TW202129560A - Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner - Google Patents
Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner Download PDFInfo
- Publication number
- TW202129560A TW202129560A TW109102241A TW109102241A TW202129560A TW 202129560 A TW202129560 A TW 202129560A TW 109102241 A TW109102241 A TW 109102241A TW 109102241 A TW109102241 A TW 109102241A TW 202129560 A TW202129560 A TW 202129560A
- Authority
- TW
- Taiwan
- Prior art keywords
- operation interface
- completed
- project
- engineering
- progress
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Data Mining & Analysis (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本發明係有關一種機電工程管理系統,尤其是一種營造業機電配管線工程施作及工程管理系統。 The invention relates to a mechanical and electrical engineering management system, in particular to a construction industry mechanical and electrical distribution pipeline engineering construction and engineering management system.
按,現今營造機電工程存在下列問題: According to the current situation, there are the following problems in the construction of electrical and mechanical engineering:
一、非計畫性施工因在執行設計圖說時並沒有計劃性進行施工前工程圖說與規範的施作分析確認,因此每個施作人員在無法了解工序執行及作業內容下施作產生錯誤所造成工時損耗。 1. Non-planned construction. Because there is no plan to analyze and confirm the construction of the pre-construction engineering drawings and specifications when implementing the design drawings, each construction staff cannot understand the process execution and the content of the operation. Cause loss of working hours.
二、因甲乙方管理人員指揮調度不當未按工程優先順序投入人力導致重覆施做的工時損耗。 2. Due to the improper command and dispatch of Party A and Party B’s management personnel and failure to invest manpower in accordance with the priority of the project, the loss of repetitive work hours has resulted.
三、人力需求之不確定性導至人力調度投入困難。 3. The uncertainty of manpower demand leads to the difficulty of manpower scheduling investment.
四、因乙方施工圖面供給不及的工時損耗。 4. Loss of working hours due to Party B's inadequate supply of construction drawings.
五、因乙方物料供給不及產生的工時損耗。 5. Loss of working hours caused by the inadequate supply of materials by Party B.
六、因管理人員不足致使施工人員怠惰所產生的工時損耗。 6. Loss of working hours caused by laziness of construction workers due to lack of management personnel.
七、因管理人員查核不足致使施工人員掩飾施工不良造成查驗缺失重新施做所產生之工時損耗。 7. The loss of working hours caused by the lack of inspection due to insufficient inspection by the management personnel, which caused the construction personnel to cover up the poor construction.
八、無法有效掌握施工人員之出勤、虛報施工人員出勤及虛報工程進度所產生的成本損耗。 8. Inability to effectively grasp the attendance of construction personnel, false reporting of construction personnel attendance, and cost loss caused by false reporting of project progress.
九、無法掌握工程高峰期之人員調度。 9. Unable to grasp the personnel scheduling during the peak period of the project.
十、因管理不足無法量化掌控施工人員之效率、產能致使施工人員產能不佳,工程進度延宕,最後須以提高人力趕工補其工程進度所增加之人力成本。 10. Due to insufficient management, it is impossible to quantify and control the efficiency and production capacity of construction personnel, resulting in poor production capacity of construction personnel and delay of project progress. Finally, it is necessary to increase manpower to make up for the increase in labor costs caused by the progress of the project.
十一、因甲乙方管理人員之不做為如圖面澄清、物料供給、障礙排除等等所產生怠工的工時損耗。 11. Loss of work-hours caused by the failure of Party A and Party B’s management personnel to clarify, supply materials, remove obstacles, etc.
十二、因施工人員偷工減料所造成重覆施做的工時損耗。 12. The loss of repetitive working hours caused by the construction workers cutting corners and materials.
十三、因設計變更資訊遲緩導致重覆施做的工時損耗。 13. Time loss of repeated implementation due to slow design change information.
十四、因甲乙方管理人員指示錯誤導致重覆施做的工時損耗。 14. Lost of repetitive working hours due to wrong instructions by the management personnel of Party A and Party B.
十五、業主對工程資訊進行無法獲知並及時表達疑問及建議。 15. The owner cannot know the project information and expresses questions and suggestions in a timely manner.
是以,針對上述先前技術所存在之問題,如何開發一種業主及管理者更有效進行查核管理工程資訊、進度及排程之實用發明,實使用者所殷切企盼,亦係相關業者須努力研發突破之目標及方向。 Therefore, in response to the above-mentioned problems in the prior art, how to develop a practical invention for owners and managers to more effectively check and manage project information, progress, and scheduling is what users are eagerly awaiting, and relevant businesses must work hard to develop breakthroughs. The goal and direction.
發明人針對上述先前技術之問題,本發明主要 目的係提供一種機電工程管理系統,以達到業主與管理者共同監督、共同查核之營造機電配管線工程施作及工程管理之目的;而其解決問題之技術特徵,係為: In view of the above-mentioned problems of the prior art, the present invention mainly The purpose is to provide a mechanical and electrical engineering management system to achieve the purpose of the construction of mechanical and electrical distribution pipeline engineering and engineering management that the owner and the manager jointly supervise and jointly check; and the technical characteristics of solving the problem are:
一、藉由用戶(業主)終端裝置以網際網路連結管理中心伺服器執行包含:專案即時資訊查詢、專案資訊查詢、任務進度查詢、工項進度查詢、工程障礙事項查詢、工程待辦事項查詢、工程待釐清事項查詢、送審查驗管制表查詢、施工排程查詢。 1. Through the user (owner) terminal device to connect to the management center server through the Internet, including: real-time project information query, project information query, task progress query, project progress query, project obstacle query, project to-do list query , Project to be clarified items inquiries, sent to the inspection control table for inquiries, construction schedule inquiries.
