TW202129560A - Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner - Google Patents

Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner Download PDF

Info

Publication number
TW202129560A
TW202129560A TW109102241A TW109102241A TW202129560A TW 202129560 A TW202129560 A TW 202129560A TW 109102241 A TW109102241 A TW 109102241A TW 109102241 A TW109102241 A TW 109102241A TW 202129560 A TW202129560 A TW 202129560A
Authority
TW
Taiwan
Prior art keywords
operation interface
completed
project
engineering
progress
Prior art date
Application number
TW109102241A
Other languages
Chinese (zh)
Inventor
吳智信
Original Assignee
郭素蓮
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郭素蓮 filed Critical 郭素蓮
Priority to TW109102241A priority Critical patent/TW202129560A/en
Priority to CN202010285057.6A priority patent/CN113222312A/en
Publication of TW202129560A publication Critical patent/TW202129560A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides an electromechanical engineering management system, which is mainly connected to the management center server through the Internet by the terminal devices of the manager and the owner. It includes: a user who is the user of the electromechanical engineering management system, including managers and owners, to connect with the management center server through terminal devices and Internet; a management center server, which contains the engineering information of the electromechanical engineering project, to connect with the user through the Internet to provide services; an electromechanical engineering management application program, which exists in the management center server and includes: a management operation interface, owner screen operation interface, engineering statistics operation interface, and engineering plan operation interface. According to this framework, it is an integration and innovation system to jointly check the management engineering information, progress, and scheduling.

Description

機電工程管理系統 Mechanical and Electrical Engineering Management System

本發明係有關一種機電工程管理系統,尤其是一種營造業機電配管線工程施作及工程管理系統。 The invention relates to a mechanical and electrical engineering management system, in particular to a construction industry mechanical and electrical distribution pipeline engineering construction and engineering management system.

按,現今營造機電工程存在下列問題: According to the current situation, there are the following problems in the construction of electrical and mechanical engineering:

一、非計畫性施工因在執行設計圖說時並沒有計劃性進行施工前工程圖說與規範的施作分析確認,因此每個施作人員在無法了解工序執行及作業內容下施作產生錯誤所造成工時損耗。 1. Non-planned construction. Because there is no plan to analyze and confirm the construction of the pre-construction engineering drawings and specifications when implementing the design drawings, each construction staff cannot understand the process execution and the content of the operation. Cause loss of working hours.

二、因甲乙方管理人員指揮調度不當未按工程優先順序投入人力導致重覆施做的工時損耗。 2. Due to the improper command and dispatch of Party A and Party B’s management personnel and failure to invest manpower in accordance with the priority of the project, the loss of repetitive work hours has resulted.

三、人力需求之不確定性導至人力調度投入困難。 3. The uncertainty of manpower demand leads to the difficulty of manpower scheduling investment.

四、因乙方施工圖面供給不及的工時損耗。 4. Loss of working hours due to Party B's inadequate supply of construction drawings.

五、因乙方物料供給不及產生的工時損耗。 5. Loss of working hours caused by the inadequate supply of materials by Party B.

六、因管理人員不足致使施工人員怠惰所產生的工時損耗。 6. Loss of working hours caused by laziness of construction workers due to lack of management personnel.

七、因管理人員查核不足致使施工人員掩飾施工不良造成查驗缺失重新施做所產生之工時損耗。 7. The loss of working hours caused by the lack of inspection due to insufficient inspection by the management personnel, which caused the construction personnel to cover up the poor construction.

八、無法有效掌握施工人員之出勤、虛報施工人員出勤及虛報工程進度所產生的成本損耗。 8. Inability to effectively grasp the attendance of construction personnel, false reporting of construction personnel attendance, and cost loss caused by false reporting of project progress.

九、無法掌握工程高峰期之人員調度。 9. Unable to grasp the personnel scheduling during the peak period of the project.

十、因管理不足無法量化掌控施工人員之效率、產能致使施工人員產能不佳,工程進度延宕,最後須以提高人力趕工補其工程進度所增加之人力成本。 10. Due to insufficient management, it is impossible to quantify and control the efficiency and production capacity of construction personnel, resulting in poor production capacity of construction personnel and delay of project progress. Finally, it is necessary to increase manpower to make up for the increase in labor costs caused by the progress of the project.

十一、因甲乙方管理人員之不做為如圖面澄清、物料供給、障礙排除等等所產生怠工的工時損耗。 11. Loss of work-hours caused by the failure of Party A and Party B’s management personnel to clarify, supply materials, remove obstacles, etc.

十二、因施工人員偷工減料所造成重覆施做的工時損耗。 12. The loss of repetitive working hours caused by the construction workers cutting corners and materials.

十三、因設計變更資訊遲緩導致重覆施做的工時損耗。 13. Time loss of repeated implementation due to slow design change information.

十四、因甲乙方管理人員指示錯誤導致重覆施做的工時損耗。 14. Lost of repetitive working hours due to wrong instructions by the management personnel of Party A and Party B.

十五、業主對工程資訊進行無法獲知並及時表達疑問及建議。 15. The owner cannot know the project information and expresses questions and suggestions in a timely manner.

是以,針對上述先前技術所存在之問題,如何開發一種業主及管理者更有效進行查核管理工程資訊、進度及排程之實用發明,實使用者所殷切企盼,亦係相關業者須努力研發突破之目標及方向。 Therefore, in response to the above-mentioned problems in the prior art, how to develop a practical invention for owners and managers to more effectively check and manage project information, progress, and scheduling is what users are eagerly awaiting, and relevant businesses must work hard to develop breakthroughs. The goal and direction.

發明人針對上述先前技術之問題,本發明主要 目的係提供一種機電工程管理系統,以達到業主與管理者共同監督、共同查核之營造機電配管線工程施作及工程管理之目的;而其解決問題之技術特徵,係為: In view of the above-mentioned problems of the prior art, the present invention mainly The purpose is to provide a mechanical and electrical engineering management system to achieve the purpose of the construction of mechanical and electrical distribution pipeline engineering and engineering management that the owner and the manager jointly supervise and jointly check; and the technical characteristics of solving the problem are:

一、藉由用戶(業主)終端裝置以網際網路連結管理中心伺服器執行包含:專案即時資訊查詢、專案資訊查詢、任務進度查詢、工項進度查詢、工程障礙事項查詢、工程待辦事項查詢、工程待釐清事項查詢、送審查驗管制表查詢、施工排程查詢。 1. Through the user (owner) terminal device to connect to the management center server through the Internet, including: real-time project information query, project information query, task progress query, project progress query, project obstacle query, project to-do list query , Project to be clarified items inquiries, sent to the inspection control table for inquiries, construction schedule inquiries.

二、藉由用戶(管理者)終端裝置以網際網路連結管理中心伺服器執行包含:專案即時資訊查詢、專案資訊管理版查詢、樓層進度查詢、區間樓層進度查詢及樓層計價查詢。 2. Use the user (manager) terminal device to connect to the management center server via the Internet, including: project real-time information query, project information management version query, floor progress query, section floor progress query, and floor pricing query.

三、藉由用戶(管理者)終端裝置以網際網路連結管理中心伺服器執行包含:工程統計及工程計畫。 3. The management center server is connected to the management center server through the Internet through the user (manager) terminal device, including: engineering statistics and engineering plans.

藉此創新獨特設計,使本發明對照先前技術而言,大致可達到如下功效: With this innovative and unique design, compared with the prior art, the present invention can roughly achieve the following effects:

一、本發明經由機電工程管理系統,業主藉由用戶終端裝置連結網際網路系統執行包含:專案即時資訊查詢、專案資訊查詢、任務進度查詢、工項進度查詢、工程障礙事項查詢、工程待辦事項查詢、工程待釐清事項查詢、送審查驗管制表查詢、施工排程查詢藉以達到即時溝通解決問題之功效。 1. The present invention is implemented through the mechanical and electrical engineering management system, and the owner connects to the Internet system through the user terminal device. The implementation includes: real-time project information query, project information query, task progress query, project progress query, project obstacle query, and project to-do Inquiry about issues, inquiries about items to be clarified in the project, inquiries on the inspection control list, and inquiries on construction schedules, in order to achieve the effect of real-time communication and problem-solving.

二、本發明經由機電工程管理系統,管理者藉由用戶終端裝置連結網際網路系統執行包含:專案即時資訊查詢、專案資訊管理查詢、樓層進度查詢、區間樓層進度查詢及樓層計價查詢藉以達到精準掌控進度、成本之實用進步性功效。 2. The present invention is through the electromechanical engineering management system, and the administrator connects to the Internet system through the user terminal device to perform the execution including: real-time project information query, project information management query, floor progress query, section floor progress query, and floor pricing query to achieve accuracy Practical and progressive effect to control progress and cost.

