CN106529779A - Information management system of construction project - Google Patents

Information management system of construction project Download PDF

Info

Publication number
CN106529779A
CN106529779A CN201610939922.8A CN201610939922A CN106529779A CN 106529779 A CN106529779 A CN 106529779A CN 201610939922 A CN201610939922 A CN 201610939922A CN 106529779 A CN106529779 A CN 106529779A
Authority
CN
China
Prior art keywords
information
building
unit
taking part
evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610939922.8A
Other languages
Chinese (zh)
Inventor
孟建民
刘明谦
陈子鑫
李晓剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shenma Information Technology Co Ltd
Original Assignee
Shenzhen Shenma Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shenma Information Technology Co Ltd filed Critical Shenzhen Shenma Information Technology Co Ltd
Priority to CN201610939922.8A priority Critical patent/CN106529779A/en
Publication of CN106529779A publication Critical patent/CN106529779A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an information management system of a construction project. According to the information management system, a first information uploading terminal is used for receiving construction participation unit information inputted by a construction participation unit and uploading the information to a cloud server; the cloud server is used for receiving the construction participation unit information and sending the information to a second information uploading terminal and an information query terminal; the second information uploading terminal is used for receiving association evaluation information inputted by an associated construction participation unit and sending the association evaluation information to the cloud server; the information query terminal is used for receiving user evaluation information inputted by a user and sending the user evaluation information to the cloud server; the cloud server is used for receiving the association evaluation information and the user evaluation information and generating integrated evaluation information and project popularity evaluation information and sending the integrated evaluation information and project popularity evaluation information to the information query terminal; and the information query terminal is used for receiving and displaying the integrated evaluation information and project popularity evaluation information. The integrated evaluation information and project popularity evaluation information can be displayed at the information query terminal, so that the user can get the construction participation unit information comprehensively.

