CN108960451A - A kind of bargh's production scheduling approaches to IM and system - Google Patents
A kind of bargh's production scheduling approaches to IM and system Download PDFInfo
- Publication number
- CN108960451A CN108960451A CN201810793953.6A CN201810793953A CN108960451A CN 108960451 A CN108960451 A CN 108960451A CN 201810793953 A CN201810793953 A CN 201810793953A CN 108960451 A CN108960451 A CN 108960451A
- Authority
- CN
- China
- Prior art keywords
- management
- unit
- information
- production
- quality
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
Abstract
The present invention discloses a kind of bargh's production Scheduling Info Management System.The management system includes: production management module, device management module, manufacturing schedule control module, quality control module, project generalized information management module, horizontal communication module, Dimine model to connection module.Production and management characteristic in conjunction with mine management type enterprise, the design structure of production Scheduling Info Management System, and the composition and function of module each in system are provided a brief description, it finally proposes and needs issues that need special attention in system operation, to improve the practice effect of system, the complex logic of Technical innova- tion is solved by system Construction, realize that safety in production Whole Course Management is information-based, realize static and dynamic data and information collection, analysis and warning, optimisation technique economic indicator, it is final to improve production efficiency and benefit.
Description
Technical field
The present invention relates to production scheduling fields, more particularly to a kind of bargh's production scheduling approaches to IM and are
System.
Background technique
Production scheduling refers to the requirement according to production plan, and daily production activity is comprehensively supervised and controlled, right
The energy imbalance occurred in production takes timely measure, and coordinates the work for producing each link, to guarantee the completion of production plan,
Have the characteristics that comprehensive, uniformity, timeliness, initiative and preventative.With the rapid development of modern age mining industry technology, equipment
The continuous improvement of advanced level, traditional production scheduling mode have been unable to satisfy the requirement of modernization mining production, have needed enterprise
More advanced means and method are taken to plan as a whole full original text.
Under the promotion of the construction of Mine Informatization, production Scheduling Info Management System is come into being, and is looked forward in type of production
Industry is used widely.But for mine management type enterprise, the engineering project of management be distributed in it is in all parts of the country or even overseas,
The lateral coverage area of production scheduling is wider, and vertical management level is more, requires higher, life to timeliness, the validity of scheduling
The composition and production enterprise for producing scheduling information management system have very big difference.
Summary of the invention
The object of the present invention is to provide a kind of productions of the bargh of validity that can be improved mine type business administration to adjust
Spend information management system.
To achieve the above object, the present invention provides following schemes:
A kind of bargh's production Scheduling Info Management System, the management system include: production management module, equipment pipe
Manage module, manufacturing schedule control module, quality control module, project generalized information management module, horizontal communication module,
Dimine model is to connection module;
Systematization, comprehensive management of the production management module for realizing production aspect, specifically include production meter
Draw establishment, the statistics of creation data and analysis, decision support.
Optionally, the production management module specifically includes:
Production-operational-plan and adjustment unit, for completing establishment year production schedules, operation tune in establishment year
Whole plan, yearly plan and plan for adjustment comparison, analysis of Influential Factors in year;
Actual production internal statistical unit, for the Various types of data to actual production in the periods such as day, week, the moon, season, year
It is counted;
Production plan and comparison unit is actually accomplished, by counting manufacturing program of a month and actually accomplishing comparison, based on year production
It draws and actually accomplishes comparison, analysis of Influential Factors;
Information output unit, for the condition query production information according to setting;
Report and graphics management unit, for exporting the result of various figures and report.
Optionally, device management module specifically includes:
Equipment operation administrative unit, for working out equipment operation plan, the statistics of actual job amount, production plan and reality
The comparison of workload, analysis of Influential Factors;
Plant maintenance and maintenance care unit are warned for plant maintenance and maintenance log, plant maintenance and maintenance;
Equipment fault statistics and analytical unit, for being analyzed equipment fault and being counted;
Major issue feedback unit needs the problem of stressing for reporting;
Report and image management unit, for exporting various reports and figure.
