CN108764610B - Standard process engineering project construction management method based on big data and storage medium - Google Patents

Standard process engineering project construction management method based on big data and storage medium Download PDF

Info

Publication number
CN108764610B
CN108764610B CN201810324765.9A CN201810324765A CN108764610B CN 108764610 B CN108764610 B CN 108764610B CN 201810324765 A CN201810324765 A CN 201810324765A CN 108764610 B CN108764610 B CN 108764610B
Authority
CN
China
Prior art keywords
project
construction
standard
management
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810324765.9A
Other languages
Chinese (zh)
Other versions
CN108764610A (en
Inventor
陈群
刘林
李文峰
王世杰
曾开发
黄瑜锋
王杰钦
陈镇西
余成柱
陈哲
陈龙
陈文灵
黄骞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian University of Technology
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201810324765.9A priority Critical patent/CN108764610B/en
Publication of CN108764610A publication Critical patent/CN108764610A/en
Application granted granted Critical
Publication of CN108764610B publication Critical patent/CN108764610B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention provides a standard process engineering project construction management method and a storage medium based on big data, wherein the method comprises the following steps of S1: generating a standard process engineering project construction management database according to massive process engineering project construction standard data and standard construction method information; s2: after acquiring basic project information corresponding to the designated project, generating a management platform corresponding to the designated project according to the database; the management platform comprises a list editing module, a budget management module, a progress management module and an information pushing module. The invention utilizes big data technology, collects standardized construction process and work flow through mass engineering projects, realizes an engineering project construction management system under a quality standardized control mode for project cost, progress, quality control and post work content management, and provides help for construction site management and construction enterprise project management.

Description

Standard process engineering project construction management method based on big data and storage medium
Technical Field
The invention relates to the field of data analysis and processing, in particular to a standard process engineering project construction management method and a storage medium based on big data.
Background
The engineering project management system is widely applied to construction engineering projects at home and abroad. The current project management system solves the problem of management tools, but is relatively lagged in the aspect of intelligent management and control.
The existing engineering project management system can not solve the problems that: the method comprises the following steps of a, automatically generating project cost information, b, automatically arranging project construction progress, c, standardizing project quality control, d, automatically pushing work tasks of project managers and the like.
Therefore, there is a need to provide an engineering project management system that can solve the above problems.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the method and the storage medium for managing the construction of the standard process engineering project based on the big data can realize the intelligent and quality-standardized construction of the control process engineering project.
In order to solve the technical problems, the invention adopts the technical scheme that:
a standard process engineering project construction management method based on big data comprises the following steps:
s1: generating a standard process engineering project construction management database according to massive process engineering project construction standard data and standard construction method information;
s2: after acquiring basic project information corresponding to a specified project, generating a management platform corresponding to the specified project according to the database; the management platform comprises a list editing module, a budget management module, a progress management module and an information pushing module;
the list editing module is used for creating and editing a standard construction process corresponding to the specified project;
the budget management module is used for generating project budget estimation data corresponding to the specified project under a standard construction process;
the progress management module is used for generating a progress plan corresponding to the designated project and monitoring the progress;
and the information pushing module is used for pushing information including construction work tasks and a standardized control method, summarizing unfinished work according to the pushing receipt within preset time, and forming a report to be pushed to a related responsible person.
The invention provides another technical scheme as follows:
a computer storage medium having stored thereon a computer program which, when executed by a processor, implements all the steps involved in the above-described method for managing construction of a standard process engineering project based on big data.
The invention has the beneficial effects that: the method takes massive technical engineering project construction standard data and a standard construction method as a basis, and generates a standard technical engineering project construction management database through a big data technology; before a new project is started, a standard process engineering project construction management platform for the project can be automatically generated after basic information is input by calling the database; the platform can realize the whole-course control of the project including standard construction process reference, task allocation, task standardization control method pushing, progress monitoring, engineering related information summarization and the like. The invention changes the manual collection and input of a large amount of project data of the traditional project management software, greatly improves the efficiency of construction standardized management, and realizes the intelligent and standardized collection and calling of construction data.
Drawings
FIG. 1 is a schematic flow chart of a standard process engineering project construction management method based on big data according to the present invention;
fig. 2 is a schematic flow chart of a standard process engineering project construction management method based on big data according to an embodiment of the present invention.
Detailed Description
In order to explain technical contents, achieved objects, and effects of the present invention in detail, the following description is made with reference to the accompanying drawings in combination with the embodiments.
The most key concept of the invention is as follows: generating a standard process engineering project construction management database by a big data technology by taking massive process engineering project construction standard data and a standard construction method as a basis; a management platform for automatically generating a designated project by calling a database; and carrying out whole-course management and control on the project through the platform.
Referring to fig. 1, the present invention provides a standard process engineering project construction management method based on big data, including:
s1: generating a standard process engineering project construction management database according to massive process engineering project construction standard data and standard construction method information;
s2: after acquiring basic project information corresponding to a specified project, generating a management platform corresponding to the specified project according to the database; the management platform comprises a list editing module, a budget management module, a progress management module and an information pushing module;
the list editing module is used for creating and editing a standard construction process corresponding to the specified project;
the budget management module is used for generating project budget estimation data corresponding to the specified project under a standard construction process;
the progress management module is used for generating a progress plan corresponding to the designated project and monitoring the progress;
and the information pushing module is used for pushing information including construction work tasks and a standardized control method, summarizing unfinished work according to the pushing receipt within preset time, and forming a report to be pushed to a related responsible person.
