Project field work data reporting method and system are reconnoitred based on mobile device
Technical field
Project field work data reporting method and system reconnoitred based on mobile device the present invention relates to a kind of, belongs to ore deposit
Produce resource outdoors exploration job information technical field.
Background technology
Reconnoitre project field work progress data digitlization report be mineral resources job information a basis
Link, critical role is occupied during the production practices that numeral is reconnoitred.Conventional reconnoitres project reporting system, it is necessary to be based on
Internet fills in reported data, it is difficult to adapt to the remote field work condition for reconnoitring area.It is not carried out the self-identifying pipe of authority
Reason, due to this shortcoming so that use of the passing reporting system to the different actual functional capabilities of roles at different levels is very chaotic, reduces
The efficiency actually reported.And conventional reporting system provides the means of auxiliary typing in project data Input Process, not,
Under the efficiency of typing is relatively low.Conventional reporting system is not carried out at a unified filing after data are reported to data
Reason, has given user by filing-up work and has voluntarily analyzed filing, very waste of manpower, while can not also ensure correctness.And with
Past reporting system does not carry out visual analysis and management to the data reported, it is impossible to provide the user intuitively project
Situation.
The content of the invention
In order to solve the deficiencies in the prior art, project field work reconnoitred based on mobile device the invention provides a kind of
Data reporting method and system, can avoid the confusion of distribution with the management of user rights at different levels, can not aid in typing and can not
Automatically classifying and filing preserve and can not visual analyzing and the deficiency of management data, realization can be made full use of to user by reality
Border production requirement carries out authority distribution and management, and realizes checking and transmitting between multi-layer to reconnoitring project report data,
Auxiliary typing, automatically classifying and filing is provided the user simultaneously to preserve and visual analysis and management data.
The present invention is for the technical scheme that is used of its technical problem of solution:There is provided a kind of reconnoitring based on mobile device
Project field work data reporting method, comprises the following steps:
(1) if not obtaining account, in client-side editing user data, registration request is sent to server, waits pending
Pass through;If existing account, user end to server sends logon information, into step (2);
(2) server judges user right rank according to log-on message, if user right, which is project process, reports authority,
Reported into step (3) carry out project;If user right, which is examination & verification, collects authority, carry out examination & verification into step (4) and collect;If
User right is monthly magazine search access right, then carries out monthly magazine inquiry into step (5);If user right is administrator right, enter
Enter step (6) and carry out system administration;
(3) project is reported:Client selects grassroot project or the existing project of modification, if grassroot project, creates new projects
And entry item data, then project data is uploaded onto the server;If being deposited in the existing project of modification, Remote Open server
The existing project of storage, online modification is simultaneously preserved to server;Server will set the project data in the period tentatively to be converged
Always;
(4) examination & verification collects:Client remote is opened in server by the project data tentatively collected, chooses whether to carry out
Editor, if entering edlin, enters after edlin to the project data tentatively collected and preserves to server;Otherwise directly preserve preliminary
The project data collected;
(5) monthly magazine is inquired about:Client opens the project data collected in Remote Open server by examination & verification, checks the overall situation
Project situation, every team's project situation and projects situation, and it is analyzed and examined;
(6) system administration:Client opens the project data collected in Remote Open server by examination & verification, checks the overall situation
Project situation, every team's project situation and projects situation, and it is analyzed and examined;Audit and registration is sent in server
The user data of request.
It is existing by according to keywords retrieval during the existing project stored in step (3) the Remote Open server
Project;When entry item data and online modification, it is index key according to the value actually entered in field, client is searched for automatically
The project data of the local field institute typing in end, presented according to matching degree in the form of combobox data field contents for
Selection.
Step (3) is described tentatively to collect, including by project data according to reconnoitre unit carry out automatically classifying and filing.
Step (4) project data to tentatively collecting enters after edlin to preserve to server, specifically includes following mistake
Journey:The item that group subordinate project leader has been filed in index key, Auto-matching server is referred to as according to group's name
Mesh number evidence, and present on the client;Project data is modified and audited;Most audit at last amended report data to
Server, which is uploaded, to be submitted.
When checking global project situation, every team's project situation and projects situation described in step (5), client is searched automatically
The project data that all groups submit in rope server is presented in client, and carries out block diagram and cake chart enters to project data
Row visual analyzing.
The user data of registration request is sent in step (6) the examination & verification server, including client obtains service automatically
The user data of registration request is had been filed in device, authority distribution is carried out, examination & approval pass through.
Project field work data reporting system, including position reconnoitred based on the above method invention also provides a kind of
Project reporting module, examination & verification summarizing module, monthly magazine enquiry module and administrator module in client, and positioned at server
Server database and preliminary summarizing module, the project reporting module, examination & verification summarizing module, monthly magazine enquiry module and keeper
Module is connected with server database by wireless network respectively, and the preliminary summarizing module directly connects with server database
Connect.
The project reporting module is provided with data referencing submodule, automatic calculating sub module and fuzzy search submodule, its
Middle data referencing submodule is used for by major key of project name automatically in server database belonging to matching entries title
The project data of project submission last month, downloads and Auto-writing is in client;The automatic calculating sub module is used for entry name
Referred to as automatic all items data of the affiliated project of matching entries title in the current year in server database of major key, under
Carry and calculate every data target automatically in client, then show;The fuzzy search submodule is used to enter field data
During row typing, field or similar field data that matching client was filled in carry out fuzzy search.
Every data target include probing rice number, drilling number, industrial hole number, mineralising hole number and complete into
Degree.
The present invention is had advantageous effect in that based on its technical scheme:
(1) the project field work data reporting method of reconnoitring based on mobile device of the invention utilizes mobile Internet,
Using intelligent mobile phone terminal, by mobile phone A PP, it can realize reconnoitre reporting for project process whenever and wherever possible, solve traditional
The project of reconnoitring reports the Dependence Problem to private network device;
(2) reconnoitring in project field work data reporting method and system based on mobile device of the invention, different visitors
Family end can realize that under unified APP system is made after different User logs ins, automatically into authority pair by rights management
The end answered.System distributes user rights at different levels the confusion with managing, and it is whole that the system has fully investigated that the project of reconnoitring reports
Flow, the items function in flow is actually reported to project leader, institute of team team leader, unit leader, keeper's level Four role
And relevance, by the way that these functions and relevance are applied in reporting system so that reporting system can be for difference
Functional authority user typing is provided, the different function privileges such as reports, audit, managing, analyzing so that entirely report process to have
The not disorderly progress of bar, substantially increases the efficiency reported, and the accuracy of each user's functional authority, which there has also been, reliably to be ensured;
(3) reconnoitre the project field work data reporting method and system based on mobile device of the invention is realized automatically
Put on file is preserved and visual analysis and management data, and system analyzes the affiliated class of logging data by factual survey
Not, data automatically can be subjected to Put on file according to affiliated rank, classification, attribute after user completes to edit and record, is easy to use
In checking and file preservation.Simultaneously by means of graphical means, visual operation is carried out to part core data, it is clear effective
Pass on linking up information on ground.Can data are objective, clearly express to user, while establishing good for further decision support
Good basis;
(4) reconnoitring project field work data reporting method and system and can be applied to based on mobile device of the invention
Reconnoitring the digitlization of project field work progress data reports field and other data to report field, and system is installed on smart mobile phone etc.
Mobile device, project data and other project datas are included and are saved in database to realize, is remarkably improved and reconnoitres item
Quality and efficiency that mesh report data is reported.
Brief description of the drawings
Fig. 1 is the module frame chart for reconnoitring project field work data reporting system based on mobile device of the present invention.
Fig. 2 is the analyze data classification for reconnoitring project field work data reporting method based on mobile device of the present invention
Schematic diagram.
Fig. 3 is the schematic flow sheet for reconnoitring project field work data reporting method based on mobile device of the present invention.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples.
Project field work data reporting method reconnoitred based on mobile device the invention provides a kind of, reference picture 3, bag
Include following steps:
(1) if not obtaining account, in client-side editing user data, registration request is sent to server, waits pending
Pass through;If existing account, account be divided into 4 kinds of users used in client, be respectively:Space in a newspaper in project, project leader fills out
Write reported data;Examination & verification collects end, and group chief engineer, which collects, to be audited each project data and submit and report;Monthly magazine inquires about end, geology
Office leader receives, checks and analyze reported data;System administration end, keeper has repertoire authority and user can be authorized
Examination & verification, different ends are realized under unified client, by rights management, are made after different User logs ins, automatically into authority
Corresponding end;User end to server sends logon information, into step (2);
(2) server judges user right rank according to log-on message, if user right, which is project process, reports authority,
Reported into step (3) carry out project;If user right, which is examination & verification, collects authority, carry out examination & verification into step (4) and collect;If
User right is monthly magazine search access right, then carries out monthly magazine inquiry into step (5);If user right is administrator right, enter
Enter step (6) and carry out system administration;
(3) project is reported:Grassroot project or the existing project of modification are selected on the interface of client, if grassroot project,
New projects and entry item data are created, then project data uploads onto the server;If the existing project of modification, Remote Open
The existing project stored in server, online modification is simultaneously preserved to server;The project data that server will be set in the period
Tentatively collected;
During the existing project stored in Remote Open server, pass through the existing project of according to keywords retrieval;Fill in item
It is index key, the local word of automatic search client according to the value actually entered in field when mesh number evidence and online modification
The project data of section institute typing, data field contents is presented in the form of combobox according to matching degree for selection;For example:
In the exploration project implementation process of 1 year, project name, annual task dispatching data will not generally change, therefore
In this monthly report data is filled in, the automatic project name quoted in form of upper month, annual task dispatching data, and support
Modification;The data that total in report data include probing, hole count, industrial hole count, mineralising hole count, the number of completed percentage
According to;
Wherein total probing=∑ (this month completes probing);
Accumulative hole count=∑ (this month completes hole count);
Hole count=industry hole count+mineralising hole count+other hole counts;
Completed percentage=total probing/year task.