Optionally, the manufacturing schedule control module specifically includes:
Project schedule plan planning unit, for working out gunter drawing schedule, establishment construction project schedule network diagram;
Actual progress data input and analytical unit for statisticalling analyze the progress data of on-site collection, and are formed and original
The data and table that beginning data are comparable;
Actual progress and schedule comparison unit, each all end of term for being run in system, project schedule control people
The actual progress data statistics of this period, analysis and the arrangement that member will compile, data related with target advance are compared,
Although it is understood that by comparing actual progress than target advance be it is advanced, lag or be consistent, form progress report;
Deviation effects analysis and non-conformance report member, for after finding schedule variance, progress monitoring personnel are first to making
The reason of occurring at deviation is analyzed and summarized, and the influence that this deviation generates follow-up work and total construction period is analyzed, to later period work
Cheng Jindu carries out forecast analysis, and can check realize schedule objective according to progress a few days ago, if had an impact to schedule objective, judgement
Whether the influence can be received;
Schedule adjustment unit, for project schedule control personnel on the basis of analysis generates questions and prospect, for
Satisfactory after correcting is taken to property, and original schedule is adjusted according to actual needs;
Report and graphics management unit, for exporting various reports and figure;
Progress monitoring system data maintenance unit, for periodically being backed up, being verified to various data and error in data;
Message output module, for according to the various information of condition query.
Optionally, the quality control module includes:
Quality standard and technical standard typing unit, the information such as national, industry quality standard and technical standard for typing,
As the foundation of engineering construction quality after typing;
Engineering project actual mass data input unit, in the quality information typing of project's earlier stage, work progress
The quality information of quality information typing, the quality information typing in project later period, different times typing is different;
Engineering project actual mass information modifies unit, is used in entire construction process, if quality information is not
If increasing in disconnected improvement, it is necessary to modify a certain purpose quality information content, original record should be shifted before a modification
Into historical data library file, in case statistics, analysis and inquiry;
The comparison unit of actual mass and plan quality, plan quality are stored in computer in advance, when practical matter
After measuring data input database, the deviation between actual mass and plan quality is calculated;
Mass deviation is used to draw various quality analysis figures according to deviation situation, pass through to the impact analysis unit of engineering
Analysis chart timely feedbacks quality information, grasps engineering actual mass information, provides foundation for quality management and quality control;
Statistics, inquiry and the report printing unit of engineering project quality are used for statistical engineering quality;
The details and processing result unit that quality accident occurs, for the date of occurrence, accident pattern, thing to quality accident
Therefore analysis of investigating the cause, processing scheme, the progress integrated management of mabage report content.
Optionally, the project generalized information management module specifically includes:
Project's earlier stage information management unit, project's earlier stage information include project profile, engineering design, contract documents;
Project construction information management unit, owner (management) information, including business relations list, oral opinion and view, refer to
It enables;Owner's material and facility responsible by contract and complementary agreement;The information reported and submitted to owner, including Design of Construction Organization, into
Spend plan, working measure, business relations list;Meeting summary, all kinds of meetings including owner (management) tissue;
Project completed papers information management unit is collected and arranges for the information to completed papers.
Optionally, the horizontal communication module specifically includes:
Equipment management center, Materials Service Center, safety monitor center, human resources management center believe in corresponding management
Carry out longitudinal information interchange in interest statement member, while each administrative center carries out lateral coordination, cooperation, assistance information between each other
Exchange.
Optionally, the Dimine model specifically includes connection module:
Dimine model import unit, the import feature for realizing Dimine model for providing interface;
Dimine model checks unit, for realizing the look facility in the Dimine software of part, model is rotated,
Scaling, change transparency, is hidden, display operation change color;
Dimine pattern query statistic unit, for by setting different attribute as screening conditions come interrogation model, and
The data for including in model are extracted, are counted and simple computation;
Dimine model print-out unit for exporting Dimine model picture, and carries out photo print.
The specific embodiment provided according to the present invention, the invention discloses following technical effects: the invention discloses one kind
Bargh's production Scheduling Info Management System, production Scheduling Info Management System are that enterprise carries out production scheduling advanced management
Means, but compared with type of production bargh, the scheduling system management range of management type enterprise is wider, and scheduling process is more complicated,
What is needed contains much information.The production of present invention combination mine management type enterprise and management characteristic, production Scheduling Info Management System
Design structure, and the composition and function of module each in system are provided a brief description, finally propose and run in system
Issues that need special attention is needed in journey, and to improve the practice effect of system, Technical innova- tion is solved by system Construction
Complex logic, realize that safety in production Whole Course Management is information-based, realize static with dynamic data and information collection, analysis and police
Show, optimisation technique economic indicator, it is final to improve production efficiency and benefit.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is production Scheduling Info Management System hierarchical structure figure provided by the invention;
Fig. 2 is production Scheduling Info Management System structure chart provided by the invention;
Fig. 3 is production management module composition schematic diagram provided by the invention;
Fig. 4 is device management module composition schematic diagram provided by the invention;
Fig. 5 is progress monitoring module composition schematic diagram provided by the invention;
Fig. 6 is quality control module composition schematic diagram provided by the invention;
Fig. 7 is project generalized information management module composition schematic diagram provided by the invention;
Fig. 8 is horizontal communication module composition schematic diagram provided by the invention;
Fig. 9 is Dimine model provided by the invention to connection module composition schematic diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of productions of the bargh of validity that can be improved mine type business administration to adjust
Spend information management system.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
In conjunction with the management level structure of enterprise, production Scheduling Info Management System is divided into management company, branch company, project management department
Three-level, every level-one corresponds to different Production scheduling management departments, and possesses different administration authorities.At different levels information transmission with
It is as shown in Figure 1 to audit decision direction.
A kind of bargh's production Scheduling Info Management System, the management system include: production management module, equipment pipe
Manage module, manufacturing schedule control module, quality control module, project generalized information management module, horizontal communication module,
Dimine model is to connection module;As shown in Fig. 2, user can be understood the main function of the modular system by the title of each module
Call relation between energy and each module;
Systematization, comprehensive management of the production management module for realizing production aspect, specifically include production meter
Draw establishment, the statistics of creation data and analysis, decision support.
Optionally, the production management module specifically includes:
Production-operational-plan and adjustment unit, for completing establishment year production schedules, operation tune in establishment year
Whole plan, yearly plan and plan for adjustment comparison, analysis of Influential Factors in year;
Actual production internal statistical unit, for the Various types of data to actual production in the periods such as day, week, the moon, season, year
Counted, including capital construction driving, production driving, mining amount, by-product mine, supporting, filling, medium-length hole, installation, other, emphasis
The contents such as engineering.It wherein further include the statistics to the different engineering output values in the internal statistical in the moon, season, year;
Production plan and comparison unit is actually accomplished, by counting manufacturing program of a month and actually accomplishing comparison, based on year production
It draws and actually accomplishes comparison, analysis of Influential Factors;
Information output unit, for the condition query production information according to setting;
Report and graphics management unit, for exporting the result of various figures and report.
As shown in figure 4, device management module specifically includes:
Equipment operation administrative unit, for working out equipment operation plan, the statistics of actual job amount, production plan and reality
The comparison of workload, analysis of Influential Factors;
Plant maintenance and maintenance care unit are warned for plant maintenance and maintenance log, plant maintenance and maintenance;Mainly
Tracking and supervision to daily plant maintenance and maintenance work are carried out, with the formal check of log units at different levels to the dimension of equipment
Shield and maintenance situation, and by set device maintenance periodic quantity, warn units at different levels to carry out the maintenance worker of equipment in time
Make;
Equipment fault statistics and analytical unit, for being analyzed equipment fault and being counted, to the detailed of equipment fault
The main reason for situation, failure, expected impact production time, maintenance measure etc. are illustrated, and will generate similar event
The equipment of barrier compares, and formulates the related precautionary measures;
Major issue feedback unit needs the problem of stressing for reporting;
Report and image management unit, for exporting various reports and figure, in the main Types such as Fig. 4 of report and figure
It is shown, the output of more reports, figure is set according to actual needs.