二、藉由用戶(管理者)終端裝置以網際網路連結管理中心伺服器執行包含:專案即時資訊查詢、專案資訊管理版查詢、樓層進度查詢、區間樓層進度查詢及樓層計價查詢。 2. Use the user (manager) terminal device to connect to the management center server via the Internet, including: project real-time information query, project information management version query, floor progress query, section floor progress query, and floor pricing query.
三、藉由用戶(管理者)終端裝置以網際網路連結管理中心伺服器執行包含:工程統計及工程計畫。 3. The management center server is connected to the management center server through the Internet through the user (manager) terminal device, including: engineering statistics and engineering plans.
藉此創新獨特設計,使本發明對照先前技術而言,大致可達到如下功效: With this innovative and unique design, compared with the prior art, the present invention can roughly achieve the following effects:
一、本發明經由機電工程管理系統,業主藉由用戶終端裝置連結網際網路系統執行包含:專案即時資訊查詢、專案資訊查詢、任務進度查詢、工項進度查詢、工程障礙事項查詢、工程待辦事項查詢、工程待釐清事項查詢、送審查驗管制表查詢、施工排程查詢藉以達到即時溝通解決問題之功效。 1. The present invention is implemented through the mechanical and electrical engineering management system, and the owner connects to the Internet system through the user terminal device. The implementation includes: real-time project information query, project information query, task progress query, project progress query, project obstacle query, and project to-do Inquiry about issues, inquiries about items to be clarified in the project, inquiries on the inspection control list, and inquiries on construction schedules, in order to achieve the effect of real-time communication and problem-solving.
二、本發明經由機電工程管理系統,管理者藉由用戶終端裝置連結網際網路系統執行包含:專案即時資訊查詢、專案資訊管理查詢、樓層進度查詢、區間樓層進度查詢及樓層計價查詢藉以達到精準掌控進度、成本之實用進步性功效。 2. The present invention is through the electromechanical engineering management system, and the administrator connects to the Internet system through the user terminal device to perform the execution including: real-time project information query, project information management query, floor progress query, section floor progress query, and floor pricing query to achieve accuracy Practical and progressive effect to control progress and cost.
三、本發明經由機電工程管理系統,管理者藉由用戶終端裝置連結網際網路系統執行包含:工程統計及工程計畫以達到排除工程障礙、有效安排人力之功效。 3. Through the electromechanical engineering management system of the present invention, the administrator connects to the Internet system through the user terminal device to perform the functions including: engineering statistics and engineering planning to eliminate engineering obstacles and effectively arrange manpower.
1:用戶 1: user
11:業主 11: Owner
12:管理者 12: Manager
2:終端裝置 2: terminal device
3:網際網路 3: Internet
4:管理中心伺服器 4: Management Center Server
41:雲端資料庫 41: Cloud database
42:機電工程管理應用程式 42: Electrical and Mechanical Engineering Management Application
421:業主畫面操作介面 421: Owner screen operation interface
4211:專案即時資訊 4211: Project real-time information
42111:工班 42111: work shift
42112:簽到及簽退項目 42112: check-in and check-out items
42113:土建項目 42113: Civil Engineering Project
421131:位置 421131: location
421132:項目 421132: Project
421133:任務照片 421133: task photos
42114:任務清單 42114: task list
421141:位置 421141: location
421142:系統 421142: System
421143:項目 421143: Project
421144:執行人數 421144: Number of executives
42115:近三日預計到貨 42115: Expected arrival in the past three days
421151:預計送貨日期 421151: Estimated delivery date
4212:專案資訊 4212: Project Information
42121:人力支出 42121: labor expenditure
42122:物料支出 42122: Material expenditure
42123:管銷費用 42123: Management and sales expenses
42124:工程 42124: Engineering
42125:天數/% 42125: days/%
4213:任務進度查詢 4213: Task progress query
42131:選擇樓層 42131: select floor
42132:選擇任務系統 42132: Select mission system
42133:選擇系統 42133: select system
42134:選擇工班 42134: select work shift
42135:位置 42135: location
42136:系統 42136: System
42137:項目 42137: Project
42138:預計完成日期 42138: Estimated completion date
42139:實際完成日期 42139: Actual completion date
421310:已完成/總工項數 421310: completed/total number of work items
421311:進度 421311: Progress
421312:圖面 421312: drawing
421313:前置任務 421313: pre-task
421314:物料 421314: Materials
421315:障礙 421315: Obstacle
421316:實際/計畫工數 421316: Actual/planned number of jobs
421317:累計成本 421317: Cumulative cost
421318:累計/預計收入 421318: Cumulative/Estimated Income
421319:歷史紀錄 421319: historical record
4214:工項進度查詢 4214: Project progress query
42141:選擇樓層 42141: select floor
42142:選擇系統 42142: select system
42143:選擇標籤 42143: Select label
42144:選擇工班 42144: select work shift
42145:選擇盤體結構 42145: Select the structure of the disc body
421451:電氣系統 421451: Electrical System
421452:弱電系統 421452: Weak Current System
421453:給水系統 421453: Water Supply System
421454:排水系統 421454: Drainage system
421455:消防系統 421455: Fire Fighting System
42146:統計 42146: Statistics
42147:總工項數 42147: Total number of work items
42148:障礙數(已完成)/工項數 42148: Number of obstacles (completed)/number of work items
42149:障礙數(未完成)/工項數 42149: Number of obstacles (unfinished) / number of work items
421410:總累計收入 421410: Total cumulative income
421411:總預計收入 421411: Total projected revenue
421412:位置 421412: location
421413:系統 421413: System
421414:From 421414:From
421415:To 421415:To
421416:工作內容 421416: work content
421417:前置作業 421417: pre-work
421418:物料 421418: Materials
421419:圖面 421419: drawing
421420:待釐清 421420: to be clarified
421421:進度 421421: Progress
421422:施工照片 421422: Construction photos
421423:障礙 421423: Obstacle
421424:累計/預計收入 421424: Cumulative/Estimated Income
421425:任務查詢 421425: task query
421426:自主檢查 421426: Independent inspection
421427:業主查驗 421427: Owner Inspection
421428:缺失 421428: missing
421429:計價 421429: Valuation
421430:排序 421430: sort
4215:工程障礙事項 4215: Engineering Obstacles
42151:新增事項 42151: new items
42152:新增事項類型 42152: Types of new items
42153:系統 42153: System
42154:回覆 42154: Reply
42155:提案日 42155: proposal day
42156:最後更新日 42156: Last update date
42157:預計完成日 42157: Estimated completion date
42158:實際完成日 42158: actual completion date
42159:類型 42159: Type
421510:範圍 421510: range
421511:標題 421511: Title
4216:工程待辦事項 4216: Engineering Backlog
42161:新增事項 42161: new items
42162:新增事項類型 42162: Types of new items
42163:系統 42163: system
42164:回覆 42164: Reply
42165:提案日 42165: proposal day
42166:最後更新日 42166: Last update date
42167:預計完成日 42167: Estimated completion date
42168:實際完成日 42168: actual completion date
42169:類型 42169: Type
421610:範圍 421610: range
421611:標題 421611: Title
4217:工程待釐清事項 4217: Project to be clarified
42171:新增事項 42171: new items
42172:新增事項類型 42172: New item types
42173:寄信 42173: send a letter
42174:項目清單 42174: project list
421741:系統 421741: System
421742:回覆 421742: Reply
421743:提案日 421743: Proposal Day
421744:最後更新日 421744: Last update day
421745:預計完成日 421745: Estimated completion date
421746:實際完成日 421746: Actual completion date
421747:類型 421747: Type
421748:範圍 421748: range
421749:標題 421749: Title
42175:負責清單 42175: Responsible list
42176:相關清單 42176: related list
42177:簽核清單 42177: Approval checklist
4218:送審查驗管制表 4218: Send inspection control form
42181:新增送審項目 42181: New items to be submitted for review
42182:應送 42182: should be sent
42183:未送 42183: not sent
42184:應送而未送 42184: should be sent but not sent
42185:送審中 42185: submitting for review
42186:退回 42186: returned
42187:近逾期 42187: nearly overdue
42188:已核可 42188: approved
42189:送審項目 42189: Items submitted for review
421810:計畫送審日期 421810: Plan submission date
421811:狀態 421811: Status
421812:核定日期 421812: approved date
421813:核定截止日期 421813: Approval deadline
421814:新增版次 421814: New edition
421815:編輯送審項目 421815: Edit submission project
4219:施工排程 4219: Construction Schedule
42191:全展開 42191: fully expanded
42192:捲至最新 42192: Roll to latest
42193:派工 42193: dispatch
421931:位置 421931: location
421932:系統 421932: System
421933:項目 421933: project
421934:派工原因 421934: Reason for dispatch
421935:其他 421935: other
421936:日期 421936: Date
42194:位置 42194: location
42195:類別 42195: Category
42196:系統 42196: System
42197:項目 42197: Project
42198:合約開始日期 42198: contract start date
42199:預計完成日期 42199: Estimated completion date
421910:合約完成日期 421910: Contract completion date
421911:建議 421911: suggestion
421912:狀態 421912: Status
421913:施工計畫書送審 421913: Construction plan submitted for review
421914:預計開始日期 421914: Estimated start date
421915:材料設備送審 421915: materials and equipment submitted for review
421916:預計結束日期 421916: Estimated end date
421917:施工圖送審 421917: Construction drawings submitted for review
421918:實際完成日期 421918: Actual completion date
421919:材料設備查驗 421919: Material and equipment inspection
421920:已完成總項目數 421920: The total number of completed projects
421921:圖面 421921: drawing
421922:歷史紀錄 421922: historical record
421923:已完成 421923: completed
421924:總工項數 421924: Total number of work items
421925:進度 421925: Progress
421926:障礙 421926: Obstacle
421927:歷史紀錄 421927: historical record
421928:物料 421928: Materials
421929:工班 421929: work shift
422:管理 422: Management
4221:專案即時資訊 4221: Project real-time information
42211:工班 42211: work shift
42212:簽到 42212: sign in
42213:簽退 42213: sign out
42214:土建項目 42214: Civil Engineering Project
422141:位置 422141: location
422142:項目 422142: Project
422143:任務照片 422143: Mission photos
42215:任務清單 42215: task list
422151:位置 422151: location
422152:系統 422152: System
422153:項目 422153: Project
422154:執行人數 422154: Number of executives
42216:近三日預計到貨 42216: Expected arrival in the past three days
422161:預計送貨日期 422161: Estimated delivery date
4222:專案資訊管理 4222: Project Information Management
42221:標單名稱 42221: bid name
42222:已完成物料計價 42222: Completed material pricing
42223:總物料計價 42223: Total material pricing
42224:已完成工資計價 42224: Completed salary valuation
42225:總工資計價 42225: Total salary valuation
42226:進度 42226: progress
42227:總/本月人力支出 42227: Total/Month Manpower Expenditure
42228:總/本月物料支出 42228: Total/Monthly Material Expenditure
42229:總/本月管理人員支出 42229: Total/Month Management Expenditure
422210:工程天數/%總/本月出工人次 422210: Engineering days/% of total/number of workers this month
422211:總/本月出工工數 422211: Total/Number of jobs this month
422212:總/本月計薪出工人次 422212: Total/Number of paid workers this month
422213:總/本月計薪出工工數 422213:Total/Number of paid jobs this month
4223:樓層進度查詢 4223: Floor progress query
42231:選擇標單 42231: Choose a bid
42232:位置 42232: location
42233:進度項目 42233: progress item
422331:平面BOX放樣及PVC配管完成 422331: Plane BOX lofting and PVC piping completed
422332:輕隔間牆立面PVC及EMT配管 422332: PVC and EMT piping on the facade of the light partition wall
422333:動力幹管配管完成 422333: Power main pipe piping completed
422334:室內燈插拉線第一次完成 422334: The indoor lamp plug-in cable is completed for the first time
422335:室內燈插拉線第二次 422335: The second time the indoor lamp is plugged into the cable
422336:小公區域及梯廳拉線完成 422336: The small public area and the elevator hall cable are completed
422337:弱電及監控系統拉水線完成 422337: Weak current and monitoring system pull water line completed
422338:動力幹線拉線完成 422338: Power main line pull line completed
422339:鋁製線槽安裝完成 422339: Aluminum wire duct installation is complete
4223310:室內 4223310: indoor
4223311:小公區域及梯廳器具安裝完成 4223311: Installation of appliances in the small public area and hallway is completed
4223312:各戶住戶盤 4223312: each household's household plate
4223313:小公電盤安裝及結線完成 4223313: The installation and connection of the small public electric panel is completed
4223314:送電及測試完成 4223314: Power transmission and test completed
42234:該項金額總計 42234: The total amount of this item
42235:單一樓層金額 42235: Amount of a single floor
42236:項目已完成% 42236: Project completed%
42237:已完成金額 42237: Amount completed
42238:該項目完成占總合約% 42238: The completion of the project accounts for% of the total contract
4224:區間樓層進度查詢 4224: Interval floor progress query
42241:選擇標單 42241: Choose a bid
42242:位置 42242: location
42243:進度項目 42243: progress item
422431:平面BOX放樣及PVC配管完成 422431: Plane BOX lofting and PVC piping completed
422432:輕隔間牆立面PVC及EMT配管 422432: PVC and EMT piping on the facade of light partition wall
422433:動力幹管配管完成 422433: Power main pipe piping completed
422434:室內燈插拉線第一次完成 422434: The indoor lamp plug-in cable is completed for the first time
422435:室內燈插拉線第二次 422435: The second time the indoor lamp is plugged into the cable
422436:小公區域及梯廳拉線完成 422436: The small public area and the elevator hall cable are completed
422437:弱電及監控系統拉水線完成 422437: Weak current and monitoring system pull water line completed
422438:動力幹線拉線完成 422438: Power main line pull line completed
422439:鋁製線槽安裝完成 422439: Aluminum wire duct installation is complete
4224310:室內 4224310: Indoor
4224311:小公區域及梯廳器具安裝完成 4224311: The installation of appliances in the small public area and hallway is completed
4224312:各戶住戶盤 4224312: each household's household plate
4224313:小公電盤安裝及結線完成 4224313: The installation and connection of the small public electric panel is completed
4224314:送電及測試完成 4224314: Power transmission and test completed
42244:該項金額總計 42244: The total amount of this item
42245:單一樓層金額 42245: Amount of a single floor
42246:項目已完成% 42246: Project completed%
42247:已完成金額 42247: Amount completed
42248:該項目完成占總合約% 42248: The completion of the project accounts for% of the total contract
4225:樓層計價查詢 4225: Floor pricing query
42251:選擇標單 42251: Choose a bid
42252:位置 42252: location
42253:進度項目 42253: Progress item
422531:平面BOX放樣及PVC配管完成 422531: Plane BOX lofting and PVC piping completed
422532:輕隔間牆立面PVC及EMT配管 422532: PVC and EMT piping on the facade of light partition wall
422533:動力幹管配管完成 422533: Power main pipe piping completed
422534:室內燈插拉線第一次完成 422534: The indoor light plug-in cable is completed for the first time
422535:室內燈插拉線第二次 422535: The second time the indoor lamp is plugged into the cable
422536:小公區域及梯廳拉線完成 422536: The small public area and the elevator hall cable are completed
422537:弱電及監控系統拉水線完成 422537: Weak current and monitoring system pull water line completed
422538:動力幹線拉線完成 422538: Power main line pull line completed
422539:鋁製線槽安裝完成 422539: Aluminum wire duct installation is complete
4225310:室內 4225310: Indoor
4225311:小公區域及梯廳器具安裝完成 4225311: The installation of appliances in the small public area and hallway is completed
4225312:各戶住戶盤 4225312: each household's household plate
4225313:小公電盤安裝及結線完成 4225313: The installation and connection of the small public electric panel is completed
4225314:送電及測試完成 4225314: Power transmission and test completed
42254:該項金額總計 42254: The total amount of this item
42255:單一樓層金額 42255: Amount of a single floor
42256:項目已完成% 42256: Project completed%
42257:已完成金額 42257: Amount completed
42258:該項目完成占總合約% 42258: The completion of the project accounts for% of the total contract
423:工程統計 423: Engineering Statistics
4231:歷史查詢 4231: Historical query
4232:區間歷史查詢 4232: Interval history query
4233:任務進度查詢 4233: Task progress query
4234:工項進度查詢 4234: Project progress query
4235:工程障礙事項 4235: Engineering Obstacles
4236:工程待辦事項 4236: Engineering Backlog
4237:工程待釐清事項 4237: Project to be clarified
4238:工程建議事項 4238: Engineering Suggestions
4239:工程障礙事項(所有工地) 4239: Engineering obstacles (all construction sites)
42310:送審查驗管制表 42310: send inspection control form
424:工程計畫 424: Engineering Plan
4241:工序建立 4241: Process establishment
4242:任務建立 4242: Mission established
4243:前置任務計畫 4243: pre-task plan
4244:派工計畫 4244: dispatch plan
4245:前置任務派工 4245: pre-task dispatch
4246:追加管理 4246: additional management
第1圖:係本發明之機電工程管理系統架構圖。 Figure 1: The architecture diagram of the electromechanical engineering management system of the present invention.
