Prior art keywords
project
integrated
management system
client computer
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009100355417A
Other languages
Chinese (zh)
Inventor
张丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hejian Technology Suzhou Co Ltd
Original Assignee
Hejian Technology Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hejian Technology Suzhou Co Ltd filed Critical Hejian Technology Suzhou Co Ltd
Priority to CN2009100355417A priority Critical patent/CN102034134A/en
Publication of CN102034134A publication Critical patent/CN102034134A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an integrated project management system and an integrated project management method. The system is constructed at a Web server end and communicated with a client computer through a local area network according to a network transmission protocol. The invention is characterized in that: the project management system at the Web server end is constructed by integrating a project plan establishment module, a project data acquisition module, a project measure analysis module and an organizational asset library module. The system automatically distributes a control and management item and a management flow by selecting project scale through a user, prompts the user to timely submit data of project information according to a project plan and performs project measure analysis by combining historical data to acquire the schedule and state of a project. The project management system can meet the requirements of capability maturity model integration (CMMI) on the project plan, the project control and management and related process areas, simplify the implementation of the project management, normalize the management operation of the project and improve the working efficiency of project members.

Description

Integrated project management system and method
Technical field
The present invention relates to a kind of Capability Maturity Model for Software integrated model (CMMI), relate in particular to a kind of integrated project management system, and utilize this system to carry out the method for project management about Xiang Mujihua project keyholed back plate and correlated process territory thereof in this model.
Background technology
Along with the continuous progress of IT industry, the standardization of increasing software company or department's emphasis project running is so a lot of tissue is implemented CMMI (Capability Maturity Model Integration) according to the situation of self.CMMI is the pass that present universally acknowledged software product enters the international market, and it is not only the authentication to product quality, the approach that a kind of especially software process improves.CMMI has 25 process domains, wherein project keyholed back plate, project scheduling process domain for adjust and control project cost, efficient all helpful.Yet the concrete enforcement of this part process need be collected the information of a lot of aspects, and such as cost, manpower, benefit, time control, defective, risk or the like, and the triggering of some flow process also needs informing or checking of personnel in the process.CMMI itself is a kind of model, methodology, and it is all different specifically to implement each company, all needs to write a large amount of documents usually, pays more manpower and materials to go to implement, this just causes the unfeasible situation of CMMI.
Summary of the invention
In view of the defective of above-mentioned prior art, purpose of the present invention aims to provide a kind of integrated project management system and method.Based on Web server end and the client computer that links to each other by local area network communication thereof, and, satisfy the keyholed back plate requirement of CMMI to the project scheduling, project keyholed back plate and correlated process territory based on user personnel's label interflow journey.
First purpose of the present invention will be achieved through the following technical solutions:
Integrated project management system, framework be in the Web server end, and communicate by letter with the network transmission protocol with the client computer by LAN and to link to each other, and it is characterized in that: the integrated structure of the project management system of described Web server end comprises:
One project scheduling organizational system module by client computer to access and Showplan organizational system interface, and disposes corresponding keyholed back plate item and management process automatically after user's scale of making is selected;
One project data collection module shows the respective items destination data collection page according to the project scheduling by the client computer, gathers project process and data message in real time;
One project metric analysis module based on the processor of Web server end, is used for the data that the data collection module collects are calculated, analyzed, with the every index of metric terms;
One organizes the wealth library module, and all carry out or completed complete projects project file and organize standard and template to be used for storage management system.
Further, aforesaid integrated project management system, communicate to connect the cable LAN that is based on TCP/IP, NETBEUI or IPX/SPX host-host protocol of framework between wherein said Web server end and the client computer, or based on the WLAN (wireless local area network) of the QoS agreement of WLAN.
Further, aforesaid integrated project management system, wherein the client computer is at least two, and is positioned at the same working group in same net territory, and the project data collection module is gathered the project process and the data message of described working group; Perhaps two client computers are positioned at two relatively independent working groups in same net territory, and the collection of project data collection module also gathers the project process and the data message of described two working groups.
Further, aforesaid integrated project management system, the wherein said wealth library module of organizing is a separate server that is used for the stock item file.
