WO2021075053A1 - エレベータの乗場敷居装置及びこれを備えたエレベータ装置 - Google Patents

エレベータの乗場敷居装置及びこれを備えたエレベータ装置 Download PDF

Info

Publication number
WO2021075053A1
WO2021075053A1 PCT/JP2019/041129 JP2019041129W WO2021075053A1 WO 2021075053 A1 WO2021075053 A1 WO 2021075053A1 JP 2019041129 W JP2019041129 W JP 2019041129W WO 2021075053 A1 WO2021075053 A1 WO 2021075053A1
Authority
WO
WIPO (PCT)
Prior art keywords
sill
building
mounting portion
side mounting
landing
Prior art date
Application number
PCT/JP2019/041129
Other languages
English (en)
French (fr)
Inventor
悠 高原
真介 石塚
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to CN201980101159.3A priority Critical patent/CN114585580B/zh
Priority to EP19948941.0A priority patent/EP4046952B1/en
Priority to US17/769,351 priority patent/US11866297B2/en
Priority to JP2021552080A priority patent/JP7279181B2/ja
Priority to PCT/JP2019/041129 priority patent/WO2021075053A1/ja
Publication of WO2021075053A1 publication Critical patent/WO2021075053A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/30Constructional features of doors or gates
    • B66B13/301Details of door sills