三、本發明經由機電工程管理系統,管理者藉由用戶終端裝置連結網際網路系統執行包含:工程統計及工程計畫以達到排除工程障礙、有效安排人力之功效。 3. Through the electromechanical engineering management system of the present invention, the administrator connects to the Internet system through the user terminal device to perform the functions including: engineering statistics and engineering planning to eliminate engineering obstacles and effectively arrange manpower.

1:用戶 1: user

11:業主 11: Owner

12:管理者 12: Manager

2:終端裝置 2: terminal device

3:網際網路 3: Internet

4:管理中心伺服器 4: Management Center Server

41:雲端資料庫 41: Cloud database

42:機電工程管理應用程式 42: Electrical and Mechanical Engineering Management Application

421:業主畫面操作介面 421: Owner screen operation interface

4211:專案即時資訊 4211: Project real-time information

42111:工班 42111: work shift

42112:簽到及簽退項目 42112: check-in and check-out items

42113:土建項目 42113: Civil Engineering Project

421131:位置 421131: location

421132:項目 421132: Project

421133:任務照片 421133: task photos

42114:任務清單 42114: task list

421141:位置 421141: location

421142:系統 421142: System

421143:項目 421143: Project

421144:執行人數 421144: Number of executives

42115:近三日預計到貨 42115: Expected arrival in the past three days

421151:預計送貨日期 421151: Estimated delivery date

4212:專案資訊 4212: Project Information

42121:人力支出 42121: labor expenditure

42122:物料支出 42122: Material expenditure

42123:管銷費用 42123: Management and sales expenses

42124:工程 42124: Engineering

42125:天數/% 42125: days/%

4213:任務進度查詢 4213: Task progress query

42131:選擇樓層 42131: select floor

42132:選擇任務系統 42132: Select mission system

42133:選擇系統 42133: select system

42134:選擇工班 42134: select work shift

42135:位置 42135: location

42136:系統 42136: System

42137:項目 42137: Project

42138:預計完成日期 42138: Estimated completion date

42139:實際完成日期 42139: Actual completion date

421310:已完成/總工項數 421310: completed/total number of work items

421311:進度 421311: Progress

421312:圖面 421312: drawing

421313:前置任務 421313: pre-task

421314:物料 421314: Materials

421315:障礙 421315: Obstacle

421316:實際/計畫工數 421316: Actual/planned number of jobs

421317:累計成本 421317: Cumulative cost

421318:累計/預計收入 421318: Cumulative/Estimated Income

421319:歷史紀錄 421319: historical record

4214:工項進度查詢 4214: Project progress query

42141:選擇樓層 42141: select floor

42142:選擇系統 42142: select system

42143:選擇標籤 42143: Select label

42144:選擇工班 42144: select work shift

42145:選擇盤體結構 42145: Select the structure of the disc body

421451:電氣系統 421451: Electrical System

421452:弱電系統 421452: Weak Current System

421453:給水系統 421453: Water Supply System

421454:排水系統 421454: Drainage system

421455:消防系統 421455: Fire Fighting System

42146:統計 42146: Statistics

42147:總工項數 42147: Total number of work items

42148:障礙數(已完成)/工項數 42148: Number of obstacles (completed)/number of work items

42149:障礙數(未完成)/工項數 42149: Number of obstacles (unfinished) / number of work items

421410:總累計收入 421410: Total cumulative income

421411:總預計收入 421411: Total projected revenue

421412:位置 421412: location

421413:系統 421413: System

421414:From 421414:From

421415:To 421415:To

421416:工作內容 421416: work content

421417:前置作業 421417: pre-work

421418:物料 421418: Materials

421419:圖面 421419: drawing

421420:待釐清 421420: to be clarified

421421:進度 421421: Progress

421422:施工照片 421422: Construction photos

421423:障礙 421423: Obstacle

421424:累計/預計收入 421424: Cumulative/Estimated Income

421425:任務查詢 421425: task query

421426:自主檢查 421426: Independent inspection

421427:業主查驗 421427: Owner Inspection

421428:缺失 421428: missing

421429:計價 421429: Valuation

421430:排序 421430: sort

4215:工程障礙事項 4215: Engineering Obstacles

42151:新增事項 42151: new items

42152:新增事項類型 42152: Types of new items

42153:系統 42153: System

42154:回覆 42154: Reply

42155:提案日 42155: proposal day

42156:最後更新日 42156: Last update date

42157:預計完成日 42157: Estimated completion date

42158:實際完成日 42158: actual completion date

42159:類型 42159: Type

421510:範圍 421510: range

421511:標題 421511: Title

4216:工程待辦事項 4216: Engineering Backlog

42161:新增事項 42161: new items

42162:新增事項類型 42162: Types of new items

42163:系統 42163: system

42164:回覆 42164: Reply

42165:提案日 42165: proposal day

42166:最後更新日 42166: Last update date

42167:預計完成日 42167: Estimated completion date

42168:實際完成日 42168: actual completion date

42169:類型 42169: Type

421610:範圍 421610: range

421611:標題 421611: Title

4217:工程待釐清事項 4217: Project to be clarified

42171:新增事項 42171: new items

42172:新增事項類型 42172: New item types

42173:寄信 42173: send a letter

42174:項目清單 42174: project list

421741:系統 421741: System

421742:回覆 421742: Reply

421743:提案日 421743: Proposal Day

421744:最後更新日 421744: Last update day

421745:預計完成日 421745: Estimated completion date

421746:實際完成日 421746: Actual completion date

421747:類型 421747: Type

421748:範圍 421748: range

421749:標題 421749: Title

42175:負責清單 42175: Responsible list

42176:相關清單 42176: related list

42177:簽核清單 42177: Approval checklist

4218:送審查驗管制表 4218: Send inspection control form

42181:新增送審項目 42181: New items to be submitted for review

42182:應送 42182: should be sent

42183:未送 42183: not sent

42184:應送而未送 42184: should be sent but not sent

42185:送審中 42185: submitting for review

42186:退回 42186: returned

42187:近逾期 42187: nearly overdue

42188:已核可 42188: approved

42189:送審項目 42189: Items submitted for review

421810:計畫送審日期 421810: Plan submission date

421811:狀態 421811: Status

421812:核定日期 421812: approved date

421813:核定截止日期 421813: Approval deadline

421814:新增版次 421814: New edition

421815:編輯送審項目 421815: Edit submission project

4219:施工排程 4219: Construction Schedule

42191:全展開 42191: fully expanded

42192:捲至最新 42192: Roll to latest

42193:派工 42193: dispatch

421931:位置 421931: location

421932:系統 421932: System

421933:項目 421933: project

421934:派工原因 421934: Reason for dispatch

421935:其他 421935: other

421936:日期 421936: Date

42194:位置 42194: location

42195:類別 42195: Category

42196:系統 42196: System

42197:項目 42197: Project

42198:合約開始日期 42198: contract start date

42199:預計完成日期 42199: Estimated completion date

421910:合約完成日期 421910: Contract completion date

421911:建議 421911: suggestion

421912:狀態 421912: Status

421913:施工計畫書送審 421913: Construction plan submitted for review

421914:預計開始日期 421914: Estimated start date

421915:材料設備送審 421915: materials and equipment submitted for review

421916:預計結束日期 421916: Estimated end date

421917:施工圖送審 421917: Construction drawings submitted for review

421918:實際完成日期 421918: Actual completion date

421919:材料設備查驗 421919: Material and equipment inspection

421920:已完成總項目數 421920: The total number of completed projects

421921:圖面 421921: drawing

421922:歷史紀錄 421922: historical record

421923:已完成 421923: completed

421924:總工項數 421924: Total number of work items

421925:進度 421925: Progress

421926:障礙 421926: Obstacle

421927:歷史紀錄 421927: historical record

421928:物料 421928: Materials

421929:工班 421929: work shift

422:管理 422: Management

4221:專案即時資訊 4221: Project real-time information

42211:工班 42211: work shift

42212:簽到 42212: sign in

42213:簽退 42213: sign out

42214:土建項目 42214: Civil Engineering Project

422141:位置 422141: location

422142:項目 422142: Project

422143:任務照片 422143: Mission photos

42215:任務清單 42215: task list

422151:位置 422151: location

422152:系統 422152: System

422153:項目 422153: Project

422154:執行人數 422154: Number of executives

42216:近三日預計到貨 42216: Expected arrival in the past three days

422161:預計送貨日期 422161: Estimated delivery date

4222:專案資訊管理 4222: Project Information Management

42221:標單名稱 42221: bid name

42222:已完成物料計價 42222: Completed material pricing

42223:總物料計價 42223: Total material pricing

42224:已完成工資計價 42224: Completed salary valuation

42225:總工資計價 42225: Total salary valuation

42226:進度 42226: progress

42227:總/本月人力支出 42227: Total/Month Manpower Expenditure

42228:總/本月物料支出 42228: Total/Monthly Material Expenditure

42229:總/本月管理人員支出 42229: Total/Month Management Expenditure

422210:工程天數/%總/本月出工人次 422210: Engineering days/% of total/number of workers this month

422211:總/本月出工工數 422211: Total/Number of jobs this month

422212:總/本月計薪出工人次 422212: Total/Number of paid workers this month

422213:總/本月計薪出工工數 422213:Total/Number of paid jobs this month

4223:樓層進度查詢 4223: Floor progress query

42231:選擇標單 42231: Choose a bid

42232:位置 42232: location

42233:進度項目 42233: progress item

422331:平面BOX放樣及PVC配管完成 422331: Plane BOX lofting and PVC piping completed

422332:輕隔間牆立面PVC及EMT配管 422332: PVC and EMT piping on the facade of the light partition wall

422333:動力幹管配管完成 422333: Power main pipe piping completed

422334:室內燈插拉線第一次完成 422334: The indoor lamp plug-in cable is completed for the first time

422335:室內燈插拉線第二次 422335: The second time the indoor lamp is plugged into the cable

422336:小公區域及梯廳拉線完成 422336: The small public area and the elevator hall cable are completed

422337:弱電及監控系統拉水線完成 422337: Weak current and monitoring system pull water line completed

422338:動力幹線拉線完成 422338: Power main line pull line completed

422339:鋁製線槽安裝完成 422339: Aluminum wire duct installation is complete

4223310:室內 4223310: indoor

4223311:小公區域及梯廳器具安裝完成 4223311: Installation of appliances in the small public area and hallway is completed

4223312:各戶住戶盤 4223312: each household's household plate

4223313:小公電盤安裝及結線完成 4223313: The installation and connection of the small public electric panel is completed

4223314:送電及測試完成 4223314: Power transmission and test completed

42234:該項金額總計 42234: The total amount of this item

42235:單一樓層金額 42235: Amount of a single floor

42236:項目已完成% 42236: Project completed%

42237:已完成金額 42237: Amount completed

42238:該項目完成占總合約% 42238: The completion of the project accounts for% of the total contract

4224:區間樓層進度查詢 4224: Interval floor progress query

42241:選擇標單 42241: Choose a bid

42242:位置 42242: location

42243:進度項目 42243: progress item

422431:平面BOX放樣及PVC配管完成 422431: Plane BOX lofting and PVC piping completed

422432:輕隔間牆立面PVC及EMT配管 422432: PVC and EMT piping on the facade of light partition wall

422433:動力幹管配管完成 422433: Power main pipe piping completed

422434:室內燈插拉線第一次完成 422434: The indoor lamp plug-in cable is completed for the first time

422435:室內燈插拉線第二次 422435: The second time the indoor lamp is plugged into the cable

422436:小公區域及梯廳拉線完成 422436: The small public area and the elevator hall cable are completed

422437:弱電及監控系統拉水線完成 422437: Weak current and monitoring system pull water line completed

422438:動力幹線拉線完成 422438: Power main line pull line completed

422439:鋁製線槽安裝完成 422439: Aluminum wire duct installation is complete

4224310:室內 4224310: Indoor

4224311:小公區域及梯廳器具安裝完成 4224311: The installation of appliances in the small public area and hallway is completed

4224312:各戶住戶盤 4224312: each household's household plate

4224313:小公電盤安裝及結線完成 4224313: The installation and connection of the small public electric panel is completed

4224314:送電及測試完成 4224314: Power transmission and test completed

42244:該項金額總計 42244: The total amount of this item

42245:單一樓層金額 42245: Amount of a single floor

42246:項目已完成% 42246: Project completed%

42247:已完成金額 42247: Amount completed

42248:該項目完成占總合約% 42248: The completion of the project accounts for% of the total contract

4225:樓層計價查詢 4225: Floor pricing query

42251:選擇標單 42251: Choose a bid

42252:位置 42252: location

42253:進度項目 42253: Progress item

422531:平面BOX放樣及PVC配管完成 422531: Plane BOX lofting and PVC piping completed

422532:輕隔間牆立面PVC及EMT配管 422532: PVC and EMT piping on the facade of light partition wall

422533:動力幹管配管完成 422533: Power main pipe piping completed

422534:室內燈插拉線第一次完成 422534: The indoor light plug-in cable is completed for the first time

422535:室內燈插拉線第二次 422535: The second time the indoor lamp is plugged into the cable

422536:小公區域及梯廳拉線完成 422536: The small public area and the elevator hall cable are completed

422537:弱電及監控系統拉水線完成 422537: Weak current and monitoring system pull water line completed

422538:動力幹線拉線完成 422538: Power main line pull line completed

422539:鋁製線槽安裝完成 422539: Aluminum wire duct installation is complete

4225310:室內 4225310: Indoor

4225311:小公區域及梯廳器具安裝完成 4225311: The installation of appliances in the small public area and hallway is completed

4225312:各戶住戶盤 4225312: each household's household plate

4225313:小公電盤安裝及結線完成 4225313: The installation and connection of the small public electric panel is completed

4225314:送電及測試完成 4225314: Power transmission and test completed

42254:該項金額總計 42254: The total amount of this item

42255:單一樓層金額 42255: Amount of a single floor

42256:項目已完成% 42256: Project completed%

42257:已完成金額 42257: Amount completed

42258:該項目完成占總合約% 42258: The completion of the project accounts for% of the total contract

423:工程統計 423: Engineering Statistics

4231:歷史查詢 4231: Historical query

4232:區間歷史查詢 4232: Interval history query

4233:任務進度查詢 4233: Task progress query

4234:工項進度查詢 4234: Project progress query

4235:工程障礙事項 4235: Engineering Obstacles

4236:工程待辦事項 4236: Engineering Backlog

4237:工程待釐清事項 4237: Project to be clarified

4238:工程建議事項 4238: Engineering Suggestions

4239:工程障礙事項(所有工地) 4239: Engineering obstacles (all construction sites)

42310:送審查驗管制表 42310: send inspection control form

424:工程計畫 424: Engineering Plan

4241:工序建立 4241: Process establishment

4242:任務建立 4242: Mission established

4243:前置任務計畫 4243: pre-task plan

4244:派工計畫 4244: dispatch plan

4245:前置任務派工 4245: pre-task dispatch

4246:追加管理 4246: additional management

第1圖:係本發明之機電工程管理系統架構圖。 Figure 1: The architecture diagram of the electromechanical engineering management system of the present invention.

第2圖:係本發明之機電工程管理應用程式基本架構圖。 Figure 2: The basic structure diagram of the electromechanical engineering management application program of the present invention.

第3圖:係本發明之業主畫面操作介面架構圖。 Figure 3: The structure diagram of the owner's screen operation interface of the present invention.

第4圖:係本發明之管理操作介面架構圖。 Figure 4: is a diagram of the management and operation interface architecture of the present invention.

第5圖:係本發明之工程統計操作介面架構圖。 Figure 5: It is the architecture diagram of the engineering statistics operation interface of the present invention.

第6圖:係本發明之工程計畫操作介面架構圖。 Figure 6: It is the structure diagram of the engineering project operation interface of the present invention.

第7圖:係本發明之專案即時資訊操作介面架構圖。 Figure 7: is a block diagram of the project real-time information operation interface of the present invention.

第8圖:係本發明之專案資訊操作介面架構圖。 Figure 8: is the structure diagram of the project information operation interface of the present invention.

第9圖:係本發明之任務進度查詢操作介面架構圖。 Fig. 9 is a structural diagram of the task progress query operation interface of the present invention.

第10圖:係本發明之工項進度查詢操作介面架構圖。 Figure 10: It is the structure diagram of the work item progress query operation interface of the present invention.

第11圖:係本發明之選擇盤體結構操作介面架構圖。 Figure 11: is the structure diagram of the operation interface of the selection disk structure of the present invention.

第12圖:係本發明之工程障礙事項操作介面架構圖。 Fig. 12: It is the structure diagram of the operation interface of the engineering obstacles of the present invention.

第13圖:係本發明之工程待辦事項操作介面架構圖。 Figure 13: It is the structure diagram of the engineering to-do list operation interface of the present invention.

第14圖:係本發明之工程待釐清事項操作介面架構圖。 Figure 14: It is a diagram of the operation interface structure of the project to be clarified in the present invention.

第15圖:係本發明之項目清單操作介面架構圖。 Figure 15 is a structural diagram of the project list operation interface of the present invention.

第16圖:係本發明之送審查驗管制表操作介面架構圖。 Figure 16: is the structure diagram of the operation interface of the present invention.

第17圖:係本發明之施工排程操作介面架構圖。 Figure 17: It is the structure diagram of the construction scheduling operation interface of the present invention.

第18圖:係本發明之專案即時資訊操作介面架構圖。 Figure 18: It is a block diagram of the project real-time information operation interface of the present invention.

第19圖:係本發明之專案資訊管理操作介面架構圖。 Figure 19: It is the structure diagram of the project information management operation interface of the present invention.

第20圖:係本發明之樓層進度查詢操作介面架構圖。 Figure 20: is the architecture diagram of the floor progress query operation interface of the present invention.

第21圖:係本發明之進度項目操作介面架構圖。 Figure 21: is a diagram of the structure of the schedule project operation interface of the present invention.

第22圖:係本發明之區間樓層進度查詢操作介面架構圖。 Figure 22: It is the structure diagram of the inter-floor progress query operation interface of the present invention.

第23圖:係本發明之進度項目操作介面架構圖。 Figure 23: is the structure diagram of the schedule project operation interface of the present invention.

第24圖:係本發明之樓層計價查詢操作介面架構圖。 Figure 24: is the structure diagram of the floor pricing query operation interface of the present invention.

第25圖:係本發明之進度項目操作介面架構圖。 Figure 25: is a diagram of the structure of the schedule project operation interface of the present invention.

請參閱第2圖所示,係本發明之機電工程管理應用程式基本架構圖,惟此等實施例僅供說明之用,在專利申請上並不受此結構之限制。 Please refer to Figure 2, which is the basic structure diagram of the electromechanical engineering management application program of the present invention. However, these embodiments are for illustrative purposes only and are not restricted by this structure in the patent application.

茲為使能進一步瞭解本發明之架構及技術,謹配合圖式再予深入說明於後: In order to further understand the structure and technology of the present invention, I would like to further explain in detail later in conjunction with the diagrams:

請參閱第1及2圖,本發明機電工程管理系統,其主要係藉由用戶1(業主11及管理者12)之終端裝置2以網際網路3與管理中心伺服器4進行連結,藉以進行共同查核管理工程資訊、進度及排程且管理者12藉以進行工程統計及工程計畫之整合創新系統,其係包含:一用戶1,其係該機電工程管理系統使用者,包含業主11及管理者12,藉由終端裝置2、網際網路3與管理中心伺服器4進行連結;一管 理中心伺服器4,其係包含處理儲存機電工程專案資訊之雲端資料庫41,以網際網路3與用戶1進行連結提供服務;一機電工程管理應用程式42,其係設置於該管理中心伺服器4,包含:業主畫面421操作介面、管理422操作介面、工程統計423操作介面及工程計畫424操作介面。 Please refer to Figures 1 and 2. The electromechanical engineering management system of the present invention mainly uses the terminal device 2 of the user 1 (owner 11 and manager 12) to connect to the management center server 4 through the Internet 3 to perform Jointly check and manage project information, progress and schedules, and an integrated and innovative system for managers 12 to perform project statistics and project planning. It includes: a user 1, which is the user of the mechanical and electrical engineering management system, including owner 11 and management Person 12, through the terminal device 2, the Internet 3 and the management center server 4 to connect; The management center server 4, which includes a cloud database 41 for processing and storing information about electromechanical engineering projects, is connected to the user 1 through the Internet 3 to provide services; an electromechanical engineering management application 42 is set on the management center server The device 4 includes: the owner screen 421 operation interface, the management 422 operation interface, the engineering statistics 423 operation interface, and the engineering plan 424 operation interface.

請參閱第1~3圖所示,為本發明之業主畫面操作介面架構圖,本發明機電工程管理系統,其中該機電工程管理應用程式42之業主畫面421操作介面包含:專案即時資訊4211操作介面、專案資訊4212操作介面、任務進度查詢4213操作介面、工項進度查詢4214操作介面、工程障礙事項4215操作介面、工程待辦事項4216操作介面、工程待釐清事項4217操作介面、送審查驗管制表4218操作介面、施工排程4219操作介面。 Please refer to Figures 1 to 3, which are the structure diagrams of the owner screen operation interface of the present invention. The electromechanical engineering management system of the present invention, wherein the owner screen 421 operation interface of the electromechanical engineering management application 42 includes: project real-time information 4211 operation interface , Project information 4212 operation interface, task progress inquiry 4213 operation interface, work item progress inquiry 4214 operation interface, engineering obstacles 4215 operation interface, engineering to-do items 4216 operation interface, engineering pending items 4217 operation interface, and inspection control form 4218 Operation interface, construction scheduling 4219 operation interface.

請參閱第1、2及4圖所示,本發明機電工程管理系統,其中該機電工程管理應用程式42之管理422操作介面包含:專案即時資訊4221操作介面、專案資訊管理4222操作介面、樓層進度查詢4223操作介面、區間樓層進度查詢4224操作介面及樓層計價查詢4225操作介面。 Please refer to Figures 1, 2 and 4, the electromechanical engineering management system of the present invention, wherein the management 422 operation interface of the electromechanical engineering management application 42 includes: project real-time information 4221 operation interface, project information management 4222 operation interface, floor progress Inquiry 4223 operation interface, section floor progress inquiry 4224 operation interface and floor pricing inquiry 4225 operation interface.

請參閱第2及5圖所示,本發明機電工程管理系統,其中該機電工程管理應用程式42之工程統計423操作介面包含:歷史查詢4231操作介面、區間歷史查詢4232操作介面、任務進度查詢4233操作介面、工項進度查詢4234操作介面、工程障礙事項4235操作介面、工程待辦事項4236操作介面、工程待釐清事項4237操作介面、工程建議事項 4238操作介面、工程障礙事項(所有工地)4239操作介面、送審查驗管制表42310操作介面。 Please refer to Figures 2 and 5, the electromechanical engineering management system of the present invention, wherein the engineering statistics 423 operation interface of the electromechanical engineering management application 42 includes: historical query 4231 operation interface, interval history query 4232 operation interface, task progress query 4233 Operation interface, work item progress query 4234 operation interface, engineering obstacles 4235 operation interface, engineering to-do items 4236 operation interface, engineering to-be clarified items 4237 operation interface, engineering suggestions 4238 operation interface, engineering obstacles (all construction sites) 4239 operation interface, and inspection control form 42310 operation interface.

請參閱第1、2及6圖所示,為本發明之工程計畫操作介面架構圖,本發明機電工程管理系統,其中該機電工程管理應用程式42之工程計畫424操作介面包含:工序建立4241操作介面、任務建立4242操作介面、前置任務計畫4243操作介面、派工計畫4244操作介面、前置任務派工4245操作介面、追加管理4246操作介面。 Please refer to Figures 1, 2 and 6, which are the engineering plan operation interface architecture diagrams of the present invention. The electromechanical engineering management system of the present invention, wherein the engineering plan 424 operation interface of the electromechanical engineering management application 42 includes: process creation 4241 operation interface, task creation 4242 operation interface, pre-task plan 4243 operation interface, dispatch plan 4244 operation interface, pre-task dispatch 4245 operation interface, additional management 4246 operation interface.

請參閱第3及7圖,本發明機電工程管理系統,其中之業主畫面421操作介面之專案即時資訊4211操作介面包含:工班42111、簽到42112、簽退42113、土建項目42114其係包含:位置421141、項目421142、任務照片421143,任務清單42115其係包含:位置421151、系統421152、項目421153、執行人數421154,近三日預計到貨42116其係包含:預計送貨日期421161。 Please refer to Figures 3 and 7, the present invention’s electromechanical engineering management system, in which the project real-time information 4211 of the owner screen 421 operation interface includes: work class 42111, sign in 42112, sign out 42113, civil engineering project 42114, which includes: location 421141, project 421142, task photo 421143, task list 42115 which contains: location 421151, system 421152, project 421153, number of people 421154, 42116 expected to arrive in the past three days, which contains: estimated delivery date 421161.

請參第3及8圖,本發明機電工程管理系統,其中之業主畫面421操作介面之專案資訊4212操作介面包含:人力支出42121、物料支出42122、管銷費用42123、工程42124、天數/%42125。 Please refer to Figures 3 and 8, the project information 4212 of the owner screen 421 operating interface of the present invention’s electromechanical engineering management system includes: manpower expenditure 42121, material expenditure 42122, management and marketing costs 42123, engineering 42124, days/%42125 .

請參第3及9圖,本發明機電工程管理系統,其中之業主畫面421操作介面之任務進度查詢4213操作介面包含:選擇樓層42131、選擇任務系統42132、選擇系統42133、選擇工班42134、位置42135、系統42136、項目42137、預計完成日期42138、實際完成日期42139、已完成/總工項 數421310、進度421311、圖面421312、前置任務421313、物料421314、障礙421315、實際/計畫工數421316、累計成本421317、累計/預計收入421318、歷史紀錄421319。 Please refer to Figures 3 and 9, the mechanical and electrical engineering management system of the present invention, in which the task progress query 4213 of the owner screen 421 operation interface includes: select floor 42131, select task system 42132, select system 42133, select work class 42134, location 42135, system 42136, project 42137, estimated completion date 42138, actual completion date 42139, completed/total work item Number 421310, progress 421311, drawing 421312, pre-task 421313, material 421314, obstacle 421315, actual/planned labor number 421316, cumulative cost 421317, cumulative/projected revenue 421318, historical record 421319.

請參第3及10圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工項進度查詢4214操作介面包含:選擇樓層42141、選擇系統42142、選擇標籤42143、選擇工班42144、選擇盤體結構42145、統計42146、總工項數42147、障礙數(已完成)/工項數42148、障礙數(未完成)/工項數42149、總累計收入421410、總預計收入421411、位置421412、系統421413、From421414、To421415、工作內容421416、前置作業421417、物料421418、圖面421419、待釐清421420、進度421421、施工照片421422、障礙421423、累計/預計收入421424、任務查詢421425、自主檢查421426、業主查驗421427、缺失421428、計價421429、排序421430。 Please refer to Figures 3 and 10, in the electromechanical engineering management system of the present invention, the owner screen 421 operation interface of the work item progress query 4214 operation interface includes: select floor 42141, select system 42142, select tag 42143, select work class 42144, select Panel structure 42145, statistics 42146, total number of work items 42147, number of obstacles (completed)/number of work items 42148, number of obstacles (uncompleted)/number of work items 42149, total cumulative income 421410, total estimated income 421411, position 421412 , System 421413, From421414, To421415, work content 421416, pre-work 421417, materials 421418, drawing 421419, to be clarified 421420, progress 421421, construction photos 421422, obstacles 421423, cumulative/estimated income 421424, task query 421425, independent inspection 421426, owner check 421427, missing 421428, pricing 421429, sorting 421430.

請參第10及11圖,本發明機電工程管理系統,其中之工項進度查詢4214操作介面之選擇盤體結構42145操作介面包含:電氣系統421451、弱電系統421452、給水系統421453、排水系統421454、消防系統421455。 Please refer to Figures 10 and 11, the electromechanical engineering management system of the present invention, in which the work item progress query 4214 operation interface selection panel structure 42145 operation interface includes: electrical system 421451, weak current system 421452, water supply system 421453, drainage system 421454, Fire fighting system 421455.

請參第3及12圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工程障礙事項4215操作介面包含:新增事項42151、新增事項類型42152、系統42153、回覆42154、提案日42155、最後更新日42156、預計完成日 42157、實際完成日42158、類型42159、範圍421510、標題421511。 Please refer to Figures 3 and 12, the mechanical and electrical engineering management system of the present invention, in which the owner screen 421 operation interface of the engineering obstacles 4215 operation interface includes: new item 42151, new item type 42152, system 42153, reply 42154, proposal date 42155, last update date 42156, estimated completion date 42157, actual completion date 42158, type 42159, range 421510, title 421511.

請參第3及13圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工程待辦事項4216操作介面之項目包含:新增事項42161、新增事項類型42162、系統42163、回覆42164、提案日42165、最後更新日42166、預計完成日42167、實際完成日42168、類型42169、範圍421610、標題421611。 Please refer to Figures 3 and 13, the mechanical and electrical engineering management system of the present invention. The project to-do items 4216 of the owner screen 421 operation interface includes: new item 42161, new item type 42162, system 42163, reply 42164 , Proposal date 42165, Last update date 42166, Estimated completion date 42167, Actual completion date 42168, Type 42169, Scope 421610, Title 421611.

請參第3及14圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工程待釐清事項4217操作介面包含:新增事項42171、新增事項類型42172、寄信42173、項目清單42174、負責清單42175、相關清單42176、簽核清單42177。 Please refer to Figures 3 and 14, the mechanical and electrical engineering management system of the present invention, in which the owner screen 421 operation interface of the project to be clarified 4217 operation interface includes: new item 42171, new item type 42172, mail 42173, item list 42174 , Responsible list 42175, related list 42176, endorsement list 42177.

請參第3、14及15圖,本發明機電工程管理系統,其中之業主畫面421操作介面之工程待釐清事項4217之項目清單42174操作介面包含:系統421741、回覆421742、提案日421743、最後更新日421744、預計完成日421745、實際完成日421746、類型421747、範圍421748、標題421749。 Please refer to Figures 3, 14 and 15, the mechanical and electrical engineering management system of the present invention, in which the owner screen 421 operating interface, the project list of items 4217 to be clarified, 42174 operating interface includes: system 421741, reply 421742, proposal date 421743, last update Date 421744, Estimated Completion Date 421745, Actual Completion Date 421746, Type 421747, Scope 421748, Title 421749.

請參第3及16圖,本發明機電工程管理系統,其中之業主畫面421操作介面之送審查驗管制表4218操作介面包含:新增送審項目42181、應送42182、未送42183、 應送而未送42184、送審中42185、退回42186、近逾期42187、已核可42188、送審項目42189、計畫送審日期421810、狀態421811、核定日期421812、核定截止日期421813、新增版次421814、編輯送審項目421815。 Please refer to Figures 3 and 16, the mechanical and electrical engineering management system of the present invention, in which the owner screen 421 operation interface of the control form 4218 for review and inspection includes: 42181 newly submitted items for review, 42182 to be submitted, 42183 not to be submitted, 42184 should be sent but not sent 42184, 42185 submitted for review, 42186 returned, 42187 nearly overdue, 42188 approved, 42189 submitted for review, planned review date 421810, status 421811, verification date 421812, verification deadline 421813, new edition 421814 421815, edit submission project.

請參第3及17圖,本發明機電工程管理系統,其中之業主畫面421操作介面之施工排程4219操作介面包含:全展開42191、捲至最新42192、派工42193其係包含:位置421931、系統421932、項目421933、派工原因421934、其他421935、日期421936,位置42194、類別42195、系統42196、項目42197、合約開始日期42198、預計完成日期42199、合約完成日期421910、建議421911、狀態421912、施工計畫書送審421913、預計開始日期421914、材料設備送審421915、預計結束日期421916、施工圖送審421917、實際完成日期421918、材料設備查驗421919、已完成總項目數421920、圖面421921、歷史紀錄421922、已完成421923、總工項數421924、進度421925、障礙421926、歷史紀錄421927、物料421928、工班421929。 Please refer to Figures 3 and 17, the mechanical and electrical engineering management system of the present invention, in which the owner screen 421 operation interface construction schedule 4219 operation interface includes: fully expanded 42191, roll to latest 42192, dispatch 42193, which includes: location 421931, System 421932, project 421933, dispatch reason 421934, other 421935, date 421936, location 42194, category 42195, system 42196, project 42197, contract start date 42198, estimated completion date 42199, contract completion date 421910, recommendation 421911, status 421912, Construction plan submitted for review 421913, estimated start date 421914, materials and equipment submitted for review 421915, estimated end date 421916, construction drawings submitted for review 421917, actual completion date 421918, materials and equipment inspection 421919, total completed projects 421920, drawings 421921, historical records 421922, completed 421923, total number of work items 421924, progress 421925, obstacles 421926, historical records 421927, materials 421928, work shifts 421929.

請參閱第4及18圖,本發明機電工程管理系統,其中之管理422操作介面之專案即時資訊4221操作介面包含:工班42211、簽到42212、簽退42213、土建項目42214其係包含:位置422141、項目422142、任務照片422143,任務清單42215其係包含:位置422151、系統422152、項目 422153、執行人數422154,近三日預計到貨42216其係包含:預計送貨日期422161。 Please refer to Figures 4 and 18, the electromechanical engineering management system of the present invention, in which the project real-time information 4221 of the management 422 operation interface includes: work class 42211, sign-in 42212, sign-out 42213, civil engineering project 42214, which includes: location 42214 , Project 422142, task photo 422143, task list 42215 which contains: location 422151, system 422152, project 422153, the number of executives is 422154, the estimated arrival of the goods in the past three days is 42216, which includes: the estimated delivery date 422161.

