017-09-06 | 2017-12-29 | 北京北控建设发展有限公司 | Construction project supervisory systems |
-
2018
- 2018-02-22 CN CN201810153362.2A patent/CN108549963A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120226513A1 (en) * | 2011-03-01 | 2012-09-06 | Kay Steeve Teong Sin | Project management system |
KR20150088022A (en) * | 2014-01-23 | 2015-07-31 | 주식회사 글로텍 | Quantity calculated automation system using a BIM tool |
CN105046432A (en) * | 2015-07-20 | 2015-11-11 | 重庆建工第十一建筑工程有限责任公司 | Building dimensional guide construction method |
CN105023201A (en) * | 2015-07-24 | 2015-11-04 | 中建三局第一建设工程有限责任公司 | Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data |
CN106202723A (en) * | 2016-07-10 | 2016-12-07 | 北京工业大学 | A kind of BIM subway work method |
CN106384200A (en) * | 2016-09-27 | 2017-02-08 | 朱海涛 | BIM (Building Information Modeling) technology-based management and application method of construction multidimensional model |
CN107145619A (en) * | 2017-03-10 | 2017-09-08 | 宁波诺丁汉大学 | Function plate design system based on the comprehensive integrated cloud platforms of BIM |
CN107016625A (en) * | 2017-03-13 | 2017-08-04 | 同济大学 | A kind of total bag enterprise B IM authorizing standard methods of architectural engineering |
CN107527155A (en) * | 2017-09-06 | 2017-12-29 | 北京北控建设发展有限公司 | Construction project supervisory systems |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109447479B (en) * | 2018-10-31 | 2021-12-21 | 广西路桥工程集团有限公司 | Project management system based on three-dimensional visualization |
CN109408979A (en) * | 2018-10-31 | 2019-03-01 | 广西路桥工程集团有限公司 | A kind of engineering construction internal control data management system |
CN109447479A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | One kind being based on three-dimensional visualization project management system |
CN109377065A (en) * | 2018-10-31 | 2019-02-22 | 广西路桥工程集团有限公司 | One kind being based on three-dimensional visualization engineering construction progress control and cost control system |
CN109408979B (en) * | 2018-10-31 | 2023-04-07 | 广西路桥工程集团有限公司 | Engineering construction internal control data management system |
CN109377065B (en) * | 2018-10-31 | 2022-02-01 | 广西路桥工程集团有限公司 | Project construction progress management and cost control system based on three-dimensional visualization |
CN109472483A (en) * | 2018-11-01 | 2019-03-15 | 广西路桥工程集团有限公司 | A kind of building-site modeling method and system based on BIM model and technology of taking photo by plane |
CN109472483B (en) * | 2018-11-01 | 2022-03-29 | 广西路桥工程集团有限公司 | Building site on-site modeling method and system based on BIM (building information modeling) model and aerial photography technology |
CN109815350A (en) * | 2019-01-28 | 2019-05-28 | 河北工业大学 | Model data base system based on Revit |
CN109815350B (en) * | 2019-01-28 | 2020-12-15 | 河北工业大学 | Model database system based on Revit |
CN111724016A (en) * | 2019-03-21 | 2020-09-29 | 上海易智链智能科技发展有限公司 | BIM-based material dynamic management method and system |
CN110083592A (en) * | 2019-05-08 | 2019-08-02 | 中国建筑第八工程局有限公司 | Architectural engineering sample managing method based on BIM |
CN111291233A (en) * | 2020-03-11 | 2020-06-16 | 中国十七冶集团有限公司 | BIM technology-based electronic construction log entry method |
CN111444141A (en) * | 2020-03-26 | 2020-07-24 | 长沙中交京纬工程技术有限公司 | Data archive storage method based on BIM |
CN111444141B (en) * | 2020-03-26 | 2022-12-02 | 北京中交京纬公路造价技术有限公司 | Data archive storage method based on BIM |
CN111737801A (en) * | 2020-06-24 | 2020-10-02 | 中建八局第一建设有限公司 | Home decoration design and construction system based on BIM |
CN113077229A (en) * | 2021-03-30 | 2021-07-06 | 贵州数智联云工程科技有限公司 | Multi-party information interaction system and method based on BIM |
CN113077229B (en) * | 2021-03-30 | 2024-04-30 | 贵州数智联云工程科技有限公司 | Multiparty information interaction system and method based on BIM |
CN113360995A (en) * | 2021-07-01 | 2021-09-07 | 苏州苏明装饰股份有限公司 | BIM model-based method and system for calling interchange decoration materials |
CN113360995B (en) * | 2021-07-01 | 2022-02-15 | 苏州苏明装饰股份有限公司 | BIM model-based method and system for calling interchange decoration materials |
CN116108522A (en) * | 2022-12-20 | 2023-05-12 | 中国建筑第二工程局有限公司 | BIM model-based data processing method and system in nuclear power construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108549963A (en) | A kind of novel execution management method therefor based on BIM information flow standards | |
CN103984333B (en) | A kind of power plant monitoring and control management system | |
CN105302532B (en) | A kind of visual modeling editing machine for constructing system model | |
CN103444151B (en) | Airport security system | |
Deng et al. | Research on safety management application of dangerous sources in engineering construction based on BIM technology | |
CN109747682A (en) | Rail traffic light current integral system | |
CN109559006A (en) | A kind of monitoring method, device and the terminal device of the construction site based on unmanned plane | |
CN104850405A (en) | Intelligent configurable workflow engine and implementation method therefor | |
CN104361126B (en) | A-grade software airworthiness certification process management and data management method conforming to DO-178B/C | |
Aouad et al. | An IT map for a generic design and construction process protocol | |
CN113034311A (en) | Building construction supervision system and method based on BIM | |
CN108416230A (en) | A kind of data access method based on data isolation model | |
CN106250989A (en) | Electric power first-aid drill plan dynamic creation method and system | |
CN106503896A (en) | Construction equipment management method based on BIM technology | |
CN107146143A (en) | Advanced manufacture e-commerce platform | |
CN110717685A (en) | Building material management system and method | |
KR20160069008A (en) | Project management system based information and communication technology | |
CN114970176A (en) | Virtual simulation method and device for power operation, computer equipment and storage medium | |
CN103942474B (en) | Method for controlling permission three-dimensional model system in software project management process | |
JP2004054716A (en) | Work management method and display method for work | |
CN105224300B (en) | A kind of visual modeling method based on system member view construction system view | |
Wang et al. | A hybrid building information modeling and collaboration platform for automation system in smart construction | |
JP5825677B2 (en) | Course control program generation method and computer system | |
CN102622678A (en) | System for managing tobacco production infrastructures | |
Mitreva et al. | Optimization of Business processes in airport services company in Macedonia using the TQM philosophy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180918 |
|
WD01 | Invention patent application deemed withdrawn after publication |