Second purpose of the present invention will be achieved through the following technical solutions:
Integrated project management method, realize that by the described integrated project management system of claim 1 described project management method is characterised in that and comprises step:
I, user are after the project scheduling organizational system module and selected scale of the project by LAN visit Web server end on the client computer, project management system is corresponding keyholed back plate item of configuration and management process automatically, is shown on the plan organizational system page of client computer;
II, system show the corresponding project data collection page on the client computer, and communication are notified and the user of keyholed back plate correspondence signs the information of closing according to the project scheduling and integration project management process;
III, project metric analysis module are measured form and graphic analyses to collected project information data, and wherein said tolerance form is the metric form with reference to each index of historical data computational item; Graphic analyses is drawn analysis diagram for according to the project information data collected in conjunction with the correspondence metric value, with the metric terms state and provide strong, weakness analysis result;
IV, all are carried out in or completed complete projects project file and organize standard and template classification deposits in the file server, the user forms an item file database to the corresponding attribute of each file mark as the query calls condition.
Further, aforesaid integrated project management method after wherein project management system described in the step I disposes corresponding keyholed back plate item and management process automatically, comprises that also the user sees through the flow process that the plan organizational system page is reduced, increased the keyholed back plate item.
Further, aforesaid integrated project management method, wherein the keyholed back plate item of project described in the step I comprises the required cost of project operation, manpower, time, and the project defective and the risk that need overcome.
Further, aforesaid integrated project management method, wherein in the Step II, the label that do not obtain the user for exceeding the default time of management process close information state, and the project data collection module sends prompting with the mail form to respective user.
Further, aforesaid integrated project management method, for describedly exceeding the management process Preset Time and reach 12 hours~24 hours situation, the project data collection module is urged signal to corresponding client computer transmitter.
Use integrated project management system of the present invention and method, its beneficial effect is embodied in:
This project management system can satisfy the requirement of CMMI for the project scheduling, project keyholed back plate and correlated process territory, has simplified project management enforcement, standard the project management running, improved program member's work efficiency; The project metric analysis helps improved project, to reach the target that project continues optimization; Organize the wealth storehouse to help to accumulate intellectual property, share outstanding experience, and help project personnel's reference learning.
Description of drawings
Fig. 1 is the topological structure synoptic diagram of the integrated project management system of the present invention.
Embodiment
For the technical characterictic that makes the integrated project management system of the present invention, method and the remarkable result after using, following constipation closes accompanying drawing, and technical solution of the present invention is made following detailed description.
As shown in Figure 1, on structure: this integrated project management system, framework is in Web server end 1, and communicate by letter with the network transmission protocol by LAN and client computer 31~33 and to link to each other, it mainly comprises project scheduling organizational system module, project data collection module, project metric analysis module and organizes wealth database four parts to form that integrated member is in the Web server end.The user uses the client computer expert to cross network and is linked to integrated project management system, setting up the project development plan, and the effectively running of management project, task; Control based on the workflow realization flow that label close; The bottom has a database, for storing data.
Specifically, project scheduling organizational system is meant that the user selects to meet the scale of the project of self-condition in system after, system is corresponding keyholed back plate item of configuration and management process automatically, and these all can be shown in the plan organizational system page.The project keyholed back plate item here is meant (project factors such as cost, manpower, benefit, time, defective, risk), and the keyholed back plate item can be reduced according to self needs, need write reason exactly.The user is required according to the plan of page prompts organizational system, after the organizational system through just coming into force behind the corresponding auditing flow.Project scheduling organizational system module is the precondition of project data collection module.
Project data is collected and to be meant for the project of organizational system, system can be according to the project scheduling, show the corresponding project data collection page, and integration project management process, Mail notifies and the corresponding role's of keyholed back plate user signs the corresponding information of closing, for slowly failing to sign the user who closes, system can send out machine and urge information to remind.