Definitions

  • the present invention is an elevator landing sill device for fixing a landing sill to a hoistway wall, and by closing a gap between a hoistway wall and a landing sill, a mortar used for finishing a landing floor can be removed from the gap.
  • the present invention relates to an elevator landing sill device provided with a partition member for preventing the inflow into the hoistway, and an elevator device provided with the partition member.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 2009-84029
  • Claim 1 of this Patent Document 1 states that "a landing sill arranged along the lower edge of the landing opening to guide the opening and closing operation of the landing door and a first fastening including a bolt to the hoistway wall on the landing opening side".
  • the landing sill is fixed by the second fastener including the bolt, and the landing sill is fixed by the second fastener while being sandwiched between the fixture and the landing sill.
  • a partition member that is fastened together with the fixture is provided, and the partition member closes the gap between the hoistway wall and the landing sill, so that the mortar used for finishing the landing floor can be moved into the hoistway from the gap.
  • An elevator landing sill device that prevents the vehicle from flowing into the hoistway wall, wherein the fixture is a wall-side member fixed to the hoistway wall by the first fastener and the landing threshold is provided by the second fastener.
  • the wall-side member and the sill-side member are connected so as to have a sill-side member to be fixed and the position of the sill-side member can be adjusted in the height direction and the depth direction of the hoistway.
  • the partition member has a first holding plate portion sandwiched between the hoistway wall and the wall-side member, and a second holding plate portion sandwiched between the sill-side member and the landing sill, and the first covering.
  • a bolt of the first fastener is inserted into the holding plate portion to form a first relief portion that allows the position of the first holding plate portion to be changed in the height direction with respect to the bolt, and the second holding plate portion is formed.
  • a bolt of the second fastener was inserted into the portion, and a second relief portion was formed to allow the position of the bolt to be changed in the depth direction of the hoistway with respect to the second holding plate portion. " It is shown.
  • the first sandwiched plate portion and the second sandwiched plate portion constituting the partition member are an integral body having a fixed shape, and the first sandwiched plate portion is a hoistway. Since the structure is fixed to the vertical surface of the wall by fasteners, it is difficult to install the partition member when the dimensional error of the building is large, and in some cases, the second holding plate part of the partition member is the side surface of the landing sill. The problem arises that the car travels to the hoistway side and comes into contact with the car.
  • An object of the present invention is to easily close the gap between the landing sill and the hoistway wall without the partition member protruding toward the hoistway even when the dimensional error of the building in the height direction and the depth direction of the hoistway is large. It is an object of the present invention to obtain an elevator landing sill device capable of preventing the outflow of mortar into the hoistway and an elevator device equipped with the sill device.
  • the present invention provides a hoistway provided in a building for raising and lowering a car, a landing opening provided on the hoistway side of the building, and a landing door provided along the lower edge of the landing opening.
  • An elevator landing sill device equipped with a landing sill that guides the opening and closing of the building and a fixture that is fixed to the hoistway wall of the building and has the landing sill attached to the upper part of the building.
  • a partition member for closing the gap between the two is provided, and the partition member is provided on the central plate portion, the building side mounting portion provided on one end side of the central plate portion, and the other end side of the central plate portion.
  • a car that raises and lowers the hoistway provided in the building
  • a hoisting machine that raises and lowers the car
  • the lower edge of the landing opening provided on the hoistway side of the building.
  • an elevator device provided with an elevator landing threshold device for guiding the opening and closing of a landing door, and the elevator landing threshold device is the above-mentioned elevator landing threshold device.
  • the partition member does not protrude toward the hoistway side and easily closes the gap between the landing sill and the hoistway wall. It is possible to obtain an elevator landing sill device capable of preventing the outflow of mortar into the hoistway and an elevator device equipped with the sill device.
  • FIG. 5 is a side view illustrating the configuration of the partition member shown in FIG. It is a figure explaining the structure of the partition member, and is the figure which shows the state before assembling the central plate part, the building side mounting part, and the sill side mounting part. It is a figure explaining the structure of the partition member, and is the figure which shows the state which assembled the central plate part, the building side mounting part, and the sill side mounting part. Perspective view of the partition member. The figure explaining the operation of the partition member when the gap between a building and a landing threshold is small.
  • the figure explaining the operation of the partition member when the gap between a building and a landing threshold is large It is a figure explaining another example of a partition member, and is the figure corresponding to FIG. It is a figure explaining still another example of a partition member, and is the figure corresponding to FIG.
  • the elevator device 1 has a car 4, a balance weight 5, and a main rope 6 installed in the hoistway 3 of the building 2, and a hoisting machine in the machine room 7 of the building 2. 8 is installed. Then, the main rope 6 having the car 4 connected to one end and the balance weight 5 connected to the other end is wound up by the hoisting machine 8 to move the car 4 to an arbitrary floor. Is configured to allow
  • a landing door 10 that interlocks with the opening and closing of the car door of the car 4 is installed.
  • the lower end of the landing door 10 is slidably supported by the landing threshold device A, which will be described later.
  • the depth direction of the hoistway 3 is the x direction
  • the opening / closing direction of the landing door 10 is the y direction
  • the elevating direction of the car 4 is the z direction.
  • FIG. 2 is a front view showing the elevator landing sill device shown in FIG. 1 and its surroundings
  • FIG. 3 is an enlarged side sectional view showing a portion of the elevator landing sill device shown in FIG.
  • the elevator landing sill device A in the first embodiment includes a landing sill (landing sill) 12 arranged along the lower edge 11 of the landing opening and guiding the opening / closing operation of the landing door 10.
  • a landing sill (landing sill) 12 arranged along the lower edge 11 of the landing opening and guiding the opening / closing operation of the landing door 10.
  • a plurality of fixtures 13 13A, 13B, 13C
  • three fixtures 13 13A, 13B, 13C
  • each fixture 13 is arranged side by side. Is fixed to the hoistway wall 3a by the first fastener 14.
  • the landing sill 12 is fixed to each of the fixtures 13 by the second fastener 15, and further, the wall side member 13a fixed to the hoistway wall 3a by the first fastener 14 and the second fastener.
  • the sill-side member 13b to which the landing sill 12 is fixed by 15 is connected to the sill-side member 13b by a third fastener 16.
  • the fixtures 13A, 13B, 13C all have the same configuration. The configuration will be described in detail with reference to FIG. 3 by taking the fixture 13B as an example.
  • the wall-side member 13a of the fixture 13B is fixed to the hoistway wall 3a by the first fastener 14 including the anchor bolt 14a and the nut 14b.
  • the landing sill 12 is fixed to the sill-side member 13b by a second fastener 15 including a bolt 15a and a nut 15b.
  • the wall-side member 13a and the sill-side member 13b are connected by a third fastener 16 including a bolt 16a and a nut 16b (see FIG. 2).
  • the wall-side member 13a has a plate-shaped fixing allowance 13aa that extends along the hoistway wall 3a and is fixed to the hoistway wall 3a by the first fastener 14, and a depth direction of the hoistway 3 from the fixing allowance 13aa (FIG. It has a plate-shaped connecting allowance 13ab that extends in a direction parallel to the (left-right direction of 3) and the height direction and is connected to the sill-side member 13b by the third fastener 16.
  • the sill-side member 13b has a plate-shaped connecting allowance 13bb which is arranged so as to overlap the connecting allowance 13ab of the wall-side member 13a and is connected by the third fastener 16, and the depth of the hoistway 3 in the left-right direction from the connecting allowance 13bb. It spreads in a direction parallel to the direction and has a plate-shaped mounting allowance 13ba in which the landing sill 12 is fastened by the second fastener 15.
  • a bolt insertion portion 13ac through which the anchor bolt 14a of the first fastener 14 is inserted is formed in the fixing allowance 13aa of the wall side member 13a.
  • the bolt insertion portion 13ac is formed in a long hole long in the longitudinal direction (y direction; the left-right direction in FIG. 2) of the landing threshold 12, whereby the anchor bolt 14a is landed on the fixing allowance 13aa. It is permissible to change the position of the threshold 12 in the longitudinal direction.
  • a plurality of, for example, three bolt insertion portions 13ac are provided side by side at equal intervals in the height direction (z direction).
  • a bolt insertion portion 13ad through which the bolt 16a of the third fastener 16 is inserted is formed in the connection allowance 13ab of the wall side member 13a.
  • the bolt insertion portion 13ad is formed in a long hole long in the depth direction (x direction) of the hoistway 3. As a result, the relative position of the bolt 16a and the wall-side member 13a in the depth direction of the hoistway 3 can be changed.
  • a bolt insertion portion 13bc through which the bolt 16a of the third fastener 16 is inserted is also formed in the connection allowance 13bb of the sill side member 13b.
  • the bolt insertion portion 13bc is formed in a long hole long in the height direction (z direction).
  • the relative positions of the bolt 16a and the sill-side member 13b can be changed in the height direction. That is, the position of the sill-side member 13b can be adjusted by the bolt insertion portions 13ad and 13bc in each of the height direction and the depth direction (x direction; the left-right direction in FIG. 3) of the hoistway 3.
  • the wall side member 13a and the sill side member 13b are connected.
  • a partition member 20 is provided so as to close the gap between the landing threshold 12 and the hoistway wall 3a of the building 2.
  • the partition member 20 has a hinge structure composed of a central plate portion 21, a building-side mounting portion 22 and a sill-side mounting portion 23 rotatably attached to both sides of the central plate portion 21.
  • the building side mounting portion 22 is fixed to the hoistway wall 3a of the building by anchor bolts (building side fasteners) 24, and the sill side mounting portion 23 is fixed to the lower surface of the landing sill 12 by bolts (sill side fasteners) 25. It is attached to.
  • the partition member 20 closes the gap between the landing sill 12 and the hoistway wall 3a of the building 2, and the mortar 30 poured in to make the upper surface of the landing sill 12 and the floor of the landing at the same height is the hoistway. It is designed to prevent the outflow to the inside of 3 (see FIG. 1).
  • floor finishing members such as carpets, tiles, and flooring that form the floor are laid on the upper surface of the mortar 30. Further, since a heavy object such as a trolley may pass through the landing opening in addition to a person, the deformation of the partition member 20 is within the allowable value even if a heavy object with the maximum allowable load that can be transported by the elevator passes. As described above, the thickness or strength of the partition member is determined.
  • 31 is a three-sided frame installed at the landing opening.