Description

Information of building project management system
Technical field
A kind of the present invention relates to field of information management, more particularly to information of building project management system.
Background technology
In the process of construction of the construction projects such as hotel, exhibition, high building, each construction project is both needed to multiple associations of unit of taking part in building Allotment is closed, to complete the construction of construction project.For arbitrary construction project built well, unit of taking part in building's quantity is various, up and down Level relation is complicated, if the unit of taking part in building of construction project need to be understood, can only search subordinate one by one by higher level unit of taking part in building and take part in building list Position, search procedure need to be expended and be related to multiple units of taking part in building in a large amount of manpowers and time cost, and search procedure, it is difficult to complete to count The each unit of taking part in building's information of construction project.As the unit of taking part in building of construction project is difficult to complete statistics, cause taking part in building for construction project The information asymmetry of unit so that developer cannot know its unit of taking part in building according to the construction project built well;Or it is arbitrary The information of other units of taking part in building cannot be known in unit of taking part in building.
In unit of taking part in building's infonnation collection process of traditional architecture project, it is typically only capable to collect including project name of taking part in building With the factural information such as unit of taking part in building title, it is impossible to collect each side user (including domestic consumer, developer or other lists of taking part in building Position) a certain construction project building-up work is participated in unit of taking part in building evaluation information, it is unfavorable for that user includes domestic consumer, developer Or other units of taking part in building) system understanding is carried out to unit of taking part in building based on the unit of taking part in building's information for getting so that user is being carried out In the process of construction of next construction project, it is impossible to which the unit of taking part in building's information according to getting selects more suitably unit of taking part in building.
The content of the invention
The technical problem to be solved in the present invention is, for collecting each side in existing building Project information management system User participates in the defect of the evaluation information of a certain construction project building-up work to unit of taking part in building, there is provided a kind of information of building project pipe Reason system.
The technical solution adopted for the present invention to solve the technical problems is:A kind of information of building project management system, including Transmission terminal and at least one information inquiry terminal in Cloud Server, at least one information being connected with Cloud Server communication, In described information, transmission terminal includes on the first information transmission terminal on transmission terminal and the second information;
Transmission terminal on the first information, for receiving unit of taking part in building's information of unit of taking part in building's input, and takes part in building described Unit information is uploaded to the Cloud Server;Unit of taking part in building's information includes information integrity;
The Cloud Server, for receiving unit of taking part in building's information, and unit of taking part in building's information is sent to described Transmission terminal and described information inquiry terminal in second information;
Transmission terminal in second information, for receiving and showing unit of taking part in building's information, and receives association and takes part in building list The correlation evaluation information is sent to the Cloud Server by the correlation evaluation information of position input;
Described information inquires about terminal, for receiving and showing unit of taking part in building's information, and the user of receiving user's input Evaluation information, and user's evaluation information is sent to into Cloud Server;
The Cloud Server, is additionally operable to receive the correlation evaluation information and user's evaluation information, and based on described Information integrity, correlation evaluation information and user's evaluation information generate overall merit information and project temperature evaluation information; And the overall merit information and the project temperature evaluation information are sent to into described information inquiry terminal;
Described information inquires about terminal, for receiving and showing the overall merit information and project temperature evaluation letter Breath.
Preferably, the correlation evaluation information includes that higher level's evaluation information of higher level unit of taking part in building input, subordinate are taken part in building list Subordinate's evaluation information of position input receives the sane level evaluation information that sane level unit of taking part in building is input into.
Preferably, each construction project includes that at least two take part in building grade;Each grade of taking part in building includes at least one The unit of taking part in building;The higher level unit of taking part in building is the immediate superior unit of the unit of taking part in building, and the unit of taking part in building of subordinate is The direct subordinate unit of the unit of taking part in building, the sane level unit are to belong to together under a higher level unit of taking part in building with the unit of taking part in building The unit of taking part in building of same rank.
Preferably, each unit of taking part in building's information includes some subdivision item information, and the subdivision item information includes taking part in building Project name and unit of taking part in building's title, also including item address of taking part in building, scale of the project of taking part in building, project work cost of taking part in building, take part in building Unit qualifications, unit of taking part in building's contact method, higher level unit of taking part in building title, higher level unit of taking part in building contact method, subordinate take part in building Organization, unit of taking part in building of subordinate contact method, relation documentary evidence, affiliated at least one of grade of taking part in building.
Preferably, described information integrity degree=Σ (subdivision item information score value × subdivision item weight), subdivision item score value difference For 1 or 0.
Preferably, also include:Described information inquires about terminal, is additionally operable to user's evaluation information of receiving user's input and by institute State user's evaluation information and be sent to the Cloud Server, each user's evaluation information includes evaluating score value;
The Cloud Server, for receiving user's evaluation information described at least one, and is based on user described at least one Evaluation information generates the project temperature evaluation information;The project temperature evaluation information includes overall merit score value, general comment valence mumber With each opinion rating quantity.
Preferably, the overall merit information=correlation evaluation score value the first weights of *+information integrity score value * second is weighed Weight+the 3rd weights of user estimate value *.