As shown in figure 5, the manufacturing schedule control module specifically includes:
Project schedule plan planning unit, it is defeated in order for working out gunter drawing schedule, establishment construction project schedule network diagram
Enter engineering project and encode the duration for determining work in every content and required resource, determines that the reasonable overlap joint of each action closes
System generates lateral road chart;Input all kinds of Project Number, each run duration, limit time, regular fee, limit expense
With, stock number, total construction period limitation, resource constraint etc., the network as needed for computer drawing, and calculate related parameter;
Actual progress data input and analytical unit for statisticalling analyze the progress data of on-site collection, and are formed and original
The data and table that beginning data are comparable;
Actual progress and schedule comparison unit, each all end of term for being run in system, project schedule control people
The actual progress data statistics of this period, analysis and the arrangement that member will compile, data related with target advance are compared,
Although it is understood that by comparing actual progress than target advance be it is advanced, lag or be consistent, form progress report;
Deviation effects analysis and non-conformance report member, for after finding schedule variance, progress monitoring personnel are first to making
The reason of occurring at deviation is analyzed and summarized, and the influence that this deviation generates follow-up work and total construction period is analyzed, to later period work
Cheng Jindu carries out forecast analysis, and can check realize schedule objective according to progress a few days ago, if had an impact to schedule objective, judgement
Whether the influence can be received;
Schedule adjustment unit, for project schedule control personnel on the basis of analysis generates questions and prospect, for
Satisfactory after correcting is taken to property, and original schedule is adjusted according to actual needs;
Report and graphics management unit, for exporting various reports and figure, in the main Types such as Fig. 5 of report and figure
It is shown, the output of more reports, figure can be carried out according to actual needs;
Progress monitoring system data maintenance unit, for periodically being backed up, being verified to various data and error in data;
Message output module, for according to the various information of condition query.
As shown in fig. 6, the quality control module includes:
Quality standard and technical standard typing unit, the information such as national, industry quality standard and technical standard for typing,
As the foundation of engineering construction quality after typing;
Engineering project actual mass data input unit, in the quality information typing of project's earlier stage, work progress
The quality information of quality information typing, the quality information typing in project later period, different times typing is different;
Engineering project actual mass information modifies unit, is used in entire construction process, if quality information is not
If increasing in disconnected improvement, it is necessary to modify a certain purpose quality information content, original record should be shifted before a modification
Into historical data library file, in case statistics, analysis and inquiry;
The comparison unit of actual mass and plan quality, plan quality are stored in computer in advance, when practical matter
After measuring data input database, the deviation between actual mass and plan quality is calculated;
Mass deviation is used to draw various quality analysis figures according to deviation situation, pass through to the impact analysis unit of engineering
Analysis chart timely feedbacks quality information, grasps engineering actual mass information, provides foundation for quality management and quality control;
Statistics, inquiry and the report printing unit of engineering project quality are used for statistical engineering quality;
The details and processing result unit that quality accident occurs, for the date of occurrence, accident pattern, thing to quality accident
Therefore analysis of investigating the cause, processing scheme, the progress integrated management of mabage report content.
As shown in fig. 7, the project generalized information management module specifically includes:
Project's earlier stage information management unit, project's earlier stage information include project profile, engineering design, contract documents;
Project construction information management unit, owner (management) information, including business relations list, oral opinion and view, refer to
It enables;Owner's material and facility responsible by contract and complementary agreement;The information reported and submitted to owner, including Design of Construction Organization, into
Spend plan, working measure, business relations list;Meeting summary, all kinds of meetings including owner (management) tissue;
Project completed papers information management unit is collected and arranges for the information to completed papers.
As shown in figure 8, the horizontal communication module specifically includes:
Equipment management center, Materials Service Center, safety monitor center, human resources management center believe in corresponding management
Carry out longitudinal information interchange in interest statement member, while each administrative center carries out lateral coordination, cooperation, assistance information between each other
Exchange.
As shown in figure 9, the Dimine model specifically includes connection module:
Dimine model import unit, the import feature for realizing Dimine model for providing interface;
Dimine model checks unit, for realizing the look facility in the Dimine software of part, model is rotated,
Scaling, change transparency, is hidden, display operation change color;
Dimine pattern query statistic unit, for by setting different attribute as screening conditions come interrogation model, and
The data for including in model are extracted, are counted and simple computation;
Dimine model print-out unit for exporting Dimine model picture, and carries out photo print.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Used herein a specific example illustrates the principle and implementation of the invention, and above embodiments are said
It is bright to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, foundation
Thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification is not
It is interpreted as limitation of the present invention.
Claims (8)
1. a kind of bargh's production Scheduling Info Management System, which is characterized in that the management system includes: production management mould
Block, device management module, manufacturing schedule control module, quality control module, project generalized information management module, lateral information are handed over
Flow module, Dimine model are to connection module;
Systematization, comprehensive management of the production management module for realizing production aspect, specifically include production plan volume
System, the statistics of creation data and analysis, decision support.