  • the width dimension inside the three-sided frame 31 and the width dimension of the landing opening are substantially the same, and the width of the partition member 20 is set to be substantially equal to the width dimension of the landing opening.
  • FIG. 4 is a side view illustrating the configuration of the partition member 20 shown in FIG.
  • the partition member 20 includes a central plate portion 21, a building-side mounting portion 22 attached to the hoistway wall 3a, and a sill-side mounting portion 23 attached to the lower surface of the landing sill 12.
  • the building side mounting portion 22 is rotatably attached to one end side of the central plate portion 21 via a shaft 26, and the sill side is rotatably attached to the other end side of the central plate portion 21 via a shaft 27.
  • the mounting portion 23 is rotatably mounted.
  • the sill-side mounting portion 23 is fixed to a predetermined position on the lower surface of the landing sill 12 by bolts 25. It is preferable that the sill-side mounting portion 23 is configured so that a gap is not formed in contact with the sill over the entire range in the left-right direction (y direction) in contact with the sill 12. Further, the building-side mounting portion 22 may also be configured so that a gap is not formed in contact with the hoistway wall 3a over the entire range in the left-right direction (y direction) in contact with the hoistway wall 3a. If it is unavoidable that a gap is formed between the sill-side mounting portion 23 and the landing sill 12, or between the building-side mounting portion 22 and the hoistway wall 3a, the gap is closed. It is advisable to provide a member, for example, a vinyl sheet or the like.
  • the positional relationship between the landing sill 12 and the building 2 is not constant, and due to a dimensional error in the building 2, the dimensions between the hoistway wall 3a and the landing sill 12 vary.
  • the position of the building-side mounting portion 22 is set to the hoistway wall 3a. It can be freely changed according to the dimension between the landing threshold 12 and the landing threshold 12. Therefore, regardless of the dimension between the hoistway wall 3a and the landing threshold 12, the building side mounting portion 22 can be moved up and down so as to be brought into close contact with the hoistway wall 3a. If the anchor bolt 24 is driven into the hoistway wall 3a corresponding to the building side mounting portion 22, the anchor bolt 24 makes it possible to securely fix the building side mounting portion 22 to the hoistway wall 3a.
  • FIG. 5 is a diagram for explaining the configuration of the partition member 20, a diagram showing a state before assembling the central plate portion 21, the building side mounting portion 22, and the sill side mounting portion 23, and FIG.
  • FIG. 7 is a view showing a state in which the portion 22 and the sill-side mounting portion 23 are assembled, and FIG. 7 is a perspective view of the assembled partition member 20.
  • a plurality of pipe portions 21a through which the shafts 26 and 27 penetrate are provided on both sides of the central plate portion 21 (in this example, two pipe portions 21a are provided on each side). Further, in the building side mounting portion 22 and the sill side mounting portion 23, the pipe portions 22a, 23a through which the shafts 26, 27 penetrate at positions that do not interfere with the pipe portion 21a on the side connected to the central plate portion 21. Are provided in plurality (three in this example). 22b is a bolt hole through which the anchor bolt 24 shown in FIG. 4 penetrates, 23b is a bolt hole through which the bolt 25 shown in FIG. 4 penetrates, and bolt holes 22b and 23b are the longitudinal directions of the partition member 20 (landing threshold). A plurality of bolts (three each in this example) are provided in each of the twelve longitudinal directions (y direction).
  • the central plate portion 21, the building side mounting portion 22, and the sill side mounting portion 23 are combined, and the shafts 26 and 27 refer to the central plate portion 21 with respect to the building side mounting portion 22 and the sill side mounting portion 22 and the above.
  • the sill-side mounting portion 23 is rotatably assembled.
  • FIG. 7 shows a perspective view of the partition member 20 in this assembled state.
  • the shaft 26 extending from one end to the other end of the partition member 20 penetrates the pipe portion 22a of the building side mounting portion 22 and the pipe portion 21a of the central plate portion 21, so that the building side mounting portion 22 rotates with respect to the central plate portion 21. It is attached freely.
  • the shaft 27 extending from one end to the other end of the partition member 20 penetrates the pipe portion 23a of the sill side mounting portion 23 and the pipe portion 21a of the central plate portion 21, so that the sill side mounting portion 23 with respect to the central plate portion 21 Is rotatably attached.
  • the shafts 26 and 27 are prevented from coming off from the partition member 20.
  • FIG. 8 is a diagram for explaining the operation of the partition member 20 when the gap between the building 2 and the landing sill 12 is small, and the dimension between the hoistway wall 3a and the landing sill 12 is small due to the dimensional error of the building.
  • the building-side mounting portion 22 is moved to the lower side of the hoistway wall 3a so that it can be brought into close contact with the hoistway wall 3a.
  • Anchor bolts 24 are driven into the hoistway wall 3a at a position corresponding to the bolt holes 22b of the building side mounting portion 22 in this state, and the anchor bolts 24 attach the building side mounting portion 22 to the hoistway wall 3a. It can be securely adhered and fixed.
  • FIG. 9 is a diagram for explaining the operation of the partition member 20 when the gap between the building 2 and the landing sill 12 is large.
  • the building side mounting By moving the position of the building side mounting portion 22 by the shafts 26 and 27 upward as compared with the case shown in FIG. 8 so that the portion 22 can be brought into close contact with the hoistway wall 3a. , The building side mounting portion 22 can be brought into close contact with the hoistway wall 3a.
  • the building side mounting portion 22 is hoisted by the anchor bolt 24. It can be securely adhered to the wall 3a and fixed.
  • the position of the building side mounting portion 22 can be freely changed by the two shafts 26 and 27 according to the dimensions between the hoistway wall 3a and the landing threshold 12. Can be done. Therefore, if the building side mounting portion 22 is set at a position where it can be brought into close contact with the hoistway wall 3a and the anchor bolts 24 are driven into the building 2, regardless of the dimensions between the hoistway wall 3a and the landing threshold 12. , The partition member 20 can always be fixed in close contact with the hoistway wall 3a and the landing threshold 12. Thereby, according to the present embodiment, it is possible to easily and surely close the gap between the hoistway wall 3a and the landing threshold 12.
  • FIG. 10 is a diagram for explaining another example of the partition member 20, and is a diagram corresponding to FIG.
  • the partition member 20 shown in FIG. 10 is provided with a plurality of pipe portions 21a for inserting shafts on both sides of the central plate portion 21 (two on each side in this example). Further, the building side mounting portion 22 and the sill side mounting portion 23 are provided with a plurality of pipe portions 22a and 23a (two in this example) at positions that do not interfere with the pipe portion 21a of the central plate portion 21. .. Further, shaft portions 22c and 23c for inserting into the pipe portion 21a are fixed to the pipe portions 22a and 23a, respectively.
  • the shaft portion 22c It is necessary to form an axial gap equal to or longer than the length of the shaft portion 22c protruding from the pipe portion 22a so that the can be inserted into the pipe portion 21a. Therefore, in this example, the axial length of the pipe portion 22a or the pipe portion 21a is shorter than that shown in FIG. 5, and a gap is formed between the pipe portions 21a and 22a after assembly.
  • a shaft portion is also inserted between the pipe portion 22c side of the pipe portion 23a of the sill side mounting portion 23 inserted between the pipe portions 21a of the central plate portion 21 and the pipe portion 21a of the central plate portion 21.
  • An axial gap equal to or longer than the length of the shaft portion 23c protruding from the pipe portion 23a is formed so that the 23c can be inserted into the pipe portion 21a.
  • the partition member 20 is installed between the building 2 and the landing threshold 12, and when the mortar 30 is poured, if there is a possibility that the mortar 30 leaks from the gap into the hoistway 3, the gap is closed. It is preferable to provide the member on the partition member 20.
  • the bolt holes 22b and 23b provided in the building side mounting portion 22 and the sill side mounting portion 23 of the partition member 20 are formed in a circular shape, but as shown in FIG. 11, the building side is formed.
  • the mounting portion 22 and the sill-side mounting portion 23 may be formed into long holes that are long in the lateral direction (direction perpendicular to the axes 26 and 27).
  • FIG. 11 is a diagram for explaining still another example of the partition member 20, and is a diagram corresponding to FIG.
  • the hoistway wall 3a and the landing sill 12 are formed. Even if there are variations in the dimensions between them, the relative positions of the anchor bolts 24 and the bolt holes 22b, or the relative positions of the bolts 25 and the bolt holes 23b, depending on the dimensions between the hoistway wall 3a and the landing threshold 12.
  • the building side mounting portion 22 can be brought into close contact with the hoistway wall 3a, and the sill side mounting portion 23 can be brought into close contact with the landing sill 12. Therefore, even after the anchor bolts 24 are placed in the building 2, the building side mounting portion 22 can be fixed to the hoistway wall 3a and the sill side mounting portion 23 can be fixed to the landing sill 12. ..
  • the partition member 20 is always used regardless of the dimension between the hoistway wall 3a and the landing threshold 12.
  • the hoistway wall 3a and the landing threshold 12 can be brought into close contact with each other and fixed. Therefore, in the example shown in FIG. 11, it is possible to more easily and surely close the gap between the hoistway wall 3a and the landing threshold 12.
  • the building side mounting portion 22 of the partition member 20 is brought into close contact with the hoistway wall 3a and the sill side. Since the mounting portion 23 can be easily brought into close contact with the lower surface of the landing sill 12, the partition member 20 can close the gap between the hoistway wall 3a and the landing sill 12. Therefore, in order to finish the landing floor, the mortar 30 poured into the landing floor side of the landing threshold 12 is prevented from flowing into the hoistway 3 through the gap between the hoistway wall 3a and the landing threshold 12. Can be done.
  • the partition member 20 can be easily moved up and down. Since the gap between the road wall 3a and the landing threshold 12 can be closed, it is possible to prevent the partition member from traveling from the side surface of the landing threshold to the hoistway 3 side as in the conventional case.
  • the partition member 20 is composed of three pieces, the central plate portion 21, the building side mounting portion 22, and the sill side mounting portion 23, but the partition member 20 is formed by using a plurality of central plate portions 21. It may be composed of a total of four or more members.
  • the central plate portion 21 is not limited to a flat plate, and may be, for example, a corrugated plate.
  • the building side mounting portion 22 and the sill side mounting portion 23 are not limited to the rectangular plate material, and may be configured to have only the mounting portion leaving the peripheral portions of the bolt holes 22b and 23b. Further, in the above embodiment, as shown in FIGS.
  • the building side mounting portion 22 is fixed to the hoistway wall 3a, and the sill side mounting portion 23 is fixed to the lower surface of the landing sill 12. Is not limited to these locations, and the building-side mounting portion 22 may be fixed to the upper surface of the building 2, or the sill-side mounting portion 23 may be fixed to the side surface of the landing sill 12. Further, the above-described embodiment has been described in detail in order to explain the present invention in an easy-to-understand manner, and is not necessarily limited to the one including all the described configurations.