Preferably, the correlation evaluation score value=higher level evaluates score value * higher level's evaluation weight+subordinate and evaluates score value * subordinates Evaluation weight+sane level evaluates score value * sane level evaluation weights.
Preferably, described information inquiry terminal, the sequence for being additionally operable to receiving user's input check instruction, and are based on the row Sequence checks that instruction shows the overall merit information or the project temperature information.
The present invention is had the advantage that compared with prior art:Information of building project management system provided by the present invention In, unit of taking part in building can be used for receiving and uploading its unit of taking part in building's information to be uploaded to cloud service by transmission terminal on the first information Device so that unit of taking part in building's infonnation collection process is simpler, unit of taking part in building's information include information integrity.Association unit of taking part in building can The correlation evaluation information to associating unit of taking part in building's input is uploaded by transmission terminal in the second information;User can pass through information inquiry end User's evaluation information of end upload user input;Cloud Server is for information integrity, correlation evaluation information and user evaluation Information is processed, and to form overall merit information and project temperature evaluation information and be sent to information inquiry terminal, information is looked into Ask terminal and receive and show the overall merit information and project temperature information.The information of building project management system can also be simply fast Speed collects user's evaluation information of the correlation evaluation information and user input of association unit of taking part in building input;And at information inquiry end Overall merit information and project temperature information is shown on end, so that user more comprehensively understands unit of taking part in building's information.
Description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the theory diagram for inventing information of building project management system in an embodiment.
In figure:10th, transmission terminal in information;11st, transmission terminal on the first information;12nd, transmission terminal in the second information;20th, cloud clothes Business device;30th, information inquiry terminal.
Specific embodiment
In order to be more clearly understood to the technical characteristic of the present invention, purpose and effect, now compare accompanying drawing and describe in detail The specific embodiment of the present invention.
Fig. 1 illustrates the information of building project management system in the present embodiment.The information of building project management system can be used Family more comprehensively understands unit of taking part in building's information.The information of building project management system includes Cloud Server 20, and Cloud Server 20 Transmission terminal 10 and at least one information inquiry terminal 30 at least one information that communication is connected.Wherein, transmission terminal 10 in information Including but not limited to the PC, panel computer, pen that network service is connected can be carried out with Cloud Server 20 with information inquiry terminal 30 Remember this and smart mobile phone.In information, transmission terminal 10 can pass through WiFi network, 3G nets with Cloud Server 20 with information inquiry terminal 30 Network or the network service of 4G real-time performances are connected.Specifically, in information, transmission terminal 10 includes transmission terminal 11 and second on the first information Transmission terminal 12 in information.
Each construction project includes that at least two take part in building grade;Each grade of taking part in building includes at least one unit of taking part in building.Ginseng There is its unique corresponding grade of taking part in building with the arbitrary unit of taking part in building to project construction of taking part in building in a project of taking part in building.Each project of taking part in building Grade quantity of taking part in building by taking part in building scale of the project and factors such as projects cost of taking part in building determine.If a project of taking part in building includes five Taking part in building grade, then first the corresponding unit of taking part in building of grade being taken part in building for first order unit of taking part in building, second takes part in building, and grade is corresponding takes part in building Unit takes part in building the corresponding unit of taking part in building of grade for level V unit of taking part in building for second level unit of taking part in building ... level V.It is appreciated that Ground, each first order unit of taking part in building include at least one second level unit of taking part in building, and each second level unit of taking part in building includes at least one Individual third level unit of taking part in building, each third level unit of taking part in building include at least one fourth stage unit of taking part in building, and each level V is taken part in building Unit includes the units of taking part in building such as at least one construction side or material supplier.In the present embodiment, each construction project includes At least two take part in building grade, and first takes part in building the corresponding first order unit of taking part in building of grade for developer, and second level unit of taking part in building includes Designing unit, supply of equipment unit, unit in charge of construction, exterior unit, supervisor, built-in unit, environmentally friendly unit, fire-fighting safety supervision list One or more in position and concealed work unit.Second level unit of taking part in building is included but is not limited to according to unit of taking part in building in item of taking part in building Groundwork function in mesh is divided, and can also be divided according to other factors.It is to be appreciated that specifically taking part in building one In project, part unit of taking part in building may not know, but can fill in second according to groundwork function Next stage or stage further unit of taking part in building under level unit of taking part in building, and upload higher level unit of taking part in building title and the contact of higher level unit of taking part in building Mode, higher level unit of taking part in building can be modified to grade of taking part in building belonging to unit of taking part in building of subordinate.
Specifically, immediate superior unit of the higher level unit of taking part in building for unit of taking part in building, unit of taking part in building of subordinate are unit of taking part in building Direct subordinate unit, sane level unit is to belong to the unit of taking part in building of the same rank under a higher level unit of taking part in building with unit of taking part in building together.This In embodiment, arbitrary construction project is taken part in building grade including the first grade and second of taking part in building;Wherein, the first grade of taking part in building is corresponding Unit of taking part in building includes developer, second level unit of taking part in building include designing unit, supply of equipment unit, unit in charge of construction, exterior unit, One or more in supervisor, built-in unit, environmentally friendly unit, fire-fighting safety supervision unit and concealed work unit.Wherein, second Level unit of taking part in building is divided according to groundwork function of the unit of taking part in building in the project of taking part in building, and can also be carried out according to other factors Divide.By taking built-in unit as an example, its higher level unit of taking part in building is developer, and unit of taking part in building of subordinate is its direct unit of taking part in building of subordinate, Sane level unit of taking part in building is designing unit, supply of equipment unit, unit in charge of construction, exterior unit, supervisor, environmentally friendly unit, fire-fighting Safety supervision unit and concealed work unit etc..
Transmission terminal 11 on the first information, for receiving unit of taking part in building's information of unit of taking part in building's upload, and unit of taking part in building are believed Breath is uploaded to Cloud Server 20.Wherein, unit of taking part in building's information includes information integrity.Each unit of taking part in building's information includes some thin At least include two subdivision item information of project name and unit of taking part in building's title of taking part in building in subitem information, and unit of taking part in building's information. Wherein, project name of taking part in building refers to the construction project title for participating in building.In unit of taking part in building using transmission terminal 11 on the first information When uploading unit of taking part in building's information, take part in building both project name and unit of taking part in building's title are indispensable, if in unit of taking part in building's information Lack any one taken part in building in project name and unit of taking part in building's title to will be unable to smoothly upload unit of taking part in building's information, so as to cannot be real Now unit of taking part in building's information is managed.Arbitrary unit of taking part in building just may participate in certain when need to set up and contact with a higher level unit of taking part in building In one specific construction project process of construction;And, arbitrary higher level unit of taking part in building can be set up with least one unit of taking part in building of subordinate Contact, so that multiple units of taking part in building of subordinate are participated in specific construction project process of construction;But arbitrary unit of taking part in building is generally only Set up with a higher level unit of taking part in building and contact.For realizing being managed unit of taking part in building's information of unit of taking part in building's input, need to be at which Unit of taking part in building's information of upload includes higher level unit of taking part in building title and higher level unit of taking part in building contact method, so that Cloud Server 20 Can notify that higher level unit of taking part in building is audited to unit of taking part in building's information by higher level unit of taking part in building contact method.
In the present embodiment, subdivision item information is also made including take part in building item address, scale of the project of taking part in building, project work of taking part in building Valency, unit of taking part in building's qualifications, unit of taking part in building's contact method, unit of taking part in building of subordinate, unit of taking part in building of subordinate contact method, relation card Prescribed paper and affiliated at least one of grade of taking part in building.Due to setting up two title identical buildings on same item address of taking part in building The probability of project is minimum, therefore can be coordinated with project name of taking part in building to point to same building item by item address of taking part in building Mesh, it is to avoid the akin project of taking part in building of two project names of taking part in building is confused.Scale of the project of taking part in building and projects of taking part in building are made Valency is determined by the project of taking part in building itself, and taking part in building scale of the project can affect the grade of taking part in building of the project of taking part in building with projects cost of taking part in building Quantity.Unit of taking part in building's qualifications are used for showing that unit of taking part in building possesses the related qualification for participating in that the construction project is built, certain In degree be used for ensure unit of taking part in building upload unit of taking part in building's information verity and reliability.Arbitrary unit of taking part in building need to one on Level unit of taking part in building or unit of taking part in building of subordinate just may participate in a certain specifically taking part in building in project when setting up contact;And, Ren Yishang Level unit of taking part in building can be set up with one or more units of taking part in building of subordinate and be contacted, so that multiple units of taking part in building of subordinate participate in specifically Take part in building in project;Arbitrary unit of taking part in building of subordinate is generally only set up with a higher level unit of taking part in building and is contacted.It is to be appreciated that arbitrary take part in building When unit fills in higher level unit of taking part in building title in default list, higher level unit of taking part in building contact method need to be together filled in;Correspondingly, When subordinate's unit of taking part in building's title is filled in default list, need to together fill in unit of taking part in building of subordinate contact method.Relation proves text Part is agreement, the scanned copy of conjunction coordinated files of unit of taking part in building and higher level unit of taking part in building or the signature of unit of taking part in building of subordinate, so that he People understands accuracy and the reliability of unit of taking part in building's information that unit of taking part in building uploads by relation documentary evidence.
In a specific embodiment, when in information, transmission terminal receives unit of taking part in building's information that unit of taking part in building uploads, generate Information integrity, is additionally operable to for information integrity to be sent to Cloud Server 20.Wherein, information integrity is all subdivision item information Score value with subdivision item weight product and value, i.e., arbitrary unit of taking part in building's information information integrity=Σ (subdivision item information score value × subdivision item weight), wherein, each subdivision item information score value can be 1 or 0.Unit of taking part in building is in the information shown by transmission terminal 10 Default list on corresponding subdivision item input field in input subdivision item information, i.e., its subdivision item information score value is 1, if not defeated Enter to segment item information, then its subdivision item information score value is 0.The corresponding subdivision item weight of each subdivision item information can with identical, with It is easy to calculate;Can also differ, can be determined according to the significance level of subdivision item information.In information, the generation of transmission terminal 10 information is complete It is whole when spending, need to by information integrity, in information, transmission terminal 10 shows, in order to unit of taking part in building when unit of taking part in building's information is uploaded Can be appreciated that whether unit of taking part in building's information completely is uploaded, promote unit of taking part in building by the every subdivision item information not being input into Pass, so as to ensure integrity degree and the reliability of the unit of taking part in building's information for uploading to Cloud Server 20.In information, transmission terminal 10 is being given birth to During into information integrity, the information integrity need to be uploaded to Cloud Server 20, in order to count and evaluate unit of taking part in building's upload Unit of taking part in building's information reliability.