2. a kind of bargh's production Scheduling Info Management System according to claim 1, which is characterized in that the production
Management module specifically includes:
Production-operational-plan and adjustment unit, by completing establishment year production schedules, working out in year based on operation adjustment
Draw, yearly plan and in year plan for adjustment comparison, analysis of Influential Factors;
Actual production internal statistical unit, for the Various types of data progress to actual production in the periods such as day, week, the moon, season, year
Statistics;
Production plan and actually accomplish comparison unit, for count manufacturing program of a month and actually accomplish comparison, year production plan with
Actually accomplish comparison, analysis of Influential Factors;
Information output unit, for the condition query production information according to setting;
Report and graphics management unit, for exporting the result of various figures and report.
3. a kind of bargh's production Scheduling Info Management System according to claim 1, which is characterized in that equipment management
Module specifically includes:
Equipment operation administrative unit, for working out equipment operation plan, the statistics of actual job amount, production plan and actual job
The comparison of amount, analysis of Influential Factors;
Plant maintenance and maintenance care unit are warned for plant maintenance and maintenance log, plant maintenance and maintenance;
Equipment fault statistics and analytical unit, for being analyzed equipment fault and being counted;
Major issue feedback unit needs the problem of stressing for reporting;
Report and image management unit, for exporting various reports and figure.
4. a kind of bargh's production Scheduling Info Management System according to claim 1, which is characterized in that the production
Progress monitoring module specifically includes:
Project schedule plan planning unit, for working out gunter drawing schedule, establishment construction project schedule network diagram;
Actual progress data input and analytical unit, for statisticalling analyze the progress data of on-site collection, and formation and original number
According to the data and table being comparable;
Actual progress and schedule comparison unit, in each all end of term for running in system, project schedule control personnel will
The actual progress data statistics of this period, analysis and the arrangement compiled, data related with target advance are compared, pass through
Compare although it is understood that actual progress than target advance be it is advanced, lag or be consistent, form progress report;
Deviation effects analysis and non-conformance report member, for after finding schedule variance, progress monitoring personnel to be inclined to causing first
The reason of difference occurs is analyzed and summarized, and analyzes the influence that this deviation generates follow-up work and total construction period, to later period engineering into
Degree carries out forecast analysis, and can check realize schedule objective according to progress a few days ago, if had an impact to schedule objective, described in judgement
Influence whether to be received;
Schedule adjustment unit, for project schedule control personnel on the basis of analysis generates questions and prospect, pointedly
Satisfactory after correcting is taken, and original schedule is adjusted according to actual needs;
Report and graphics management unit, for exporting various reports and figure;
Progress monitoring system data maintenance unit, for periodically being backed up, being verified to various data and error in data;
Message output module, for according to the various information of condition query.
5. a kind of bargh's production Scheduling Info Management System according to claim 1, which is characterized in that the quality
Control module includes:
Quality standard and technical standard typing unit, for the information such as typing country, industry quality standard and technical standard, typing
Afterwards as the foundation of engineering construction quality;
Engineering project actual mass data input unit, for the quality in the quality information typing of project's earlier stage, work progress
The quality information of data input, the quality information typing in project later period, different times typing is different;
Engineering project actual mass information modifies unit, is used in entire construction process, if quality information is constantly changing
If increasing in, it is necessary to modify a certain purpose quality information content, original record should be transferred to go through before a modification
In history database file, in case statistics, analysis and inquiry;
The comparison unit of actual mass and plan quality, plan quality are stored in computer in advance, when actual mass is believed
After ceasing input database, the deviation between actual mass and plan quality is calculated;
Mass deviation is used to draw various quality analysis figures according to deviation situation, pass through analysis to the impact analysis unit of engineering
Figure timely feedbacks quality information, grasps engineering actual mass information, provides foundation for quality management and quality control;
Statistics, inquiry and the report printing unit of engineering project quality are used for statistical engineering quality;
The details and processing result unit that quality accident occurs, for the date of occurrence of quality accident, accident pattern, accident tune
Look into the analysis of causes, processing scheme, the progress integrated management of mabage report content.
6. a kind of bargh's production Scheduling Info Management System according to claim 1, which is characterized in that the project
Generalized information management module specifically includes:
Project's earlier stage information management unit, project's earlier stage information include project profile, engineering design, contract documents;
Project construction information management unit, owner (management) information, including business relations list, oral opinion and view, instruction;Industry
The main material and facility responsible by contract and complementary agreement;The information reported and submitted to owner, including Design of Construction Organization, humidometer
It draws, working measure, business relations list;Meeting summary, all kinds of meetings including owner (management) tissue;
Project completed papers information management unit is collected and arranges for the information to completed papers.
7. a kind of bargh's production Scheduling Info Management System according to claim 1, which is characterized in that the transverse direction
Information interchange module specifically includes:
Equipment management center, Materials Service Center, safety monitor center, human resources management center are in corresponding management information list
Longitudinal information interchange is carried out in member, while each administrative center carries out lateral coordination, cooperation, the friendship of assistance information between each other
Stream.
8. a kind of bargh's production Scheduling Info Management System according to claim 1, which is characterized in that described
Dimine model specifically includes connection module:
Dimine model import unit, the import feature for realizing Dimine model for providing interface;
Dimine model checks unit, for realizing the look facility in the Dimine software of part, is rotated, is contracted to model
It puts, changes color, change transparency, hides, display operation;
Dimine pattern query statistic unit, for by setting different attribute as screening conditions come interrogation model, and to mould
The data for including in type extract, count and simple computation;
Dimine model print-out unit for exporting Dimine model picture, and carries out photo print.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810793953.6A CN108960451A (en) | 2018-07-19 | 2018-07-19 | A kind of bargh's production scheduling approaches to IM and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810793953.6A CN108960451A (en) | 2018-07-19 | 2018-07-19 | A kind of bargh's production scheduling approaches to IM and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108960451A true CN108960451A (en) | 2018-12-07 |
Family
ID=64497386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810793953.6A Pending CN108960451A (en) | 2018-07-19 | 2018-07-19 | A kind of bargh's production scheduling approaches to IM and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108960451A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109886562A (en) * | 2019-01-29 | 2019-06-14 | 长沙迪迈数码科技股份有限公司 | Surface mining production technical reserve pending transactions automatically create and processing method and system |
CN110119906A (en) * | 2019-05-23 | 2019-08-13 | 合肥联宝信息技术有限公司 | A kind of method and apparatus of management product quality |
CN110175358A (en) * | 2019-04-24 | 2019-08-27 | 山东科技大学 | A kind of digging production technical reserve space-time restriction model building method |
CN111126884A (en) * | 2020-03-26 | 2020-05-08 | 杭州产链数字科技有限公司 | Engineering progress management system and method based on block chain |
CN112396329A (en) * | 2020-11-23 | 2021-02-23 | 上海宝临电气集团有限公司 | Intelligent production management method, system, intelligent terminal and storage medium |
CN113112105A (en) * | 2020-01-13 | 2021-07-13 | 北京靖钫矿山科技有限公司 | Management information system and method for mine |
CN117252396A (en) * | 2023-11-13 | 2023-12-19 | 长春易加科技有限公司 | Intelligent factory visual management system based on wire harness production workshop |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060149406A1 (en) * | 2004-12-31 | 2006-07-06 | Inventec Corporation | Production procedure planning system and method |
CN102968686A (en) * | 2011-12-23 | 2013-03-13 | 山东黄金集团有限公司 | Digital mine production scheduling system |
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN104835012A (en) * | 2015-05-21 | 2015-08-12 | 湖南视拓科技发展有限公司 | Iron and steel enterprise production scheduling management system and production scheduling management method |
US20150324759A1 (en) * | 2014-05-09 | 2015-11-12 | International Business Machines Corporation | Equipment preventive maintenance scheduling |
CN107437154A (en) * | 2017-08-15 | 2017-12-05 | 安徽婧文科技有限公司 | Project management information processing system based on computer technology |
-
2018
- 2018-07-19 CN CN201810793953.6A patent/CN108960451A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060149406A1 (en) * | 2004-12-31 | 2006-07-06 | Inventec Corporation | Production procedure planning system and method |
CN103136626A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering project |
CN102968686A (en) * | 2011-12-23 | 2013-03-13 | 山东黄金集团有限公司 | Digital mine production scheduling system |
US20150324759A1 (en) * | 2014-05-09 | 2015-11-12 | International Business Machines Corporation | Equipment preventive maintenance scheduling |
CN104835012A (en) * | 2015-05-21 | 2015-08-12 | 湖南视拓科技发展有限公司 | Iron and steel enterprise production scheduling management system and production scheduling management method |
CN107437154A (en) * | 2017-08-15 | 2017-12-05 | 安徽婧文科技有限公司 | Project management information processing system based on computer technology |
Non-Patent Citations (6)
Title |
---|
刘云鹤: "基于三维可视化技术的矿山生产管理信息系统开发", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 * |
孟祥东: "小型企业信息化生产管理系统软件设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
徐少游: "基于三维可视化模型的露天矿安全高效生产关键技术研究", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 * |
苏胜旺等: "生产调度信息管理系统在露天铁矿的应用", 《金属矿山》 * |
高国安主编: "《河南煤炭行业科学发展论坛优秀论文集 2008》", 31 March 2009, 郑州:河南人民出版社 * |
黄丹: "基于"六大系统"的矿山CIMS生产管理体系研究", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109886562A (en) * | 2019-01-29 | 2019-06-14 | 长沙迪迈数码科技股份有限公司 | Surface mining production technical reserve pending transactions automatically create and processing method and system |
CN110175358A (en) * | 2019-04-24 | 2019-08-27 | 山东科技大学 | A kind of digging production technical reserve space-time restriction model building method |
CN110175358B (en) * | 2019-04-24 | 2020-08-04 | 山东科技大学 | Construction method of mining production planning space-time constraint model |
CN110119906A (en) * | 2019-05-23 | 2019-08-13 | 合肥联宝信息技术有限公司 | A kind of method and apparatus of management product quality |
CN110119906B (en) * | 2019-05-23 | 2022-03-25 | 合肥联宝信息技术有限公司 | Method and device for managing product quality |
CN113112105A (en) * | 2020-01-13 | 2021-07-13 | 北京靖钫矿山科技有限公司 | Management information system and method for mine |
CN111126884A (en) * | 2020-03-26 | 2020-05-08 | 杭州产链数字科技有限公司 | Engineering progress management system and method based on block chain |
CN112396329A (en) * | 2020-11-23 | 2021-02-23 | 上海宝临电气集团有限公司 | Intelligent production management method, system, intelligent terminal and storage medium |
CN117252396A (en) * | 2023-11-13 | 2023-12-19 | 长春易加科技有限公司 | Intelligent factory visual management system based on wire harness production workshop |
CN117252396B (en) * | 2023-11-13 | 2024-02-20 | 长春易加科技有限公司 | Intelligent factory visual management system based on wire harness production workshop |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108960451A (en) | A kind of bargh's production scheduling approaches to IM and system | |
De Groote | Maintenance performance analysis: a practical approach | |
Abdul-Rahman | The cost of non-conformance during a highway project: a case study | |
CN103268531B (en) | A kind of energy diode platform for energy centre | |
EA009552B1 (en) | Support apparatus, system and method for facilitating real time operations and maintenance | |
CN110910092A (en) | Highway construction information management platform | |
CN104574002A (en) | Asset management information processing method based on big data analysis and asset management information processing device based on big data analysis | |
CN112070450A (en) | TCM system | |
CN104820907A (en) | Working site safety check improvement method and system based on data mining | |
KR20170030036A (en) | Tutoring system for managing performance of manufacturing metal with electric furnace | |
Zhiqiang et al. | Productivity improvement in the construction industry: a case study of mechanization in Singapore | |
Mahmood et al. | Performance evaluation by using overall equipment effectiveness (OEE): an analyzing tool | |
Handoko et al. | The importance of sustainability audit report in go public companies sector, in Indonesia | |
Ratnasabapathy et al. | A review of construction waste data and reporting systems used in Australia | |
CN114240211A (en) | Intelligent production management system and management method | |
CN114066113A (en) | Production and manufacturing execution system for environment-friendly paper tableware industry | |
CN112288148A (en) | Full-period project management system based on intelligent manufacturing of ship industry | |
CN112418795A (en) | Labor employment supervision and early warning system | |
CN111008766A (en) | Public building operation quality management system and method based on PDCA and target decomposition | |
Haines | Environmental performance indicators: balancing compliance with business economics | |
CN116542638B (en) | Decision support system and method for nuclear power installation | |
Gapanovich et al. | Mathematical and information support of the URRAN system | |
Gerus et al. | Application of the process approach as a methodological basis for formation of a unified network technological process of railway transportation | |
Barr et al. | Real time modeling for financial and performance management | |
Hopper | Cost accounting, control and capitalism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181207 |