請參閱第4及19圖,本發明機電工程管理系統,其中之管理422操作介面之專案資訊管理4222操作介面包含:標單名稱42221、已完成物料計價42222、總物料計價42223、已完成工資計價42224、總工資計價42225、進度42226、總/本月人力支出42227、總/本月物料支出42228、總/本月管理人員支出42229、工程天數/%總/本月出工人次422210、總/本月出工工數422211、總/本月計薪出工人次422212、總/本月計薪出工工數422213。 Please refer to Figures 4 and 19, in the electromechanical engineering management system of the present invention, the project information management 4222 operation interface of the management 422 operation interface includes: bid name 42221, completed material valuation 42222, total material valuation 42223, and completed wage valuation 42224, total salary valuation 42225, progress 42226, total/month manpower expenditure 42227, total/month material expenditure 42228, total/month management expenditure 42229, engineering days/% total/monthly workers 42210, total/ 422211 total/monthly paid workers, 422212 total/monthly paid workers, 422213 total/monthly paid workers.

請參閱第4、20及21圖,本發明機電工程管理系統,其中之管理422操作介面之樓層進度查詢4223操作介面包含:選擇標單42231、位置42232、進度項目42233其係包含:平面BOX放樣及PVC配管完成422331、輕隔間牆立面PVC及EMT配管422332、動力幹管配管完成422333、室內燈插拉線第一次完成422334、室內燈插拉線第二次422335、小公區域及梯廳拉線完成422336、弱電及監控系統拉水線完成422337、動力幹線拉線完成422338、鋁製線槽安裝完成422339、室內4223310、小公區域及梯廳器具安裝完成4223311、各戶住戶盤4223312、小公電盤安裝及結線完成4223313、送電及測試完成4223314,該項金額總計42234、單一樓層金額42235、項目已完成%42236、已完成金額42237、該項目完成占總合約%42238。 Please refer to Figures 4, 20 and 21, the electromechanical engineering management system of the present invention, in which the floor progress query of the management 422 operation interface 4223 operation interface includes: selection order 42231, position 42232, progress item 42233, which includes: plane BOX stakeout And PVC piping completed 422331, light partition wall facade PVC and EMT piping 422332, power main pipe piping completed 422333, indoor lamp plug-in cable completed for the first time 422334, indoor lamp plug-in cable for the second time 422335, small public area and The elevator hall cable is completed 422336, the weak current and monitoring system cable is completed 422337, the power main line cable is completed 422338, the aluminum wire trough installation is completed 422339, the indoor 4223310, the small public area and the elevator hall appliances are installed 4223311 4223312. The installation and connection of small public electric panels were completed 4223313, and the power transmission and testing were completed 4223314. The total amount of this item is 42234, the amount of a single floor is 42235, the project has completed 42236, and the completed amount is 42237. The completion of the project accounts for 42238 of the total contract.

請參閱第4、22及23圖,本發明機電工程管理 系統,其中之管理422操作介面之區間樓層進度查詢4224操作介面包含:選擇標單42241、位置42242、進度項目42243其係包含:平面BOX放樣及PVC配管完成422431、輕隔間牆立面PVC及EMT配管422432、動力幹管配管完成422433、室內燈插拉線第一次完成422434、室內燈插拉線第二次422435、小公區域及梯廳拉線完成422436、弱電及監控系統拉水線完成422437、動力幹線拉線完成422438、鋁製線槽安裝完成422439、室內4224310、小公區域及梯廳器具安裝完成4224311、各戶住戶盤4224312、小公電盤安裝及結線完成4224313、送電及測試完成4224314,該項金額總計42244、單一樓層金額42245、項目已完成%42246、已完成金額42247、該項目完成占總合約%42248。 Please refer to Figures 4, 22 and 23, the present invention of electromechanical engineering management In the system, the management 422 operation interface of the interval floor progress query 4224 operation interface includes: selection order 42241, location 42242, progress item 42243, which includes: plane BOX lofting and PVC piping completion 422431, light partition wall facade PVC and EMT piping 422432, power main pipe piping completed 422433, indoor lamp plug-in cable completed for the first time 422434, indoor lamp plugged cable for the second time 422435, small public area and stair hall pull cable completed 422436, weak current and monitoring system pull cable Completion of 422437, power main line pull line 422438, aluminum trunking installation 422439, indoor 4224310, small public area and stair hall equipment installation 4224311, each household's household board 4224312, small public power board installation and wiring completed 4224313, power transmission and testing Completion of 4224314, the total amount of this item is 42244, the amount of a single floor is 42245, the project has been completed% 42246, the completed amount is 42247, and the completion of the project accounts for 42248% of the total contract.

請參閱第4、24及25圖,本發明機電工程管理系統,其中之管理422操作介面之樓層計價查詢4225操作介面包含:選擇標單42251、位置42252、進度項目42253其係包含:平面BOX放樣及PVC配管完成422531、輕隔間牆立面PVC及EMT配管422532、動力幹管配管完成422533、室內燈插拉線第一次完成422534、室內燈插拉線第二次422535、小公區域及梯廳拉線完成422536、弱電及監控系統拉水線完成422537、動力幹線拉線完成422538、鋁製線槽安裝完成422539、室內4225310、小公區域及梯廳器具安裝完成4225311、各戶住戶盤4225312、小公電盤安裝及結線完成4225313、送電及測試完成4225314,該項金額總計42254、單一樓層金額42255、項目已完成%42256、已完成金額 42257、該項目完成占總合約%42258。 Please refer to Figures 4, 24 and 25, the electromechanical engineering management system of the present invention, the management 422 operation interface of the floor pricing query 4225 operation interface includes: selection order 42251, location 42252, progress item 42253, which includes: plane BOX stakeout And PVC piping completed 422531, light partition wall facade PVC and EMT piping 422532, power main pipe piping completed 422533, indoor light plug-in cable completed for the first time 422534, indoor light plug-in cable for the second time 422535, small public area and The elevator hall cable is completed 422536, the weak current and monitoring system cable is completed 422537, the power trunk cable is completed 422538, the aluminum trunking installation is completed 422539, the indoor 4225310, the small public area and the elevator hall appliances are installed 4225311 4225312. The installation and connection of small public electric panels are completed 4225313, power transmission and testing are completed 4225314, the total amount of this item is 42254, the amount of a single floor is 42255, the project has been completed% 42256, and the amount has been completed 42257. The completion of the project accounts for 42258% of the total contract.

上述實施例所揭示者係藉以具體說明本發明,且文中雖透過特定的術語進行說明,當不能以此限定本發明發明之專利範圍;熟悉此項技術領域之人士當可在瞭解本發明之精神與原則後對其進行變更與修改而達到等效之目的,而此等變更與修改,皆應涵蓋於如后所述之申請專利範圍所界定範疇中。 The above-mentioned embodiments are used to describe the present invention in detail, and although specific terms are used in the text, the patent scope of the present invention cannot be limited by this; those familiar with the technical field should understand the spirit of the present invention. After the principles are changed and modified to achieve the equivalent purpose, these changes and modifications should be covered by the scope of the patent application as described later.

42:機電工程管理應用程式 42: Electrical and Mechanical Engineering Management Application

421:業主畫面 421: Owner Screen

422:管理 422: Management

423:工程統計 423: Engineering Statistics

424:工程計畫 424: Engineering Plan

Claims (15)

一種機電工程管理系統,其主要係藉由管理者及業主之終端裝置以網際網路與管理中心伺服器進行連結,藉以進行共同查核管理工程資訊、進度及排程之整合創新系統,其係包含: A mechanical and electrical engineering management system, which is mainly connected to the management center server through the Internet through the terminal devices of the manager and the owner, so as to jointly check and manage the project information, progress and scheduling. It is an integrated and innovative system that includes : 一用戶,其係該機電工程管理系統使用者,包含管理者及業主,藉由終端裝置、網際網路與管理中心伺服器進行連結; A user, who is the user of the mechanical and electrical engineering management system, including the manager and the owner, is connected to the management center server through a terminal device, the Internet; 一管理中心伺服器,其係包含機電工程專案之工程資訊,以網際網路與用戶進行連結提供服務; A management center server, which contains engineering information of electromechanical engineering projects, and provides services through Internet connection with users; 一機電工程管理應用程式,其係存在於該管理中心伺服器,包含:業主畫面操作介面、管理操作介面、工程統計操作介面及工程計畫操作介面,其中該業主畫面操作介面包含:專案即時資訊操作介面、專案資訊操作介面、任務進度查詢操作介面、工項進度查詢操作介面、工程障礙事項操作介面、工程待辦事項操作介面、工程待釐清事項操作介面、送審查驗管制表操作介面、施工排程操作介面;其中該管理操作介面包含:專案即時資訊操作介面、專案資訊管理操作介面、樓層進度查詢操作介面、區間樓層進度查詢操作介面及樓層計價查詢操作介面;其中該工程統計操作介面包含:歷史查詢操作介面、區間歷史查詢操作介面、任務進度查詢操作 介面、工項進度查詢操作介面、工程障礙事項操作介面、工程待辦事項操作介面、工程待釐清事項操作介面、工程建議事項操作介面、工程障礙事項(所有工地)操作介面、送審查驗管制表操作介面;其中該工程計畫操作介面包含:工序建立操作介面、任務建立操作介面、前置任務計畫操作介面、派工計畫操作介面、前置任務派工操作介面、追加管理操作介面。 An electromechanical engineering management application program, which exists on the management center server, includes: owner screen operation interface, management operation interface, engineering statistics operation interface, and engineering plan operation interface. The owner screen operation interface includes: project real-time information Operation interface, project information operation interface, task progress inquiry operation interface, work item progress inquiry operation interface, engineering obstacles operation interface, engineering to-do list operation interface, engineering pending clarification operation interface, submission inspection control table operation interface, construction schedule Process operation interface; the management operation interface includes: project real-time information operation interface, project information management operation interface, floor progress query operation interface, section floor progress query operation interface, and floor pricing query operation interface; the project statistics operation interface includes: Historical query operation interface, interval historical query operation interface, task progress query operation Interface, work item progress inquiry operation interface, engineering obstacles operation interface, engineering to-do items operation interface, engineering to-be clarified items operation interface, engineering suggestions operation interface, engineering obstacles (all construction sites) operation interface, operation interface for inspection control list Interface: The engineering plan operation interface includes: process establishment operation interface, task establishment operation interface, pre-task plan operation interface, dispatch plan operation interface, pre-task dispatch operation interface, and additional management operation interface. 如請求項1所述之機電工程管理系統,其中該業主畫面操作介面之專案即時資訊操作介面包含:工班、簽到、簽退、土建項目、任務清單、近三日預計到貨,其中該土建項目包含:位置、項目、任務照片,其中該任務清單包含:位置、系統、項目、執行人數,其中該近三日預計到貨包含:預計送貨日期。 For the mechanical and electrical engineering management system described in claim 1, the project real-time information operation interface of the owner's screen operation interface includes: work shift, sign-in, sign-out, civil construction project, task list, and expected arrival in the past three days, where the civil construction The project includes: location, project, task photo, where the task list includes: location, system, project, number of people to perform, and the expected arrival in the last three days includes: estimated delivery date. 如請求項1所述之機電工程管理系統,其中該業主畫面操作介面之專案資訊操作介面包含:人力支出、物料支出、管銷費用、工程、天數/%。 The mechanical and electrical engineering management system described in claim 1, wherein the project information operation interface of the owner's screen operation interface includes: manpower expenditure, material expenditure, management and marketing expenses, engineering, days/%. 如請求項1所述之機電工程管理系統,其中該任務進度查詢操作介面包含:選擇樓層、選擇任務系統、選擇系統、選擇工班、位置、系統、項目、預計完成日期、實際完成日期、已完成/總工項數、進度、圖面、前置任務、物料、障礙、實際/計畫工數、累計成本、累計/預計收入、歷史紀錄。 For the mechanical and electrical engineering management system described in claim 1, the task progress query operation interface includes: select floor, select task system, select system, select work shift, location, system, project, estimated completion date, actual completion date, completed Number of completed/total work items, progress, drawings, pre-tasks, materials, obstacles, actual/planned work numbers, cumulative cost, cumulative/estimated revenue, and historical records. 如請求項1所述之機電工程管理系統,其中該工項進度查詢操作介面包含:選擇樓層、選擇系統、選擇標籤、選擇工班、選擇盤體結構、統計、總工項數、障礙數(已完成)/工項數、障礙數(未完成)/工項數、總累計收入、總預計收入、位置、系統、From、To、工作內容、前置作業、物料、圖面、待釐清、進度、施工照片、障礙、累計/預計收入、任務查詢、自主檢查、業主查驗、缺失、計價、排序,其中該選擇盤體結構操作介面包含:電氣系統、弱電系統、給水系統、排水系統、消防系統。 The mechanical and electrical engineering management system described in claim 1, wherein the work item progress query operation interface includes: select floor, select system, select label, select work class, select panel structure, statistics, total number of work items, number of obstacles ( Completed)/number of work items, number of obstacles (uncompleted)/number of work items, total cumulative income, total estimated income, location, system, From, To, work content, pre-work, materials, drawings, to be clarified, Progress, construction photos, obstacles, accumulated/estimated income, task query, self-inspection, owner's inspection, missing, pricing, and sorting. The operation interface of this selection panel structure includes: electrical system, weak current system, water supply system, drainage system, fire protection system. 如請求項1所述之機電工程管理系統,其中該工程障礙事項操作介面包含:新增事項、新增事項類型、系統、回覆、提案日、最後更新日、預計完成日、實際完成日、類型、範圍、標題。 For the mechanical and electrical engineering management system described in claim 1, the operation interface of the engineering obstacle includes: new items, new item types, systems, responses, proposal date, last update date, estimated completion date, actual completion date, type , Scope, title. 如請求項1所述之機電工程管理系統,其中該工程待辦事項操作介面之項目包含:新增事項、新增事項類型、系統、回覆、提案日、最後更新日、預計完成日、實際完成日、類型、範圍、標題。 For the mechanical and electrical engineering management system described in claim 1, the items in the operation interface of the project to-do list include: new items, new item types, systems, responses, proposal date, last update date, estimated completion date, actual completion Day, type, scope, title. 如請求項1所述之機電工程管理系統,其中該工程待釐清事項操作介面包含:新增事項、新增事項類型、寄信、項目清單、負責清單、相關清單、簽核清單,其中該項目清單操作介面包含:系統、回覆、提案日、最後更新日、預計完成日、實際完成日、類型範圍、標題。 For the mechanical and electrical engineering management system described in claim 1, the operation interface of the items to be clarified for the project includes: new items, new item types, mailing, item lists, responsible lists, related lists, and approval lists, among which the item The list operation interface includes: system, reply, proposal date, last update date, estimated completion date, actual completion date, type range, title. 如請求項1所述之機電工程管理系統,其中該送審查驗管制表操作介面包含:新增送審項目、應送、未送、應送而未送、送審中、退回、近逾期、已核可、送審項目、計畫送審日期、狀態、核定日期、核定截止日期、新增版次、編輯送審項目。 For example, the mechanical and electrical engineering management system described in claim 1, in which the operation interface of the control list for examination and inspection includes: newly added items for examination, should be sent, not sent, should be sent but not sent, submitted for review, returned, nearly overdue, approved , Projects submitted for review, planned review date, status, verification date, verification deadline, new editions, editing projects submitted for review. 如請求項1所述之機電工程管理系統,其中該施工排程操作介面包含:全展開、捲至最新、派工、位置、類別、系統、項目、合約開始日期、預計完成日期、合約完成日期、建議、狀態、施工計畫書送審、預計開始日期、材料設備送審、預計結束日期、施工圖送審、實際完成日期、材料設備查驗、已完成總項目數、圖面、歷史紀錄、已完成、總工項數、進度、障礙、歷史紀錄、物料、工班,其中該派工其係包含:位置、系統、項目、派工原因、其他、日期。 The mechanical and electrical engineering management system described in claim 1, wherein the construction scheduling operation interface includes: fully expanded, rolled to the latest, dispatched, location, category, system, project, contract start date, estimated completion date, contract completion date , Recommendations, Status, Construction Plan Submitted for Review, Estimated Start Date, Material and Equipment Submitted for Review, Estimated End Date, Construction Drawings Submitted for Review, Actual Finish Date, Material and Equipment Inspection, Total Projects Completed, Drawings, Historical Records, Completed, The total number of work items, progress, obstacles, historical records, materials, and work shifts, where the dispatch system includes: location, system, project, dispatch reason, other, and date. 如請求項1所述之機電工程管理系統,其中該管理操作介面之專案即時資訊操作介面包含:工班、簽到、簽退項目、土建項目、任務清單及近三日預計到貨項目,其中該土建項目包含:位置、項目及任務照片,其中該任務清單其係包含:位置、系統、項目、執行人數,其中該近三日預計到貨其係包含:預計送貨日期。 Such as the mechanical and electrical engineering management system described in claim 1, wherein the project real-time information operation interface of the management operation interface includes: work shift, check-in, check-out project, civil engineering project, task list and expected arrival project in the past three days, among which the The civil engineering project includes: location, project, and task photos. The task list includes: location, system, project, and number of people to perform. Among them, the expected arrival in the last three days includes: estimated delivery date. 如請求項1所述之機電工程管理系統,其中該管理操作介面之專案資訊管理操作介面包含:標單名稱、已完成 物料計價、總物料計價、已完成工資計價、總工資計價、進度、總/本月人力支出、總/本月物料支出、總/本月管理人員支出、工程天數/%總/本月出工人次、總/本月出工工數、總/本月計薪出工人次、總/本月計薪出工工數。 The mechanical and electrical engineering management system described in claim 1, wherein the project information management operation interface of the management operation interface includes: bid name, completed Material pricing, total material pricing, completed wage pricing, total wage pricing, progress, total/month manpower expenditure, total/month material expenditure, total/month management staff expenditure, engineering days/% total/monthly workers Times, total/number of workers this month, total/number of paid workers this month, total/number of paid workers this month. 如請求項1所述之機電工程管理系統,其中該管理操作介面之樓層進度查詢操作介面包含:選擇標單、位置、進度項目、該項金額總計、單一樓層金額、項目已完成%、已完成金額、該項目完成占總合約%,其中該進度項目包含:平面BOX放樣及PVC配管完成、輕隔間牆立面PVC及EMT配管、動力幹管配管完成、室內燈插拉線第一次完成、室內燈插拉線第二次、小公區域及梯廳拉線完成、弱電及監控系統拉水線完成、動力幹線拉線完成、鋁製線槽安裝完成、室內、小公區域及梯廳器具安裝完成、各戶住戶盤、小公電盤安裝及結線完成、送電及測試完成。 The mechanical and electrical engineering management system described in claim 1, wherein the floor progress query operation interface of the management operation interface includes: selection of bids, location, progress items, total amount of this item, single floor amount, project completed%, completed Amount. The completion of the project accounts for% of the total contract. The progress items include: flat BOX stakeout and PVC piping completed, light partition wall facade PVC and EMT piping, power main pipe piping completed, and indoor light plug-in cable completed for the first time , The second time the indoor light plugs in the cable, the small public area and the staircase are completed, the weak current and monitoring system is completed, the power trunk cable is completed, the aluminum trunking is installed, the indoor, the small public area and the staircase are completed The installation of appliances is completed, the installation and connection of household boards and small public power boards are completed, and the power transmission and testing are completed. 如請求項1所述之機電工程管理系統,其中該管理操作介面之區間樓層進度查詢操作介面包含:選擇標單、位置、進度項目、該項金額總計、單一樓層金額、項目已完成%、已完成金額、該項目完成占總合約%,其中該進度項目包含:平面BOX放樣及PVC配管完成、輕隔間牆立面PVC及EMT配管、動力幹管配管完成、室內燈插拉線第一次完成、室內燈插拉線第二次、小公區域 及梯廳拉線完成、弱電及監控系統拉水線完成、動力幹線拉線完成、鋁製線槽安裝完成、室內、小公區域及梯廳器具安裝完成、各戶住戶盤、小公電盤安裝及結線完成、送電及測試完成。 For the mechanical and electrical engineering management system described in claim 1, the section floor progress query operation interface of the management operation interface includes: selection of bids, location, progress items, total amount of this item, amount of a single floor,% completed of the project, The completed amount and the completion of the project accounted for% of the total contract. The progress items include: flat BOX stakeout and PVC piping completed, light partition wall facade PVC and EMT piping, power main pipe piping completed, and the first time indoor light plug-in cable Finished, the indoor lamp plugged in the cable for the second time, the small public area And the elevator hall pull line is completed, the weak current and monitoring system pull line is completed, the power trunk line is completed, the aluminum trunking is installed, the indoor, small public area and the elevator hall appliances are installed, and the household panels and small public power panels are installed. And the connection is completed, the power transmission and the test are completed. 如請求項1所述之機電工程管理系統,其中該樓層計價查詢操作介面包含:選擇標單、位置、進度項目、該項金額總計、單一樓層金額、項目已完成%、已完成金額、該項目完成占總合約%,其中該進度項目包含:平面BOX放樣及PVC配管完成、輕隔間牆立面PVC及EMT配管、動力幹管配管完成、室內燈插拉線第一次完成、室內燈插拉線第二次、小公區域及梯廳拉線完成、弱電及監控系統拉水線完成、動力幹線拉線完成、鋁製線槽安裝完成、室內、小公區域及梯廳器具安裝完成、各戶住戶盤、小公電盤安裝及結線完成、送電及測試完成。 For the mechanical and electrical engineering management system described in claim 1, the floor pricing query operation interface includes: selection of bids, location, progress item, total amount of the item, amount of a single floor, project completed %, completed amount, the project The completion accounts for% of the total contract. The progress items include: flat BOX stakeout and PVC piping completion, light partition wall facade PVC and EMT piping, power main pipe piping completion, indoor light plug-in cable completed for the first time, indoor light plug-in The second time of pulling the line, the small public area and the staircase hall pulling line is completed, the weak current and monitoring system pulling line is completed, the power main line pulling line is completed, the aluminum trunking installation is completed, the indoor, small public area and the staircase hall appliance installation is completed, The installation and connection of the household board and small public electricity board of each household are completed, and the power transmission and testing are completed.
TW109102241A 2020-01-21 2020-01-21 Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner TW202129560A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
TW109102241A TW202129560A (en) 2020-01-21 2020-01-21 Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner
CN202010285057.6A CN113222312A (en) 2020-01-21 2020-04-13 Electromechanical engineering management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW109102241A TW202129560A (en) 2020-01-21 2020-01-21 Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner

Publications (1)

Publication Number Publication Date
TW202129560A true TW202129560A (en) 2021-08-01

Family

ID=77085720

Family Applications (1)

Application Number Title Priority Date Filing Date
TW109102241A TW202129560A (en) 2020-01-21 2020-01-21 Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner

Country Status (2)

Country Link
CN (1) CN113222312A (en)
TW (1) TW202129560A (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1378163A (en) * 2001-04-05 2002-11-06 杨承喜 Personal first page system for resource management
CN1484181A (en) * 2002-09-18 2004-03-24 崇越科技股份有限公司 Special engineering control and management system and method thereof
CN103136626B (en) * 2011-11-29 2016-08-03 北京建龙重工集团有限公司 The online management method of engineering project
CN105354652A (en) * 2015-08-26 2016-02-24 吕曼 Intelligent management system for engineering construction project
KR101994550B1 (en) * 2017-12-13 2019-07-02 주식회사 저스티스어드벤처 Method for real-time reporting and managing the work process for a repairing ships

Also Published As

Publication number Publication date
CN113222312A (en) 2021-08-06

Similar Documents

Publication Publication Date Title
Formoso et al. Method for waste control in the building industry
CN109523111A (en) A kind of facilities and equipment management system
Dykstra Construction project management: A complete introduction
Pierce Jr Project scheduling and management for construction
Abdullah et al. Potential effects on large mara construction projects due to construction delay
Klanac et al. Trends in construction lost productivity claims
Elfving Exploration of opportunities to reduce lead times for engineered-to-order products
Firing et al. Main challenges found in the handover of a shopping centre in Norway
TW202129560A (en) Electromechanical engineering management system connected to the management center server through the Internet by the terminal devices of the manager and the owner
Kamarah Framework for scheduling, controlling, and delivery planning for scattered repetitive infrastructure rehabilitation projects
TWM594763U (en) Mechanical and Electrical Engineering Management System
Zubairu Maintenance of government office buildings in Nigeria: A post-occupancy evaluation approach
Nguyen et al. Completing the construction management at Hoa Binh construction group
Costa et al. Guidelines and conditions for implementing kanban in construction
Pheng et al. Project management processes
Edwards Applied facilities management for the hospitality industry
Alkhalouf Impacts of COVID-19 on Construction
WALKER PROJECT MANAGEMENT PLAN FOR THE EXPANSION OF THE GENERATION ASSET MANAGEMENT GROUP WORKSPACE
Uzuegbunam et al. CONSTRUCTION MANAGEMENT FOR ARCHITECTS AND BUILDERS: PANACEA FOR SUSTAINABLE PEACE AND CONFLICT RESOLUTION IN DEVELOPING NATIONS
Baker Time-cost relationships in construction.
Kaiser Mortgaging the Future: The Cost of Deferring Maintenance.
Gunnoe et al. The Impact of Utilizing Expertise to Project Risk and Performance
Rathod et al. Risk Assessment and Management of Construction Project
KR20230146834A (en) A service platform for smart facility management
Omar et al. Trust Building in Managing Strata Residence in Kuala Lumpur