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

エレベータの乗場敷居装置は、乗り場開口の下縁に沿って設けられた乗場敷居と、建屋の昇降路壁に固定され、前記乗場敷居を取り付けた固定具を備える。また、乗場敷居と昇降路壁の間の間隙を塞ぐ仕切部材を備え、この仕切部材は、中央板部と、中央板部の一端側に設けられた建屋側取付部と、中央板部の他端側に設けられた敷居側取付部と、中央板部と建屋側取付部とを回転可能に固定する建屋側回転部と、中央板部と敷居側取付部とを回転可能に固定する敷居側回転部を備える。更に、建屋側取付部を建屋に固定する建屋側締結具と、敷居側取付部を乗場敷居に固定する敷居側締結具を備える。

Description

エレベータの乗場敷居装置及びこれを備えたエレベータ装置
 本発明は、乗場敷居を昇降路壁に固定するエレベータの乗場敷居装置であって、昇降路壁と乗場敷居との間の間隙を塞ぐことによって、乗場床の仕上げに用いられるモルタルが前記間隙から昇降路内に流入するのを阻止する仕切部材を備えたエレベータの乗場敷居装置及びこれを備えたエレベータ装置に関するものである。
 従来のエレベータの乗場敷居装置としては特開2009-84029号公報(特許文献1)に記載されたものなどがある。
 この特許文献1の請求項1には、「乗場開口の下縁に沿って配置され乗場戸の開閉動作を案内する乗場敷居と、前記乗場開口側の昇降路壁に対しボルトを含む第1締結具により固定されるとともに、ボルトを含む第2締結具により前記乗場敷居が固定される固定具と、この固定具と前記乗場敷居に挟まれた状態で前記第2締結具により前記乗場敷居とともに前記固定具に共締めされる仕切部材とを備え、前記仕切部材が前記昇降路壁と前記乗場敷居との間の間隙を塞ぐことによって、乗場床の仕上げに用いられるモルタルがその間隙から昇降路内に流入するのを阻止するエレベータの乗場敷居装置であって、前記固定具は、前記昇降路壁に前記第1締結具により固定される壁側部材と、前記第2締結具により前記乗場敷居が固定される敷居側部材とを有し、高さ方向および昇降路の奥行方向の前記敷居側部材の位置調整が可能となるように、前記壁側部材と前記敷居側部材とが連結され、前記仕切部材は、前記昇降路壁と前記壁側部材に挟まれる第1被挟持板部と、前記敷居側部材と前記乗場敷居に挟まれる第2被挟持板部とを有し、前記第1被挟持板部には、前記第1締結具のボルトが挿通されこのボルトに対する高さ方向の前記第1被挟持板部の位置変更を許容する第1逃げ部が形成され、前記第2被挟持板部には、前記第2締結具のボルトが挿通されこのボルトの前記第2被挟持板部に対する昇降路の奥行方向の位置変更を許容する第2逃げ部が形成された」エレベータの乗場敷居装置が示されている。
特開2009-84029号公報
 しかし、特許文献1に記載の乗場敷居装置では、仕切部材を構成する第1被挟持板部と第2被挟持板部が形状固定の一体物であると共に、第1被挟持板部は昇降路壁の垂直面に締結具により固定される構造であることから、建屋の寸法誤差が大きい場合に仕切部材の設置が困難となり、場合によっては仕切部材の第2被挟持板部が乗場敷居の側面から昇降路側に出張ってしまい、乗りかごと接触するという課題が生じる。
 本発明の目的は、高さ方向および昇降路の奥行き方向の建屋の寸法誤差が大きい場合であっても、仕切部材が昇降路側に出っ張ることなく乗場敷居と昇降路壁の間隙を容易に塞ぐことができ、昇降路内へのモルタルの流出も防止することのできるエレベータの乗場敷居装置及びこれを備えたエレベータ装置を得ることにある。
 上記目的を達成するため、本発明は、建屋に設けられ乗りかごが昇降する昇降路と、前記建屋の昇降路側に設けられた乗り場開口と、この乗り場開口の下縁に沿って設けられ乗場ドアの開閉を案内する乗場敷居と、前記建屋の昇降路壁に固定され、上部に前記乗場敷居を取り付けた固定具を備えているエレベータの乗場敷居装置であって、前記乗場敷居と前記昇降路壁の間の間隙を塞ぐ仕切部材を備え、前記仕切部材は、中央板部と、前記中央板部の一端側に設けられた建屋側取付部と、前記中央板部の他端側に設けられた敷居側取付部と、前記中央板部と前記建屋側取付部とを回転可能に固定する建屋側回転部と、前記中央板部と前記敷居側取付部とを回転可能に固定する敷居側回転部を備え、更に前記建屋側取付部を前記建屋に固定する建屋側締結具と、前記敷居側取付部を前記乗場敷居に固定する敷居側締結具を備えることを特徴とする。
 本発明の他の特徴は、建屋に設けられた昇降路を昇降する乗りかごと、前記乗りかごを昇降させる巻上機と、前記建屋の昇降路側に設けられた乗り場開口の下縁に沿って設けられ乗場ドアの開閉を案内するエレベータの乗場敷居装置を備えるエレベータ装置であって、前記エレベータの乗場敷居装置は上述したエレベータの乗場敷居装置であることを特徴とする。
 本発明によれば、高さ方向および昇降路の奥行き方向の建屋の寸法誤差が大きい場合であっても、仕切部材が昇降路側に出っ張ることなく乗場敷居と昇降路壁の間隙を容易に塞ぐことができ、昇降路内へのモルタルの流出も防止することのできるエレベータの乗場敷居装置及びこれを備えたエレベータ装置を得ることができる効果がある。
エレベータ装置の概略断面図。 図1に示すエレベータの乗場敷居装置とその周辺を示す正面図。 図2に示すエレベータの乗場敷居装置の部分を拡大して示す側断面図。 図3に示す仕切部材の構成を説明する側面図。 仕切部材の構成を説明する図で、中央板部、建屋側取付部及び敷居側取付部を組み立てる前の状態を示す図。 仕切部材の構成を説明する図で、中央板部、建屋側取付部及び敷居側取付部を組み立てた状態を示す図。 仕切部材の斜視図。 建屋と乗場敷居との隙間が小さい場合における仕切部材の動作を説明する図。 建屋と乗場敷居との隙間が大きい場合における仕切部材の動作を説明する図。 仕切部材の他の例を説明する図で、図5に相当する図。 仕切部材の更に他の例を説明する図で、図6に相当する図。
 以下、本発明のエレベータの乗場敷居装置の具体的実施例を図面に基づいて説明する。各図において、同一符号を付した部分は同一或いは相当する部分を示している。
 まず、図1の概略断面図を用いて、本発明が適用される一般的なエレベータ装置の構成を説明する。この図1に示すように、エレベータ装置1は、建屋2の昇降路3内に、乗りかご4、釣合いおもり5、主ロープ6を設置し、また、建屋2の機械室7内に巻上機8を設置している。そして、一端に前記乗りかご4を連結し、他端に前記釣合いおもり5を連結した前記主ロープ6を、前記巻上機8で巻き上げることで、乗りかご4を任意の階床に移動させることができるように構成されている。
 また、各階床の乗場9の昇降路3側には、乗りかご4のかごドアの開閉と連動する乗場ドア10が設置されている。この乗場ドア10の下端は、後述する乗場敷居装置Aにより摺動可能に支持されている。
  なお、以下では、昇降路3の奥行方向をx方向、乗場ドア10の開閉方向をy方向、乗りかご4の昇降方向をz方向とする。
 次に、図1に示すエレベータ装置の各階におけるエレベータの乗場敷居装置について図2及び図3を用いて説明する。図2は図1に示すエレベータの乗場敷居装置とその周辺を示す正面図、図3は図2に示すエレベータの乗場敷居装置の部分を拡大して示す側断面図である。
 図2に示すように、本実施例1におけるエレベータの乗場敷居装置Aは、乗場開口の下縁11に沿って配置され乗場ドア10の開閉動作を案内する乗場敷居(乗場シル)12を備えている。乗場開口側の昇降路壁3aには、乗場敷居12の長手方向に沿って複数個、例えば3個の固定具13(13A,13B,13C)が並んで配置されていて、それぞれの固定具13は、第1締結具14により昇降路壁3aに固定されている。また、それぞれの固定具13には、第2締結具15により乗場敷居12が固定され、更に、前記第1締結具14により昇降路壁3aに固定される壁側部材13aと、第2締結具15により乗場敷居12が固定される敷居側部材13bとは、第3締結具16により連結されている。
