CN107369002A - Engineering project information processing method and system - Google Patents
Engineering project information processing method and system Download PDFInfo
- Publication number
- CN107369002A CN107369002A CN201710552022.2A CN201710552022A CN107369002A CN 107369002 A CN107369002 A CN 107369002A CN 201710552022 A CN201710552022 A CN 201710552022A CN 107369002 A CN107369002 A CN 107369002A
- Authority
- CN
- China
- Prior art keywords
- information
- project
- construction
- issue
- bidding documents
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Biodiversity & Conservation Biology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of engineering project information processing method and system, method to be:Acquisition is reached the standard grade solicited message;Qualification authentication is carried out, obtains license of reaching the standard grade;Project information is classified according to default issue of bidding documents type, obtains issue of bidding documents classification results, with reference to the quacification of default construction party, the issue of bidding documents information of formation project side;The issue of bidding documents information of project side is issued;Obtain the bid request of construction party;Qualification examination is carried out, obtains construction permits;The construction information constructed according to project information and completion information are obtained, and is audited;After examination & verification passes through, project settlement data is obtained, and generates form and wall newspaper, is shown in the terminal interface of project side.The management that the present invention is automated based on computer to engineering project information, engineering project information is set to obtain unified processing, further engineering project information is obtained timely processing, ensure the integrality and correctness of engineering project information, accelerate the progress of engineering project.
Description
Technical field
The present invention relates to computer information technology field, more particularly to engineering project information processing method and system.
Background technology
At present, construction industry progressively moves towards to standardize, and the management of engineering project is important as one of administrative department
Work, in rapid urbanization process, urban construction scale development, all kinds of construction project species are various, also brought to enterprise
Bigger project management difficulty, particularly underground pipe network build related major project, and the scope being related to is wide, and quantities is big,
The complexity of underground construction, construction period length, the personnel being related to are more, to bringing many difficulties in management.
At present, the mode of project management still rests on traditional management mode, based on main one artificial follow-up, people
Work carries out project scheduling management mode:This way to manage is mainly characterized by, and manual type carries out project process follow-up, such as
Call about, either wechat inquire or carry out investigation to job site and check, then the money of various pictures is collected by construction team
Material issues project manager by way of wechat, and project manager is printed as papery archive, and this mode is more original project
Follow-up mode.This mode can cause the missing of data and normally can not be settled accounts with Party A, substantial amounts of so as to often spend
Time and Party A check progress, data, often can not the progress of management and control engineering and the quality of engineering.The item of Party A is sometimes connect
Mesh can not find suitable construction team again, or feel that the quotation of construction team is not cheap enough, so as to cause engineering company normal
The project to Party A construct, cause very big loss.Another question is exactly that construction pair and Construction Party implement project
During, the account phase of accounts receivable is involved, construction is solved and be paid out wages to taking project funds as early as possible to rural migrant worker.
Therefore, in the prior art the defects of is that existing engineering project information, most data are carried out by artificial mode
Management, it is excessively scattered because information content is excessive, the mode of neither one unified management, make engineering project can be because of information processing not
In time, situations such as information is imperfect influences the progress of engineering project.
The content of the invention
For above-mentioned technical problem, the present invention provides a kind of engineering project information processing method and system, employs and is based on
The management that computer is automated to engineering project information, engineering project information is obtained unified processing, further make work
Journey project information obtains timely processing, ensures the integrality and correctness of engineering project information, accelerates the progress of engineering project.
In order to solve the above technical problems, technical scheme provided by the invention is:
In a first aspect, the present invention provides a kind of engineering project information processing method, including:
Step S1, acquisition are reached the standard grade solicited message, and the solicited message of reaching the standard grade includes reaching the standard grade for project side and solicited message and applied
The solicited message of reaching the standard grade of work side;
Step S2, according to the solicited message of reaching the standard grade, qualification authentication is carried out, obtains license of reaching the standard grade;
Step S3, project information is obtained, the project information is classified according to default issue of bidding documents type, obtains issue of bidding documents
Classification results, the classification results of the issue of bidding documents include mark in real time, reservation mark and service mark;
Step S4, according to the classification results of the issue of bidding documents, with reference to the quacification of default construction party, form the project side
Issue of bidding documents information;
Step S5, obtains the issue of bidding documents solicited message of the project side, and according to the issue of bidding documents solicited message by the project
The issue of bidding documents information of side is issued, and is shown on the construction party and the terminal interface of the project side;
Step S6, according to the issue of bidding documents information of the project side, obtain the bid request of the construction party;
Step S7, according to the bid request of the construction party, qualification examination is carried out, obtains construction permits;
Step S8, the construction information constructed according to the project information and completion information are obtained, and audited;
Step S9, after examination & verification passes through, project settlement data is obtained, and generate form and wall newspaper, be shown in the project
The terminal interface of side.
Engineering project information processing method provided by the invention, its technical scheme are:Acquisition is reached the standard grade solicited message, it is described on
Line solicited message includes reach the standard grade solicited message and the solicited message of reaching the standard grade of construction party of project side;According to the request letter of reaching the standard grade
Breath, qualification authentication is carried out, obtains license of reaching the standard grade;Project information is obtained, the project information is entered according to default issue of bidding documents type
Row classification, obtains issue of bidding documents classification results, and the classification results of the issue of bidding documents include mark in real time, reservation mark and service mark;According to described
The classification results of issue of bidding documents, with reference to the quacification of default construction party, form the issue of bidding documents information of the project side;
Obtain the issue of bidding documents solicited message of the project side, and according to the issue of bidding documents solicited message by the issue of bidding documents of the project side
Information is issued, and is shown on the construction party and the terminal interface of the project side;Believed according to the issue of bidding documents of the project side
Breath, obtain the bid request of the construction party;According to the bid request of the construction party, qualification examination is carried out, construction is obtained and is permitted
Can;The construction information constructed according to the project information and completion information are obtained, and is audited;After examination & verification passes through,
Project settlement data is obtained, and generates form and wall newspaper, is shown in the terminal interface of the project side.
Engineering project information processing method provided by the invention, is automated based on computer to engineering project information
Management, makes engineering project information obtain unified processing, engineering project information is obtained timely processing, ensures engineering item
The integrality and correctness of mesh information, accelerate the progress of engineering project, reduce line down tube should in various cumbersome work,
So as to improve the operating efficiency of Traditional project company, while also reduce the various risks in work progress.
Further, before the step S1, in addition to:
Project side's information registering step:
Obtain the registration information of the project side;
According to the registration information of the project side, the registration of the project side is completed;
Or
Construction party information registering and improve step:
The authentication information of the construction party is obtained, the authentication information includes the cell-phone number information of construction party;
According to the authentication information of the construction party, registration is completed;
The data information that the construction party provides is obtained, enters that row information is perfect, and the data information includes the construction team
Essential information, real-name authentication information, construction area information, the strong degree information of engineering, construction team personnel and counterpart personnel money
Matter information;
The data information that the construction party provides is audited, examination & verification is completed to the perfect of the construction party information after passing through.
Further, the step S4, it is specially:
When the classification results of the issue of bidding documents to implement to mark, the specified construction party of project side's selection, and the finger are obtained
Determine the quacification that construction party meets the default construction party;
According to the specified construction party, the issue of bidding documents information of the project side is formed;
When the issue of bidding documents classification results for reservation mark, obtain the project root according to the Project Areas in the project information
At least one reservation construction party of domain selection, and at least one reservation construction party meets the qualification bar of the default construction party
Part;
According at least one reservation construction party, the issue of bidding documents information of the project side is formed;
When the classification results of the issue of bidding documents are mark in real time, at least one realtime construction side of project side selection is obtained,
And at least one realtime construction side is not required to the quacification that meets the default construction party;
According at least one realtime construction side, the issue of bidding documents information of the project side is formed.
Further, project scoring step is also included after the step S9:
Preset term standards of grading are obtained, the preset term standards of grading include safety, service, quality civilized construction,
Data is accurate and completes the time limit;
According to the preset term standards of grading, construction information and completion information to the project information score,
Obtain project appraisal result.
Further, loaning bill step is also included after the step S9:
According to the project settlement data, loan application inventory is generated according to preset ratio;
According to the loan application inventory, the loan application relevant information of the offer of the construction party is obtained;
The loan application relevant information is audited, after examination & verification passes through, generates loan application.
Second aspect, the invention provides a kind of engineering project information processing system, including:
Acquisition request of reaching the standard grade module, for obtaining solicited message of reaching the standard grade, the solicited message of reaching the standard grade includes the upper of project side
The solicited message of reaching the standard grade of line solicited message and construction party;
Qualification authentication module, for solicited message of being reached the standard grade according to, qualification authentication is carried out, obtains license of reaching the standard grade;
Issue of bidding documents classification of type module, for obtaining project information, the project information is entered according to default issue of bidding documents type
Row classification, obtains issue of bidding documents classification results, and the classification results of the issue of bidding documents include mark in real time, reservation mark and service mark;
Issue of bidding documents information generating module, for the classification results according to the issue of bidding documents, with reference to the quacification of default construction party,
Form the issue of bidding documents information of the project side;
Issue of bidding documents information issuing module, asked for obtaining the issue of bidding documents solicited message of the project side, and according to the issue of bidding documents
Information is issued the issue of bidding documents information of the project side, is shown on the construction party and the terminal interface of the project side;
Bid request acquisition module, for the issue of bidding documents information according to the project side, the bid for obtaining the construction party please
Ask;
Qualification examination module, for the bid request according to the construction party, qualification examination is carried out, obtains construction permits;
Project construction data obtaining module, for obtaining the construction information constructed according to the project information and completion
Information, and audited;
Project completes module, for after examination & verification passes through, obtaining project settlement data, and generates form and wall newspaper, shows
Terminal interface in the project side.
Engineering project information processing system provided by the invention, its technical scheme are:By acquisition request module of reaching the standard grade, obtain
Solicited message of reaching the standard grade is taken, the solicited message of reaching the standard grade includes the request letter of reaching the standard grade of reach the standard grade solicited message and the construction party of project side
Breath;By qualification authentication module, according to the solicited message of reaching the standard grade, qualification authentication is carried out, obtains license of reaching the standard grade;Pass through issue of bidding documents class
Type sort module, project information is obtained, the project information is classified according to default issue of bidding documents type, obtain issue of bidding documents classification
As a result, the classification results of the issue of bidding documents include mark in real time, reservation mark and service mark;By issue of bidding documents information generating module, according to institute
The classification results of issue of bidding documents are stated, with reference to the quacification of default construction party, form the issue of bidding documents information of the project side;
By issue of bidding documents information issuing module, the issue of bidding documents solicited message of the project side is obtained, and is asked according to the issue of bidding documents
Information is issued the issue of bidding documents information of the project side, is shown on the construction party and the terminal interface of the project side;
By bid request acquisition module, according to the issue of bidding documents information of the project side, the bid request of the construction party is obtained;Pass through money
Lattice auditing module, according to the bid request of the construction party, qualification examination is carried out, obtains construction permits;Believed by project construction
Acquisition module is ceased, obtains the construction information constructed according to the project information and completion information, and audited;Pass through item
Mesh completes module, after examination & verification passes through, obtains project settlement data, and generates form and wall newspaper, is shown in the project side
Terminal interface.
Engineering project information processing system provided by the invention, is automated based on computer to engineering project information
Management, makes engineering project information obtain unified processing, engineering project information is obtained timely processing, ensures engineering item
The integrality and correctness of mesh information, accelerate the progress of engineering project, reduce line down tube should in various cumbersome work,
So as to improve the operating efficiency of Traditional project company, while also reduce the various risks in work progress.
Further, before the acquisition request module of reaching the standard grade, in addition to,
Project side's information registering module, is used for:
Obtain the registration information of the project side;
According to the registration information of the project side, the registration of the project side is completed;
Or
Construction party information registering and module is improved, be used for:
The authentication information of the construction party is obtained, the authentication information includes the cell-phone number information of construction party;
According to the authentication information of the construction party, registration is completed;
The data information that the construction party provides is obtained, enters that row information is perfect, and the data information includes the construction team
Essential information, real-name authentication information, construction area information, the strong degree information of engineering, construction team personnel and counterpart personnel money
Matter information;
The data information that the construction party provides is audited, examination & verification is completed to the perfect of the construction party information after passing through.
Further, the issue of bidding documents information generating module, is specifically used for:
When the classification results of the issue of bidding documents to implement to mark, the specified construction party of project side's selection, and the finger are obtained
Determine the quacification that construction party meets the default construction party;
According to the specified construction party, the issue of bidding documents information of the project side is formed;
When the issue of bidding documents classification results for reservation mark, obtain the project root according to the Project Areas in the project information
At least one reservation construction party of domain selection, and at least one reservation construction party meets the qualification bar of the default construction party
Part;
According at least one reservation construction party, the issue of bidding documents information of the project side is formed;
When the classification results of the issue of bidding documents are mark in real time, at least one realtime construction side of project side selection is obtained,
And at least one realtime construction side is not required to the quacification that meets the default construction party;
According at least one realtime construction side, the issue of bidding documents information of the project side is formed.
Further, the project is completed also to include project grading module after module, is used for:
Preset term standards of grading are obtained, the preset term standards of grading include safety, service, quality civilized construction,
Data is accurate and completes the time limit;
According to the preset term standards of grading, construction information and completion information to the project information score,
Obtain project appraisal result.
Further, the project is completed also to include loaning bill module after module, is used for:
According to the project settlement data, loan application inventory is generated according to preset ratio;
According to the loan application inventory, the loan application relevant information of the offer of the construction party is obtained;
The loan application relevant information is audited, after examination & verification passes through, generates loan application.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art
The required accompanying drawing used is briefly described in embodiment or description of the prior art.
Fig. 1 shows a kind of flow chart for engineering project information processing method that the embodiment of the present invention is provided;
Fig. 2 shows a kind of schematic diagram for engineering project information processing system that the embodiment of the present invention is provided;
Fig. 3 shows the engineering project of a kind of engineering project information processing method and system that the embodiment of the present invention is provided
Management flow figure.
Embodiment
The embodiment of technical solution of the present invention is described in detail below in conjunction with accompanying drawing.Following examples are only used for
Clearly illustrate technical scheme, therefore be intended only as example, and the protection of the present invention can not be limited with this
Scope.
Embodiment one
Fig. 1 shows a kind of flow chart for engineering project information processing method that the embodiment of the present invention is provided;Such as Fig. 1 institutes
Show, a kind of engineering project information processing method that embodiment one provides, including:
Step S1, obtains solicited message of reaching the standard grade, and solicited message of reaching the standard grade includes reach the standard grade solicited message and the construction party of project side
Solicited message of reaching the standard grade;
Step S2, according to solicited message of reaching the standard grade, qualification authentication is carried out, obtains license of reaching the standard grade;
Step S3, project information is obtained, project information is classified according to default issue of bidding documents type, obtain issue of bidding documents classification
As a result, the classification results of issue of bidding documents include mark in real time, reservation mark and service mark;
Step S4, according to the classification results of issue of bidding documents, with reference to the quacification of default construction party, the issue of bidding documents for forming project side is believed
Breath;
Step S5, the issue of bidding documents solicited message of project side is obtained, and according to issue of bidding documents solicited message by the issue of bidding documents information of project side
Issued, be shown on construction party and the terminal interface of project side;
Step S6, according to the issue of bidding documents information of project side, obtain the bid request of construction party;
Step S7, according to the bid request of construction party, qualification examination is carried out, obtains construction permits;
Step S8, the construction information constructed according to project information and completion information are obtained, and audited;
Step S9, after examination & verification passes through, project settlement data is obtained, and generate form and wall newspaper, be shown in project side
Terminal interface.
Engineering project information processing method provided by the invention, its technical scheme are:Acquisition is reached the standard grade solicited message, and reaching the standard grade please
Information is asked to include reach the standard grade solicited message and the solicited message of reaching the standard grade of construction party of project side;According to solicited message of reaching the standard grade, provided
Lattice certification, obtain license of reaching the standard grade;Project information is obtained, project information is classified according to default issue of bidding documents type, sent out
Classification results are marked, the classification results of issue of bidding documents include mark in real time, reservation mark and service mark;According to the classification results of issue of bidding documents, with reference to pre-
If the quacification of construction party, the issue of bidding documents information of project side is formed;
The issue of bidding documents solicited message of acquisition project side, and sent out the issue of bidding documents information of project side according to issue of bidding documents solicited message
Cloth, it is shown on construction party and the terminal interface of project side;According to the issue of bidding documents information of project side, the bid for obtaining construction party please
Ask;According to the bid request of construction party, qualification examination is carried out, obtains construction permits;Obtain what is constructed according to project information
Construction information and completion information, and audited;After examination & verification passes through, project settlement data is obtained, and generates form and wall newspaper,
It is shown in the terminal interface of project side.
Engineering project information processing method provided by the invention, is automated based on computer to engineering project information
Management, makes engineering project information obtain unified processing, engineering project information is obtained timely processing, ensures engineering item
The integrality and correctness of mesh information, accelerate the progress of engineering project, reduce line down tube should in various cumbersome work,
So as to improve the operating efficiency of Traditional project company, while also reduce the various risks in work progress.
Specifically, before step S1, in addition to:
Project side's information registering step:
The registration information of acquisition project side;
According to the registration information of project side, the registration of finished item side;
Or
Construction party information registering and improve step:
The authentication information of construction party is obtained, authentication information includes the cell-phone number information of construction party;
According to the authentication information of construction party, registration is completed;
The data information that construction party provides is obtained, enters that row information is perfect, data information includes the essential information of construction team, reality
Name authentication information, construction area information, the strong degree information of engineering, construction team personnel and counterpart personnel's qualification information;
The data information that construction party provides is audited, examination & verification is completed to the perfect of construction party information after passing through.
It should be noted that the authentication information of construction party is not limited solely to the cell-phone number of construction party, such as body can also be included
The information such as part card number;After succeeding in registration, the information of construction party is carried out perfect, contribute to project side to enter when selecting construction party
Row selection, while also contribute to construction party and improve the competitiveness of oneself.In addition, the information provided construction party is audited, really
Legal regular construction party when protecting construction party, ensure the right of both sides.
Specifically, step S4, it is specially:
When the classification results of issue of bidding documents to implement to mark, the specified construction party of project side's selection is obtained, and specify construction party to meet
The quacification of default construction party;
According to specified construction party, the issue of bidding documents information of formation project side;
When the classification results of issue of bidding documents are marked for reservation, acquisition project root selects at least according to the item area in project information
One reservation construction party, and at least one reservation construction party meets the quacification of default construction party;
According at least one reservation construction party, the issue of bidding documents information of formation project side;
When the classification results of issue of bidding documents to mark in real time, at least one realtime construction side of project side's selection, and at least one are obtained
Individual realtime construction side is not required to the quacification for meeting default construction party;
According at least one realtime construction side, the issue of bidding documents information of formation project side.
The type of issue of bidding documents has three kinds, according to different issue of bidding documents types, issue of bidding documents information corresponding to formation, wherein, implement to be marked on
Construction team's acceptance of the bid is directly specified when issue of bidding documents, construction team does not need tender offer, and construction can select to move back mark.And service mark is not
Limited by the qualification that construction team uploads, reservation mark and real-time mark are limited by the qualification uploaded.That is, selected by project side
Construction party will be limited by qualification, such as scale qualification, equipment qualification etc..The project manager of project side selects some under reservation mark
Construction type carries out issue of bidding documents, and issue of bidding documents first selects construction area, and recalling the region can construct all construction teams of the construction type,
Project manager can select 1 or the progress issue of bidding documents of multiple construction teams, then proceed to add the other information of issue of bidding documents, eventually form
Issue of bidding documents information.
Issue of bidding documents Cheng Houhou, construction party can receive the project information of push by the end APP that constructs, while short message can also receive item
Mesh information, construction team click on tender offer, wait project manager to specify construction team after bidding successfully.Project manager selects the engineering
Unique construction team that type can construct, construction team is selected to integrate measurement by comprehensive grading and bid, specified in construction team
It is that cannot move back target after the acceptance of the bid of mark, wherein construction team, whether project manager sees according to construction type needs offer to tell somebody what one's real intentions are card,
If the engineering type of no-dig technique, it is desirable to provide card of telling somebody what one's real intentions are, otherwise need not provide card of telling somebody what one's real intentions are.
By such setting, the issue of bidding documents information of engineering information is clearly divided into three classes, can help to construction party selection certainly
The engineering that oneself can be constructed, project side is contributed to carry out Classification Management and matching bid to project.
Preferably, project scoring step is also included after step S9:
Preset term standards of grading are obtained, preset term standards of grading include safety, service, quality civilized construction, data
The accurate and completion time limit;
According to preset term standards of grading, construction information and completion information to project information score, and obtain project
Appraisal result.
Wherein, preset term standards of grading include 5 dimensions, are respectively:Safety, service, quality civilized construction, data are accurate
Really and in time complete, according to 5 dimensions and calculate average mark.
Wherein, specific standards of grading are:
Safety:Roll 3 months, ordinary accident, once detain 2 points, major accident, once detain 5 points;
Service:Refuse single 0.5 point of button, continuous order 10 times plus 0.5 point;
Quality civilized construction:1 point of button is once complained, rolls within 3 months accumulative 35 points of buttons, it is serious to complain 5 points of button;
Data is accurate:Continuous 10 times accurate plus 0.5 point;
Completion in time:Timely completion date=scheduled completion time+admissible number of days, detains 5 points not in time.
Scored by the work progress to each project and performance level, supervision can be played a part of to construction party,
Also, by comprehensive grading, make to form benign competition between each construction party, improve constantly construction quality.
Preferably, loaning bill step is also included after step S9:
According to project settlement data, loan application inventory is generated according to preset ratio;
According to loan application inventory, the loan application relevant information of the offer of construction party is obtained;
Loan application relevant information is audited, after examination & verification passes through, generates loan application.
During project construction, therefore, it be able to can apply borrowing through the above way because fund cause influence project progress
Money, to ensure that project progress is normally carried out.
Referring to Fig. 2, second aspect, the invention provides a kind of engineering project information processing system 10, including:
Acquisition request of reaching the standard grade module 101, for obtaining solicited message of reaching the standard grade, solicited message of reaching the standard grade includes reaching the standard grade for project side
The solicited message of reaching the standard grade of solicited message and construction party;
Qualification authentication module 102, for according to solicited message of reaching the standard grade, carrying out qualification authentication, obtaining license of reaching the standard grade;
Issue of bidding documents classification of type module 103, for obtaining project information, project information is carried out according to default issue of bidding documents type
Classification, obtains issue of bidding documents classification results, and the classification results of issue of bidding documents include mark in real time, reservation mark and service mark;
Issue of bidding documents information generating module 104, for the classification results according to issue of bidding documents, with reference to the quacification of default construction party,
The issue of bidding documents information of formation project side;
Issue of bidding documents information issuing module 105, for obtaining the issue of bidding documents solicited message of project side, and will according to issue of bidding documents solicited message
The issue of bidding documents information of project side is issued, and is shown on construction party and the terminal interface of project side;
Bid request acquisition module 106, for the issue of bidding documents information according to project side, obtain the bid request of construction party;
Qualification examination module 107, for the bid request according to construction party, qualification examination is carried out, obtains construction permits;
Project construction data obtaining module 108, for obtaining the construction information constructed according to project information and completion
Information, and audited;
Project completes module 109, for after examination & verification passes through, obtaining project settlement data, and generates form and wall newspaper, shows
Show the terminal interface in project side.
Engineering project information processing system 10 provided by the invention, its technical scheme are:Pass through acquisition request module of reaching the standard grade
101, solicited message of reaching the standard grade is obtained, solicited message of reaching the standard grade includes the request letter of reaching the standard grade of reach the standard grade solicited message and the construction party of project side
Breath;By qualification authentication module 102, according to solicited message of reaching the standard grade, qualification authentication is carried out, obtains license of reaching the standard grade;Pass through issue of bidding documents class
Type sort module 103, project information is obtained, project information is classified according to default issue of bidding documents type, obtain issue of bidding documents classification
As a result, the classification results of issue of bidding documents include mark in real time, reservation mark and service mark;By issue of bidding documents information generating module 104, according to issue of bidding documents
Classification results, with reference to the quacification of default construction party, form the issue of bidding documents information of project side;
By issue of bidding documents information issuing module 105, the issue of bidding documents solicited message of project side is obtained, and is incited somebody to action according to issue of bidding documents solicited message
The issue of bidding documents information of project side is issued, and is shown on construction party and the terminal interface of project side;Mould is obtained by bid request
Block 106, according to the issue of bidding documents information of project side, obtain the bid request of construction party;By qualification examination module 107, according to construction
The bid request of side, qualification examination is carried out, obtains construction permits;By project construction data obtaining module 108, obtain according to item
The construction information and completion information that mesh information is constructed, and audited;Module 109 is completed by project, passed through in examination & verification
Afterwards, project settlement data is obtained, and generates form and wall newspaper, is shown in the terminal interface of project side.
Engineering project information processing system 10 provided by the invention, engineering project information is automated based on computer
Management, engineering project information is obtained unified processing, engineering project information is obtained timely processing, ensure engineering
The integrality and correctness of project information, accelerate the progress of engineering project, reduce line down tube should in various cumbersome works
Make, so as to improve the operating efficiency of Traditional project company, while also reduce the various risks in work progress.
Specifically, before acquisition request of reaching the standard grade module 101, in addition to,
Project side's information registering module, is used for:
The registration information of acquisition project side;
According to the registration information of project side, the registration of finished item side;
Or
Construction party information registering and module is improved, be used for:
The authentication information of construction party is obtained, authentication information includes the cell-phone number information of construction party;
According to the authentication information of construction party, registration is completed;
The data information that construction party provides is obtained, enters that row information is perfect, data information includes the essential information of construction team, reality
Name authentication information, construction area information, the strong degree information of engineering, construction team personnel and counterpart personnel's qualification information;
The data information that construction party provides is audited, examination & verification is completed to the perfect of construction party information after passing through.
It should be noted that the authentication information of construction party is not limited solely to the cell-phone number of construction party, such as body can also be included
The information such as part card number;After succeeding in registration, the information of construction party is carried out perfect, contribute to project side to enter when selecting construction party
Row selection, while also contribute to construction party and improve the competitiveness of oneself.In addition, the information provided construction party is audited, really
Legal regular construction party when protecting construction party, ensure the right of both sides.
Specifically, issue of bidding documents information generating module 104, is specifically used for:
When the classification results of issue of bidding documents to implement to mark, the specified construction party of project side's selection is obtained, and specify construction party to meet
The quacification of default construction party;
According to specified construction party, the issue of bidding documents information of formation project side;
When the classification results of issue of bidding documents are marked for reservation, acquisition project root selects at least according to the item area in project information
One reservation construction party, and at least one reservation construction party meets the quacification of default construction party;
According at least one reservation construction party, the issue of bidding documents information of formation project side;
When the classification results of issue of bidding documents to mark in real time, at least one realtime construction side of project side's selection, and at least one are obtained
Individual realtime construction side is not required to the quacification for meeting default construction party;
According at least one realtime construction side, the issue of bidding documents information of formation project side.
The type of issue of bidding documents has three kinds, according to different issue of bidding documents types, issue of bidding documents information corresponding to formation, wherein, implement to be marked on
Construction team's acceptance of the bid is directly specified when issue of bidding documents, construction team does not need tender offer, and construction can select to move back mark.And service mark is not
Limited by the qualification that construction team uploads, reservation mark and real-time mark are limited by the qualification uploaded.That is, selected by project side
Construction party will be limited by qualification, such as scale qualification, equipment qualification etc..The project manager of project side selects some under reservation mark
Construction type carries out issue of bidding documents, and issue of bidding documents first selects construction area, and recalling the region can construct all construction teams of the construction type,
Project manager can select 1 or the progress issue of bidding documents of multiple construction teams, then proceed to add the other information of issue of bidding documents, eventually form
Issue of bidding documents information.
Issue of bidding documents Cheng Houhou, construction party can receive the project information of push by the end APP that constructs, while short message can also receive item
Mesh information, construction team click on tender offer, wait project manager to specify construction team after bidding successfully.Project manager selects the engineering
Unique construction team that type can construct, construction team is selected to integrate measurement by comprehensive grading and bid, specified in construction team
It is that cannot move back target after the acceptance of the bid of mark, wherein construction team, whether project manager sees according to construction type needs offer to tell somebody what one's real intentions are card,
If the engineering type of no-dig technique, it is desirable to provide card of telling somebody what one's real intentions are, otherwise need not provide card of telling somebody what one's real intentions are.
By such setting, the issue of bidding documents information of engineering information is clearly divided into three classes, can help to construction party selection certainly
The engineering that oneself can be constructed, project side is contributed to carry out Classification Management and matching bid to project.
Preferably, project is completed also to include project grading module after module 109, is used for:
Preset term standards of grading are obtained, preset term standards of grading include safety, service, quality civilized construction, data
The accurate and completion time limit;
According to preset term standards of grading, construction information and completion information to project information score, and obtain project
Appraisal result.
Wherein, preset term standards of grading include 5 dimensions, are respectively:Safety, service, quality civilized construction, data are accurate
Really and in time complete, according to 5 dimensions and calculate average mark.
Wherein, specific standards of grading are:
Safety:Roll 3 months, ordinary accident, once detain 2 points, major accident, once detain 5 points;
Service:Refuse single 0.5 point of button, continuous order 10 times plus 0.5 point;
Quality civilized construction:1 point of button is once complained, rolls within 3 months accumulative 35 points of buttons, it is serious to complain 5 points of button;
Data is accurate:Continuous 10 times accurate plus 0.5 point;
Completion in time:Timely completion date=scheduled completion time+admissible number of days, detains 5 points not in time.
Scored by the work progress to each project and performance level, supervision can be played a part of to construction party,
Also, by comprehensive grading, make to form benign competition between each construction party, improve constantly construction quality.
Preferably, project is completed also to include loaning bill module after module 109, is used for:
According to project settlement data, loan application inventory is generated according to preset ratio;
According to loan application inventory, the loan application relevant information of the offer of construction party is obtained;
Loan application relevant information is audited, after examination & verification passes through, generates loan application.
During project construction, therefore, it be able to can apply borrowing through the above way because fund cause influence project progress
Money, to ensure that project progress is normally carried out.
Embodiment two
Referring to Fig. 3, the engineering project information processing method and system that are provided in embodiment one, PC ends backstage, industry can be passed through
Be engaged in end APP, and construction team end APP is realized tri- parts, using business end APP and construction end APP to site operation data and project
Data is collected, and according to the project data of collection and data collect showing and generating form and billboard.So reduce
Line down tube should in various cumbersome work, so as to improve the operating efficiency of Traditional project company, while also reduce construction
During various risks.
PC ends backstage, business end APP, the function of each part in these three parts of construction team end APP and setting is described below:
PC ends backstage includes authority management module, site management module, operation management module and Financial Management module.Power
It is mainly to carry out control of authority, the different module of different Role Dilemmas and page to the page and module on backstage to limit management module
Face, site management module are mainly the type to construction, and engineering is quantitative, and the Back ground Information such as Construction Party carries out maintenance and management, fortune
Battalion's management module is mainly project generation form and billboard.Financial Management module is mainly that the project of completion can be realized automatically
The application of loaning bill.
Business end APP, project manager are mainly used in using business end APP, issue of bidding documents, upload card of telling somebody what one's real intentions are, and specify acceptance of the bid construction
Team, examination & verification asbuilt documentation etc..
Construct end APP, and construction team is mainly used in tender offer using construction end APP, registers and goes into operation, and upload goes into operation, construction
And asbuilt documentation, submit workload change and completion description.
Business end app role may be provided with:Project manager, documenter, An Zhiyuan.
The responsibility of project manager is issue of bidding documents:Acceptance of the bid construction team is specified, uploads card of telling somebody what one's real intentions are, audits asbuilt documentation;
The responsibility of documenter is:The project that project manager specifies carries out asbuilt documentation examination & verification;
Pacifying the responsibility of matter person is:During project construction, to the safety of project, the supervision of quality, APP (industry is fed back to
Be engaged in end APP and construction end APP) on.
Construction end APP role has:Construction team.
The responsibility of construction team is:Tender offer, upload go into operation, construction, asbuilt documentation, change workload etc.;
The role on PC ends backstage has:Keeper, run assistant director.
The responsibility of keeper is:Runing the responsibility of assistant director, which is, is safeguarded to the essential information of PC end station point:Assist project manager
Project is set up the project.
Also include comprehensive grade model:Including 5 dimensions, it is respectively:Safety, service, quality civilized construction, data are accurate
With timely completion, according to 5 dimensions and average mark is calculated.
Specifically standards of grading are:
Safety:Roll 3 months, ordinary accident, once detain 2 points, major accident, once detain 5 points;
Service:Refuse single 0.5 point of button, continuous order 10 times plus 0.5 point;
Quality civilized construction:1 point of button is once complained, rolls within 3 months accumulative 35 points of buttons, it is serious to complain 5 points of button;
Data is accurate:Continuous 10 times accurate plus 0.5 point;
Completion in time:Timely completion date=scheduled completion time+admissible number of days, detains 5 points not in time.
Financial modeling:
According to the data of project completion clearing, the application that can be borrowed money proportionally is generated, relevant information is filled in by construction team
Submitted after confirmation, then generate loan application.
Engineering project information processing is carried out with reference to tri- above-mentioned PC ends backstage, business end APP, construction team end APP parts, its
Process is specific as follows:
1st, construction team opens construction end APP, clicks on registration, input handset number, and password short message identifying code is submitted, succeeded in registration
Automated log on afterwards, continue to improve data, include the essential information of addition construction team, real-name authentication, select the region that can be constructed, choosing
It is strong to select the engineering that can be constructed, adds the information such as qualification corresponding to construction team personnel and personnel, is then forwarded to PC ends backstage and enters
Row examination & verification.
2nd, PC ends backstage operation personnel is registered to construction team and perfect information is audited, and after examination & verification passes through, illustrates this
Construction team possesses the ability of construction.
3rd, operation personnel logs in PC backstages and opened an account to project manager, and project manager opens business end APP, registering service
APP is held, into homepage, the type of issue of bidding documents want in selection, there is that three types are optional, is to mark in real time respectively, reservation mark and service mark, in fact
Apply and construction team's acceptance of the bid is directly specified when being marked on issue of bidding documents, construction team does not need tender offer, and construction can select to move back mark.Service
Mark is not limited by the qualification that construction team uploads, and reservation mark is limited with mark in real time by the qualification uploaded.
4th, project manager selects some construction type under reservation mark to carry out issue of bidding documents, and issue of bidding documents first selects construction area, recalled
The region can construct all construction teams of the construction type, and project manager can select 1 or multiple construction teams are sent out
Mark, then proceed to add the other information of issue of bidding documents, last issue of bidding documents success.
5th, issue of bidding documents Cheng Houhou, construction team will receive the project information of push by the end APP that constructs, while short message can also be received
To project information, construction team clicks on tender offer, waits project manager to specify construction team after bidding successfully.
6th, project manager selects unique construction team that the engineering type can construct, and is integrated by comprehensive grading and bid
Construction team is selected in measurement, specifies construction team's acceptance of the bid.
7th, it is that cannot move back target, project manager sees whether need upload to tell somebody what one's real intentions are according to construction type after construction team's acceptance of the bid
Card, if the engineering type of no-dig technique is, it is necessary to upload card of telling somebody what one's real intentions are, and carry out surveying feedback.
8th, upload card of telling somebody what one's real intentions are to reach job site into time that is rear, going into operation to plan, construction team and register going into operation, generation
Top application crew it is actual start to go into operation, during going into operation, collect the data to go into operation, the data of construction, completion
Data etc..
9th, construction team uploads and gone into operation, and construction and asbuilt documentation, changes workload, fills in completion description, submits wait project
Manager's examination & verification.
10th, the data and the workload of change that project manager uploads to project are audited, and examination & verification is completed after passing through, such as
Fruit, which is not audited, to be passed through and will reject, and writes rejection reason exactly, allows construction team to submit change workload from new uplink data, wait pending
Core.
11st, after examination & verification passes through, project can generate the fraction of five latitudes and commenting for synthesis according to the dimension system of comprehensive grading five
Point.
12nd, during project kickoff to completion, peace matter personnel can record the safe mass and civilization of construction stage
Related data to system.
13rd, project terminates since project verification to completion, can all automatically generate form and billboard corresponding to each state.
By above-mentioned PC ends backstage, business end APP, construction team end APP setting, the processing of engineering project information is carried out,
The management automated to engineering project information, engineering project information is obtained unified processing, further make engineering project
Information obtains timely processing, ensures the integrality and correctness of engineering project information, accelerates the progress of engineering project, reduce
Line down tube should in various cumbersome work, so as to improve the operating efficiency of Traditional project company, while also reduce construction
During various risks.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent
The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to
The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered
Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology
The scope of scheme, it all should cover among the claim of the present invention and the scope of specification.
Claims (10)
- A kind of 1. engineering project information processing method, it is characterised in that including:Step S1, obtains solicited message of reaching the standard grade, and the solicited message of reaching the standard grade includes reach the standard grade solicited message and the construction party of project side Solicited message of reaching the standard grade;Step S2, according to the solicited message of reaching the standard grade, qualification authentication is carried out, obtains license of reaching the standard grade;Step S3, project information is obtained, the project information is classified according to default issue of bidding documents type, obtain issue of bidding documents classification As a result, the classification results of the issue of bidding documents include mark in real time, reservation mark and service mark;Step S4, according to the classification results of the issue of bidding documents, with reference to the quacification of default construction party, form the hair of the project side Mark information;Step S5, obtains the issue of bidding documents solicited message of the project side, and according to the issue of bidding documents solicited message by the project side Issue of bidding documents information is issued, and is shown on the construction party and the terminal interface of the project side;Step S6, according to the issue of bidding documents information of the project side, obtain the bid request of the construction party;Step S7, according to the bid request of the construction party, qualification examination is carried out, obtains construction permits;Step S8, the construction information constructed according to the project information and completion information are obtained, and audited;Step S9, after examination & verification passes through, project settlement data is obtained, and generate form and wall newspaper, be shown in the project side Terminal interface.
- 2. engineering project information processing method according to claim 1, it is characterised in thatBefore the step S1, in addition to:Project side's information registering step:Obtain the registration information of the project side;According to the registration information of the project side, the registration of the project side is completed;OrConstruction party information registering and improve step:The authentication information of the construction party is obtained, the authentication information includes the cell-phone number information of construction party;According to the authentication information of the construction party, registration is completed;The data information that the construction party provides is obtained, enters that row information is perfect, the data information includes the base of the construction team This information, real-name authentication information, construction area information, the strong degree information of engineering, construction team personnel and counterpart personnel's qualification letter Breath;The data information that the construction party provides is audited, examination & verification is completed to the perfect of the construction party information after passing through.
- 3. engineering project information processing method according to claim 1, it is characterised in thatThe step S4, it is specially:When the classification results of the issue of bidding documents to implement to mark, the specified construction party of project side's selection is obtained, and described specify is applied Work side meets the quacification of the default construction party;According to the specified construction party, the issue of bidding documents information of the project side is formed;When the classification results of the issue of bidding documents to preengage mark, obtain the project root and selected according to the item area in the project information At least one reservation construction party selected, and at least one reservation construction party meets the quacification of the default construction party;According at least one reservation construction party, the issue of bidding documents information of the project side is formed;When the classification results of the issue of bidding documents to mark in real time, at least one realtime construction side of project side's selection, and institute are obtained State the quacification that at least one realtime construction side is not required to meet the default construction party;According at least one realtime construction side, the issue of bidding documents information of the project side is formed.
- 4. engineering project information processing method according to claim 1, it is characterised in thatAlso include project scoring step after the step S9:Preset term standards of grading are obtained, the preset term standards of grading include safety, service, quality civilized construction, data The accurate and completion time limit;According to the preset term standards of grading, construction information and completion information to the project information score, obtained Project appraisal result.
- 5. engineering project information processing method according to claim 1, it is characterised in thatAlso include loaning bill step after the step S9:According to the project settlement data, loan application inventory is generated according to preset ratio;According to the loan application inventory, the loan application relevant information of the offer of the construction party is obtained;The loan application relevant information is audited, after examination & verification passes through, generates loan application.
- 6. engineering project information processing system, it is characterised in that including:Acquisition request of reaching the standard grade module, for obtaining solicited message of reaching the standard grade, the solicited message of reaching the standard grade includes reaching the standard grade for project side please Ask information and the solicited message of reaching the standard grade of construction party;Qualification authentication module, for solicited message of being reached the standard grade according to, qualification authentication is carried out, obtains license of reaching the standard grade;Issue of bidding documents classification of type module, for obtaining project information, the project information is divided according to default issue of bidding documents type Class, obtains issue of bidding documents classification results, and the classification results of the issue of bidding documents include mark in real time, reservation mark and service mark;Issue of bidding documents information generating module, for the classification results according to the issue of bidding documents, with reference to the quacification of default construction party, formed The issue of bidding documents information of the project side;Issue of bidding documents information issuing module, for obtaining the issue of bidding documents solicited message of the project side, and according to the issue of bidding documents solicited message The issue of bidding documents information of the project side is issued, is shown on the construction party and the terminal interface of the project side;Bid request acquisition module, for the issue of bidding documents information according to the project side, obtain the bid request of the construction party;Qualification examination module, for the bid request according to the construction party, qualification examination is carried out, obtains construction permits;Project construction data obtaining module, for obtaining the construction information constructed according to the project information and completion letter Breath, and audited;Project completes module, for after examination & verification passes through, obtaining project settlement data, and generates form and wall newspaper, is shown in institute State the terminal interface of project side.
- 7. engineering project information processing system according to claim 6, it is characterised in thatBefore the acquisition request module of reaching the standard grade, in addition to,Project side's information registering module, is used for:Obtain the registration information of the project side;According to the registration information of the project side, the registration of the project side is completed;OrConstruction party information registering and module is improved, be used for:The authentication information of the construction party is obtained, the authentication information includes the cell-phone number information of construction party;According to the authentication information of the construction party, registration is completed;The data information that the construction party provides is obtained, enters that row information is perfect, the data information includes the base of the construction team This information, real-name authentication information, construction area information, the strong degree information of engineering, construction team personnel and counterpart personnel's qualification letter Breath;The data information that the construction party provides is audited, examination & verification is completed to the perfect of the construction party information after passing through.
- 8. engineering project information processing system according to claim 6, it is characterised in thatThe issue of bidding documents information generating module, is specifically used for:When the classification results of the issue of bidding documents to implement to mark, the specified construction party of project side's selection is obtained, and described specify is applied Work side meets the quacification of the default construction party;According to the specified construction party, the issue of bidding documents information of the project side is formed;When the classification results of the issue of bidding documents to preengage mark, obtain the project root and selected according to the item area in the project information At least one reservation construction party selected, and at least one reservation construction party meets the quacification of the default construction party;According at least one reservation construction party, the issue of bidding documents information of the project side is formed;When the classification results of the issue of bidding documents to mark in real time, at least one realtime construction side of project side's selection, and institute are obtained State the quacification that at least one realtime construction side is not required to meet the default construction party;According at least one realtime construction side, the issue of bidding documents information of the project side is formed.
- 9. engineering project information processing system according to claim 6, it is characterised in thatThe project is completed also to include project grading module after module, is used for:Preset term standards of grading are obtained, the preset term standards of grading include safety, service, quality civilized construction, data The accurate and completion time limit;According to the preset term standards of grading, construction information and completion information to the project information score, obtained Project appraisal result.
- 10. engineering project information processing system according to claim 6, it is characterised in thatThe project is completed also to include loaning bill module after module, is used for:According to the project settlement data, loan application inventory is generated according to preset ratio;According to the loan application inventory, the loan application relevant information of the offer of the construction party is obtained;The loan application relevant information is audited, after examination & verification passes through, generates loan application.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710552022.2A CN107369002A (en) | 2017-07-07 | 2017-07-07 | Engineering project information processing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710552022.2A CN107369002A (en) | 2017-07-07 | 2017-07-07 | Engineering project information processing method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107369002A true CN107369002A (en) | 2017-11-21 |
Family
ID=60305216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710552022.2A Pending CN107369002A (en) | 2017-07-07 | 2017-07-07 | Engineering project information processing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107369002A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108197910A (en) * | 2018-03-27 | 2018-06-22 | 四川国际招标有限责任公司 | A kind of project for bidding project verification management system |
CN109816277A (en) * | 2019-03-14 | 2019-05-28 | 万才科技(杭州)有限公司 | A kind of management method of recruitment unit |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN103136624A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project bidding, tendering and bid evaluation |
CN104166920A (en) * | 2014-06-27 | 2014-11-26 | 江苏华大天益电力科技有限公司 | Online biding method and system |
CN106779325A (en) * | 2016-11-29 | 2017-05-31 | 河北建筑工程学院 | A kind of engineering management monitoring system and method |
-
2017
- 2017-07-07 CN CN201710552022.2A patent/CN107369002A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN103136624A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project bidding, tendering and bid evaluation |
CN104166920A (en) * | 2014-06-27 | 2014-11-26 | 江苏华大天益电力科技有限公司 | Online biding method and system |
CN106779325A (en) * | 2016-11-29 | 2017-05-31 | 河北建筑工程学院 | A kind of engineering management monitoring system and method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108197910A (en) * | 2018-03-27 | 2018-06-22 | 四川国际招标有限责任公司 | A kind of project for bidding project verification management system |
CN109816277A (en) * | 2019-03-14 | 2019-05-28 | 万才科技(杭州)有限公司 | A kind of management method of recruitment unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103136626B (en) | The online management method of engineering project | |
CN107705020A (en) | A kind of overall process intelligence engineering supervisory information managing and control system | |
US20030120578A1 (en) | System and methods for electronic securities underwriting and electronic dissemination of annual financial and disclosure information from issuers to information repositories in accordance with U.S. securities laws and regulations | |
US11587185B2 (en) | Accounting platform functionalities | |
US10453043B2 (en) | System and method for online bill payment | |
US20050060203A1 (en) | RESPA compliant title insurance commitment system | |
CN106295968A (en) | A kind of office management system | |
CN112801777B (en) | Automatic processing method, system, electronic equipment and storage medium for bank letter | |
CN101976398A (en) | Credit rating work system-based rating report manuscript manufacturing method | |
US20210166330A1 (en) | Accounting Platform Functionalities | |
CN103500417A (en) | Programmed trading strategy management system and management method based on Internet | |
CN111274774A (en) | Industrial building engineering full-process automatic management system | |
CN113656505A (en) | Digitalization of distributed project management system and method for synchronizing data thereof | |
CN107369002A (en) | Engineering project information processing method and system | |
CN109858715A (en) | Artificial intelligence is rendered an account internal control system | |
CN114511296A (en) | High-standard farmland construction project management platform | |
CN101706938A (en) | Method for realizing complete closed operation of financial and guarantee business and capital clearance | |
US20230274361A1 (en) | Distributed ledger technology for asset-backed securities | |
CN110706089B (en) | Financial non-tax fund payment system and method | |
CN111461674A (en) | Building engineering acceptance and wage approval system based on Saas cloud service | |
Ismail | National Land Code 1965: Electronic Land Administration System in Land Registries | |
CN108960775A (en) | A kind of enterprises registration electronic service method based on mobile terminal | |
Zhou | Research on Banking Process Optimization Based on RPA in Financial Sharing Mode | |
CN114298665A (en) | Intelligent office system | |
CN115099789A (en) | Mobile terminal intelligent contract platform and operation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171121 |
|
RJ01 | Rejection of invention patent application after publication |