Unit of taking part in building's information for receiving unit of taking part in building's information, and is sent to the upload of the second information eventually by Cloud Server 20 End 12 and information inquiry terminal 30.It is to be appreciated that being previously stored with information of building project summary sheet on Cloud Server 20, this is built Building project information summary sheet includes at least one unit of taking part in building's information, and each unit of taking part in building's information includes some subdivision item information, And each unit of taking part in building's information at least includes two subdivision item information of project name and unit of taking part in building's title of taking part in building.It is appreciated that Ground, after Cloud Server 20 receives unit of taking part in building's information that transmission terminal 11 is uploaded on the first information, and unit of taking part in building's information Store In information of building project summary sheet, and unit of taking part in building's information is sent to into transmission terminal 12 and information in corresponding second information Inquiry terminal 30.It is to be appreciated that Cloud Server 20 is after the target query instruction for receiving the input of information inquiry terminal 30, will Unit of taking part in building's information is sent to corresponding information inquiry terminal 30.It is to be appreciated that the subdivision item information is also taken part in building including higher level Organization and contact method, unit of taking part in building of subordinate title and contact method,
Transmission terminal 12 in second information, for receiving and showing unit of taking part in building's information, and receives the input of association unit of taking part in building Correlation evaluation information, correlation evaluation information is sent to into Cloud Server 20.Specifically, correlation evaluation information includes that higher level takes part in building Higher level's evaluation information of unit input, subordinate's evaluation information of unit of taking part in building of subordinate input receive the input of sane level unit of taking part in building Sane level evaluation information.It is to be appreciated that in the process of construction of arbitrary construction project, the immediate superior ginseng of a certain unit of taking part in building Build unit to carry out an acceptance inspection the work of unit of taking part in building, assess work effect of the unit of taking part in building in construction project process of construction Rate and quality, therefore higher level's evaluation information more client of its input is true.The unit of taking part in building of subordinate of a certain unit of taking part in building and sane level Unit of taking part in building can have more detailed in construction project process of construction is participated in the work efficiency of unit of taking part in building and quality Solution, therefore in unit of taking part in building's infonnation collection process of construction project, subordinate's evaluation information and sane level evaluation information is also collected, with It is easy to user to better understand the details of arbitrary unit of taking part in building.
Information inquiry terminal 30, for receiving and showing unit of taking part in building's information, and the user of receiving user's input evaluates letter Breath, and user's evaluation information is sent to into Cloud Server 20.Specifically, show on information inquiry terminal 30 that some opinion ratings are pressed Button, each opinion rating button correspondence one evaluate score value.Information inquiry terminal 30, clicks on arbitrary opinion rating for receive user Button and be input into user's evaluation information and user's evaluation information be sent to into Cloud Server 20, user's evaluation information includes evaluating Score value.Such as can be provided with information inquiry terminal 30, in, differ from three opinion rating buttons, respectively correspond to 10 points, 5 points and -5 Point, any user can be clicked on by information inquiry terminal 30, in, differ from three opinion rating buttons, to be input into comprising evaluation User's evaluation information of score value.
In a specific embodiment, Cloud Server 20 is additionally operable to receive at least one user by information inquiry terminal User's evaluation information of 30 inputs, and project temperature evaluation information, wherein, project are generated based at least one user's evaluation information Temperature evaluation information includes overall merit score value, general comment valence mumber and each opinion rating quantity.Such as can set on information inquiry terminal 30 Have, in, differ from three opinion rating buttons, respectively correspond to 10 points, 5 points and -5 points, any user can pass through information inquiry end End 30 clicks on, in, differ from three opinion rating buttons, to be input into a user's evaluation information comprising evaluation score value;In project heat In degree evaluation information, overall merit score value is the summation of the corresponding point value of evaluation of all user's evaluation informations, and general comment valence mumber is all The quantity of user's evaluation information, each opinion rating quantity refer to click on, in, differ from the quantity of three opinion rating buttons. It is to be appreciated that project temperature evaluation information can be conducive to the construction project that user's understanding unit of taking part in building participates in building concerned Degree.
In a specific embodiment, Cloud Server 20 is additionally operable to receive correlation evaluation information and user's evaluation information, and Overall merit information and project temperature evaluation information are generated based on information integrity, correlation evaluation information and user's evaluation information; And overall merit information and project temperature evaluation information are sent to into information inquiry terminal 30.Specifically, overall merit information= Correlation evaluation score value the first weights of *+information integrity score value the second weights of *+the 3rd weights of user estimate value *;Wherein, associate Evaluate score value, information integrity score value and user estimate value to determine based on same basis of evaluating;First weight, the second weight and 3rd weight is 1 with value.In the present embodiment, correlation evaluation score value, information integrity score value and user estimate value are adopted Evaluate radix be 1-100 between numerical value, then calculated overall merit information be 1-100 between data so that use Family understands the whole synthesis strength of a certain unit of taking part in building according to the overall merit information.