The project metric analysis mainly comprises tolerance form and graphic analyses two parts, and the tolerance form is the metric form of or manual calculations each index regular according to historical data; Graphic analyses is according to all kinds of project datas of having collected, in conjunction with the correspondence metric data, draws out analysis diagram, with the metric terms state, gives strong point weakness analysis result simultaneously.
Organize the wealth library module to be meant and preserve various item files, just as a data bank, so be referred to as the wealth storehouse, comprise all kinds of standard class files such as standard, masterplate of organizing, and the project file of actual items, the user needs each file is marked corresponding attribute, and these files finally are the file servers 2 that leaves a platform independent in, so that enough big storage space to be provided.The user can find required file fast with these attribute conditions.Organize needs such as standard, document template, big event file to be submitted to and organize the wealth storehouse through specific label interflow Cheng Caineng.
Technique scheme can optimal design be:
On the one hand, communicate to connect the cable LAN that is based on TCP/IP, NETBEUI or IPX/SPX host-host protocol of framework between this Web server end and the client computer, or based on the WLAN (wireless local area network) of the QoS agreement of WLAN.
On the other hand, this client computer is at least two, and be positioned at the same working group that department one is represented in same net territory, the project data collection module is gathered the project process and the data message of described working group, perhaps this client computer is at least two, and be positioned at two relatively independent working groups that department one and department two are represented in same net territory, the collection of project data collection module also gathers the project process and the data message of described two working groups.
Server end of the present invention needs two-server at least, and one one or more is as data and file server 2 as application server 1, and all the operating platform of Microsoft Windows 2000 Server (any version) is assembled in requirement.
Application software of the present invention is deployed on the application server 1 to handle the front end demand, the above internal memory of this application server requirement 128M, the above hard drive space of 250G, system requirements installation IIS 5.0 above internet information services and 5.0 above web browsers; If simultaneously as flow process sign-off server, also need to install IBM Lotus Domino R6 in addition.
File server 2 stored items data and files require the above internal memory of 64M, the above hard drive space of 2G, and demand installation database software SQL Server 2000.
Client of the present invention requires the operating platform of Microsoft Windows NT 4.0, Windows 2000 (all versions), Windows Me or Windows 98; Require to install IIS 5.0 above internet information services and 5.0 above web browsers.The subscription client of flow process sign-off also needs to install IBM Lotus Notes R6 client if desired.
From management method, realize that the step of project integrated management comprises:
I, user are after the project scheduling organizational system module and selected scale of the project by LAN visit Web server end on the client computer, project management system is corresponding keyholed back plate item of configuration and management process automatically, is shown on the plan organizational system page of client computer;
II, system show the corresponding project data collection page on the client computer, and communication are notified and the user of keyholed back plate correspondence signs the information of closing according to the project scheduling and integration project management process;
III, project metric analysis module are measured form and graphic analyses to collected project information data, and wherein said tolerance form is the metric form with reference to each index of historical data computational item; Graphic analyses is drawn analysis diagram for according to the project information data collected in conjunction with the correspondence metric value, with the metric terms state and provide strong, weakness analysis result;
IV, all are carried out in or completed complete projects project file and organize standard and template classification deposits in the file server, the user forms an item file database to the corresponding attribute of each file mark as the query calls condition.
Technique scheme can optimal design be: for describedly exceeding the management process Preset Time and reach 12 hours~24 hours situation, the project data collection module is urged signal to corresponding client computer transmitter.
This project is primarily aimed at the keyholed back plate information and the behavior of plan flow process of the project scheduling and project management and correlated process territory thereof among the CMMI, makes it be integrated in integrated project management system, and wherein behavior integration is meant based on personnel and signs the interflow journey.Use this system platform thereby reach, promptly satisfied the requirement of CMMI for the correlated process territory, simplify project management and implement, standard project management operation improves program member's work efficiency; The project metric analysis helps improved project, to reach the target that project continues optimization; Organize the wealth storehouse to help to accumulate intellectual property, share outstanding experience, and help project personnel's reference learning.
In sum, be detailed description to a specific embodiment of the present invention, be intended to illustrate character of innovation of the present invention and technique effect, but be not the diversity that limits embodiment of the present invention with this.In every case the simple modification or the equivalence of the foregoing description are replaced, design that can the object of the invention all belongs within the scope of the present patent application protection.