Reference picture 2, it is described tentatively to collect, including project data according to unit is reconnoitred is subjected to automatically classifying and filing, then enter
One step analyze data classification, is divided into evaluating data by project data, looks into data, census data, aberration data in advance, while to this year
The combined data of full unit project, institute of every team close item purpose is spent calculate and classify automatically preserving.
(4) examination & verification collects:Client remote is opened in server by the project data tentatively collected, chooses whether to carry out
Editor, if entering edlin, enters after edlin to the project data tentatively collected and preserves to server;Otherwise directly preserve preliminary
The project data collected;
State to enter after edlin the project data tentatively collected and preserve to server, specifically include procedure below:According to big
Team's name is referred to as the project data that group subordinate project leader has been filed in index key, Auto-matching server, and
The core informations such as drilling situation, project process are intuitively presented in the form of related map on the client;To item number
According to modifying and audit;Amended report data is most audited at last uploads submission to server.
(5) monthly magazine is inquired about:Client opens the project data collected in Remote Open server by examination & verification, checks the overall situation
Project situation, every team's project situation and projects situation, and it is analyzed and examined;
When checking global project situation, every team's project situation and projects situation, in the automatic search server of client
The project data (including ore deposit situation and drilling Percent Complete are shown in probing) that all groups submit is presented in client, and carries out post
Shape figure and cake chart carry out visual analyzing to project data.
(6) system administration:Client opens the project data collected in Remote Open server by examination & verification, checks the overall situation
Project situation, every team's project situation and projects situation, and it is analyzed and examined, using block diagram, pie
Figure carries out visual analysis to data such as perforate situation, project processes;Audit the number of users that registration request is sent in server
According to.
The user data of registration request is sent in the examination & verification server, including client is obtained in server and carried automatically
The user data of registration request is handed over, authority distribution is carried out, examination & approval pass through.
Project field work data reporting system, reference picture reconnoitred based on the above method invention also provides a kind of
1, including project reporting module, examination & verification summarizing module, monthly magazine enquiry module and administrator module positioned at client, and be located at
The server database of server and preliminary summarizing module, the project reporting module, examination & verification summarizing module, monthly magazine enquiry module
It is connected respectively with server database by wireless network with administrator module, the preliminary summarizing module is directly and server count
Connected according to storehouse.
The project reporting module is provided with data referencing submodule, automatic calculating sub module and fuzzy search submodule, its
Middle data referencing submodule is used for by major key of project name automatically in server database belonging to matching entries title
The project data of project submission last month, downloads and Auto-writing is in client;The automatic calculating sub module is used for entry name
Referred to as automatic all items data of the affiliated project of matching entries title in the current year in server database of major key, under
Carry and calculate every data target automatically in client, then show;The fuzzy search submodule is used to enter field data
During row typing, field or similar field data that matching client was filled in carry out fuzzy search.
Every data target include probing rice number, drilling number, industrial hole number, mineralising hole number and complete into
Degree.
The present invention reports field and other data to report field applied to the digitlization of project field work progress data is reconnoitred,
System is installed on the mobile devices such as smart mobile phone, but is not limited only to mobile device.Project data number is reconnoitred based on mobile device
Word is reported, and is a kind of important improvement to traditional-handwork data reporting schemes.This brand-new reporting schemes, be by using
The mobile device for reconnoitring project data reporting system is installed, project data and other project datas are included and data are saved in
Realized in storehouse, be remarkably improved and reconnoitre quality and efficiency that project report data are reported.