Specifically, correlation evaluation score value=higher level evaluates score value * higher level's evaluation weight+subordinate and evaluates the evaluation of score value * subordinates Weight+sane level evaluates score value * sane level evaluation weights;Wherein, higher level's evaluation weight, subordinate's evaluation weight and sane level evaluation weight It is 1 with value.It is to be appreciated that higher level evaluates score value, subordinate's evaluation score value, sane level evaluation score value is also based on same evaluation basis It is determined that, for ease of calculating, can make higher level evaluate score value, subordinate evaluate score value and sane level evaluate evaluation radix that score value adopts for Numerical value between 1-100.Five correlation evaluation grade buttons, wherein, the first order are provided with transmission terminal 12 in the second information such as The corresponding score value of correlation evaluation grade button be 20 points, the corresponding score value of second level correlation evaluation grade button be 40 points, the 3rd The corresponding score value of level correlation evaluation grade button is 60 points, and the corresponding score value of fourth stage correlation evaluation grade button is 80 points, the The corresponding score value of Pyatyi correlation evaluation grade button is 100 points;It is 40% to be provided with higher level's evaluation weight, and subordinate's evaluation weight is 40%, and sane level evaluation weight is 20%, if higher level unit of taking part in building clicks on fourth stage correlation evaluation grade button, subordinate takes part in building list Level V correlation evaluation grade button is hit in site, and sane level unit of taking part in building clicks on fourth stage correlation evaluation grade button, then its association Evaluate score value=80*40%+100*40%+80*20%=88.If it is to be appreciated that multiple sane level units of taking part in building or subordinate's ginseng When building unit and being input into sane level evaluation information or subordinate's evaluation information respectively, can be using the average of multiple sane level evaluation informations as new Sane level evaluation information adds correlation evaluation information to be calculated;Evaluate the average of multiple subordinate's evaluation informations as new subordinate Information adds correlation evaluation information to be calculated.When overall merit information is calculated, user estimate value is that all users evaluate The average of score value, and the average is converted to into the score value corresponding with radix is evaluated.Letter is evaluated if any 100 user input users Breath, wherein, user's evaluation information of 85 user input favorable comments, the user's evaluation information commented in 10 user inputs, 5 users User's evaluation information that difference is commented is input into, then overall merit score value=85*10+10*5-5*5=875, then user evaluation information=875/ (100*10) * 100=87.5.When overall merit information is evaluated, the unit of taking part in building's information that transmission terminal in information need to be uploaded Information integrity is converted to the score value corresponding with radix is evaluated.Unit of taking part in building's letter is uploaded by transmission terminal in information in user such as During breath, default list is provided with 10 subdivision item information, and each subdivision item weight is 100%, if user fills in wherein 9 subdivisions Item information, then its corresponding information integrity is 90%, and its information integrity is 90%*100=90.In the specific embodiment In, correlation evaluation information, information integrity, the evaluation radix of user's evaluation information are 100, if the first weight is 60%, the Two weights are 20%, and the 3rd weight is 20%, then calculated overall merit information is 88*60%+87.5*20%+90* 20%=88.3.It is to be appreciated that the overall merit information of unit of taking part in building's information of arbitrary unit of taking part in building is between 1-100 Data, in order to compare unit of taking part in building's information of any two unit of taking part in building, so that understand the whole synthesis strength of unit of taking part in building.
Information inquiry terminal 30, for receiving and showing overall merit information and project temperature evaluation information.It is appreciated that Ground, information inquiry terminal 30 can receive and show overall merit information, so that the basic overall merit information of user understands appoints ginseng The whole synthesis strength of unit is built, and the construction project that a certain unit of taking part in building participates in building is understood based on project temperature evaluation information Concerned degree.
In a specific embodiment, information inquiry terminal 30, the sequence for being additionally operable to receiving user's input check instruction, and Check that instruction shows overall merit information or project temperature information based on sequence.In the present embodiment, information inquiry terminal 30 is connecing When receiving and show with overall merit information or project temperature information, due to the quantity of shown unit of taking part in building's information it is more, no Beneficial to the overall merit information or project temperature information of each unit of taking part in building of comparison.For solving the above problems, can be in information inquiry Terminal 30 shows that overall merit information or the correspondence position of project temperature information are provided with a rank button, the inquiry of user's click information Rank button in terminal 30, you can be input into information inquiry terminal 30 and check instruction including sequence, to check according to the sequence Instruct corresponding order to show overall merit information or project temperature information, be conducive to user to know quite well according to demand and respectively take part in building Unit of taking part in building's information of unit.
In the information of building project management system provided by the present embodiment, unit of taking part in building can be by transmission terminal on the first information 11 are used for receiving and uploading its unit of taking part in building's information to be uploaded to Cloud Server 20 so that unit of taking part in building's infonnation collection process is simpler It is single.Association unit of taking part in building can upload the correlation evaluation information to associating unit of taking part in building's input by transmission terminal 12 in the second information; User can be by user's evaluation information of 30 upload user of information inquiry terminal input;Cloud Server 20 is for information completely Degree, correlation evaluation information and user's evaluation information are processed, to form overall merit information and project temperature evaluation information simultaneously Information inquiry terminal 30 is sent to, information inquiry terminal 30 receives and show the overall merit information and project temperature information.Should Information of building project management system also simple and quick can collect the correlation evaluation information of association unit of taking part in building input and user is defeated The user's evaluation information for entering;And overall merit information and project temperature information is shown on information inquiry terminal 30, so that user More comprehensively understand unit of taking part in building's information.
The present invention is illustrated by above-mentioned specific embodiment, it will be appreciated by those skilled in the art that, without departing from In the case of the scope of the invention, various conversion and equivalent substitute can also be carried out to the present invention.In addition, being directed to particular condition or tool Body situation, can make various modifications, without deviating from the scope of the present invention to the present invention.Therefore, the present invention is not limited to disclosed Specific embodiment, and whole embodiments for falling within the scope of the appended claims should be included.