 前記固定具13A,13B,13Cはすべて同じ構成である。その構成について固定具13Bを例に挙げて図3により詳細に説明する。図3に示すように、固定具13Bの前記壁側部材13aは、アンカーボルト14aおよびナット14b含む第1締結具14により昇降路壁3aに固定されている。前記敷居側部材13bには、ボルト15aおよびナット15bを含む第2締結具15により乗場敷居12が固定されている。前記壁側部材13aと前記敷居側部材13bとは、ボルト16aおよびナット16b(図2参照)を含む第3締結具16により連結されている。
 前記壁側部材13aは、昇降路壁3aに沿って広がり第1締結具14により昇降路壁3aに固定される板状の固定代13aaと、この固定代13aaから昇降路3の奥行方向(図3の左右方向)と高さ方向とに平行な方向に広がり、第3締結具16により敷居側部材13bに連結される板状の連結代13abとを有する。
 前記敷居側部材13bは、壁側部材13aの連結代13abに重ねて配置され第3締結具16により連結される板状の連結代13bbと、この連結代13bbから左右方向と昇降路3の奥行方向とに平行な方向に広がり、乗場敷居12が第2締結具15により締結される板状の取付代13baとを有する。
 前記壁側部材13aの固定代13aaには、第1締結具14のアンカーボルト14aが挿通されるボルト挿通部13acが形成されている。図2に示すように、前記ボルト挿通部13acは、乗場敷居12の長手方向(y方向;図2の左右方向)に長い長孔に形成され、これによって、固定代13aaに対するアンカーボルト14aの乗場敷居12の長手方向の位置変更が許容されている。また、このボルト挿通部13acは、図2に示すように、高さ方向(z方向)に複数、例えば3つ等間隔に並んで設けられている。
 前記壁側部材13aの連結代13abには、第3締結具16のボルト16aが挿通されるボルト挿通部13adが形成されている。このボルト挿通部13adは昇降路3の奥行方向(x方向)に長い長孔に形成されている。これにより、昇降路3の奥行方向におけるボルト16aと壁側部材13aとの相対的位置の変更が許容されている。
 敷居側部材13bの連結代13bbにも、第3締結具16のボルト16aが挿通されるボルト挿通部13bcが形成されている。このボルト挿通部13bcは高さ方向(z方向)に長い長孔に形成されている。これにより、ボルト16aと敷居側部材13bとの高さ方向の相対的位置の変更が許容されるようになっている。つまり、ボルト挿通部13ad,13bcによって、高さ方向および昇降路3の奥行方向(x方向;図3の左右方向)のそれぞれの方向に対し敷居側部材13bの位置調整が可能となるように、壁側部材13aと敷居側部材13bとが連結されている。
 図2、図3に示すように、前記乗場敷居12と建屋2の昇降路壁3aとの間の隙間を塞ぐように仕切部材20が設けられている。この仕切部材20は、中央板部21と、この中央板部21の両側に回動自在に取り付けられた建屋側取付部22及び敷居側取付部23により丁番構造に構成されている。また、前記建屋側取付部22はアンカーボルト(建屋側締結具)24により建屋の昇降路壁3aに固定され、前記敷居側取付部23はボルト(敷居側締結具)25により乗場敷居12の下面に取り付けられている。この仕切部材20により、前記乗場敷居12と建屋2の昇降路壁3aとの間の隙間を塞ぎ、乗場敷居12の上面と乗場の床面を同じ高さにするために流し込むモルタル30が昇降路3内(図1参照)に流出するのを防止するようにしている。
 なお、図示はしていないが、前記モルタル30の上表面には床面を形成する絨毯、タイル、フローリングなどの床面仕上部材が敷設される。また、乗場開口からは人以外に台車等の重量物も通過することがあるので、エレベータで搬送可能な許容最大荷重の重量物が通過しても前記仕切部材20の変形が許容値以内に収まるように前記仕切部材の厚さまたは強度が決められている。
 図2、図3において、31は乗場開口に設置される三方枠である。この三方枠31の内側の幅寸法と前記乗場開口の幅寸法はほぼ同じであり、前記仕切部材20の幅は乗場開口の幅寸法とほぼ等しく設定されている。
 次に、図4~図7を用いて、上述した仕切部材20の具体的構成について説明する。
  図4は図3に示す仕切部材20の構成を説明する側面図である。この図4に示すように、仕切部材20は、中央板部21と、昇降路壁3aに取り付けられる建屋側取付部22と、乗場敷居12の下面に取り付けられる敷居側取付部23を備えている。また、前記中央板部21の一端側には軸26を介して前記建屋側取付部22が回動自在に取り付けられ、前記中央板部21の他端側には軸27を介して前記敷居側取付部23が回動自在に取り付けられている。
 前記敷居側取付部23は前記乗場敷居12下面の所定位置にボルト25により固定されている。なお、前記敷居側取付部23は、前記乗場敷居12と接する左右方向(y方向)の全範囲に亘って前記乗場敷居と接して隙間が形成されないように構成すると良い。また、前記建屋側取付部22も、前記昇降路壁3aと接する左右方向(y方向)の全範囲に亘って前記昇降路壁3aと接して隙間が形成されないように構成すると良い。前記敷居側取付部23と前記乗場敷居12との間、或いは前記建屋側取付部22と前記昇降路壁3aとの間に隙間が形成されてしまうのを回避できない場合には、その隙間を塞ぐ部材、例えばビニールシート等を設けるようにすると良い。
 前記乗場敷居12と前記建屋2との位置関係は一定ではなく、建屋2の寸法誤差のために、昇降路壁3aと乗場敷居12との間の寸法にはばらつきが生じる。本実施例の仕切部材20は2つの軸26,27により、前記敷居側取付部23を乗場敷居12に固定した状態であっても、前記建屋側取付部22の位置を、昇降路壁3aと乗場敷居12との間の寸法に応じて自由に変えることができる。従って、昇降路壁3aと乗場敷居12との間の寸法が如何なる状態であっても、前記建屋側取付部22を上下に移動させて前記昇降路壁3aに密着させることができる状態として、その建屋側取付部22に対応する昇降路壁3aにアンカーボルト24を打設すれば、このアンカーボルト24により、前記建屋側取付部22を昇降路壁3aに確実に固定することが可能となる。
 このようにして、前記仕切部材20を昇降路壁3aと乗場敷居12に固定した後、図3、図4に示すように、モルタル30を流し込めば、モルタル30が昇降路3内に流出するのを前記仕切部材20により防止することができる。
 次に、前記仕切部材20の構成を図5~図7を用いて説明する。図5は仕切部材20の構成を説明する図で、中央板部21、建屋側取付部22及び敷居側取付部23を組み立てる前の状態を示す図、図6は中央板部21、建屋側取付部22及び敷居側取付部23を組み立てた状態を示す図、図7は組み立てられた仕切部材20の斜視図である。
 図5に示すように、中央板部21の両側には軸26,27が貫通する管部21aが複数個(この例では両側にそれぞれ2個づつ)設けられている。また、建屋側取付部22と敷居側取付部23には、前記中央板部21と連結される側で前記管部21aと干渉しない位置に、前記軸26,27が貫通する管部22a,23aがそれぞれ複数個(この例では3個)設けられている。
  なお、22bは図4に示す前記アンカーボルト24が貫通するボルト孔、23bは図4に示す前記ボルト25が貫通するボルト孔であり、ボルト孔22b,23bは仕切部材20の長手方向(乗場敷居12の長手方向;y方向)にそれぞれ複数個(この例ではそれぞれ3個づつ)設けられている。
 前記中央板部21、建屋側取付部22、敷居側取付部23は図6に示すように、組み合わされ、軸26,27により、前記中央板部21に対し、前記建屋側取付部22及び前記敷居側取付部23が回動自在に組み立てられる。
 この組み立てられた状態の仕切部材20の斜視図を図7に示す。仕切部材20の一端から他端まで延びる軸26が建屋側取付部22の管部22aと中央板部21の管部21aに貫通することにより、中央板部21に対し建屋側取付部22が回動自在に取り付けられている。また、仕切部材20の一端から他端まで延びる軸27が敷居側取付部23の管部23aと中央板部21の管部21aに貫通することにより、中央板部21に対し敷居側取付部23が回動自在に取り付けられている。なお、前記軸26,27は仕切部材20から外れないように抜け止めが施されている。
 次に、上記仕切部材20を建屋2と乗場敷居12との間に取り付ける際の仕切部材20の動作を図8、図9を用いて説明する。