From the above description, the beneficial effects of the present invention are: the invention utilizes big data technology, collects standardized construction process and work flow through mass engineering projects, realizes an engineering project construction management system under a quality standardized control mode for project cost, progress, quality control and post work content management, and provides help for construction site management and construction enterprise project management.
Further, the S1 specifically includes:
extracting a great amount of construction and municipal projects including engineering project categories, engineering cost information, engineering elevation or floor information, engineering project manager configuration standards, construction work logic flows, process standard quality requirements and process operation standard working hours; and combining the standard data with the standard construction method information to form a standard process engineering project construction management database.
According to the description, massive construction standard data of the process engineering project are extracted to serve as basic data of the database, and the reliability of the data of the database is guaranteed.
Furthermore, the management platform also comprises a material management module, a construction log module and a quality acceptance module;
the material management module is used for generating a material name corresponding to the specified project and managing materials;
the construction log module is used for recording the material approach inspection condition and the construction progress and generating real-time construction data according to the current construction progress by combining the standardized construction process in the list editing module;
and the quality acceptance module is used for reserving quality acceptance data of the specified items including executive personnel, completion conditions and problems.
According to the description, the management platform can simultaneously realize material management, construction log recording and quality acceptance aiming at the specified project, further improve the function of the platform and provide more intelligent management help for users.
Further, the S1 specifically includes:
s11: extracting massive including engineering project category uiEngineering cost information liEngineering elevation or floor number information viEngineering project manager configuration standard psiiAnd the construction work logic flow fiAnd a process operation standard time tiProcess standard substanceAmount required hiInformation m of standard construction methodiInformation n of square meters or kilometers of itemsiData x of building and municipal engineering projectiSaid engineering project data xiCan be expressed as xi=<ui,li,vii,fi,ti,hi,mi,ni>I is the number of the construction project x;
s12: for the engineering project data xiProcessing to obtain project standardized construction data set under standard construction method state
Figure BDA0001626201530000041
And constructing a standard process engineering project construction management database according to the data set.
Further, the S2 specifically includes:
step 21: according to the database, a specified project category u is inputaA designated engineering elevation or floor number information vaInformation n of corresponding item square meters or kilometersaAcquiring the project data x corresponding to the specified projecta
Step S22: according to the project data x of the appointed projectaAnd generating a standard process engineering project construction management platform corresponding to the specified project.
According to the description, the construction method can automatically extract and process massive engineering project data of building and municipal projects, obtain a project standardized construction data set in a standard construction method state, and provide data support for quality standard management of subsequent specific engineering projects by using the project standardized construction data set as a standard process engineering project construction management database.
Further, the method further comprises:
s3: receiving index feedback information of the specified project, and in the management platform, processing the engineering cost information laEngineering elevation or floor number information vaEngineering project manager configuration standard psiaAnd the construction work logic flow faAnd a process operation standard time taThe process standard quality requirement haInformation m of standard construction methodaAnd (6) adjusting.
According to the above description, after the project is completed, the database can intelligently adjust the index of the database according to the index feedback condition of the specified project a.
The invention provides another technical scheme as follows:
a computer storage medium having stored thereon a computer program which, when executed by a processor, implements all the steps involved in the above-described method for managing construction of a standard process engineering project based on big data.
From the above description, the beneficial effects of the present invention are:
it should be understood by those skilled in the art that all or part of the processes in the above technical solutions may be implemented by instructing the related hardware through a computer program, where the program may be stored in a computer-readable storage medium, and when executed, the program may include the processes of the above methods.
Example one
Referring to fig. 2, the present embodiment provides a method for managing construction of a standard process engineering project based on big data, which includes the following steps:
firstly, data acquisition:
step 11: extracting information such as engineering project categories, engineering cost information (including standard human, material and machine numbers), engineering elevation or floor number information, engineering project management personnel configuration standards, construction work logic flows, process standard quality requirements, process operation standard working hours and the like of massive building and municipal projects, and combining standard construction method information to form a standard process engineering project construction management database;
the mass engineering project data comprises engineering project category uiEngineering cost information liEngineering elevation or floor number information viEngineering project manager configuration standard psiiAnd the construction work logic flow fiAnd process operationsStandard time tiThe process standard quality requirement hiInformation m of standard construction methodiInformation n of square meters or kilometers of itemsiEngineering project data xiCan be expressed as xi=<ui,li,vii,fi,ti,hi,mi,ni>And i is the number of the construction item x.