Claims (9)

1. a kind of information of building project management system, it is characterised in that be connected including Cloud Server, with Cloud Server communication At least one information on transmission terminal and at least one information inquiry terminal, in described information transmission terminal include the first information upload Transmission terminal in terminal and the second information;
Transmission terminal on the first information, for receiving unit of taking part in building's information of unit of taking part in building's input, and by the unit of taking part in building Information is uploaded to the Cloud Server;Unit of taking part in building's information includes information integrity;
Unit of taking part in building's information for receiving unit of taking part in building's information, and is sent to described second by the Cloud Server Transmission terminal and described information inquiry terminal in information;
Transmission terminal in second information, for receiving and showing unit of taking part in building's information, and it is defeated to receive association unit of taking part in building The correlation evaluation information is sent to the Cloud Server by the correlation evaluation information for entering;
Described information inquires about terminal, and for receiving and showing unit of taking part in building's information, and the user of receiving user's input evaluates Information, and user's evaluation information is sent to into Cloud Server;
The Cloud Server, is additionally operable to receive the correlation evaluation information and user's evaluation information, and is based on described information Integrity degree, correlation evaluation information and user's evaluation information generate overall merit information and project temperature evaluation information;And will The overall merit information and the project temperature evaluation information are sent to described information inquiry terminal;
Described information inquires about terminal, for receiving and showing the overall merit information and the project temperature evaluation information.
2. information of building project management system according to claim 1, it is characterised in that the correlation evaluation information includes Higher level's evaluation information of higher level unit of taking part in building input, subordinate's evaluation information of unit of taking part in building of subordinate input or reception sane level are taken part in building The sane level evaluation information of unit input.
3. information of building project management system according to claim 2, it is characterised in that each construction project is included at least Two grades of taking part in building;Each grade of taking part in building includes unit of taking part in building described at least one;The higher level unit of taking part in building is described The immediate superior unit of unit of taking part in building, the unit of taking part in building of subordinate is the direct subordinate unit of the unit of taking part in building, the sane level Unit is to belong to the unit of taking part in building of the same rank under a higher level unit of taking part in building with the unit of taking part in building together.
4. information of building project management system according to claim 1, it is characterised in that each unit of taking part in building's information Including some subdivision item information, the subdivision item information includes take part in building project name and unit of taking part in building's title, also including item of taking part in building Mesh address, scale of the project of taking part in building, project work cost of taking part in building, unit of taking part in building's qualifications, unit of taking part in building's contact method, Shang Jican Build organization, higher level unit of taking part in building contact method, unit of taking part in building of subordinate title, unit of taking part in building of subordinate contact method, relation card Prescribed paper, affiliated at least one of grade of taking part in building.
5. information of building project management system according to claim 4, it is characterised in that described information integrity degree=Σ (subdivision item information score value × subdivision item weight), subdivision item score value is respectively 1 or 0.
6. information of building project management system according to claim 1, it is characterised in that also include:
Described information inquires about terminal, is additionally operable to user's evaluation information of receiving user's input and sends user's evaluation information To the Cloud Server, each user's evaluation information includes evaluating score value;
The Cloud Server, for receiving user's evaluation information described at least one, and is based on user's evaluation described at least one Information generates the project temperature evaluation information;The project temperature evaluation information includes overall merit score value, general comment valence mumber and each Opinion rating quantity.
7. information of building project management system according to claim 1, it is characterised in that the overall merit information=pass Connection evaluates score value the first weights of *+information integrity score value the second weights of *+the 3rd weights of user estimate value *.
8. information of building project management system according to claim 7, it is characterised in that the correlation evaluation score value=on Level is evaluated score value * higher level's evaluation weight+subordinate and evaluates score value * subordinates evaluation weight+sane level evaluation score value * sane level evaluation weights.
9. information of building project management system according to claim 1, it is characterised in that described information inquires about terminal, also Instruction is checked in sequence for receiving user's input, and checks that instruction shows the overall merit information or institute based on the sequence State project temperature information.
CN201610939922.8A 2016-10-24 2016-10-24 Information management system of construction project Pending CN106529779A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610939922.8A CN106529779A (en) 2016-10-24 2016-10-24 Information management system of construction project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610939922.8A CN106529779A (en) 2016-10-24 2016-10-24 Information management system of construction project