  図8は建屋2と乗場敷居12との隙間が小さい場合における仕切部材20の動作を説明する図で、建屋の寸法誤差のために、昇降路壁3aと乗場敷居12との間の寸法が小さい場合には、敷居側取付部23を乗場敷居12に取り付けた状態で、前記建屋側取付部22を昇降路壁3aの下方側に移動させて前記昇降路壁3aに密着できるようにする。この状態での建屋側取付部22のボルト孔22bに対応する位置の昇降路壁3aにアンカーボルト24を打設して、このアンカーボルト24により、前記建屋側取付部22を昇降路壁3aに確実に密着させて固定することができる。
 図9は建屋2と乗場敷居12との隙間が大きい場合における仕切部材20の動作を説明する図で、昇降路壁3aと乗場敷居12との間の寸法が大きい場合には、前記建屋側取付部22が前記昇降路壁3aに密着させることができるように、軸26,27により建屋側取付部22の位置を、図8に示した場合に比べて上方に移動させて位置決めをすることにより、建屋側取付部22を昇降路壁3aに密着させることができる。この密着させた状態での建屋側取付部22のボルト孔22bに対応する位置の昇降路壁3aにアンカーボルト24を打設することにより、前記アンカーボルト24により前記建屋側取付部22を昇降路壁3aに確実に密着させて固定できる。
 このように、本実施例の仕切部材20は、2つの軸26,27により前記建屋側取付部22の位置を、昇降路壁3aと乗場敷居12との間の寸法に応じて自由に変えることができる。従って、前記建屋側取付部22を前記昇降路壁3aに密着できる位置に設定してアンカーボルト24を建屋2に打設すれば、昇降路壁3aと乗場敷居12との間の寸法にかかわらず、常に仕切部材20を昇降路壁3aと乗場敷居12に密着させて固定することが可能となる。これにより、本実施例によれば、昇降路壁3aと乗場敷居12との間の隙間を容易且つ確実に塞ぐことが可能となる。
 なお、上述した実施例では、仕切部材20の中央板部21と建屋側取付部22を接続する軸26、及び前記中央板部21と敷居側取付部23を接続する軸27は、それぞれ1本の別部材で構成した例を説明したが、図10に示す構成としても良い。図10は仕切部材20の他の例を説明する図で、図5に相当する図である。
 この図10に示す仕切部材20は、中央板部21の両側には軸を挿入するための管部21aがそれぞれ複数個(この例では両側にそれぞれ2個づつ)設けられている。また、建屋側取付部22と敷居側取付部23には、前記中央板部21の管部21aと干渉しない位置に管部22a,23aがそれぞれ複数個(この例では2個)設けられている。更に、各管部22a,23aには、前記管部21aに挿入するための軸部22c,23cがそれぞれ固定されている。
 このような構成とすることにより、各軸部22c,23cを中央板部21の管部21aにそれぞれ挿入することにより、建屋側取付部22と敷居側取付部23を中央板部21に対し回動自在に取り付けることができる。
 なお、中央板部21の管部21aの間に挿入される建屋側取付部22の管部22aの反軸部22c側と、中央板部21の管部21aとの間には、軸部22cを管部21aに挿入できるように、管部22aから突出している軸部22cの長さと同等以上の軸方向隙間が形成されるようにする必要がある。従って、この例では、前記管部22aまたは管部21aの軸方向長さが図5に示すものより短くなり、組立て後には管部21aと22aとの間に隙間が形成される。
 同様に、中央板部21の管部21aの間に挿入される敷居側取付部23の管部23aの反軸部22c側と、中央板部21の管部21aとの間にも、軸部23cを管部21aに挿入できるように、管部23aから突出している軸部23cの長さと同等以上の軸方向隙間が形成されるようにする。
 仕切部材20を前記建屋2と前記乗場敷居12との間に設置し、モルタル30を流し込む際に、モルタル30が前記隙間から昇降路3内に漏れる可能性がある場合には、その隙間を塞ぐ部材を仕切部材20に設けるようにすると良い。
 また、上述した実施例では、仕切部材20の建屋側取付部22と敷居側取付部23に設けているボルト孔22b,23bを円形に形成しているが、図11に示すように、建屋側取付部22と敷居側取付部23の短手方向(軸26,27に対し直角方向)に長い長孔に形成しても良い。図11は仕切部材20の更に他の例を説明する図で、図6に相当する図である。
 この図11に示すように、ボルト孔22b,23bを、建屋側取付部22と敷居側取付部23の短手方向に長い長孔に形成することにより、昇降路壁3aと乗場敷居12との間の寸法にばらつきがあっても、昇降路壁3aと乗場敷居12との間の寸法に応じて、アンカーボルト24とボルト孔22bとの相対位置、或いはボルト25とボルト孔23bとの相対位置を自由に変えることができ、これにより建屋側取付部22を昇降路壁3aに、敷居側取付部23を乗場敷居12にそれぞれ密着させることができる。従って、アンカーボルト24を建屋2に打設した後であっても、建屋側取付部22を昇降路壁3aに、敷居側取付部23を乗場敷居12に密着させて固定することが可能となる。
 このように、図11の例によれば、アンカーボルト24を建屋2に打設した後であっても、昇降路壁3aと乗場敷居12との間の寸法にかかわらず、常に仕切部材20を昇降路壁3aと乗場敷居12に密着させて固定することが可能となる。従って、図11に示す例とすれば、昇降路壁3aと乗場敷居12との間の隙間を更に容易且つ確実に塞ぐことが可能となる。
 以上説明した本実施例によれば、昇降路壁3aと乗場敷居12との間の寸法にばらつきがあっても、仕切部材20の建屋側取付部22を昇降路壁3aに密着させ、敷居側取付部23を乗場敷居12の下面に密着させることが容易に可能となるので、仕切部材20により昇降路壁3aと乗場敷居12との間の間隙を塞ぐことができる。従って、乗場床の仕上げのために、乗場敷居12の乗場床側に流し込まれるモルタル30が、昇降路壁3aと乗場敷居12との間の間隙から昇降路3内に流入するのを防止することができる。
 また、本実施例によれば、高さ方向(z方向)および昇降路3の奥行き方向(x方向)の建屋の寸法誤差が比較的大きい場合にも、仕切部材20を容易に対応させて昇降路壁3aと乗場敷居12との間の間隙を塞ぐことができるので、従来のように仕切部材が乗場敷居の側面から昇降路3側に出張ることも防ぐことができる。
 なお、本発明は上述した実施例に限定されるものではなく、様々な変形例が含まれる。
  例えば、上述した実施例では、仕切部材20を中央板部21、建屋側取付部22及び敷居側取付部23の3枚で構成しているが、中央板部21を複数枚として仕切部材20を合計4枚以上の部材で構成しても良い。また、中央板部21は平板には限らず例えば波板でも良い。更に、建屋側取付部22や敷居側取付部23も長方形の板材には限らず、ボルト孔22b,23bの周辺部を残した取付部分のみ有する構成としても良い。
  また、上記実施例では、図3、図4に示したように、建屋側取付部22を昇降路壁3aに、敷居側取付部23を乗場敷居12の下面に固定しているが、固定箇所はこれらの箇所に限られず、建屋側取付部22を建屋2の上面に固定したり、敷居側取付部23を乗場敷居12の側面に固定するようにしても良い。
  また、上記した実施例は本発明を分かり易く説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。
 1:エレベータ装置、2:建屋、3:昇降路、3a:昇降路壁、4:乗りかご、5:釣合いおもり、6:主ロープ、7:機械室、8:巻上機、9:乗場、10:乗場ドア、11:下縁、12:乗場敷居、13(13A,13B,13C):固定具、13a:壁側部材、13aa:固定代、13ab:連結代、13ac,13ad:ボルト挿通部、13b:敷居側部材、13ba:取付代、13bb:連結代、13bc:ボルト挿通部、14:第1締結具、14a:アンカーボルト、14b:ナット、15:第2締結具、15a:ボルト、15b:ナット、16:第3締結具、16a:ボルト、16b:ナット、20:仕切部材、21:中央板部、21a:管部、22:建屋側取付部、22a:管部、22b:ボルト孔、22c:軸部、23:敷居側取付部、23a:管部、23b:ボルト孔、23c:軸部、24:アンカーボルト(建屋側締結具)、25:ボルト(敷居側締結具)、26:軸(建屋側回転部)、27:軸(敷居側回転部)、30:モルタル、31:三方枠、A:乗場敷居装置。