Step 12: processing mass engineering data to obtain a project standardized construction data set under the state of a standard construction method
Figure BDA0001626201530000061
And building a standard process engineering project construction management database based on the data set.
Step 13: setting the project needing manual input for database calling as follows: the method comprises the steps of project category u, project elevation or floor information v and project square meter or kilometer number information n.
Extracting new project data to form a project management platform:
step 21: defining engineering class information u of new project a in systemaEngineering elevation or floor number information vaAnd item square meter or kilometer information na
Step 22: according to the database, the system automatically generates a standard process engineering project construction management platform of a new project a;
the standard process engineering project construction management platform at least comprises:
A. the standardized construction process list editing module is used for creating and editing a standardized construction process, the standardized construction process information comprises a standardized construction process, required cost, required time and required materials under the modularization of the standardized construction process, and the standardized construction process information can be stored in the cloud server;
B. the standardized budget management module is used for generating project budget estimation data under a set of standard construction processes, the standardized budget data comprises material cost, labor cost and mechanical cost, and the project standardized budget data can be stored in the cloud server;
C. the standardized progress management module is used for progress planning and progress monitoring, the time plan and the progress of the modular process in each piece of standard construction process information can be automatically formed through the standard construction process information, and the actual progress is represented by a Gantt chart;
D. the standardized material management module is used for generating project required material estimation data under a set of standard construction processes, the standardized material data comprise material, manual and mechanical consumption, and the project standardized material data can be stored in the cloud server;
E. the construction log module is used for recording the material approach inspection condition and the construction progress and generating real-time construction data by combining a standardized construction process according to the current construction progress, wherein the real-time construction data can be stored in the cloud server;
F. and the quality acceptance module is used for feeding back the standardized construction process in real time after the standardized construction process is finished, and keeping relevant data such as executive personnel, completion conditions, problems and the like on the system, wherein the data of the completion conditions of the project can be stored in the cloud server.
Thirdly, pushing information of the project management system:
31, automatically pushing information such as a construction work task, a standardized control method and the like by the platform through a mobile phone according to the associated information of the construction project managers;
and step 32, automatically summarizing the unfinished work every day according to the return receipt of the pushing task, and forming a report to push related responsible persons.
Fourthly, self-adjusting a standard process engineering project construction management system:
step 4, according to the process management information of the new project a, the engineering cost information l in the standard databaseaEngineering elevation or floor number information vaEngineering project manager configuration standard psiaAnd the construction work logic flow faAnd a process operation standard time taThe process standard quality requirement haInformation m of standard construction methodaReadjustment is performed.
The embodiment forms the information l of the engineering cost by retrieving the standardized work information of mass engineering projectsiEngineering elevation or floor number information viEngineering project manager configuration standard psiiAnd the construction work logic flow fiAnd a process operation standard time tiThe process standard quality requirement hiInformation m of standard construction methodiAn engineering standardization work information base consisting of key information and the like; in the implementation of a new project a, when the project type information u of the project is setaEngineering elevation or floor number information vaAnd item square meter or kilometer information naThen, automatically generating key information such as engineering cost, engineering quality, engineering progress, personnel work task packages and the like by a standard process engineering project management system for automatically generating a new project a, and pushing tasks according to personnel work responsibilities; in the project implementation process, a project non-working report can be generated in time according to the project feedback condition and pushed; after the project is finished, the database can intelligently adjust the indexes of the database according to the index feedback condition of the project a.
Example two
In a first embodiment, a computer storage medium is provided, where a computer program is stored, and when the computer program is executed by a processor of a system, the computer program can implement all the steps included in the method for managing construction of a standard process engineering project based on big data according to the first embodiment.
In summary, the construction management method and the storage medium for the standard process engineering project based on the big data provided by the invention utilize the big data technology, collect the standardized construction process and the work flow through the mass engineering projects, realize the engineering project construction management system under the quality standardized control mode for project cost, progress, quality control and post work content management, and provide help for construction site management and construction enterprise project management.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent changes made by using the contents of the present specification and the drawings, or applied directly or indirectly to the related technical fields, are included in the scope of the present invention.