Claims (10)

1. integrated project management system, framework be in the Web server end, and communicate by letter with the network transmission protocol with the client computer by LAN and to link to each other, and it is characterized in that: the integrated structure of the project management system of described Web server end comprises:
One project scheduling organizational system module by client computer to access and Showplan organizational system interface, and disposes corresponding keyholed back plate item and management process automatically after user's scale of making is selected;
One project data collection module shows the respective items destination data collection page according to the project scheduling by the client computer, gathers project process and data message in real time;
One project metric analysis module based on the processor of Web server end, is used for the data that the data collection module collects are calculated, analyzed, with the every index of metric terms;
One organizes the wealth library module, and all carry out or completed complete projects project file and organize standard and template to be used for storage management system.
2. integrated project management system according to claim 1, it is characterized in that: communicate to connect the cable LAN that is based on TCP/IP, NETBEUI or IPX/SPX host-host protocol of framework between described Web server end and the client computer, or based on the WLAN (wireless local area network) of the QoS agreement of WLAN.
3. integrated project management system according to claim 1 is characterized in that: described client computer is at least two, and is positioned at the same working group in same net territory, and the project data collection module is gathered the project process and the data message of described working group.
4. integrated project management system according to claim 1, it is characterized in that: described client computer is at least two, and be positioned at two relatively independent working groups in same net territory, the collection of project data collection module also gathers the project process and the data message of described two working groups.
5. integrated project management system according to claim 1 is characterized in that: the described wealth library module of organizing is a separate server that is used for the stock item file.
6. integrated project management method, realize that by the described integrated project management system of claim 1 described project management method is characterised in that and comprises step:
I, user are after the project scheduling organizational system module and selected scale of the project by LAN visit Web server end on the client computer, project management system is corresponding keyholed back plate item of configuration and management process automatically, is shown on the plan organizational system page of client computer;
II, system show the corresponding project data collection page on the client computer, and communication are notified and the user of keyholed back plate correspondence signs the information of closing according to the project scheduling and integration project management process;
III, project metric analysis module are measured form and graphic analyses to collected project information data, and wherein said tolerance form is the metric form with reference to each index of historical data computational item; Graphic analyses is drawn analysis diagram for according to the project information data collected in conjunction with the correspondence metric value, with the metric terms state and provide strong, weakness analysis result;
IV, all are carried out in or completed complete projects project file and organize standard and template classification deposits in the file server, the user forms an item file database to the corresponding attribute of each file mark as the query calls condition.
7. integrated project management method according to claim 6, it is characterized in that: after project management system described in the step I disposes corresponding keyholed back plate item and management process automatically, comprise that also the user sees through the flow process that the plan organizational system page is reduced, increased the keyholed back plate item.
8. according to claim 6 or 7 described integrated project management methods, it is characterized in that: the keyholed back plate item of project described in the step I comprises the required cost of project operation, manpower, time, and the project defective and the risk that need overcome.
9. integrated project management method according to claim 6, it is characterized in that: in the Step II, the label that do not obtain the user for exceeding the default time of management process close information state, and the project data collection module sends prompting with the mail form to respective user.
10. integrated project management method according to claim 9 is characterized in that: for describedly exceeding the management process Preset Time and reach 12 hours~24 hours situation, the project data collection module is urged signal to corresponding client computer transmitter.
CN2009100355417A 2009-09-27 2009-09-27 Integrated project management system and method Pending CN102034134A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100355417A CN102034134A (en) 2009-09-27 2009-09-27 Integrated project management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100355417A CN102034134A (en) 2009-09-27 2009-09-27 Integrated project management system and method

Publications (1)

Publication Number Publication Date
CN102034134A true CN102034134A (en) 2011-04-27

Family

ID=43886992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100355417A Pending CN102034134A (en) 2009-09-27 2009-09-27 Integrated project management system and method

Country Status (1)

Country Link
CN (1) CN102034134A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102708466A (en) * 2012-05-21 2012-10-03 苏州汉清投资管理有限公司 Project management system
CN102957715A (en) * 2011-08-19 2013-03-06 深圳市快播科技有限公司 Method and system for data transmission
CN103136619A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering quality acceptance report form
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103177310A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Data processing system for cost control
CN103177306A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Workflow control system of project implementation
CN103258257A (en) * 2013-05-14 2013-08-21 国家电网公司 System and method for managing going-out process
CN104217284A (en) * 2014-08-25 2014-12-17 才明嵩 An ecological balance system for productivity
CN109740960A (en) * 2019-01-11 2019-05-10 深圳传世智慧科技有限公司 Management change project method for early warning, server and management change system
CN109814919A (en) * 2019-01-25 2019-05-28 上海创景信息科技有限公司 Configurable data measure and system and storage medium based on management process
CN110633947A (en) * 2018-06-22 2019-12-31 上海昶铭软件科技有限公司 Project management system and working method thereof
CN112269439A (en) * 2020-10-30 2021-01-26 苏州睿珥信息科技有限公司 Data processing system of project management software class
CN112527859A (en) * 2020-12-04 2021-03-19 浪潮云信息技术股份公司 Flexible configuration management method based on business object
CN113051152A (en) * 2021-02-20 2021-06-29 武汉木仓科技股份有限公司 Task data generation method and device and processing equipment
CN113723713A (en) * 2021-11-01 2021-11-30 商运(江苏)科创发展有限公司 Micro-service green manufacturing customer management system and method
CN113759767A (en) * 2021-08-02 2021-12-07 利芳 Project integration management system