Claims (11)

  1.  建屋に設けられ乗りかごが昇降する昇降路と、前記建屋の昇降路側に設けられた乗り場開口と、この乗り場開口の下縁に沿って設けられ乗場ドアの開閉を案内する乗場敷居と、前記建屋の昇降路壁に固定され、上部に前記乗場敷居を取り付けた固定具を備えているエレベータの乗場敷居装置であって、
     前記乗場敷居と前記昇降路壁の間の間隙を塞ぐ仕切部材を備え、
     前記仕切部材は、中央板部と、前記中央板部の一端側に設けられた建屋側取付部と、前記中央板部の他端側に設けられた敷居側取付部と、前記中央板部と前記建屋側取付部とを回転可能に固定する建屋側回転部と、前記中央板部と前記敷居側取付部とを回転可能に固定する敷居側回転部を備え、更に
     前記建屋側取付部を前記建屋に固定する建屋側締結具と、前記敷居側取付部を前記乗場敷居に固定する敷居側締結具を備える
     ことを特徴とするエレベータの乗場敷居装置。
  2.  請求項1に記載のエレベータの乗場敷居装置において、
     前記仕切部材の建屋側取付部は、前記建屋側締結具により建屋の昇降路壁に固定され、前記敷居側取付部は敷居側締結具により前記乗場敷居の下面に取り付けられていることを特徴とするエレベータの乗場敷居装置。
  3.  請求項1に記載のエレベータの乗場敷居装置において、
     前記仕切部材は、エレベータで搬送可能な許容最大荷重の重量物が通過しても前記仕切部材の変形が許容値以内に収まるように前記仕切部材の厚さまたは強度が決められていることを特徴とするエレベータの乗場敷居装置。
  4.  請求項2に記載のエレベータの乗場敷居装置において、
     前記仕切部材は、前記中央板部の一端側に軸を介して前記建屋側取付部を回動自在に取り付け、前記中央板部の他端側にも軸を介して前記敷居側取付部が回動自在に取り付けられていることを特徴とするエレベータの乗場敷居装置。
  5.  請求項1に記載のエレベータの乗場敷居装置において、
     前記仕切部材の敷居側取付部は、左右方向の全範囲に亘って前記乗場敷居と接するように構成され、前記建屋側取付部は、前記昇降路壁と接する左右方向の全範囲に亘って前記昇降路壁と接するように構成されていることを特徴とするエレベータの乗場敷居装置。
  6.  請求項1に記載のエレベータの乗場敷居装置において、
     前記仕切部材の敷居側取付部と前記乗場敷居との間に形成される隙間、または前記建屋側取付部と前記昇降路壁との間に形成される隙間を塞ぐ部材を設けていることを特徴とするエレベータの乗場敷居装置。
  7.  請求項4に記載のエレベータの乗場敷居装置において、
     前記仕切部材の中央板部の両側にはそれぞれ前記軸が貫通する管部が複数個づつ設けられ、前記建屋側取付部と前記敷居側取付部には、それぞれ、前記中央板部と連結される側で中央板部の前記管部と干渉しない位置に、前記軸が貫通する管部を複数個設けていることを特徴とするエレベータの乗場敷居装置。
  8.  請求項7に記載のエレベータの乗場敷居装置において、
     前記建屋側締結具はアンカーボルトで、前記敷居側締結具はボルトであり、
     前記仕切部材の前記建屋側取付部には、長手方向に前記アンカーボルトを通すための複数個のボルト孔が設けられ、前記敷居側取付部には、長手方向に前記ボルトを通すための複数個のボルト孔が設けられていることを特徴とするエレベータの乗場敷居装置。
  9.  請求項7に記載のエレベータの乗場敷居装置において、
     前記仕切部材は、中央板部の両側には軸を挿入するための管部がそれぞれ複数個設けられ、建屋側取付部と敷居側取付部には、前記中央板部の管部と干渉しない位置に管部がそれぞれ複数個設けられ、前記建屋側取付部と敷居側取付部の管部には、前記中央板部の管部に挿入するための軸部がそれぞれ固定され、前記各軸部を中央板部の管部にそれぞれ挿入することにより、建屋側取付部と敷居側取付部を中央板部に対し回動自在に取り付けていることを特徴とするエレベータの乗場敷居装置。
  10.  請求項8に記載のエレベータの乗場敷居装置において、
     前記仕切部材の前記建屋側取付部及び前記敷居側取付部に設けられているボルト孔は、前記建屋側取付部または前記敷居側取付部の短手方向に長い長孔に形成されていることを特徴とするエレベータの乗場敷居装置。
  11.  建屋に設けられた昇降路を昇降する乗りかごと、前記乗りかごを昇降させる巻上機と、前記建屋の昇降路側に設けられた乗り場開口の下縁に沿って設けられ乗場ドアの開閉を案内するエレベータの乗場敷居装置を備えるエレベータ装置であって、
     前記エレベータの乗場敷居装置は請求項1~10の何れか1項に記載のエレベータの乗場敷居装置であることを特徴とするエレベータ装置。
PCT/JP2019/041129 2019-10-18 2019-10-18 エレベータの乗場敷居装置及びこれを備えたエレベータ装置 WO2021075053A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201980101159.3A CN114585580B (zh) 2019-10-18 2019-10-18 电梯的门厅地坎装置以及具备其的电梯装置
EP19948941.0A EP4046952B1 (en) 2019-10-18 2019-10-18 Elevator landing sill device and elevator device equipped with same
US17/769,351 US11866297B2 (en) 2019-10-18 2019-10-18 Elevator landing sill device and elevator device equipped with same
JP2021552080A JP7279181B2 (ja) 2019-10-18 2019-10-18 エレベータの乗場敷居装置及びこれを備えたエレベータ装置
PCT/JP2019/041129 WO2021075053A1 (ja) 2019-10-18 2019-10-18 エレベータの乗場敷居装置及びこれを備えたエレベータ装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/041129 WO2021075053A1 (ja) 2019-10-18 2019-10-18 エレベータの乗場敷居装置及びこれを備えたエレベータ装置

Publications (1)