Publications (1)

Publication Number Publication Date
CN106529779A true CN106529779A (en) 2017-03-22

Family

ID=58292541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610939922.8A Pending CN106529779A (en) 2016-10-24 2016-10-24 Information management system of construction project

Country Status (1)

Country Link
CN (1) CN106529779A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109087026A (en) * 2018-08-29 2018-12-25 樱拓(上海)生物科技有限公司 The supplier's matching system and method for scientific experiment

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1776735A (en) * 2004-11-17 2006-05-24 精工爱普生株式会社 Electronic bidding system and method
CN101163067A (en) * 2007-02-13 2008-04-16 杭州智通装饰网络管理有限公司 Building industry cooperation network management system and management method thereof
US20090030835A1 (en) * 2002-05-07 2009-01-29 Burns Wesley E System and method for auctioning bids on construction projects
CN102938103A (en) * 2012-10-19 2013-02-20 北京神舟航天软件技术有限公司 Plan information synchronizing system and method in project managing process
CN103136624A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project bidding, tendering and bid evaluation
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103136622A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project contracting enterprise evaluation
CN103679403A (en) * 2014-01-03 2014-03-26 北京神舟航天软件技术有限公司 Automatic and parallel data synchronization method for distributed project management systems
CN104636459A (en) * 2015-02-06 2015-05-20 唐绪文 Business information communication system based on construction party and engineering party
CN105279616A (en) * 2015-11-23 2016-01-27 中铁四局集团有限公司 hierarchical management method and device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090030835A1 (en) * 2002-05-07 2009-01-29 Burns Wesley E System and method for auctioning bids on construction projects
CN1776735A (en) * 2004-11-17 2006-05-24 精工爱普生株式会社 Electronic bidding system and method
CN101163067A (en) * 2007-02-13 2008-04-16 杭州智通装饰网络管理有限公司 Building industry cooperation network management system and management method thereof
CN103136624A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project bidding, tendering and bid evaluation
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103136622A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project contracting enterprise evaluation
CN102938103A (en) * 2012-10-19 2013-02-20 北京神舟航天软件技术有限公司 Plan information synchronizing system and method in project managing process
CN103679403A (en) * 2014-01-03 2014-03-26 北京神舟航天软件技术有限公司 Automatic and parallel data synchronization method for distributed project management systems
CN104636459A (en) * 2015-02-06 2015-05-20 唐绪文 Business information communication system based on construction party and engineering party
CN105279616A (en) * 2015-11-23 2016-01-27 中铁四局集团有限公司 hierarchical management method and device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109087026A (en) * 2018-08-29 2018-12-25 樱拓(上海)生物科技有限公司 The supplier's matching system and method for scientific experiment

Similar Documents

Publication Publication Date Title
Polyakova et al. Design of a socio-economic processes monitoring system based on network analysis and big data
Peng et al. Exponential operation and aggregation operator for q‐rung orthopair fuzzy set and their decision‐making method with a new score function
Jelokhani-Niaraki et al. A group multicriteria spatial decision support system for parking site selection problem: A case study
Alvandi et al. Economic and environmental value stream map (E2VSM) simulation for multi-product manufacturing systems
Wu et al. Measuring E-government performance of provincial government website in China with slacks-based efficiency measurement
Joro et al. Weight-restricted DEA in action: from expert opinions to mathematical models
CN110069706A (en) Method, end side equipment, cloud side apparatus and the end cloud cooperative system of data processing
Lück et al. Experiences of stakeholder participation in multi-criteria decision analysis (MCDA) processes for water infrastructure
Larsson et al. Cardinal and rank ordering of criteria—addressing prescription within weight elicitation
JP2021170187A (en) Consensus building support device and consensus building support method
Dos Santos et al. The analysis of academic information system success: A case study at Instituto Profissional de Canossa (IPDC) Dili timor-leste
Androutsopoulou et al. Passive expert-sourcing for policy making in the European Union
CN109377114A (en) Appraisal procedure, server and the storage medium of supplier
Xu et al. A Heterogeneous Multiattribute Group Decision‐Making Method Based on Intuitionistic Triangular Fuzzy Information
Zhang et al. Transmission cost allocation based on data envelopment analysis and cooperative game method
CN109934631A (en) Question and answer information processing method, device and computer equipment
CN106529779A (en) Information management system of construction project
Browne et al. Simulating market power in the New Zealand electricity market
Zharan et al. „Survey on Integrating of Renewable Energy into the Mining Industry,“
Xu et al. Ranking academic impact of world national research institutes—by the Chinese Academy of Sciences
CN105931020A (en) Voting method and device
CN106548419A (en) Information of building project management system
Keegan et al. Structure and dynamics of coauthorship, citation, and impact within CSCW
CN106548420A (en) Information of building project management system
Hua Model for evaluating the classification modes of the China’s college entrance examination with hesitant fuzzy information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 518000 B06, 14 floor, 3 building, Xun Mei Plaza, Nanshan District, Shenzhen, Guangdong.

Applicant after: Shenzhen small construction information technology Co., Ltd.

Address before: 518000 Guangdong Shenzhen Futian District Huaqiang North Street, Yan Nan Road 96 Ge Lin Yuan Yuan 1509

Applicant before: Shenzhen Shenma Information Technology Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322