CN109949018A - Construction-engineering project management overall process tracing system - Google Patents
Construction-engineering project management overall process tracing system Download PDFInfo
- Publication number
- CN109949018A CN109949018A CN201910306906.9A CN201910306906A CN109949018A CN 109949018 A CN109949018 A CN 109949018A CN 201910306906 A CN201910306906 A CN 201910306906A CN 109949018 A CN109949018 A CN 109949018A
- Authority
- CN
- China
- Prior art keywords
- information
- project
- construction
- cloud server
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 23
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000012216 screening Methods 0.000 claims abstract description 7
- 238000007726 management method Methods 0.000 claims description 48
- 238000004891 communication Methods 0.000 claims description 6
- 238000007728 cost analysis Methods 0.000 claims description 3
- 238000011156 evaluation Methods 0.000 claims description 3
- 238000012795 verification Methods 0.000 abstract description 2
- 230000010354 integration Effects 0.000 description 3
- 241001269238 Data Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Construction-engineering project management overall process tracing system, including cloud server, screening module, memory and local server, the cloud server are connect with local server, local server internal memory, screening module built in cloud server.The cloud server collect personnel, material and mechanical equipment location information and realize real-time update, cloud server is for obtaining random client location, and Client location information is sent to navigation module, navigation module establishes existing customer end position to the guidance path of target position information, and cloud server is pointed out to go to the direction of target position to the staff for holding client according to guidance path.The local server is used to store the correlation result information of cloud server, and local server simultaneously can pre-process the relevant information of each client.The present invention realizes Whole Course Management of the construction-engineering project from project verification examination & approval to financing construction.
Description
Technical field
The present invention relates to building engineering fields, specifically construction-engineering project management overall process tracing system.
Background technique
With the development of the city and social progress, construction-engineering project management seem more and more necessary.Engineering management exists
Today of system universalness, software become the important carrier of information exchange, and in building trade, software building can also be passed through
The mature project management ecosphere, and then run through entire project management system, this is not also institute in current building engineering field
See.
Summary of the invention
The present invention is intended to provide construction-engineering project management overall process tracing system.
In order to achieve the object, the invention provides the following technical scheme: construction-engineering project management tracks system with overall process
System, including cloud server, screening module, memory and local server, the cloud server are connect with local server,
Local server internal memory, screening module built in cloud server, the cloud server collect personnel, material and machine
The location information of tool equipment simultaneously realizes real-time update, and cloud server is for obtaining random client location, and by client position
Confidence breath is sent to navigation module, and navigation module establishes existing customer end position to the guidance path of target position information, cloud
Server is pointed out to go to the direction of target position to the staff for holding client according to guidance path;
The local server is used to store the correlation result information of cloud server, and local server simultaneously can be right
The relevant information of each client is pre-processed;
The also built-in project examination unit of the local server, project management unit, engineering data base, supplier's pipe
Unit, operation management unit and project construction progress tracking and managing unit are managed, the project examination module is for building determining
Engineering project is built to be examined;The project management unit is used for contract, single project process, progress materials, project
Cost analysis and engineering, which manage after sale, to be managed collectively;The supplier management unit is used for supplier information, supplier
Product information, supplier's quotation information, the online product of supplier, which place an order, buys module, supplier's financial management and supplier evaluation
And integration module information is managed collectively;The operation management unit is for managing routine office work information, bid information and pre-
Calculate information;The project construction progress tracking and managing unit is used for daily tracking project construction progress, and row information of going forward side by side analysis is anti-
Feedback.
Preferably, the cloud server includes positioning navigation module.
Preferably, the project construction progress tracking and managing unit can be adopted by the daily camera for being installed on construction site
Collect information.
Preferably, engineering data base storage be connected on the remote server, on remote server warning device and
Display unit.
Preferably, the client is mobile terminal, including wireless communication module, display screen and input module, client
End is connect by wireless communication module with cloud server access modules.
Compared with prior art, the beneficial effects of the present invention are: the present invention realizes construction-engineering project from project verification examination & approval
To the Whole Course Management of financing construction.
The engineerings such as Project contract control of the present invention, process management and control, budget control, flow management and control, finance control, buying control
Whole process supervision is extracted by the cross one another data of each data module, and all kinds of correlation datas are presented for manager, convenient
Management and examination & approval.By the support of unified operation management system and branch company's management system, contract management system is concluded a treaty clearly double
The responsibility-power-benefit of side makes engineering management targeted by project management, and process tracking is constantly provided with controllably for manager
Data.Under the guidance of business management system, by engineering financing management system, operation flow/finance cash flow/pipe is realized
Process integration is managed, the processing of the integrated information of finance is driven under the event-driven of system.By supplier management system with
Resources of human talents management system is engineering management better choice and implementation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of construction-engineering project management overall process tracing system provided by the present invention.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation
Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common
Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects
It encloses.
Referring to Fig. 1, in the embodiment of the present invention, construction-engineering project management overall process tracing system, including cloud clothes
Business device, screening module, memory and local server, the cloud server is connect with local server, in local server
Set memory, screening module built in cloud server.
The cloud server collect personnel, material and mechanical equipment location information and realize real-time update, cloud
Server is sent to navigation module for obtaining random client location, and by Client location information, and navigation module foundation is worked as
Preceding client location is to the guidance path of target position information, and cloud server is according to guidance path to the work for holding client
Personnel point out to go to the direction of target position.
The local server is used to store the correlation result information of cloud server, and local server simultaneously can be right
The relevant information of each client is pre-processed.
The also built-in project examination unit of the local server, project management unit, engineering data base, supplier's pipe
Unit, operation management unit and project construction progress tracking and managing unit are managed, the project examination module is for building determining
Engineering project is built to be examined;The project management unit is used for contract, single project process, progress materials, project
Cost analysis and engineering, which manage after sale, to be managed collectively;The supplier management unit is used for supplier information, supplier
Product information, supplier's quotation information, the online product of supplier, which place an order, buys module, supplier's financial management and supplier evaluation
And integration module information is managed collectively;The operation management unit is for managing routine office work information, bid information and pre-
Calculate information;The project construction progress tracking and managing unit is used for daily tracking project construction progress, and row information of going forward side by side analysis is anti-
Feedback.
The cloud server includes positioning navigation module.
The project construction progress tracking and managing unit can acquire information by the daily camera for being installed on construction site.
The engineering data base storage is connected with warning device on the remote server, on remote server and display is single
Member.
The client is mobile terminal, including wireless communication module, display screen and input module, client pass through nothing
Line communication module is connect with cloud server access modules.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (5)
1. construction-engineering project management overall process tracing system, including cloud server, screening module, memory and local clothes
Business device, the cloud server are connect with local server, local server internal memory, and cloud server is built-in to screen mould
Block, which is characterized in that
The cloud server collect personnel, material and mechanical equipment location information and realize real-time update, cloud service
Device is sent to navigation module for obtaining random client location, and by Client location information, and navigation module establishes current visitor
Family end position is to the guidance path of target position information, and cloud server is according to guidance path to the staff for holding client
Point out to go to the direction of target position;
The local server is used to store the correlation result information of cloud server, and local server simultaneously can be to each visitor
The relevant information at family end is pre-processed;
The also built-in project examination unit of the local server, project management unit, engineering data base, supplier management list
Member, operation management unit and project construction progress tracking and managing unit, the project examination module are used for determining building work
Journey project is examined;The project management unit is used for contract, single project process, progress materials, project cost
Analysis and engineering manage be managed collectively after sale;The supplier management unit is used for supplier information, supplier products
Information, supplier's quotation information, the online product of supplier, which place an order, buys module, supplier's financial management and supplier evaluation and product
Sub-module information is managed collectively;The operation management unit is for managing routine office work information, bid information and budget letter
Breath;The project construction progress tracking and managing unit is used for daily tracking project construction progress, row information of going forward side by side analysis feedback.
2. construction-engineering project management overall process tracing system according to claim 1, which is characterized in that the cloud
Server includes positioning navigation module.
3. construction-engineering project management overall process tracing system according to claim 1, which is characterized in that the project
Construction speed tracking and managing unit can acquire information by the daily camera for being installed on construction site.
4. construction-engineering project management overall process tracing system according to claim 1, which is characterized in that the engineering
Database is stored on the remote server, and warning device and display unit are connected on remote server.
5. construction-engineering project management overall process tracing system according to claim 1, which is characterized in that the client
End is mobile terminal, including wireless communication module, display screen and input module, and client passes through wireless communication module and cloud
The connection of server access module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910306906.9A CN109949018A (en) | 2019-04-17 | 2019-04-17 | Construction-engineering project management overall process tracing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910306906.9A CN109949018A (en) | 2019-04-17 | 2019-04-17 | Construction-engineering project management overall process tracing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109949018A true CN109949018A (en) | 2019-06-28 |
Family
ID=67014217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910306906.9A Pending CN109949018A (en) | 2019-04-17 | 2019-04-17 | Construction-engineering project management overall process tracing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109949018A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110880096A (en) * | 2019-11-20 | 2020-03-13 | 广西越知网络股份有限公司 | Multi-party cooperative office system for constructional engineering |
CN111582704A (en) * | 2020-04-30 | 2020-08-25 | 重庆世创工程管理有限公司 | Shared EPC + system |
CN112085481A (en) * | 2020-09-22 | 2020-12-15 | 国网山东省电力公司烟台供电公司 | Whole-process tracking system for electric power engineering project management |
CN112116316A (en) * | 2020-09-02 | 2020-12-22 | 武汉乐力通特机电工程有限公司 | Project management system based on industrial cloud platform |
CN112396407A (en) * | 2020-12-25 | 2021-02-23 | 张瑞青 | Engineering supervision cost consultation comprehensive management system |
CN112950175A (en) * | 2021-04-16 | 2021-06-11 | 重庆中楷工程技术服务有限公司 | Whole-process project management system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030225725A1 (en) * | 2001-05-31 | 2003-12-04 | Miller Julia K. | System and method for geocoding diverse address formats |
CN107748959A (en) * | 2017-10-25 | 2018-03-02 | 东华理工大学 | A kind of construction management information service system |
CN107948245A (en) * | 2017-10-31 | 2018-04-20 | 重庆工程职业技术学院 | Project Management System based on BIM |
CN108765200A (en) * | 2018-05-30 | 2018-11-06 | 福泽润森(武汉)科技股份有限公司 | A kind of entry level Project Management System |
CN109409675A (en) * | 2018-09-27 | 2019-03-01 | 广州小楠科技有限公司 | A kind of construction-engineering project management system |
CN208576462U (en) * | 2018-07-17 | 2019-03-05 | 宁波宝贝第一母婴用品有限公司 | A kind of automobile children safety chair intelligence control system |
CN109447479A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | One kind being based on three-dimensional visualization project management system |
-
2019
- 2019-04-17 CN CN201910306906.9A patent/CN109949018A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030225725A1 (en) * | 2001-05-31 | 2003-12-04 | Miller Julia K. | System and method for geocoding diverse address formats |
CN107748959A (en) * | 2017-10-25 | 2018-03-02 | 东华理工大学 | A kind of construction management information service system |
CN107948245A (en) * | 2017-10-31 | 2018-04-20 | 重庆工程职业技术学院 | Project Management System based on BIM |
CN108765200A (en) * | 2018-05-30 | 2018-11-06 | 福泽润森(武汉)科技股份有限公司 | A kind of entry level Project Management System |
CN208576462U (en) * | 2018-07-17 | 2019-03-05 | 宁波宝贝第一母婴用品有限公司 | A kind of automobile children safety chair intelligence control system |
CN109409675A (en) * | 2018-09-27 | 2019-03-01 | 广州小楠科技有限公司 | A kind of construction-engineering project management system |
CN109447479A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | One kind being based on three-dimensional visualization project management system |
Non-Patent Citations (1)
Title |
---|
陈伟杰 等: "《编组站大数据网络技术应用》", 31 December 2016, 中国铁道出版社 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110880096A (en) * | 2019-11-20 | 2020-03-13 | 广西越知网络股份有限公司 | Multi-party cooperative office system for constructional engineering |
CN110880096B (en) * | 2019-11-20 | 2023-10-31 | 广西越知网络股份有限公司 | Multi-party collaborative office system for building engineering |
CN111582704A (en) * | 2020-04-30 | 2020-08-25 | 重庆世创工程管理有限公司 | Shared EPC + system |
CN112116316A (en) * | 2020-09-02 | 2020-12-22 | 武汉乐力通特机电工程有限公司 | Project management system based on industrial cloud platform |
CN112085481A (en) * | 2020-09-22 | 2020-12-15 | 国网山东省电力公司烟台供电公司 | Whole-process tracking system for electric power engineering project management |
CN112396407A (en) * | 2020-12-25 | 2021-02-23 | 张瑞青 | Engineering supervision cost consultation comprehensive management system |
CN112950175A (en) * | 2021-04-16 | 2021-06-11 | 重庆中楷工程技术服务有限公司 | Whole-process project management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109949018A (en) | Construction-engineering project management overall process tracing system | |
Kraus et al. | Digitalization of business processes of enterprises of the ecosystem of Industry 4.0: virtual-real aspect of economic growth reserves | |
CN109978409B (en) | Multi-engineering enterprise-level intelligent construction site block chain management method | |
Tezel et al. | From conventional to it based visual management: A conceptual discussion for lean construction | |
CN108960467A (en) | Realty information management and data analysis system | |
CN112232761B (en) | Infrastructure application system and method | |
CN111161017A (en) | Cloud marketing system and method based on mobile terminal and block chain | |
CN102880929A (en) | Outworker support system for field of construction machinery | |
CN202373029U (en) | Commodity circulation tracing system | |
CN109242245A (en) | Field maintenance person's management system and its management method based on location information | |
CN108108957A (en) | Brand promotion project management method, device, terminal device and medium | |
US20140229204A1 (en) | Estimate method and generator | |
Azhar et al. | Impact of mobile tools and technologies on jobsite operations | |
Alexandrova et al. | Digital technologies development in industry sectors and areas of activity | |
Tsipoulanidis et al. | Contemporary potentials and challenges of digital logistics and supply chain management | |
Hou et al. | An integration framework of advanced technologies for productivity improvement for LNG mega-projects | |
Saaidin et al. | Risk variable on contractor’s tender figure in Malaysia | |
CN106296299A (en) | The storage Factory Building full data management system and method for trade and investment promotion | |
Klosova et al. | Methods for identifying non-value-adding activities in construction processes | |
Hasan et al. | Building Information Modeling (BIM) and construction tech integration for construction operations: State of the art | |
Syafar et al. | Mobile Collaboration Technology in Engineering Asset Maintenance–What Technology, Organisation and People Approaches Are Required? | |
CN111865636A (en) | Optical cable pipeline data analysis system, method, server and storage medium | |
SUNDSTRÖM | How Internet of Things can support Facility Management with tenant insights | |
Song et al. | Research on a mobile terminal-based control platform for the delivery and management of power material transportation | |
Wu et al. | Model and system for cotton-picker operation scheduling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190628 |
|
RJ01 | Rejection of invention patent application after publication |