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102957715A (en) * 2011-08-19 2013-03-06 深圳市快播科技有限公司 Method and system for data transmission
CN103136619B (en) * 2011-11-29 2016-01-27 北京建龙重工集团有限公司 The online management method of acceptance of engineering quality form
CN103136619A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering quality acceptance report form
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103136626B (en) * 2011-11-29 2016-08-03 北京建龙重工集团有限公司 The online management method of engineering project
CN103177310A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Data processing system for cost control
CN103177306A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Workflow control system of project implementation
CN102708466A (en) * 2012-05-21 2012-10-03 苏州汉清投资管理有限公司 Project management system
CN103258257A (en) * 2013-05-14 2013-08-21 国家电网公司 System and method for managing going-out process
CN104217284A (en) * 2014-08-25 2014-12-17 才明嵩 An ecological balance system for productivity
CN110633947A (en) * 2018-06-22 2019-12-31 上海昶铭软件科技有限公司 Project management system and working method thereof
CN109740960A (en) * 2019-01-11 2019-05-10 深圳传世智慧科技有限公司 Management change project method for early warning, server and management change system
CN109814919A (en) * 2019-01-25 2019-05-28 上海创景信息科技有限公司 Configurable data measure and system and storage medium based on management process
CN112269439A (en) * 2020-10-30 2021-01-26 苏州睿珥信息科技有限公司 Data processing system of project management software class
CN112527859A (en) * 2020-12-04 2021-03-19 浪潮云信息技术股份公司 Flexible configuration management method based on business object
CN113051152A (en) * 2021-02-20 2021-06-29 武汉木仓科技股份有限公司 Task data generation method and device and processing equipment
CN113759767A (en) * 2021-08-02 2021-12-07 利芳 Project integration management system
CN113723713A (en) * 2021-11-01 2021-11-30 商运(江苏)科创发展有限公司 Micro-service green manufacturing customer management system and method
CN113723713B (en) * 2021-11-01 2022-01-28 商运(江苏)科创发展有限公司 Micro-service green manufacturing customer management system and method

Similar Documents

Publication Publication Date Title
CN102034134A (en) Integrated project management system and method
US20190164231A1 (en) Xbrl-based intelligent financial cloud platform system, construction method and business implementation method thereof
CN101556475B (en) Real-time tracking system for processing materials and production process based on radio frequency technique
EA012934B1 (en) A system and a method for managing remote applications
KR100907563B1 (en) Integrated monitoring system and its operation method
CN102646224A (en) Management integrating system of enterprise standardization
CN101141370A (en) Gridding service based electric power enterprise real-time data processing method
CN106982251A (en) Project field work data reporting method and system are reconnoitred based on mobile device
CN103559594A (en) Management system and method for having control over procurement plan according to inventory level of spare parts
CN110210980A (en) A kind of driving behavior appraisal procedure, device and storage medium
CN104766240A (en) Electronic banking data processing system and method
CN100370458C (en) Data integration and analysis system and method
Ereth et al. A Capability Approach for Designing Business Intelligence and Analytics Architectures.
CN106447257A (en) Multifunctional warehouse management system
CN109284330A (en) A kind of Internet of Things big data management system for garden
Salim et al. Towards data quality into the data warehouse development
KR20000058988A (en) How to support venture incubation on the Internet
CN102346666A (en) Capturing and processing data generatid in an erp interim phase
CN109326013A (en) A kind of internet punch card system for office's performance management
CN108183870A (en) A kind of cloud data center scheduling of resource sharing method and system based on cloud maturity
CN201590107U (en) Taxation management system based on Web GIS
Furley The BT operational support systems architecture
CN112926945A (en) Flood prevention key part regulating and controlling system and method based on real object ID
CN105373874A (en) ERP decision support system
CN110147406A (en) A kind of visual numeric simulation system and its framework method towards cloud computing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110427