第2圖:係本發明之機電工程管理應用程式基本架構圖。 Figure 2: The basic structure diagram of the electromechanical engineering management application program of the present invention.
第3圖:係本發明之業主畫面操作介面架構圖。 Figure 3: The structure diagram of the owner's screen operation interface of the present invention.
第4圖:係本發明之管理操作介面架構圖。 Figure 4: is a diagram of the management and operation interface architecture of the present invention.
第5圖:係本發明之工程統計操作介面架構圖。 Figure 5: It is the architecture diagram of the engineering statistics operation interface of the present invention.
第6圖:係本發明之工程計畫操作介面架構圖。 Figure 6: It is the structure diagram of the engineering project operation interface of the present invention.
第7圖:係本發明之專案即時資訊操作介面架構圖。 Figure 7: is a block diagram of the project real-time information operation interface of the present invention.
第8圖:係本發明之專案資訊操作介面架構圖。 Figure 8: is the structure diagram of the project information operation interface of the present invention.
第9圖:係本發明之任務進度查詢操作介面架構圖。 Fig. 9 is a structural diagram of the task progress query operation interface of the present invention.
第10圖:係本發明之工項進度查詢操作介面架構圖。 Figure 10: It is the structure diagram of the work item progress query operation interface of the present invention.
第11圖:係本發明之選擇盤體結構操作介面架構圖。 Figure 11: is the structure diagram of the operation interface of the selection disk structure of the present invention.
第12圖:係本發明之工程障礙事項操作介面架構圖。 Fig. 12: It is the structure diagram of the operation interface of the engineering obstacles of the present invention.
第13圖:係本發明之工程待辦事項操作介面架構圖。 Figure 13: It is the structure diagram of the engineering to-do list operation interface of the present invention.
第14圖:係本發明之工程待釐清事項操作介面架構圖。 Figure 14: It is a diagram of the operation interface structure of the project to be clarified in the present invention.
第15圖:係本發明之項目清單操作介面架構圖。 Figure 15 is a structural diagram of the project list operation interface of the present invention.
第16圖:係本發明之送審查驗管制表操作介面架構圖。 Figure 16: is the structure diagram of the operation interface of the present invention.
第17圖:係本發明之施工排程操作介面架構圖。 Figure 17: It is the structure diagram of the construction scheduling operation interface of the present invention.
第18圖:係本發明之專案即時資訊操作介面架構圖。 Figure 18: It is a block diagram of the project real-time information operation interface of the present invention.
第19圖:係本發明之專案資訊管理操作介面架構圖。 Figure 19: It is the structure diagram of the project information management operation interface of the present invention.
第20圖:係本發明之樓層進度查詢操作介面架構圖。 Figure 20: is the architecture diagram of the floor progress query operation interface of the present invention.
第21圖:係本發明之進度項目操作介面架構圖。 Figure 21: is a diagram of the structure of the schedule project operation interface of the present invention.
第22圖:係本發明之區間樓層進度查詢操作介面架構圖。 Figure 22: It is the structure diagram of the inter-floor progress query operation interface of the present invention.
第23圖:係本發明之進度項目操作介面架構圖。 Figure 23: is the structure diagram of the schedule project operation interface of the present invention.
第24圖:係本發明之樓層計價查詢操作介面架構圖。 Figure 24: is the structure diagram of the floor pricing query operation interface of the present invention.
第25圖:係本發明之進度項目操作介面架構圖。 Figure 25: is a diagram of the structure of the schedule project operation interface of the present invention.
請參閱第2圖所示,係本發明之機電工程管理應用程式基本架構圖,惟此等實施例僅供說明之用,在專利申請上並不受此結構之限制。 Please refer to Figure 2, which is the basic structure diagram of the electromechanical engineering management application program of the present invention. However, these embodiments are for illustrative purposes only and are not restricted by this structure in the patent application.
茲為使能進一步瞭解本發明之架構及技術,謹配合圖式再予深入說明於後: In order to further understand the structure and technology of the present invention, I would like to further explain in detail later in conjunction with the diagrams:
請參閱第1及2圖,本發明機電工程管理系統,其主要係藉由用戶1(業主11及管理者12)之終端裝置2以網際網路3與管理中心伺服器4進行連結,藉以進行共同查核管理工程資訊、進度及排程且管理者12藉以進行工程統計及工程計畫之整合創新系統,其係包含:一用戶1,其係該機電工程管理系統使用者,包含業主11及管理者12,藉由終端裝置2、網際網路3與管理中心伺服器4進行連結;一管
理中心伺服器4,其係包含處理儲存機電工程專案資訊之雲端資料庫41,以網際網路3與用戶1進行連結提供服務;一機電工程管理應用程式42,其係設置於該管理中心伺服器4,包含:業主畫面421操作介面、管理422操作介面、工程統計423操作介面及工程計畫424操作介面。
Please refer to Figures 1 and 2. The electromechanical engineering management system of the present invention mainly uses the
請參閱第1~3圖所示,為本發明之業主畫面操作介面架構圖,本發明機電工程管理系統,其中該機電工程管理應用程式42之業主畫面421操作介面包含:專案即時資訊4211操作介面、專案資訊4212操作介面、任務進度查詢4213操作介面、工項進度查詢4214操作介面、工程障礙事項4215操作介面、工程待辦事項4216操作介面、工程待釐清事項4217操作介面、送審查驗管制表4218操作介面、施工排程4219操作介面。
Please refer to Figures 1 to 3, which are the structure diagrams of the owner screen operation interface of the present invention. The electromechanical engineering management system of the present invention, wherein the
請參閱第1、2及4圖所示,本發明機電工程管理系統,其中該機電工程管理應用程式42之管理422操作介面包含:專案即時資訊4221操作介面、專案資訊管理4222操作介面、樓層進度查詢4223操作介面、區間樓層進度查詢4224操作介面及樓層計價查詢4225操作介面。
Please refer to Figures 1, 2 and 4, the electromechanical engineering management system of the present invention, wherein the
請參閱第2及5圖所示,本發明機電工程管理系統,其中該機電工程管理應用程式42之工程統計423操作介面包含:歷史查詢4231操作介面、區間歷史查詢4232操作介面、任務進度查詢4233操作介面、工項進度查詢4234操作介面、工程障礙事項4235操作介面、工程待辦事項4236操作介面、工程待釐清事項4237操作介面、工程建議事項
4238操作介面、工程障礙事項(所有工地)4239操作介面、送審查驗管制表42310操作介面。
Please refer to Figures 2 and 5, the electromechanical engineering management system of the present invention, wherein the
請參閱第1、2及6圖所示,為本發明之工程計畫操作介面架構圖,本發明機電工程管理系統,其中該機電工程管理應用程式42之工程計畫424操作介面包含:工序建立4241操作介面、任務建立4242操作介面、前置任務計畫4243操作介面、派工計畫4244操作介面、前置任務派工4245操作介面、追加管理4246操作介面。
Please refer to Figures 1, 2 and 6, which are the engineering plan operation interface architecture diagrams of the present invention. The electromechanical engineering management system of the present invention, wherein the
請參閱第3及7圖,本發明機電工程管理系統,其中之業主畫面421操作介面之專案即時資訊4211操作介面包含:工班42111、簽到42112、簽退42113、土建項目42114其係包含:位置421141、項目421142、任務照片421143,任務清單42115其係包含:位置421151、系統421152、項目421153、執行人數421154,近三日預計到貨42116其係包含:預計送貨日期421161。
Please refer to Figures 3 and 7, the present invention’s electromechanical engineering management system, in which the project real-
請參第3及8圖,本發明機電工程管理系統,其中之業主畫面421操作介面之專案資訊4212操作介面包含:人力支出42121、物料支出42122、管銷費用42123、工程42124、天數/%42125。
Please refer to Figures 3 and 8, the
請參第3及9圖,本發明機電工程管理系統,其中之業主畫面421操作介面之任務進度查詢4213操作介面包含:選擇樓層42131、選擇任務系統42132、選擇系統42133、選擇工班42134、位置42135、系統42136、項目42137、預計完成日期42138、實際完成日期42139、已完成/總工項
數421310、進度421311、圖面421312、前置任務421313、物料421314、障礙421315、實際/計畫工數421316、累計成本421317、累計/預計收入421318、歷史紀錄421319。
Please refer to Figures 3 and 9, the mechanical and electrical engineering management system of the present invention, in which the
請參第3及10圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工項進度查詢4214操作介面包含:選擇樓層42141、選擇系統42142、選擇標籤42143、選擇工班42144、選擇盤體結構42145、統計42146、總工項數42147、障礙數(已完成)/工項數42148、障礙數(未完成)/工項數42149、總累計收入421410、總預計收入421411、位置421412、系統421413、From421414、To421415、工作內容421416、前置作業421417、物料421418、圖面421419、待釐清421420、進度421421、施工照片421422、障礙421423、累計/預計收入421424、任務查詢421425、自主檢查421426、業主查驗421427、缺失421428、計價421429、排序421430。
Please refer to Figures 3 and 10, in the electromechanical engineering management system of the present invention, the
請參第10及11圖,本發明機電工程管理系統,其中之工項進度查詢4214操作介面之選擇盤體結構42145操作介面包含:電氣系統421451、弱電系統421452、給水系統421453、排水系統421454、消防系統421455。
Please refer to Figures 10 and 11, the electromechanical engineering management system of the present invention, in which the work
請參第3及12圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工程障礙事項4215操作介面包含:新增事項42151、新增事項類型42152、系統42153、回覆42154、提案日42155、最後更新日42156、預計完成日
42157、實際完成日42158、類型42159、範圍421510、標題421511。
Please refer to Figures 3 and 12, the mechanical and electrical engineering management system of the present invention, in which the
請參第3及13圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工程待辦事項4216操作介面之項目包含:新增事項42161、新增事項類型42162、系統42163、回覆42164、提案日42165、最後更新日42166、預計完成日42167、實際完成日42168、類型42169、範圍421610、標題421611。
Please refer to Figures 3 and 13, the mechanical and electrical engineering management system of the present invention. The project to-
請參第3及14圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工程待釐清事項4217操作介面包含:新增事項42171、新增事項類型42172、寄信42173、項目清單42174、負責清單42175、相關清單42176、簽核清單42177。
Please refer to Figures 3 and 14, the mechanical and electrical engineering management system of the present invention, in which the
請參第3、14及15圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工程待釐清事項4217之項目清單42174操作介面包含:系統421741、回覆421742、提案日421743、最後更新日421744、預計完成日421745、實際完成日421746、類型421747、範圍421748、標題421749。
Please refer to Figures 3, 14 and 15, the mechanical and electrical engineering management system of the present invention, in which the
請參第3及16圖,本發明機電工程管理系統,其中之業主畫面421操作介面之送審查驗管制表4218操作介面包含:新增送審項目42181、應送42182、未送42183、
應送而未送42184、送審中42185、退回42186、近逾期42187、已核可42188、送審項目42189、計畫送審日期421810、狀態421811、核定日期421812、核定截止日期421813、新增版次421814、編輯送審項目421815。
Please refer to Figures 3 and 16, the mechanical and electrical engineering management system of the present invention, in which the
請參第3及17圖,本發明機電工程管理系統,其中之業主畫面421操作介面之施工排程4219操作介面包含:全展開42191、捲至最新42192、派工42193其係包含:位置421931、系統421932、項目421933、派工原因421934、其他421935、日期421936,位置42194、類別42195、系統42196、項目42197、合約開始日期42198、預計完成日期42199、合約完成日期421910、建議421911、狀態421912、施工計畫書送審421913、預計開始日期421914、材料設備送審421915、預計結束日期421916、施工圖送審421917、實際完成日期421918、材料設備查驗421919、已完成總項目數421920、圖面421921、歷史紀錄421922、已完成421923、總工項數421924、進度421925、障礙421926、歷史紀錄421927、物料421928、工班421929。
Please refer to Figures 3 and 17, the mechanical and electrical engineering management system of the present invention, in which the
請參閱第4及18圖,本發明機電工程管理系統,其中之管理422操作介面之專案即時資訊4221操作介面包含:工班42211、簽到42212、簽退42213、土建項目42214其係包含:位置422141、項目422142、任務照片422143,任務清單42215其係包含:位置422151、系統422152、項目
422153、執行人數422154,近三日預計到貨42216其係包含:預計送貨日期422161。
Please refer to Figures 4 and 18, the electromechanical engineering management system of the present invention, in which the project real-
請參閱第4及19圖,本發明機電工程管理系統,其中之管理422操作介面之專案資訊管理4222操作介面包含:標單名稱42221、已完成物料計價42222、總物料計價42223、已完成工資計價42224、總工資計價42225、進度42226、總/本月人力支出42227、總/本月物料支出42228、總/本月管理人員支出42229、工程天數/%總/本月出工人次422210、總/本月出工工數422211、總/本月計薪出工人次422212、總/本月計薪出工工數422213。
Please refer to Figures 4 and 19, in the electromechanical engineering management system of the present invention, the
請參閱第4、20及21圖,本發明機電工程管理系統,其中之管理422操作介面之樓層進度查詢4223操作介面包含:選擇標單42231、位置42232、進度項目42233其係包含:平面BOX放樣及PVC配管完成422331、輕隔間牆立面PVC及EMT配管422332、動力幹管配管完成422333、室內燈插拉線第一次完成422334、室內燈插拉線第二次422335、小公區域及梯廳拉線完成422336、弱電及監控系統拉水線完成422337、動力幹線拉線完成422338、鋁製線槽安裝完成422339、室內4223310、小公區域及梯廳器具安裝完成4223311、各戶住戶盤4223312、小公電盤安裝及結線完成4223313、送電及測試完成4223314,該項金額總計42234、單一樓層金額42235、項目已完成%42236、已完成金額42237、該項目完成占總合約%42238。
Please refer to Figures 4, 20 and 21, the electromechanical engineering management system of the present invention, in which the floor progress query of the
請參閱第4、22及23圖,本發明機電工程管理
系統,其中之管理422操作介面之區間樓層進度查詢4224操作介面包含:選擇標單42241、位置42242、進度項目42243其係包含:平面BOX放樣及PVC配管完成422431、輕隔間牆立面PVC及EMT配管422432、動力幹管配管完成422433、室內燈插拉線第一次完成422434、室內燈插拉線第二次422435、小公區域及梯廳拉線完成422436、弱電及監控系統拉水線完成422437、動力幹線拉線完成422438、鋁製線槽安裝完成422439、室內4224310、小公區域及梯廳器具安裝完成4224311、各戶住戶盤4224312、小公電盤安裝及結線完成4224313、送電及測試完成4224314,該項金額總計42244、單一樓層金額42245、項目已完成%42246、已完成金額42247、該項目完成占總合約%42248。
Please refer to Figures 4, 22 and 23, the present invention of electromechanical engineering management
In the system, the
請參閱第4、24及25圖,本發明機電工程管理系統,其中之管理422操作介面之樓層計價查詢4225操作介面包含:選擇標單42251、位置42252、進度項目42253其係包含:平面BOX放樣及PVC配管完成422531、輕隔間牆立面PVC及EMT配管422532、動力幹管配管完成422533、室內燈插拉線第一次完成422534、室內燈插拉線第二次422535、小公區域及梯廳拉線完成422536、弱電及監控系統拉水線完成422537、動力幹線拉線完成422538、鋁製線槽安裝完成422539、室內4225310、小公區域及梯廳器具安裝完成4225311、各戶住戶盤4225312、小公電盤安裝及結線完成4225313、送電及測試完成4225314,該項金額總計42254、單一樓層金額42255、項目已完成%42256、已完成金額
42257、該項目完成占總合約%42258。
Please refer to Figures 4, 24 and 25, the electromechanical engineering management system of the present invention, the
上述實施例所揭示者係藉以具體說明本發明,且文中雖透過特定的術語進行說明,當不能以此限定本發明發明之專利範圍;熟悉此項技術領域之人士當可在瞭解本發明之精神與原則後對其進行變更與修改而達到等效之目的,而此等變更與修改,皆應涵蓋於如后所述之申請專利範圍所界定範疇中。 The above-mentioned embodiments are used to describe the present invention in detail, and although specific terms are used in the text, the patent scope of the present invention cannot be limited by this; those familiar with the technical field should understand the spirit of the present invention. After the principles are changed and modified to achieve the equivalent purpose, these changes and modifications should be covered by the scope of the patent application as described later.