Publication Number Publication Date
WO2021075053A1 true WO2021075053A1 (ja) 2021-04-22

Family

ID=75537768

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/041129 WO2021075053A1 (ja) 2019-10-18 2019-10-18 エレベータの乗場敷居装置及びこれを備えたエレベータ装置

Country Status (5)

Country Link
US (1) US11866297B2 (ja)
EP (1) EP4046952B1 (ja)
JP (1) JP7279181B2 (ja)
CN (1) CN114585580B (ja)
WO (1) WO2021075053A1 (ja)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS547649Y2 (ja) * 1973-04-25 1979-04-10
JPS5485728U (ja) * 1977-11-30 1979-06-18
JPS5526267B2 (ja) * 1976-06-09 1980-07-11
JPS5913635B2 (ja) * 1978-09-05 1984-03-30 三菱電機株式会社 エレベ−タ装置
JPS59199981A (ja) * 1983-04-26 1984-11-13 株式会社東芝 エレベ−タ乗場床
JP2009084029A (ja) 2007-10-02 2009-04-23 Hitachi Building Systems Co Ltd エレベータの乗場敷居装置
KR101553220B1 (ko) * 2014-04-01 2015-09-16 (주)조은엔터프라이즈 엘리베이터 도어 씰 구조

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1051945A (en) * 1912-10-29 1913-02-04 Bernard Baumann Safety device for elevators.
US2120081A (en) * 1935-01-02 1938-06-07 Elisha E Alexander Elevator plate mechanism
US2739354A (en) * 1952-06-12 1956-03-27 Lewis J Pope Elevator door bridge
JPS595024Y2 (ja) * 1976-02-12 1984-02-15 三菱電機株式会社 エレベ−タ乗場の堰板
JPS5950898B2 (ja) 1977-06-17 1984-12-11 松下精工株式会社 ヒ−トポンプ空気調和機の制御回路
JPS5485728A (en) 1977-12-20 1979-07-07 Canon Inc Image forming device
US4579503A (en) * 1983-11-02 1986-04-01 Leyman Manufacturing Corp. Sideloader elevator platform
JP2713013B2 (ja) * 1992-03-27 1998-02-16 三菱電機株式会社 エレベーター用敷居の取付構造
US7788854B2 (en) * 2002-09-03 2010-09-07 Harold S. Friedman Elevator entrance door sill pivotable into and out of elevator shaft via hinge connected support and alignment brackets
ATE480489T1 (de) * 2003-09-18 2010-09-15 Otis Elevator Co Aufzugsanordnung mit verlängerbarer schwelle
JP2013107768A (ja) * 2011-11-24 2013-06-06 Hitachi Ltd エレベーター装置
CN102602789B (zh) * 2012-03-27 2014-04-16 中国矿业大学 一种矿用电梯承接平台及承接方法
EP3031767B1 (en) * 2014-12-12 2021-08-25 Kone Corporation Elevator door sill
CN205802735U (zh) * 2016-04-13 2016-12-14 苏州捷菱快速电梯有限公司 一种用于安装电梯厅门地坎的支架
JP2018008809A (ja) * 2016-07-15 2018-01-18 株式会社日立製作所 乗りかご及びエレベーター装置
US9932171B1 (en) * 2016-10-18 2018-04-03 David R. Hall Bridging apparatus
CN206705471U (zh) * 2017-03-10 2017-12-05 西子电梯科技有限公司 一种可调式层门地坎组件
JP6388418B1 (ja) * 2017-06-23 2018-09-12 東芝エレベータ株式会社 エレベータ装置
JP6768630B2 (ja) * 2017-12-15 2020-10-14 株式会社日立ビルシステム エレベーター装置
CN108002191A (zh) * 2017-12-29 2018-05-08 东莞市凯勒帝数控科技有限公司 一种电梯用可调节高度的厅门挡泥板
CN207811030U (zh) * 2018-01-29 2018-09-04 杭州西奥电梯有限公司 一种电梯厅门挡泥板
US11034549B2 (en) * 2018-04-25 2021-06-15 Otis Elevator Company Gap-reducing sill assembly for an elevator car
US11066277B2 (en) * 2018-04-25 2021-07-20 Otis Elevator Company Gap-reducing sill assembly for an elevator car
KR102121690B1 (ko) * 2019-03-25 2020-06-10 장귀경 전단에 연장부재가 결합된 엘리베이터 홀 플로어 커버
JP2021116914A (ja) * 2020-01-29 2021-08-10 トヨタ自動車株式会社 無端金属ベルト
JP2023026801A (ja) * 2021-08-16 2023-03-01 株式会社日立製作所 エレベーターシステム及びエレベーターシステムの制御方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS547649Y2 (ja) * 1973-04-25 1979-04-10
JPS5526267B2 (ja) * 1976-06-09 1980-07-11
JPS5485728U (ja) * 1977-11-30 1979-06-18
JPS5913635B2 (ja) * 1978-09-05 1984-03-30 三菱電機株式会社 エレベ−タ装置
JPS59199981A (ja) * 1983-04-26 1984-11-13 株式会社東芝 エレベ−タ乗場床
JP2009084029A (ja) 2007-10-02 2009-04-23 Hitachi Building Systems Co Ltd エレベータの乗場敷居装置
KR101553220B1 (ko) * 2014-04-01 2015-09-16 (주)조은엔터프라이즈 엘리베이터 도어 씰 구조

Also Published As

Publication number Publication date
US11866297B2 (en) 2024-01-09
US20230339726A1 (en) 2023-10-26
JPWO2021075053A1 (ja) 2021-04-22
EP4046952A1 (en) 2022-08-24
EP4046952B1 (en) 2024-07-10
JP7279181B2 (ja) 2023-05-22
EP4046952A4 (en) 2023-06-28
CN114585580A (zh) 2022-06-03
CN114585580B (zh) 2023-06-09

Similar Documents

Publication Publication Date Title
CN109159852B (zh) 模块化居住舱室的安装方法
WO2021075053A1 (ja) エレベータの乗場敷居装置及びこれを備えたエレベータ装置
US20200346898A1 (en) Elevator landing door assembly and its installation method
JP2009084029A (ja) エレベータの乗場敷居装置
JP5888712B2 (ja) エレベータ装置
KR100941955B1 (ko) 엘리베이터의 권상기 설치구조와 케이지 조립체
JP7406630B2 (ja) エレベーター装置及びその三方枠の取付構造
JP7140918B2 (ja) エレベータの乗場敷居装置
WO2016125229A1 (ja) エレベータのフェッシャープレート、及びフェッシャープレートの組立方法
JP2011162325A (ja) エレベータのかご
JP4189382B2 (ja) 取外し可能なカバーを備えたエレベータシステムのための屋上用制御ユニット
JP2004250210A (ja) 機械室レスエレベータの制御装置
KR101803186B1 (ko) 층간소음방지장치
JP7534125B2 (ja) エレベーター及び乗り場ドア
JP6088353B2 (ja) エレベーターのフェッシャープレート
WO2022224395A1 (ja) 乗りかご及びエレベーター
WO2016006060A1 (ja) エレベータ装置及びエレベータ用パネル
WO2017221418A1 (ja) エレベータのかご室壁
JP2024069890A (ja) エレベータの保守装置
KR100923274B1 (ko) 엘리베이터의 권상기 설치구조와 케이지 조립체
WO2021124544A1 (ja) 乗りかご、エレベーター及び固定ブラケット
KR20100110704A (ko) 엘리베이터의 권상기 설치구조와 케이지 조립체
JP5146076B2 (ja) エレベータの乗場装置
JP2022071942A (ja) エレベーターの出入口装置
JP3061697U (ja) 出入口を複数持つエレベ―タ―

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19948941

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021552080

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019948941

Country of ref document: EP

Effective date: 20220518