Claims (6)

1. A standard process engineering project construction management method based on big data is characterized by comprising the following steps:
s1: generating a standard process engineering project construction management database according to massive process engineering project construction standard data and standard construction method information;
s2: after acquiring basic project information corresponding to a specified project, generating a management platform corresponding to the specified project according to the database; the management platform comprises a list editing module, a budget management module, a progress management module and an information pushing module;
the S2 specifically includes:
step 21: according to the database, a specified project category u is inputaA designated engineering elevation or floor number information vaInformation n of corresponding item square meters or kilometersaAcquiring the project data x corresponding to the specified projecta
Step S22: according to the project data x of the appointed projectaGenerating a standard process engineering project construction management platform corresponding to the designated project;
the list editing module is used for creating and editing a standard construction process corresponding to the specified project;
the budget management module is used for generating project budget estimation data corresponding to the specified project under a standard construction process;
the progress management module is used for generating a progress plan corresponding to the designated project and monitoring the progress;
and the information pushing module is used for pushing information including construction work tasks and a standardized control method, summarizing unfinished work according to the pushing receipt within preset time, and forming a report to be pushed to a related responsible person.
2. The construction management method of the standard process engineering project based on the big data as claimed in claim 1, wherein the S1 is specifically:
extracting a great amount of construction and municipal projects including engineering project categories, engineering cost information, engineering elevation or floor information, engineering project manager configuration standards, construction work logic flows, process standard quality requirements and process operation standard working hours; and combining the standard data with the standard construction method information to form a standard process engineering project construction management database.
3. The construction management method for the big data based standard process engineering project according to claim 1, wherein the management platform further comprises a material management module, a construction log module and a quality acceptance module;
the material management module is used for generating a material name corresponding to the specified project and managing materials;
the construction log module is used for recording the material approach inspection condition and the construction progress and generating real-time construction data according to the current construction progress by combining the standardized construction process in the list editing module;
and the quality acceptance module is used for reserving quality acceptance data of the specified items including executive personnel, completion conditions and problems.
4. The construction management method of the standard process engineering project based on the big data as claimed in claim 1, wherein the S1 is specifically:
s11: extracting massive including engineering project category uiEngineering cost information liEngineering elevation or floor number information viEngineering project manager configuration standard psiiAnd the construction work logic flow fiAnd a process operation standard time tiThe process standard quality requirement hiInformation m of standard construction methodiInformation n of square meters or kilometers of itemsiData x of building and municipal engineering projectiSaid engineering project data xiCan be expressed as xi=<ui,li,vii,fi,ti,hi,mi,ni>I is the number of the construction project x;
s12: for the engineering project data xiProcessing to obtain project standardized construction data set under standard construction method state
Figure FDA0003354256770000021
And constructing a standard process engineering project construction management database according to the data set.
5. The construction management method for the big data based standard technical engineering project according to claim 1, characterized in that the method further comprises:
s3: receiving index feedback information of the specified project, and in the management platform, processing the engineering cost information laEngineering elevation or floor number information vaEngineering project manager configuration standard psiaAnd the construction work logic flow faAnd a process operation standard time taThe process standard quality requirement haInformation m of standard construction methodaAnd (6) adjusting.
6. A computer storage medium, on which a computer program is stored, wherein the program, when executed by a processor, implements all the steps included in the method for managing construction of a standard technical engineering project based on big data according to any one of the above claims 1 to 5.
CN201810324765.9A 2018-04-12 2018-04-12 Standard process engineering project construction management method based on big data and storage medium Active CN108764610B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810324765.9A CN108764610B (en) 2018-04-12 2018-04-12 Standard process engineering project construction management method based on big data and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810324765.9A CN108764610B (en) 2018-04-12 2018-04-12 Standard process engineering project construction management method based on big data and storage medium

Publications (2)

Publication Number Publication Date
CN108764610A CN108764610A (en) 2018-11-06
CN108764610B true CN108764610B (en) 2022-04-01

Family

ID=63981612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810324765.9A Active CN108764610B (en) 2018-04-12 2018-04-12 Standard process engineering project construction management method based on big data and storage medium

Country Status (1)

Country Link
CN (1) CN108764610B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109816255A (en) * 2019-01-29 2019-05-28 珠海金慧科技有限公司 Self iteration intelligent algorithm of house ornamentation construction reference
CN109886576B (en) * 2019-02-20 2023-04-07 司空定制家居科技有限公司 Digital delivery task management method, device and storage medium
CN110378668A (en) * 2019-06-28 2019-10-25 赣州和永软件开发有限责任公司 The method and system of engineering project information initialization is carried out with item base template library
CN110458413A (en) * 2019-07-16 2019-11-15 北京朗道新科智能科技有限公司 A kind of working procedure management method, system, storage medium and electric terminal
CN111291994A (en) * 2020-02-12 2020-06-16 普元信息技术股份有限公司 Multi-project management system and method suitable for agile development mode in big data environment
CN111813745A (en) * 2020-07-27 2020-10-23 中交路桥北方工程有限公司 System, device and method for civil construction technology and standard query
CN113379244A (en) * 2021-06-10 2021-09-10 筑橙科技(深圳)有限公司 Construction progress calculation method and system based on spraying robot construction
CN113434760B (en) * 2021-06-25 2022-12-27 平安国际智慧城市科技股份有限公司 Construction method recommendation method, device, equipment and storage medium
CN114626833A (en) * 2022-04-18 2022-06-14 国网北京市电力公司 Construction standard process supervision method, device, equipment and medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101064027A (en) * 2006-04-28 2007-10-31 施威 Architectural engineering construction technique normalizing knowledge base data structure
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN104809591A (en) * 2015-05-11 2015-07-29 东北电力大学 Electric power construction engineering supervision mechanism based on big data
CN106203798A (en) * 2016-06-30 2016-12-07 国网山东省电力公司经济技术研究院 A kind of engineering construction work plan preparation method
CN106845935A (en) * 2017-01-12 2017-06-13 深圳云联万企科技有限公司 A kind of method and system of engineering project flow template
CN106951444A (en) * 2017-02-17 2017-07-14 深圳市嘉力达节能科技股份有限公司 Architectural engineering information processing method and device
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
CN107480912A (en) * 2017-08-31 2017-12-15 福建四创软件有限公司 Hydraulic engineering construction comprehensive management system based on big data analysis and Internet of Things

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101064027A (en) * 2006-04-28 2007-10-31 施威 Architectural engineering construction technique normalizing knowledge base data structure
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN104809591A (en) * 2015-05-11 2015-07-29 东北电力大学 Electric power construction engineering supervision mechanism based on big data
CN106203798A (en) * 2016-06-30 2016-12-07 国网山东省电力公司经济技术研究院 A kind of engineering construction work plan preparation method
CN106845935A (en) * 2017-01-12 2017-06-13 深圳云联万企科技有限公司 A kind of method and system of engineering project flow template
CN106951444A (en) * 2017-02-17 2017-07-14 深圳市嘉力达节能科技股份有限公司 Architectural engineering information processing method and device
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
CN107480912A (en) * 2017-08-31 2017-12-15 福建四创软件有限公司 Hydraulic engineering construction comprehensive management system based on big data analysis and Internet of Things

Also Published As

Publication number Publication date
CN108764610A (en) 2018-11-06

Similar Documents

Publication Publication Date Title
CN108764610B (en) Standard process engineering project construction management method based on big data and storage medium
CN114186984B (en) Two-dimensional and three-dimensional integrated collaborative design system for architectural design enterprise
CN104471595A (en) Workflow management device and workflow management method
CN104899143A (en) Software peer review system realizing device for providing DM (Data Mining)
US20080221959A1 (en) System and architecture for managing distributed design chains
CN111488999A (en) Be applied to wind-powered electricity generation field safety production information-based management system
CN114819511A (en) Enterprise strategic object landing execution and performance management system and method
CN109711692A (en) KPI INDEX MANAGEMENT method, apparatus, computer equipment and storage medium
CN112633686A (en) Medical system labor dispatch management system and working method thereof
Fauzan et al. Information system for asset management
TW200426639A (en) System and method for electronic case management
CN111369116A (en) Project early-stage and project early-stage management system based on visualization technology
CN112381519A (en) Method and device for processing work logs and readable storage medium
Tian et al. Application of integrated manufacturing system of flexible production line in spacecraft manufacturing line
CN1475949A (en) Management method and system of working program
Paymer The Maintenance of Change–Developing Electronic Tools for a Dynamic Sustainable Asset Management System
CN112529455A (en) IPD management platform for whole construction process
CN116485169A (en) Method for supervising product production life cycle based on metadata and flow management
CN115271370A (en) Technical standard implementation evaluation field supervising and checking device and method
Lihong Application Computer Technology in the Engineering Supervision
CN110619505A (en) Project operation management system
CN117494990A (en) On-site leaching uranium mining experiment management system
TW200426642A (en) Quality of case management system and method
Hu et al. An integrated and comprehensive information management model for construction project lifecycle
CN114357272A (en) Public opinion handling decision method based on web crawler technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant