CN108764610A - Standard technology construction management of project method based on big data, storage medium - Google Patents
Standard technology construction management of project method based on big data, storage medium Download PDFInfo
- Publication number
- CN108764610A CN108764610A CN201810324765.9A CN201810324765A CN108764610A CN 108764610 A CN108764610 A CN 108764610A CN 201810324765 A CN201810324765 A CN 201810324765A CN 108764610 A CN108764610 A CN 108764610A
- Authority
- CN
- China
- Prior art keywords
- project
- construction
- management
- standard
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Biodiversity & Conservation Biology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of standard technology construction management of project method based on big data, storage medium, and method includes S1:Process engineering project construction normal data and standard construction information according to magnanimity generate standard technology construction management of project database;S2:After the project essential information for obtaining corresponding technical routine, management platform corresponding with technical routine is generated according to the database;Management platform includes inventory editor module, budget management module, progress control module and info push module.The present invention utilizes big data technology, standardized construction technique and workflow are collected by magnanimity engineering project, to project cost, progress, Quality Control, management position action, it realizes the construction management of project system under quality standardization pipe diameter design, help is provided for construction site management and enterprise in charge of construction's project management.
Description
Technical field
The present invention relates to Data Analysis Services fields, particularly relate to a kind of standard technology engineering project based on big data
Execution management method therefor, storage medium.
Background technology
Project management system is widely used in domestic and international construction project.Current project management system solves
The problem of management tool, but also fall behind relatively in terms of the intelligent management and control.
Existing project management system can not solve:A project costs Automatic generation of information, b project construction progresses are automatic
The problems such as layout, the standardization of c project integrations, d project manager's task automatic push.
Therefore, demand provides a kind of project management system that can be solved the above problems.
Invention content
The technical problem to be solved by the present invention is to:A kind of standard technology Construction of Engineering Projects pipe based on big data is provided
Reason method, storage medium can realize intelligent, quality standardization management and control process engineering project construction.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:
A kind of standard technology construction management of project method based on big data, including:
S1:Process engineering project construction normal data and standard construction information according to magnanimity generate standard technology work
Journey item construction management database;
S2:After the project essential information for obtaining a corresponding technical routine, generates according to the database and specified with described one
The corresponding management platform of project;The management platform include inventory editor module, budget management module, progress control module and
Info push module;
The inventory editor module, the standard construction technology for creating and editing the corresponding technical routine;
The budget management module corresponds to the construction budget of the technical routine and estimates for generating under standard construction technology
Data;
The progress control module, the schedule for generating the corresponding technical routine, and carry out Schedule monitoring;
Info push module, for push include construction working task and standardization control method information, while pre-
If summarizing unfinished work according to push receipt in the time, and forms report and push to responsible person concerned.
Another technical solution provided by the invention is:
A kind of computer storage media, is stored thereon with computer program, which realizes above-mentioned when being executed by processor
All steps that standard technology construction management of project method based on big data is included.
The beneficial effects of the present invention are:The present invention is constructed with the process engineering project construction normal data and standard of magnanimity
Based on engineering method, by big data technology, standard technology construction management of project database is generated;Start in new project
Before, it can be by calling the database, the standard technology engineering project automatically generated after typing essential information for the project is applied
Work management platform;It can realize that the project include the reference of standard construction technology, task distribution, task standardization by the platform
The whole management and control that control method push, Schedule monitoring, engineering relevant information summarize etc..It is soft that the present invention changes conventional items management
The artificial collection and input of part bulk items data, greatly improve the efficiency of construction standardization management, realize construction data
Intelligence, standardization collect and call.
Description of the drawings
Fig. 1 is a kind of flow diagram of the standard technology construction management of project method based on big data of the present invention;
Fig. 2 is that the flow of the standard technology construction management of project method based on big data of the embodiment of the present invention one is shown
It is intended to.
Specific implementation mode
To explain the technical content, the achieved purpose and the effect of the present invention in detail, below in conjunction with embodiment and coordinate attached
Figure is explained.
The design of most critical of the present invention is:With the process engineering project construction normal data and standard construction of magnanimity
Based on, standard technology construction management of project database is generated by big data technology;By calling database automatic
Generate the management platform of technical routine;Whole management and control is carried out to the project by platform.
Fig. 1 is please referred to, the present invention provides a kind of standard technology construction management of project method based on big data, packet
It includes:
S1:Process engineering project construction normal data and standard construction information according to magnanimity generate standard technology work
Journey item construction management database;
S2:After the project essential information for obtaining a corresponding technical routine, generates according to the database and specified with described one
The corresponding management platform of project;The management platform include inventory editor module, budget management module, progress control module and
Info push module;
The inventory editor module, the standard construction technology for creating and editing the corresponding technical routine;
The budget management module corresponds to the construction budget of the technical routine and estimates for generating under standard construction technology
Data;
The progress control module, the schedule for generating the corresponding technical routine, and carry out Schedule monitoring;
Info push module, for push include construction working task and standardization control method information, while pre-
If summarizing unfinished work according to push receipt in the time, and forms report and push to responsible person concerned.
As can be seen from the above description, the beneficial effects of the present invention are:The present invention utilizes big data technology, passes through magnanimity engineering
Project collects standardized construction technique and workflow, to project cost, progress, Quality Control, management position action, realizes matter
Construction management of project system under amount standardization pipe diameter design, is construction site management and enterprise in charge of construction's project management
Help is provided.
Further, the S1 is specially:
The room of extraction magnanimity is built, municipal project includes engineering project classification, engineering cost information, project elevation or number of plies letter
Breath, project management personnel depaly standard, construction working logic flow, technological standards quality requirement, technological operation standard work
When process engineering project construction normal data;The normal data is combined with standard construction information, forms standard work
Skill construction management of project database.
Seen from the above description, basic number of the process engineering project construction normal data as database of magnanimity is extracted
According to ensureing the reliability of database data.
Further, the management platform further includes store keeping module, builder's diary module and inspection of quality module;
The store keeping module, the material item for generating the corresponding technical routine, and pipe is carried out to material
Reason;
The builder's diary module is used for recording materials entry test situation and construction speed, and according to current construction
Progress is in conjunction with the standardized construction Process Production realtime construction data in the inventory editor module;
The inspection of quality module for retaining the technical routine includes operational staff, performance, of problems
Inspection of quality data.
Seen from the above description, management platform can also realize the store keeping for technical routine, record construction day simultaneously
Will and inspection of quality, further complete platform function provide to the user and more intelligentized manage help.
Further, the S1 is specially:
S11:That extract magnanimity includes engineering project classification ui, engineering cost information li, project elevation or number of plies information vi、
Project management personnel depaly standard ψiWith construction working logic flow fiAnd technological operation standard work force ti, technological standards
Quality requirement hi, standard construction information mi, project square metre or milimeter number information niRoom build, Municipal Engineering Projects data
xi, the engineering project data xiIt is represented by xi=<ui,li,vi,ψi,fi,ti,hi,mi,ni>, i is the number of project under construction x;
S12:To the engineering project data xiIt is handled, obtains the project standardization under standard construction state
Construction data collection, standard technology Construction of Engineering Projects pipe is built according to the data set
Manage database.
Further, the S2 is specially:
Step 21:According to the database, engineering project classification u is specified by typing onea, a specified project elevation or
Number of plies information va, corresponding project square metre or milimeter number information na, obtain the engineering project data of the corresponding technical routine
xa;
Step S22:Engineering project data x according to the technical routineaGenerate the standard work of the corresponding technical routine
Skill construction management of project platform.
Seen from the above description, it can realize that the room of magnanimity is built in automation, the engineering project data of municipal project carry out
Extraction, processing, obtain the project standardized construction data set under standard construction state, in this, as standard technology engineering
Item construction management database provides data support for the quality standard management of follow-up concrete engineering project.
Further, the method further includes:
S3:The index feedback information for receiving the technical routine, in the management platform, to its engineering cost information
la, project elevation or number of plies information va, project management personnel depaly standard ψaWith construction working logic flow fa, Yi Jigong
Skill operation standard working hour ta, technological standards quality requirement ha, standard construction information maIt is adjusted.
Seen from the above description, it can realize after the completion of project, database can be anti-according to the index of technical routine a
Present the intelligent adjustment that situation carries out database index.
Another technical solution provided by the invention is:
A kind of computer storage media, is stored thereon with computer program, which realizes above-mentioned when being executed by processor
All steps that standard technology construction management of project method based on big data is included.
As can be seen from the above description, the beneficial effects of the present invention are:
It corresponds to one of ordinary skill in the art will appreciate that realizing all or part of flow in above-mentioned technical proposal, being can
It is realized with instructing relevant hardware by computer program, the program can be stored in one and computer-readable deposit
In storage media, the program is when being executed, it may include such as the flow of above-mentioned each method.
Embodiment one
Fig. 2 is please referred to, the standard technology construction management of project method based on big data that the present embodiment provides a kind of should
Method includes the following steps:
One, data acquire:
Step 11:Extraction magnanimity room builds, the engineering project classification of municipal project, engineering cost information (people containing standard, material,
Machine quantity), project elevation or number of plies information, project management personnel depaly standard, construction working logic flow, technological standards
The information such as quality requirement, technological operation standard work force, combined standard construction information form standard technology Construction of Engineering Projects
Manage database;
Magnanimity engineering project data include engineering project classification ui, engineering cost information li, project elevation or number of plies information
vi, project management personnel depaly standard ψiWith construction working logic flow fiAnd technological operation standard work force ti, technique
Standard prescriptions hi, standard construction information mi, project square metre or milimeter number information ni, engineering project data xiIt can table
It is shown as xi=<ui,li,vi,ψi,fi,ti,hi,mi,ni>, i is the number of project under construction x.
Step 12:The project data of magnanimity is handled, the project standardization under standard construction state is obtained and applies
Work data setStandard technology construction management of project number is set up based on the data set
According to library.
Step 13:Set data base call need manual typing project as:Engineering project classification u, project elevation or number of plies letter
Cease v, project square metre or milimeter number information n.
Two, new projects' data are extracted, and form project management platform:
Step 21:The works category information u of new projects a is defined in systemsa, project elevation or number of plies information vaAnd item
Mesh square metre or milimeter number information na;
Step 22:According to the database, the standard technology construction management of project of system automatically generated new projects a is flat
Platform;
The standard technology construction management of project platform includes at least:
A, standardized construction technique inventory editor module, for creating and editing standard construction technology, the standard construction
Technique information includes the standard technology practice under standard construction technology modularization, required cost, required time, required uses material, institute
Standard construction technology information is stated to be storable in the Cloud Server;
B, budget management module is standardized, for generating the construction budget estimated data under a set of standard construction technology, institute
It includes Master Cost, labour cost and machinery expenses to state standardization budget data, and the Engineering Standardization budget data can store
In the Cloud Server;
C, progress control module is standardized, for schedule, Schedule monitoring, in each standard construction technology information
The period planning of modular process, progress can be automatically formed by standard construction technology information, and the actual progress is used
Gantt chart indicates;
D, standardized materials management module estimates number needed for the engineering under a set of standard construction technology for generating with material
Include that material, artificial and mechanical appliances, the Engineering Standardization are storable in institute with material data according to, standardization material data
It states in Cloud Server;
E, builder's diary module, be used for recording materials entry test situation and construction speed, and according to current construction into
Combining standardized construction technology is spent to generate a realtime construction data, and the realtime construction data are storable in the Cloud Server
In;
F, inspection of quality module, for by Real-time Feedback after the completion of standardized construction technique, executor to be retained in system
Member, performance, there are related datas such as problems, the engineering performance data are storable in the Cloud Server.
Three, project management system information pushes:
Step 31, platform automatically control construction working task, standardization according to associated construction project management personal information
The information such as method processed carry out mobile phone push;
Step 32, daily according to push task receipt summarize unfinished work automatically, and formed report carry out related responsibility
People pushes.
Four, standard technology construction management of project system self-regulation is whole:
Step 4, according to new projects' a procedure management informations, for the engineering cost information l in standard databasea, engineering mark
High or number of plies information va, project management personnel depaly standard ψaWith construction working logic flow faAnd technological operation standard
Working hour ta, technological standards quality requirement ha, standard construction information maIt is adjusted again.
The present embodiment is formed by retrieving magnanimity engineering project standardization effort information by engineering cost information li, engineering
Absolute altitude or number of plies information vi, project management personnel depaly standard ψiWith construction working logic flow fiAnd technological operation mark
Quasi- working hour ti, technological standards quality requirement hi, standard construction information miThe Engineering Standardization work letter of equal key messages composition
Cease library;In new projects a implementations, as setting engineering project engineering classification information ua, project elevation or number of plies information vaAnd project
Square metre or milimeter number information naAfterwards, the standard technology project management system that will automatically generate new projects a, automatically generates work
The key messages such as Cheng Chengben, construction quality, project progress, person works' task packet, and can be appointed according to person works' responsibility
Business push;In the project implementation process, project jobs in operation report can be generated in time according to project feedback situation and pushed;
After the completion of project, database can carry out the intelligent of database index according to the index feedback of project a and adjust.
Embodiment two
The present embodiment corresponding embodiment one provides a kind of computer storage media, is stored thereon with computer program, the journey
Sequence can realize the standard technology engineering project based on big data described in above-described embodiment one when being executed by the processor of system
All steps that execution management method therefor is included.
In conclusion standard technology construction management of project method provided by the invention based on big data, storage are situated between
Matter collects standardized construction technique and workflow using big data technology by magnanimity engineering project, to project cost, into
Degree, Quality Control, management position action realize the construction management of project system under quality standardization pipe diameter design, to apply
Work field management and enterprise in charge of construction's project management provide help.
Example the above is only the implementation of the present invention is not intended to limit the scope of the invention, every to utilize this hair
Equivalents made by bright specification and accompanying drawing content are applied directly or indirectly in relevant technical field, include similarly
In the scope of patent protection of the present invention.
Claims (7)
1. a kind of standard technology construction management of project method based on big data, which is characterized in that including:
S1:Process engineering project construction normal data and standard construction information according to magnanimity generate standard technology engineering item
Mesh construction management database;
S2:After the project essential information for obtaining a corresponding technical routine, generated and a technical routine according to the database
Corresponding management platform;The management platform includes inventory editor module, budget management module, progress control module and information
Pushing module;
The inventory editor module, the standard construction technology for creating and editing the corresponding technical routine;
The budget management module corresponds to the construction budget of the technical routine and estimates number for generating under standard construction technology
According to;
The progress control module, the schedule for generating the corresponding technical routine, and carry out Schedule monitoring;
Info push module, for push include construction working task and standardization control method information, while when default
It is interior to summarize unfinished work according to push receipt, and form report and push to responsible person concerned.
2. the standard technology construction management of project method based on big data as described in claim 1, which is characterized in that institute
Stating S1 is specially:
Extraction magnanimity room build, municipal project include engineering project classification, engineering cost information, project elevation or number of plies information,
Project management personnel depaly standard, construction working logic flow, technological standards quality requirement, technological operation standard work force
Process engineering project construction normal data;The normal data is combined with standard construction information, forms standard technology work
Journey item construction management database.
3. the standard technology construction management of project method based on big data as described in claim 1, which is characterized in that institute
It further includes store keeping module, builder's diary module and inspection of quality module to state management platform;
The store keeping module, the material item for generating the corresponding technical routine, and material is managed;
The builder's diary module is used for recording materials entry test situation and construction speed, and according to current construction speed
In conjunction with the standardized construction Process Production realtime construction data in the inventory editor module;
The inspection of quality module includes operational staff, performance, quality of problems for retaining the technical routine
Product acceptance data.
4. the standard technology construction management of project method based on big data as described in claim 1, which is characterized in that institute
Stating S1 is specially:
S11:That extract magnanimity includes engineering project classification ui, engineering cost information li, project elevation or number of plies information vi, engineering
Project manager's configuration standard ψiWith construction working logic flow fiAnd technological operation standard work force ti, technological standards quality
It is required that hi, standard construction information mi, project square metre or milimeter number information niRoom build, Municipal Engineering Projects data xi, institute
State engineering project data xiIt is represented by xi=<ui,li,vi,ψi,fi,ti,hi,mi,ni>, i is the number of project under construction x;
S12:To the engineering project data xiIt is handled, obtains the project standardized construction under standard construction state
Data setStandard technology construction management of project number is built according to the data set
According to library.
5. the standard technology construction management of project method based on big data as claimed in claim 4, which is characterized in that institute
Stating S2 is specially:
Step 21:According to the database, engineering project classification u is specified by typing onea, specified a project elevation or the number of plies
Information va, corresponding project square metre or milimeter number information na, obtain the engineering project data x of the corresponding technical routinea;
Step S22:Engineering project data x according to the technical routineaGenerate the standard technology engineering of the corresponding technical routine
Item construction management platform.
6. the standard technology construction management of project method based on big data as claimed in claim 5, which is characterized in that institute
The method of stating further includes:
S3:The index feedback information for receiving the technical routine, in the management platform, to its engineering cost information la, engineering
Absolute altitude or number of plies information va, project management personnel depaly standard ψaWith construction working logic flow faAnd technological operation mark
Quasi- working hour ta, technological standards quality requirement ha, standard construction information maIt is adjusted.
7. a kind of computer storage media, is stored thereon with computer program, which is characterized in that when the program is executed by processor
Realize that the standard technology construction management of project method based on big data described in the claims 1-6 any one is wrapped
All steps contained.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810324765.9A CN108764610B (en) | 2018-04-12 | 2018-04-12 | Standard process engineering project construction management method based on big data and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810324765.9A CN108764610B (en) | 2018-04-12 | 2018-04-12 | Standard process engineering project construction management method based on big data and storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108764610A true CN108764610A (en) | 2018-11-06 |
CN108764610B CN108764610B (en) | 2022-04-01 |
Family
ID=63981612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810324765.9A Active CN108764610B (en) | 2018-04-12 | 2018-04-12 | Standard process engineering project construction management method based on big data and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108764610B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109816255A (en) * | 2019-01-29 | 2019-05-28 | 珠海金慧科技有限公司 | Self iteration intelligent algorithm of house ornamentation construction reference |
CN109886576A (en) * | 2019-02-20 | 2019-06-14 | 司空科技股份有限公司 | Task management method, device and storage medium are delivered in digitlization |
CN110378668A (en) * | 2019-06-28 | 2019-10-25 | 赣州和永软件开发有限责任公司 | The method and system of engineering project information initialization is carried out with item base template library |
CN110458413A (en) * | 2019-07-16 | 2019-11-15 | 北京朗道新科智能科技有限公司 | A kind of working procedure management method, system, storage medium and electric terminal |
CN111291994A (en) * | 2020-02-12 | 2020-06-16 | 普元信息技术股份有限公司 | Multi-project management system and method suitable for agile development mode in big data environment |
CN111813745A (en) * | 2020-07-27 | 2020-10-23 | 中交路桥北方工程有限公司 | System, device and method for civil construction technology and standard query |
CN113379244A (en) * | 2021-06-10 | 2021-09-10 | 筑橙科技(深圳)有限公司 | Construction progress calculation method and system based on spraying robot construction |
CN113434760A (en) * | 2021-06-25 | 2021-09-24 | 平安国际智慧城市科技股份有限公司 | Construction method recommendation method, device, equipment and storage medium |
CN114626833A (en) * | 2022-04-18 | 2022-06-14 | 国网北京市电力公司 | Construction standard process supervision method, device, equipment and medium |
CN118096089A (en) * | 2024-04-25 | 2024-05-28 | 浙江龙腾畅想软件有限公司 | Engineering project management method, system and medium based on data platform |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101064027A (en) * | 2006-04-28 | 2007-10-31 | 施威 | Architectural engineering construction technique normalizing knowledge base data structure |
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN104809591A (en) * | 2015-05-11 | 2015-07-29 | 东北电力大学 | Electric power construction engineering supervision mechanism based on big data |
CN106203798A (en) * | 2016-06-30 | 2016-12-07 | 国网山东省电力公司经济技术研究院 | A kind of engineering construction work plan preparation method |
CN106845935A (en) * | 2017-01-12 | 2017-06-13 | 深圳云联万企科技有限公司 | A kind of method and system of engineering project flow template |
CN106951444A (en) * | 2017-02-17 | 2017-07-14 | 深圳市嘉力达节能科技股份有限公司 | Architectural engineering information processing method and device |
CN107358340A (en) * | 2017-06-23 | 2017-11-17 | 深圳云联万企科技有限公司 | A kind of project management system based on list of engineering |
CN107480912A (en) * | 2017-08-31 | 2017-12-15 | 福建四创软件有限公司 | Hydraulic engineering construction comprehensive management system based on big data analysis and Internet of Things |
-
2018
- 2018-04-12 CN CN201810324765.9A patent/CN108764610B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101064027A (en) * | 2006-04-28 | 2007-10-31 | 施威 | Architectural engineering construction technique normalizing knowledge base data structure |
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN104809591A (en) * | 2015-05-11 | 2015-07-29 | 东北电力大学 | Electric power construction engineering supervision mechanism based on big data |
CN106203798A (en) * | 2016-06-30 | 2016-12-07 | 国网山东省电力公司经济技术研究院 | A kind of engineering construction work plan preparation method |
CN106845935A (en) * | 2017-01-12 | 2017-06-13 | 深圳云联万企科技有限公司 | A kind of method and system of engineering project flow template |
CN106951444A (en) * | 2017-02-17 | 2017-07-14 | 深圳市嘉力达节能科技股份有限公司 | Architectural engineering information processing method and device |