42:機電工程管理應用程式 42: Electrical and Mechanical Engineering Management Application
421:業主畫面 421: Owner Screen
422:管理 422: Management
423:工程統計 423: Engineering Statistics
424:工程計畫 424: Engineering Plan
Claims (15)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW109102241A TW202129560A (en) | 2020-01-21 | 2020-01-21 | Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner |
CN202010285057.6A CN113222312A (en) | 2020-01-21 | 2020-04-13 | Electromechanical engineering management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW109102241A TW202129560A (en) | 2020-01-21 | 2020-01-21 | Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner |
Publications (1)
Publication Number | Publication Date |
---|---|
TW202129560A true TW202129560A (en) | 2021-08-01 |
Family
ID=77085720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW109102241A TW202129560A (en) | 2020-01-21 | 2020-01-21 | Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN113222312A (en) |
TW (1) | TW202129560A (en) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1378163A (en) * | 2001-04-05 | 2002-11-06 | 杨承喜 | Personal first page system for resource management |
CN1484181A (en) * | 2002-09-18 | 2004-03-24 | 崇越科技股份有限公司 | Special engineering control and management system and method thereof |
CN103136626B (en) * | 2011-11-29 | 2016-08-03 | 北京建龙重工集团有限公司 | The online management method of engineering project |
CN105354652A (en) * | 2015-08-26 | 2016-02-24 | 吕曼 | Intelligent management system for engineering construction project |
KR101994550B1 (en) * | 2017-12-13 | 2019-07-02 | 주식회사 저스티스어드벤처 | Method for real-time reporting and managing the work process for a repairing ships |
-
2020
- 2020-01-21 TW TW109102241A patent/TW202129560A/en unknown
- 2020-04-13 CN CN202010285057.6A patent/CN113222312A/en active Pending
Also Published As
Publication number | Publication date |
---|---|
CN113222312A (en) | 2021-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Formoso et al. | Method for waste control in the building industry | |
CN109523111A (en) | A kind of facilities and equipment management system | |
Dykstra | Construction project management: A complete introduction | |
Pierce Jr | Project scheduling and management for construction | |
Abdullah et al. | Potential effects on large mara construction projects due to construction delay | |
Klanac et al. | Trends in construction lost productivity claims | |
Elfving | Exploration of opportunities to reduce lead times for engineered-to-order products | |
Firing et al. | Main challenges found in the handover of a shopping centre in Norway | |
TW202129560A (en) | Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner | |
Kamarah | Framework for scheduling, controlling, and delivery planning for scattered repetitive infrastructure rehabilitation projects | |
TWM594763U (en) | Mechanical and Electrical Engineering Management System | |
Zubairu | Maintenance of government office buildings in Nigeria: A post-occupancy evaluation approach | |
Nguyen et al. | Completing the construction management at Hoa Binh construction group | |
Costa et al. | Guidelines and conditions for implementing kanban in construction | |
Pheng et al. | Project management processes | |
Edwards | Applied facilities management for the hospitality industry | |
Alkhalouf | Impacts of COVID-19 on Construction | |
WALKER | PROJECT MANAGEMENT PLAN FOR THE EXPANSION OF THE GENERATION ASSET MANAGEMENT GROUP WORKSPACE | |
Uzuegbunam et al. | CONSTRUCTION MANAGEMENT FOR ARCHITECTS AND BUILDERS: PANACEA FOR SUSTAINABLE PEACE AND CONFLICT RESOLUTION IN DEVELOPING NATIONS | |
Baker | Time-cost relationships in construction. | |
Kaiser | Mortgaging the Future: The Cost of Deferring Maintenance. | |
Gunnoe et al. | The Impact of Utilizing Expertise to Project Risk and Performance | |
Rathod et al. | Risk Assessment and Management of Construction Project | |
KR20230146834A (en) | A service platform for smart facility management | |
Omar et al. | Trust Building in Managing Strata Residence in Kuala Lumpur |