CN107358340A (en) * | 2017-06-23 | 2017-11-17 | 深圳云联万企科技有限公司 | A kind of project management system based on list of engineering |
CN107480912A (en) * | 2017-08-31 | 2017-12-15 | 福建四创软件有限公司 | Hydraulic engineering construction comprehensive management system based on big data analysis and Internet of Things |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109816255A (en) * | 2019-01-29 | 2019-05-28 | 珠海金慧科技有限公司 | Self iteration intelligent algorithm of house ornamentation construction reference |
CN109886576A (en) * | 2019-02-20 | 2019-06-14 | 司空科技股份有限公司 | Task management method, device and storage medium are delivered in digitlization |
CN110378668A (en) * | 2019-06-28 | 2019-10-25 | 赣州和永软件开发有限责任公司 | The method and system of engineering project information initialization is carried out with item base template library |
CN110458413A (en) * | 2019-07-16 | 2019-11-15 | 北京朗道新科智能科技有限公司 | A kind of working procedure management method, system, storage medium and electric terminal |
CN111291994A (en) * | 2020-02-12 | 2020-06-16 | 普元信息技术股份有限公司 | Multi-project management system and method suitable for agile development mode in big data environment |
CN111813745A (en) * | 2020-07-27 | 2020-10-23 | 中交路桥北方工程有限公司 | System, device and method for civil construction technology and standard query |
CN111813745B (en) * | 2020-07-27 | 2024-06-04 | 中交路桥建设有限公司 | System, device and method for inquiring civil engineering technology and standard |
CN113379244A (en) * | 2021-06-10 | 2021-09-10 | 筑橙科技(深圳)有限公司 | Construction progress calculation method and system based on spraying robot construction |
CN113434760A (en) * | 2021-06-25 | 2021-09-24 | 平安国际智慧城市科技股份有限公司 | Construction method recommendation method, device, equipment and storage medium |
CN113434760B (en) * | 2021-06-25 | 2022-12-27 | 平安国际智慧城市科技股份有限公司 | Construction method recommendation method, device, equipment and storage medium |
CN114626833A (en) * | 2022-04-18 | 2022-06-14 | 国网北京市电力公司 | Construction standard process supervision method, device, equipment and medium |
CN118096089A (en) * | 2024-04-25 | 2024-05-28 | 浙江龙腾畅想软件有限公司 | Engineering project management method, system and medium based on data platform |
Also Published As
Publication number | Publication date |
---|---|
CN108764610B (en) | 2022-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108764610A (en) | Standard technology construction management of project method based on big data, storage medium | |
US6073108A (en) | Task-based classification and analysis system | |
TWI834657B (en) | Method for scheduling semiconductor back-end factories | |
CN101976240B (en) | Form number generating method and system | |
CN104471595A (en) | Workflow management device and workflow management method | |
EP1468374A2 (en) | Method and system for asset transition project management | |
Goryachev et al. | “Smart factory”: intelligent system for workshop resource allocation, scheduling, optimization and controlling in real time | |
CN104318354A (en) | Task information processing method and system | |
CN102073926A (en) | Automatic intelligent briefing generation method | |
CN107480882A (en) | A kind of system and method for generating BPM | |
CN110110978A (en) | A kind of MES system for cabinet automatic assembly line | |
CN110032154B (en) | Production control method and system for small-batch products | |
CN113537943A (en) | Universal workflow engine and construction method thereof | |
Hu | Information lifecycle modeling framework for construction project lifecycle management | |
CN112308516A (en) | Target project information generation method and related equipment | |
CN115169658B (en) | Inventory consumption prediction method, system and storage medium based on NPL and knowledge graph | |
Rao et al. | On-line simulation for shop floor control in manufacturing execution system | |
CN115689788A (en) | Financial data analysis method | |
CN115600797A (en) | Task processing method, device, equipment and medium | |
CN105446289B (en) | By the method and system of the timestamp of manufacturing execution system collection work state | |
JP2008299496A (en) | Operation simulator and program | |
CN110515611B (en) | Document number generation method | |
CN109492953A (en) | A kind of provide multiple forms of energy to complement each other monitoring and managing method and system based on Building Information Model | |
CN108305023A (en) | A kind of method that electronic assemblies industry realizes automatic job distribution | |
JP2003280728A (en) | Production scheduling control method and production scheduling control program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |